federal capital territory
DESCRIPTION
Ministerial PlatformTRANSCRIPT
FEDERAL CAPITAL TERRITORY
ADMINISTRATION
MINISTERIAL PLATFORM
TO
COMMEMORATE NATIONAL DEMOCRACY DAY 2012
Presented by:
Senator Bala Abdulkadir Mohammed
Honourable Minister, FCT
17th May, 2012
MINISTERIAL P LATFORM FCT 1
OUTLINEMandate
Background
Situation analysis
Addressing the Challenges
Achievement/Impact:
1.0 Effective & efficient administrative framework: policies, roadmap, reforms,
2.0 Infrastructure development: Districts development, Satellite Town
development, Roads, Water supply, Urban Renewal
3.0 Social services: Education, Health care, Art & Culture, City management,
Social menace,
4.0 Wealth Creation and poverty reduction: Agriculture, micro credit scheme,
empowerment,
5.0 Safe and secure environment: Sanitation, Environment, Security
6.0 Investment Initiatives
7.0 Partnerships: Private Sector Participation, International Donors,
2MINISTERIAL P LATFORM FCT
MANDATEVision: “To be one of the top 20 capital cities in the
World by the year 2020 ”
Mission: “The provision of infrastructure, services and administration for the development of a first class Federal Capital Territory comparable to the
best in the world”
FCT Goals:
Goal 1: Provide, maintain infrastructure and utilities to the FCT residents
Goal 2: Reduce poverty through Economic Empowerment programs
Goal 3: Manage and promote a safe and beautiful Environment
Goal 4: Provide World class social services to FCT residents
3MINISTERIAL P LATFORM FCT
Location: Federal Capital Territory of Nigeria, Western Africa
Constituencies: 6 Area Councils
Total Area: 8,000 sq km (FCC 250 sq km)
Population: 2.5 million (Approx)
Literacy: 70%
Natural Resources: Coal, columbite, Tantalite, Granite, Precious Stones, Gem Stones
Climate: Dust haze, cold & dryness
Weather: Rainy & Dry seasons with brief harmattan;
Geographic Features: Lush vegetation and rich soil, Rivers, Hills, Mountains & Forest.
FCT GDP at around US$5 billion (National Bureau of Statistics)
BACKGROUND
FCT
4MINISTERIAL P LATFORM FCT
SITUATION ANALYSIS
On my assumption of duty as Minister of
FCT, I was confronted with the following
challenges: -
a chaotic and corrupt land administration
system,
abuse of mass housing programme,
endemic traffic congestion,
failing environmental orderliness,
threatening security situation,
inadequate transportation infrastructure &
services,
5MINISTERIAL P LATFORM FCT
SITUATION ANALYSIS
inadequate transportation
infrastructure & services,
Inadequate access to quality
education,
over stretched and inadequate health
facilities,
poor revenue collection,
over-lapping and duplication of
departmental responsibilities.
6MINISTERIAL P LATFORM FCT
7MINISTERIAL P LATFORM FCT
SITUATION ANALYSIS
8MINISTERIAL P LATFORM FCT
SITUATION ANALYSIS
ACHIEVEMENTS/IMPACTS (SERVICES)
9MINISTERIAL P LATFORM FCT
ADDRESSING THE CHALLENGES
The Reforms:
Roadmap for sustainable development of FCTA
Land administration reform
Parks & Recreation Policy
Restructuring & reorganization of FCTA
The Policies:
16 draft Bills in the National Assembly
Trade & Investment Policy
Land SWAP Model
Monitoring & Evaluation Policy
Re-establishment of Satellite Towns Development Agency (STDA)
Transformation Agenda
10MINISTERIAL P LATFORM FCT
ADDRESSING THE CHALLENGES
Roadmap for sustainable development of
FCTA
Land administration reform
Restructuring & reorganization of FCTA
Re-establishment of Satellite Towns
Development Agency (STDA)
11MINISTERIAL P LATFORM FCT
ROADMAP FOR STRATEGIC DEVELOPMENT
12MINISTERIAL P LATFORM FCT
LAUNCHING OF ACCELERATED
AREA COUNCIL TITLE REISSUANCE
SCHEME (AACTRIS)
Conversion of customary (Area Council) land titles to statutory titles saw the lunching of Accelerated Area Council Titles Reissuance Scheme (AACTRIS) on the 19th of December, 2011.
So far, the Project Implementation Committee has cleared 170 cases for issuance of Certificates of Occupancy with the hope of increasing this figure to 1000 in the shortest time.
ROADMAP FOR STRATEGIC DEVELOPMENT
13MINISTERIAL P LATFORM FCT
ROADMAP FOR STRATEGIC DEVELOPMENT
A APPOINTMENT,PROMOTION& DISCIPLINE
S/No. ACTIVITIES NO. OF
BENEFICIARIES
1 Promotion 2,020
2 Conversion of Staff 93
3 Recruitment of Staff 1,496
4 Proper placement 114
5 Provisional and Temporary appointments 104
Series of disciplinary cases were concluded in 2011 by the FCTA
senior Staff Disciplinary Committee.
Staff attendance are monitored across SDAs
This method has led to improvement in staff dedication to duty
14MINISTERIAL P LATFORM FCT
B MANPOWER PLANNING & DEVELOPMENT
1 International Training conducted for FCTA
staff
150
2 Local Training conducted for FCTA staff 3,000
3 In – Service Training 150
4 In –House Workshop 1,200
5 Payment of 1st 28th Days 638
6 Induction workshop 453
7 ICT Training Programme 50
8 Part – time training Programme 150
9 ICT Training for Teachers 1,200
ROADMAP FOR STRATEGIC DEVELOPMENT
15MINISTERIAL P LATFORM FCT
ACHIEVEMENTS/IMPACTS
1.0 Effective & efficient administrative framework: 1.1 4Nos. policies were adopted
1.2 Increased Internally Generated Revenue (IGR) by 35% over 2011
1.3 100% increase on Public Private Transactions under PPP
1.4 7Nos. Investment Initiatives were developed
1.5 140Nos. of stakeholder engagements conducted
1.6 Value ($4.6billion) of Foreign Direct Investment inflow into FCT
1.7 Drastic reduction in number of litigations
1.8 Upgrading of Satellite Town Infrastructure department to a Satellite Town Development Agency
16MINISTERIAL P LATFORM FCT
17MINISTERIAL P LATFORM FCT
INFRASTRUCTURE DEVELOPMENT
Primary Infrastructure
Rehabilitation and Expansion of Airport Expressway (Shehu
Musa Yar’Adua Expressway).
Rehabilitation and Expansion of Outer Northern Expressway
(Kubwa Road) Murtala Muhammed.
Extension of Inner Southern Expressway (ISEX) from Outer
Southern Expressway (OSEX) to Southern Parkway (S8/9).
Provision of Primary Road to Mass Housing (Arterial Road
S30), Abuja.
Completion of Roads B6/B12 and Circle Roads, Abuja Central
Area
Reconstruction of Lower Usuma Dam - Gurara Road Project
Abuja Rail Mass Transit Project (Lots 1&3) Phase 1
Tanks 1 & 6 and Associated Trunk mains
Construction of Phases 3 & 4 (20,000m3/hr) Lower Usuma
Dam Water Treatment Plants
18MINISTERIAL P LATFORM FCT
INFRASTRUCTURE DEVELOPMENT
District Infrastructure
Development of District I (Kagini) of Abuja North West
District, Phase iv FCC
Provision of Engineering Infrastructure to Wuye District
Provision of Engineering Infrastructure to Jahi District
Provision of Engineering Infrastructure to Mbora District
Idu District – Industrial Area IB Abuja Phase III
Provision of Engineering Infrastructure to Abuja
Technology Village (ATV), Abuja.
Karmo Residential District Infrastructure
Provision of Infrastructure to Maitama Extension
(Goodluck District)
Provision of Engineering Infrastructure to Guzape District
Lot II19MINISTERIAL P LATFORM FCT
INFRASTRUCTURE DEVELOPMENT
PPP Infrastructure Development
Initiatives
Land Swap Model
9 districts being embarked upon Ketti North, Sheretti, Ketti, Sherreti Chechi, Waru
Kpozaika, Burum, Burum West, Ketti East, and
Gwagwa Districts
Public Private Partnership (PPP)
4 districts being embarked upon
Durumi, Mabushi, Kado, Gwarinpa I
Industrial Park
Idu Industrial Park development
20MINISTERIAL P LATFORM FCT
INFRASTRUCTURE DEVELOPMENT
District Layout
21MINISTERIAL P LATFORM FCT
INFRASTRUCTURE DEVELOPMENT
GUZAPE
DISTRICTKAGINI
KARMO
JAHI
WUYE
IDU
ATV
MBORA
MAITAMA EXT.
REHABILITATION AND EXPANSION OF
AIRPORT EXPRESSWAY LOTS I
• Contractor: M/S Julius Berger Nig. Plc.
• Contract Sum:
Lot I: N59,223,254,545.70
• Award: 11th May, 2009
• Commencement: 13th May, 2009
• Completion: : 2013
• Scope of Work:- 10 lanes Expressway 14km length of road work
- 21 Nos. bridges
- 147 Nos. Culverts
- 2 Nos. clover leaf interchange s
- 3 Nos. Pedestrian Bridges and lay-by
- 47km length of Storm Water drainage
- 100 km Power Supply
- 1640 Nos. Street lighting
- 14 km length of Telecommunication Ducts
ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)ROAD INFRASTRUCTURE
22MINISTERIAL P LATFORM FCT
ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)
REHABILITATION AND EXPANSION OF AIRPORT
EXPRESSWAY LOTS I & II
LOT I
• Progress Status: 60%
• Achievement (May 2011-May 2012): 19%
• Achievement (May 2011-May 2012):
15%
Impact of the Project: The travel time has reduced
tremendously between the City and Airport
ROAD INFRASTRUCTURE
23MINISTERIAL P LATFORM FCT
REHABILITATION AND EXPANSION OF
AIRPORT EXPRESSWAY LOTS II
• Contractor: M/S Julius Berger Nig. Plc.
• Contract Sum:
Lot II: N49,200,892,508.15
• Award: 11th May, 2009
• Commencement: 13th May, 2009
• Completion: : 2013
• Scope of Work:- 10 lanes Expressway 12.5km length of road
work
- 9 Nos. bridges
- 147 Nos. Culverts
- 1 No. clover leaf interchanges
- 3 Nos. Pedestrian Bridges and lay-by
- 37km length of Storm Water drainage
- 99km Power Supply
- 1748 Nos. Street lighting
- 12.5 km length of Telecommunication Ducts
ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)ROAD INFRASTRUCTURE
24MINISTERIAL P LATFORM FCT
ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)
REHABILITATION AND EXPANSION OF
AIRPORT EXPRESSWAY LOTS II
LOT II
• Progress Status: 90%• Achievement (May 2011-May 2012):
15%
Impact of the Project: The travel time has
reduced tremendously between the City and
Airport
ROAD INFRASTRUCTURE
25MINISTERIAL P LATFORM FCT
Rehabilitation and Expansion of Outer Northern
Expressway (ONEX) (Kubwa Rd) Lot I
• Contractor: Lot I: M/S Dantata & Sawoe
• Contract Sum:
Lot I: N66,830,910,468.75
• Award: 7th May, 2009
• Commencement: May, 2009
• Completion: : 2013
• Scope of Work:
- 39km length of 10 lanes Expressway
- 2 Nos. bridges
- 35 Nos. Culverts
- 2 Nos. clover leaf interchanges
- 5 Nos. Pedestrian Bridges and lay-by
- Storm Water drainage
- Power Supply
-. Street lighting
- 19 km length of Telecommunication Ducts
ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)ROAD INFRASTRUCTURE
Lot I
26MINISTERIAL P LATFORM FCT
Rehabilitation and Expansion of Outer Northern
Expressway (ONEX) (Kubwa Rd) Lot I
- Construction of concrete Gallery
- Pedestrian Bridges and lay-by
- Storm Water drainage
- Power Supply and Street lighting
- Telecommunication Ducts
LOT I
• Progress Status: 81%
• Achievement (May 2011-May 2012): 20%
Impact of the Project: The travel time has
reduced tremendously between the City,
Kubwa and Zuba.
ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)ROAD INFRASTRUCTURE
27MINISTERIAL P LATFORM FCT
Lot I
Rehabilitation and Expansion of Outer Northern
Expressway (ONEX) (Kubwa Rd) Lot II
• Contractor: Lot II: M/S CGC Nig. Ltd
• Contract Sum:
Lot II: N81,914,280,462.40
• Award: 7th May, 2009
• Commencement: May, 2009
• Completion: : 2013
• Scope of Work:
- 20.25km length of 10 lanes Expressway
- 21 Nos. Box Culverts
- 4 Nos. interchanges
- 6 Nos. Pedestrian Bridges
- 84 Nos. Storm Water drainage
- 20.35km of Power Supply and Street lighting
- 20km length of Telecommunication Ducts
- Concrete gallery
ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)ROAD INFRASTRUCTURE
28MINISTERIAL P LATFORM FCT
Lot II
Rehabilitation and Expansion of Outer Northern
Expressway (ONEX) (Kubwa Rd) Lot II
- Construction of concrete Gallery
- Pedestrian Bridges and lay-by
- Storm Water drainage
- Power Supply and Street lighting
- Telecommunication Ducts
LOT II
• Progress Status: 80%
• Achievement (May 2011-May 2012): 22%
Impact of the Project: The travel time has
reduced tremendously between the City,
Kubwa and Zuba.
ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)ROAD INFRASTRUCTURE
Lot II
29MINISTERIAL P LATFORM FCT
CONSTRUCTION OF SOUTHERN PARKWAY FROM
INNER SOUTHERN EXPRESSWAY (ISEX) TO RING
ROAD I (RRI)
• Contractor: M/s Setraco Nig. Ltd
• Contract Sum: N53,333,27,967.71
• Award: 13/12/2010
• Commencement: January, 2011
• Completion: : July, 2013
• Scope of Work:
- Site Clearance and Earthworks
- Surface water Drainages
- Road works
- Bridge Works
- Culverts
- Power Supply and Streetlight
- Conduits for Post and Telecommunication
- Water supply
• Progress Status: 12%
• Achievement (May 2011-May 2012): 12% Impact of the Project: Reduction of traffic
congestion within the Southern part of the City.
ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)ROAD INFRASTRUCTURE
30MINISTERIAL P LATFORM FCT
ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)
EXTENSION OF INNER SOUTHERN
EXPRESSWAY (ISEX) FROM OUTER
SOUTHERN EXPRESSWAY (OSEX) TO
SOUTHERN PARKWAY (S8/S9)
• Contractor: M/S Salini Nig. Ltd
• Contract Sum: N13,385,719,204.51
• Award: 11/01/2010
• Commencement: 20th January, 2010
• Completion: December, 2013
• Scope of Work:
- 3.8km length of 10 lanes Expressway
- Construction of two (2) under pass bridges
- Construction of one (1) Flyover
ROAD INFRASTRUCTURE
31MINISTERIAL P LATFORM FCT
ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)
EXTENSION OF INNER SOUTHERN
EXPRESSWAY (ISEX) FROM OUTER SOUTHERN
EXPRESSWAY (OSEX) TO SOUTHERN
PARKWAY (S8/S9)
- 1.4km length of Storm Water drainage
- Power Supply and Street lighting
- 3.2km length of Telecommunication Ducts
- 2 No box culverts
- 1 No pedestrian bridge
• Progress Status: 56%
• Achievement (May 2011-May 2012): 36%
Impact of the Project: Reduce/eliminate
traffic congestion that is presently
experienced from North – eastern part of the
Country into the territory (AYA – Junction).
ROAD INFRASTRUCTURE
32MINISTERIAL P LATFORM FCT
ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)
PROVISION OF PRIMARY ROAD TO MASS
HOUSING (ARTERIAL ROAD S.30), ABUJA
• Contractor: M/S Exsa Nig Ltd
• Contract Sum: N6,533,496,888.19
• Award: 30/12/2010
• Commencement: March, 2011
• Completion: : 2013
• Scope of Work:
- 9.72km length of Road
- 3 No 3 Cell 3x3 Box Culverts
- 1 No 2 Cell 2x2 Box Culverts
- 12km length of Storm Water
Drainage pipes
ROAD INFRASTRUCTURE
33MINISTERIAL P LATFORM FCT
PROVISION OF PRIMARY
ROAD TO MASS HOUSING
(ARTERIAL ROAD S.30), ABUJA
• Progress Status: 20%
• Achievement (May 2011-May
2012): 20%
Impact of the Project: Reduction
in travel time
ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)PRIMARY INFRASTRUCTURE
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
SITE CLEARANCE
EARTHWORKS SURFACE WATER
DRAINAGE
CULVERT WORKS
ROAD WORKS
OUTSTANDING WORKS
ACHIEVEMENT TO DATE
34MINISTERIAL P LATFORM FCT
COMPLETION OF ROADS B6, B12 & CIRCLE
ROAD, ABUJA CENTRAL AREA
• Contractor: M/S Julius Berger Nig. Plc
• Contract Sum: N66,831,381,113.01
• Award: 14/05/2007
• Commencement: 28th May, 2007
• Completion: 2014
• Scope of Work:
- Site Clearance and Earthworks
- Surface water Drainages
- Road works
- Bridge Works
- Retaining walls
ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)ROAD INFRASTRUCTURE
35MINISTERIAL P LATFORM FCT
COMPLETION OF ROADS B6, B12 &
CIRCLE ROAD, ABUJA CENTRAL
AREA
- Interchange Structure
- Culverts
- Power Supply and Streetlight
- Conduits for Post and
Telecommunication
• Progress Status: 47%
• Achievement (May 2011-May 2012): 5%
Impact of the Project: Reduction in
travel time
ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)ROAD INFRASTRUCTURE
36MINISTERIAL P LATFORM FCT
ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)ROAD INFRASTRUCTURE
37MINISTERIAL P LATFORM FCT
RECONSTRUCTION OF LOWER USUMA
DAM – GURARA DAM-JERE ROAD
PROJECT
• Contractor: M/S SCC Nig Ltd
• Contract Sum: N13,840,383,768.75
• Award: 9/02/2011
• Commencement: 23rd March, 2011
• Completion: 23rd Sept. 2012
• Scope of Work:
- 72km length of Road
- 10 Nos. Culverts
- 144km length of Storm Water
Drainage
ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)ROAD INFRASTRUCTURE
38MINISTERIAL P LATFORM FCT
RECONSTRUCTION OF LOWER USUMA
DAM – GURARA DAM ROAD PROJECT
• Progress Status: 60%
• Achievement (May 2011-May 2012):
60%
Impact of the Project: Creates an
alternative route for movement out of
the City from Abuja to Kaduna
ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)
EXTENSION OF INNER SOUTHERN
EXPRESSWAY (ISEX) FROM
OUTER SOUTHERN EXPRESSWAY
(OSEX) TO SOUTHERN PARKWAY
(S8/S9)
• Contractor: M/S Salini Nig. Ltd
• Contract Sum: N13,385,719,204.51
• Award: 11/01/2010
• Commencement: 20th January, 2010
• Completion: : December, 2013
• Scope of Work:
- 10 lanes Expressway
- Construction of two (2) under pass bridges
- Construction of one (1) full clover leaf
interchange
ROAD INFRASTRUCTURE
39MINISTERIAL P LATFORM FCT
ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)
EXTENSION OF INNER SOUTHERN
EXPRESSWAY (ISEX) FROM OUTER
SOUTHERN EXPRESSWAY (OSEX) TO
SOUTHERN PARKWAY (S8/S9)
- One (1 ) diamond interchange
- Storm Water drainage
- Power Supply and Streetlighting
- Telecommunication Ducts
• Progress Status: 56%
• Achievement (May 2011-May 2012): 36%
Impact of the Project: Reduce/eliminate
traffic congestion that is presently
experienced from North – eastern part of
the Country into the territory (AYA –
Junction).
ROAD INFRASTRUCTURE
40MINISTERIAL P LATFORM FCT
CONSTRUCTION OF TANKS 1 & 6 AND
ASSOCIATEDTRUNK MAINS
• Contractor: M/S M/S Sarplast (W.A)
Ltd
• Contract Sum: N22,892,354,814.20
• Award: 29/08/2006
• Commencement: 11th October, 2006
• Completion: 2014
• Scope of Work:
- construction of two (2) No. 40,000m3
capacity reinforced concrete
Tanks
ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)WATER INFRASTRUCTURE
CONSTRUCTION OF TANK 6 IN
PROGRESS
41MINISTERIAL P LATFORM FCT
CONSTRUCTION OF TANKS 1 & 6
AND ASSOCIATEDTRUNK MAINS
- Laying of Ductile Iron pipes
(1000mm to 1400mm diameter)
• Progress Status: 32%
• Achievement (May 2011-May 2012): 10%
Impact of the Project: Job creation
ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)WATER INFRASTRUCTURE
CONSTRUCTION OF TANK 1 IN
PROGRESS
LAYING OF PIPES
42MINISTERIAL P LATFORM FCT
CONSTRUCTION OF PHASES 3 & 4
(20,000M3/HR) LOWER USUMA DAM
WATER TREATMENT PLANTS
PROJECT.
• Contractor: M/S Biwater Nig. Ltd
• Contract Sum: N18,093,697,840.57
• Award: 14/07/2005
• Commencement: 5th August, 2005
• Completion: 2012
• Scope of Work:
- Construction of four (4No.) identical
water treatment modules, 5,000m3/hr
each.
ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)WATER INFRASTRUCTURE
43MINISTERIAL P LATFORM FCT
CONSTRUCTION OF PHASES 3 & 4
(20,000M3/HR) LOWER USUMA DAM
WATER TREATMENT PLANTS
PROJECT.
• Progress Status: 96%
• Achievement (May 2011-May 2012):10%
Impact of the Project: Job creation
ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)WATER INFRASTRUCTURE
44MINISTERIAL P LATFORM FCT
ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)
2.1.1 Development of District 1 of Abuja North
West District, phase IV, FCC
• Contractor: M/S Salini Nig. Ltd
• Contract Sum: N52,609,879,284.47
• Award: 30/12/2010
• Commencement: 7th March, 2011
• Completion: 7th March, 2015
• Scope of Work:
The scope of works involve provision
of complete Engineering Infrastructure to
the District as follows:
- Site Clearance and Earthworks
- Road Works
- Interchanges (Flyover): 2 No
DISTRICT INFRASTRUCTURE
45MINISTERIAL P LATFORM FCT
- Box Culverts: 23 Nos.
- Storm Water Drainage of about 71.93Km of
pipes
- Foul Sewer of about 85.12Km of pipes
- Water Supply of about 95.54Km of pipes
- Power Supply and Street lighting
- Telecommunication Ducts
• Progress Status: 5%
• Achievement (May 2011-May 2012): 5%
• Impact of the Project: Provide access to 1000
commercial and Residential Plots and improve
the socio-economic well being of the residents
of FCC.
ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)
2.1.1 DEVELOPMENT OF DISTRICT 1 (KAGINI) CONTD
DISTRICT INFRASTRUCTURE
46MINISTERIAL P LATFORM FCT
2.1.2 PROVISION OF ENGINEERING
INFRASTRUCTURE TO WUYE DISTRICT,
ABUJA.
• Contractor: Arab Contractors (OAO) Nig. Ltd
• Contract Sum: N39,681,137,736.47
• Award: 21/8/09
• Commencement: 23rd September, 2009
• Completion: : 23rd January, 2013
• Scope of Work:
- Road works of about 34km.
- 2Nos of bridges
- 5Nos. box culverts
- 2 Nos. of pipe culvert
- 54km length of water drainage system.
- 30km Waste Water Drainage Network.
ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)DISTRICT INFRASTRUCTURE
47MINISTERIAL P LATFORM FCT
- 52km length water supply network
- Power supply – 2 Nos. 33/11KV electrical
Injection Substations, 220km cables and street
lighting.
- 22km length of telecommunication ducts.
• Progress Status: 45%
• Achievement (May 2011-May 2012): 11%
• Impact of the Project: Provide access to 1700
commercial and Residential Plots and improve
the socio-economic well being of the residents
of FCC
2.1.2 PROVISION OF ENGINEERING
INFRASTRUCTURE TO WUYE DISTRICT,
ABUJA.
ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)
DISTRICT INFRASTRUCTURE
48MINISTERIAL P LATFORM FCT
ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)
2.1.3 PROVISION OF ENGINEERING
INFRASTRUCTURE TO JAHI DISTRICT
• Contractor: M/S Gilmor Nig. Ltd
• Contract Sum: N39,681,137,736.47
• Award: 21/8/09
• Commencement: 23rd September, 2009
• Completion: : 23rd January, 2013
• Scope of Work:
55km of Site Clearance & Earthworks
(244.36Ha)
55km of road works
Construction of 41 Nos. Reinforced concrete
box Culverts .
DISTRICT INFRASTRUCTURE
49MINISTERIAL P LATFORM FCT
87km of water supply network
89km storm water drainage system
75.43km of sewage drainage system
2No. 33kv/11kv injection substations
100km Telecommunication ducts
200km of Electrical power supply cables
2385 Nos. Street lighting poles
River Training/Channelization.
• - Progress Status: 45%
• Achievement (May 2011-May 2012): 11%
• Impact of the Project: Provide access to 200
commercial and Residential Plots and improve the
socio-economic well being of the residents of FCC
ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)
2.1.3 PROVISION OF ENGINEERING
INFRASTRUCTURE TO JAHI DISTRICT
DISTRICT INFRASTRUCTURE
50MINISTERIAL P LATFORM FCT
ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)
2.1.4 PROVISION OF PRIMARY ENGINEERING
INFRASTRUCTURE TO MBORA DISTRICT PHASE I.
DISTRICT INFRASTRUCTURE
51MINISTERIAL P LATFORM FCT
• Contractor: M/S Sammya Nigeria Limited
• Contract Sum: N6,664,244,869.17
• Award: 09/02/2011
• Commencement: 14th February, 2011
• Completion: : February, 2014
• Scope of Work:
- 23.55km Road Works
- 3 Nos. Box Culverts
- 14.029km length of Storm Water Drainage
- 9.022km length of Foul Sewer
- 4.8km length of Water Supply network
- Power Supply and Street lighting
- 9.248km Telecommunication Ducts
ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)
2.1.4 PROVISION OF PRIMARY ENGINEERING INFRASTRUCTURE TO MBORA DISTRICT PHASE I.
• Progress Status: 8%
• Achievement (May 2011-May 2012): 8%
• Impact of the Project: Provide access
to commercial and Residential Plots
and improve the socio-economic well
being of the residents of FCC.
DISTRICT INFRASTRUCTURE
52MINISTERIAL P LATFORM FCT
IDU DISTRICT – INDUSTRIAL AREA 1B –
ABUJA PHASE III
Design and Construction of the District
Infrastructures• Contractor: M/S Salini Nig. Ltd
• Contract Sum: N6,093,230,212, E186,523,176.33
• Award: 29/01/2002
• Commencement:13th September, 2003
• Completion: : 2014
• Scope of Work:
ROADS NETWORK OF VARIOUS CATEGORIES: Arterials Stot: 7.82 Km Collectors Stot: 3.98 Km Locals Stot: 8.92 Km
4 LORRY PARKS
4 BRIDGES
CULVERTS
Box and Pipe Total Length: 1,340 m
ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)DISTRICT INFRASTRUCTURE
53MINISTERIAL P LATFORM FCT
IDU DISTRICT – INDUSTRIAL AREA 1B – ABUJA PHASE
III CULVERTS
Box and Pipe Total Length: 1,340 m
Storm Water Underground Drainage System Total Length
(PVC+R/C): 46,060 m
District Foul Sewer Drainage System Total Length (PVC+R/C):
29,994m
Water Supply Distribution Network Total Length: 34,394 m
ELECTRICAL WORKS:
2 Substations 33/11 KV 108 Local Substations 11/0.415 KVA (Transformers) 70.265m of Power Supply Distribution Network 810 Street Lighting Poles 35,471m Street Lighting Network
70,800m of telecommunication ducts
1 mini sewage treatment plant
• Progress Status: 68%
• Achievement (May 2011-May 2012): 16%
• Impact of the Project: Provide access to 240 commercial and
Industrial Plots and improve the socio-economic well being of the
residents of FCC and employment to about 500 Nigerians.
ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)DISTRICT INFRASTRUCTURE
54MINISTERIAL P LATFORM FCT
PROVISION OF ENGINEERING INFRASTRUCTURE TO
ABUJA TECHNOLOGY VILLAGE (ATV), ABUJA.
• Contractor: M/S Gilmor Engineering (Nig) Ltd.
• Contract Sum: N20,873,175,507.00
• Award: 24th May, 2007
• Commencement: 8th June, 2007
• Completion: : 2014
• Scope of Work:
- 33km length of Road works
- 25km length of Surface water Drainages
- 37km length of foul sewerage
- 67.2 km length of water supply networks
- 2 Nos. 5000m3 elevated storage tanks
- 1 No. 4,000m3 ground storage tank
- 20.13km gas pipeline
- Bridge Works
- Retaining walls
- Interchange Structure
- Culverts
- 57km length of Power Supply cables
- 1,339 Nos. of Streetlight
- 1 No. 33/11kva injection substation
- 133km Telecommunication ducts
ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)DISTRICT INFRASTRUCTURE
55MINISTERIAL P LATFORM FCT
ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)DISTRICT INFRASTRUCTURE
56MINISTERIAL P LATFORM FCT
PROVISION OF ENGINEERING
INFRASTRUCTURE TO ABUJA TECHNOLOGY
VILLAGE (ATV), ABUJA.
• Progress Status: 58%
• Achievement (May 2011-May 2012): 12%
Impact of the Project: Enhancing the kick starting of
ATV free zone site activities, provision of access
and primary Engineering Infrastructure to over 350
plots, Provision of Employment to over 350
Nigerians.
KARMO RESIDENTIAL DISTRICT
INFRASTRUCTURE • Contractor: M/S SCC (Nig) Ltd
• Contract Sum: N14,216,597,391.56
+
E251,453,895.213
• Award: 29/02/2002
• Commencement: September, 2003
• Completion: : 2014
• Scope of Work:- 99.72km length Road Works
- 1.06km length of Box Culverts
- 38.91km Storm Water Drainage pipes
- 48.51km Foul Sewer pipes
- 44.61km Water Supply networks
- 123.91km Power Supply and
- 1053 Nos. of Street lighting poles
- 2 Nos. injection sub-stations
- 41km Telecommunication Ducts
ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)DISTRICT INFRASTRUCTURE
57MINISTERIAL P LATFORM FCT
ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)
KARMO RESIDENTIAL DISTRICT
INFRASTRUCTURE
Progress Status: 85%
Achievement (May 2011-May 2012): 15%
Impact of the Project: Provide access to
272 Residential Plots and improve the
socio-economic well being of the residents
of FCC.
DISTRICT INFRASTRUCTURE
58MINISTERIAL P LATFORM FCT
ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)
PROVISION OF ENGINEERING
INFRASTRUCTURE TO
MAITAMA EXTENSION (GOODLUCK
DISTRICT)
• Contractor: M/S Mangrovetech Nig. Ltd
• Contract Sum: N23,650,000,000
• Award: 4th May, 2011
• Commencement: 7th July, 2011
• Completion: : 2014
• Scope of Work:- 21km length of Road of various types.
- 1No. interchange structure
- 3Nos. Bridges
- 26.4km length of storm water line of various
sizes.
- 31.8km length of foul sewer line of various sizes.
- 38.7km length of water supply line
- 1 No. booster pump station
DISTRICT INFRASTRUCTURE
59MINISTERIAL P LATFORM FCT
ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)
PROVISION OF ENGINEERING INFRASTRUCTURE
TO
MAITAMA EXTENSION DISTRICT
- 1000m3 clean water reservoir.
- Network of electricity distribution
- 1 No. 33KV/11KV injection substation.
- Street lighting
- telecommunication ducts
• Progress Status: 10%
• Achievement (May 2011-May 2012): 10%
• Impact of the Project: Provide access to 186
commercial and Residential Plots and improve the
socio-economic well being of the residents of FCC.
DISTRICT INFRASTRUCTURE
60MINISTERIAL P LATFORM FCT
ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)
PROVISION OF ENGINEERING INFRASTRUCTURE
TO GUZAPE DISTRICT, LOT II
• Contractor: M/S Gilmor Engineering
(Nig) Ltd.
• Contract Sum: N13,179,573,398.12
+
E130,461,116.78
• Award: 7/03/2003
• Commencement: 10th December, 2003
• Completion: : 2014
• Scope of Work:
- 30.8km length of Road Works
- 22 Nos. Box Culverts
- 33km length of Storm Water Drainage pipes
- 53km length of Foul Sewer pipes
DISTRICT INFRASTRUCTURE
61MINISTERIAL P LATFORM FCT
ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)
PROVISION OF ENGINEERING
INFRASTRUCTURE TO GUZAPE DISTRICT,
LOT II
- - 33.5km length of Water Supply Networks
- 163km of Power Supply cables
- 50km length of Telecommunication Ducts
- 1 No. 33/11kva injection sub-station
• Progress Status: 85%
• Achievement (May 2011-May 2012): 10%
• Impact of the Project: Provide access to 350
commercial and Residential Plots and
improve the socio-economic well being of the
residents of FCC.
DISTRICT INFRASTRUCTURE
LANDMARK ACHIEVEMENT
AS OF YEAR ENDING MAY
2011SITE
CLEARA
NCE
AND
EARTH
WORKS
SURFAC
E
WATER
DRAINA
GE
LANDMARK ACHIEVEMENT
AS OF YEAR ENDING MAY
2012
SITE
CLEARA
NCE AND
EARTHW
ORKS
SURFACE
WATER
DRAINAG
E
ROAD
WORKS
62MINISTERIAL P LATFORM FCT
ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)RAIL INFRASTRUCTURE
63MINISTERIAL P LATFORM FCT
Abuja Rail Mass Transit Project
Phase Ⅰ (Lots 1&3)
Contractor - M/s China Civil
Engineering Construction
Corporation (CCECC) Nig Ltd.
Contract Sum – US$841Million
Award – 27 May 2007
Commencement - May 2009
New Completion date - 2015
Scope - Detailed design and
construction of 60.67km of standard
gauge double track rail
Abuja Rail Mass Transit Project
Phase Ⅰ (Lots 1&3)
Progress status: 22%
Achievement (May 2011 – May 2012): 1%
Signing of Chinese Loan Agreement
of $500million
Impact: 430 jobs created
ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)RAIL INFRASTRUCTURE
64MINISTERIAL P LATFORM FCT
ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)SATELLITE TOWNS INFRASTRUCTURE
65MINISTERIAL P LATFORM FCT
District Infrastructure Projects
Regional (Link) Road Projects
Rural Road Projects
Township Roads
Future focus:
Private Sector participation in
housing development
Designate districts in the Area
Councils as affordable housing
STDA to provide site and
services
Provision of Engineering Infrastructure to
Kubwa Satellite Town (Districts 4 & 5)Contractor: Messrs SCC Nig Ltd.
Contract Sum: N 18,884,104,962.39
Revised Contract Sum: N 42,683,490,832.51
Award: 7th March, 2007
Date of Revision: November, 2011
Commencement: May, 2007
Completion: 24 Months from Date of revision
Scope of Work: Road-94km, Culvert-19.70km, U-
channel Concrete Line Drain-41km, Stone
Pitched drains - 463, 539m2, Water line -17km and
Electricity – 11KV line -59.59km, LT line – 86.46kmof LT line
Progress Status: 43%
Achievement (May 2011-May 2012): 6%
Impact of the Project:
Ready access to about 2,300 plots for development of
Building Structures
Movement of people from Federal capital City to
KubwaSatellite Town.
ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)SATELLITE TOWNS INFRASTRUCTURE
66MINISTERIAL P LATFORM FCT
Bwari Satellite Town (Districts 1 & 2) Contractor: Messrs Arab Contractors O.A.O. Nigeria Limited
Contract Sum: N13,131,947,653.56
Award: 26th November, 2006
Commencement: 27th February, 2007
Completion: 26th November, 2008 but this has not been
tenable due Poor cash flow.
Scope of Work: Provision of 26km of Road, 3Nos. Bridges, 7Nos.
Box Culverts, Drains and Pipe Culverts, Water Supply & Power
Supply.
Progress Status: 58%
Achievement (May 2011-May 2012): 22%
- 15% Length of Road Completed
Power substation Completed
3Nos. Bridges Completed
4Nos. Box Culverts Completed
20% of Open Concrete Line Drain Completed
25% of Pipe Culverts Completed
Impact of the ProjectEmployment Creation
Rural - Urban Migration reduced.
Services to 2,656 of plots and ready for building developers.
Growth of cottage industries as a result of improved power
reticulations.
ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)SATELLITE TOWNS INFRASTRUCTURE
67MINISTERIAL P LATFORM FCT
ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)SATELLITE TOWNS INFRASTRUCTURE
68MINISTERIAL P LATFORM FCT
Provision of Engineering Infrastructure to Karshi
Satellite Town (Districts 1&2), FCT.Contractor: Messrs SCC (Nig) Limited
Contract Sum: N11,520,240,993.12
Revise Contract Sum: N28,220,048,498.00
Date of Award: 7th March, 2007
Date of Revision: 24th November, 2011
Date of Commencement: June, 2007
Date of Completion: 24th November, 2013
Scope of Work: Roads 42km Culverts 3.67km, U
Shape Concrete side drains 68km, Water
line 38.57km, Electrical Reticulation
Progress Status: 40.10%
Achievement (May 2011-May, 2012): 5%
Impact of the Project:
provide access to about 390 plots for the development
of building structure
Movement of people from the Federal Capital City to
Karshi Satellite Town.
ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)SATELLITE TOWNS INFRASTRUCTURE
69MINISTERIAL P LATFORM FCT
Provision of Roads, Water and Electricity Supply to the Resettlement site of Galuwyi/Shere
Contractor: M/S Parsons Science Engineering Company Limited
Contract Sum: N6, 050,071,212.9 (Phase 1)
Award: 3rd December 2010
Commencement: 14th January 2011
Completion: October 2013
Scope of works: Construction of 17km network of asphalt surface finished road, laying of 700m of 20mm UPVC pipe, provision and installation of 508 high and low tension poles and
installation of transformers.
Progress status: 16%
Achievement (May 2011 – May 2012: 13%
8km network of roads completed up-to Sub- base level, 3km completed up-to formation level and 165m length of concrete pipe culverts completed.
Impact of the project:
Informal employment of persons
450 units of Resettlement houses connected with network of roads.
Project: Construction of Karshi-Ara Road
Contractor: Messrs Mangrovetech Construction and
Engineering Nig. Ltd
Contract Sum: N4,097,185,656.30
Award: 4th August 2010
Commencement: 3rd September, 2010
Completion: May, 2012
Scope of Work: 25km Asphalt road with 2 No.
Bridges and culverts
Progress Status: 23%
Achievement (May 2011-May 2012): 17%
9km Earthworks
2.5km of sub-base
0.6km of Asphalt road
Impact of the Project:
Ready access from Karshi-Ara for vehicular
and human traffic
Informal employment of persons
Linking of ten villages, viz: Gasaki, Jeje,
Kodayi, Stakuwa, Ara-Sabo, Angwan Kupi,
Kuwada, Panda, Taka Lafia and Ara
ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)SATELLITE TOWNS INFRASTRUCTURE
70MINISTERIAL P LATFORM FCT
Project: Construction of Karshi-Apo Road
Contractor: Messrs Mangrovetech Construction
and Engineering Nig. Ltd
Contract Sum: N2,258,423,468.23
Award: 22nd December, 2010
Commencement: 10th January , 2011
Completion: September, 2012
Scope of Work: 14km of Asphalt Road with pipe and
box culverts.
Progress Status: 29%
Achievement (May 2011-May 2012): 20%
7.5km Earthwork to sub-base
1.480km stone base
1.37km of Asphalt road with some pipe and box
culverts completed
Impact of the Project:
Ready access from Apo to Karshi for vehicular
and human traffic
Informal employment of persons
Linking of three villages, viz: Wasa, Madalla, Chori
and Karshi
ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)SATELLITE TOWNS INFRASTRUCTURE
71MINISTERIAL P LATFORM FCT
Rehabilitation of Gwagwalada – Dobi – Izom
Road
Contractor: M/S Ndubuieze Engineering
International Company Nig. Ltd (NEIC)
Contract Sum: N1,611,691,830.00
Award: 7th December, 2010
Commencement: 13th January, 2011
Completion:
Scope of Work: 27 Km of Asphalt Road with
drainage structures
Progress Status: 28%
Achievement (May 2011-May 2012): 21%
15 km of Earthwork to formation level, 111
meters of culverts.
Impact of the Project:
Ready access to several Villages along the
Road,
informal employment to the locals,
reduction in travel time.
ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)SATELLITE TOWNS INFRASTRUCTURE
72MINISTERIAL P LATFORM FCT
Construction of Onex Bwari Road
Contractor: Messrs Parsons Science Engineering
Co Ltd
Contract Sum: N2,017,002,504.83
Award: 9th December, 2010
Commencement: 13th January , 2011
Completion: 13th January, 2013
Scope of Work: 14km of Asphalt Road.
Progress Status: 8%
Achievement (May 2011-May 2012): 12%
7.5km of Earthworks (cut & fill)
4km stone base work
Impact of the Project:
Informal employment of persons
ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)SATELLITE TOWNS INFRASTRUCTURE
73MINISTERIAL P LATFORM FCT
Construction of 11km Mpape –Galuwyi/Shere Road
Contractor: M/S Petroline Global Solutions Limited
Contract Sum: N1,558,443,337.37
Award: 3rd November, 2010
Commencement : 10th December, 2010
Completion: December 2013
Scope of works: Construction of 11km length of asphaltic Concrete surface finished road, 255m length of pipe culvert and 100m length of box culvert.
Progress Status: 9%
Achievement (May 2011- May 2012: 6%
Earthworks on 5km length of roads in progress, 30m length of box culvert 80m length of pipe culverts completed
Impact of the project:
Ready access to Galuwyi from Mpape for vehicular and human traffic,
Linkage of four villages to the city
Informal employment to persons.
ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)SATELLITE TOWNS INFRASTRUCTURE
74MINISTERIAL P LATFORM FCT
ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)SATELLITE TOWNS INFRASTRUCTURE
75MINISTERIAL P LATFORM FCT
Construction of 20km, A2 Kwaita-Yebu
Road Contractor: M/S Abdec Nigeria. Limited
Contract Sum: N1,239,569,575.38
Award: April, 2005
Commencement:June, 2005
Completion: May 2013
Scope of works : Construction 20km length of
surface roads, 1 No. 2 span bridge, 2074m3 of box
culvert and 600m length of pipe culvert
Progress Status: 83%
Achievement (May 2011-May 2012): 14%
4km length of road completed up-to surface
dressing, 40m length of pipe culvert completed and
deck of the two Span bridge completed
Impact of the project:
Linkage of six villages to the city
Informal employment of persons.
ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)SATELLITE TOWNS INFRASTRUCTURE
76MINISTERIAL P LATFORM FCT
Provision of Road Infrastructure and Water
Reticulation to Kubwa Owner Occupier Estate Phase
II
Contractor: Messrs Mangrovetech Nigeria Limited
Contract Sum: N883,175,415.49
Award: 22nd February, 2011
Commencement:10th March, 2011
Completion: April 2013
Scope of Work: 6km of Asphalt Roads with drainage
structures
Progress Status: 26.5%
Achievement (May 2011-May 2012): 20.5%
1.52km Asphalt Road and 3.22km trapezoidal
Concrete Drains.
Impact of the Project: Easy movement within the
Estate.
Construction of township roads in 6 Area Councils
Contractor: m/s Sochez int’l Ltd, Birak Engr. & Constr. Co. Ltd, Bilsha Nig. Ltd, Sahabi Liman & Sons Ltd, Proxy Ltd, Commade Nig. Ltd, Momreta Nig. Ltd, Niko Engr. Ltd, Marwamagdi Constr. Co. Nig. Ltd, Crane Builders & Engr. Ltd.
Contract Sum: N 7.2Billion
Award: 22 February 2011
Commencement: 1st March 2011
Completion: June 2012
Scope of Work: Construction of 60km asphalt with drainage structures in the 6 area councils.
Progress Status: 40%
Achievement (May 2011-May 2012): Bwari 35%, Kuje 55%, Gwagwalada 21%, Kwali 27%, Abaji 25%, AMAC 31%
15 km length of road to asphalt level, 25km length of road to sub-base level, 20km length of road to formation level
Impact of the Project: Easy movement within the Estate, Informal employment of persons and Reduction of flooding of plots located at the low areas of the Estate
ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)SATELLITE TOWNS INFRASTRUCTURE
77MINISTERIAL P LATFORM FCT
ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)
78MINISTERIAL P LATFORM FCT
Land Swap Model
FCT Administration is to grant agreed
percentage of land in a Greenfield district to a
Developer for real property development under a
Special Contract envisaged by the Land Use Act;
In exchange for the grant, the Developer is to
provide primary infrastructure in the agreed
district without any financial, technical or demand
risk on the part of the FCTA;
ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)
79MINISTERIAL P LATFORM FCT
Land Swap Model
The primary infrastructure which the Developer is to provide is as
follows:
The detailed district design and the Bill of Engineering;
Agreed kilometers of roads of varying specified sizes within the districts;
Agreed kilometers of Storm Water Drains;
Agreed kilometers of Foul Water Drains;
Agreed kilometers of Water distribution lines;
Agreed kilometers of Street Lighting Lines;
Agreed kilometers of Electrical Power distribution lines;
Agreed kilometers of telecommunication ducts; and
Agreed Number of mini Sewage Treatment Plants
The Developer is to deliver a Business plan that shows its technical capacity,
financial capability and managerial competence
ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)
80MINISTERIAL P LATFORM FCT
Land Swap Model
Legal Justification for the Relationship
under section 8 of the Land Use Act FCT may make any grant of
land subject to a Special Contract; and
The Hon. Minister has the power to revoke such grant in the
event that there is any breach of the Special Contract
Basic Terms of Relationship
Commitment fee N350 million on presentation of Business Plan
to fund Physical Plan, Preliminary design, Detailed Engineering
Design, Survey plan, Feasibility Studies, and Preparation of
Agreement;
Detailed design and provide Infrastructure in the district within a
maximum period of 48 months;
ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)
81MINISTERIAL P LATFORM FCT
Land Swap Model
Strict compliance with FCDA Specifications and Standards for
district infrastructure works;
The Developer shall not commence real property development
or sale of any land in the district until it achieves at least 35%
of functional Infrastructure works;
The release of land titles to the Developer shall be made as
follows:
15% of the Rights of Occupancy shall be released to the
Developer on evidence of transfer of 15% of the infrastructure
cost to the Project Account;
80% of the Rights of Occupancy shall be released on the basis
of interim measured certificates, the minimum value of which
shall not be less than 20% of the Infrastructure works;
5% Retained till after the retention period of 12 months
ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)
82MINISTERIAL P LATFORM FCT
Land Swap Model
Note that the Rights of Occupancy are to be warehoused in a bank
mutually agreed by the parties;
The structure of the total project Cost shall consist of Construction
Cost, Financing Cost, Professional fees, Resident Supervision Cost,
12 months Operating Cost, Resettlement & Compensation Cost,
and Return on Investment
The funding structure of the project must include an
acceptable ratio as follows:
Debt - 50%
Equity - 15%
Off-Plan Sales - 35%
The Developer is to provide an acceptable Performance Bond
from a reputable Bank or Insurance company;
FCTA is to retain at least 40% of buildable plots in the district
ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)
83MINISTERIAL P LATFORM FCT
Land Swap Model
LIST OF INVESTORS THAT EXPRESSED INTERESTS
Dangote Group Plc;
Edimo Gruppo of Italy;
Adkan Services Nigeria Limited;
Ridley Group;
Afri-International Projects & Consulting Limited;
China Railway Construction Company;
Hongye Group;
Rosehill Group;
Nimec Investment Company limited;
Balmus International Limited;
First Aries Crude Oil Production;
System Properties Development Consortium Limited
Gilmor Engineering Nigeria Limited
Caraway Dallas District Development Project
Partner: Messrs. Plethora Realty & Facility Managers Limited
Location: Along Keffi road, adjacent to highbrow Sunrise Estate and the Mogadishu Barracks
Dev. Cost : N24 billion
• Scope of Work: to provide integrated civil
infrastructure 222 hectares and is parcellized
into 413 plots as follows:
• 339 residential,
• 52 diplomatic,
• 7 Commercial and
• 15 Others (Green & Institutional)
Progress Status:
ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)PUBLIC PRIVATE PARTNERSHIP (PPP) LAND SWAP MODEL
84MINISTERIAL P LATFORM FCT
Caraway Dallas District Development Project
• The infrastructure to be provided include
amongst others:
16.7 km of roads of varying specified
sizes;
16.4km of Storm Water Drains
21.2km of Foul Water Drains
22.3km of Water distribution lines;
19.9km of Street Lighting Lines
27.6km of Electrical Power distribution
lines
14.5km of telecommunication ducts; and
3 Nos. mini Sewage Treatment Plants
ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)PUBLIC PRIVATE PARTNERSHIP (PPP) LAND SWAP MODEL
85MINISTERIAL P LATFORM FCT
THE DEVELOPMENT OF ENGINEERING INFRASTRUCTURE BY PPP
FOR KATAMPE DISTRICT, PHASE II, FCC, ABUJA
DEVELOPER: DEANSHANGER PROJECT LIMITED, ABUJA
DEVELOPMENT COST: N61, 194,747,645:00 (Sixty One Billion, One
Hundred and ninety four million, seven hundred and forty seven thousand,
six hundred and forty five naira)
SIZE OF DISTRICT: 777 Hectares
TOTAL NUMBER OF PLOTS: 2,583 Plots consisting of 1,788 high,
600 medium and 195 low density plots
COST OF DEVELOPABLE SPACE: N12,000:00 per Square metre.
TOTAL LENGTHS OF ROADS IN CATEGORIES:
Arterial (6- lane carriage way) - 5,137m
Collector (4- lane carriage way) - 6,182m
Special Important Local Street (2-lane way) -7,802m
Important Local Street (2-lane way)) - 2,075m
Local Street (2-lane way) -19,436m
Minor Access Road (2-lane way) -28,880m 69,512m
ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)PPP
86MINISTERIAL P LATFORM FCT
ACHIEVEMENTS/IMPACTS
Impacts
70% reduction in travel time (Kubwa – City Centre from
2h/30min -35min and Airport – City Centre from 1h/30min –
45min)
65% reduction in accident rate
16,000 more houses built as a result of district
infrastructure provision
87MINISTERIAL P LATFORM FCT
ACHIEVEMENTS/IMPACTS
Impacts
42% population have access to potable water supply in the
FCC
Reduction in water borne diseases (No cholera and other
disease outbreak)
Reduction in travel time from satellite towns of Bwari,
Karshi and Kuje to the City Centre.
88MINISTERIAL P LATFORM FCT
ACHIEVEMENTS/IMPACTS (SERVICES)SERVICES
89MINISTERIAL P LATFORM FCT
90%
50%
13%
61%
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
HT
C f
or
PM
TC
T
AC
CE
SS
(C
OV
ER
AG
E %
)
PMTCT
Universal Access Target for PMTCT to be reached by 2015
National Cummulative PMTCT Target to be reached by 2011
National Cummulative Actual PMTCT Coverage achieved in 2011
FCT Cummulative Actual PMTCT Coverage achieved by end of 2011
PREVENTION OF MOTHER TO CHILD TRANSMISSION) FCT
PMTCT OF HIV TARGET AND ACHIEVEMENT IN 2011
Service Sector :
Education
Social Development
Health
Land Administration
Abuja Geographic Information System (AGIS)
Transportation
Environment & Sanitation
Development Control
Water Supply
Parks & Recreation
Urban Affairs
ACHIEVEMENTS/IMPACTS (SERVICES)
90MINISTERIAL P LATFORM FCT
ACHIEVEMENTS/IMPACTS (SERVICES)
Education Services:
91MINISTERIAL P LATFORM FCT
Improved Meaningful Access to Education
for Residents at all levels and Types of
Education
Increased Enrolment from 2011 – 2012:
ECCE – 3,893 children (22.9%)
Primary - 4,249 pupils (2.4%)
Junior Secondary - 6,824 students (8.3%)
Senior Secondary - 5,403 students (12.2%)
Non Formal Education - 1,225 learners (7.4%)
Improved access was achieved through:
enrolment drive
establishment of new schools
construction, rehabilitation and furnishing of additional classrooms
toilets and other facilities in schools.
28 new schools were established
to decongest existing schools and
accommodate new enrolments
1,553 classrooms were completed
to accommodate 6,138 students at
both Basic & Senior Sec levels
29 learners graduated from the
VTCs in 2011;
FCTA supported training of 400
adult learners in the acquisition of
different skills that will empower
them to be self reliant
ACHIEVEMENTS/IMPACTS (SERVICES)
Education Services:
92MINISTERIAL P LATFORM FCT
6 learners were given materials such as
computers , sewing machines and other
equipment
22,468 pupils/students who were
indigenes and indigent were given
educational assistance to the tune of
N404,865,000.00
UNFPA also supported the
empowerment of 53 learns who had
undergone skill acquisition training
Technology Incubation center was set up
at Karu to empower youths Science and
Technology Education
ACHIEVEMENTS/IMPACTS (SERVICES)
Education Services:
93MINISTERIAL P LATFORM FCT
provision of facilities at COE Zuba permanent
site to enhance learning:
Library Complex
Science Labs
Auditorium
Access roads
Abuja University of Technology Abaji (AUTA):
completion of take off Admin Block,
10 Blocks of Classrooms,
6 faculty offices,
5 bungalows of staff quarters,
3 blocks of science labs,
bore hole
electricity installations
It is hoped that academic activities will
commence in the 2012/2013 academic session
ACHIEVEMENTS/IMPACTS (SERVICES)
Higher Education Services:
94MINISTERIAL P LATFORM FCT
Sustainable Energy Resource Centre has
been set up in Karu
120 Mathematics Teachers have already
been trained on improved methods of
teaching through the Mathematics
Improvement Project set up in 2011
Work at the International Technical
&Vocational Institute Utako has reached 58%
completion:
production centre
Admin Block
Technical Drawing Lab
Dining hall and Canteen
6 Workshops
Male Hostel
ACHIEVEMENTS/IMPACTS (SERVICES)
Science & Technology Education
95MINISTERIAL P LATFORM FCT
Science Laboratories
• 12 Science Labs and 2 Intro Technology Labs were constructed in Junior Secondary Schools
School Furniture
• 1,375 Sets of furniture were provided for Primary and Junior Secondary Schools
Textbooks & Instructional Materials
• 1,241,603 pupils/students and teacher textbooks and instructional materials were provided in 2011
ACHIEVEMENTS/IMPACTS (SERVICES)
Education Services:
96MINISTERIAL P LATFORM FCT
Teacher Recruitment
• 2,500 Teachers were recruited for Basic and Senior Secondary Schools
Teacher Training & Development
• Trainings were carried out for 6,911 heads of schools & teachers in various areas for improved teaching and learning outcomes
Special Needs Education
• Provision of 20 specialized instructional materials/equipment: Braille Machine, Thermo phones, Audiometer, Embosser, Computers with special software, Braille papers, Wheel Chairs and Physiotherapy equipment . 18-Seater Bus was also provided to each of the 3 special needs schools
ACHIEVEMENTS/IMPACTS (SERVICES)
Education Services:
97MINISTERIAL P LATFORM FCT
ACHIEVEMENTS/IMPACTS (SERVICES)
Education Services:
Toilet Facilities
•Provision of 16 water system toilets with overhead tanks for Junior Secondary Schools
Libraries
•10 Libraries with a capacity to accommodate 140 pupils/students each were constructed, furnished and equipped in both Junior and Senior Secondary schools
e-Education
•Plans have been completed to pilot test integrated and systematic deployment in the management and provision of all educational services in 50 schools
•Implementation will take off fully when the 2012 budget is operational
98MINISTERIAL P LATFORM FCT
JSS Jukwoyi 2011 SAGE Champions•Junior Secondary School Jikwoyi took first position in all competitions
organized by the Students for the Advancement of Global Entrepreneurship (SAGE).
•The school is now four times world Champion (Ukraine 2007, Nigeria 2008 & Brazil 2009), and USA (2011).
Science & Tech Awards•Promotion of science & technology in schools has earned FCT many laurels:
1st position in Nigerian Institute of Physics Competition, 1st position in the world space week completion, 1st position in the NNPC National Science completion
•The Secretariat successfully conducted competition in Science and technology Exhibition among students of FCT, Federal Ministry of Science & Tech Parastals and Private Companies
FGN/UBEC Awards
• FCT UBEB has consecutively taken the 1st position from 2006 –2011 in the North Central Zone for effective and efficient implementation of the UBE Programme through the intervention fund
ACHIEVEMENTS/IMPACTS (SERVICES)
Education Awards:
99MINISTERIAL P LATFORM FCT
- Sustained surveillance, evacuation,
rehabilitation and repatriation of over
4,800 destitute.
- 35 mentally-ill persons (among the
destitute apprehended) were treated in
neuro-psychiatric hospital in Kaduna,
10 of them have fully recovered,
rehabilitated and reunited with their
families.
- Organised a medical and rehabilitation
outreach programme for over 500
elderly persons in FCT.
ACHIEVEMENTS/IMPACTS (SERVICES)
Social Services
100MINISTERIAL P LATFORM FCT
- 500 Child-hawkers/beggar and
street-kids were apprehended and
later released to their
parents/guardians after thorough
counselling,
- Over 60 street-kids and child-
hawkers were enrolled into primary
schools by their parents/guardians.
ACHIEVEMENTS/IMPACTS (SERVICES)
Social Services
101MINISTERIAL P LATFORM FCT
- 25 young physically-challenged
persons currently in Bwari
Vocational & Rehabilitation
Centre;
100 indigent patients, abandoned
babies, unidentified and
unconscious accident victims,
traumatized and abused (rape)
cases were supported and
rehabilitated;
ACHIEVEMENTS/IMPACTS (SERVICES)
Social Services
102MINISTERIAL P LATFORM FCT
3,000 Commercial Sex Workers were
apprehended and evacuated from their
flash-points in FCC,
300 of them, are undergoing further
rehabilitation programme in the FCT
Women Rehabilitation Centre, Sabon-
Lugbe, in various vocational trades,
The first batch of 50 trainees had
already graduated and passed-out on
6th October, 2011;
ACHIEVEMENTS/IMPACTS (SERVICES)
Social Services
103MINISTERIAL P LATFORM FCT
90 family cases were settled and re-
union of 38 children with family members
FCT has conducted Annual FCT PRO-
AM Golf Championship
a new Synthetic Basketball Court at
Area 10 Sports Complex has been
completed;
a Squash Hall also being constructed at
the complex is at its final stage of
completion.
ACHIEVEMENTS/IMPACTS (SERVICES)
Social Services
104MINISTERIAL P LATFORM FCT
Enumeration exercise of all
hospitality establishments such as
hotels, guest houses, restaurants,
fast foods and eateries in all the six
Area Councils for documentation.
A directory called: “Hotel Guide” has
being produced
The pictorial guide catalogues Parks
and Gardens in Abuja.
The guide is a must have for every
nature and fun seeker.
ACHIEVEMENTS/IMPACTS (SERVICES)
Social Services
105MINISTERIAL P LATFORM FCT
Development of Katampe Hill as a
Tourism Village
The concept of Katampe Hill is to
make it a one-stop tourism village
that in addition to the myth
surrounding it and its natural
endowment.
Tourism Information Desks (TIDs)
Designed for tourist information
dissemination which are
fundamental to tourism
development.
ACHIEVEMENTS/IMPACTS (SERVICES)
Social Services
106MINISTERIAL P LATFORM FCT
Refurbishing of Ushaffa
Pottery Centre at Ushaffa in
Bwari Area Council, a Training
Centre for women and Youth
as well as a Tourist Centre.
Development of Taruga
Archeological Site, a major
Tourist site in the FCT located
in the Municipal Area Council.
ACHIEVEMENTS/IMPACTS (SERVICES)
Social Services
107MINISTERIAL P LATFORM FCT
Creation of State of the Art Cultural
Parks and Gardens which include
Sculptural, Horticultural Artistic,
Ecological and Nature Parks within
the FCT.
Children’s Holiday Workshop- an
avenue for talent hunt and creativity
Fair
ACHIEVEMENTS/IMPACTS (SERVICES)
Social Services
108MINISTERIAL P LATFORM FCT
Parking Management System
On-Street Parking Management
system with 3600 spaces in two
zones within the FCC introduced.
650 jobs created
Reduced congestion in all controlled
zones
Traffic Light System
48 signalized intersections upgraded
ACHIEVEMENTS/IMPACTS (SERVICES)
Transportation Services
109MINISTERIAL P LATFORM FCT
Traffic Management Devices installed:
900 solar powered road studs,
850 delineators,
35 solar warning lights,
1800 anti-glare curtains,
1050 Traffic signs
50 Speed bumps
ACHIEVEMENTS/IMPACTS (SERVICES)
Transportation Services
110MINISTERIAL P LATFORM FCT
Operator License Scheme :
3 operators licensed for high capacity
bus operation.
AUMTCO, NURTW and FABREM
operating daily on some routes in FCT
with 150 buses.
Additional 300 high capacity buses
procured.
ACHIEVEMENTS/IMPACTS (SERVICES)
Transportation Services
111MINISTERIAL P LATFORM FCT
Bus Rapid Transit (BRT) Pilot Scheme:
Dedicated lanes marked for the BRT
operation between Eagle Square and
Mararaba along Keffi Highway.
Peak time journey time reduced by
40 minutes
Increased ridership by 2000
passengers
610 jobs created
ACHIEVEMENTS/IMPACTS (SERVICES)
Transportation Services
112MINISTERIAL P LATFORM FCT
DRTS Vehicle Registration:
E-registration technology introduced.
20000 additional vehicles registered
DRTS Operations:
35 new operational vehicles procured
Full geographical coverage of the Territory
500 additional vehicle license renewed
N75Million monthly average IGR
Additional 120 jobs created
ACHIEVEMENTS/IMPACTS (SERVICES)
Transportation Services
113MINISTERIAL P LATFORM FCT
ACHIEVEMENTS/IMPACTS (SERVICES)
Healthcare Services
114MINISTERIAL P LATFORM FCT
Access to Health has been increased ;
80 beds in FCT secondary Care in 2011 (Zuba Cottage
Hospital 40 Beds, Nyanya Hospital 20 beds, Gwarinpa
Hospital 10 Beds and Kubwa 10 beds)
48 beds in the Primary Care in 2011(12 beds each in
Shere, Wasa, Apo Resettlement sites and kubwa owner
occupier
Employment of 900 Health workers cutting across all the
Professions in 2011
The incidence of Malaria in FCT dropped from 57705 in 2010 to 46504
in 2011(22% reduction)
15% increase in out patient attendance in Secondary Care
Facilities in 2011 ( Total out patient seen in 2010 was 595264
compared to 654553 in 2011)
Establishing Primary Healthcare Development Board to oversee
the Primary Healthcare in FCT
Up scaling the FCT Mobile Outreach Programme (The Mailafiya)
Quality to Healthcare in FCT has been increased by ;
Supply and Installation of CT-Scan at Maitama District Hospital
Supply and Installation of CT-Scan at Asokoro District Hospital
Supply and Installation of Mammogram at Maitama District
Hospital
Supply and Installation of 3 HT Ulltrasound machines to 3 FCTA
Hospitals (Asokoro, Maitama and Gwarinpa Hospitals)
ACHIEVEMENTS/IMPACTS (SERVICES)
Healthcare Services
115MINISTERIAL P LATFORM FCT
Construction of 60 Bed Cottage
Hospital at GwagwaladaContractor: M/S The Solid Concrete
Industries Ltd
Contract Sum:677,879,466.60
Award: 18-11-10
Date of Commencement: Feb. 2011
Date Of Completion: 2012
Scope of Work: Construction of 60
bedded main Hospital building
comprising Wards, Theater, Pharmacy,
Laboratory, A&E unit, Antenatal /
Maternity and residential qtrs.,
ACHIEVEMENTS/IMPACTS (SERVICES)
Healthcare Services
116MINISTERIAL P LATFORM FCT
Construction of 60 Bed Cottage
Hospital at Gwagwalada
Progress Status: 15%
Achievement: (May 2011 – May 2012): 15%
Impact: Employment of site staff and
wealth creation
ACHIEVEMENTS/IMPACTS (SERVICES)
Healthcare Services
117MINISTERIAL P LATFORM FCT
Construction of 225 Bed Hospital
Karu
Completed the Project and
concessioned half of the Hospital to
M/S Primus International Supper
Specialist and is currently
operational.
ACHIEVEMENTS/IMPACTS (SERVICES)
Healthcare Services
118MINISTERIAL P LATFORM FCT
Construction and Equipping of 220-Beb
Utako Hospital Contractor: PPC Medical systems
Contract Sum: N4,263,501,682.10
Award: 22-09-08
Commencement: Jan. 2009
Completion: 2014
Scope of Work: Construction and equipping of 220
bedded main Hospital building comprising Wards,
Theater, Pharmacy, Radiology Laboratory, A&E unit,
Antenatal / Maternity and residential qtrs. and supply
and Installation of Hos[ital. Equipment,
Progress Status: 57%
Achievement: (May 2011 – May 2012): 6%
Impact: Reduction in Mobility and Mortality in Utako and its
environs , it also increases access to quality care
ACHIEVEMENTS/IMPACTS (SERVICES)
Healthcare Services
119MINISTERIAL P LATFORM FCT
Contractor: M/s Mabinu cosy Investment Co. Ltd, and 21 Other contractors
Contract Sum: N361,246,445.42
Date of Award: 2009-2011
Date of Commencement:2010
Date Of Completion: Majority completed in 2011 few remaining to be
completed 2012
Scope of Work: Provision of additional Wards, Expansion of Radiology unit
, Maternity, Laboratory, staff Qtrs., Laundry units and general rehabilitation and
landscaping
Progress Status: 80%
Achievement: (May 2011 – May 2012) : 15%
Impact: Reduction in Mobility and Mortality in FCT and its environs ,
increases access to quality care and reduce waiting time and increase capacity to
handle FCT’s dynamic population
ACHIEVEMENTS/IMPACTS (SERVICES)Healthcare Services
120MINISTERIAL P LATFORM FCT
Expansion and Rehabilitation of Asokoro , Maitama, Wuse , Abaji, Bwari,
Gwarinpa, Kubwa and Nyanya Hospitals
ACHIEVEMENTS/IMPACTS (SERVICES)
Healthcare Services
40 Bed Cottage Hospital Zuba
The project has attained 100%
completion both in Construction and
furnishing..
121MINISTERIAL P LATFORM FCT
ACHIEVEMENTS/IMPACTS (SERVICES)
Healthcare Services Hostel Block for School of Nursing and
MidwiferyContractor: M/S SA Consult LTD, M/S Princecom
Int. Ltd, Ben-lob & Co Ltd and 3 others
Contract Sum: N533,462,530.66
Date of Award: 08 -09-10
Date of Commencement: Jan. 2011
Date Of Completion: 2012
Scope of Work: Rehabilitation of Hostel and
Classroom Area, Construction of additional 18Nos
Classroom with staff common rooms and Offices,
Construction of additional 180 Bedded Hostel and
Perimeter fencing of the entire school
Progress Status: 70%
Achievement: (May 2011 – May 2012): 30%Impact: Human Resource for Health Manpower development,
provision of skilled personnel for Midwifery Service Scheme,
improved Health awareness at community level and reduction in
Maternal Mortality rate in FCT
122MINISTERIAL P LATFORM FCT
ACHIEVEMENTS/IMPACTS (SERVICES)
Healthcare Services
Expansion of Nyanya General
Hospital
The project has attained 100%
completion both in Construction and
furnishing..
123MINISTERIAL P LATFORM FCT
ACHIEVEMENTS/IMPACTS (SERVICES)
Healthcare Services HIV COUNSELING & TESTING) FCT HCT
TARGET AND ACHIEVEMENT AS AT 2011
124MINISTERIAL P LATFORM FCT
ACHIEVEMENTS/IMPACTS (SERVICES)
Healthcare Services
Distributed of 524,157pcs (2/household) Long
Lasting Insecticide Nets (LLINS) during campaign in
FCT still planning for mop-up activity.
Distributed 41,196 doses of ACTs to focus public
health facilities.
Distributed 1, 517 RDT kits to focus public health
facilities in FCT for evidence based
Diagnosis.
Distributed 6, 289 doses of SP to focus public
health facilities for pregnant women in FCT.
98% Monthly Routine data for M&E was carried out
in 2011 and is still ongoing
125MINISTERIAL P LATFORM FCT
ACHIEVEMENTS/IMPACTS (SERVICES)
Healthcare Services
90%
50%
13%
61%
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
HT
C fo
r P
MT
CT
AC
CE
SS (
CO
VE
RA
GE
%)
PMTCT
Universal Access Target for PMTCT to be reached by 2015
National Cummulative PMTCT Target to be reached by 2011
National Cummulative Actual PMTCT Coverage achieved in 2011
FCT Cummulative Actual PMTCT Coverage achieved by end of 2011
PREVENTION OF MOTHER TO CHILD TRANSMISSION) FCT
PMTCT OF HIV TARGET AND ACHIEVEMENT IN 2011
126MINISTERIAL P LATFORM FCT
FCT
ACHIEVEMENTS/IMPACTS (SERVICES)
Healthcare Services
Attendants at delivery by Area council
127MINISTERIAL P LATFORM FCT
ACHIEVEMENTS/IMPACTS (SERVICES)
Healthcare Services
Immunizing babies at high
levels of commitment by the
FCT Minister/ wife of the
HM, FCT during a
supplemental immunization
campaign
128MINISTERIAL P LATFORM FCT
ACHIEVEMENTS/IMPACTS (SERVICES)
Healthcare Services Static PHC structures located in the 52
clusters in FCT Communities.
12 prototype PHC completed and
operational in communities
18 prototype PHC facilities are at various
stages of completion
22 additional PHCs are being procured
These will serve as static operational
bases for the mailafiya teams in the
clusters.
129MINISTERIAL P LATFORM FCT
Front Entrance of Staff Qtrs
at Kuchako Community.
Front Entrance to the PHC clinic
Increasing access, improving response rate to disease outbreakin the communities and the quality of healthcare service delivery
Treated and managed (60,000) cases of tropical diseases and(90) minor surgical procedures done in 336 communities of theFCT.
The programme was presented at the World Conference onInformation Technology in Amsterdam and Health CareIndustry conference in London and in Glasgow Scotland
Creation of dependable data base for tracer diseases and othermorbid human situations in communities in the FCT. Detailscould be found at the mailafiya website -www.fctmdgmailafiya.org
Hosted the PAN African Health Summit in Abuja Nigeria
Was given the “Best Rural Health Practice” by the FMOH
Formulation of the e-Health policy for the Territory and the mounting of an e-Health pilot policy platform
ACHIEVEMENTS/IMPACTS (SERVICES)
Healthcare Services
130MINISTERIAL P LATFORM FCT
Comprehensive Water
Supply Scheme for Abaji
& Its Environs
A Water supply project
sponsored by the MDG PSU,
FCTA and the Abaji Area
Council which is been
executed by Messrs. CGC,
ACHIEVEMENTS/IMPACTS (SERVICES)
Water Supply
131MINISTERIAL P LATFORM FCT
Comprehensive Water
Supply Scheme for Abaji &
Its Environs
The project is being
supervised by the Water
Board is presently
ongoing at Abaji.
The project commenced
fully in January 2011 and
has reached 83%
completion stage.
ACHIEVEMENTS/IMPACTS (SERVICES)
Water Supply
132MINISTERIAL P LATFORM FCT
Kuje Water Supply
A scheme has also been conceived to
provide potable water supply to Kuje, Pegi
satellite town and other adjoining Housing
estates including Custom, Immigration, Air
force etc, along Bill Clinton Way (Airport
Road).
The design of the Kuje Dam and the
treatment Plant / Pegi satellite town water
reticulation and Pegi Distribution Tank
and Trunk Mains to Pegi Distribution Tank
have all been commissioned.
Rubochi Mini Water Project
Water has been provided to Rubochi
community serving over 5000
population after over 100 years of
lack of pipe borne water
ACHIEVEMENTS/IMPACTS (SERVICES)
Water Supply
133MINISTERIAL P LATFORM FCT
Metering and Water Usage
Management
4000 metres (pre paid & AMR) have
been installed in the city to boost
revenue generation.
Massive installation of conventional
meters and prepayment meters in the
satellite Towns.
ACHIEVEMENTS/IMPACTS (SERVICES)
Water Supply
134MINISTERIAL P LATFORM FCT
Successfully installed the new 400feet
mast,
2Nos. of stereo FM Radio transmitters,
Provision of street lights, supply and
installation of automatic voltage regulator,
uninterrupted power supply, digital audio
workstation and provision of ICT facility.
Carry out Aso Radio Live Coverage in line
with the Transformation Agenda of Mr.
President
2NOS.FM Radio Stereo Transmitter with
FM –HD EXITER
ACHIEVEMENTS/IMPACTS (SERVICES)
*Broadcasting Services
135MINISTERIAL P LATFORM FCT
Handover of Source Code of AGIS II
Project in December 19, 2011
marking the formal disengagement
of Julius Berger Nig. (JBN)
Consultants from the operational
management of the AGIS system
after more than 7 years of
engagement;
FCTA inaugurated the Committee
on Forgery and Falsification of Land
titles
ACHIEVEMENTS/IMPACTS (SERVICES)
Services
136MINISTERIAL P LATFORM FCT
Repositioning of AGIS as a centre of
excellence for geospatial data and
computerization services for FCT
Take over of AGIS II Project from Julius
Berger Consultants in 2010 (including
source code)
E-Payment System as a replacement for
draft payment, increase IGR by 35%
Enhancement of the security of AGIS
System and Physical Access
Commence the regularization of Area
Council Titles (Pending in AGIS repository
since 2005)
ACHIEVEMENTS/IMPACTS (SERVICES)
Services
137MINISTERIAL P LATFORM FCT
Land Administration:
Powers Of Attorney Approved And Registered - 249
Fresh Land Applications
Residential Applications - 7,558
Commercial (Organization) - 2,900
Land Allocations
Residential - 138
Commercial (Organization)- 126
Rights of Occupancy Issued - 1025
Certificates of Occupancy
Total received (Stored) - 730
Issued (Conveyed) - 306
Title Regularization Approvals Received - 324
Registered Transactions in the Deed Registry
Assignments - 100
Mortgages - 96
Deed of Release - 22
Deed of Sublease - 5
Certified True Copy -
Certificates of Occupancy - 19
Rights of Occupancy - 75
Acknowledgements - 58
ACHIEVEMENTS/IMPACTS (SERVICES)
Services
138MINISTERIAL P LATFORM FCT
Development Control:
942 were granted approval for Building
Plans applications
1065 complete setting-out approvals
granted to commence development
6447 illegal structures were removed in and
around the Federal Capital City (FCC)
In collaboration with NigComSat a software
for monitoring and enhanced processing of
building plan has been developed for the
FCT to be launch in July 2012
The sum of N2,662,752,299.27 had been
generated as revenue within the first and
second quarter of 2012
ACHIEVEMENTS/IMPACTS (SERVICES)
City Management
139MINISTERIAL P LATFORM FCT
One of the Iconic buildings granted
approval
(PTDF Corporate Headquarters)
The World Trade Center (Churchgate)
Facility Maintenance & Management:
Improvement in the performance of street
lights from about 45% to 80%.
Construction of zonal offices in Kuje, Bwari,
and Gwagwalada towards effective
monitoring and supervision of developments
in satellite towns
Procurement of official offices/residences
for International Agencies in Abuja.
ACHIEVEMENTS/IMPACTS (SERVICES)
City Management
140MINISTERIAL P LATFORM FCT
Parks and Recreation:
Development of Parks and Recreation
Policy for the FCT
Greening and Beautification of the FCC
and satellite town through the activities
of Abuja Green Society
Propagation of over 50,000 trees by the
two nursery plants of the department
Installation of Solar lights in selected
neighbourhood parks
Contract for tree planting for Airport and
OSEX awarded
ACHIEVEMENTS/IMPACTS (SERVICES)
City Management
141MINISTERIAL P LATFORM FCT
Urban Affairs:
Established Fire Training School in
Gwarinpa
Procured Emergency Rescue Equipment
to meet up with the current security
challenges of the country and other
natural or man made disasters
Developed Disaster Data Bank for the
FCT
Trained FCT Fire Service personnel in
and outside the country in disaster
management.
ACHIEVEMENTS/IMPACTS (SERVICES)
City Management
142MINISTERIAL P LATFORM FCT
FCT fire man at un building bomb site
FCT FIRE MEN AT THISDAY BOMB SITE
Services:Average time to grant R of O and C of O is reduced
from 6months – 3 months
The cost of commuting is reduced (N2.50/km
between Kubwa - Abuja)
Reduction in the number of accident rate/day from
10/day to 5/day
60% reduction in average time for the evacuation
of waste in the city (10hrs – 8hrs)
80% increase in functional street lights
30% reduction in registration time
ACHIEVEMENTS/IMPACTS (SERVICES)
143MINISTERIAL P LATFORM FCT
Services:
50% increase in construction sites proactively
checked for compliance with permit conditions
Reduction in number of days to complete first
building plan approval
Reduction in Average time for regularization of
titles
40% reduction in social menaces in FCT
Reduction Under 5 mortality rate, 80 per 1000
live births
20% reduction in accident rate
ACHIEVEMENTS/IMPACTS (SERVICES)
144MINISTERIAL P LATFORM FCT
ACHIEVEMENTS/IMPACTS (SERVICES)
Services:
18,995 people Enrolled In Non-Formal
Education Sub-Sector
65% of the rural population have access to
potable water
No reported outbreak of water borne diseases
58% of population have access to health care
services in FCT
Maternal mortality rate stand at 375 per
100,000
145MINISTERIAL P LATFORM FCT
ACHIEVEMENTS/IMPACTS (SERVICES)
Services:
Increase in enrolments from 2010 to 2011:
2.4% in Primary, 8.3% in JSS, 12.2% in SSS &
7.4% in Non Formal Education
82.6 gross enrolment ratio
Reduction in Pupil/Student : Classroom Ratio
from 1:67-1:50
75.1% Pass Rate(JSCE)
15.6% Pass Rate(SSCE)
146MINISTERIAL P LATFORM FCT
ACHIEVEMENTS/IMPACTS (IMPOWERMENT)
Youth Empowerment Programme:
The programme is targeted at the
unemployed youth with bias to gender in
the 6 Area councils to make them
economically and socially responsible and
self reliant through vocational skills
acquisition and business development.
The programme is divided into 4
component namely,
Skills acquisition,
Community Empowerment Agricultural Initiative,
Microcredit Scheme and
conditional cash Transfer
Empowerment
147MINISTERIAL P LATFORM FCT
ACHIEVEMENTS/IMPACTS (IMPOWERMENT)
- 181 were train in 5 trade areas at
the skill
- 1,125 presently undergoing
training in different trade areas
including livestock production.
- 35 communities are presently
participating in Irrigation Farming
Skill Acquisition
148MINISTERIAL P LATFORM FCT
ACHIEVEMENTS/IMPACTS (IMPOWERMENT)
- 172 farms were opened in 172
communities
18,040 jobs were created from the
initiative
- A total of 640.6 tonnes of assorted
grains were produced by the
communities
Valued at the current market price of
N37,332,000.00
Community Empowerment
Agricultural Initiative
149MINISTERIAL P LATFORM FCT
ACHIEVEMENTS/IMPACTS (IMPOWERMENT)
- 1,312 Farmers and
Entrepreneurs are being
assessed for loans
disbursement for small
business.
Micro Credit schemes
150MINISTERIAL P LATFORM FCT
ACHIEVEMENTS/IMPACTS (IMPOWERMENT)
The Condition Cash transfer (CCT)
is a programme for the core poor
whereby cash is transfer to poor
families on the condition that those
families make investments in
human capital e.g.
Sending children to School regularly
Taking children to regular health check-
ups
Overall objective is to break
intergenerational transfer of poverty
Conditional Cash Transfer (CCT)
151MINISTERIAL P LATFORM FCT
ACHIEVEMENTS/IMPACTSDesign and Construction of Cultural
Centre and Millennium Tower
Wealth creation and tourism
development
Expected project period 8years
Percentage completion 42%
Work in progress
152MINISTERIAL P LATFORM FCT
ACHIEVEMENTS/IMPACTS
Empowering the communities with
the program 1 Village One
Product of Shea Butter project
- 2012 Batch A Corps Members
being sensitized on
Entrepreneurship
Enterprise Development
153MINISTERIAL P LATFORM FCT
ACHIEVEMENTS/IMPACTS
Other wealth creation, employment
and poverty alleviation:
Outreach Services
Business Clinic
Access to suitable Workspace
such as business premises
Linking mentee to mentors
Organized Annual Abuja
Business Plan Competition
(ABPC)
Micro – Finance Complex Kwali
Enterprise Development
154MINISTERIAL P LATFORM FCT
ACHIEVEMENTS/IMPACTS
Wealth Creation and poverty reduction:
26,000 jobs created through agricultural activities
# of Jobs created through empowering communities
8.51mt and Crops 697.03 Volume of agric
production (mt)
55,000 farmers empowered and engaged in
profitable farming enterprise
155MINISTERIAL P LATFORM FCT
ACHIEVEMENTS/IMPACTS (SECURITY)
Through coordination and provision of logistics supports to
the Security Agencies of the FCT Commands have
resulted in some of the success recorded. They include: 370 stolen vehicles recovered.
150 suspected armed robbers arrested.
Prompt response to distress calls reduced from 30 minutes to 10
minutes.
Several criminal hideouts were raided in various locations in Abuja.
About 600 kilograms of substances suspected to be Indian hemp
and other hard drugs recovered
35 drug addicts were rehabilitated and 19 are still undergoing
rehabilitation.
24 hours surveillance and guards in strategic location in Abuja.
Ensured crime free festivities during the EMBER months.
156MINISTERIAL P LATFORM FCT
ACHIEVEMENTS/IMPACTS4 numbers of kidnap attempts were foiled.
FCTA embarked on Community Policing
G7 security summit resuscitated comprises
Benue, FCT, Kaduna, Kogi, Nasarawa, Niger
and Plateau States to reduce crime rate.
12 (twelve) number police post built in 12
communities of the six Area Councils.
157MINISTERIAL P LATFORM FCT
ACHIEVEMENTS/IMPACTS
Construction of Police
Stations in Three (3)
Districts in FCC
Expected project period 12
months
Percentage completion
100%
Work in progress
Police Station Wuye District Abuja
Police Station Garki District Abuja
158MINISTERIAL P LATFORM FCT
ACHIEVEMENTS/IMPACTS
There were issues of security
interest recorded during the year
under review especially bomb
blasts at the Louis Edet force
Headquarters, the United Nations
building and recently the attack at
Thisday Newspaper office
complex at Jabi.
This new dimension of crime
“terrorism” has made the security
agencies to beef up security in
the FCT to forestall future
occurrences
159MINISTERIAL P LATFORM FCT
ACHIEVEMENTS/IMPACTS
Safe and secure environment:Reduced crime rate by 30%
80% of areas with security coverage
Improved greening of the environment by 25%
Reduction in average response time to crime
prevention to 1hr.30min (police preparedness)
25,000 population have access to improved
sanitation facilities
# of emergency response to distress call attended to
160MINISTERIAL P LATFORM FCT
The FCTA through AICL partnered with
The Churchgate Group to develop the
Abuja World Trade Centre (WTC). The
project is rising from the ashes of the
former Bakassi market in the Central
Business Area
The Abuja WTC is located on a 6.102
hectares site along Constitution Avenue,
CBD, Abuja
The site is being transformed
into a mega complex consisting
of high rise residential towers (37 floors),
office towers, conference facilities and a
shopping mall with entertainment facilities
The first phase will be delivered by the
year 2013 at an estimated cost of N156Bn
ACHIEVEMENTS/IMPACTS (INVESTMENT)
World Trade Center Project
161MINISTERIAL P LATFORM FCT
ACHIEVEMENTS/IMPACTS (INVESTMENT)
Fairway Estate in Games Village
In line with the FCTA’ s vision of
providing housing to the various
categories of residents of the FCT,
AICL has recently completed the
construction of Fairway Estate at
Games Village, Abuja
The Estate consist of 8 units,
semi-detached, 5-Bedroom
luxury duplexes
The total project cost is
approximately N600Mn
The sale of the houses is in progress
162MINISTERIAL P LATFORM FCT
The FCTA constructed a district
market in Mabushi through a PPP
arrangement
The Build, Operate, & Transfer (BOT)
was carried out by a private
company, Metshade Limited. The
market will revert to FCTA at the end
of the period stipulated in the BOT
agreement i.e., 10 years
The market consist of over 2,000
shops of various types, ranging from
lock-up shops, open stalls,
warehouses, to restaurants
The project is completed and is
awaiting commissioning
ACHIEVEMENTS/IMPACTS (INVESTMENT)
BOT Markets - Mabushi
163MINISTERIAL P LATFORM FCT
ACHIEVEMENTS/IMPACTS (INVESTMENT)
164MINISTERIAL P LATFORM FCT
• There is an existing collaboration
between the FCTA and Balkan
Energy Centre Inc. (USA) for the
project.
• FCTA provided the land mass of
17.3 hectares in three (3) phases,
• Phase I and II to cater for 3,502
Condominium/ apartments,
• 5 star hotel with 798 rooms,
• office and banking spaces and
multi level parking spaces
Partnership
ACHIEVEMENTS/IMPACTS (INVESTMENT)
165MINISTERIAL P LATFORM FCT
Partnership • While the Company agreed to
develop the said land area into
mixed use of
• condominiums/apartments,
• commercial centres,
• 5 star hotel,
• office & Banking spaces,
• multi-level parking and
• other structures of World-Class
standard
• The project is estimated to cost
over $2.6 billion
ACHIEVEMENTS/IMPACTS
The FCT Archives And History Bureau has a purpose built ,state of the Art Archives building, at No 5 peace Drive, Area 11,Garki
Presently, the Bureau has established and equipped the following units:-
Photo Gallery
Cyber cafe with a capacity for 30 people
Reference library, for Scholar, Researchers, and Policy Makers.
Well equipped 250 capacity conference hall open to the public on rent.
STUDENTS ON EXCURSION
Partnership
166MINISTERIAL P LATFORM FCT
ACHIEVEMENTS/IMPACTS
Partners on community
nutrition support
Collaborative review meeting
with development partners
during immunization
supplemental campaigns/
cooperation for modern
family planning services
delivery in the six area
councils
Partnership
167MINISTERIAL P LATFORM FCT
ACHIEVEMENTS/IMPACTS
Collaboration between FCTA
and Kuje Area Council for the
construction of Rubochi
Water Works to supply water
to munu, Rubochi and its
environs
Partnership
168MINISTERIAL P LATFORM FCT
In collaboration with JICA/
UNIDO and Kaiyo Sanyo
for End of Life Vehicle
project in FCT
Auto Pound
All abandoned vehicles are
kept in an Auto Pound for
recycling.
ACHIEVEMENTS/IMPACTS (PARTNERSHIP)
Partnership
169MINISTERIAL P LATFORM FCT
Partnership between United
Nation System, Donor
Agencies and other
organizations such as (World
Bank, JICA, etc).
ACHIEVEMENTS/IMPACTS (PARTNERSHIP)
Partnership
170MINISTERIAL P LATFORM FCT
ACHIEVEMENTS/IMPACTS
(INVESTMENT)
Increase in Foreign Direct Investment (FDI) by 600%
Investment initiatives for infrastructure development of
FCT
171MINISTERIAL P LATFORM FCT
Thank you for listening.
172MINISTERIAL P LATFORM FCT