  • 8/8/2019 Force Mains: Not To Be Forgotten Assets

    1/26

    WEFTEC10

    New Orleans, LouisianaOctober 26, 2010

    FORCE MAINS:

    NOT TO BE FORGOTTENASSETS

    Bryon Livingston, P.E. Black & Veatch

    Alireza Parhami, P.E. Black & Veatch

    Stacy Gallick Johnson County Wastewater

  • 8/8/2019 Force Mains: Not To Be Forgotten Assets

    2/26

    WEFTEC10 New Orleans, Louisiana

    Force Mains: Not-to-be-forgotten assets

    Introduction

    Force Mains in a Collection System

    Overview of Johnson Countys System

    Coordination With Asset Management Plan

    System for Evaluating Force Mains

    October 26, 2010B&V Livingston | 2

  • 8/8/2019 Force Mains: Not To Be Forgotten Assets

    3/26

    WEFTEC10 New Orleans, Louisiana

    Force Mains: Not-to-be-forgotten assets

    Force Mains in the Collection System

    Not Like the Other Pipelines

    No Access like Manholes in the Gravity System

    No Periods of Low Flow to Inspect or Maintain

    No Excess Capacity or Redundant Pipeline to Take

    Out of Service Failure Can Create Dramatic Consequences

    Sink Holes Not Just Overflows

    Pressurized System

    October 26, 2010B&V Livingston | 3

  • 8/8/2019 Force Mains: Not To Be Forgotten Assets

    4/26

    WEFTEC10 New Orleans, Louisiana

    Force Mains: Not-to-be-forgotten assets

    Sewage Flowing Directly to Lake - Cant Save 3 Homes Muskegon, 2007

    Fai led Sewer Causes St reet To Collapse St. Louis 2009 This is Break No. 5 Richmond, ON 2002

    Catastrophic Events

    October 26, 2010B&V Livingston | 4

  • 8/8/2019 Force Mains: Not To Be Forgotten Assets

    5/26

    WEFTEC10 New Orleans, Louisiana

    Force Mains: Not-to-be-forgotten assets

    External Loads

    Soil

    TrafficOverburden

    Bedding Condition and Material

    Internal Corrosion

    External Corrosion

    Design and Construction Practices

    Leakage

    SoilCharacteristics

    Contraction

    Loads

    Temperature

    Many Factors Impact Service Life of a Pipe

    Movement

    Water Characteristics

    October 26, 2010B&V Livingston | 5

  • 8/8/2019 Force Mains: Not To Be Forgotten Assets

    6/26

    WEFTEC10 New Orleans, Louisiana

    Force Mains: Not-to-be-forgotten assets

    Johnson County Wastewater Asset management plan

    2008 Developed Asset Management Plan

    Completed A Basic Level 1 Review Of MostFacilities

    Process Identified The Need For AdditionalInformation On Force Mains

    Force Mains Not The Typical Asset In TheCollection System

    October 26, 2010B&V Livingston | 6

  • 8/8/2019 Force Mains: Not To Be Forgotten Assets

    7/26WEFTEC10 New Orleans, Louisiana

    Force Mains: Not-to-be-forgotten assets

    Background information

    Johnson County Wastewater (JCW) Serves

    Communities In Northeast Johnson County Kansas System Contains 40 Miles Of Force Mains

    Sizes Vary From 4 To 42 Materials Primarily Ductile And Cast Iron With Some

    PVC, HDPE And PCCP

    October 26, 2010B&V Livingston | 7

  • 8/8/2019 Force Mains: Not To Be Forgotten Assets

    8/26WEFTEC10 New Orleans, Louisiana

    Force Mains: Not-to-be-forgotten assets

    Service area

    Serves 500,000

    Customers Multiple Sewer

    Districts

    32 Lift Stations

    2,100 Miles OfCollection System

    60 mgd TreatmentCapacity

    October 26, 2010B&V Livingston | 8

  • 8/8/2019 Force Mains: Not To Be Forgotten Assets

    9/26WEFTEC10 New Orleans, Louisiana

    Force Mains: Not-to-be-forgotten assets

    JCWs asset management plan

    Established Process For Management Of Assets

    Treatment Plants, Lift Stations, CollectionSystem

    Established Rating And Terminology

    Identified Force Mains Required Unique Process

    When Establishing an Asset Management Plan Remember

    to Allow For Modifications Based on Better Data

    October 26, 2010B&V Livingston | 9

  • 8/8/2019 Force Mains: Not To Be Forgotten Assets

    10/26WEFTEC10 New Orleans, Louisiana

    Force Mains: Not-to-be-forgotten assets

    Asset management - method tomanage force mains

    Recognized Lack Of Data On Force Mains

    Actual Location Of Pipe In The Alignment

    Condition Of The Pipe

    Required Procedure To Prioritize And EstablishMethods For Collecting Data For ConditionAssessment

    Consistent With Existing Process

    Recognized Force Mains Require A Unique

    Procedure

    October 26, 2010B&V Livingston | 10

  • 8/8/2019 Force Mains: Not To Be Forgotten Assets

    11/26WEFTEC10 New Orleans, Louisiana

    Force Mains: Not-to-be-forgotten assets

    Force main procedure

    Inspection Prioritization Based On Risk Analysis

    Provide Procedure For Collection Of DataRoutinely And By Inspection

    Compatible With Asset Management PlanMethodology

    Develop A Priortization Matrix That Is Flexible AndEasy To Use

    October 26, 2010B&V Livingston | 11

  • 8/8/2019 Force Mains: Not To Be Forgotten Assets

    12/26WEFTEC10 New Orleans, Louisiana

    Force Mains: Not-to-be-forgotten assets

    Prioritization matrix

    Based Upon Risk Analysis Process

    Probability Of Failure (POF)

    Consequence Of Failure (COF)

    POF X COF = RISK Modified To Include Redundancy

    POF X COF X REDUNDANCY = Business RiskExposure

    October 26, 2010B&V Livingston | 12

  • 8/8/2019 Force Mains: Not To Be Forgotten Assets

    13/26WEFTEC10 New Orleans, Louisiana

    Force Mains: Not-to-be-forgotten assets

    Factors for probability of failure

    Pipe Length

    Pipe Material

    Pipe Age

    Pipe Break Data

    Multiple Material In Pipeline

    October 26, 2010B&V Livingston | 13

  • 8/8/2019 Force Mains: Not To Be Forgotten Assets

    14/26WEFTEC10 New Orleans, Louisiana

    Force Mains: Not-to-be-forgotten assets

    Probability of failure factors

    October 26, 2010B&V Livingston | 14

    Each

    Parameter isWeighted

    RatingsEstablished For

    EachParameter

  • 8/8/2019 Force Mains: Not To Be Forgotten Assets

    15/26WEFTEC10 New Orleans, Louisiana

    Force Mains: Not-to-be-forgotten assets

    Factors for consequence of failure

    Pipe Diameter

    Pipe Alignment

    Pipe Physical Location

    No Manholes To Locate Pipeline

    Estimated Duration Of Service Interruption

    Land Use Adjacent To Pipeline

    October 26, 2010B&V Livingston | 15

  • 8/8/2019 Force Mains: Not To Be Forgotten Assets

    16/26WEFTEC10 New Orleans, Louisiana

    Force Mains: Not-to-be-forgotten assets

    Consequence of failure factors

    October 26, 2010B&V Livingston | 16

    Each

    Parameter isWeighted

    RatingsEstablished For

    EachParameter

  • 8/8/2019 Force Mains: Not To Be Forgotten Assets

    17/26WEFTEC10 New Orleans, Louisiana

    Force Mains: Not-to-be-forgotten assets

    Priority ranking results

    October 26, 2010B&V Livingston | 17

    POF x COF x

    Redundancy =Business Risk

    Ranking

  • 8/8/2019 Force Mains: Not To Be Forgotten Assets

    18/26WEFTEC10 New Orleans, Louisiana

    Force Mains: Not-to-be-forgotten assets

    Force main inspection priorities

    Provide A Numerical Ranking Based On Business

    Risk Exposure Method Allows Adjusting Of Weighting On Factors

    To Meet Specific Concerns

    Revised in the Future Based on Data Collected

    October 26, 2010B&V Livingston | 18

  • 8/8/2019 Force Mains: Not To Be Forgotten Assets

    19/26WEFTEC10 New Orleans, Louisiana

    Force Mains: Not-to-be-forgotten assets

    Inspection and condition assessment

    procedure

    Develop A Standard Approach For Inspection Procedures

    Inspection Plan Evaluate Leak Detection

    Conduct Testing And Inspection

    Evaluate Data To Complete Condition Assessment

    Identify Inspection Technologies For Various Pipe Materials

    Ductile And Cast Iron

    PVC And HDPE

    Pre-stressed Concrete Cylinder Pipe (PCCP)

    October 26, 2010B&V Livingston | 19

  • 8/8/2019 Force Mains: Not To Be Forgotten Assets

    20/26WEFTEC10 New Orleans, Louisiana

    Force Mains: Not-to-be-forgotten assets

    Relationship to asset management plan

    Builds Upon Level 1 Assessment Data

    Establishes Priorities For Force Mains Inspections

    Results Of Condition Assessment Compatible With

    Existing Plan Provides The Condition Of The Pipe For Managing

    As An Asset In Future Planning

    October 26, 2010B&V Livingston | 20

  • 8/8/2019 Force Mains: Not To Be Forgotten Assets

    21/26WEFTEC10 New Orleans, Louisiana

    Force Mains: Not-to-be-forgotten assets

    Capital planning with results

    October 26, 2010B&V Livingston | 21

  • 8/8/2019 Force Mains: Not To Be Forgotten Assets

    22/26WEFTEC10 New Orleans, Louisiana

    Force Mains: Not-to-be-forgotten assets

    Implementation of procedure

    Determine Priority Inspection From Matrix

    Evaluation Collect Data And Conduct Inspection Of Pipeline

    Complete Condition Assessment Based On FieldData

    Prioritize Pipeline For Rehabilitation Or

    Replacement

    October 26, 2010B&V Livingston | 22

  • 8/8/2019 Force Mains: Not To Be Forgotten Assets

    23/26WEFTEC10 New Orleans, Louisiana

    Force Mains: Not-to-be-forgotten assets

    Collection of data

    Implement Data Collection In Operation Work

    Orders Following Form Developed From Review Of Several

    Utilities

    Simple Is Better

    Complete Inspections Of Priority Pipelines

    Update Gis Information From Gathering Efforts

    October 26, 2010B&V Livingston | 23

  • 8/8/2019 Force Mains: Not To Be Forgotten Assets

    24/26WEFTEC10 New Orleans, Louisiana

    Force Mains: Not-to-be-forgotten assets

    Work order datacollection

    October 26, 2010B&V Livingston | 24

  • 8/8/2019 Force Mains: Not To Be Forgotten Assets

    25/26WEFTEC10 New Orleans, Louisiana

    Force Mains: Not-to-be-forgotten assets

    Conclusions

    Force Mains Require Unique Procedure In The

    Asset Management Plan Condition Assessment Is A Difficult Task

    Prioritization of Pipelines Results in BetterManagement of Assets

    October 26, 2010B&V Livingston | 25

  • 8/8/2019 Force Mains: Not To Be Forgotten Assets

    26/26

    WEFTEC10

    New Orleans, LouisianaOctober 26, 2010

    Questions?

    Bryon Livingston, P.E.Email: [email protected]

    Stacy GalickEmail: [email protected]

    Alireza Parhami, P.E.Email: [email protected]

    mailto:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]