forecast meteorological drought based on the standardized precipitation index
DESCRIPTION
Forecast Meteorological Drought based on the Standardized Precipitation Index. Kingtse Mo Climate Prediction Center & Jinho Yoon Pacific Northwest National Lab, Richland, wa. Objectives. Develop objective drought Prediction based on drought indices - PowerPoint PPT PresentationTRANSCRIPT
11
Forecast Meteorological Drought based Forecast Meteorological Drought based on the Standardized Precipitation Indexon the Standardized Precipitation Index
Kingtse MoClimate Prediction Center
& Jinho Yoon
Pacific Northwest National Lab, Richland, wa
22
ObjectivesObjectives
Develop objective drought Prediction based on drought indices
Meteorological droughtMeteorological drought: : based on the Precipitation deficit.
Index: Standardized Precipitation Index (SPI)
33
SPISPISPI3-SPi12:
For drought monitoring: SPIs are updated daily using the CPC unified Precip analysis
Advantages:
Only need precipitation
Can be applied to station data
SPI3: shorter range P conditions
SPI6 comparable time scales with soil moisture
SPi12-24: long term droughtD3 D2 D1
Predicting SPI from CFS over the United States
Downscaling from the CFS forecasts (T62) to 50 KM. Four different downscaling methods are tested
Append the corrected P forecasts to the observed P data set
Compute SPI from 3 months to 12 months
Evaluate the forecasts
44
Bilinear interpolationBilinear interpolation
55
Correct the model climatology and Correct the model climatology and bilinear interpolation to a high bilinear interpolation to a high resolution gridresolution grid
Example: 1988 Nov
1. Too smooth over the mountain region,
2. amplitudes are too low because of ensemble mean , low resolution,and BI
Ensemble CFS T62 fcsts
66
Bias correction & Downscaling Bias correction & Downscaling (BCSD) (BCSD)
Probability mapping based on distributionsProbability mapping based on distributions
• Get probability distribution PDFs for A (coarse T62 Get probability distribution PDFs for A (coarse T62 fcsts ) and A(fine, obs)fcsts ) and A(fine, obs)
• From A (coarse) get percentile based on PDF (coarse)From A (coarse) get percentile based on PDF (coarse)• => assume the same percentile for the fine grid and => assume the same percentile for the fine grid and
work backward based on the PDF fine get A fine work backward based on the PDF fine get A fine (anomaly)(anomaly)
• If normally distributed , time ratio of stdIf normally distributed , time ratio of std
)(
)(*)(')('
coarse
finecoarseAfineA
Ref Wood et al (U. Washington 2002,2006)
1988 Nov
77
Improvements over mountain regionsstronger amplitudes
88
Schaake’s linear regressionSchaake’s linear regression
Schaake’s linear regression – Schaake’s linear regression – calibrate P ensemble forecasts calibrate P ensemble forecasts based on the historical performancebased on the historical performance
For P, transfer to normal space first For P, transfer to normal space first
)(
)(),(*)(')('
coarse
fineobshindcastcoarseAfineA
Ref: Wood and Schaake (2008)
Schaake et al. (2007)
Can be negative=>make fcsts worse
99
Bayesian merging & bias correction Bayesian merging & bias correction
Bayesian correction – calibrate Bayesian correction – calibrate Probability distribution based on Probability distribution based on forecast informationforecast information
Calibration based on the linear Calibration based on the linear regression regression
fcst=a*obs+b fcst=a*obs+b
and spreadand spread
Ref: Luo et al. (2007); Luo and Wood (2008)
Bayesian methodBayesian method For T62 CFS forecasts, the spread is
large because of low skill and ICs cover large interval (about 25 days apart)
Amplitudes of forecasts after Bayesian downscaling are too weak.
Here, we use no spread (Coelho et al. 2004), but screen to select only fcsts close to the ensemble mean
1010
1111
1988 NovA good fcst
Spread is too large, so it dumps fcst.Magnitudes are too weak
Screen fcstsNo spread
P CorrelationP Correlationfor lead=1for lead=1
1212
BCSD
Schaake
Bayesian
Ensemble
MayNov
1313
Standardized Precipitation Index Standardized Precipitation Index Forecasts Forecasts
Append the bias corrected and downscaled P to the observed P time series
Calculate SPI from extended time series The advantages are (1) no need of hydrologic
model and (2) can use any base period. An example: Fcst Nov 1981 SPIs P : observed : Jan1950-oct1981 append fcsts with ICs in Oct-Nov lead 1 f1 lead 2 f2
to f9 etc P time series: Jan1950-oct 1981 (obs) Nov 1981 (fcst)For SPI6 lead 1, there are 5 months of observed P
1414
Seasonal dependence of skillSeasonal dependence of skill
1.For the first 3 months, 1.For the first 3 months, AC>0.6 and RMS < 0.8 AC>0.6 and RMS < 0.8
2. From lead 1 to 4 mo, the 2. From lead 1 to 4 mo, the fcsts are skillful and fcsts are skillful and differences between differences between downscaling methods are downscaling methods are small.small.
3. Large differences occur 3. Large differences occur after lag 4 when skill is lowafter lag 4 when skill is low
BCSD
Schaake
Bayesian
Ensemble mean
NOV
FEB
MAY
Aug
rmes skill for different methods (may fcsts spi6)
1515
BCSD
Schaake
Bayesian
lead1 Lead 2 Lead 3
1616
SPI6-Bayesian
Nov
Feb
May
Aug
RMSE Lead 1 Lead 2
SPI6 obs(colored) &fcsts(lead 2) (32-36N)
1717
SPI6 fcst & obs lead=3
1818
1919
Dynamic downscaling based on Dynamic downscaling based on the 50-km RSMthe 50-km RSM
1.RSM (regional spectral model) nested in the CFS forecasts to downscale(April 28-May 3) ICs (50 km resolution) (Thanks, Henry Juang)
2.How does this compare with the statistical BCSD downscaling method
2020
Correlation
RSM-50km
P
T62 BCSD15mem
T26 BCSD5mem
SPI6
RSM better than 5 mem, but worse than 15mem T62
ConclusionsConclusions
2121
1. Attempt has been made to predict the meteorological drought based on SPI from downscaled P from T62 CFS seasonal forecasts
2. 2. For SPI3, the ACC is above 0.5 for 2 months and for SPI6, the ACC is above 0.5 for 4 months.
3. For SPI prediction, the skill is not sensitive to the downscaling methods.
4. Dynamic downscaling based on the 50-RSM does not have advantage in comparison with the simple BCSD downscaling.