PSA DESIGN DEVELOPMENT
BAILEY CENTERFORT WORTH, TX
Owner: Mahkani Bros. Investment GroupSize: 13,000 SF (Leased at $4.00 SF)Cost: $150,000Scope: Space Planning, Facade Renovation
PSA conducted site analysis and As-built drawings for this mixed-use lot in need of an update of its 1950’s facade and finish out for some of the spaces. Developed several 3D model schemes of image concepts for approvals prior to the final drawings for permit and bid.
Bailey Center Site Plan
PSA DESIGN DEVELOPMENT
MOTEL 12FORT WORTH, TX
Owner: Mahkani Bros. Investment GroupSize: 15,486 SF; 40 unitsCost: $2,600,000Scope: Master Planning, Site Planning and Floor Planning
PSA completed Master Planning of a mixed-use tract development with retail shopping strip center at the frontage road with a shared entry to a proposed 40 room/unit Motel facility. Project included offices, breakfast counter common area, and resident quarters located above the office area. Complete with 3D modeling views of exteriors, interiors and landscape plans.
PSA DESIGN DEVELOPMENT
28th STREETFORT WORTH, TX
Owner: Mahkani Bros. Investment GroupSize: 10,000 SFCost: $1,400,000Scope: Project Manager/Architect, Construction Documents, Construction Administration, Site Planning, Complete Design
PSA completed all phases of planning, bids/negotiations and construction administration to full completions. 3D modeled views helped to obtain the crucial element of obtaining a variance before the public hearing board and achieved approvals of dropping a previous 50’ landscape setback down to 5’.
PSA DESIGN DEVELOPMENT
BROOKSHIRE MEDICAL COMPLEXHURST, TX
Owner: Dr. Kevin Afkami, DDSSize: 9,000 SFCost: $1,200,000Scope: Complete Design, Full Construction Documents, Site/Landscape Planning, Replats
PSA accomplished site plan approvals and Master Planning/Replatting of tract on Pipeline Road in Hurst, adjacent to the Tarrant County Community College for medical office buildings for the Brookshire Medical Complex. The project included 2 separate office buildings and phases.