Web page title: Front Range Wireless Web page description: Home page

1 CUSTOMER SERVICE CENTERKEEPING YOUR NETWORK ON THE AIR

2 Site modification 3 Site maintenance 4 24-7 Emergency contacts5 Frequently requested information6 Microwave7 Fiber 8 Switch solutions9 WiMAX10 Hydrogen fuel cells

Page 2: FRW website copy plan

2 Site modification MIGRATION WITHOUT INTERRUPTION

Microwave (to page 6)T1/DS3 install testingSectorization Equipment changesFiber installStructural upgradesLTEUMTSHVAC maintenance or upgradesRadio change outsGenerator installsE911Pre-construction site surveys

Web page title: Site modificationsWeb page description: Home page

New database provides recall of past projects by site.

Our new project management database provides fast recall to our staff and customers. We track the address, directions and access issues for every location. Recall details include dates and type of work performed, who was involved, PO number, other carriers on the site, etc. Call the office if you need site or job information. Anyone can help you! Quick response – one of the value-added services we provide to every customer.

Your support teamBest Total Solution

PHOTO

Mark GreierProject [email protected]

See my profile on Linked in

Why I use Front Range:

I want to say a MILLION thanks for sending these completion notices. You are the only GC that sends these out right away once the install is complete. Hope you know how much this is appreciated! Becky – Customer project manager

SMR ExperienceMore than 1000 SMRs in 2009•More than 200 UMTS and 200 LTE sites in 2009•More than 60 licensed and un-licensted MW projects involving 130 hops in 2009.

Page 3: FRW website copy plan

3 Site maintenance QUICK RESPONSE TIME

HVACLocal crews in Denver and CSWestern regional network of approved subcontractorsGeneratorsFAA lighting/controller repairsTesting services (Click #11)Concrete repairsShelter repairsPlumb and tension guyed towersRoad improvementRooftop repairsPainting (including towers)Weed abatementSnow plowingSnow cat serviceCertified weldersGraffiti removalDatabase of all sites visited and work performed.

Web page title: Site modificationsWeb page description: Home page

GPS tracking and computer in every vehicle.

If you need a fallen tree branch removed, we may have a crew in the area who can remove it today! Happy landlord.

Our GPS tracker tells us exactly where our crews are in any state and whether they are at a site or traveling. So as soon as they are done with the tree, we can they can email you a photo and you can notify the landlord. Always ready – one of the value-added services we provide to every customer.

Your support teamBest Total Solution

PHOTO

Sean McConnellProject [email protected]

See my profile on Linked in

Why I use Front Range:

I want to say a MILLION thanks for sending these completion notices. You are the only GC that sends these out right away once the install is complete. Hope you know how much this is appreciated! Becky – Customer project manager

Maintenance ExperienceMore than 300 SMRs in 2008•More than 200 UMTS and 200 LTE sites in 2009•More than 60 licensed and unlicensted MW projects involving 130 hops in 2009.•Multiple switch maintenance projects in 4 wester states

Page 4: FRW website copy plan

4 24/7 Emergency Contacts WE NEVER SAY NO

HVAC repairsMicrowave outagesDisaster recoverIn-house AC and DC electriciantsCertified weldersLarge spare parts inventorySwitch issuesCOW deploymentGenerator maintenanceLocal crews in Denver and CSWestern regional network of approved subcontractorsFAA lighting/controller repairs GeneratorsTesting services Snow plowingSnow cat serviceTechnical troubleshootingDatabase of all sites visited and work performed.

Web page title: 24/7 Emergency contactsWeb page description: Emergency services

More capacity than others

All crew vehicles are stocked with tools, spare parts, test equipment and laptop computers with air cards.

Always ready – one of the value-added services we provide to every customer.

Your support teamBest Total Solution

PHOTO

Tony BielecProject [email protected]

See my profile on Linked in

Why I use Front Range:

I want to say a MILLION thanks for sending these completion notices. You are the only GC that sends these out right away once the install is complete. Hope you know how much this is appreciated! Becky – Customer project manager

Emergency experienceMore than 300 SMRs in 2008•More than 200 UMTS and 200 LTE sites in 2009•More than 60 licensed and unlicensted MW projects involving 130 hops in 2009.•Multiple switch maintenance projects in 4 wester states

Page 5: FRW website copy plan

Web page title: Frequently requested company informationWeb page description: Home page

5 Frequently requested company informationALWAYS TRAINING. ALWAYS READY.

Training courses (click #12)

Pre-qualifications (site and equipment) (click #13 for list)

Company organization (click #14)

Company history (click #15)

ES & H Statistics (#16)

Training standardsAs a Voting member of National Association of Tower Erectors (NATE) since 2002. We support Nate-Osha partnership and go out of our way to comply. Safety and quality standards and inspections are enforced. Went a step further by having our QA process audited and certified by ISO.

Crew configuration (All crew members are cross-trained in civil, line and antenna, DC power and coax line testing). All crew vehicles are stocked with tools, spare parts, test equipment and laptop computers with air cards.Materials staging – two warehouse

– one of the value-added services we provide to every customer.

Your support teamBest Total Solution

PHOTO

Aaron [email protected]

See my profile on Linked in

Why I use Front Range:

I want to say a MILLION thanks for sending these completion notices. You are the only GC that sends these out right away once the install is complete. Hope you know how much this is appreciated! Becky – Customer project manager

Licenses by StateMore than 300 SMRs in 2008•More than 200 UMTS and 200 LTE sites in 2009•More than 60 licensed and unlicensted MW projects involving 130 hops in 2009.•Multiple switch maintenance projects in 4 wester states

Page 6: FRW website copy plan

Web page title: MicrowaveWeb page description: Home page

6 Microwave REGIONAL COMMUNICATIONS NETWORKS

Path studiesLine of site reportsOEM equipment certifications Lucent certifiedMotorola certifiedEmerson certifiedTest equipmentScopesPre-testingSpecial waveguide tools

Teamed with MindBank Consulting Group

Your support teamBest Total Solution

PHOTO

Adam GoretzkiMicrowave [email protected]

See my profile on Linked in

Why I use Front Range: Adam- any testimonials for this space?

Microwave Experience

Help!Investing in the latest test equipment

In addition to providing our technicians and crews with the latest training, we have invested heavily in test equipment that makes us more efficient, more accurate, more reliable.

We own six Anritsus and 2 ME path boxes

Zero defects – one of the value-added services we provide to every customer.

Page 7: FRW website copy plan

7 Fiber optic services Leading the way in transport services

SwitchesLTE migration

In-house excavationWestern regional subs

Web page title: Fiber optics

Regional view with pre-qualified subcontractor network

Always ready – one of the value-added services we provide to every customer.

Your support teamBest Total Solution

PHOTO

Rob ThompsonProject [email protected]

See my profile on Linked in

Why I use Front Range:

I want to say a MILLION thanks for sending these completion notices. You are the only GC that sends these out right away once the install is complete. Hope you know how much this is appreciated! Becky – Customer project manager

Fiber optic experienceMore than 300 SMRs in 2008•More than 200 UMTS and 200 LTE sites in 2009•More than 60 licensed and unlicensted MW projects involving 130 hops in 2009.•Multiple switch maintenance projects in 4 wester states

Page 8: FRW website copy plan

8 Switch UpgradesWestern Power Installation

• Switch construction and maintenance• Power coordination• Consulting hotline• Troubleshooting• Emergency repairs• Engineering• Generator installs• Service upgrades• Similar projects• Boise switch• Verizon maintenance (# of sites etc)• Contact and quals

Fiber optics

Web page title: Switch upgrades

Quality assurance program

.

Quality assurance methods– one of the value-added services we provide to every customer.

Your support teamBest Total Solution

PHOTO

Jason LangworthyProject [email protected]

See my profile on Linked in

Why I use Front Range:

I want to say a MILLION thanks for sending these completion notices. You are the only GC that sends these out right away once the install is complete. Hope you know how much this is appreciated! Becky – Customer project manager

Switch experienceMultiple switch maintenance projects in 4 wester states

ISO 9001:2008 certified

Page 9: FRW website copy plan

• WiMAX

Web page title: WiMAX

New headline

Always ready – one of the value-added services we provide to every customer.

Your support teamBest Total Solution

PHOTO

Paul PertelesiAccounting/Human [email protected]

See my profile on Linked inWhy I use Front Range:

I want to say a MILLION thanks for sending these completion notices. You are the only GC that sends these out right away once the install is complete. Hope you know how much this is appreciated! Becky – Customer project manager

WiMAX experienceMore than 300 SMRs in 2008•More than 200 UMTS and 200 LTE sites in 2009•More than 60 licensed and unlicensted MW projects involving 130 hops in 2009.•Multiple switch maintenance projects in 4 wester states

Page 10: FRW website copy plan

10 Your best total solutionValue added to every quote

ResponsiveDatabase trackingGPS, laptop, streets and trip in every truckAlways read for additional wok, supplier networkNever say no. More capacity that othersTraining and cross trainingCloseout packagesQuality insurance program (ISO audited and certified)Materials staging –Two warehousesTest equipment investmentRegional view with pre-qualified subs throughout the West.QA check and double checkFinancial strength

Zero defects – An oversight or mistake on our part becomes a defect if it gets passed on to the customer. We share your desire that nothing be left undone. If it’s not right, we’ll fix it at our expense.

Web page title: Value-added pricing Web page description: Home page

Page 11: FRW website copy plan

Web page title: Front Range Wireless Web page description: Home page

11 Testing services – Contact

Six Antrisu spectrum analyzersPIMMicrowave

Training with this equipment

Contact and qualsTestimonial

Page 12: FRW website copy plan

Staff training and development schedule

Course Qualified Scheduled TotalSafety Environmental Safety and Health orientation 25 20 45First Aid/CPR 25 20 45Non-ionizing Radiation Safety 24 24Driver License verification 24 24Commercial Drivers License 0Fall protection 18 18Personal protective equipment 21 21Climbing Safety and Rescue 0Advance Rigging and Ropes 18 18Crane safety 0Excavation and trench safety 0Aerial lift operator 1 1Forklift operator 22 22Man-rated hoist operator 2 2Earth moving equipment operator 1 1

Construction standardsOSHA 10 hour construction standards 0OSHA 30 hour construction standards

OEM training and certificationsMarconi power distribution frames (Emerson radios) 4 4Pico power distribution frames (Emerson radios) 4 4Alcatel-Lucent (8000 and 9500 series radios) 3 3Fiber optic cleaning, racking, power and mutiplexer components 0

Switch installation certificationsSafety and procedural standards 2 2Fiber optic installation, splicing and testing 2 2Cabling and distributions systems 2 2Line and trunk testing 2 2Fire stopping/protection systems 2 2

Quality audits for power and ground, removals and labels 1 1

LicensesInternational Code Council National Standard General Building Contractor (A) Exam. 1 1Colorado ElectricalDenverColorado Springs

Quality assurance certificationInternational Organization for Standardization (ISO) 9001:2009 #41132

Technical testing certificationAnritsu sweep testing certification 2Passive Intermodulation Test System certification 2XL Path Align-R Microwave Pathing system certification 2

Page 13: FRW website copy plan

13 Pre-qualifications (sites and equipment):

AT&TVerizon Wireless(Alltell)Sprint (Nextel)Open Range WirelessT-MobileCrown CastleAmerican Tower Corp.General DynamicsBlack and VeatchAircellMotorolaAlcatel-LucentCity of Colorado Springs Excel EnergyIntermountain Rural Electric AssociationQwestComcastOpen Range Communications

Page 14: FRW website copy plan

14 Company organization

Sole corporate officer: Aaron Kingstrom. Project managers: Mark Greier, RobThompson, Tony BielecWestern Power Installation (WPI): Jason LangworthyEstimator: Brad MillerController: Sean McConnellAccounting/Human Resources: Paul Pertelesi

Crew configuration (All crew members are cross-trained in civil, line and antenna, DC power and coax line testing). All crew vehicles are stocked with tools, spare parts, test equipment and laptop computers with air cards.

Microwave: Four two-man crewsDC power: Four two-man crewsCivil: One two-man crewLine and antenna: Four two-man crewsElectrical: Two two-man crewsSite construction: Two two-man crewsSwitch services: Four technicians

City and state licensing information available on request.Customer list available on request.

Page 15: FRW website copy plan

• Company History

2001Front Range Wireless (FRW), Inc., established as a privately-held ColoradoCorporation. Starting with seven employees doing $1 million in sales, we nowaverage 45 employees and $14 million inannual revenues. We are approved for bonding on projectsup to $20 million. Aaron Kingstrom, sole director.

Master electrician’s license.

Selected as approved subcontractor for Bechtel to build communications sites forATT.

Completed training on Andrew microwave dishes.

2002Became voting member of National Association of Tower Erectors (NATE).

Selected by General Dynamics as an approved subcontractor to buildcommunications sites for ATT.

2003Opened 10,000 square foot warehouse and material distribution center on10 acres in Colorado Springs, CO.

2005Completed Marconi and Pico training for power distribution frames (PDFs).OEM training for Emerson microwave radios and PDFs.

2006Purchased 10,000 square foot office complex and warehouse on two acres in Centennial, CO

2007Audited and certified by the International Organization for Standardization (ISO) 9001: 2000 -- a family of standards for quality management which cover all

key processes in the business and facilitates continual improvement. Certificate No. 41132.

Formed Western Power Installation Inc., a wholly owned subsidiaryconcentrating on the construction, maintenance and upgrade ofCellular mobile switching centers (MSCs). Annual revenues average $1million. Aaron Kingstrom, sole director. Jason Langworthy, foreman.

Approved to work in Verizon and ATT MSCs.

2007Purchased XL microwave path boxes.

2008Completed Alcatel training for 8000- and 9500-series microwave radios.

Completed training for fiber optic cleaning, racking, power and multiplexer components.

2009 Formed teaming arrangement with Mindbank Technical Solutions to provide government and public safety customers with Land Mobile Radio (LMR) assessment and design.

Purchased Passive Intermodulation Test system (PIM).

Passed International Code Council National Standard General Building Contractor (A) Exam. John Ballenger, qualifying party.

Purchased ProEst estimating database system allowing us to provide consistent pricing on short notice.

Created customized project management database allowing us to recall details on all sites visited and provide rapid updates to customer questions regarding current and past project status.

Established web-based project collaboration site.