FY 11 GPC UPDATE BRIEFING. John T. Daniel 11 May 2011. GLOBAL POV CONTRACT OVERVIEW. * History * GPC Structure * Shipping/Storage Volume * AAL’s Performance * Global POV Contractor Initiatives * GPC Re-compete. GLOBAL POV CONTRACT HISTORY. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: FY 11 GPC UPDATE BRIEFING

FY 11 GPC UPDATE FY 11 GPC UPDATE BRIEFING BRIEFING John T. Daniel

11 May 2011

Page 2: FY 11 GPC UPDATE BRIEFING

GLOBAL POV CONTRACT OVERVIEW

* History* GPC Structure* Shipping/Storage Volume* AAL’s Performance* Global POV Contractor Initiatives* GPC Re-compete

Page 3: FY 11 GPC UPDATE BRIEFING

GLOBAL POV CONTRACT HISTORY

• SDDC established the Global POV contract beginning 1 Nov 98. The purpose was to provide point-to-point logistics management, transportation, and storage of service members POVs with a single contractor. Storage of POVs was added in May 2002.– The initial contract was awarded to American

Auto Logistics (AAL) for a two year base with three one year options (1 Nov 98 through 31 Oct 03)

Page 4: FY 11 GPC UPDATE BRIEFING

GLOBAL POV CONTRACT HISTORY

• The follow-on contract was also awarded to AAL. This contract (current) began on 1 Nov 03 and potentially runs through 31 Oct 13.

• This contract has a two year base period; three one year options; and five award term years

– The award term is an incentive designed to reward the contractor for excellent performance

– AAL earned the first three award term years and began performance of the first one on 1 Nov

– AAL is currently operating in Award Term 3 (1 NOV 10-31 Oct 11)

Page 5: FY 11 GPC UPDATE BRIEFING

GLOBAL POV CONTRACT HISTORY

• As a result of a Base Realignment and Closure (BRAC) initiative, SDDC was relocated to Scott AFB and consolidated with Air Mobility Command (AMC) and USTRANSCOM. – Contracting Officer responsibilities for the

Global POV contract transferred to USTRANSCOM effective 12 Feb 07

– Editing Rights to the Shipping/Storing Your POV Pamphlets transferred to USTRANSCOM J5J4

Page 6: FY 11 GPC UPDATE BRIEFING

GLOBAL POV CONTRACTGOVERNMENT REPORTING STRUCTURE

HQ SDDC GPC PMMr. Terry Griffin

HQ 598TH TTG

European LeadMr. Tim Daniel

Global POV Contract – EUCOM AOR

Chain of Command and Responsibility

STAFF DIRECTION

OPCON

LEGEND:

Contractual Chain

USTRANSCOM KOMs. Carey Gropp

Trans BNs

VPC Site CORs

PM KO

COR

COR

Page 7: FY 11 GPC UPDATE BRIEFING

POV SHIPPING VOLUME FY10

Page 8: FY 11 GPC UPDATE BRIEFING

POV SHIPPING VOLUME FY11

Page 9: FY 11 GPC UPDATE BRIEFING

POV STORAGE VOLUME FY10

Page 10: FY 11 GPC UPDATE BRIEFING

POV STORAGE VOLUME FY11

Page 11: FY 11 GPC UPDATE BRIEFING

GLOBAL POV CONTRACTOR PERFORMANCE 1998-2010

Quality • RDD compliance rating of 99% since 1999

Service • Customer satisfaction rating of 99% since 1998

Accountability• Approximately 8,000 claims handled annually, in a timely,

professional, and courteous mannerTechnology

• CLASS, an internally developed supply chain management system, customized to support specifically the GPC, was launched in November, 2008

Flexibility• Added 9 new VPC’s since 1998; closed 5 obsolete VPC’s • Started storage program in 2002

Cost Control • Program cost to DoD well below inflation

Page 12: FY 11 GPC UPDATE BRIEFING

GLOBAL POV PROGRAM ENHANCEMENTS

* Reengineering of www.whereismypov.com* Safety Improvements* Wallet Cards* VPC Processing Continuity Card* Automated POV email arrival notification* QAR Reformat* Performance Level Hierarchy

Page 13: FY 11 GPC UPDATE BRIEFING

GLOBAL POV CONTRACT GPC3

•Complete RFP/RFQ by 3 Aug 2012

• ISSUE RFP/RFQ by 7 Nov 2012

• Expected GPC Contract Award 30 Jul 2013

Page 14: FY 11 GPC UPDATE BRIEFING

GPC BENEFITS TO THE DoD

• Single point of contact for POV shipping and storage program

• Transparent cost - no hidden fees or surprise costs

• Convenience to the service member

• Low government overhead to administer

• Fast and fair claims settlement process directly with service

member

• Reliable and dependable network – able to deliver to the right

place at the right time.

Page 15: FY 11 GPC UPDATE BRIEFING

Ms. Janice Griffin, SDDC Storage and POV Team Lead618-220-5441, [email protected]

Mr. Terry Griffin, SDDC GPC Program Manager618-220-5440. [email protected]

Mr. Tim Daniel, Lead COR, European Region808-845-8531, [email protected]

Ms. Carrey Gropp, USTRANSCOM Contracting Officer618-220-7060, [email protected]