gci profile en

10
Geomatic Consulting International Vietnam – Cambodia - Myanmar www.gci-int.com Land and Engineering Surveying Topographic Mapping and Design Aerial Photography & Mapping Geospatial Products and Services Professional Survey Services Since 1998 Company Profile

Upload: david-mitchell

Post on 11-Apr-2017

213 views

Category:

Documents


5 download

TRANSCRIPT

Page 1: GCI Profile EN

Geomatic Consulting International Vietnam – Cambodia - Myanmar

www.gci-int.com

Land and Engineering Surveying Topographic Mapping and Design Aerial Photography & Mapping Geospatial Products and Services

Professional Survey Services Since 1998

Company Profile

Page 2: GCI Profile EN

Geomatic Consulting International

Land & Engineering Survey

Topographic Mapping & Design

Aerial Photography & LiDAR Geospatial Products & Services

Geomatic Consulting International (GCI) is an independent provider of technical and consulting services in land and engineering survey, topographic mapping and design, and geospatial products and systems.

GCI operates on New Zealand-based best-practise principles with legal entities in Vietnam, Cambodia and Myanmar. Since 1997, GCI has been active throughout the SE Asia region, having completed assignments in Bangladesh, Cambodia, Hong Kong, India, Indonesia, Laos, Myanmar, New Zealand and Vietnam. The company has established a strong record of accomplishment on a wide variety of prestigious projects for multi-national clients in the transport infrastructure, property and urban development, industrial, energy, natural resources and hospitality sectors.

Mission GCI’s mission is to expand and enhance our position as a leader in land and engineering surveying and mapping through the provision of independent, responsive and innovative services. This goal continues to be realised through our: Integrity GCI emphasises honesty & ethics throughout the organisation Accuracy Assignments performed to the appropriate level of accuracy Reliability Data and plans can be counted on for detailed design Efficiency The appropriate use of technology to maximise resources

Sectors The company has gained considerable experience in the private sector, providing services throughout the project cycle from feasibility study to implementation, construction and post-construction monitoring. GCI provides valuable services for a variety of sectors, including; Infrastructure:

Bridges, highways, railways, tunnels, ports & harbours

Energy: Hydroelectric & thermal power stations, oil & gas processing facilities and pipelines

Property Development: Residential, office and commercial premises, golf courses and resort developments

Natural Resources: Mineral exploration, rural development, irrigation, forestry and agriculture

Services With a core business in engineering and geodetic surveying, GCI applies the principles of professional practise to our entire service range. Our services include:

Land Surveying: Topographic mapping, remote sensing, base mapping, aerial mapping, cartography and image processing Engineering Surveying: Construction and civil/mechanical surveying, building surveying, dimensional surveys

Road Design: Detailed design services for access roads, haul roads and provincial highways Geo-Information Solutions: Hardware, software and data procurement, delivery and maintenance

Management The firm is managed by qualified survey engineers with over 35 years experience in the Indochina region. Their mission is to ensure the highest level of service and reliability for GCI’s engineering, consulting, design, civil engineering, and construction clients.

 

Vietnam   

Geographic Technology Solutions Ltd 

 

Ho Chi Minh City Office: 01 Street 2B 

Bach Khoa Estate (Do Xuan Hop Street) 

Phu Huu Ward  District 9  

 

Tel +84 (0) 8 3743 2514  Email hcmc@gci‐int.com 

 

Hanoi Office: 2nd Floor 

31 Nui Truc Street Ba Dinh District  

 

Tel +84 (0) 913 808 160 Email hanoi@gci‐int.com 

  

 

Cambodia   

Geomatic Consulting International (Cambodia) Ltd 

 

Phnom Penh Office: Unit 203, 10 Street 242 Sangkat Chaktomuk Khan Daun Penh  

 

Tel +855 (0) 10 681 521 Email pp@gci‐int.com 

  

 

Myanmar   

Geomatic Consulting International (Myanmar) Ltd 

 

Yangon Office: No 195 B, Mingalar Street, 

13 Ward, South Ohkalarpa 

  Tel: +95(0) 942 002 6800 Email yangon@gci‐int.com 

 

 

 

Geomatic Consulting International (IBC) Ltd  

 Incorprated in the  British Virgin Islands 

 Trident Chambers 

PO Box 46 Road Town Tortola 

  

Page 3: GCI Profile EN

Services

Land & Engineering Survey

Topographic Mapping & Design

Aerial Photography & Mapping

Geospatial Products & Services

GCI provides a wide range of both conventional and innovative survey and mapping services to offer our clients unsurpassed confidence in both our results and our value.

Consulting

o Survey project management o Supervision of third party survey operations o Validation of third party data, reports and drawings o Data integrity and validation services o Consulting services on survey systems, specification & methodologies o Terms of reference design o QC/QA audit surveys o Advice & specification for equipment procurement o Provision of staff for assignments under direct client supervision o GPS training & technical support

Land Survey

o Topographic mapping for engineering design o Earthwork & volume calculations o Boundary, lease and ROW surveys o Cadastral mapping o GNSS rover leasing o GNSS reference networks o Digital terrain modelling (DTM) o Building condition surveys o Route & corridor mapping o Stockpiles, waste, overburden surveys o Exploration grids o Erosion/accretion surveys

Engineering Survey

o Civil & mechanical engineering surveys

o Control network design and establishment o Precise levelling & alignment o Setting out of structures, embedded elements & machinery o Settlement and verticality monitoring o As-built surveys & drawings o Dimensional surveys o Monitoring of heavy equipment installations o Structural deformation surveys o Vibration and noise monitoring

Marine Survey

o Hydrographic & bathymetric surveys o River & seabed mapping o Landfall site investigation for pipelines & cables o Tide & flow metering o Current velocity surveys o Underwater & diving inspection surveys

CADD

o Serial map & plan production o As-built drawings, profiles and sections o Road design for access & haul roads, minor roads & provincial highways o Drainage & utility design o Scheme plan, concept plan and subdivision design drawings o Field to office and office to field o Data conversion & transformation o Digitisation and vectorisation o Route, alignment and corridor design

Geospatial

o High resolution satellite imagery reseller o Aerial photography and LiDAR o 3D terrain modelling from aerial photos, satellite

imagery & LiDAR o Feature & attribute data collection for asset

management o Ground control point surveys for satellite imagery &

aerial photography o Pre- and post marking for photogrammetry o Point-of-interest mapping for PNDs o Geographic Information services o GIS & LIS base mapping o Image processing & rectification o Data acquisition, processing and analysis

Page 4: GCI Profile EN

Sectors

Land & Engineering Survey

Topographic Mapping & Design

Aerial Photography & Mapping

Geospatial Products & Services

GCI operates in a wide variety of industries and fields of business, primarily in the engineering based sectors. The company also offers geographic information services for clients in non-engineering and non-technical areas, such as those involved in, and in support of, trade and commerce.

Infrastructure

Transport

Highways, bridges, and tunnels Light rail, mass rapid transit, monorail Terminals runways, approach paths Ports, harbour & inland waterways

Energy Thermal power plants

Hydroelectric power stations Renewable & alternative energy

Transmission networks

Sanitation Water supply facilities & distribution

Wastewater collection networks Water treatment stations

Disposals & outfalls

Communications Submarine cable networks

Cell network planning and design Land network, landfalls design &

construction

Natural Resources

Land Management Land administration

Land use planning & development Cadastral & legal system of land tenure

Forestry management

Resource Management Irrigation planning

Water resource planning Forestry & biodiversity management

Coastal & marine resources

Mining Mineral exploration & exploitation

Infrastructure & processing facilities Extraction & carriage audits

Quarries & excavations Access & haul roads

Environment Habitat retention

Sustainable development Disposal of hazardous materials

Heritage conservation Impact assessment

Commercial Marketing, Distribution & Retail

Market research Retail location planning

Inventory & stock monitoring Distribution network planning

Real Estate

Urban Development Subdivisions and residential communities

Commercial & retail complexes Office buildings

Mixed-use & integrated complexes

Tourism & Recreation Hotel & resort developments

Golf courses & sports facilities Entertainment complexes & theme parks

Marinas, wharfs & jetties

Industrial

Oil & Gas Hydrocarbon exploration

Gas pipelines & gathering systems Offshore platforms & production facilities

Gas processing terminals

Petrochemical Oil refineries

Petrochemical plants Fertiliser & plants Plastics facilities

Manufacturing Factories & mills

Production & processing plants Export processing zones

Industrial parks

Page 5: GCI Profile EN

Projects

2015  HCMC Metro Line 1 (Viaduct), Ho Chi Minh City, Vietnam

FVR has engaged GCI to carry out engineering surveys for the geometric control survey of the casting of the viaduct segments, as well as the erection of the spans on the 13.5km long viaduct. GCI supplies the Project Surveyor, a Survey Manager and four engineering survey crews.

Freyssinet – VSL – 

Rezzani JV 

  Arata Urban Development, Phnom Penh, Cambodia A survey control network of benchmarks and GPS points were established by GCI before completing a 14 Ha topographic site survey. The site boundary corners were also set out.

Advancing Engineering 

Consultants 

  Saigon Water Transmission, Ho Chi Minh City, Vietnam GCI provided the main contractor with a 15km long topographic site survey for the design of the D3m city water pipeline. Surveys included control network, topographic and hydrographic surveys of major river crossings.

 Obrascón Huarte Lain 

(OHL) 

  Dalat at 1200 Golf and Country Club, Lam Dong Province, Vietnam GCI’s first contract on the Dalat at 1200 Golf and Country Club near Dalat was a topographic survey covering 72ha of the project’s first phase of Villas for geotechnical, architectural and engineering design. GCI made extensive use of Real Time Kinematic GPS equipment and methods. High resolution satellite imagery from Digitalglobe was also provided to the project.

Dalat at 1200/ACTEAM

  Waste Water Treatment Plants, Phnom Penh & Siem Reap, Cambodia GCI currently provides Vinci Construction Grands Projets with control, set out, formwork verification as well as As-built surveys for the construction of two waste water treatment plants within the Phnom Penh and Siem Reap International airports.

Vinci Construction 

Grand Projets 

  Miennel Villa Development, Kampot, Cambodia The project owner and architect engaged GCI to survey the site and near-shore ocean frontages for the building platform and landscape design. A BIM dataset was submitted.

Miennel 

  Holm Residential, Ho Chi Minh City , Vietnam GCI provides construction survey services for the 2-year development of 32 residential villa units in the City’s Thao Dien ward, District 2. Services include building and infrastructure conditional surveys, site surveys and design volume calculations, structure settlement monitoring and survey verification services.

TDS JSC 

2008 – 2015 

Ho Tram Strip Resort Development, Ba Ria - Vung Tau, Vietnam The project owner engaged GCI for pre-construction boundary, control network, utility, road design, topographic and oceanographic surveys in 2008. Currently GCI is involved on the ongoing development, supplying topographic, as-built and engineering survey services for the second hotel tower and the Bluffs villa developments.

Ho Tram Project Co 

2014  Nagaworld VIP Hangar, Pochentong Airport, Phnom Penh GCI surveyors completed control network, topographic, site feature and level surveys for the construction design engineering of the 100m wide hangar and supporting facilities.

Aircraft Support 

Industries 

2012 ‐ 2014 

The Bluffs Golf Course, Ho Tram, Vietnam The firm provided construction surveys, terrain modelling, earthworks volume calculations, claims quantities and as-built survey on the Ho Tram Strip 18-hole Championship golf course.

Linksshape 

  Ing City Development, Phnom Penh, Cambodia The project’s main road and bridge contractor engaged GCI to provide topographic and hydrographic surveys of the river crossing to the south of the site for detailed engineering design of a new RC bridge.

SDAG 

  Harvest Fish Hatchery Expansion, Siem Reap, Cambodia Control network and topographic surveys of the existing hatchery and adjacent land were completed for the engineering design of the sites expansion.

Advancing Engineering 

Consultants 

  East Binh Duong Township, Binh Duong Province, Vietnam GCI set out over 200 boundary positions in often challenging conditions for the 126 Ha urban development site in Binh Duong Province. RTK GPS was used throughout.

VinaCapital  

Real Estate 

  Coilcraft Factory, An Phu IZ, Phu Yen Province, Vietnam A range of site survey services (topographic, survey control, site profile, wind assessment, flood assessment, salinity measurements, water quality analysis, dioxin and prelim UXO assessment) were carried out for the feasibility and design of a new magneto facility.

Coilcraft Industries 

  Nghi Son Refinery, Thanh Hoa Province, Vietnam GCI provided survey services (topographic, verification, as-built, volume calculations, etc) for a 6-month period for the ground improvement contractor in the tank farm area of the refinery.

Menard Asia 

Page 6: GCI Profile EN

Projects

  Century 21 Mixed-Use Development, Ho Chi Minh City, Vietnam Various surveys were carried out for the developer including: control network establishment, terrain surveys, boundary audit surveys and site topographic surveys, including existing water bodies and structures.

21st Century/VCRE 

2013 ‐ 2014 

Southern Railway, Phnom Penh to Sihanoukville, Cambodia Level crossings on the 240km line from Phnom Penh to Sihanoukville were surveyed for detailed engineering and safety design. GCI installed permanent control points and produced detailed plan/profile sheets for the engineering design consultant.

Novare Design NZ 

2013  Wheatstone LNG, Ho Chi Minh City , Vietnam Dimensional survey services were provided at the projects spiral-welded pile fabrication yard ensuring tolerances and specifications in the sub-contractors manufacturing were adhered to.

JSA Australasia 

  Clearwater Bay/Diamond Bay Golf & Country Clubs, Hong Kong As-built surveys for earthwork volume calculations were carried out for the course shaping firm using RTK GPS.

Linksshape 

  Thao Dien Sapphire, Ho Chi Minh City , Vietnam GCI provided site survey services for the future development of residential villas in the City’s Thao Dien ward, District 2. Services included control network establishment, a boundary audit survey, topographic and utility mapping.

TDS Co Ltd 

2013 ‐ 2014 

Infrastructure Mapping, Nation-wide, Vietnam The firm carried out ground control point surveys for 11 Cities throughout Vietnam, including; Hanoi, Hai Phong, Vinh, Hue, Da Nang, Quy Nhon, Nha Trang, Ban Me Thuot, Da Lat, Ho Chi Minh City and Can Tho.

ICO 

2012 ‐ 2013 

Hanoi Operations Factory (Nokia), Bac Ninh Province, Vietnam GCI supported the construction of Nokia’s new mobile phone facility in Bac Ninh Province through the provision of fulltime (11 months) site survey services to the project’s main contractor. Services included all aspects of site survey works, and were performed with conventional (total station) and GNSS surveying methods.

POSCO Engineering 

2010 – 2013 2008 

City Garden Apartments, Ho Chi Minh City, Vietnam GCI provided survey audit services for site control, occupation surveys of the site boundary as well as elevation surveys on the adjacent Van Thanh creek, all on behalf of the owner/developer. GCI also provided engineering survey checks on the tower construction, including settlement monitoring and regular checks on horizontal and vertical movement of the structures.

City Garden 

Apartments Ltd 

(REFICO) 

2010 – 2013 

Rao II Cable-Stayed Bridge, Hai Phong, Vietnam At the pre-construction phase the firm checked the project site control, completed a baseline environmental monitoring (vibration, dust and noise) and undertook an existing condition survey of over 400 houses and buildings around the site. GCI was further engaged on the site fulltime (30 months), providing survey services in the form of a Survey Project Manager and two survey crews for the project’s main contractor, ensuring that all positional aspects of the construction works were correct.

MT Hojgaard 

2012 ‐ 2013 

Yangon City GIS, Yangon, Myanmar GCI supported the creation of the Yangon City Development Committee’s Geographic Information System through the surveying of control points and the field verification of 300km² of existing 1:50,000 scale mapping.

Asia Air Survey 

2012  Thilawa SEZ, Myanmar GCI’s first large scale topographic site survey in Myanmar was being carried out on one of Myanmar’s largest sites – the 25 km² Thilawa Special Economic Zone, south of Yangon. GCI completed this survey as part of the design process for the site, and included RTK mapping, control network establishment, long and cross sectional surveys of existing feeder roads, sectional surveys of rivers and drainage channels in to the Yangon River and digital terrain modelling.

Nippon Koei 

2009 – 2012 

Saigon Golf & Country Club, Ho Chi Minh City, Vietnam GCI provided satellite imagery, topographic, horticultural and hydrographic surveys for the project owner prior to construction. The golf course construction contractor engaged GCI to provide topographic, set out, staking and as-built surveys for the two-year construction of the golf course, driving range, nursery and maintenance areas.

SDI 

Linksshape 

GolfCon 

2011 – 2012 

Vietnam Glass Industries Plant III, Ba Ria – Vung Tau, Vietnam GCI provided setting out and audit survey services for the construction of the second and third glass line in the VGI facility.

Nippon Sheet Glass 

  Forest Preservation Project, Kampong Thom, Cambodia Our services included the procurement of the LiDAR system and aircraft for the mapping of 20km² of forest as a pilot for a ODA funded REDD project. GCI also operated GPS ground stations for the LiDAR calibration flights, LiDAR and aerial photography flights, as well as supervised the processing of the LiDAR and digital photos.

Asia Air Survey 

Page 7: GCI Profile EN

Projects

  Chi Linh Golf Course, Hai Duong, Vietnam Upon completion of the golf course construction, GCI completed a detailed as-built survey of the course and it’s features, including cart paths, QCVs, drainage features, tees, greens, bunkers and water features.

Linksshape 

2011  Hanoi Operations Factory, Bac Ninh, Vietnam GCI completed pre-construction surveys for the owner, including the establishment of a new site control network, a topographic survey with a void volume survey of the site sand fill, and a feature survey of the existing site services and utilities.

Nokia 

  DFAT (Australian Government), Ho Chi Minh City, Vietnam Building and dimensional surveys of the 20th floor of Vincom Tower in Ho Chi Minh City were completed by GCI surveyors for the architects and engineers engaged in the refit of the office space.

GHD 

  Laguna (Banyan Tree) Resort Golf Course, Lang Co, Thua Thien - Hue, Vietnam The golf course construction contractor engaged GCI to provide topographic, set out, earthworks volume calculations, staking and as-built surveys for the rough shaping of the golf course, driving range, nursery and maintenance areas for the duration of their seven month contract.

Linksshape 

  Phu My Cable-Stayed Bridge, Ho Chi Minh City, Vietnam As a component of the signing off of the structure at the conclusion of the maintenance period, GCI conducted detailed level surveys of the bridge deck for the main contractor. Data was used to compare post-construction performance with design parameters.

BBBH Consortium 

(Bilfinger Berger 

Baulderstone 

Hornibrook) 

  Ba Na Golf Course, Da Nang, Vietnam The golf course construction contractor engaged GCI to provide topographic, set out, earthworks volume calculations, staking and as-built surveys for the rough shaping of the golf course, driving range, nursery, access roads and drainage features and maintenance areas.

Linksshape 

  Nuclear Power Plant 2, Ninh Thuan, Vietnam GCI was selected by the mapping consultant to provide aerial photography, ground control and aerial mapping services for the Feasibility Study of Vietnam’s first atomic power station. Our services also included supply of 1:25000 topographic maps and existing aerial photography from Vietnam Government archives.

Asia Air Survey  

  Saigon South Residences, Ho Chi Minh City, Vietnam The project owner commissioned GCI to complete a full topographic, control point and boundary survey of the 3Ha site.

IndochinaLand 

  Dai Phuoc Lotus New Town, Dong Nai, Vietnam The company provided verification surveys of the project control network at the outset of construction and was later engaged to monitor the control network and provide audit surveys of the site construction works, including sub-contractor survey control, villa pad set-out and as-built. Volumetric surveys of site filling have also been completed.

VinaDaiPhuoc 

2010  

Dai Lai Golf Course, Vinh Phuc, Vietnam Upon completion of the golf course construction, GCI completed a detailed as-built survey of the course and it’s features, including cart paths, QCVs, drainage features, tees, green bunkers and water features.

Linksshape 

  Greg Norman Estates, Da Nang, Vietnam The project owner engaged GCI to establish the site control network, complete a site topographic survey (17Ha) and set out design features during the project start-up phase.

VinaCapital 

  50 Dong Khoi, Ho Chi Minh City, Vietnam For the refit of the building’s interior for new tenants, GCI completed a detailed 3D dimensional survey of the building for the project architect. Plan and elevation drawings were delivered and used for the refit design.

DesignHub 

  Ceana Villas, Quang Nam, Vietnam The project manager commissioned GCI to complete a detailed topographic survey of the site, an as-built survey of previously installed piles, a check survey of project control points and provide QC/QA services on previously completed surveys.

VinaProjects 

  Vinh Thai Urban Township, Nha Trang, Vietnam The project owner contracted GCI to complete a full control network, topographic, feature and utility survey of the 183 Ha site for master plan and detailed engineering design. The field survey was carried out with RTK GPS equipment. High resolution satellite imagery was also supplied and rectified.

Vinh Thai Urban 

Development 

  Nhat Tan Cable-Stayed Bridge, Hanoi, Vietnam A control network verification survey was carried by GPS and orthometric levelling for the main contractor during the pre-construction phase. In 2011 GCI supplied the project’s engineers with Ashtech dual-frequency GPS receivers for the surveying and monitoring of the bridges five towers.

Sumitomo Mitsui 

Page 8: GCI Profile EN

Projects

  Binh Duong II Liquid Plant, Binh Duong, Vietnam As part of a building settlement study, the firm was commissioned to complete baseline and monitoring surveys over a six-month period. Precise levelling equipment and techniques were used for engineering analysis of the structure.

Proctor & Gamble 

  Centrepoint Building, Ho Chi Minh City, Vietnam The project owner engaged GCI to provide nett rentable area certification for the commercial office leasing of Ho Chi Minh City’s first green building.

REFICO 

2009  

Niagara Hospitality School, Ba Ria – Vung Tau, Vietnam As part of the overall Ho Tram strip development, ACDL contracted GCI to undertake a topographic survey of a 90ha site near Phuoc Hai for the detailed design of a hospitality training school.

Asian Coast 

Development Ltd 

  Ben Luc – Long Thanh Expressway, Long An - Dong Nai, Vietnam GCI supplied orthorectified high resolution satellite imagery and ground control points of the 60km-long new expressway alignment for the feasibility study. Imagery was rectified and delivered in both WGS84 and VN2000 coordinate systems.

Katahira & Engineers 

2007‐ 2009 

Phu My Cable-Stayed Bridge, Ho Chi Minh City, Vietnam GCI was employed by the construction consortium on a Sub-consultancy basis to provide engineering survey services on all aspects of the construction programme from bridge and approach piles, piers and decks, to the tower pile-caps, towers, deck and road furniture. GCI was the Project Surveyor and supplied four fulltime survey crews for 30 months, using RTK GPS as well as conventional equipment in support of the bridge construction.

BBBH Consortium 

(Bilfinger Berger 

Baulderstone 

Hornibrook) 

  Saigon Bridge 2, Ho Chi Minh City, Vietnam As part of the preliminary design completed by BBBH, GCI carried out topographic surveys of the existing bridge, approaches, piers and a hydrographic survey of the Saigon River

BBBH 

  Diamond Island Apartments, Ho Chi Minh City, Vietnam Audit survey services for the site control network, site boundary and the zone B building footprint were performed for the project owner prior to construction. Additional engineering survey services were provided in 2009 during the foundation construction work.

BTA Developments 

2008  Ha Long Star Resort, Ha Long, Vietnam A topographic survey of the 125 hectare site was undertaken for the detailed design of hotels, villas, site roads, drainage and utilities, using RTK & conventional equipment. GCI’s client was the project’s engineering consultant.

Hyder Consulting 

  Starbay Resort, Phu Quoc Island, Kien Giang, Vietnam The project owner commissioned GCI to complete the topographic survey of the site, through the supervision and management of third party survey teams on 200 Ha, and completing the detailed topographic survey of the remaining 300 Ha. GCI completed the 1:500 plan production of the entire site, in accordance with Vietnamese standards and regulations for the project’s license application.

Millenium Asset 

Management 

  Combined Cycle Power Plants, Ca Mau, Vietnam GCI provided survey checking and audit services to the turbine and generator supplier during the 12-month construction of 2 power islands for the Ca Mau I & Ca Mau II stations. Services included both civil and mechanical surveying.

Siemens 

  Koh Rong Development, Cambodia 1:25,000 topographic maps were procured and digitised into a 3D model of the island for master and concept planning purposes.

Millenium Asset 

Management 

  

Saigon Premier Container Terminal, Ho Chi Minh City The project’s Resident Engineer awarded GCI various sub-consultancy assignments throughout the construction of the container terminal. Tasks included; checking the survey control network, designing, installation supervision and precise surveying of new permanent control points, and surveys of high voltage transmission lines over the Dong Ngai river to determine air draft (clearance) distances.

DP World 

2007  Dream Bay Resort, Pineapple Island, Kien Giang, Vietnam Commissioned by the resort developer, GCI completed a detailed topographic survey of the 15 Ha site, for investment license application and detailed design purposes. Conventional and satellite based mapping techniques were employed on the development.

Skye Holdings 

  Noi Bai Expressway, Hanoi – Lao Cai, Vietnam GCI was contracted by the project’s design consultant to design, manage and provide QC/QA functions on the GPS control network from Hanoi to the Chinese border at Lao Cai (240km).

Pacific Consultants 

International 

  Pu Sam Cap, Lai Chau, Vietnam GPS surveys of ground control points for satellite imagery-based mapping were undertaken during the exploration phase of the mining project in northern Vietnam.

Triple Plate Junction 

Page 9: GCI Profile EN

Projects

2006  Sanctuary Residential Resort, Ho Tram, Ba Ria – Vung Tau Province, Vietnam GCI has supported the project through detailed topographic survey of the 16Ha site, using GPS and conventional methods for the detailed engineering design of the residential resort and it’s environs. The company has also completed boundary check surveys during the construction phase

REFICO 

  Mekong Groundwater Study, Various Provinces, Cambodia Differential GPS (DGPS) was used to survey 70 groundwater wells in Prey Veng and Svay Rieng provinces in eastern Cambodia and incorporate the results into a larger study of groundwater in the Mekong Delta.

NCDD 

  Poverty Reduction Project, Central Provinces, Vietnam As a sub-component of the poverty reduction project, GCI procured 11 sets single frequency survey-grade GPS receivers and trained surveyors from 9 central Vietnam provinces in static, stop-and-go and kinematic GPS surveying.

Ministry of Agriculture 

and Rural 

Development 

2005 ‐ 2009 

Cuu Long Cable-Stayed Suspension Bridge, Can Tho, Vietnam GCI supplied full survey services to the main contractor on this second cable-stayed bridge over the Mekong River. GCI’s role was to provide QC/QA services, ensuring that all sub-contractors conform to design and construction requirements. The company supplied the survey supervisor and three fulltime survey crews, using RTK GPS as well as conventional equipment.

TKN Joint Operation 

(Taisei, Kajima, Nippon 

Steel) 

2005  Phu My 2.2 Power Plant, Ba Ria – Vung Tau, Vietnam GCI provided civil & mechanical surveying services for the main contractor, as well as verticality & tilt monitoring services during installation of turbines & generators.

Cofiva 

  Ngoc The – Thi Lien Environmental Sanitation, Ho Chi Minh City, Vietnam Survey control from the detailed design phase was checked for the construction supervision consultant and audited prior to construction of this World Bank funded sanitation project.

Camp Dresser McKee

2002  Bunga Raya Alpha Central Processing Platform, Nha Trang, Vietnam GCI supplied the project with an independent structural dimensional survey of the platform, monitoring deck deflections and providing as-built structural reports.

Talisman 

2002 ‐ 2003 

Rural Access Roads Improvement Project - Various Sites, Laos PDR GCI provided supervisory and management services on 450 kms of rural road surveys, as well as data collection and detailed road design services for an additional 150 kms of provincial highway and access road.

PCI Asia 

2001 – 2003 

Phu My 3 Combined Cycle Power Plant, Ba Ria – Vung Tau, Vietnam GCI supplied topographical site and UXO clearance surveys as well as setting out services during pre-construction, followed by QC/QA services during the two-year construction period of the US$400 million BOT power plant.

Siemens 

2002 ‐ 2003 

Saigon East West Highway, Ho Chi Minh City, Vietnam Technical Assistance sub-consultancy services in the form of supervision and quality assurance functions on topographic and hydrographic surveys were supplied during the 12 month detailed design phase of this JBIC project.

PCI Asia 

2000 ‐ 2002 

Nam Con Son Gas Terminal, Ba Ria – Vung Tau, Vietnam The firm completed an 18 month contract supplying up to eight crews completing civil and mechanical surveying services on the construction of the gas processing facility and 28 km pipeline as part of the US$1.5 billion Nam Con Son BOT Gas Development Project.

McConnell Dowell 

Page 10: GCI Profile EN

Projects

  My Thuan Riverbank Protection, Tien Giang, Vietnam Services provided included: topographic, hydrographic, and river velocity surveys as well as multi-beam sonar imaging during the construction of the protection works. GCI provided underwater surveys of the groyne structures, monitoring the structures attitude and positioning during the post-construction monitoring phase of the project.

Baulderstone 

Hornibrook 

2000  Agricultural Mapping, South Central Highlands, Vietnam GPS mapping, ground truthing and crop data collection services for a satellite image based, Geographic Information System (GIS).

Geosys 

1997 – 2000 

My Thuan Cable-Stayed Suspension Bridge, Tien Giang, Vietnam GCI completed sub-consultancy services, from topographic and hydrographic surveys to engineering surveys on all components of the bridge from bored river piles to towers and decks.

Baulderstone 

Hornibrook 

1997 ‐ 2000 

Ham Thuan Hydro Electric, Lam Dong, Vietnam GCI provided survey services for this major construction project. Initially undertaking topographic work for detailed design, the firm set out and monitored all project components, including main dam, auxiliary dams, headrace tunnel, penstocks, powerhouse and tail race canal.

Kumagai Gumi, 

Kukdong, Astaldi 

Consortium 

  3rd Highway Rehabilitation, Mekong Delta, Vietnam GCI provided survey supervision, quality control and reporting services for this Feasibility and Preliminary Design Phase of the design of 240 kilometres of National Highway No 1 from Can Tho to Nam Cam in the Mekong Delta.

Maunsell (AECOM) 

  East West Transport Corridor, Da Nang, Vietnam Seabed mapping of the harbour using hydrographic methods and GPS navigation and positioning techniques and topographic surveys of the headland for design of port facilities and channel improvement works

Maunsell (AECOM)