General Electric Company of
Libya (GECOL)
GEC L الشركة العامة للكهرباء
Presentation Outline
• General overview of GECOL
• Performance Indicators (KPI)
• GECOL Master Plan
Load forecast.
Generation expansion.
Demand side management (DSM).
Transmission expansion.
EHV Substations.
• GECOL future vision
• Challenges
• Damage in Libyan network
during the revolution
• Conclusion
GEC L الشركة العامة للكهرباء
Generation Types – March 2010
GEC L الشركة العامة للكهرباء
Overview • GECOL is a state-owned vertically structured power utility responsible for
generation, transmission and distribution of electric power throughout Libya.
• 2010 Key Figures:
Peak Load 5,759 MW
Installed Generation Capacity 8,907 MW
Generated Energy 32.6 TWh
400 kV Transmission system 2,823 km
220 kV Transmission system 13,782 km
30, 66 kV Subtransmission 23,132 km
11 kV distribution 52,260 km
Customers 1,224,193
Per-Capita Consumption 4,351 kWh
Urban & Rural Electrification Rate ~99%
GEC L الشركة العامة للكهرباء
Performance Indices
98.44 Average interconnection availability
0.27 Share of imported energy
98.1 System energy efficiency
3.48 Frequency violation events
75 Period of frequency violations
713 Supply continuity interruption (
0.16 Forced interruption
21.7 System minutes interruption (
0 Voltage violation events
0 Period of voltage violations
10.6 Equipment unavailability
95 Dependability of protection system (%)
93 Selectivity of protection system (%)
94 Security of protection system (%)
GECOL Master Plan
GEC L الشركة العامة للكهرباء Graphic Ennami
GEC L الشركة العامة للكهرباء Graphic Ennami
Peak Loads for the years 2008, 2009 (4756, 5282) MW.
The actual peak load during summer 2010 (5722 MW).
Load growth recorded about 79% increase between 2003 and 2012
0
1,000
2,000
3,000
4,000
5,000
6,000
2003 2004 2005 2006 2007 2008 2009 2010 2011 2012
Mega Watt
year
Mega Watt
year
Load Development
Growth Rate of 6.7% per year
MEDELEC 21st Annual Meeting - Tripoli, Libya, April 4th 2013
0
5,000
10,000
15,000
20,000
25,000
30,000
35,000
2003 2004 2005 2006 2007 2008 2009 2010 2011 2012
Growth Rate of 7.6% per year
Giga Watt Hours
year
Energy Production Development 2003 - 2012
MEDELEC 21st Annual Meeting - Tripoli, Libya, April 4th 2013
0
2000
4000
6000
8000
10000
12000
14000 2
01
3
20
14
20
15
20
16
20
17
20
18
20
19
20
20
Mega Watts
Peak Load Mega Projects
Growth Rate of 11.4% per year
Load Development 2013 – 2020
MEDELEC 21st Annual Meeting - Tripoli, Libya, April 4th 2013
0
10,000
20,000
30,000
40,000
50,000
60,000
70,000
2013 2014 2015 2016 2017
Giga Watt Hours
System Energy Mega Projects
year
Growth Rate of 13.9% per year
Energy Production Development - Expected
MEDELEC 21st Annual Meeting - Tripoli, Libya, April 4th 2013
GEC L الشركة العامة للكهرباء Graphic Ennami
Tripoli
west
south
alwosta
bengazi
Green mountain
Load density during
2000-2007
17.9% 8.7%
6%
14.7%
32%
20.3%
GEC L الشركة العامة للكهرباء Graphic Ennami
The deviation value between the KEPCO study and the actual peak load recorded during 2008, 2009 :
Year Forecasted
peak load MW Actual peak
load MW Deviation value MW
Deviation percent
2008 4834 4756 78 1.7%
2009 5225 5282 -57 - 1.1%
(13/08/2008)
(02/09/2009)
The forecasted peak load close to the actual peak load recorded during the
years 2008, 2009.
Electricity Demand and Generation balance from Period 2010-2020 in MW Year 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
System Peak Load 5,832 6,307 6,785 7,271 7,764 8,261 8762 9264 9769 10274 10780
Mega Projects Load 1,097 1,982 3,497 3,930 4,211 4,211 4,211 4,211 4,211 4,211 4,211
Total 6,929 8,289 10,282 11,201 11,975 12,472 12,973 13,475 13,980 14,485 14,991
Generation Capacity 5,000 4,900 4,800 4,700 4,600 4,550 4,450 4,350 4,250 4,150 4,050
Balance -1,929 -3,389 -5,482 -6,501 -7,375 -7,922 -8,523 -9,125 -9,730 -10,335 -10,941
Projects Under
Construction
Misurata CC Power Plant I 460 690 690 690 690 690 690 690 690 690 690
Benghazi North CC Power
Plant I 460 690 690 690 690 690 690 690 690 690 690
West Sarir Gas Power Plant 460 690 690 690 690 690 690 690 690 690 690
Extension of West Mountain
Gas Power Plant 260 260 260 260 260 260 260 260 260 260 260
Zwetina Power Plant 460 460 460 690 690 690 690 690 690 690 690
Gulf steam Power Plant 350 1,050 1,400 1,400 1,400 1,400 1,400 1,400 1,400 1,400
Contracted
Projects
Ubari Gas Power Plant 300 600 600 600 600 600 600 600 600 600
Tripoli West Steam Power
Plant 350 1,050 1,400 1,400 1,400 1,400 1,400 1,400 1,400
Proposed Projects
Bumba Gulf Power Plant 350 700 1400 1400 1400 1400 1400 1400
Misurata CC Power Plant II 460 690 690 690 690 690 690 690
Militah Power Plant 920 920 1200 1200 1200 1200 1200 1200
Tripoli East Power Plant 350 700 1400 1400 1400
Zwetina Power Plant II 230 460 690 690
Abutraba Power Plant 350 700
Total Capacity of the new Projects 2,100 3,790 5,140 7,800 8,730 9,710 10,060 10,640 11,570 12,150 12,500
Balance after Capaity Additions 171 51 -692 1,299 1,355 1,788 1,537 1,515 1,840 1,815 1,559
Reserve Margin 2.47% 0.62% -6.73% 11.60% 11.32% 14.34% 11.85% 11.24% 13.16% 12.53% 10.40%
GEC L الشركة العامة للكهرباء Graphic Ennami
Generator Type Power Plant Units Actual Capacity in MW
Un
der
Co
nst
ruct
ion
&
Co
ntr
acte
d P
roje
cts
Stea m
Gulf 4ST - 700 1,400 1,400 1,400 Tripoli West II 4ST - - 350 1,050 1,400
Gas
West Mountain Extension 2GT 260 260 260 260 260
Sarir West 3GT 460 690 690 690 690 Ubari 4GT 300 600 600 600
Co
mb
ined
Cyc
le
Misurata I 2GT 460 460 460 460 460 1ST - 230 230 230 230
Benghazi North II 2GT 460 460 460 460 460 1ST - 230 230 230 230
Zwetina I 2GT 460 460 460 460 460 1ST - 230 230 230 230
Total Actual Capacity 2,100 4,020 5,370 6,070 6,420
Under Construction and Contracted Projects
Year 2010 2011 2012 2013 2014
Peak Load in MW 6,929 8,289 10,282 11,201 11,975
Actual Generation Capacity in MW 5,000 4,900 4,800 4,700 4,600
GEC L الشركة العامة للكهرباء Graphic Ennami
GEC L الشركة العامة للكهرباء Graphic Ennami
THE EXISTING POWER PLANTS 5269 MW Combined cycle
Gas station
Steam station
UNDER CONSTRUCTION , AND COMMISSIONING POWER PLANT
UNDER CONSTRUCTION , AND COMMISSIONING POWER PLANTS 4462 MW
GEC L الشركة العامة للكهرباء Graphic Ennami
Combined cycle
Gas station
Steam station
CONTRACTED POWER PLANTS 2250 MW
GEC L الشركة العامة للكهرباء Graphic Ennami
Combined cycle
Gas station
Steam station
CONTRACTED POWER PLANT
89 KM
Lines in Operation
Lines Under Construction
GEC L الشركة العامة للكهرباء Graphic Ennami
Al-Beida
Benghazi North
Hoon
Misurata
Bani Walid
Ghdames
Al-Rowais
Tubrok
Sabha
Abu-Arqub
Al-Tabbah
GMMR
Al-Khoms
Ejdabia Ras Lanuf
Sirte
Benghazi West
Alg
eria
Egyp
t
Bir Al-Usta Milad
Zawia
Al-Sarir
Al-Gwarsha
Benghazi South
Tripoli South
Sidi Bannur Tu
nis
ia
Bumba Gulf
Surman south
Millitah Tripoli west
Lines Contracted
Ultra-high voltage (400kv) network
Stations 400kv under constructing and commissioning
GEC L الشركة العامة للكهرباء Graphic Ennami
Al-Beida
Benghazi North
Hoon
Misurata
Bani Walid
Ghdames
Al-Rowais
Tubrok
Sabha
Abu-Arqub
Al-Tabbah
GMMR
Al-Khoms
Ejdabia Ras Lanuf
Sirte Benghazi West
Alg
eria
Egyp
t
Bir Al-Usta Milad
Zawia
Al-Sarir
Al-Gwarsha
Benghazi South
Tripoli South
Sidi Bannur Tu
nis
ia
Bumba Gulf
Surman south
Millitah Tripoli west
Stations 400kv contracted
400/220kv Substations
GEC L الشركة العامة للكهرباء
Demand side management (DSM).
GEC L الشركة العامة للكهرباء
DSM Definition
• Manipulation of the load shape
– Lower it
– Change its shape
• Through
– Codes and standards
– Change behavior
– Change technologies
– Pricing
GEC L الشركة العامة للكهرباء Graphic Ennami
Libyan-Egyptian Interconnection:
The feasibility study of the Libyan-Egyptian Interconnection concluded that exporting 500MW to Egypt is possible.
Libyan-Tunisian Interconnection:
The feasibility study of the Libyan-Tunisian Interconnection suggested the possibility of exchanging 500MW in both directions over 400kV voltage level.
Libyan-Algerian Interconnection:
The technical study of the Libyan-Algerian Interconnection has been implemented exchange 400 MW between the two countries
Cross-Border power exchange
GEC L الشركة العامة للكهرباء
GECOL future vision
Increase the exchange capacity between Libya and neabering country. Libyan-Italian Interconnection: The preliminary findings of the feasibility study of the Libyan-Italian Interconnection over DC through submarine cable suggested that exporting 1000MW to Italy is possible. Libyan-Greek Interconnection: Discussions between Libya and Greece are underway, with emphasis on the importance of such interconnection aiming at exporting 3000MW to Greece.
GEC L الشركة العامة للكهرباء Graphic Ennami
Interconnection with Neighboring Countries
GEC L الشركة العامة للكهرباء Graphic Ennami
Using smart grid and meters to manage and operate the network.
Power quality issues:-
THD and voltage swell and sage specially in the distribution network.
Challenges facing at GECOL
GEC L الشركة العامة للكهرباء Graphic Ennami
Minor and major inspection for power plants which force us to stop them, as a results overdue maintenance needed. This situation causes a power shortage.
Building our capacity specially in following:-
• generation transmission project management.
• Renewable energy integration in the planning stage.
• Asset management and online conditional monitoring.
• Energy efficiency for both the end use equipments and network operation.
Damage in Libyan network during the revolution
GEC L الشركة العامة للكهرباء Graphic Ennami
GEC L الشركة العامة للكهرباء Graphic Ennami
Thank you