Generation and Reservoirs Statistics

01st November 2015

PUBLIC UTILITIES COMMISSION OF SRI LANKA

Page 2: Generation Report 01-11-2015

2

01st November 2015

Note: Generation from other SPPs (Mini Hydro, Solar and Biomass) is not included

Cumulative Dispatch 01st November

Category Dispatch (MWh)

CEB Hydro 16,714 62.90%

CEB Thermal Oil 30 0.11%

CEB Coal 9,480 35.68%

IPP Thermal 0 0.00%

SPP Wind 347 1.30%

Total 26,571

Note: Generation from Mini Hydro, Solar and Biomass power plants in September, October and

November is not included in annual cumulative renewable generation figure.

16714

30

9480

347

Generation Mix in MWh

CEB Hydro

CEB Thermal Oil

CEB Coal

IPP Thermal

SPP Wind

Total Generation - 26,571 MWh

From 01st January – 01st November

Category Dispatch (GWh)

CEB Hydro 3,657 34.05%

CEB Thermal Oil 993 9.25%

CEB Coal 3,932 36.62%

IPP Thermal 1,200 11.18%

Renewable 955 8.90%

Total 10,738

Page 3: Generation Report 01-11-2015

3

0

1000

2000

3000

4000

5000

6000

7000

Rated Capacity

Available

Dispatched

Dispatch on 01st November 2015

MWh

Page 4: Generation Report 01-11-2015

4

0

50

100

150

200

250

300

InstalledCapacity

AvailableCapacity

Night Peak Load

Night Peak Contribution on 01st November 2015

MW

Page 5: Generation Report 01-11-2015

5

Day Peak Demand – 1,225.8MW

Minimum Recorded Demand – 820.7MW

Note: Hydro Reservoir Storage Capacity as at 01st November 2015 –968.2GWh (76.93%)

1127.2

23.4

545

2

Contribution to the Night Peak in MW

CEB Hydro

CEB Thermal Oil

CEB Coal

IPP Thermal

SPP Wind

Night Peak - 1697.6MW

92.6%

84.3%

83.2%

74.4%

76.4% 58.7%

0

30

60

90

120

150

180

210

240

270

300

330

360

Castlereigh Maussakelle Kotmale Victoria Randenigala Samanalawewa

Reservoir Storage Levels ( As at 06.00 hr on 02nd November 2015) GWh

Page 6: Generation Report 01-11-2015

6

0

200

400

600

800

1000

1200

2012

2013

2014

2015

Comparison of Reservoir Storage Levels GWh

Page 7: Generation Report 01-11-2015

7

Note: Contribution from Mini Hydro, Solar and Biomass is not included

0

200

400

600

800

1000

1200

1400

1600

1800

2000

2200

24001

-Jan

15

-Jan

29

-Jan

12

-Fe

b

26

-Fe

b

12

-Mar

26

-Mar

9-A

pr

23

-Ap

r

7-M

ay

21

-May

4-J

un

18

-Ju

n

2-J

ul

16

-Ju

l

30

-Ju

l

13

-Au

g

27

-Au

g

10

-Se

p

24

-Se

p

8-O

ct

22

-Oct

Demand Variation 2015

Nigh Peak

Day Peak

MinimumDemand

MW

Page 8: Generation Report 01-11-2015

8

Note: Contribution from Wind, Mini Hydro, Solar and Biomass is not included

0

300

600

900

1200

1500

1800

2100

CEB Hydro

IPP Thermal

CEB Thermal Oil

CEB Coal

Load Curve for 31st October 2015

Time of Day

MW

Page 9: Generation Report 01-11-2015

9

0

2000

4000

6000

8000

10000

12000

2014 2015

SPP Wind

IPP

CEB Coal

CEB Oil

CEB Hydro

Comparison of Cumulative Dispatch from 01st January - 01st November

GWh

Year

Page 10: Generation Report 01-11-2015

10

Note: Generation from SPP Mini Hydro, Solar and Biomass is not included

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

11000

12000

2014

2015

Comparison of Cumulative Dispatch GWh

Page 11: Generation Report 01-11-2015

11

List of Power Stations

Power Station Capacity (MW) Primary Fuel

CEB Hydro

Victoria 210

Ukuwela 40

Kotmale 201

Randenigala 122

Rantambe 49

Bowatenna 40

Nilambe 3.2

Upper Kotmale 150

Old Laxapana 50

New Laxapana 115

Polpitiya 75

Wimalasurendra 50

Canyon 60

Samanalawewa 120

Kukuleganga 75

Inginiyagala 10

Udawalawe 6

CEB Thermal

Sapugaskanda 1 72 Heavy Fuel

Sapugaskanda 2 72 Heavy Fuel

Kelanitissa Small Gas Turbines 68 Auto Diesel

GT 7 - Kelanitissa 115 Auto Diesel

Kelanitissa CCY 165 Naptha & Diesel

Lakvijaya (Puttalam Coal) 285 Coal

Lakvijaya (Puttalam Coal) Stage II 285 Coal

Lakvijaya (Puttalam Coal) Stage III 285 Coal

Uthuru Janani 24 Heavy Fuel

Private Thermal (IPPs)

Asia Power 51 Heavy Fuel

AES Kelanitissa 163 Auto Diesel

West Coast 270 Low Sulphur Furnace oil

Northern Power 27 Auto Diesel