glitter and rainbows ahead: mount druitt kids … and rainbows ahead: mount druitt kids brighten...

10
bmdhproject.health.nsw.gov.au |[email protected]| 1800 155 102 BMDH Project Weekly Update Friday 9 December 2016 | No 203 Glier and rainbows ahead: Mount Drui kids brighten things up

Upload: ngocong

Post on 12-May-2019

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Glitter and rainbows ahead: Mount Druitt kids … and rainbows ahead: Mount Druitt kids brighten things up bmdhproject.health.nsw.gov.au |WSLHD- MDHProject@health.nsw.gov.au| 1800

bmdhproject.health.nsw.gov.au |[email protected]| 1800 155 102

BMDH Project Weekly Update Friday 9 December 2016 | No 203

Glitter and

rainbows

ahead: Mount

Druitt kids

brighten

things up

Page 2: Glitter and rainbows ahead: Mount Druitt kids … and rainbows ahead: Mount Druitt kids brighten things up bmdhproject.health.nsw.gov.au |WSLHD- MDHProject@health.nsw.gov.au| 1800

bmdhproject.health.nsw.gov.au |[email protected]| 1800 155 102

BMDH Project Weekly Update Blacktown Hospital | Friday 9 December 2016 | No 203

STAFF PARKING ONLY

EMBARK BUILDING & CRESTWOOD CENTRE

HOSPITAL

P2

Blacktown Hospital

P11

BUNGARRIBEE

WESTERN SYDNEY UNI

MELA

LEUCA

BLACKTOWN ROAD

P

Admin & Education

BLACKTOWN HOSPITAL

There are major

roadworks all over our site

at the moment and this is

expected to continue until

the end of the year. At the

risk of sounding repetitive,

please continue to take

care, stay on marked paths

and follow signs and

instructions from traffic

controllers.

Major works in and around

the multi-storey car park in

preparation for the start of

work on our car park

expansion.

Works between the

roadway of WSU and

ambulance station.

Footpath works from

Marcel Crescent on the

side to the hospital.

Cabling and upgrade works

continue in the original

hospital building; there will

be some intermittent

outages to phone and data

on levels 2, 3 and 4

between 7.30pm-3am.

Affected departments will

be notified.

Work is progressing on

B47 refurb and B2Hub.

Sorry about the noise.

High voltage Sydney Trains

cabling works underway

on local roads.

Coming in 2017: New hospital

road entry and changes to

access - more info soon.

Renal

HOSPITAL

DIARY

Blacktown Hospital Staff Christmas Choir Callout - info

attached

Christmas Tree decorating competition - check your

Broadcasters

Multi-storey car park works start January 2017.

STAGE 2

P12

Blacktown Rd westbound only

ARE YOU

KEEPING UP

WITH THE NEWS?

Follow BMDH

Project

on social media

Facebook BMDH

Project

Twitter

@BMDHProject

Instagram @BMDHProject

Tag your posts to share with us

#BMDHProject

Or share your pics with us via

email (don’t forget your contact

details)

Roads and

access

changing

temporarily

During night

works traffic

will be

redirected

through

mental health

road and P2

carpark

Follow signs

and

directions

Take extra

Works in this area -

take care

Minor works in Admin

Building

Works underway

in and around P1

car park - drive

carefully

Hello? Patient phones in the new clinical

services building go live on

Tuesday 13 December. Numbers

will be distributed to the wards.

Page 3: Glitter and rainbows ahead: Mount Druitt kids … and rainbows ahead: Mount Druitt kids brighten things up bmdhproject.health.nsw.gov.au |WSLHD- MDHProject@health.nsw.gov.au| 1800

bmdhproject.health.nsw.gov.au |[email protected]| 1800 155 102

BMDH Project Weekly Update Mount Druitt Hospital | Friday 9 December 2016 | No 203

Site fencing is going up around the hospital dock in preparation for work on our MRI

and surgery expansion.

Fleet vehicle parking has now moved to car park near Building 8. There is no change

to booking process.

Work underway around child care for the new community dialysis centre.

Work underway around New Beginnings for the drug health expansion.

Please remember to drive carefully, stay on marked paths and follow instructions

from site staff.

What’s in Stage 2 at Mount Druitt Hospital?

A new community dialysis centre with dedicated parking

New MRI unit on level 2

New Recovery addition on level 2

New single-storey Drug Health expansion

New pre-admission clinics

Projects completed 2017

MOUNT

DRUITT

HOSPITAL

NEWS

All fleet vehicles

relocating to this

parking area.

No change to

booking process

Dialysis centre

under construction

Drug Health

expansion

Fencing in this area for MRI and

theatre projects - temporary loss

of parking until project completion

Page 4: Glitter and rainbows ahead: Mount Druitt kids … and rainbows ahead: Mount Druitt kids brighten things up bmdhproject.health.nsw.gov.au |WSLHD- MDHProject@health.nsw.gov.au| 1800

bmdhproject.health.nsw.gov.au |[email protected]| 1800 155 102

BMDH Project Special Regional Dialysis Centre celebration | BMDH Update No 202

Our child care centre kids are brightening things up at Mount

Druitt by creating colourful boxes which will feature on the

shadecloth around the dialysis centre construction site. The

boxes feature items the kids think will make hospital happier,

like rainbows, the beach, animals and stars. Thanks to Mount

Druitt child care centre staff and parents, Marily and Malcolm

from our arts team, and our gorgeous kids. Pictured: staffers

Christine and Sarla, with Shubhi (front page), Noormeet,

Joshua, Jermiah, Josh, Gian and Lithesh.

FRONT PAGE

Page 5: Glitter and rainbows ahead: Mount Druitt kids … and rainbows ahead: Mount Druitt kids brighten things up bmdhproject.health.nsw.gov.au |WSLHD- MDHProject@health.nsw.gov.au| 1800

bmdhproject.health.nsw.gov.au |[email protected]| 1800 155 102

BMDH Project Brag Book Friday 9 December 2016 | No 203

LAND CARE: Coolamon Cottage child care kids Georgine, Max and

Kishen (pictured below with Melissa and Alisha from the centre) were on

hand this week to help Andy, Will and Carl from Landforms to plant some

native trees around the child care centre to beautify the landscape and

attract local birds. Thanks to Adam Donnelley from Stage 2 partner

Donnelley Constructions for donating the trees and organising the guys to

plant them (with our help, of course!)

DIGGING IT

Page 6: Glitter and rainbows ahead: Mount Druitt kids … and rainbows ahead: Mount Druitt kids brighten things up bmdhproject.health.nsw.gov.au |WSLHD- MDHProject@health.nsw.gov.au| 1800

bmdhproject.health.nsw.gov.au |[email protected]| 1800 155 102

BMDH Project Brag Book Friday 9 December 2016 | No 203

CELEBRATING VOLUNTEERING: It’s a been a huge year for Blacktown with lots of new

volunteers and our wonderful new vollie coordinator Janice. Ninety of our favourite VVIPs (Valued

Volunteers are Important People) got together this week at Blacktown Workers for lunch. Thank

you for everything you do for us!

VALUING OUR VOLLIES

IN THE NEWS

If you missed this week’s

Mount Druitt stories in our

local papers and on

Channel 7, you can catch up

on our Facebook page.

Page 7: Glitter and rainbows ahead: Mount Druitt kids … and rainbows ahead: Mount Druitt kids brighten things up bmdhproject.health.nsw.gov.au |WSLHD- MDHProject@health.nsw.gov.au| 1800

bmdhproject.health.nsw.gov.au |[email protected]| 1800 155 102

BMDH Project Brag Book Friday 9 December 2016 | No 203

PAPER GIANTS: Are you a paper person or have you gone

digital? This week our B2Hub team were exploring paper

independence - how we use paper and how we choose to

use it in the future.

Paper independence is not about being paper-free. It’s

about reducing our reliance on paper with a “use less, keep

less” approach. It’s a part of our readiness for the move to

the B2Hub next year, but the tips for managing paper are

useful for anyone in any office setting.

For a fresh start in 2017, go through the paper on your desk

before you leave for the holiday break. Categorise what

you need to keep. Recycle or shred what you don’t need or

no longer use.

WE THREE KINGS

SANTA BABY INDEPENDENCE DAY

BEARING GIFTS: Best Nativity Ever. The Virgin Mary, baby Jesus, two sheep and the Three Kings

made from dialysis consumables and now being adored in our Regional Dialysis Centre Bubbles

Gallery. The figures were created by patients, carers and staff as part of our award-winning arts

program, which helps make the experience of dialysis less confronting.

ZAT YOU SANTY CLAUS?: Cancer carer Barry puts the

finishing touches to the singing Santa in our Cancer Centre.

Page 8: Glitter and rainbows ahead: Mount Druitt kids … and rainbows ahead: Mount Druitt kids brighten things up bmdhproject.health.nsw.gov.au |WSLHD- MDHProject@health.nsw.gov.au| 1800

Singers Wanted for Inaugural

Blacktown Christmas Choir

Two twenty minute performances

December 22nd in Hospital Street

12pm and 1pm.

If you can improvise a harmony or hold a tune

we would love to have you join us.

Well known carols and nothing complicated.

Rehearsals on Thursday December 1 and 15 at 12.30pm

Level 7 Meeting & Tutorial Rooms CSB

RSVP to Bel Peri [email protected]

or show up at the rehearsal

Page 9: Glitter and rainbows ahead: Mount Druitt kids … and rainbows ahead: Mount Druitt kids brighten things up bmdhproject.health.nsw.gov.au |WSLHD- MDHProject@health.nsw.gov.au| 1800

bmdhproject.health.nsw.gov.au |[email protected]| 1800 155 102

Blacktown Hospital Site Alert

Temporary road changes in

October and November at

Blacktown Hospital We’re completing infrastructure works at Blacktown Hospital in preparation for the start

of construction on the new acute services building next year. We need to make some

temporary road changes around the excavation site. Here’s what you need to know.

Temporary road changes 1/2 | Issued 14 October 2016

USE THE SLIP ROAD

To avoid delays during this

time, we suggest you use the

Blacktown Road slip lane for

entry and exit to parking

areas.

DROP OFF AT CANCER

CENTRE ENTRY

To avoid delays, advise

carers to drop off and pick up

at the cancer centre entry,

near the bus stop.

DAY WORKS

ONGOING

7.30 AM - 5.30PM

There will be traffic

redirection around the multi

-storey car park road and

pedestrian crossing.

Follow the signs and

instructions from site staff.

PLEASE TAKE CARE

Your safety is VERY important

to us. At the risk of sounding

like a broken record, we’d just

like to remind you one more

time to take care and always

follow directions.

NIGHT WORKS

ONGOING

NIGHT WORKS

9.30PM - 5.30AM

There will be traffic

redirection around the multi-

storey car park road and

pedestrian crossing.

Follow the signs and

instructions from site staff.

Change

of dates

Page 10: Glitter and rainbows ahead: Mount Druitt kids … and rainbows ahead: Mount Druitt kids brighten things up bmdhproject.health.nsw.gov.au |WSLHD- MDHProject@health.nsw.gov.au| 1800

bmdhproject.health.nsw.gov.au |[email protected]| 1800 155 102

Blacktown Hospital Site Alert

Temporary road changes 2/2 | Issued 14 October 2016

Day works

Ongoing

7.30am - 5.30pm

Night works

Ongoing

9.30pm - 5.30am

Clinical Services Building

Original Building

P1 car park

Renal/Admin

Mental Health

Clinical Services Building

Original Building

P1 car park

Renal/Admin

Mental Health

Blacktown Road

Slip lane

entry

Cancer Centre entry

Slip lane

entry

Cancer Centre entry

Main

entry

Blacktown Road

Main

entry

One lane through traffic