Page 1: GoGoal Hydro Power Pvt. Ltd

W lW lH d i i t t bl

WelcomeWelcomeHydropower is an important renewable energy

source world wide...

Building Nation through Green Energy Initiatives… Building Nation Through Green Energy Initiatives…

Page 2: GoGoal Hydro Power Pvt. Ltd

New projects RMU/RenovationGoGoal Hydro Power Pvt. Ltd.

W h ld i h H d Testing & Commissioning

We move the world with Hydro power……

Erection & Installation

D i &

Manufacturing

Design & Engineering

Building Nation Through Green Energy Initiatives…

Page 3: GoGoal Hydro Power Pvt. Ltd

Contents

1. About Us.

2 Our Strength

Contents

2. Our Strength

3. Manufacturing Facilities and Infrastructure

4. Organization Structure

5. Glimpses of Major Hydro Projects Executed.

6. Projects in Hand / Anticipated Orders

7 Financial Performance7. Financial Performance

8. Our Customers 

9. Vision & Mission

Building Nation Through Green Energy Initiatives…

Page 4: GoGoal Hydro Power Pvt. Ltd

About Us 1980• Established as an ancillary of BHEL under proprietorship of Shri SatishKumar to cater the needs of machining of Heavy & Large components ofsteel castings and forgings required for Thermal & Hydro Applications.

1980

g g g q y pp

1990

• Business expansion in the area of Renovation , Capital Repair & AnnualMaintenance of Hydro Electric projects up to 250 MW single unit.

2005

• Business further expanded for Manufacturing of Major Components/Assemblies for Hydro Electric Projects like Runner , Guide Wheel Assembly,R h b Pi t Ri T C t

2005

Building Nation through Green Energy Initiatives… Building Nation through Green Energy Initiatives… Building Nation through Green Energy Initiatives… Building Nation Through Green Energy Initiatives…

Runner chamber, Pivot Ring, Top Cover etc.

Continued ...........

Page 5: GoGoal Hydro Power Pvt. Ltd

2010About Us

• Company converted into Pvt. Ltd. Company.• Entered into the field of Renovation modernization & Up gradation ofexisting Small & Medium Hydro Electric projects with TechnicalCollaboration with reputed Foreign CompaniesCollaboration with reputed Foreign Companies.

• Company acquired the technical knowledge for Reverse Engineering todevelop the major components of Hydro Turbine in the absence of originaldrawings.H i ll b ti ith F i t d H d P C i f• Having collaboration with Foreign reputed Hydro Power Companies forDesign & Engineering, Company entered into turnkey contracts for newHEPs including D&E, Manufacturing, E & C of small & medium Projects.

• After continuous success company has now gone up for New Projects on

2015

Building Nation through Green Energy Initiatives… Building Nation through Green Energy Initiatives… Building Nation through Green Energy Initiatives… Building Nation Through Green Energy Initiatives…

p y g p jEPC basis from water to wire i.e. D&E, Electro Mechanicals, HydroMechanicals & Civil Construction with State‐of‐Art Technology.

Page 6: GoGoal Hydro Power Pvt. Ltd

Our Strength• Manufacturing facilities at our Haridwar workshop for all type ofElectro Mechanicals & Hydro Mechanicals for Hydroelectric Projects(Kaplan Francis & Pelton) including major components like Runner

Our Strength

(Kaplan, Francis & Pelton) including major components like Runner,Guide vane, Top Cover, Pivot Ring/Lower Cover, Runner Chamber andHydro mechanicals including fully automatic trash rack cleaningmachine etc.

• Proven Technology for Design & Engineering, Model Testing etc fromreputed foreign collaborators (Russia & Ukraine) for Medium & SmallHydro Electric Projects.

• Experienced manpower drawn from MNCs & Power GeneratingEquipment Manufacturing Companies such as BHEL, ALSTOM,VOITH etc. Fresh Engineers from Premier Institutes & TrainedEngineers from National Power Training Institute (Ministry of Power,

Building Nation Through Green Energy Initiatives…

Govt. of India) Nangal (Punjab).

Continued ...........

Page 7: GoGoal Hydro Power Pvt. Ltd

I ti f iliti h UT MPI DP Di i l I ti t

Our Strength• Inspection facilities such as UT, MPI, DP, Dimensional Inspection etc

• Sufficient workforce, T & P to handle 10 sites at a time for Dismantling, Renovation, Erection & Commissioning.

• Expertise in Reverse Engineering for manufacturing of major Hydro Power components in the absence of original• Expertise in Reverse Engineering for manufacturing of major Hydro Power components in the absence of originaldrawing.

•Location of GoGoal is having an added advantages in operation of the Company due to its vicinity close to largeManufacturing Technology & Testing Hubs like BHEL ( 3 Km) IIT Roorkee (30 Km) Delhi/Gzb /Faridabad ( 200 Km)Manufacturing Technology & Testing Hubs like BHEL ( 3 Km), IIT Roorkee (30 Km), Delhi/Gzb./Faridabad ( 200 Km)

Building Nation Through Green Energy Initiatives…

Page 8: GoGoal Hydro Power Pvt. Ltd

Manufacturing Facilities & InfrastructureMachining Facilities

D/C Vertical Boring Machine - (Make WMW, Germany) : Max. Job Dia 4200 ,Height 3000 mm & wt. 40 MT

Floor type Horizontal Boring Machine (Make WMW, Germany) : Spindle Dia: 160mm, Horizontal travel

3000 mm, vertical travel 1800 mm & Spindle travel 1200 mm with Rotary table of size 2000 mm x 2300 mm &

wt of Work piece 15Tons.

Horizontal Lathe (Precision) – 7 nos. : Max job diameter : up to 1200mm. Max admit between centers: up to

4500 MM4500 MM

Building Nation Through Green Energy Initiatives…

Vertical Boring Machine (Francis  Runner 115 MW)

Horizontal Boring Machine (Runner Hub 36 MW)

Precision Lathe(Turbine Shaft 60 MW) Continued ...........

Page 9: GoGoal Hydro Power Pvt. Ltd

Machining FacilitiesManufacturing Facilities & Infrastructure

S/C Vertical Boring Machine (Make Schiess) : Max. job diameter : 1250 mm, Max. wt. of work piece : 1.5 Tons

Horizontal Lathe (Heavy Duty) – 10 nos. : Max job diameter : Up to 2000 mm. Max admit between centers : Up to

7000 mm & Max weight of job : Up to 30 MT

Slotting machine (Make - Nu Schimbati) : Stroke : 350 mm x Table1000 mm.

Radial drilling machine (Make – Cincinnati) : Drilling capacity 70 mm, Swing and Vertical travel of Arm :

1500 mm x 600 mm

Insitu Boring/Turning machine : Diameter range : Up to 4000 mm

Tool Room Facilities Horizontal milling machine

Surface Grinder

Shaper

Building Nation Through Green Energy Initiatives…

Thread Cutting Machine

Continued ...........

Page 10: GoGoal Hydro Power Pvt. Ltd

Fabrication Facilities

Manufacturing Facilities & Infrastructure

Plate bending machine : Max. thickness : 25 mm, Max width : 2250 mm

Hydraulic Press (500 Ton)

Fabrication Facilities

TIG welding set (Ador make)

MIG welding sets (Ador make) : 4 Nos.

PUG machines (ESAB) : 4 Nos.

Shot/Sand Blasting machine (NESCO)

Plasma Cutting m/c (GERRARD) Max thickness for SS plate 25 mm.

Hand operated gas cutters : 5 Nos.p g

Gauzing M/c up to 1000 Amp. (Ador)

Welding rectifiers & generators up to 600 Amp : 20 Nos.

Electrodes Pre Heating Ovens : 12 Nos Electrodes Pre Heating Ovens : 12 Nos.

Electrodes Holding Ovens : 5 Nos.

Building Nation Through Green Energy Initiatives… Continued ...........

Page 11: GoGoal Hydro Power Pvt. Ltd

Material Handling  FacilitiesManufacturing Facilities & Infrastructure

EOT Cranes up to 40 Ton capacity : 5 Nos.

Jib Crane 3 Ton capacity : 1 No.

Gantry Crane 5 Ton capacity : 1 No.

Hydra Crane 9 Ton Capacity : 1 No.

Fork Lifter 5 Ton Capacity : 1 No.

Inspection & Testing Facilitiesp g UT M/c ( EEC Make )

MPI Testing M/c

DP Testing Facilities

Portable Hardness Tester

Inside Micrometer ( up to 4000mm) – Mitutoyo Make

Outside Micrometer (up to 1000mm) – Mitutoyo Make

Building Nation Through Green Energy Initiatives…

Vernier Calipers (up to 4000 mm) – Mitutoyo Make

Thickness Measurement Instrument (up to 100mm) Continued ...........

Page 12: GoGoal Hydro Power Pvt. Ltd

Manufacturing Facilities & Infrastructure

Stress Relieving Furnace (Gas Fired) of size 5 m x 5 m x 2.5 m, 40 Ton : 1 No

Miscellaneous Facilities

Portable Digital Weighing Machine up to 50 Ton : 1 No.

Air compressor capacity up to 125 Cu.ft /min. : 3 Nos.

Complete set of T&P for Erection & Commissioning to handle 10 sites at a time

including Power Spanners, Hydraulic/Mechanical Jacks, Hand Grinders, Pullers,

Winches etc.

Finning Machine for Generator Cooler Pipes Stress Relieving Furnace

g p

Power Backup

Building Nation Through Green Energy Initiatives…

DG sets :- 4 Nos. (Total Capacity : 420 KVA)

Page 13: GoGoal Hydro Power Pvt. Ltd

Organisation Structure  Managing Director

 

 

 

   

Business Advisor

Director

Planning & Development

 

 

 

 

Executive Director General Manager

 

 

 

�  

TOTAL MANPOWER

MaterialsManagement

Maintenance Quality Manageme

Production H.R Finance Project Managemen

Design & Engineering

Commercial

TOTAL MANPOWER Managers & Executives : 36 Supervisors : 35 Technicians : 31 Artisans : 235 Contract Labours : 100

Building Nation Through Green Energy Initiatives…

TOTAL 437

Page 14: GoGoal Hydro Power Pvt. Ltd

U it Y f

Runners & Assemblies manufactured & supplied to various Hydro Electric Projects 

SL.No. Description of Item Qty. End User Unit Capacity Customer Year of

Supply Remark

1 Guide Wheel Assembly 2 Sets

MOR-IITurkey

2 x 3.25 MW

Mor. Electric Turkey 2011-12 Export Order

G id Wh l AGKOLU 2 2 19 M El t i2. Guide Wheel Assembly 2 Sets AGKOLU

Turkey 2 x 2.19

MW Mor. Electric

Turkey 2011-12 Export Order

3.Francis Runner for 30 MW Turbine of Tiloth P H

1 No. Tiloth P.H 3 X 30 MW

UJVNL-Thro BHEL 2010

Original drawings were not availableReverse Engg carried out &P.H. Reverse Engg carried out & manufactured .

4. Francis Runner dia. 1200 mm 24 No. Subhash

Projects 2.75 MW Voith Siemens 2007-08 Inspected by Vioth Germany

Spiral Casing and 3X8 MW V ith I t d b Vi th G5.p g

Stay Ring dia. 6000 mm

7 Sets Bhilangana 3X8 MW Voith Siemens 2007-08 Inspected by Vioth Germany

6. Guide Wheel Assembly 4 Sets Bhilangana 3X8 MW Voith

Siemens 2007-08 Inspected by Vioth Germany

7. Runner Cones 15 No. Bhilangana 3X8 MW Voith Siemens 2007-08 Inspected by Vioth Germany

8. D.T. Cone and Elbow 4 Sets Bhilangana 3X8 MW Voith Siemens 2007-08 Inspected by Vioth Germany

Page 15: GoGoal Hydro Power Pvt. Ltd

Capacit Total Dia of Wt of

List of Major Renovation Projects 

S. No.

Customer'sName

Project’s Name

End User

Capacity of each

unit (MW)

No. of Units

Total Cap.(MW)

Year Type of Machine

Dia. of Runner (mm)

Wt. of Runner (Tons)

1. SJVNL Nathpa Jhakri SJVNL 250 6 1500 2007 FRANCIS 4500 32

2. BHEL SALAL NHPC 115 6 690 2009 FRANCIS 4300 35

3. BHEL CHIBRO UJVNL 60 4 240 2007 FRANCIS 3500 143. BHEL CHIBRO UJVNL 60 4 240 2007 FRANCIS 3500 14

4. BHEL SHANAN PSPCL 50 1 110 2012 PELTON 2900 8

5. BHEL KANGAN JKSPDC 35 3 105 2008 FRANCIS 1900 4

6. BHEL KOPLI NEEPCO 50 4 275 2006 FRANCIS 1900 5

7. BHEL CHILLA UJVNL 36 4 144 2006 KAPLAN 4000 20

Continued ...........Building Nation Through Green Energy Initiatives…

Page 16: GoGoal Hydro Power Pvt. Ltd

Customer C it Total Di f Wt f

List of Major Renovation Projects 

S. No.

Customer's

Name

Project’s Name

End User

Capacity of each

unit (MW)

No. of Units

Total Cap.(MW)

Year Type of Machine

Dia. of Runner (mm)

Wt. of Runner (Tons)

8. BHEL TILOTH UJVNL 30 3 90 2006 FRANCIS 1980 4.5

9. BHEL RANGIT NHPC 20 3 60 2008 FRANCIS 1950 4

10. BHEL DHALIPUR UJVNL 17 3 51 2005 FRANCIS 3600 15

11. BHEL MUKERIAN PSPCL 15, 19.5 3, 3 207 2008 KAPLAN 3800 18

12. BHEL UBDC PSPCL 15, 15.45 3, 3 91.35 2007 KAPLAN 3800 18

13. BHEL KHATIMA UJVNL 13.8 3 41.4 2008 KAPLAN 4000 40

14 UJVNL Mohammadpur UJVNL 3.1 3 9.3 2010 -

2013 KAPLAN 3600 15

15 BHEL Varzob-Tajikisthan

Verzob HEP 3.76 2 7.2 2012 Francis 1250 2.25

Continued ...........Building Nation Through Green Energy Initiatives…

Page 17: GoGoal Hydro Power Pvt. Ltd

List of Major Renovation Projects

S. No.

Customer's

Name

Project’s Name End User

Capacity of each

unit (MW)

No. of Units

Total Cap.(MW)

Year Type of Machine

Dia. of Runner (mm)

Wt. of Runner (Tons)

List of Major Renovation Projects 

Name unit (MW) (MW) (mm) (Tons)

16 UJVNL TILOTH UJVNL 30 3 90 2014 FRANCIS 1980 4.5

17. UJVNL DHAKRANI UJVNL 17 3 51 2014 FRANCIS 3600 15

18. UJVNL CHILLA UJVNL 36 4 144 2014 KAPLAN 4000 20

Building Nation Through Green Energy Initiatives…

Page 18: GoGoal Hydro Power Pvt. Ltd

Highlights of RMU of Hydro Electric Projects

MOHAMMADPUR HEP (3X3.1 MW-Vertical Kaplan):

• Order obtained from UJVNL against ICB through stiff competition with MNCs like Andritz . The project was funded by NABARD.Andritz . The project was funded by NABARD.

• Successfully commissioned and Handed Over the complete Project in time to UJVNL

in Year 2012-13 and all units are working satisfactorily since then.

• All Units are generating double the Power than the power generating before RM &U.

• Almost all the New equipments installed with the state of Art Technology like Turbine, Generator, Static

Excitation Power Transformers SCADA Digital Governor OPU Fully Automatic TRCM etcExcitation ,Power Transformers, SCADA, Digital Governor, OPU, Fully Automatic TRCM etc.

Achievement: Before RM&U total Power Generation was 4.5 MW & after RM&U generation is 10.23 MW.

Performance tests carried out by IIT Roorkee & found better than specified.

Building Nation Through Green Energy Initiatives…

Page 19: GoGoal Hydro Power Pvt. Ltd

Highlights of RMU of Hydro Electric Projects

KULHAL HEP (3X10 MW- VERTICAL KAPLAN) : Obtained order from UJVNL through International Competitive Bidding against tough competition with renowned

g g y j

Multinational Companies like BHEL, Andritz for complete Design & Engineering, Reverse Engineering,

Manufacturing, Testing, Supply, E&C of Electro-mechanicals equipment, Hydro-mechanicals Equipment

including 2 Nos. Trash Rack Cleaning Machine and Civil works.g g

Building Nation Through Green Energy Initiatives…

Page 20: GoGoal Hydro Power Pvt. Ltd

Highlights of Renovation of Hydro Electric Projects

TILOTH HEP (3X30MW VERTICAL FRANCIS ): Original drawings were not available, GoGoal prepared the drawings by Reverse engineering for the Runner .O g a d a gs e e ot a a ab e, GoGoa p epa ed t e d a gs by e e se e g ee g o t e u e

New Runner of 13/4 Stainless Steel Casting was manufactured, machined, profile made and supplied in time .

Erection & commissioning of runner was done at site successfully and Generating power 10 % higher than original.

SALAL HEP of NHPC (6X115MW VERTICAL FRANCIS in J&K):

Original drawings were not available, GoGoal prepared the drawings by Reverse engineering for the profile of the

Blades.

Renovated the Runner having diameter 4300mm and weight 35 Ton with in house facility with third party inspection.

Generating Power more than the original

Building Nation Through Green Energy Initiatives…

Generating Power more than the original.

Page 21: GoGoal Hydro Power Pvt. Ltd

New ProjectsSOBLA-I HEP (2X4.0 MW- HORIZONTAL FRANCIS) :

Executed successfully this order obtained from UJVNL through International Competitive Bidding against stiff

competition with MNC’s for complete Design, Engineering, Manufacturing, Testing, Supply of Electro-

mechanicals equipment. The project was funded by ADB.

SURINGAD-II HEP (2X2.5 MW- HORIZONTAL PELTON) : Obtained order from UJVNL through International Competitive Bidding against tough competition with renowned

Building Nation Through Green Energy Initiatives…

Multinational Companies which is under execution for complete Design, Engineering, Manufacturing, Testing,

Supply, Erection & Commissioning of Electro-mechanicals equipment.

Page 22: GoGoal Hydro Power Pvt. Ltd

GoGoal Beyond India…RM&U OF VARZOB I HEP (2X3 67MW Vertical Francis) TAJIKISTAN :RM&U OF VARZOB-I HEP (2X3.67MW-Vertical Francis) TAJIKISTAN :

Successfully executed before time, even in difficult working condition i.e. - 1 ̊C to -10 ̊C.

Achievement: Revived the power house with increased generation fromAchievement: Revived the power house with increased generation from3 MW to 9.5 MW and Over all Generation is Tripled the ratedcapacity after RM &U.

Manufactured & supplied 4 sets of Guide Wheel Assembly to MOR Electric Company Turkey

Manufactured & supplied coolers for Hydro Electric Projects to M/s Druk Green Bhutan.

Building Nation Through Green Energy Initiatives…

Page 23: GoGoal Hydro Power Pvt. Ltd

Projects in HandProjects in Hand Sl.No. NAME OF SITE Capacity of HEPS CUSTOMER DESCRIPTION OF WORK

1. Kulhal HEP 3 X 10 MW UJVNL RM&U of Hydro Project

2. Suringard SHP 2 X 2.5 MW UJVNL Design, Engineering Erection ,Commissioning of Suringard SHP

3. TILOTH P.H 3 X 30 MW UJVNL Renovation of Machine

4. Dehar P.H 6 X 165 MW PSNR Rotary Valve of Unit # 3 & 4

5. Mouda(Thermal) 2X660 MW BHEL/NTPC Erection and Commissioning of Bus-duct System for

Power House

6. Kangan 3 X 35 MW JKSPDC Renovation of Machine including Supply of Spares

7. Chilla PH 4 X 36 MW UJVNL Annual maintenance of 3 m/c and Capital Maintenance of 1 m/c

Continued ...........Building Nation Through Green Energy Initiatives…

Page 24: GoGoal Hydro Power Pvt. Ltd

Projects in Hand

S. No. NAME OF SITE Capacity of HEPS CUSTOMER DESCRIPTION OF WORK

Projects in Hand 

8. Kudgi(Thermal) 3 x 800 MW BHEL/NTPC Erection and Commissioning of Bus-duct System for Power

House

9. Dhakrani 3 X 11.25 MW UJVNL Renovation of m/c no. C

Supply, erection, testing and commissioning of fully digital 10. Sumbal 2 X4.5 MW JKSPDC

pp y, , g g y gstatic excitation system along with power cables and control cables

11. URGAM 1 SHP 2 X 1.5 MW UJVNL RM&U of Electro-mechanical equipments

12 Salal PH 6 X115 MW NHPC Machining and polishing of one no TB Disc12. Salal PH 6 X115 MW NHPC Machining and polishing of one no. TB Disc

13. URGAM 1 SHP 2 X1.5 MW UJVNL Restoration of Complete civil works

Building Nation Through Green Energy Initiatives…

Page 25: GoGoal Hydro Power Pvt. Ltd

Anticipated OrdersS. No. NAME OF SITE Capacity CUSTOMER DESCRIPTION OF WORK

1. Ganderbal 2 x 4.5 MW JKSPDCTurnkey Package for Dismantling, Supply, Installation, Testing and Commissioning of the 1x4.5MW Unit Gandarbal (RMU Work)

2. Lower Maakan 2 x 2.5 MW Sidh Power Complete E&M Work of a new project

3. Suringad-II 2 X 2.5 MW UJVNL Complete Civil work of Power house and Switchyard

4. Pilangad 2 X 1.125 MW UJVNL Restoration of Complete civil works

5. Ramganga 3x66 MW UJVNL RM&U of Hydro Project

6. Tiloth 3x30 MW UJVNL RM&U of Hydro Project

7. Chilla 4x36 MW UJVNL RM&U of Hydro Project

8. Dhalipur 3x17 MW UJVNL RM&U of Hydro Project

9. Asiganga 2x4.5 MW UJVNL Complete Electromechanical works

10. Madhyameshwar 3x5 MW UJVNL Complete Electromechanical works

11 K ldi d 2 2 5 MW UJVNL R t ti f El t h i l k

Building Nation Through Green Energy Initiatives…

11. Kaldigad 2x2.5 MW UJVNL Restoration of Electromechanical works

Page 26: GoGoal Hydro Power Pvt. Ltd

Financial Strength of Company 500

350

400

450

200

250

300

R    M

ILLIONS

   

TURNOVER

PBT (NET PROFIT)

NET WORTH

100

150

200

IN NET WORTH

0

50

2010‐2011 2011‐2012 2012‐2013 2013‐2014 2014‐2015 (Provisional)

2015‐2016 (Projected)

Dip in Turn over in year 2013‐14 is due to natural calamity & heavy flood in Uttrakhandduring June 2013.

Building Nation Through Green Energy Initiatives…

Page 27: GoGoal Hydro Power Pvt. Ltd

C OffiCorporate Office‐GOGOAL HYDRO POWER PVT. LTD.E-60, INDUSTRIAL AREA, HARIDWAR, UTTARAKHAND, 249401 (INDIA)PHONE NO. +911334-227751, 222252FAX- +91134-266807E-MAIL- [email protected]:-www.gogoalhydro.comRegd. Office-FF-33, OMAXE Square, JASOLA, NEW DELHI 110025NEW DELHI 110025Regional Office- 48, Sai Lok , GMS Road, Dehradun

Building Nation Through Green Energy Initiatives…

Page 28: GoGoal Hydro Power Pvt. Ltd

PHOTO GALLARY

Control Room of Mohammadpur Power House                                     (3x3.1 MW)

Mohammadpur Power House after RMU  (3x3.1 MW)

Building Nation Through Green Energy Initiatives…

Trash Rack Cleaning Machine of Mohammadpur Power House(3x3.1 MW)

Switchyard of Mohammadpur Power House     (3x3.1 MW) Continued ...........

Page 29: GoGoal Hydro Power Pvt. Ltd

PHOTO GALLARY

Trash Rack Cleaning Machine of MohammadpurMohammadpur Power House after Trash Rack Cleaning Machine of Mohammadpur Power House(3x3.1 MW)

Mohammadpur Power House after RMU  (3x3.1 MW)

Building Nation Through Green Energy Initiatives…

Generator Mohommadpur HEP Pelton Runner Shanan HEP ( 15 MW)

Page 30: GoGoal Hydro Power Pvt. Ltd

PHOTO GALLARY(Varzob HEP, Tajikistan)

Building Nation Through Green Energy Initiatives…

Page 31: GoGoal Hydro Power Pvt. Ltd

PHOTO GALLARY

Spiral Casing (8 0 MW) of Bhilangana PowerFrancis Runner (115MW) of NHPC Spiral Casing (8.0 MW) of Bhilangana Power House

Francis Runner (115MW) of NHPC Salal Power Station

Guide Wheel assembly (2.75MW) For Rishiganga Hydro Electric Project

Francis Runner (76MW) of Maneri Bhali-II Hydro Project

Building Nation Through Green Energy Initiatives…

Page 32: GoGoal Hydro Power Pvt. Ltd

PHOTO GALLARY

Building Nation Through Green Energy Initiatives…

Page 33: GoGoal Hydro Power Pvt. Ltd

Our Customers

Bharat Heavy Electricals Limited Himachal State Electricity Board

Uttarakhand Jal Vidyut Nigam Ltd Bhakra Beas Management Board

Satluj Jal Vidyut Nigam Ltd Steel Authority of India Ltd

National Hydro Power Corporation Jammu & Kashmir State Power Development Corp.

Uttar Pradesh Jal Vidyut Nigam Ltd Orissa Hydro Power Corporation

P j b St t P C ti V ith H d P t Li it dPunjab State Power Corporation Voith Hydro Pvt. Limited

Building Nation Through Green Energy Initiatives…

Page 34: GoGoal Hydro Power Pvt. Ltd

Our Overseas Customers

Druk Green Power Corporation (Bhutan)

MOR Electric Company, Turkey

Barki Tojik Co., Tajikistan

Building Nation Through Green Energy Initiatives…

Page 35: GoGoal Hydro Power Pvt. Ltd

Vision & MissionGOGOAL

GoGoal Hydro Power Pvt. Ltd. (GoGoal) is committed towards continuous growth ofthe company through strategic planning, technological up gradation in the field ofH d P P j tHydro Power Projects.

Sustainability in the field of Design, Engineering, Manufacturing, Testing, Installation,Erection and Commissioning New Hydro Power Project and Renovation.Modernisation & Up Gradation of Existing Hydro Power Projects.

Building Nation Through Green Energy Initiatives…

Page 36: GoGoal Hydro Power Pvt. Ltd