green gables preliminary and final plat
TRANSCRIPT
Green Gables Preliminary and Final PlatPreliminary and Final Plat
April 24, 2013
Development Team
Green Gables Development Corporation (Owner/Developer)
DTJ Design (Planner/Landscape Architect)
Enertia Consulting Group (Civil Engineer)
Kimley-Horne (Traffic Engineer)
Wright Water Engineering (Floodplain, Wetland, Drainage)Wright Water Engineering (Floodplain, Wetland, Drainage)
Community Design Values Create a mixed use, cohesive, integrated community
Celebrate the site’s unique character and features Celebrate the site’s unique character and features
Create connectivity and recreational opportunities
Anchor the community with a mixed use commercial Anchor the community with a mixed-use commercial center
Improve access and traffic safety
Design a central parkway to serve the community
Provide appropriate transitions between land uses
Broaden market base by offering a variety of housing types
Improve walkability and pedestrian connectivity Improve walkability and pedestrian connectivity
Enhance economic vitality
P li i d Fi l Pl tPreliminary and Final Plat
To subdivide the property into:
3 lots for mixed-use development p
1 lot for high density residential development
1 l t f l d di d it id ti l d l t 1 lot for low and medium density residential developmentand special destination commercial development
1 l t f di id ti l d it d l t d 1 lot for medium residential density development and
1 lot for low density residential development.
Key Components of PlatKey Components of Plat Create lots that can be conveyed for future planning and
development – all are subject to future subdivision or SDP
Drainage improvements including Floodplain and ACOE Section 404 Permit improvements
Extend the major infrastructure Sewer and Water Electric and Gas Electric and Gas Regional storm drainage improvements
Major roadway improvements and public access (trails and id lk )sidewalks)
Provide access to all parcels
Construct Phase 1 Park Land Dedication improvements and Landscape Improvements
Ci l tiCirculation
W t W A /i / t ff J llWest Warren Avenue – r/in r/out off Jewell
South Pierce Way at Jewell Avenue – Full Movement
West Evans Avenue Intersection at Wadsworth – ¾ Movement
South Upham Court
Pedestrian Circulation Pedestrian Circulation Sidewalks Trails Trails
D t ti d D iDetention and Drainage
Regional storm water detention for full build out Regional storm water detention for full build-out
Water quality for infrastructure and roadways
Integration of detention and drainage into wetland mitigation area
Floodplain modification and management for FEMA 100-year flood event (improved from 10-year)
Removal of adjacent property from FEMA floodplain
Improved flood elevation downstream Improved flood elevation downstream
Other Permits and ApprovalsOther Permits and Approvals
Jewell – No access permit required, but construction plans are Jewell No access permit required, but construction plans are in for approval with Lakewood
Wadsworth and Evans intersection access permit – approved by Lakewood and CDOTby Lakewood and CDOT
Wadsworth r/in r/out –approved by Lakewood and CDOT
Wetland Permit– Army Corps of Engineers Section 404 and 401 Wetland Permit Army Corps of Engineers Section 404 and 401 permits for 18 acre wetland mitigation area
Floodplain revision – Approved Conditional Letter of Map Revision (CLOMR) from Urban Drainage and Flood Control Revision (CLOMR) from Urban Drainage and Flood Control District
Stormwater discharge, De-Watering, and APEN (Air Pollution Environmental Notification) Permits approved through CDPHEEnvironmental Notification) Permits approved through CDPHE
TreesTrees Worked with tree consultant develop tree management plan
Healthy trees Healthy trees Diseased trees Tree maintenance program P i it t l t t Priority transplant trees Potential trees to be preserved
This Plat has incorporated existing healthy trees to the extent This Plat has incorporated existing, healthy trees to the extent possible into the design. Site grading and tree removal is limited to the areas of construction (drainage area, roadways, utilities).
Future design and platting will incorporate existing trees to the extent possible and relocate trees where feasible in open space tracts, parks and other areas.
GREEN GABLESConceptual Master Plan
Conceptual Master Plan 05.02.12
GREEN GABLESOpen Space Master Plan
Open Space Concept Plan
Open Space Corridor (Drainage)
Future Park Phases
Neighborhood Park and Recreation Center Pocket ParksAdditional trail connections and sidewalksAdditional trail connections and sidewalksPrivate beach clubMulti-family amenityCommercial Plaza
Trail and Landscape Plan
GREEN GABLESOpen Space Master Plan
Neighborhood Trail Corridor and Private Beach Club
GREEN GABLESRetail Village Plaza
Plaza Illustration
Thank You & Questions