gsa study uses macro bim
DESCRIPTION
In 2010, the GSA commissioned a feasibility study of the Robert C. Weaver Federal Building, the 1.2 million-square-foot home of the Department of Housing and Urban Development. The HUD Building currently is home to 3,000 HUD employees with 700 more scattered through the federal district. Using Macro BIM to perform detailed analysis of occupancy and existing space, the project team created a new maximized space plan to accommodate all 3,700 staffers. Several major modernization plans were also studied. Webinar attendees will learn how Macro BIM was used: • With traditional “Problem Seeking” programming strategies • Gathering and verifying data • Analyzing multiple alternatives • Developing cost estimates Examples from the Robert C. Weaver Federal Building Feasibility Study and Program of Requirements project will be used to demonstrate these concepts. Additionally, lessons learned, other potential uses for the BIM, and a BIM roadmap for the project will be presented.TRANSCRIPT
![Page 1: GSA Study uses Macro BIM](https://reader034.vdocuments.net/reader034/viewer/2022052622/5594d5671a28ab78798b4732/html5/thumbnails/1.jpg)
Beck TechnologyInnovation in all Dimensions
Beck Technology
![Page 2: GSA Study uses Macro BIM](https://reader034.vdocuments.net/reader034/viewer/2022052622/5594d5671a28ab78798b4732/html5/thumbnails/2.jpg)
Beck TechnologyInnovation in all Dimensions
GSA HUD Feasibility Study Presentation Agenda
I. Overview of GoToWebinar Controls
II. Who is Beck Technology
II. What is Macro BIM
III. Concept behind DProfiler
IV. HUD Feasibility Study
![Page 3: GSA Study uses Macro BIM](https://reader034.vdocuments.net/reader034/viewer/2022052622/5594d5671a28ab78798b4732/html5/thumbnails/3.jpg)
Beck TechnologyInnovation in all Dimensions
GoToWebinar Attendee Control Panel
![Page 4: GSA Study uses Macro BIM](https://reader034.vdocuments.net/reader034/viewer/2022052622/5594d5671a28ab78798b4732/html5/thumbnails/4.jpg)
Beck TechnologyInnovation in all Dimensions
In operation since 1912
Privately held - 3rd generation
Consistently ranked among the top building
companies in the United States
85% repeat customers
Award winning Design and Construction firm
“Integrated Enterprise”
Development/Arch/Construction/Technology
Hunt Oil Company Headquarters | Dallas, Texas
About Beck…
![Page 5: GSA Study uses Macro BIM](https://reader034.vdocuments.net/reader034/viewer/2022052622/5594d5671a28ab78798b4732/html5/thumbnails/5.jpg)
Beck TechnologyInnovation in all Dimensions
About Beck Technology…
Beginning in 1996
Member of the Beck Group of Companies
Technology Development Company
BIM Authoring Software - DProfiler
Commercially Available since 2006
Consulting Services since 2008
GSA Contract Holder
Offices in Dallas, Atlanta, D.C., Tampa, and
Rio/Sao Paulo
![Page 6: GSA Study uses Macro BIM](https://reader034.vdocuments.net/reader034/viewer/2022052622/5594d5671a28ab78798b4732/html5/thumbnails/6.jpg)
Beck TechnologyInnovation in all Dimensions
BIM IDIQ Contract InformationContract No. GS-00P-09-CY-D-0283
Laser Scanning Contract InformationContract No. GS-00P-09-CY-D-0300
Zones AZones BZones C
Zones B
![Page 7: GSA Study uses Macro BIM](https://reader034.vdocuments.net/reader034/viewer/2022052622/5594d5671a28ab78798b4732/html5/thumbnails/7.jpg)
Beck TechnologyInnovation in all Dimensions
Macro Building Information Modeling
“A computer model, assembled of
higher level components, used for
macro level analysis including
visualization, spatial validation,
cost modeling/estimating,
phasing/sequencing, energy
performance, and risk.”
“…rapidly assembled models for analysis…”
MACRO MICRO
![Page 8: GSA Study uses Macro BIM](https://reader034.vdocuments.net/reader034/viewer/2022052622/5594d5671a28ab78798b4732/html5/thumbnails/8.jpg)
Beck TechnologyInnovation in all Dimensions
The Concept Behind DProfiler
…a simple 3D computer model
![Page 9: GSA Study uses Macro BIM](https://reader034.vdocuments.net/reader034/viewer/2022052622/5594d5671a28ab78798b4732/html5/thumbnails/9.jpg)
Beck TechnologyInnovation in all Dimensions
The Concept Behind DProfiler
…tied to data
• Program
• Spaces
• Cost
• Energy
• Sequencing
• And other…
![Page 10: GSA Study uses Macro BIM](https://reader034.vdocuments.net/reader034/viewer/2022052622/5594d5671a28ab78798b4732/html5/thumbnails/10.jpg)
Beck TechnologyInnovation in all Dimensions
Software Demo
![Page 11: GSA Study uses Macro BIM](https://reader034.vdocuments.net/reader034/viewer/2022052622/5594d5671a28ab78798b4732/html5/thumbnails/11.jpg)
Beck TechnologyInnovation in all Dimensions
Benefits – Macro Analysis
Monthly Electric Consumption
![Page 12: GSA Study uses Macro BIM](https://reader034.vdocuments.net/reader034/viewer/2022052622/5594d5671a28ab78798b4732/html5/thumbnails/12.jpg)
Beck TechnologyInnovation in all Dimensions
Benefits - Accurate Conceptual Cost ModelingPerformance Case Studies
![Page 13: GSA Study uses Macro BIM](https://reader034.vdocuments.net/reader034/viewer/2022052622/5594d5671a28ab78798b4732/html5/thumbnails/13.jpg)
Beck TechnologyInnovation in all Dimensions
Benefits - Evaluating Alternatives
![Page 14: GSA Study uses Macro BIM](https://reader034.vdocuments.net/reader034/viewer/2022052622/5594d5671a28ab78798b4732/html5/thumbnails/14.jpg)
Beck TechnologyInnovation in all Dimensions
Concept Analysis
Wilford Hall – San Antonio Military Medical Center
![Page 15: GSA Study uses Macro BIM](https://reader034.vdocuments.net/reader034/viewer/2022052622/5594d5671a28ab78798b4732/html5/thumbnails/15.jpg)
Beck TechnologyInnovation in all Dimensions
Concept Analysis
Wilford Hall – San Antonio Military Medical Center
![Page 16: GSA Study uses Macro BIM](https://reader034.vdocuments.net/reader034/viewer/2022052622/5594d5671a28ab78798b4732/html5/thumbnails/16.jpg)
Beck TechnologyInnovation in all Dimensions
Design Development Cost Estimating
• Establishing early budget
• Begin with conceptual design studies
• Identify and define all assumptions
University of Texas at Arlington – Reaction Lab
Begin at Planning
Facilitates “Target-Based Design”
![Page 17: GSA Study uses Macro BIM](https://reader034.vdocuments.net/reader034/viewer/2022052622/5594d5671a28ab78798b4732/html5/thumbnails/17.jpg)
Beck TechnologyInnovation in all Dimensions
Design Development Cost Estimating
• Continue through Schematic Design
• Update budget
• Re-Validate or adjust assumptions
University of Texas at Arlington – Reaction Lab
Schematic Design
Facilitates “Target-Based Design”
![Page 18: GSA Study uses Macro BIM](https://reader034.vdocuments.net/reader034/viewer/2022052622/5594d5671a28ab78798b4732/html5/thumbnails/18.jpg)
Beck TechnologyInnovation in all Dimensions
Master Planning
Integrating Macro BIM alongside
traditional processes
South Texas College – McAllen, Texas
![Page 19: GSA Study uses Macro BIM](https://reader034.vdocuments.net/reader034/viewer/2022052622/5594d5671a28ab78798b4732/html5/thumbnails/19.jpg)
Beck TechnologyInnovation in all Dimensions
Master Planning
Aerial Photo Planning Model Macro Cost Model
![Page 20: GSA Study uses Macro BIM](https://reader034.vdocuments.net/reader034/viewer/2022052622/5594d5671a28ab78798b4732/html5/thumbnails/20.jpg)
Beck TechnologyInnovation in all Dimensions
Master Planning
- Existing Buildings
- 20 Year Build Out
- 15 Year Build Out
- 10 Year Build Out
Phasing Model
South Texas College – McAllen, Texas
![Page 21: GSA Study uses Macro BIM](https://reader034.vdocuments.net/reader034/viewer/2022052622/5594d5671a28ab78798b4732/html5/thumbnails/21.jpg)
Beck TechnologyInnovation in all Dimensions
Master Planning
Communicate the Information
![Page 22: GSA Study uses Macro BIM](https://reader034.vdocuments.net/reader034/viewer/2022052622/5594d5671a28ab78798b4732/html5/thumbnails/22.jpg)
Beck TechnologyInnovation in all Dimensions
Master Planning
656a Library Expansion 50,000 $200.34 $10,017,075.28
656a Library Expansion 50,000 $200.34 $10,017,075.28
![Page 23: GSA Study uses Macro BIM](https://reader034.vdocuments.net/reader034/viewer/2022052622/5594d5671a28ab78798b4732/html5/thumbnails/23.jpg)
Beck TechnologyInnovation in all Dimensions
Feasibility Case Study
Integrating Macro BIM & Traditional Programming
A Case Study on the Robert C. Weaver Federal Building
Washington, D.C.
![Page 24: GSA Study uses Macro BIM](https://reader034.vdocuments.net/reader034/viewer/2022052622/5594d5671a28ab78798b4732/html5/thumbnails/24.jpg)
Beck TechnologyInnovation in all Dimensions
Robert C. Weaver Feasibility Project
“To determine the viability of a potential modernization project.”Statement of Work - Objective #1
![Page 25: GSA Study uses Macro BIM](https://reader034.vdocuments.net/reader034/viewer/2022052622/5594d5671a28ab78798b4732/html5/thumbnails/25.jpg)
Beck TechnologyInnovation in all Dimensions
REFERENCE KEY
Washington Mon.
US Capitol Building
GSA NCR
Air & Space
HUD
Robert C. Weaver Feasibility Project
1
2
3
4
1
2
3
4
5
5
![Page 26: GSA Study uses Macro BIM](https://reader034.vdocuments.net/reader034/viewer/2022052622/5594d5671a28ab78798b4732/html5/thumbnails/26.jpg)
Beck TechnologyInnovation in all Dimensions
General Project Information:
Robert C. Weaver Feasibility Project
SW District of DC Metro Area
Designed by Architect Marcel Breuer
Iconic example of “Brutalist” design
Construction completed in 1968
![Page 27: GSA Study uses Macro BIM](https://reader034.vdocuments.net/reader034/viewer/2022052622/5594d5671a28ab78798b4732/html5/thumbnails/27.jpg)
Beck TechnologyInnovation in all Dimensions
Robert C. Weaver Feasibility Project
Construction Information:
1.3 Million GSF
900,000+USF
Hybrid CIP concrete and precast frame/skin
Load bearing, precast window modules
Punched openings
![Page 28: GSA Study uses Macro BIM](https://reader034.vdocuments.net/reader034/viewer/2022052622/5594d5671a28ab78798b4732/html5/thumbnails/28.jpg)
Beck TechnologyInnovation in all Dimensions
Robert C. Weaver Feasibility Project
Dark/lighting issues
IAQ issues
Limited access to views
Compartmentalized
Lack of meeting space
Poor space standards
Poor utilization
Fan-coil units
“10 Floors of Basement”
Notable Notes:
![Page 29: GSA Study uses Macro BIM](https://reader034.vdocuments.net/reader034/viewer/2022052622/5594d5671a28ab78798b4732/html5/thumbnails/29.jpg)
Beck TechnologyInnovation in all Dimensions
Robert C. Weaver Feasibility Project
Purpose:
Explore a range of
building strategies
to support the
customer’s
mission
![Page 30: GSA Study uses Macro BIM](https://reader034.vdocuments.net/reader034/viewer/2022052622/5594d5671a28ab78798b4732/html5/thumbnails/30.jpg)
Beck TechnologyInnovation in all Dimensions
0
200000
400000
600000
800000
1000000
1200000
2010 2011 2012 2013 2014 2015 2016 2017 2018 2019
HQ
Po
rtfo
lio U
seab
le S
qu
are
Fe
et
(USF
)
HUD HQ Space Supply + Demand (Useable Square Feet)
SUPPLY TOTAL
EFFICIENT DEMAND TOTALSTATUS QUO DEMAND TOTALWEAVER SUPPORT
TOTAL
270,000 USF SPACE SAVINGS
Existing Lease Expirationsover next 4 years
Robert C. Weaver Feasibility Project
![Page 31: GSA Study uses Macro BIM](https://reader034.vdocuments.net/reader034/viewer/2022052622/5594d5671a28ab78798b4732/html5/thumbnails/31.jpg)
Beck TechnologyInnovation in all Dimensions
Robert C. Weaver Feasibility Project
*From HUD CAFM
![Page 32: GSA Study uses Macro BIM](https://reader034.vdocuments.net/reader034/viewer/2022052622/5594d5671a28ab78798b4732/html5/thumbnails/32.jpg)
Beck TechnologyInnovation in all Dimensions
Robert C. Weaver Feasibility Project
![Page 33: GSA Study uses Macro BIM](https://reader034.vdocuments.net/reader034/viewer/2022052622/5594d5671a28ab78798b4732/html5/thumbnails/33.jpg)
Beck TechnologyInnovation in all Dimensions
Robert C. Weaver Feasibility Project
4D Sequencing (BIM)
Modernization Phases:
-Move Out
-Area Under Construction
-Move Back In
-Area Complete
![Page 34: GSA Study uses Macro BIM](https://reader034.vdocuments.net/reader034/viewer/2022052622/5594d5671a28ab78798b4732/html5/thumbnails/34.jpg)
Beck TechnologyInnovation in all Dimensions
*From DProfiler BIM
Robert C. Weaver Feasibility Project
![Page 35: GSA Study uses Macro BIM](https://reader034.vdocuments.net/reader034/viewer/2022052622/5594d5671a28ab78798b4732/html5/thumbnails/35.jpg)
Beck TechnologyInnovation in all Dimensions
Robert C. Weaver Feasibility Project
![Page 36: GSA Study uses Macro BIM](https://reader034.vdocuments.net/reader034/viewer/2022052622/5594d5671a28ab78798b4732/html5/thumbnails/36.jpg)
Beck TechnologyInnovation in all Dimensions
Exploring Alternatives
Design concepts
incorporated into the
BIM for Cost Estimating
Atrium roof w/
glazing to allow
light into the space.
Explore the
Curtainwall
Concept
*From Cannon Study
*From Cannon Study
*From Cannon Study
*From DProfiler BIM
Robert C. Weaver Feasibility Project
![Page 37: GSA Study uses Macro BIM](https://reader034.vdocuments.net/reader034/viewer/2022052622/5594d5671a28ab78798b4732/html5/thumbnails/37.jpg)
Beck TechnologyInnovation in all Dimensions
Cost Evaluation of Design ConceptsThe cost model communicates design and
estimating assumptions for better analysis!
*From Cannon Study
*From DProfiler BIM
*From DProfiler BIM
Robert C. Weaver Feasibility Project
![Page 38: GSA Study uses Macro BIM](https://reader034.vdocuments.net/reader034/viewer/2022052622/5594d5671a28ab78798b4732/html5/thumbnails/38.jpg)
Beck TechnologyInnovation in all Dimensions
***Provide a roadmap for Design Excellence team & knowledge transfer***
Robert C. Weaver Feasibility Project
![Page 39: GSA Study uses Macro BIM](https://reader034.vdocuments.net/reader034/viewer/2022052622/5594d5671a28ab78798b4732/html5/thumbnails/39.jpg)
Beck TechnologyInnovation in all Dimensions
Preferred
Alternative -
Uniformat Cost
Elements
Breakdown
Robert C. Weaver Feasibility Project
![Page 40: GSA Study uses Macro BIM](https://reader034.vdocuments.net/reader034/viewer/2022052622/5594d5671a28ab78798b4732/html5/thumbnails/40.jpg)
Beck TechnologyInnovation in all Dimensions
Value Added through Integration of BIM and Problem Seeking:
• Speed of delivery
• Precision of budget
• Analysis of a wider range of alternatives
• Streamlining of decision-making
• Improved ability to secure funding
• Customer confidence in results and team
Robert C. Weaver Feasibility Project