guild road industrial park workshop. guild road industrial park incubator study identified a lack of...
TRANSCRIPT
![Page 1: Guild Road Industrial Park Workshop. Guild Road Industrial Park Incubator Study identified a lack of market for a successful incubator in Woodland. Consultant](https://reader036.vdocuments.net/reader036/viewer/2022062421/56649d745503460f94a5449c/html5/thumbnails/1.jpg)
Guild Road Industrial ParkWorkshop
![Page 2: Guild Road Industrial Park Workshop. Guild Road Industrial Park Incubator Study identified a lack of market for a successful incubator in Woodland. Consultant](https://reader036.vdocuments.net/reader036/viewer/2022062421/56649d745503460f94a5449c/html5/thumbnails/2.jpg)
Guild Road Industrial Park
• Incubator Study identified a lack of market for a successful incubator in Woodland.
• Consultant identified a market need for 25,000-50,000 square foot industrial buildings.
• Guild Road design includes 3-5 buildings ranging from 25,000 or 45,000 square foot buildings.
![Page 3: Guild Road Industrial Park Workshop. Guild Road Industrial Park Incubator Study identified a lack of market for a successful incubator in Woodland. Consultant](https://reader036.vdocuments.net/reader036/viewer/2022062421/56649d745503460f94a5449c/html5/thumbnails/3.jpg)
Guild Road Industrial Park-Next Phase
• Land Use/ Master Planning Permit– Pre-application $16,500– Permit Application Cost $118,250– Final Construction Documents $47,500– Contingency @ 10% $18,225– Total Estimated Cost $200,475
![Page 4: Guild Road Industrial Park Workshop. Guild Road Industrial Park Incubator Study identified a lack of market for a successful incubator in Woodland. Consultant](https://reader036.vdocuments.net/reader036/viewer/2022062421/56649d745503460f94a5449c/html5/thumbnails/4.jpg)
Guild Road Industrial Park-Funding Options
• Funding options for Land Use/ Master Planning Permit– Cowlitz County .09 Rural Development Funds $1
million available- request of $50,000 due February/March
– CERB Planning- request of $50,000 or 25% of the total project cost due April 6
– EDA funding- request of $100,000 due – Currently in Port budget from reserves for the total
amount
![Page 5: Guild Road Industrial Park Workshop. Guild Road Industrial Park Incubator Study identified a lack of market for a successful incubator in Woodland. Consultant](https://reader036.vdocuments.net/reader036/viewer/2022062421/56649d745503460f94a5449c/html5/thumbnails/5.jpg)
Guild Road Industrial Park- Building Design
• Each building- the example shown is the Phase 1 23,000 square foot building- will include at grade docks
• Each building would have a design for an office space. The example provides a 2,000 square foot space.
• The building is a metal tilt up like the Down River Drive designs for five of the buildings.
• The example shown is estimated to cost $858,981 or $37.35 per square foot.
• A return on investment (ROI)for the building would be
![Page 6: Guild Road Industrial Park Workshop. Guild Road Industrial Park Incubator Study identified a lack of market for a successful incubator in Woodland. Consultant](https://reader036.vdocuments.net/reader036/viewer/2022062421/56649d745503460f94a5449c/html5/thumbnails/6.jpg)
Guild Road Industrial Park-Planning Level Cost Estimate
• Full Site Improvements is for all sites- $943,250• Site Improvements for Phase One Building
$685,525• Site Improvements for Phase Two Building
$298,000• Site Improvements for Final Phases depends on
the building selection (3- 25k foot or 1-45k foot building)
![Page 7: Guild Road Industrial Park Workshop. Guild Road Industrial Park Incubator Study identified a lack of market for a successful incubator in Woodland. Consultant](https://reader036.vdocuments.net/reader036/viewer/2022062421/56649d745503460f94a5449c/html5/thumbnails/7.jpg)
Phase One Building Example 23,000 square feet
![Page 8: Guild Road Industrial Park Workshop. Guild Road Industrial Park Incubator Study identified a lack of market for a successful incubator in Woodland. Consultant](https://reader036.vdocuments.net/reader036/viewer/2022062421/56649d745503460f94a5449c/html5/thumbnails/8.jpg)
Guild Road Office Space Example
![Page 9: Guild Road Industrial Park Workshop. Guild Road Industrial Park Incubator Study identified a lack of market for a successful incubator in Woodland. Consultant](https://reader036.vdocuments.net/reader036/viewer/2022062421/56649d745503460f94a5449c/html5/thumbnails/9.jpg)
Guild Road Industrial Park- Total Costs
• Land Use/ Master Planning Permitting $200,475
• Full Site Improvements $943,250• Building Costs Option 1: $3,473,481• Building Cost Option 2: $4,593,971• Total Option 1: $4,617,206• Total Option 2: $ 5,737,696
![Page 10: Guild Road Industrial Park Workshop. Guild Road Industrial Park Incubator Study identified a lack of market for a successful incubator in Woodland. Consultant](https://reader036.vdocuments.net/reader036/viewer/2022062421/56649d745503460f94a5449c/html5/thumbnails/10.jpg)
Guild Road Industrial Park-Total Cost Funding Options
• CERB Funding $ 300,000 grant + $1.7 million loan
• EDA Funding $1.5 million grant limit (for construction)
• Cowlitz County .09 Rural Development• USDA Infrastructure Funding for
telecommunications, storm water, sewer, etc.