gypsey race park and avenue - · pdf fileb e c k h i l l b r i d g e. 5 3. 4. 1. area 3 ......
TRANSCRIPT
![Page 1: GYPSEY RACE PARK AND AVENUE - · PDF fileb e c k h i l l b r i d g e. 5 3. 4. 1. area 3 ... wall / seating ... 117962-01-l-002 rev character area 1 character area 2 3 5 2 ca1 4 3 5](https://reader031.vdocuments.net/reader031/viewer/2022030505/5ab2ab857f8b9a00728d6678/html5/thumbnails/1.jpg)
GYPSEY RACE PARK AND AVENUE
HILDERTHORPE ROAD
A1038
A1038
PRO
SPECT STR
EET
SP
RIN
GFI
ELD
AV
EN
UE
NE
W B
UR
LIN
GTO
N R
OA
D
HA
MIL
TON
RO
AD
WOODLAND WALKLEARNING ZONE
PROMENADE
ACTIVITY ZONE
PLAY AREA
EVENTS AREA
URBANBEACH
GRASSEDAMPHITHEATRE
STEPPEDTERRACE
VIEWING PLATFORM
NATUREGARDEN
POCKET PARK
SAVA
GE
RO
AD
ST
HIL
DA’
S S
TRE
ET
OLI
ND
A R
OA
D
WINDSOR CRESENT
NELSON STREET
STA
TIO
N R
OA
D
HILDERTHORPE ROAD
BRIDLINGTON TRAIN STATION
TESCOSUPERSTORE
PETROLSTATION
PROPOSED MSCP
�
BECK HILL BRIDGE
5
3
4
1
AREA 3
AREA 5
CHARACTER AREAS
GREEN LINEAR PARK - URBAN REGENERATION
CHARACTER AREA 3+4 THE SECOND PHASE OF DELIVERY
THE MASTERPLAN
AREA 2AREA 1
AREA 4
Construction Jan 2018 Construction Jan 2018
![Page 2: GYPSEY RACE PARK AND AVENUE - · PDF fileb e c k h i l l b r i d g e. 5 3. 4. 1. area 3 ... wall / seating ... 117962-01-l-002 rev character area 1 character area 2 3 5 2 ca1 4 3 5](https://reader031.vdocuments.net/reader031/viewer/2022030505/5ab2ab857f8b9a00728d6678/html5/thumbnails/2.jpg)
STAY
Grass
Grass
SP
SP
SP
SP SP
MP
TP
S01210.820
S01410.043
S01310.084
GATEWAY
WOODLANDRETENTION POND
CANTILEVEREDBOARDWALK
GRASSED AREA
GRASSED AREA
GRASSED AREA
70° ENGINEEREDSLOPE
70° ENGINEEREDSLOPE PUBLIC SPACE
0 5m 10m 25m
STAY
B
SP
SP
SP
SP
SP SP
SP
SP
SP
SP
SP
SP
SP
SP
SPSP
SP
SP
SP
SP
SP
MP
GU
TP
TP
S01110.699
S01210.820
S01610.929
R0112.388
R0212.649
R20011.178
RS0112.513
11.05
10.500 10.697
10.691
10.717
10.741
10.816
10.887
(10.200)
(10.400)
(10.300)
(10.800)(10.700)
10.200
(10.600)
(10.600)
(10.500)
MP
GYPSEY RACE PARK AND AVENUE - PHASE 1 DETAILED DESIGN
AREA INABEYANCE
GATEWAY
WOODLAND
PUBLIC SPACE
RETENTION POND
CANTILEVEREDBOARDWALK
GRASSED AREA
GRASSED AREA
GRASSED AREA
70° ENGINEEREDSLOPE
70° ENGINEEREDSLOPE
9.02652Sea Roarer
9.08000Kling Klang Disc
4.60110-4.60170Seal
4.73020Lop-eared Rabbit
Existing levels
Proposed levels
Proposed plantedareas
Proposed tree
Proposed tree
Proposed retainingwall / seatingProposed parapet
1. Notes2.
F:\U6001\WTNjobs\117962 - Gypsey Race Park\B - Landscape Architecture\04-Drawings\AutoCAD Folder\L-Landscape Dwgs(dwg)\ 117962-01-L-002 - General Arrangement.dwg
This drawing should not be relied on or used in circumstances other than those for which it was originallyprepared and for which Sweco was commissioned. Sweco accepts no responsibility for this drawing toany party other than the person by whom it was commissioned. This drawing has been prepared for thetitled project or named part thereof and should not be relied upon or used for any other project without anindependent check being carried out as to its suitability and prior written authority of Sweco beingobtained. Sweco accepts no responsibility or liability for the consequences of this drawing being used fora purpose other than the purposes for which it was commissioned. Any person using or relying on thisdrawing for such other purpose agrees, and will by such use or reliance be taken to confirm hisagreement, to indemnify Sweco for all loss or damage resulting therefrom.
Notes
100
2030
4050
6070
8090
100
Original Size
Client
Rev. Amendment DetailsDate Orig Chk'd App'd
Date Date Date Date
Drawing Number Revision
Scale Originator Drawn Checked Approved
Drawing Title
Project Title
Drawing Status
A1
Choose office address from drop down
For Information
GYPSEY RACEPARK & AVENUE
Character Area 1General Arrangement
1:150 PM
17.08.16
PM
17.08.16
SH
18.08.16
RM
18.08.16
117962-01-L-002 REV
CHARACTER AREA 1
CHARACTER AREA 2
3
5
2CA1
4
3
5
1
4
• Submission for planning application September 2016
• Construction 2017
• Completion 2018
STAT
ION
RO
AD
COACH & CAR PARK
COACH & CAR PARK
EXISTING TOILET BLOCK
HILDERTHORPE ROAD
HILDERTHORPE ROAD
SAVA
GE
RO
AD
PHASE 1 TIME LINE
KEY
SCALE 1/2500 5m 10m 25m
SCALE 1/250
CA2
Refer to visualisation of character area 1
![Page 3: GYPSEY RACE PARK AND AVENUE - · PDF fileb e c k h i l l b r i d g e. 5 3. 4. 1. area 3 ... wall / seating ... 117962-01-l-002 rev character area 1 character area 2 3 5 2 ca1 4 3 5](https://reader031.vdocuments.net/reader031/viewer/2022030505/5ab2ab857f8b9a00728d6678/html5/thumbnails/3.jpg)
Section A runs south to north from Hilderthorpe Road into the linear park, cutting through the attenuation basin which not only provides a SUDS function, but is also a ecological feature as it will become a new habitat for insects and birds.
Section B runs south to north from Hilderthorpe Road into the linear park, the footpath sits adjacent to the retaining structure opening up views of the Gypsey Race.
Section C runs south to north from Hilderthorpe Road into the linear park. Shrubs, grass and multistem trees create seperation between the road and the park. The focus in this area is the hub space where the beacon is located. A viewing area at the top of the retained slope provides views towards the Gypsey Race.
Section D runs south to north from Hilderthorpe Road into the linear park, and is at the eastern edge of character area 1. This section shows the split paths of the woodland walk and vegetated environment surrounding the Gypsey Race.
Section F runs south to north from Hilderthorpe Road towards the development retail area, a clearly defined route provides a space for active recreation or for resting and people watching.
Section E runs south to north from Hilderthorpe Road towards the development retail area. Planting and an avenue of trees provide some seperation and screening from the road.
Location Plan Area 1 @ NTS
KEY
GYPSEY RACE PARK AND AVENUE - PHASE 1 DETAILED DESIGN
Timber boardwalk along main river footpath
Play phones
Concrete Conservation units
Small tractor
PUBLIC SPACE INITIAL DESIGN OPTIONS
PROPOSED SECTIONS
WATER STRATEGY
ECOLOGICAL STRATEGY
MATERIALS STRATEGY
PLAY STRATEGY
VISUALISATION CHARACTER AREA 1
PLANTING STRATEGYBOARDWALK DESIGN OPTIONS
Visualisation of character area 1 from Station Road
Steel Structure with timber deck
informal layout - with seating and landscape interwoven
A cantilevered viewing platform over the retention pond provides a physical connection with the Gypsey Race River, making space for peaceful recreation or activity learning zone
An area to Rest, Relax, Socialise, Eat, Work and Play
Formal Layout - Natural stone elements with numerous routes
Glulam Structure with timber deck
Engineered green slopes
Acer platanoides Quercus coccinea Ulmus ‘New Horizon’
Sustainable Drainage Systems (SuDS) to be implemented
Bug hotels
![Page 4: GYPSEY RACE PARK AND AVENUE - · PDF fileb e c k h i l l b r i d g e. 5 3. 4. 1. area 3 ... wall / seating ... 117962-01-l-002 rev character area 1 character area 2 3 5 2 ca1 4 3 5](https://reader031.vdocuments.net/reader031/viewer/2022030505/5ab2ab857f8b9a00728d6678/html5/thumbnails/4.jpg)
GYPSEY RACE PARK AND AVENUE - PHASE 2 DETAILED DESIGN
AREA INABEYANCE
GATEWAY
WOODLAND
PUBLIC SPACE
RETENTION POND
CANTILEVEREDBOARDWALK
GRASSED AREA
GRASSED AREA
GRASSED AREA
70° ENGINEEREDSLOPE
70° ENGINEEREDSLOPE
9.02652Sea Roarer
9.08000Kling Klang Disc
4.60110-4.60170Seal
4.73020Lop-eared Rabbit
Existing levels
Proposed levels
Proposed plantedareas
Proposed tree
Proposed tree
Proposed retainingwall / seatingProposed parapet
1. Notes2.
F:\U6001\WTNjobs\117962 - Gypsey Race Park\B - Landscape Architecture\04-Drawings\AutoCAD Folder\L-Landscape Dwgs(dwg)\ 117962-01-L-002 - General Arrangement.dwg
This drawing should not be relied on or used in circumstances other than those for which it was originallyprepared and for which Sweco was commissioned. Sweco accepts no responsibility for this drawing toany party other than the person by whom it was commissioned. This drawing has been prepared for thetitled project or named part thereof and should not be relied upon or used for any other project without anindependent check being carried out as to its suitability and prior written authority of Sweco beingobtained. Sweco accepts no responsibility or liability for the consequences of this drawing being used fora purpose other than the purposes for which it was commissioned. Any person using or relying on thisdrawing for such other purpose agrees, and will by such use or reliance be taken to confirm hisagreement, to indemnify Sweco for all loss or damage resulting therefrom.
Notes
100
2030
4050
6070
8090
100
Original Size
Client
Rev. Amendment DetailsDate Orig Chk'd App'd
Date Date Date Date
Drawing Number Revision
Scale Originator Drawn Checked Approved
Drawing Title
Project Title
Drawing Status
A1
Choose office address from drop down
For Information
GYPSEY RACEPARK & AVENUE
Character Area 1General Arrangement
1:150 PM
17.08.16
PM
17.08.16
SH
18.08.16
RM
18.08.16
117962-01-L-002 REV
CHARACTER AREA 35
2
4
• Submission for planning application February 2018
• Construction Autumn 2018
• Completion Autumn 2019
PHASE 2 TIME LINE
KEY
SCALE 1/250
BBAA
CA3
HILDERTHORPE ROAD
TESCO SUPERSTORE
PETROL STATION
SPR
ING
FIEL
D A
VEN
UE
PROPOSED SECTIONS CHARACTER AREA 3
AB
CC
C
SECTION AA AA B BB C CC
SECTION B SECTION C
![Page 5: GYPSEY RACE PARK AND AVENUE - · PDF fileb e c k h i l l b r i d g e. 5 3. 4. 1. area 3 ... wall / seating ... 117962-01-l-002 rev character area 1 character area 2 3 5 2 ca1 4 3 5](https://reader031.vdocuments.net/reader031/viewer/2022030505/5ab2ab857f8b9a00728d6678/html5/thumbnails/5.jpg)
SEATING
SEATING
5.75
PRECAST CONCRETERETAINING WALLWITH SEATING
TIMBER TOPSEATING
PLANTING AREAPL6
GRASSED AREAPL1, PL7, PL8
BOULDERS
GRASS STEPS RETAINEDWITH TIMBER BOARD
EXISTING LEVELSTO BE RETAINED
PROPOSED LEVELS
BALLUSTRADE
YORKSHIRE WATERINFRASTRUCTURE
PROPOSED TREES
GABIONS RETENTIONWALL
HARD PAVINGAREAP1, P2
PROJECT BOUNDARY
4.000
F1
A1
R1
P1
K1
C1L1
PEDESTRIAN FOOTPATHSPUBLIC SPACESEDGING
P2
KERBS / STEPSK2GABIONS RETAINING WALLSRETAINING WALLS WITH FACINGCANTILEVER RETAINING WALLS
R2R3
PEDESTRIAN PARAPETSBRIDGETERRACES
A2S1
LANDSCAPE BOULDERSS3EMBANKMENTSE1BENCHESBOLLARDS
B1B2
BINSB3CYCLE STANDS4M HIGH COLUMNSUPLIGHTERS / STEPS LIGHTINGBENCH LIGHTING
L2L3
INFORMATION BOARDSFINGER POSTF3
T1 HORIZONTAL BARSARM GAMESTREET MUSICIANS
T2T3
STONE ANIMALST4PRE GROWN IVY PANELSPL9
NOTES:
1. All dimensions in mm, unless otherwise stated.
2. Do not scale from this drawing.
REFER TO 118844S01 OUTLINE SPECIFICATION
DESCRIPTION OF REVISIONDATE
06.04.17 PM
DRAWN
FIRST ISSUE
REVISIONLETTER
SHA0
CHECKEDBY
APPROVEDBY
SH
T: (+44) 0113 262 0000Grove House Mansion Gate Drive Leeds LS7 4DN
DRAWING STATUS :
DRAWING NUMBER :
DRAWING SCALE :
PAPER SIZE :
DRAWING TITLE :
REVISION :
DRAWN BY :
CHECKED BY :
CLIENT :
PROJECT TITLE :
DRAWN DATE :
CHECKED DATE :
APPROVED BY : APPROVED DATE :
FOR INFORMATION
EAST RIDING OF YORKSHIRE COUNCIL
BURLINGTON PARADE
GENERAL ARRANGEMENTAREA 4
1:200
A1
PM 24.03.17
SH 24.03.17
RM 03.04.17
119440-04-L01 P1
12.05.17 PM NEW RAMPED ACCESS +NORTH PATH WIDTH EXTENDED
SHA1 SH
02.08.17 PM REVISED LAYOUT SHP1 SH
CHARACTER AREA 4 3
5
1
AREA INABEYANCE
GATEWAY
WOODLAND
PUBLIC SPACE
RETENTION POND
CANTILEVEREDBOARDWALK
GRASSED AREA
GRASSED AREA
GRASSED AREA
70° ENGINEEREDSLOPE
70° ENGINEEREDSLOPE
9.02652Sea Roarer
9.08000Kling Klang Disc
4.60110-4.60170Seal
4.73020Lop-eared Rabbit
Existing levels
Proposed levels
Proposed plantedareas
Proposed tree
Proposed tree
Proposed retainingwall / seatingProposed parapet
1. Notes2.
F:\U6001\WTNjobs\117962 - Gypsey Race Park\B - Landscape Architecture\04-Drawings\AutoCAD Folder\L-Landscape Dwgs(dwg)\ 117962-01-L-002 - General Arrangement.dwg
This drawing should not be relied on or used in circumstances other than those for which it was originallyprepared and for which Sweco was commissioned. Sweco accepts no responsibility for this drawing toany party other than the person by whom it was commissioned. This drawing has been prepared for thetitled project or named part thereof and should not be relied upon or used for any other project without anindependent check being carried out as to its suitability and prior written authority of Sweco beingobtained. Sweco accepts no responsibility or liability for the consequences of this drawing being used fora purpose other than the purposes for which it was commissioned. Any person using or relying on thisdrawing for such other purpose agrees, and will by such use or reliance be taken to confirm hisagreement, to indemnify Sweco for all loss or damage resulting therefrom.
Notes
100
2030
4050
6070
8090
100
Original Size
Client
Rev. Amendment DetailsDate Orig Chk'd App'd
Date Date Date Date
Drawing Number Revision
Scale Originator Drawn Checked Approved
Drawing Title
Project Title
Drawing Status
A1
Choose office address from drop down
For Information
GYPSEY RACEPARK & AVENUE
Character Area 1General Arrangement
1:150 PM
17.08.16
PM
17.08.16
SH
18.08.16
RM
18.08.16
117962-01-L-002 REV
KEY
SCALE 1/200
• Submission for planning application February 2018
• Construction Autumn 2018
• Completion Autumn 2019
PHASE 2 TIME LINE
A
AABB
B
C
CC
CA4
GYPSEY RACE PARK AND AVENUE - PHASE 2 DETAILED DESIGN
![Page 6: GYPSEY RACE PARK AND AVENUE - · PDF fileb e c k h i l l b r i d g e. 5 3. 4. 1. area 3 ... wall / seating ... 117962-01-l-002 rev character area 1 character area 2 3 5 2 ca1 4 3 5](https://reader031.vdocuments.net/reader031/viewer/2022030505/5ab2ab857f8b9a00728d6678/html5/thumbnails/6.jpg)
GYPSEY RACE PARK AND AVENUE - PHASE 2 DETAILED DESIGN
Timber top seating
Natural play elements
Resin bound surfacing
Mounds
WATER STRATEGY
ECOLOGICAL STRATEGY
MATERIALS STRATEGY
PLAY STRATEGY
VISUALISATION CHARACTER AREA 3
PROPOSED FOOTBRIDGE & BALUSTRADE
PLANTING STRATEGY
Engineered green slopes
Acer platanoides
BALUSTRADE DETAIL
BRIDGE SECTION
BRIDGE SECTION
Quercus coccinea Ulmus ‘New Horizon’
Sustainable Drainage Systems (SuDS) to be implemented
Bug hotels
VISUALISATION CHARACTER AREA 4
PROPOSED SECTIONS CHARACTER AREA 4
SECTION A
SECTION B
SECTION C