hampshire local flood risk management strategy (lfrms) stakeholder workshop 9 th july 2012
TRANSCRIPT
Hampshire Local Flood Risk Management Strategy (LFRMS)
Stakeholder Workshop 9th July 2012
Purpose of today….
• Provide an introduction to the LFRMS
• Statutory requirement
• Roles and responsibilities
• Context
• Process
• Begin to involve you in shaping the strategy
• Capture your experiences of flooding
• Gather your comments on our assessment of current and future flood risk
• Brief you, so that you can brief others
Role of this Stakeholder Group…
• Bring together people affected by and responsible for flooding
• The invite list for today represents our current knowledge of Hampshire’s flooding community - please let us know if we’ve missed anyone out
• We hope this group will play an active role in shaping the LFRMS
• Contributing local flood knowledge
• Reviewing findings of our technical work
• Helping to identify other stakeholders
• Helping to raise awareness of flooding issues and responses
• Feeding back comments from the wider community
• Reviewing the proposed strategy
Agenda for Today
• Overview of the project
• Introductions (all)
• Questions
• Overview of our assessment of flood risk
• Break out session – an opportunity to look at our flood risk maps in more detail
• Feedback
• Next steps
• Final questions (to finish around 1.30pm)
Surface water flood risk
• <15,000 properties have a 3% chance of internal surface water flooding every year
• Around 30,000 residential properties have a 0.5% chance
• The annualised cost of damage from this flooding is estimated at around £20m
• Does not include cost of infrastructure flooding
• Does not include cost of nuisance flooding
• 700 properties affected by groundwater flooding in Hampshire in 2000/2001
• Some areas being affected in 94/95, 00/01 and 02/03
• Flooding can last weeks or months
Recorded flood incidents
• According to HCC records, around 370 properties have experienced surface or groundwater flooding since HCC have been recording flooding.
Introduction to the LFRMSBackground, process and programme
Background to LFRMS
• Flood Risk Regulations (2009) and the Flood and Water Management Act (2010)
• Places Lead Local Flood Authorities (LLFA) at the core of local flood risk management delivery.
• Hampshire County Council is a LLFA and is responsible for the production, maintenance, application and monitoring of a Local Flood Risk Management Strategy (LFRMS)
Background to LFRMS
The Act states that the LFRMS should explain:
• The roles and responsibilities of risk management authorities within the LLFA and their management functions
• The objectives for managing local flood risk
• The measures proposed to meet these objectives
• Importantly, an assessment of how (technically and financially), and when these measures will be implemented
• The environmental impact of the strategy.
“develop, maintain, apply and monitor”
Background to LFRMS
• HCC already produced Preliminary Flood Risk Assessment (PFRA)
• LFRMS now required to assess local flood risk - ordinary watercourses, surface runoff and groundwater
• The LFRMS must be consistent with the Environment Agency’s National Flood Risk Management Strategy.
Background to LFRMS
• The Preliminary Flood Risk Assessment identified priority areas based on Environment Agency national significant criteria
• Camberley/Farnborough
• Basingstoke
• Aldershot
• Horndean
• Fleet
• Winchester
• Andover
• Alton
45,500 people at risk
Background to LFRMS
• Surface Water Management Plans (SWMP) are ongoing in
• Rushmoor
• Eastleigh
• Basingstoke
• Groundwater SWMP about to be commissioned
• Rolling prioritised programme for remaining SWMPs
The LFRMS process…
Stage 1 – Issues and Analysis
- Develop vision and objectives
- Develop stakeholder engagement plan
- Assess current and future flood risk
Stage 2 – Scheme Identification
- Develop long list of schemes and projects
- Consider funding sources
Stage 3 – Draft Action Plan
- Quantitative cost benefit assessment of long list
- Prioritised list of schemes and interventions
Stage 4 – Final Action Plan
- Publish and launch LFRMS
Structure of the LFRMS
- Similar to an LDF suite of documents
- The strategy/action plan will be a concise document which can be easily updated
- It will cover a 15 year period – to 2028, but will be reviewed as required
- Supported by various ‘evidence base’ type documents
LFRMS Main document
Current and future flood risk
Managing Local Flood risk
Partners and communication
Objectives…
Should:- Be locally relevant
- Be compatible with other strategies/policies
- Fall within the remit of the LFRMS
- Reflect environmental, social and economic factors
We will use them to help us:- Appraise options
- Prioritise investment
- Gauge the success of the strategy over time
• Our objectives have evolved to take account of comments from our Steering Group
The LFRMS objectives…
• improve our knowledge and understanding of local flood risk in Hampshire;
• develop strategy, policy and a LFRMS action plans to manage these risks, providing balanced social and environmental benefits for the economic investment;
• work in partnership with other flood risk management authorities to deliver the strategy and action plan;
• maintain, and improve where necessary, local flood risk management infrastructure and systems to reduce risk;
• ensure that local planning authorities take full account of flood risk when allocating land and considering permitting development (by avoiding development in inappropriate locations and minimising flood risk wherever possible)
• Engage with community groups to increase public awareness of, and reporting of, flooding and promote appropriate individual and community level planning and action;
• improve and support community level flood response and recovery;
• Identify national, regional and local funding mechanisms to deliver flood risk management interventions.
The LFRMS will…
• Set out roles and responsibilities for flooding
• Present an assessment of flood risk and identify ‘hot spots’
• Take account of flood issues from main rivers, coastal erosion etc (although largely out of scope)
• Consider climate change implications
• Signpost to, and cross reference, other relevant strategies
• Provide detail to help inform planning policies on where development can go
• Set out actions (interventions, management, policies) to reduce risk
• Identify costs and benefits of strategic schemes (both financial and non-financial)
• Provide advice on funding mechanisms and develop a funding strategy
• Undertake Strategic Environmental Assessment of strategy
• Strategy is for 15 year period to 2028, reviewed in 2018, and review following any significant flood event
Opportunities to influence the strategy…
• As part of the requirements under the Act, Risk Management Authorities and members of the public must be consulted
• Over and above this basic requirement, consultation is included as a central part of our overall approach because we hope it will
- Ensure our analysis of flood risk matches local experience
- Pave the way for a smooth working relationship with our partners
- Generate greater buy in for the proposals
- Help promote understanding about the issues
Consultation on the LFRMSContext, methodology, role of this group
Why consult?
• As part of the requirements under the Act, Risk Management Authorities and members of the public must be consulted
• Over and above this basic requirement, consultation is included as a central part of our overall approach because we hope it will
- Ensure our analysis of flood risk matches local experience
- Pave the way for a smooth working relationship with our partners
- Generate greater buy in for the proposals
- Help promote understanding about the issues
Who we will consult…
Tier 1 Partners Work with Bodies with direct responsibility for flood risk management
Tier 1a Members Keep informed/ involve
District and County Council Members
Scrutiny Committee Members
Tier 2 Stakeholders
Involve Representatives of groups who may be affected by flooding
Tier 3 Public Consult The public
How we will consult…
Tier 1
Partners
Tier 1a
Members
Tier 2
Stakeholders
Tier 3
Public
Steering Group Briefings Workshop Online consultation
When we will consult…
Tier 1Partners
Tier 1aMembers
Tier 3Public
Stage 1Issues and Analysis
April 2012
Stage 4Final Strategy
Nov 2012
Tier 2
Stakeholders
Stage 2Scheme Identification
Stage 3Draft Strategy
How we will consult…
Tier 1
Partners
Tier 1a
Members
Tier 2
Stakeholders
Tier 3
Public
Steering Group
Ongoing
Briefings
Ongoing
Workshop
July 2012
Online consultation
Autumn 2012
30 Second introductions
The Assessment of Current and Future Flood Risk An overview
Assessment of current and future flood risk
- Combine national scale data from EA, with regional scale data from other providers
- Build on PFRA assessment
- Sit alongside SWMP
- Single consistent assessment of local flood risk
- Feed into future SWMP programme
- Balanced assessment of consequence and probability
Available data
Current flood risk
• Incident data
• HCC incident data (drainage tool v4.xls) & supporting GIS layers
• Water company flood incident data (DG5 register)
• Thames Water
• Southern Water
• Wessex Water
• Groundwater flooding incident data from 2001 report and EA Defra report on groundwater flooding
• Model or simulated data
• EA flood maps
• EA surface water maps (AStSWF, FMfSW)
Methodology
• Analyse flood incident data
• Frequency
• Consequence
• Confidence
• Analyse flood map data
• Frequency
• Consequence
• Confidence
• Combine incident and map data
• Combine risk score
• Map hotpot areas and flood metrics
• These results just for Residential property flooding from EA FmFSW 1 in 200yr
• Also completed for residential property FmFSW 1 in 30, HCC incident data
• Ongoing for non residential property and infrastructure
• Qualifying for funding from the EA (Flood Defence Grant in Aid) driven by residential properties at risk of significant surface flooding and deprivation index.
• Economic cost of flooding for non-residential property will be used to supplement applications for FDGiA and seek funding from other sources.
Break out session Looking at the maps in more detail
Break out session
• Facilitators will talk you through the assessment process in more detail
• Take some time to study the maps in more detail
• Help us verify the assessment by commenting on:
- Does the mapping reflect your experience?
- Are we showing a risk where you have no knowledge of flooding?
- Are we missing any areas which regularly flood?
Next Steps
Next steps
• Completion and consultation on ‘current and future flood risk’
• Gathering info on funding sources
• Gathering info on planned/committed schemes
• Defining potential policy approaches
• Drawing up a ‘long list’ of potential schemes
• Strategic Environmental Assessment
• Short listing of schemes
• Identifying a costed programme of works to address flood issues
• Writing the draft LFRMS
Online consultation
• Some of the information you have viewed today will be made available online for wider comment
• Please encourage others to visit the website and leave their comments
• www3.hants.gov.uk/flooding
Or contact
Consultation on draft strategy…
• The draft LFRMS will be available for public consultation in the autumn
• The document will be available:
- On the website
- In public buildings
• There will be an online questionnaire
• We will be holding a drop in session for people to find out more and ask questions
• Please take the time to comment and encourage others to also get involved
• Following the consultation the strategy will be updated and finalised in November
Feedback
• Please take a moment to fill out a feedback form to let us know how you think this session has been
• We will use your feedback to help plan future consultations
Contact details
• Any further comments or questions please contact
Pete Errington
01962 846766 [email protected]
Andy McConkey
01793 816602 [email protected]