heidelbergcement india ltd.-unit jhansi

30
“22nd National Award for Excellence in Energy Management 2021” HeidelbergCement India Ltd.-Unit Jhansi Mr Sunil Kumar, Plant Head Mr Manoj Vaish, SGM(Production) Mr Shailendra Agrawal, GM(E&I)

Upload: others

Post on 12-Jan-2022

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: HeidelbergCement India Ltd.-Unit Jhansi

• Click icon to add picture

“22nd National Award for Excellence in Energy Management 2021”

HeidelbergCement India Ltd.-Unit Jhansi

Mr Sunil Kumar, Plant Head

Mr Manoj Vaish, SGM(Production)

Mr Shailendra Agrawal, GM(E&I)

Page 2: HeidelbergCement India Ltd.-Unit Jhansi

• Click icon to add pictureBrief introduction on Company/UnitHeidelbergCement Group

Presence in IndiaWorldwide Presence

53,000 employees

Leading market positions in aggregates,

cement, and ready-mixed concrete

3,000 production sites in more than 50

countries

Cement capacity 184 mt (incl. joint

ventures)

Aggregates resources and reserves 19.2 bnt

Page 3: HeidelbergCement India Ltd.-Unit Jhansi

• Click icon to add pictureHeidelbergCement India Limited – Unit Jhansi- Jhansi Cement Grinding & Packing Unit installed in 1989, initial capacity- of 0.5 MTPA- 100 % PPC Manufacturing, Near to Power Plants (PTPP 920 MW & LPP 1920 MW)- Capacity Expanded to 2.7 MTPA by installing VRM in 2013- Capacity Expanded to 3.25 MTPA by upgrading High efficiency Separator and

debottlenecking of Ball Mill in 2020

Major Equipment Installed Capacity Make

Cement Mill -1 (Ball Mill) 162 TPH KHD Humbolt

Roller Press 200 TPH KHD Humbolt

Cement Mill -2 (VRM) 215 TPH Loesche

Packer – 4 Nos. 4 * 250 TPH EEL/FLS

Wagon Tippler 1000 TPH Metso

Wagon Loading Machine 8 * 120 TPH EEL/ FLS

Page 4: HeidelbergCement India Ltd.-Unit Jhansi

• Click icon to add pictureImpact of Covid-19

April May

2019-20 277542 241107

2020-21 58602 192055

277542 241107

58602

192055

0

100000

200000

300000

400000

500000 Impact on Production

April May

2019-20 25.09 25.09

2020-21 45.13 26.82

25.09 25.09

45.13

26.82

0.00

20.00

40.00

60.00 Impact on SEC

April May

2019-20 248947 248657

2020-21 33781 195217

248947 248657

33781

195217

0

100000

200000

300000

400000

500000 Impact on Dispatch

Page 5: HeidelbergCement India Ltd.-Unit Jhansi

• Click icon to add pictureOverall Specific Power Consumption Kwh/T

2017-18 2018-19 2019-20 2020-21

Specific Power 29.01 27.99 27.41 27.61

29.01

27.99

27.41

27.61

26.50

27.00

27.50

28.00

28.50

29.00

29.50Specific Power

*Increased due to Intermittent running as Impact of Covid 19

Page 6: HeidelbergCement India Ltd.-Unit Jhansi

• Click icon to add pictureCement Mill – 2 VRM Grinding Only -SPC (KWh/Ton)

2017-18 2018-19 2019-20 2020-21

Specific Power 23.93 23.50 23.13 23.10

23.93

23.50

23.13 23.10

22.60

22.80

23.00

23.20

23.40

23.60

23.80

24.00

Page 7: HeidelbergCement India Ltd.-Unit Jhansi

• Click icon to add pictureCement Mill – 2 VRM: Overall SPC (KWh/Ton)

23.9323.50

23.13 23.10

1.99

1.681.66 1.79

1.62

1.621.62 1.64

22.00

23.00

24.00

25.00

26.00

27.00

28.00

VRM 2017-18 VRM 2018-19 VRM 2019-20 VRM 2020-21

Cement Grinding

RMH

Packing Plant

26.4126.80

26.53

27.54

*Increased due to Intermittent running as Impact of Covid 19

Page 8: HeidelbergCement India Ltd.-Unit Jhansi

• Click icon to add pictureCement Mill -1 :Ball Mill Only Grinding SPC (KWh/Ton)

2017-18 2018-19 2019-20 2020-21

Specific Power 24.70 23.83 22.84 23.93

24.70

23.83

22.84

23.93

21.50

22.00

22.50

23.00

23.50

24.00

24.50

25.00Kw

h/T

*Increased due to Intermittent running as Impact of Covid 19

Page 9: HeidelbergCement India Ltd.-Unit Jhansi

• Click icon to add pictureCement Mill 1 Ball Mill– Overall SPC (KWh/Ton)

24.7023.83

22.84

23.93

1.37

1.33

1.28

0.85

1.75

1.71

1.7

1.65

21.00

22.00

23.00

24.00

25.00

26.00

27.00

28.00

29.00

BM 2017-18 BM 2018-19 BM 2019-20 BM 2020-21

27.82

25.82

26.8726.43

Cement Grinding

RMH

Packing Plant

*Increased due to Intermittent running as Impact of Covid 19

Page 10: HeidelbergCement India Ltd.-Unit Jhansi

• Click icon to add picture

24.89 25.00

28.00

23

23.5

24

24.5

25

25.5

26

26.5

27

27.5

28

28.5

HCIL VRM 2020-21LM 53.3 +3

Benchmark (VRM)(CII Cement Mill VRM

LM56.3 +3 P2)

Bechmark (VRM)(CII Cement Mill VRM

LM 53.3 +3 P5)

24.78 24.7

21

22

23

24

25

26

27

HCIL BM 2020-21 Benchmark (BM)(CII Cement Mill PPC P2)

VRM Best in Industry Ball Mill Best in Industry

Specific Power Comparison with Benchmark

Page 11: HeidelbergCement India Ltd.-Unit Jhansi

• Click icon to add pictureNational Bench Marking CII for Cement Mill VRM

Page 12: HeidelbergCement India Ltd.-Unit Jhansi

• Click icon to add picture

National Bench Marking CII for Cement Mill Ball Mill with Roller Press

Page 13: HeidelbergCement India Ltd.-Unit Jhansi

• Click icon to add pictureList of Energy Saving Projects with Payback 2018-19

No Title of Project

Annual

Electrical

Saving

(kWh)

Annual

Electrical

Cost Saving

(Rs million)

Annual

Thermal Cost

Saving (Rs

million)

Total Annual

Savings (Rs

million)

Investment

Made (Rs

million)

1Replacement of Conventional

lights with LED lights90000 0.65 0 0.65 0.147

2Raw material Handling Bag filters

Optimization40320 0.3 0 0.3 0

3Packing plant Bag filter

Optimization83160 0.62 0 0.62 0

4Optimization of Fly ash Silo bin

aeration Blower230400 1.72 0 1.72 0.21

5 VRM Optimisation 1688000 12.6 12.6

Page 14: HeidelbergCement India Ltd.-Unit Jhansi

• Click icon to add pictureList of Energy Saving Projects with Payback 2019-20

No Title of Project

Annual

Electrical

Saving

(kWh)

Annual

Electrical Cost

Saving (Rs

million)

Total Annual

Savings (Rs

million)

Investment

Made (Rs

million)

1Modification in truck loaders,

installation of luffing arrangement of

1.5 KW to reduce operation of hoisting

lowering motor 15 KW

57600 0.4032 0.4032 0.05

2 To install old solar plates with inverter

for substation lighting70000 0.511 0.511 0.15

3To control plant lighting from DCS

72000 0.504 0.504 0.01

4 To install occupancy sensor for office

lighting36500 0.2555 0.2555 0.0245

5 Monitor & optimise compressor power

on daily basis

64000 0.448 0.448 0.025

6

Installation of Energy Chain

Arrangement in place of festooning

cables in wagon & truck loading

machines

160000 1.12 1.12 1

Page 15: HeidelbergCement India Ltd.-Unit Jhansi

• Click icon to add pictureList of Energy Saving Projects with Payback 2020-21

No Title of ProjectAnnual Electrical

Saving (kWh)

Annual Electrical

Cost Saving (Rs

million)

Total Annual

Savings (Rs

million)

Investment Made

(Rs million)

1

Installed the pneumatic

cylinder in manual gate and

hard wire automation done of

manual gate by separate level

switch

72000 0.54 0.54 0.03

2

Stopped one Bag Filter (22

KW)fan with RAL of Packing

Plant by connecting venting

line from other Bag filter

70000 0.53 0.53 0.05

3Replacement of Conventional

lights with LED lights129806 0.97 0.97 0.87

4

Installation of screw

compressors in place of vane

compressors for dry fly ash

unloading

200000 1.5 1.5 22

5Installation of high efficiency

Separator in Ball Mill769805 5.77 5.77 150

Page 16: HeidelbergCement India Ltd.-Unit Jhansi

• Click icon to add pictureInnovative ProjectInstallation of High Efficiency Compressor for Flyash Unloading

Problem:

As our production capacity has been increased with various modifications in mill, installed vane

compressors were not meeting our Dry Flyash unloading requirement.

Average unloading rate in dry season at VRM Silo (2 Nos Vane compressors each 950 m3/hr + 1 no

reciprocating compressor 1100m3/hr) which combined output of around 90 TPH. Current VRM Dry Flyash

requirement is 98 TPH. There was no margin available for unloading to meet the requirement. Also

maintenance cost of these vane compressors is very high as its spares are imported from FLS USA.

Solution:

A preliminary study was conducted by Plant team for effective evacuation of large size Fly Ash bulkers to

Flyash silo for VRM. 3 nos. of new high efficiency screw compressors for Flyash unloading (each

~1500m3/h) were installed.

After installing new compressor it doubles our Flyash unloading capacity to meet the requirement

Page 17: HeidelbergCement India Ltd.-Unit Jhansi

• Click icon to add picture

Innovative ProjectInstallation of High Efficiency Compressor for Flyash Unloading

Page 18: HeidelbergCement India Ltd.-Unit Jhansi

• Click icon to add picture

Sr No. On site FYUOM

Renewable Energy ConsumptionMWH %

On Site

1 Solar 2017-18 MWH 75 0.12

2 Solar 2018-19 MWH 102 0.27

3 Solar 2019-20 MWH 175 0.53

4 Solar 2020-21 MWH 175 0.53

Off Site MWH %

5 Solar 2018-19 MWH 108 2

6 Solar 2019-20 MWH 791 2

7 Non solar 2019-20 MWH 2912 6

8 Non solar 2020-21 MWH 3319 8

Utilisation of Renewable Energy sources –

Page 19: HeidelbergCement India Ltd.-Unit Jhansi

• Click icon to add picture

Sr. No.

Project Description StatusSaving in Kwh per

year

Saving in Kg of CO2 eq.

1Installed 7.5 Kw Solar system at 5 locations

Completed 14600 11.97 K

2Installed transparent sheets in plant building to use day light

Completed 11242 9.21 K

3Installation of Turbo Ventilators( 36 Nos.)

Completed 18000 14.76 K

4Installation of 2 MW solar system

Under study 4500000 3690 K

5Long term PPA signed for purchase of 15 MW solar power

Completed - 400000K

Utilisation of Renewable Energy sources

Page 20: HeidelbergCement India Ltd.-Unit Jhansi

• Click icon to add picture

29.221

28.38

28.18

27.75

27

27.5

28

28.5

29

29.5

2018-19 2019-20 2020-21 2021-22(target)

GHG Emission Reduction

2018-19 2019-20 2020-21 2021-22(target)

GHG Emission reduction & Target

Page 21: HeidelbergCement India Ltd.-Unit Jhansi

• Click icon to add picture

GHG Emission Intensity Reduction Scope 1& 2

23.85

23.4623.58

23.16

22

22.5

23

23.5

24

24.5

25

2018-19 2019-20 2020-21 2021-22

KgCO2 /Ton of Cement (Scope-1 + Scope 2)

*Target

0.49

0.68

0.41

0.70

-

0.20

0.40

0.60

0.80

2017-18 2018-19 2019-20 2020-21

Scope 1 Emission

24.02

23.17

23.05

22.88

22.00

23.00

24.00

25.00

2017-18 2018-19 2019-20 2020-21

Scope 2 Emission

Page 22: HeidelbergCement India Ltd.-Unit Jhansi

• Click icon to add pictureGreen Supply Chain – Procurement Process

Page 23: HeidelbergCement India Ltd.-Unit Jhansi

• Click icon to add pictureGreen Supply Chain – Project Implemented

SrNo.

Projects Implemented

Investment Made

Benefits Achieved Description

1Maximization of fly ash blending up to 35%

30 MillionEnsuring availability

of dry fly ash

- Long term contract Power plant- -O&M contract for dry fly ash

system maintenance

2More despatch from rake ( 65% :35% ratio)

75 Million railway siding

Ease of dispatch bulk quantity and

availability of 2 point loading

Railway siding has been developed to engage more rakes and avoid congestion

3100 % Reverse Logistic for Raw Material, Two way transportation

Engaging dedicated trucks

Freight saving - 100 Rs./ Ton

Clinker from Damoh plant to Jhansi and reverse loading dry fly ash from Jhansi PTPP to Damoh plant

4Mobile Sales Force Application

2 MillionLive detail sales

accountingHandy Sales Portable for Dealer detail

5 Magma Tool 1 MillionPaper less and Ease access land record

Land record Management compilation of all land details

6On line portal for Rake Planning Application

0.25 MillionFast speed rake

demand management

Rake planning application for rake demand, Customer care and logistic integration

Page 24: HeidelbergCement India Ltd.-Unit Jhansi

• Click icon to add pictureEnergy Monitoring System

Page 25: HeidelbergCement India Ltd.-Unit Jhansi

• Click icon to add pictureEnergy Target setting

-Short term & long term goals which are Specific, measurable, assignable and realistic - Annual specific energy targets (best power achieved and energy Project considered) for the specific year.- Long term ( 3 to 5 year ) targets are being set on the basis of Capital expenses plan for the coming years, statutory guidelines for environment , availability of raw material, process related change etc..

Page 26: HeidelbergCement India Ltd.-Unit Jhansi

• Click icon to add pictureDaily Energy Monitoring System & Review

Description Frequency

Review of Energy Consumption

Daily

Section wise review of energy consumption with team

Weekly

Plant Head Review meeting

Weekly

Energy Management Cell Meeting

Monthly

Capex Review of Encon Projects

Monthly

Page 27: HeidelbergCement India Ltd.-Unit Jhansi

• Click icon to add pictureAwareness for Reducing Energy Consumption

-Plant head addressing team to increase awareness towards reduction in energy consumption

Page 28: HeidelbergCement India Ltd.-Unit Jhansi

• Click icon to add pictureEnergy Committee

Page 29: HeidelbergCement India Ltd.-Unit Jhansi

• Click icon to add pictureISO 50001 Certificate•Certified to ISO 50001 – ENERGY MANAGEMENT

•External & Internal Yearly audit from Certified agencies ( TUV) & trained auditors

Page 30: HeidelbergCement India Ltd.-Unit Jhansi

• Click icon to add pictureAward & accolades

Award - Green CO GOLD Unit by CII