hft project overview cd0 review h.g. ritter lbnl

22
HFT Project Overview CD0 Review H.G. Ritter LBNL

Upload: audra-chandler

Post on 25-Dec-2015

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: HFT Project Overview CD0 Review H.G. Ritter LBNL

HFT Project Overview

CD0 Review

H.G. RitterLBNL

Page 2: HFT Project Overview CD0 Review H.G. Ritter LBNL

HFT CD0 Review, February 25 and 26, 2008 2

Project

• In the first part we have shown– Compelling science– Proposed detector can do necessary

measurements• In the second part we will show

– Properties of detector– How we build it– We have the team and the organization

to build it

Page 3: HFT Project Overview CD0 Review H.G. Ritter LBNL

HFT CD0 Review, February 25 and 26, 2008 3

OverviewSTAR Tracking Upgrade to identify mid-rapidity Charm and Bottom hadrons through direct reconstruction and measurement of the displaced vertex

Page 4: HFT Project Overview CD0 Review H.G. Ritter LBNL

HFT CD0 Review, February 25 and 26, 2008 4

HFT Project

• Time line:– February 2008 (CD-0) – June 2013

(CD-4)• Budget

– Previous (proposal):$15.1M-16M– Present estimated cost range:

$11.1M-14.7M•Updates to Design•Contingency

Page 5: HFT Project Overview CD0 Review H.G. Ritter LBNL

HFT CD0 Review, February 25 and 26, 2008 5

PIXEL

• 2 layers of 30x30 m pixels at 2.5 and 8 cm radius

• Very low material budget to limit multiple scattering

• Rapid insertion and removal• Precision positioning• Air cooling • Data reduction and formatting on

chip

Page 6: HFT Project Overview CD0 Review H.G. Ritter LBNL

HFT CD0 Review, February 25 and 26, 2008 6

PIXEL

Page 7: HFT Project Overview CD0 Review H.G. Ritter LBNL

HFT CD0 Review, February 25 and 26, 2008 7

Engineering Prototype

Page 8: HFT Project Overview CD0 Review H.G. Ritter LBNL

HFT CD0 Review, February 25 and 26, 2008 8

IST

• One layer of single sided silicon pads at a radius of 14 cm

• ~23 ladders• 11 units

(modules) per ladder

• Conventional and proven technology

• MIT expertise

Page 9: HFT Project Overview CD0 Review H.G. Ritter LBNL

HFT CD0 Review, February 25 and 26, 2008 9

Optimal technology

• Pixel: New technology– Resolution– Low material budget

• IST: Proven strip-pad technology– Experience– Cost effective

Page 10: HFT Project Overview CD0 Review H.G. Ritter LBNL

HFT CD0 Review, February 25 and 26, 2008 10

SSD• Existing detector• Needs upgrade to cope with DAQ1000

– (order of 350k$)

Page 11: HFT Project Overview CD0 Review H.G. Ritter LBNL

HFT CD0 Review, February 25 and 26, 2008 11

Collaboration

• BNL: C. Chasman, D. Beavis, R. Debbe, J.H. Lee, M.J. Levine, F. Videbaek, Z. Xu

• UCLA: R. Cendejas, H. Huang, S. Sakai, G. Wang, C. Whitten• Kent State: J. Joseph, D. Keane, S. Margetis, V. Rykov, W.M.

Zhang• Prague: M. Bystersky, J. Kapitan, V. Kushpil, M. Sumbera • Strasbourg: J. Baudot, C. Hu-Guo, A. Shabetai, M. Szelezniak,

M. Winter• MIT: J. Balewski, D. Hasell, J. Kelsey, R. Milner, M. Plesko, R.

Redwine, B. Surrow, G. Van Nieuwenhuizen• LBNL: E. Anderssen, X. Dong, L. Greiner, H.S. Matis, S.

Morgan, H.G. Ritter, A. Rose, E. Sichtermann, R.P. Singh, T. Stezelberger, X. Sun, J.H. Thomas, V. Tram, C. Vu, H.H. Wieman, N. Xu

• Purdue: A.S. Hirsch, X. Li, B. Srivastava, F. Wang, Q. Wang, W. Xie

Page 12: HFT Project Overview CD0 Review H.G. Ritter LBNL

HFT CD0 Review, February 25 and 26, 2008 12

STAR - HFT Collaboration

• LBNL, MIT and BNL are main institutes for construction– Excellent track record– Experience

• Strasbourg/LBNL - active pixel sensor development

• Kent State, Purdue, Prague, UCLA, LBNL play lead role in simulation, analysis software and calibration

• Entire STAR collaboration will analyze data– Excellent track record– Experience

Page 13: HFT Project Overview CD0 Review H.G. Ritter LBNL

HFT CD0 Review, February 25 and 26, 2008 13

Management Structure

HFT Project ManagementContract Project Manager: HG Ritter (acting) LBNLDeputy, Contract Project Manager: RP Singh LBNL

Deputy, Contract Project Manager: F. Videbaek BNL

PIXEL

Wieman LBNL

Anderssen LBNL

IST

B. Surrow MIT

J. Kelsey MIT

Integration

F. Videbaek BNL

J. Kelsey MIT

Software

S. Margetis KSU

SSD LiaisonJ. Thomas LBNL

Safety CoordinatorTBD

DOEJ. Simon-Gillo

Budget ControlS. Morgan LBNL

STARSpokesperson: T. HallmanUpgrade coord: R. Majka

BNLLBNL

Page 14: HFT Project Overview CD0 Review H.G. Ritter LBNL

HFT CD0 Review, February 25 and 26, 2008 14

HFT Technical Committee

Ritter - Project ManagerSingh - Deputy Project ManagerMorgan - BudgetVidebaek - IntegrationWieman - PixelAnderssen - Pixel, IntegrationSurrow - ISTKelsey - IST, IntegrationThomas - SSD LiaisonMargetis - SoftwareHallman - STARMajka - STAR

Weekly meetings, management control

Page 15: HFT Project Overview CD0 Review H.G. Ritter LBNL

HFT CD0 Review, February 25 and 26, 2008 15

Risk Management

• APS Sensors depending on Strasbourg pace of development– Early prototypes, involved in testing

and design• Kinematic mount, low mass ladder,

alignment challenging– Solve problem in the R+D phase

• SSD is essential– Involved in upgrade and running of

SSD, design redundancy into IST

Page 16: HFT Project Overview CD0 Review H.G. Ritter LBNL

HFT CD0 Review, February 25 and 26, 2008 16

Performance Requirements

• Thickness of beam pipe + first Pixel layer < 0.5% radiation length

• Pixel integration time < 200 s• Read-out compatible with DAQ

1000• Internal alignment and stability

better than 20 m for Pixel and better than 300 m for IST

• Detector hit efficiency of Pixel > 95%

Page 17: HFT Project Overview CD0 Review H.G. Ritter LBNL

HFT CD0 Review, February 25 and 26, 2008 17

Projected Run Plan

1) First run with HFT: 200 GeV Au+Au v2 and RCP with 500M M.B. collisions

2) Second run with HFT: 200 GeV p+p RAA

3) Third run with HFT: 200 GeV Au+Au Centrality dependence of v2 and RAA

Charm background and first attempt for electron pair measurements

C baryon with sufficient statistics

Page 18: HFT Project Overview CD0 Review H.G. Ritter LBNL

HFT CD0 Review, February 25 and 26, 2008 18

Milestones

◊ CD-0 February 2008◊ CD-1 October 2008◊ CD-2/3 August 2009◊ CD-4 June 2013◊ Modified East Cone with West Cone in for Summer

’09 – June 2009◊ Installation of Engineering Prototype – September

2010◊ Engineering Prototype in Beam – January 2011◊ Ultimate Installed – September 2011◊ Ultimate In Beam – January 2012◊ IST Installed – July 2012

Page 19: HFT Project Overview CD0 Review H.G. Ritter LBNL

HFT CD0 Review, February 25 and 26, 2008 19

Estimated Cost Range

WBS Task Name

Cost in $K

Cont. in %

Cont. in $K

Lower Range in $K (Est. TPC)

Upper Range in $K

1.1Research and Development

1,461 0 0 1,461 1,461

1.2 Pixel 1,985 46 1,125 3,110 4,354

1.3 Strip Detector 2,345 36 878 3,223 4,351

1.4 Integration 1,665 41 946 2,611 3,656

1.5 Software 0 0 0 0 0

1.6 Project Management 732 0 0 732 878

Total 8,188 29 2,949 11,138 14,701

Appropriate labor ratesEscalated Risk based contingency

Page 20: HFT Project Overview CD0 Review H.G. Ritter LBNL

HFT CD0 Review, February 25 and 26, 2008 20

Summary• Compelling science for the RHIC II era• A detector

– That can deliver the science– Built on the strength of STAR

•Coverage and particle identification– Uses innovative technology to get

superior resolution • A team and an organization

– That can build the detector– That will extract the science in a timely

fashion• Meets the charges

Page 21: HFT Project Overview CD0 Review H.G. Ritter LBNL

Back-up

Page 22: HFT Project Overview CD0 Review H.G. Ritter LBNL

HFT CD0 Review, February 25 and 26, 2008 22

Technology Driven Schedule