Page 1: HUMANITARIAN OPERATIONS UPDATE 25 April 2003. 24 Apr 03 2 Introduction Welcome to new attendees Purpose of the HOC update Limitations on material Expectations

HUMANITARIAN OPERATIONS

UPDATE

25 April 2003

Page 2: HUMANITARIAN OPERATIONS UPDATE 25 April 2003. 24 Apr 03 2 Introduction Welcome to new attendees Purpose of the HOC update Limitations on material Expectations

224 Apr 03

Introduction

• Welcome to new attendees

• Purpose of the HOC update

• Limitations on material

• Expectations

Page 3: HUMANITARIAN OPERATIONS UPDATE 25 April 2003. 24 Apr 03 2 Introduction Welcome to new attendees Purpose of the HOC update Limitations on material Expectations

324 Apr 03

WEATHER UPDATE

Page 4: HUMANITARIAN OPERATIONS UPDATE 25 April 2003. 24 Apr 03 2 Introduction Welcome to new attendees Purpose of the HOC update Limitations on material Expectations

424 Apr 03

Kuwait City Baghdad

Forecast

Page 5: HUMANITARIAN OPERATIONS UPDATE 25 April 2003. 24 Apr 03 2 Introduction Welcome to new attendees Purpose of the HOC update Limitations on material Expectations

524 Apr 03

Amman Batman

Forecast

Page 6: HUMANITARIAN OPERATIONS UPDATE 25 April 2003. 24 Apr 03 2 Introduction Welcome to new attendees Purpose of the HOC update Limitations on material Expectations

624 Apr 03

Page 7: HUMANITARIAN OPERATIONS UPDATE 25 April 2003. 24 Apr 03 2 Introduction Welcome to new attendees Purpose of the HOC update Limitations on material Expectations

724 Apr 03

Page 8: HUMANITARIAN OPERATIONS UPDATE 25 April 2003. 24 Apr 03 2 Introduction Welcome to new attendees Purpose of the HOC update Limitations on material Expectations

824 Apr 03

Page 9: HUMANITARIAN OPERATIONS UPDATE 25 April 2003. 24 Apr 03 2 Introduction Welcome to new attendees Purpose of the HOC update Limitations on material Expectations

924 Apr 03

OPERATIONAL SUMMARY

Page 10: HUMANITARIAN OPERATIONS UPDATE 25 April 2003. 24 Apr 03 2 Introduction Welcome to new attendees Purpose of the HOC update Limitations on material Expectations

1024 Apr 03

Operational Summary

• 14 of “Top 55” accounted for– Three captured recently

• Concentrating on stability efforts

Page 11: HUMANITARIAN OPERATIONS UPDATE 25 April 2003. 24 Apr 03 2 Introduction Welcome to new attendees Purpose of the HOC update Limitations on material Expectations

1124 Apr 03

Security Situation Update

• Rear Area Threat: – Iraqi paramilitary activities north of Kuwaiti

border

• Travel in Iraq entails risk– Close interaction with HOC prior to departure

is highly recommended to ensure receipt of the most recent security updates

Page 12: HUMANITARIAN OPERATIONS UPDATE 25 April 2003. 24 Apr 03 2 Introduction Welcome to new attendees Purpose of the HOC update Limitations on material Expectations

1224 Apr 03

Permissive Cities• Al Amarah• Al Hillah• Al Qa’im• An Najaf• An Nasiriyah• Ah Humza• Ar Rutbah• Ash Shumali• As Samawah• As Sulimaniyah• As Sumali• Az Zubayr

• Basrah• Dahuk• Irbil• Karbala• Kirkuk• Mudaysis• Nukyhab• Rumaithah• Rumaylah• Safwan• Umm Qasr

Page 13: HUMANITARIAN OPERATIONS UPDATE 25 April 2003. 24 Apr 03 2 Introduction Welcome to new attendees Purpose of the HOC update Limitations on material Expectations

1324 Apr 03

Permissive Areas

• Basrah Governorate (all)

• Mysan Governorate (all)

Page 14: HUMANITARIAN OPERATIONS UPDATE 25 April 2003. 24 Apr 03 2 Introduction Welcome to new attendees Purpose of the HOC update Limitations on material Expectations

1424 Apr 03

Significant CMO/Civil Developments

• USAID investigating contracts for running civil airports

• Czech field hospital setting up at the former Basrah military hospital site

• Railroad– Railroad proved from Basrah to Baghdad– Some repairs needed in An Nasiriyah– At pre-war levels; never met US/UK standards– Details of study available

Page 15: HUMANITARIAN OPERATIONS UPDATE 25 April 2003. 24 Apr 03 2 Introduction Welcome to new attendees Purpose of the HOC update Limitations on material Expectations

1524 Apr 03

Southern Highlights

• Umm Qasr– A primary care clinic was discovered in town

that had not received any assistance– Assessment being conducted April 24

• Basrah– Power

• Najebia & Khoral Zubayr plants on line, latter making pwr

• Fuel supply identified in area storage tanks

Page 16: HUMANITARIAN OPERATIONS UPDATE 25 April 2003. 24 Apr 03 2 Introduction Welcome to new attendees Purpose of the HOC update Limitations on material Expectations

1624 Apr 03

Southern Highlights

• Basrah– Sewage treatment plant partially operational

• Only mechanical separation before pumping to salt flats

– Water• Insufficient sweet water in An Nasiriyah canal• Delivered untreated; potable by IO/NGO and military

deliveries• Military and private reverse osmosis pumps

operating

Page 17: HUMANITARIAN OPERATIONS UPDATE 25 April 2003. 24 Apr 03 2 Introduction Welcome to new attendees Purpose of the HOC update Limitations on material Expectations

1724 Apr 03

Southern City Critical Status

Southern Iraq

Al Basrah A A A A/G G

Qalat Sukkar A R A A Power from Ar Rifa

An Nasiriyah R/A R A G G

As Samawah A A G

Umm Qasr G G R/A G G

Az Zubayr A A G 80% have running water

Wat

er

Fo

od

Fu

el

Sec

uri

ty

Po

wer

R - Red – Definite need, little or no assistance provided, extremely limited supply, no access by general HA communityA – AmberAmber - Some need, some assistance provided, restricted supply, restricted access by general HA CommunityG – Green – No need or all assistance provided, ample supply, generally unimpeded access by general HA community

Page 18: HUMANITARIAN OPERATIONS UPDATE 25 April 2003. 24 Apr 03 2 Introduction Welcome to new attendees Purpose of the HOC update Limitations on material Expectations

1824 Apr 03

Central Highlights

• Baghdad– Fuel running low at water and sewage plant– NGO/Coalition working to ensure continued

supply– Work continues on power and water system

Page 19: HUMANITARIAN OPERATIONS UPDATE 25 April 2003. 24 Apr 03 2 Introduction Welcome to new attendees Purpose of the HOC update Limitations on material Expectations

1924 Apr 03

Central City Critical Status

Central Iraq

An Najaf A A G G Power at 65%

Al Amarah G R A Potable water for entire city

Al Kut R R G A

Ad Diwaniyah A/G A Depends upon An Najaf for power

Karbala G G G G

Baghdad A A A R

Wat

er

Fo

od

Fu

el

Po

wer

Sec

uri

ty

R - Red – Definite need, little or no assistance provided, extremely limited supply, no access by general HA communityA – AmberAmber - Some need, some assistance provided, restricted supply, restricted access by general HA CommunityG – Green – No need or all assistance provided, ample supply, generally unimpeded access by general HA community

Page 20: HUMANITARIAN OPERATIONS UPDATE 25 April 2003. 24 Apr 03 2 Introduction Welcome to new attendees Purpose of the HOC update Limitations on material Expectations

2024 Apr 03

Northern Highlights

• Mosul– Civil Engineers inspected Mosul Dam

• Dam is structurally sound and work crews are on duty• Monitoring water pressure on the dam• Increased water levels are due to higher than normal

rainfall

Page 21: HUMANITARIAN OPERATIONS UPDATE 25 April 2003. 24 Apr 03 2 Introduction Welcome to new attendees Purpose of the HOC update Limitations on material Expectations

2124 Apr 03

Northern City Critical Status

Northern Iraq

Kirkuk G G G G

Irbil G G G G G

As Sulaymaniyah G G G G G

Dahuk G G G G G

Mosul A A A A A Power reduced due to natural gas supply problem

Wat

er

Fo

od

Fu

el

Po

wer

Sec

uri

ty

R - Red – Definite need, little or no assistance provided, extremely limited supply, no access by general HA communityA – AmberAmber - Some need, some assistance provided, restricted supply, restricted access by general HA CommunityG – Green – No need or all assistance provided, ample supply, generally unimpeded access by general HA community

Page 22: HUMANITARIAN OPERATIONS UPDATE 25 April 2003. 24 Apr 03 2 Introduction Welcome to new attendees Purpose of the HOC update Limitations on material Expectations

2224 Apr 03

AirportsBasrah A Coalition controlled, awaiting operations

Safwan R Coalition forces not using facility

Jalibah A Under coalition control

Tallil A Coalition operations only w/o permission

Qalat Salih R Not Secured, Not Assessed

Qalat Sikar R Not Secured, Not Assessed

Al-Kut R Not Secured, Not Assessed

An Numaniyah A Under coalition control

Baghdad A Coalition operations only w/o permission

Irbil A Coalition operations only w/o permission

Mosul A Coalition operations only w/o permission

SeaportUmm Qasr G HA operations in progress

R - Red A – AmberAmber G – Green Blank – No information

Page 23: HUMANITARIAN OPERATIONS UPDATE 25 April 2003. 24 Apr 03 2 Introduction Welcome to new attendees Purpose of the HOC update Limitations on material Expectations

2324 Apr 03

Border CrossingsKuwait A

Saudi Arabia R Closed

Jordan G Open

Syria R Closed

Turkey A Border crossing reportedly getting smoother

Iran R/A Reports of aid moving across border

R - Red A – Amber Amber G – Green Blank – No information

Page 24: HUMANITARIAN OPERATIONS UPDATE 25 April 2003. 24 Apr 03 2 Introduction Welcome to new attendees Purpose of the HOC update Limitations on material Expectations

2424 Apr 03

Dislocated Civilians Information

• Jordan-Iraq border no man’s land– Approximately 950 people (possibly Iranian

refugees)– Desire to cross into Jordan– May establish camp inside Iraq for them

Page 25: HUMANITARIAN OPERATIONS UPDATE 25 April 2003. 24 Apr 03 2 Introduction Welcome to new attendees Purpose of the HOC update Limitations on material Expectations

2524 Apr 03

UN SECURITY POSTURE

Page 26: HUMANITARIAN OPERATIONS UPDATE 25 April 2003. 24 Apr 03 2 Introduction Welcome to new attendees Purpose of the HOC update Limitations on material Expectations

2624 Apr 03

HUMANITARIAN ORGANIZATION

INPUTS

Page 27: HUMANITARIAN OPERATIONS UPDATE 25 April 2003. 24 Apr 03 2 Introduction Welcome to new attendees Purpose of the HOC update Limitations on material Expectations

2724 Apr 03

Standing RFIs

• Significant civilian population movements

• Landmine, UXO, depleted uranium locations

• Information on border procedures

Page 28: HUMANITARIAN OPERATIONS UPDATE 25 April 2003. 24 Apr 03 2 Introduction Welcome to new attendees Purpose of the HOC update Limitations on material Expectations

2824 Apr 03

• No RFIs received

RFI Status

Page 29: HUMANITARIAN OPERATIONS UPDATE 25 April 2003. 24 Apr 03 2 Introduction Welcome to new attendees Purpose of the HOC update Limitations on material Expectations

2924 Apr 03

DATA

PENDING

APATAP AT Mix

UXOUnknownSubMunition

Explosive Locations

As of 23 Apr 03

Page 30: HUMANITARIAN OPERATIONS UPDATE 25 April 2003. 24 Apr 03 2 Introduction Welcome to new attendees Purpose of the HOC update Limitations on material Expectations

3024 Apr 03

National HA Needs Ranking Matrix Regional National Region City Governorate Rating Ranking RankingSouth Al Basrah Al Basrah 15 3 (3) 7 (6) South Umm Qasr Al Basrah 6 7 (7) 16 (15) South Safwan Al Basrah 12 5 (5) 10 (10) South Az Zubayr Al Basrah 11 6 (6) 11 (11) South As Samawah Al Muthanna 17 2 (2) 5 (4) South An Nasiriyah Dhi Qar 14 (17) 4 (4) 9 (6) South Al Amarah Maysan 18 (N) 1 (1) 4 (3) Central An Najaf An Najaf 9 6 (6) 12 (12) Central Al Kufah An Najaf N - - Central Al Hillah Babil 9 (6(-)) 6 (7) 12 (15) Central Karbala Karbala 6 8 (7) 16 (15) Central Baghdad Baghdad 21 2 (2) 2 (2) Central Al Kut Wassit 19 14 (-) 3 (5) 3 (9) Central Baqubah Diyala N - - Central Samarra Salah ad Din N - - Central Tikrit Salah ad Din N - - Central Ar Ramadi Al Anbar N - - Central Fallujah Al Anbar N - - Central Ad Diwaniyah Al Qadisuyah 24 1 (1) 1 (1) Central Ar Rutbah Al Anbar 17 4 (3) 5 (4) Central Al Qaim Al Anbar 15 5 (4) 7 (6) North Erbil Erbil 0 - - North As Sulaymaniyah As Sulaymaniyah 0 - - North Kirkuk At Ta min 9 (3 (-)) 1 (1) 12 (12) North Dahuk Dahuk 0 - - North Mosul Ninawa 9 (14 (-)) 1 (1) 12 (12) North Tallafar Ninawa N - -

(#) – Previous ranking

Page 31: HUMANITARIAN OPERATIONS UPDATE 25 April 2003. 24 Apr 03 2 Introduction Welcome to new attendees Purpose of the HOC update Limitations on material Expectations

3124 Apr 03

Questions ?