icp statistics nov-2013

12

Click here to load reader

Upload: bacabacabaca

Post on 20-Apr-2017

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ICP Statistics Nov-2013

11/2013

API 51

API 57

API 65

API 93

TE

API 57

API 58

API 57

QUT

QUS

QUP

TOTA

INDIVI

Tot

Certified IndividualActive Certificate

04/07 09

10 5110 5

70 4079 4

53 3637 3

36 260

ES 139

71 29

80

77

TE 129

SE

PA

AL 13383 14

AMER

IDUAL CER

tal Numbe

USA

ls 8,48

(51.7%

es 15,45

(53.8

9/07 03/08 1

5321 5770

4262 4555

3794 3876*

288 316

188 251

62 96

18 85

128 122

4061 15171 1

RICAN PET

RTIFICAT

As of No

Active

er of API C

CAN3 %) (159 %)

3(1

10/08 03/09

5907 6321

4738 5150

3966 4091

356 410

298 328

122 138

117 135

20 38

131 146

1565516757

- 1 -

TROLEUM

TION PROG

ovember 1, 2

Certificat

Certified I

NADA 1,936 11.8%) 3,291 11.5%)

9 10/09 03/1

6507 695

0 5375 575

4301 438

0 457 48

8 369 39

8 172 19

5 180 23

8 57 7

6 162 17

7175801864

M INSTITUT

GRAMS ST

2013

tes

Individual

OTHER 5,979

(36.5%)9,975

(34.7%)

10 10/10 05/

58 7155 76

54 6061 65

82 4541 47

86 509 5

91 416 4

96 230 2

30 266 3

70 87

73 184 2

4019449208

TE

ATUS

ls = 16,398

TOTA

16,3

28,7

/11 11/11 04

622 8002 8

563 7009 7

768 5029 5

554 599

423 480

272 300

315 359

99 115

201 226

82122132 23

8

AL

398

725

4/12 10/12 0

8556 8994

7639 8052

5304 5647

706 784

518 572

327 355

419 490

129 148

241 269

3863 253352

04/13 11/13

974610221

8695 9116

5905 6162

901 964

609 631

382 416

565 645

161 182

286 327

18

43

2727928725

3

1

6

2

4

1

6

5

2

7

8

3

5

Page 2: ICP Statistics Nov-2013

11/2013

0

5000

10000

15000

20000

25000

30000

8843100

O

006110741161

Overall Pr

112661

14061

1

- 2 -

rogram G

15655

17576

19

Growth

9449

22132

253335

28725

API 510

API 570

API 653

Other Program

Total

ms

Page 3: ICP Statistics Nov-2013

11/2013

Yea

200

200

200

200

201

201

201

201

2006

2007

2008

2009

2010

2011

2012

2013

B

ar

6 535

7 559

8 596

9 649

0 684

1 740

2 793

3 848

0% 10%

Breakdow

USA

50 71.

98 68.

64 66.

95 64.

46 61.

08 58.

34 54.

83 51.

20%

15.5%

18.2%

20.5%

22.2%

25

n of Certi

.8%

.5% 1

.2% 1

.3% 1

.6% 1

.3% 1

.7% 1

.7% 1

30% 40%

%

5.2%

29.1%

33.2%

36.5%

- 3 -

fied Inspe

Canad

949 1

1079 1

1196 1

1358 1

1468 1

1605 1

1761 1

1936 1

50% 6

54.

51.7%

%

ectors Wor

da

12.7%

13.2%

13.3%

13.5%

13.2%

12.6%

12.1%

11.8%

60% 70%

7

68.5

66.2%

64.3%

61.6%

58.3%

.7%

%

rldwide

Other c

1155

1489

1842

2243

2807

3688

4820

5979

80%

71.8%

5%

countries

15.5%

18.2%

20.5%

22.2%

25.2%

29.0%

33.2%

36.5

US

Canada

Other Cou

%

%

%

%

%

%

%

ntries

Page 4: ICP Statistics Nov-2013

11/2013

A

Full t

Full

Dist

Industr

PetroleuChemic

OtherAny of the

UnidentiTOTA

Distributi

Empl

time emplo

time emploa

Independ

Un

tribution o

ry

um cal r above

ified AL

ion of cert

loyment typ

oyee of an

oyee of anagency dent contr

nidentified

of certified

tified indiv

pe

owner/use

inspectio

ractor

- 4 -

d individu

Total

7148 1382 3055 4012 801

16398

viduals by

Total

er

n

uals by ind

y the empl

6163

7307

1736

1192

dustry type

Percentage

43.6%8.4%18.6%24.5%4.5%

oyment ty

Percenta

37

44

10

7.

e

e of total

% % % %

%

ype

age of total

7.6%

4.6%

0.6%

2%

Page 5: ICP Statistics Nov-2013

11/2013

Year

2004

2005

2006

2007

2008

2009

2010

2011

2012

2013

API

Exam Administratio

Ju

Decemb

Ju

Decemb

Ju

Decemb

Ju

Septemb

Decemb

Ju

Septemb

Decemb

Ju

Septemb

Decemb

Ju

Septemb

Decemb

Ju

Septemb

Decemb

Ju

Septemb

Decemb

Ju

Septemb

EXAM PE

510, Press

on CANDI-DATES

ne 30

ber 31

ne 30

ber 39

ne 39

ber 52

ne 57

ber 20

ber 61

ne 63

ber 17

ber 58

ne 60

ber 32

ber 65

ne 67

ber 34

ber 65

ne 74

ber 44

ber 83

ne 98

ber 63

ber 79

ne 96

ber 59

*- out of 1

- 5 -

ERFORMA

sure Vessel

-S

PASS

00 20

18 18

04 19

94 23

91 23

20 31

71 33

06 11

13 37

38 35

75 8

86 31

04 28

21 17

59 33

78 35

44 20

51 34

42 39

40 21

33 44

88 55

34 33

95 48

60 55

90 33

25 question

ANCE

Inspectors

FAIL P

08 92

83 135

92 112

38 156

33 158

18 202

30 241

15 91

72 241

54 284

86 89

18 268

84 320

73 148

30 329

57 321

01 143

42 309

92 350

16 224

45 388

54 434

37 297

85 310

59 401

35 255

ns

s

PASS % Pa

69.3

57.6

63.2

60.4

59.6

61.2

57.8

55.9

60.7

55.5

49.1

54.3

47.0

53.9

50.1

51.7

58.4

52.5

52.8

49.1

53.4

56.1

53.2

61.1

58.2

56.8

ass Point

100

107

108

106

106

106

106

106

105

105

103

109

112

112

110

109

109

110

108

108

109

109

109

90*

90

90

Page 6: ICP Statistics Nov-2013

11/2013

Year

2004

2005

2006

2007

2008

2009

2010

2011

2012

2013

API 653

Exam administrat

on March

September

March

September

March

September

March

September

March

September

March

September

March

September

March

September

March

September

March

September

3 Abovegroun

iCANDID

ATES

210

299

265

313

288

366

347

336

388

323

407

425

473

492

586

660

683

691

644

- 6 -

nd Storage T

PASS F

145

197

139

189

169

244

226

188

229

183

244

250

274

300

319

332

383

419

364

Tanks Inspec

FAIL PAS%

65 69.1

102 65.9

126 52.5

124 60.4

119 58.7

122 66.7

121 65.1

148 56.0

159 59.0

140 56.7

163 60.0

175 58.8

199 57.9

192 61.0

267 54.4

328 50.3

300 56.1

272 60.6

280 56.5

ctors

SS PASS P

1 98

9 10

5 10

4 10

7 10

7 10

1 10

0 10

0 10

7 10

0 10

8 10

9 10

0 10

4 10

3 10

1 10

6 10

5 86

POINT

8

1

2

3

5

4

3

5

6

6

6

7

3

3

1

1

5

7

6

Page 7: ICP Statistics Nov-2013

11/2013

*- o

Year a

2004

2005

2006

2007

2008

2009

2010

2011

2012

2013

out of 125 qu

Exam administrati

on June

December

June

December

June

December

June

September

December

June

September

December

June

September

December

June

September

December

June

September

December

June

September

December

June

September

December

uestions

API 570 -

CANDI-DATES

368

314

354

365

492

477

518

158

518

681

142

670

637

222

637

815

351

735

882

454

981

1002

732

784

1078

702

- 7 -

Piping Insp

PASS FA

241 1

145 1

185 1

198 1

248 24

251 2

297 2

84 7

274 24

349 3

87 5

331 3

317 3

118 1

316 3

428 3

178 1

375 3

487 3

224 2

526 4

506 4

353 3

366 4

556 5

337 3

pectors

AIL PASS

27 65.5

69 46.2

69 52.3

67 54.2

44 50.4

26 52.6

21 57.3

74 53.2

44 52.9

32 51.2

55 61.3

39 49.4

20 49.8

04 53.2

21 49.6

87 52.5

73 50.7

60 51.0

95 55.2

30 49.3

55 53.6

96 50.5

79 48.2

18 46.7

22 51.6

65 48.0

S % PASS

5 10

2 1

3 11

2 11

4 11

6 10

3 10

2 10

9 11

2 11

3 11

4 10

8 10

2 10

6 11

5 10

7 10

0 11

2 10

3 10

6 11

5 11

2 11

7 86

6 8

0 8

POINT

00

10

11

11

12

09

09

09

10

10

10

09

09

09

11

07

07

10

08

08

10

10

11

6*

87

87

Page 8: ICP Statistics Nov-2013

11/2013

Ye

20

20

ear Sessio

012 37

38

39

40

41

42

43

013 44

45

46

47

48

49

50

51

52

53

54

Year

2007

2009

2010

2011

2012

2013

on # Exam a

S

N

F

F

S

Exam administra

pilot

Decemb

No applicat

July

Novemb

March

June

Novemb

March(session 4SeptembSession

API U

administration

March

May

June

July

September

October

November

January

January

February

February

March

May

July

August

September

Total test

API UT Ex

ation CANDDATE

ber 11

tions

5

ber 4

3

1

ber 1

48)

6

ber 54

7

Total tes

- 8 -

UT Examine

n CANDI-DATES

25

15

17

18

3

2

19

6

17

6

20

6

18

6

24

16

13

18

ted in 2013

xaminers (

DI-ES

PASS

3

1

3

2

1

0

0

3

4

sted in 2013

ers

PASS F

12

10

9

11

2

1

11

4

9

3

15

2

10

5

15

9

10

10

- 129

Sizing)

FAIL

10

2

2

2

1

1

3

3

3 - 13

FAIL PA

13

5

8

7

1

1

8

2

8

3

5

4

8

1

9

7

3

8

PASS %

9

60

50

0

ASS %

48

48.3

53.0

61.1

Page 9: ICP Statistics Nov-2013

11/2013

Year

2011

2012

2013

YEAR A

2009

2010

2011

2012

2013

AP

Exam administra

July

Novemb

March

Novemb

January

March

April

May

July

Septemb

AP

EXAM ADMINISTR

ATION March

September

March

September

March

September

March

September

March

PI UT Exam

ation CANDDATE

5

ber 8

4

ber 6

y 1

2

6

4

11

ber 3

Total tes

PI TES – Ta

CANDI-DATES

78

91

46

82

139

121

108

105

70

- 9 -

miners ( Phas

DI-ES

PASS

4

6

2

4

1

1

5

4

9

3

sted in 2013

ank Entry su

PASS FA

42 3

60 3

26 2

47 3

62 7

47 7

62 4

67 3

38 3

sed Array)

FAIL

1

2

2

2

0

1

1

0

2

0

3 - 31

upervisors.

AIL PASS

36 53.

31 65.

20 56.

35 57.

77 44.

74 38.

46 57.

38 63.

32 54.

PASS %

80

75

50

S % PASPOINT

OF 19 86

9 86

5 86

3 86

6 86

8 86

4 79

8 79

3 75

SS (OUT

120) 6

6

6

6

6

6

9

9

5

Page 10: ICP Statistics Nov-2013

11/2013

Year ad

2009

S

2010

2011

D

2012

D

2013

Year

2007

2008

2009

2010

2011

2012

2013

A

Exam dministrati

on March

September

March (2)

May

sept

February

June

December

June

December

June

Exam administrat

on March

September

March

September

March

September

March

September

March

September

March

September

March

September

API 936 - R

CANDI-DATES

42

67

82

9

77

12

91

154

117

141

103

A

tiCANDI-DATES

65

70

72

64

81

81

75

84

89

86

102

127

109

193

- 10 -

efractory P

PASS F

40

46

53

8

53

9

58

109

87

102

70

API 571

PASS FAIL

33 32

34 36

26 46

16 48

33 48

30 51

34 41

43 41

34 55

27 59

28 74

37 90

36 73

69 124

ersonnel

FAIL PAS

2 95

18 68

29 64

1 89

24 68

3 7

33 63

45 70

30 74

39 72

33 68

L PASS %

50.8

48.6

36.1

25

40.7

37

45.3

51.2

38.2

31.4

27.5

29.1

33.0

4 35.8

SS % PAPOINT

of 5.2 5

8.7 5

4.6 5

9.0 5

8.8 5

75 5

3.7 5

0.8 5

4.4 5

2.3 5

8.0 5

PASS POINT (out of 70)

49

49

49

49

49

49

49

49

49

49

49

49

49

49

ASS T (out 75)

51

51

51

51

51

51

51

51

51

51

51

Page 11: ICP Statistics Nov-2013

11/2013

Year

2007

2008

2009

2010

2011

2012

2013

Year

2008

2009

2010

2011

2012

2013

Exam administrat

on March

September

March

September

March

September

March

September

March

September

March

September

March

September

Exam administrat

on March

September

March

September

March

September

March

September

March

September

March

September

API 5

tiCANDI-DATES

30

87

88

80

97

91

95

137

140

147

200

244

238

319

API 5

tiCANDI-DATES

24

27

26

20

21

21

33

29

32

24

38

54

- 11 -

580

PASS FAIL

18 12

68 19

31 57

19 61

45 52

47 44

37 58

55 82

49 91

59 88

70 130

90 154

91 147

138 181

577

PASS FAIL

21 3

18 9

18 8

12 8

17 4

12 9

19 14

14 15

20 12

15 9

21 17

36 18

L PASS %

60

78.2

35.2

23.8

46.4

51.6

39.0

40.2

35.0

40.1

0 35.0

4 39.7

7 38.2

43.3

L PASS %

87.5

66.7

69.2

60

81.0

57.1

57.6

48.3

62.5

62.5

55.2

66.7

PASS POINT (out of 70)

49

49

49

49

49

49

49

49

49

49

49

49

49

49

PASS POINT (out of 70)

49

49

49

49

49

49

49

49

49

49

49

49

Page 12: ICP Statistics Nov-2013

11/2013

2013 H

Individ

HIGHLIGHT

dual Certific

Source Insp

November 2

UT exams a

571, 577 an

API replace

Notarization

First admini

TS

cation Prog

pector certific

2013

are now adm

d 580 are no

ed paper-base

n is no longe

istration of C

rams News:

cation progr

ministered eve

ow stand alon

ed applicatio

er required

CBT is plann

- 12 -

:

ram has laun

ery 2 month

ne credentia

on system w

ned for Marc

nched – first

hs

als

with an online

ch 2014

exam admin

e portal.

nistration