iline installation guide · mount 2 receptacle on one side of the junction block. insert the...

47
ILINE installation guide

Upload: others

Post on 14-Mar-2020

7 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ILINE installation guide · Mount 2 receptacle on one side of the junction block. Insert the junction block slighfly tilted like in the diagram with the junction block without the

ILINE installation guide

Page 2: ILINE installation guide · Mount 2 receptacle on one side of the junction block. Insert the junction block slighfly tilted like in the diagram with the junction block without the

ILINE INSTALLATION GUIDE | 2 amqsolutions.com

CONTENTS

ILINE 180° (2-WAY) ASSEMBLY . . . . . . . . . . . . . . . 3

Components . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4

Post, Beam Plate & Feet Assembly . . . . . . . . . . . 5

Beam Assembly (3-Circuit) . . . . . . . . . . . . . . . 6-7

Beam Assembly (4-Circuit) . . . . . . . . . . . . . . . 8-9

Post, Beam Plate & Feet Assembly (cont.) . 10-14

ILINE 120° (3-WAY) ASSEMBLY . . . . . . . . . . . . . . 15

Components . . . . . . . . . . . . . . . . . . . . . . . . 16-17

Post, Beam Plate & Feet Assembly . . . . . . . . . . 18

Beam Assembly (3-Circuit) . . . . . . . . . . . . . 19-20

Beam Assembly (4-Circuit) . . . . . . . . . . . . . 21-22

Footer & Base Plate Assembly . . . . . . . . . . 23-24

Post & Beam Assembly . . . . . . . . . . . . . . . . . . . 25

Entering Electric Base Feed. . . . . . . . . . . . . . . . 26

Cover and Trim Assembly . . . . . . . . . . . . . . . . . 27

Installing Caps & Covers — Post Sleeve . . . . . . 28

Extending the Configuration. . . . . . . . . . . . . . . . 29

ILINE 90°/180° (4-WAY) ASSEMBLY . . . . . . . . . . . 30

Components . . . . . . . . . . . . . . . . . . . . . . . . 31-32

Footer & Base Plate Assembly . . . . . . . . . . 33-34

Beam Assembly (3-Circuit) . . . . . . . . . . . . . 35-36

Beam Assembly (4-Circuit) . . . . . . . . . . . . . 37-38

Post, Beam Plate & Feet Assembly . . . . . . . 39-40

Installing Jumpers . . . . . . . . . . . . . . . . . . . . . . . 41

Installing Caps & Covers . . . . . . . . . . . . . . . . . . 42

Installing Caps & Covers — Post Sleve . . . . . . . 43

Installing Screens . . . . . . . . . . . . . . . . . . . . . . . . 44

Final Adjustments. . . . . . . . . . . . . . . . . . . . . . . . 45

Power Pole Retrofit . . . . . . . . . . . . . . . . . . . . . . . 46

Page 3: ILINE installation guide · Mount 2 receptacle on one side of the junction block. Insert the junction block slighfly tilted like in the diagram with the junction block without the

ILINE 180° (2-WAY)

Page 4: ILINE installation guide · Mount 2 receptacle on one side of the junction block. Insert the junction block slighfly tilted like in the diagram with the junction block without the

ILINE INSTALLATION GUIDE | 4 amqsolutions.com

ILINE 180° (2-WAY)

2-Way Post

COMPONENTS

Vertical Post

Top Cap

Post Side Cover

Nuts

180° Post is for inline/2-way applications only

Base Plate

Feet Assembly

Horizontal Beam

Beam

Face Plate Cover

Sliding Clip Receptacle Cover

Data Face Plate Data Adaptor

Junction Bracket (3 circuit)

Junction Bracket (4 circuit)

Bottom Beam Plate

Page 5: ILINE installation guide · Mount 2 receptacle on one side of the junction block. Insert the junction block slighfly tilted like in the diagram with the junction block without the

ILINE INSTALLATION GUIDE | 5 amqsolutions.com

ILINE 180° (2-WAY)PHASE 1 | Post, Beam Plate & Feet Assembly

Step 1 Step 2

Page 6: ILINE installation guide · Mount 2 receptacle on one side of the junction block. Insert the junction block slighfly tilted like in the diagram with the junction block without the

ILINE INSTALLATION GUIDE | 6 amqsolutions.com

ILINE 180° (2-WAY)PHASE 2 | Beam Assembly (3-Circuit)

Step 1

Place beam upside down on the floor to reveal the beam canal.

Step 2

Insert the sliding clip into the beam from the top and slide it to the sides. (Make sure the tab below the clip goes into the slot on the beam.)

5

64

3

21

Page 7: ILINE installation guide · Mount 2 receptacle on one side of the junction block. Insert the junction block slighfly tilted like in the diagram with the junction block without the

ILINE INSTALLATION GUIDE | 7 amqsolutions.com

ILINE 180° (2-WAY)

Beam Cut-Out Side

PHASE 2 | Beam Assembly (3-Circuit)

Step 3

Mount 2 receptacle on one side of the junction block. Insert the junction block slighfly tilted like in the diagram with the junction block without the receptacles facing the beam cut-out.

Step 4

Clip on the receptacles to the junction block through the beam cut-out.

Step 6

Place the face plate cover over the beam cut-out. Position it like in the diagram.

Step 5

Take 2 junction bracket (3-circuit) and position them as shown in the diagram below. Make sure the base of the bracket is touching the beam. Now take the 4 self-tapping screws which are supplied with the bracket and screw them in.

Step 7

Slide-in the sliding clip till the tab locks into the face plate cover.

wide

narrow

Page 8: ILINE installation guide · Mount 2 receptacle on one side of the junction block. Insert the junction block slighfly tilted like in the diagram with the junction block without the

ILINE INSTALLATION GUIDE | 8 amqsolutions.com

ILINE 180° (2-WAY)PHASE 2 | Beam Assembly (4-Circuit)

Step 1

Place beam upside down on the floor to reveal the beam canal.

Step 2

Insert the sliding clip into the beam from the top and slide it to the sides. (Make sure the tab below the clip goes into the slot on the beam.)

6

5

4

3

2

1

Page 9: ILINE installation guide · Mount 2 receptacle on one side of the junction block. Insert the junction block slighfly tilted like in the diagram with the junction block without the

ILINE INSTALLATION GUIDE | 9 amqsolutions.com

ILINE 180° (2-WAY)

Step 3

Mount 2 receptacle on one side of the junction block. Insert the junction block slighfly tilted like in the diagram with the junction block without the receptacles facing the beam cut-out.

Step 4

Clip on the receptacles to the junction block through the beam cut-out.

Step 6

Place the face plate cover over the beam cut-out. Position it like in the diagram.

Step 5

Take 3 junction block (4-circuit) and position it as shown in the diagram. Push it down until it can go no further.

Step 7

Slide-in the sliding clip till the tab locks into the face plate.

PHASE 2 | Beam Assembly (4-Circuit)

Beam Cut-Out Side

wide

narrow

Page 10: ILINE installation guide · Mount 2 receptacle on one side of the junction block. Insert the junction block slighfly tilted like in the diagram with the junction block without the

ILINE INSTALLATION GUIDE | 10 amqsolutions.com

ILINE 180° (2-WAY)PHASE 1 | Post, Beam Plate & Feet Assembly (cont .)

Step 1

Once complete, lay each beam assembly between each foot assembly.

NOTE:

Make sure the Outer-to-Inner beams are mounted to the ends while the Inner-to-Inner beams go in between them.

Step 2

Place (do not fasten) the vertical posts on each of the footer assemblies.

Step 3

Slide the beam assemblies onto each of the vertical posts and fasten each side of the beam using 2 screws.

* Use phillip head screw to mount beams on vertical posts.

NOTE: Inner-to-Inner beams are slightly longer than Outer-to-Inner beams.

NOTE: L-shaped configurations must use Inner-to-Inner beam.

4

Oute -to-Inner Beam

r

Outer-to-Inner B

eam

Inne -to-Inner Beam

r

4

4

4

2

1

Page 11: ILINE installation guide · Mount 2 receptacle on one side of the junction block. Insert the junction block slighfly tilted like in the diagram with the junction block without the

ILINE INSTALLATION GUIDE | 11 amqsolutions.com

ILINE 180° (2-WAY)

Step 4

Take the exposed end of the power entry and feed through the desired end of the beam and into the adjacent post-opening.

Continue to feed the power entry until the exposed end is out through one of the base plate’s openings.

Step 5

Secure the post to the footer assembly using a 7/16” spanner.

PHASE 1 | Post, Beam Plate & Feet Assembly (cont .)

Page 12: ILINE installation guide · Mount 2 receptacle on one side of the junction block. Insert the junction block slighfly tilted like in the diagram with the junction block without the

ILINE INSTALLATION GUIDE | 12 amqsolutions.com

ILINE 180° (2-WAY)PHASE 2 | Post, Beam Plate & Feet Assembly (cont .)

Step 1

Connect power entry plug to the junction block.

Step 2

Feed the jumper through the beam canal and into the vertical post opening into the next beam assembly.

Step 3

Connect the jumper to each junction block.

Step 4

Repeat Steps 1-3 until the last jumper is connected the last junction block.

The remaining installation of electrical must be installed by a professional electrician.

STOP

3

2

2

1

Page 13: ILINE installation guide · Mount 2 receptacle on one side of the junction block. Insert the junction block slighfly tilted like in the diagram with the junction block without the

ILINE INSTALLATION GUIDE | 13 amqsolutions.com

ILINE 180° (2-WAY)PHASE 3 | Post, Beam Plate & Feet Assembly (cont .)

Step 1

Insert side covers into all exposed openings of each vertical posts.

Step 3

Take two data adapters/face plates and snap them onto each end of the underside of the beam assembly. Snap on data face plates.

Step 2

Place top caps on all vertical posts.

Step 4

Insert the bottom beam plates between each data adapter on the underside of the beam assembly.

Step 5

Repeat Steps 1-4 for all beam assemblies.

Page 14: ILINE installation guide · Mount 2 receptacle on one side of the junction block. Insert the junction block slighfly tilted like in the diagram with the junction block without the

ILINE INSTALLATION GUIDE | 14 amqsolutions.com

ILINE 180° (2-WAY)PHASE 4 | Post, Beam Plate & Feet Assembly (cont .)

Step 1

Check the horizontal alignment of the beams

Step 2

If not aligned, please rotate the foot to adjust each post’s elevation until leveled.

NOTE: Use a leveling guide for accuracy.

Completed ILINE 180° (2-Way Post)

Page 15: ILINE installation guide · Mount 2 receptacle on one side of the junction block. Insert the junction block slighfly tilted like in the diagram with the junction block without the

ILINE 120° (3-WAY)

Page 16: ILINE installation guide · Mount 2 receptacle on one side of the junction block. Insert the junction block slighfly tilted like in the diagram with the junction block without the

ILINE INSTALLATION GUIDE | 16 amqsolutions.com

ILINE 120° (3-WAY)

3-Way Post

COMPONENTS

4-Way Post

Hex Nuts

Hex Nuts

Glide,OEM

Base Place Kit

Foot SRC Foot DRE Foot DRCVertical Post

Vertical Post

Top Cap

Top Cap

Post Side Cover

Post Side Cover

Base Plate

Foot SRE

Post Sleeve

Page 17: ILINE installation guide · Mount 2 receptacle on one side of the junction block. Insert the junction block slighfly tilted like in the diagram with the junction block without the

ILINE INSTALLATION GUIDE | 17 amqsolutions.com

ILINE 120° (3-WAY)

Beam

COMPONENTS

Horizontal Beam

Face Plate Cover Sliding Clip

Bottom Beam Plate

Junction Bracket (4 circuit)

Receptacle Cover

Data Face Plate Data Adaptor Junction Bracket (3 circuit)

Page 18: ILINE installation guide · Mount 2 receptacle on one side of the junction block. Insert the junction block slighfly tilted like in the diagram with the junction block without the

ILINE INSTALLATION GUIDE | 18 amqsolutions.com

ILINE 120° (3-WAY)PHASE 1 | Post, Beam Plate & Feet Assembly

Step 1 Step 2

Page 19: ILINE installation guide · Mount 2 receptacle on one side of the junction block. Insert the junction block slighfly tilted like in the diagram with the junction block without the

ILINE INSTALLATION GUIDE | 19 amqsolutions.com

ILINE 120° (3-WAY)PHASE 2 | Beam Assembly (3-Circuit)

Step 1

Place beam upside down on the floor to reveal the beam canal.

Step 2

Insert the sliding clip into the beam from the top and slide it to the sides. (Make sure the tab below the clip goes into the slot on the beam.)

6

5

4

3

2 1

Page 20: ILINE installation guide · Mount 2 receptacle on one side of the junction block. Insert the junction block slighfly tilted like in the diagram with the junction block without the

ILINE INSTALLATION GUIDE | 20 amqsolutions.com

ILINE 120° (3-WAY)

Beam Cut-Out Side

PHASE 2 | Beam Assembly (3-Circuit)

Step 3

Mount 2 receptacle on one side of the junction block. Insert the junction block slighfly tilted like in the diagram with the junction block without the receptacles facing the beam cut-out.

Step 4

Clip on the receptacles to the junction block through the beam cut-out.

Step 6

Place the face plate cover over the beam cut-out. Position it like in the diagram.

Step 5

Take 2 junction bracket (3-circuit) and position them as shown in the diagram below. Make sure the base of the bracket is touching the beam. Now take the 4 self-tapping screws which are supplied with the bracket and screw them in.

Step 7

Slide-in the sliding clip till the tab locks into the face plate cover.

wide

narrow

Page 21: ILINE installation guide · Mount 2 receptacle on one side of the junction block. Insert the junction block slighfly tilted like in the diagram with the junction block without the

ILINE INSTALLATION GUIDE | 21 amqsolutions.com

ILINE 120° (3-WAY)PHASE 2 | Beam Assembly (4-Circuit)

Step 1

Place beam upside down on the floor to reveal the beam canal.

Step 2

Insert the sliding clip into the beam from the top and slide it to the sides. (Make sure the tab below the clip goes into the slot on the beam.)

6

5

4

3

2

1

Page 22: ILINE installation guide · Mount 2 receptacle on one side of the junction block. Insert the junction block slighfly tilted like in the diagram with the junction block without the

ILINE INSTALLATION GUIDE | 22 amqsolutions.com

ILINE 120° (3-WAY)

Step 3

Mount 2 receptacle on one side of the junction block. Insert the junction block slighfly tilted like in the diagram with the junction block without the receptacles facing the beam cut-out.

Step 4

Clip on the receptacles to the junction block through the beam cut-out.

Step 6

Place the face plate cover over the beam cut-out. Position it like in the diagram.

Step 5

Take 3 junction block (4-circuit) and position it as shown in the diagram. Push it down until it can go no further.

Step 7

Slide-in the sliding clip till the tab locks into the face plate.

PHASE 2 | Beam Assembly (4-Circuit)

Beam Cut-Out Side

wide

narrow

Page 23: ILINE installation guide · Mount 2 receptacle on one side of the junction block. Insert the junction block slighfly tilted like in the diagram with the junction block without the

ILINE INSTALLATION GUIDE | 23 amqsolutions.com

ILINE 120° (3-WAY)PHASE 1 | Footer & Base Plate Assembly

Step 1

Insert a 3” bolt into each of the 2” compression springs.

Step 2

Insert the bolts and the compression springs into the inner corner holes of the base plate.

Step 3

Screw the bolts into the coupling nuts until the bolt tips are revealed.

Step 4

Screw the foot assembly to the foot plate nuts.

Step 5

Repeat Steps 1-4 for the all foot and base plates.

- 4” x 3” Bolt (5/16” x 18)

- 4” x 2” Compression Spring

- Base Plate

- 4” x 3/4” Coupling Nut (5/16” x 18)

- Foot Plate Nut

- Foot Plate

4

3

2

1

Page 24: ILINE installation guide · Mount 2 receptacle on one side of the junction block. Insert the junction block slighfly tilted like in the diagram with the junction block without the

ILINE INSTALLATION GUIDE | 24 amqsolutions.com

ILINE 120° (3-WAY)PHASE 2 | Footer & Base Plate Assembly

Page 25: ILINE installation guide · Mount 2 receptacle on one side of the junction block. Insert the junction block slighfly tilted like in the diagram with the junction block without the

ILINE INSTALLATION GUIDE | 25 amqsolutions.com

ILINE 120° (3-WAY)PHASE 3 | Post & Beam Assembly

Step 1

Assemble the base plate, glide and post together.

Step 2

Slide the beam assembly into the open slots in the center of vertical post. Fasten the beams using two screws on each end.

2

1

Page 26: ILINE installation guide · Mount 2 receptacle on one side of the junction block. Insert the junction block slighfly tilted like in the diagram with the junction block without the

ILINE INSTALLATION GUIDE | 26 amqsolutions.com

ILINE 120° (3-WAY)PHASE 4 | Entering Electric Base Feed

Step 1

Take the exposed end of the power entry and feed through the center vertical post.

Step 2

Plug the power entry plug to the junction block.

NOTE: Depending on the floor plan, you may access the base feed through any of the posts in the assembly.

7/16” Spanner

Use 1/4”-20 hex nut to tight down posts on the footer-assemblies

2

1

Page 27: ILINE installation guide · Mount 2 receptacle on one side of the junction block. Insert the junction block slighfly tilted like in the diagram with the junction block without the

ILINE INSTALLATION GUIDE | 27 amqsolutions.com

ILINE 120° (3-WAY)PHASE 5 | Cover and Trim Assembly

Step 1

Insert side covers into each exposed opening in vertical posts.

Step 2

Attach top cover to the center vertical post.

Step 3

Snap on data face plates onto each end of the beam assemblies.

Step 4

Insert the bottom beam plate between each data adapter on the underside of the beam assembly.

&

4

4

3

3

2

2

1

1

Page 28: ILINE installation guide · Mount 2 receptacle on one side of the junction block. Insert the junction block slighfly tilted like in the diagram with the junction block without the

ILINE INSTALLATION GUIDE | 28 amqsolutions.com

ILINE 120° (3-WAY)PHASE 6 | Installing Caps & Covers — Post Sleeve

Step 1

Detach the pre-cut portion for the base feed access and line up with post.

Step 2

Align the Post Sleeve* on both sides andapply pressure until pieces snap into place.

Step 3

Installed Post Sleeve.

NOTE: After installing electrical, level for best aesthetic appearance.

Attached Post Sleeve

3

21

Page 29: ILINE installation guide · Mount 2 receptacle on one side of the junction block. Insert the junction block slighfly tilted like in the diagram with the junction block without the

ILINE INSTALLATION GUIDE | 29 amqsolutions.com

ILINE 120° (3-WAY)PHASE 7 | Extending the Configuration

Step 1

Selecting the post that will accommodate the extension, replace the end foot plate (DRE) with a center foot.

Step 2

Open the top cap, then insert the new beam assembly.

Step 3

Feed the jumper through the beam canal and into the vertical post opening into the next beam assembly.

Step 4

Connect the jumper to each junction block.Re-attach the top cover onto the vertical post.

DRC

DRE

4

3

2

1

Page 30: ILINE installation guide · Mount 2 receptacle on one side of the junction block. Insert the junction block slighfly tilted like in the diagram with the junction block without the

ILINE 90°/180° (4-WAY)

Page 31: ILINE installation guide · Mount 2 receptacle on one side of the junction block. Insert the junction block slighfly tilted like in the diagram with the junction block without the

ILINE INSTALLATION GUIDE | 31 amqsolutions.com

ILINE 90°/180° (4-WAY)COMPONENTS

4-Way Post

Hex Nuts Base Place Kit

Foot SRC Foot DRE Foot DRCVertical Post

Top Cap Post Side Cover

Foot SRE

Post Sleeve

Page 32: ILINE installation guide · Mount 2 receptacle on one side of the junction block. Insert the junction block slighfly tilted like in the diagram with the junction block without the

ILINE INSTALLATION GUIDE | 32 amqsolutions.com

ILINE 90°/180° (4-WAY)

Beam

COMPONENTS

Horizontal Beam

Face Plate Cover Sliding Clip

Bottom Beam Plate

Junction Bracket (4 circuit)

Receptacle Cover

Data Face Plate Data Adaptor Junction Bracket (3 circuit)

Page 33: ILINE installation guide · Mount 2 receptacle on one side of the junction block. Insert the junction block slighfly tilted like in the diagram with the junction block without the

ILINE INSTALLATION GUIDE | 33 amqsolutions.com

ILINE 90°/180° (4-WAY)PHASE 1 | Footer & Base Plate Assembly

Step 1

Insert a 3” bolt into each of the 2” compression springs.

Step 2

Insert the bolts and the compression springs into the inner corner holes of the base plate.

Step 3

Screw the bolts into the coupling nuts until the bolt tips are revealed.

Step 4

Screw the foot assembly to the foot plate nuts.

Step 5

Repeat Steps 1-4 for the all foot and base plates.

- 4” x 3” Bolt (5/16” x 18)

- 4” x 2” Compression Spring

- Base Plate

- 4” x 3/4” Coupling Nut (5/16” x 18)

- Foot Plate Nut

- Foot Plate

4

3

2

1

Page 34: ILINE installation guide · Mount 2 receptacle on one side of the junction block. Insert the junction block slighfly tilted like in the diagram with the junction block without the

ILINE INSTALLATION GUIDE | 34 amqsolutions.com

ILINE 90°/180° (4-WAY)PHASE 2 | Footer & Base Plate Assembly

Page 35: ILINE installation guide · Mount 2 receptacle on one side of the junction block. Insert the junction block slighfly tilted like in the diagram with the junction block without the

ILINE INSTALLATION GUIDE | 35 amqsolutions.com

ILINE 90°/180° (4-WAY)PHASE 2 | Beam Assembly (3-Circuit)

Step 1

Place beam upside down on the floor to reveal the beam canal.

Step 2

Insert the sliding clip into the beam from the top and slide it to the sides. (Make sure the tab below the clip goes into the slot on the beam.)

6

5

4

3

2 1

Page 36: ILINE installation guide · Mount 2 receptacle on one side of the junction block. Insert the junction block slighfly tilted like in the diagram with the junction block without the

ILINE INSTALLATION GUIDE | 36 amqsolutions.com

ILINE 90°/180° (4-WAY)

Beam Cut-Out Side

PHASE 2 | Beam Assembly (3-Circuit)

Step 3

Mount 2 receptacle on one side of the junction block. Insert the junction block slighfly tilted like in the diagram with the junction block without the receptacles facing the beam cut-out.

Step 4

Clip on the receptacles to the junction block through the beam cut-out.

Step 6

Place the face plate cover over the beam cut-out. Position it like in the diagram.

Step 5

Take 2 junction bracket (3-circuit) and position them as shown in the diagram below. Make sure the base of the bracket is touching the beam. Now take the 4 self-tapping screws which are supplied with the bracket and screw them in.

Step 7

Slide-in the sliding clip till the tab locks into the face plate cover.

wide

narrow

Page 37: ILINE installation guide · Mount 2 receptacle on one side of the junction block. Insert the junction block slighfly tilted like in the diagram with the junction block without the

ILINE INSTALLATION GUIDE | 37 amqsolutions.com

ILINE 90°/180° (4-WAY)PHASE 2 | Beam Assembly (4-Circuit)

Step 1

Place beam upside down on the floor to reveal the beam canal.

Step 2

Insert the sliding clip into the beam from the top and slide it to the sides. (Make sure the tab below the clip goes into the slot on the beam.)

6

5

4

3

2

1

Page 38: ILINE installation guide · Mount 2 receptacle on one side of the junction block. Insert the junction block slighfly tilted like in the diagram with the junction block without the

ILINE INSTALLATION GUIDE | 38 amqsolutions.com

ILINE 90°/180° (4-WAY)

Step 3

Mount 2 receptacle on one side of the junction block. Insert the junction block slighfly tilted like in the diagram with the junction block without the receptacles facing the beam cut-out.

Step 4

Clip on the receptacles to the junction block through the beam cut-out.

Step 6

Place the face plate cover over the beam cut-out. Position it like in the diagram.

Step 5

Take 3 junction block (4-circuit) and position it as shown in the diagram. Push it down until it can go no further.

Step 7

Slide-in the sliding clip till the tab locks into the face plate.

PHASE 2 | Beam Assembly (4-Circuit)

Beam Cut-Out Side

wide

narrow

Page 39: ILINE installation guide · Mount 2 receptacle on one side of the junction block. Insert the junction block slighfly tilted like in the diagram with the junction block without the

ILINE INSTALLATION GUIDE | 39 amqsolutions.com

ILINE 90°/180° (4-WAY)PHASE 1 | Post, Beam Plate & Feet Assembly

Step 1

Once complete, lay each beam assembly between each foot assembly.

NOTE: Make sure the Outer-to-Inner beams are mounted to the ends while the Inner-to-Inner beams go in between them.

Step 2

Place (do not fasten) the vertical posts on each of the footer assemblies.

Step 3

Slide the beam assemblies onto each of the vertical posts and fasten each side of the beam using 2 screws.

* Use phillip head screw to mount beams on vertical posts.

Outer-to-Inner B

eam

Outer-to-Inner B

eam

Inner-to-Inner B

eam

NOTE: Inner-to-Inner beams are slightly longer than Outer-to-Inner beams.

NOTE: L-shaped configurations must use Inner-to-Inner beam.

4

4

4

4

2

1

Page 40: ILINE installation guide · Mount 2 receptacle on one side of the junction block. Insert the junction block slighfly tilted like in the diagram with the junction block without the

ILINE INSTALLATION GUIDE | 40 amqsolutions.com

ILINE 90°/180° (4-WAY)

Step 4

Take the exposed end of the power entry and feed through the desired end of the beam and into the adjacent post-opening.

Continue to feed the power entry until the exposed end is out through one of the base plate’s openings.

Step 5

Secure the post to the footer assembly using a 7/16” spanner.

PHASE 1 | Post, Beam Plate & Feet Assembly

Page 41: ILINE installation guide · Mount 2 receptacle on one side of the junction block. Insert the junction block slighfly tilted like in the diagram with the junction block without the

ILINE INSTALLATION GUIDE | 41 amqsolutions.com

ILINE 90°/180° (4-WAY)PHASE 2 | Installing Jumpers

Step 1

Connect power entry plug to the junction block.

Step 2

Feed the jumper through the beam canal and into the vertical post opening into the next beam assembly.

Step 3

Connect the jumper to each junction block.

Step 4

Repeat Steps 1-3 until the last jumper is connected the last junction block.

The remaining installation of electrical must be installed by a professional electrician.

STOP

3

2

2

11

Page 42: ILINE installation guide · Mount 2 receptacle on one side of the junction block. Insert the junction block slighfly tilted like in the diagram with the junction block without the

ILINE INSTALLATION GUIDE | 42 amqsolutions.com

ILINE 90°/180° (4-WAY)PHASE 3 | Installing Caps & Covers

Step 1

Insert side covers into all exposed openings of each vertical posts.

Step 3

Take two data adapters/face plates and snap them onto each end of the underside of the beam assembly. Snap on data face plates.

Step 2

Place top caps on all vertical posts.

Step 4

Insert the bottom beam plates between each data adapter on the underside of the beam assembly.

Step 5

Repeat Steps 1-4 for all beam assemblies.

Page 43: ILINE installation guide · Mount 2 receptacle on one side of the junction block. Insert the junction block slighfly tilted like in the diagram with the junction block without the

ILINE INSTALLATION GUIDE | 43 amqsolutions.com

ILINE 90°/180° (4-WAY)PHASE 4 | Installing Caps & Covers — Post Sleeve

Step 1

Detach the pre-cut portion for the base feed access and line up with post.

Step 2

Align the Post Sleeve* on both sides andapply pressure until pieces snap into place.

Step 3

Installed Post Sleeve.

NOTE: After installing electrical, level for best aesthetic appearance.

Attached Post Sleeve

3

21

Page 44: ILINE installation guide · Mount 2 receptacle on one side of the junction block. Insert the junction block slighfly tilted like in the diagram with the junction block without the

ILINE INSTALLATION GUIDE | 44 amqsolutions.com

ILINE 90°/180° (4-WAY)PHASE 5 | Installing Screens

Step 1

Place 2 screen clips on top of each beam and loosely link both sides with a screw and nut.

Step 2

Insert plastic sleeves into the opening of each screen clip.

Step 3

Insert the screen into the screen clip. Make sure the metal side is down and fabric side is up.

NOTE: Pre-measuring each clip’s distance from the beam ends before attaching will ensure a centered and balanced appearance to the installed screen. (Suggested distance between clip and beam edge: 11 inches.)

NOTE: For 22” or 28” high screens, metal strip along the length of the screen should be located on the bottom when installed.

NOTE: Frosted glass screens cannot be used with ILINE.

Step 4

Tightly screw the screen clips with #6 allen wrench to secure the screens in place.

Step 5

Repeat Steps 1-4 for each screen.

#6 Allen Wrench (Angle-tip is recommended)

1

4

3

2

Page 45: ILINE installation guide · Mount 2 receptacle on one side of the junction block. Insert the junction block slighfly tilted like in the diagram with the junction block without the

ILINE INSTALLATION GUIDE | 45 amqsolutions.com

ILINE 90°/180° (4-WAY)PHASE 6 | Final Adjustments

Step 1

Check the vertical and horizontal alignment of the beams and screens.

Step 2

If not aligned, use a 1/2” spanner to rotate the coupling nuts on the base to change each corner’s elevation until leveled.

NOTE: Use a leveling guide for accuracy.

Completed ILINE

.

Horizontal alignment

Vertical alignment

* Adjust height of each coupling-nuts to level the base plate of each post.

2

1

Page 46: ILINE installation guide · Mount 2 receptacle on one side of the junction block. Insert the junction block slighfly tilted like in the diagram with the junction block without the

ILINE INSTALLATION GUIDE | 46 amqsolutions.com

ILINE 90°/180° (4-WAY)PHASE 7 | Power Pole Retrofit

Step 1

Mount the adapter bracket to power pole using two machine screws and two self tappers.

Step 2

Insert Power Pole with adapter bracket into the slot opening in the side of the vertical post. (Remove the top cap and the side trim from the vertical post for post installation.)

Step 3

Anchor down the post with two screws into the vertical post.

Step 4

Adjust glide in the bottom plate to the floor level.

Step 5

Provide anchoring to the sealing using the sealing trim.

5

4

3

2

1

Page 47: ILINE installation guide · Mount 2 receptacle on one side of the junction block. Insert the junction block slighfly tilted like in the diagram with the junction block without the

Please contact [email protected] if you are missing any parts, have difficulty with assembly,

or have any product related questions.