  • 7/24/2019 Indonesia Cost Handbook

    1/104

    Langdon & Seah Indonesia PT.

    INDONESIA 2015Construction Cost Handbook

  • 7/24/2019 Indonesia Cost Handbook

    2/104

    PT Langdon & Seah Indonesia would like to acknowledge

    the following projects featured on our cover page:

    1. The Plaza and Keraton Residence at Plaza

    Indonesia, Jakarta2. Sampoerna Strategic Square 2, Jakarta

    3. Thamrin 9, Jakarta4. Bvlgari Resort and Spa, Bali

    5. Hall D, Jakarta International Expo6. Signature Tower, Jakarta

    1 2 3

    4

    65

  • 7/24/2019 Indonesia Cost Handbook

    3/104

    First Edition 2015

    PT. Langdon & Seah Indonesia

    All rights reserved. No part of this publication may bere-produced or copied in any form without prior written

    permission from PT. Langdon & Seah Indonesia.

    The information contained herein should be regarded

    as indicative and for general guidance only. Whilstevery effort h a s been made to ensure accu racy , noresponsibility can be accepted for errors andomissions, however caused.

    Unless otherwise stated, costs reflected in this handbook

    are current at 4th Quarter 2014.

  • 7/24/2019 Indonesia Cost Handbook

    4/104

    TABLE OF CONTENTS4

    Table of Contents 4Introduction 6Calendars 7

    1. CONSTRUCTION COST DATA

    Construction Costs for Indonesia 12

    M&E Costs for Indonesia 14Cost Breakdown for different building types 16

    Construction Costs for Selected Asian Cities 18

    M&E Costs for Selected Asian Cities 24Major Rates for Selected Asian Cities 30

    Utility Costs for Selected Asian Cities 36

    Detailed Electricity Tariffs for Indonesia 38Office MEP Cost Components 40

    2. GENERAL CONSTRUCTION DATA

    2015 Construction Outlook 43

    Construction Cost Trends in Indonesiaa) Material Price Indices 44b) Consumer Price Indices 46c) Labour Price Indices 48

  • 7/24/2019 Indonesia Cost Handbook

    5/104

    TABLE OF CONTENTS 5

    3. CONTRACT PROCUREMENT

    Contract Procurement 51

    4. OTHER INFORMATION

    Exchange Rates 58

    Prime Rates 60Currency Fluctuations 61Conversion Factors 64

    IDD Codes and Time Differences 70Relevant Websites 71

    Current Construction Regulations 72

    5. LANGDON & SEAH

    Langdon & Seah Values 81

    Professional Services 82PT Arcadis Project Management 84

    Langdon & Seah Offices 85

  • 7/24/2019 Indonesia Cost Handbook

    6/104

    INTRODUCTION6

    ABOUT US

    First established in 1934 in Singapore under the name"Waters and Watson" we became the pre-eminent

    Quantity Surveying and Construction Cost

    Management firm in Asiaoperating for many yearsas Langdon, Every & Seah and subsequently Davis

    Langdon & Seah. In April 2012, we merged with

    Arcadis, the international consultancy, design,engineering and management services company, to

    become Langdon and Seah.

    PT. Langdon & Seah Indonesia has had a presence in

    Indonesia since 1972, and has been involved in manyof the bestknown and most prestigious projects in the

    country. Its varied track record takes in a multitude ofprojects from nearly every sector of the construction

    industry.

    Since 2013, Langdon & Seah Indonesia haveincreased their profile in Project Management with theestablishment of PT. Langdon & Seah Project

    Management, now renamed to PT. Arcadis ProjectManagement.

    5

  • 7/24/2019 Indonesia Cost Handbook

    7/104

    CALENDARS 7

    2014

    2014JANUARY FEBRUARY MARCH

    S M T W T F S S M T W T F S S M T W T F S1 2 3 4 1 1

    5 6 7 8 9 10 11 2 3 4 5 6 7 8 2 3 4 5 6 7 812 13 14 15 16 17 18 9 10 11 12 13 14 15 9 10 11 12 13 14 1519 20 21 22 23 24 25 16 17 18 19 20 21 22 16 17 18 19 20 21 2226 27 28 29 30 31 23 24 25 26 27 28 23/30 24/31 25 26 27 28 29

    APRIL MAY JUNES M T W T F S S M T W T F S S M T W T F S

    1 2 3 4 5 1 2 3 1 2 3 4 5 6 7

    6 7 8 9 10 11 12 4 5 6 7 8 9 10 8 9 10 11 12 13 1413 14 15 16 17 18 19 11 12 13 14 15 16 17 15 16 17 18 19 20 2120 21 22 23 24 25 26 18 19 20 21 22 23 24 22 23 24 25 26 27 2827 28 29 30 25 26 27 28 29 30 31 29 30

    JULY AUGUST SEPTEMBERS M T W T F S S M T W T F S S M T W T F S

    1 2 3 4 5 1 2 1 2 3 4 5 66 7 8 9 10 11 12 3 4 5 6 7 8 9 7 8 9 10 11 12 13

    13 14 15 16 17 18 19 10 11 12 13 14 15 16 14 15 16 17 18 19 20

    20 21 22 23 24 25 26 17 18 19 20 21 22 23 21 22 23 24 25 26 2727 28 29 30 31 24/31 25 26 27 28 29 30 28 29 30

    OCTOBER NOVEMBER DECEMBER

    S M T W T F S S M T W T F S S M T W T F S1 2 3 4 1 1 2 3 4 5 6

    5 6 7 8 9 10 11 2 3 4 5 6 7 8 7 8 9 10 11 12 1312 13 14 15 16 17 18 9 10 11 12 13 14 15 14 15 16 17 18 19 2019 20 21 22 23 24 25 16 17 18 19 20 21 22 21 22 23 24 25 26 2726 27 28 29 30 31 23/30 24 25 26 27 28 29 28 29 30 31

    JANUARY

    2015FEBRUARY MARCH

    S M T W T F S S M T W T F S S M T W T F S1 2 3 1 2 3 4 5 6 7 1 2 3 4 5 6 7

    4 5 6 7 8 9 10 8 9 10 11 12 13 14 8 9 10 11 12 13 1411 12 13 14 15 16 17 15 16 17 18 19 20 21 15 16 17 18 19 20 2118 19 20 21 22 23 24 22 23 24 25 26 27 28 22 23 24 25 26 27 2825 26 27 28 29 30 31 29 30 31

    APRIL MAY JUNE

    S M T W T F S S M T W T F S S M T W T F S

    2

    1 2 3 4

    0

    2 1 2

    5

    3 4 5 65 6 7 8 9 10 11 3 4 5 6 7 8 9 7 8 9 10 11 12 13

    12 13 14 15 16 17 18 10 11 12 13 14 15 16 14 15 16 17 18 19 2019 20 21 22 23 24 25 17 18 19 20 21 22 23 21 22 23 24 25 26 2726 27 28 29 30 24/31 25 26 27 28 29 30 28 29 30

    JULY AUGUST SEPTEMBERS M T W T F S S M T W T F S S M T W T F S

    1 2 3 4 1 1 2 3 4 55 6 7 8 9 10 11 2 3 4 5 6 7 8 6 7 8 9 10 11 12

    12 13 14 15 16 17 18 9 10 11 12 13 14 15 13 14 15 16 17 18 1919 20 21 22 23 24 25 16 17 18 19 20 21 22 20 21 22 23 24 25 2626 27 28 29 30 31 23/30 24/31 25 26 27 28 29 27 28 29 30

    OCTOBER NOVEMBER DECEMBERS M T W T F S

    1 2 3

    S M T W T F S

    1 2 3 4 5 6 7

    S M T W T F S

    1 2 3 4 54 5 6 7 8 9 10 8 9 10 11 12 13 14 6 7 8 9 10 11 12

    11 12 13 14 15 16 17 15 16 17 18 19 20 21 13 14 15 16 17 18 1918 19 20 21 22 23 24 22 23 24 25 26 27 28 20 21 22 23 24 25 2625 26 27 28 29 30 31 29 30 27 28 29 30 31

    1

  • 7/24/2019 Indonesia Cost Handbook

    8/104

    CALENDARS8

    2 016

    JANUARY 2016FEBRUARY MARCHS M T W T F S S M T W T F S S M T W T F S

    1 2 1 2 3 4 5 6 1 2 3 4 53 4 5 6 7 8 9 7 8 9 10 11 12 13 6 7 8 9 10 11 12

    10 11 12 13 14 15 16 14 15 16 17 18 19 20 13 14 15 16 17 18 1917 18 19 20 21 22 23 21 22 23 24 25 26 27 20 21 22 23 24 25 2624/31 25 26 27 28 29 30 28 29 27 28 29 30 31

    APRIL MAY JUNE

    S M T W T F S S M T W T F S S M T W T F S1 2 1 2 3 4 5 6 7 1 2 3 4

    3 4 5 6 7 8 9 8 9 10 11 12 13 14 5 6 7 8 9 10 1110 11 12 13 14 15 16 15 16 17 18 19 20 21 12 13 14 15 16 17 1817 18 19 20 21 22 23 22 23 24 25 26 27 28 19 20 21 22 23 24 2524 25 26 27 28 29 30 29 30 31 26 27 28 29 30

    JULY AUGUST SEPTEMBER

    S M T W T F S S M T W T F S S M T W T F S1 2 1 2 3 4 5 6 1 2 3

    3 4 5 6 7 8 9 7 8 9 10 11 12 13 4 5 6 7 8 9 1010 11 12 13 14 15 16 14 15 16 17 18 19 20 11 12 13 14 15 16 1717 18 19 20 21 22 23 21 22 23 24 25 26 27 18 19 20 21 22 23 2424/31 25 26 27 28 29 30 28 29 30 31 25 26 27 28 29 30

    OCTOBER NOVEMBER DECEMBERS M T W T F S S M T W T F S S M T W T F S

    1 1 2 3 4 5 1 2 32 3 4 5 6 7 8 6 7 8 9 10 11 12 4 5 6 7 8 9 109 10 11 12 13 14 15 13 14 15 16 17 18 19 11 12 13 14 15 16 17

    16 17 18 19 20 21 22 20 21 22 23 24 25 26 18 19 20 21 22 23 2423/30 24/3125 26 27 28 29 27 28 29 30 25 26 27 28 29 30 31

    2017JANUARY FEBRUARY MARCH

    S M T W T F S1 2 3 4 5 6 7

    S M T W T F S1 2 3 4

    S M T W T F S1 2 3 4

    8 9 10 11 12 13 14 5 6 7 8 9 10 11 5 6 7 8 9 10 11

    15 16 17 18 19 20 21 12 13 14 15 16 17 18 12 13 14 15 16 17 1822 23 24 25 26 27 28 19 20 21 22 23 24 25 19 20 21 22 23 24 2529 30 31 26 27 28 26 27 28 29 30 31

    APRIL MAY JUNE

    S M T W T F S S M T W T F S S M T W T F S

    2

    1

    0

    1 2 3 4

    1

    5 6

    7

    1 2 3

    2 3 4 5 6 7 8 7 8 9 10 11 12 13 4 5 6 7 8 9 10

    9 10 11 12 13 14 15 14 15 16 17 18 19 20 11 12 13 14 15 16 1716 17 18 19 20 21 22 21 22 23 24 25 26 27 18 19 20 21 22 23 2423/30 24 25 26 27 28 29 28 29 30 30 25 26 27 28 29 30

    JULY AUGUST SEPTEMBERS M T W T F S S M T W T F S S M T W T F S

    1 1 2 3 4 5 1 22 3 4 5 6 7 8 6 7 8 9 10 11 12 3 4 5 6 7 8 99 10 11 12 13 14 15 13 14 15 16 17 18 19 10 11 12 13 14 15 16

    16 17 18 19 20 21 22 20 21 22 23 24 25 26 17 18 19 20 21 22 2323/30 24/3125 26 27 28 29 27 28 29 30 31 24 25 26 27 28 29 30

    OCTOBER NOVEMBER DECEMBERS M T W T F S S M T W T F S S M T W T F S1 2 3 4 5 6 7 1 2 3 4 1 28 9 10 11 12 13 14 5 6 7 8 9 10 11 3 4 5 6 7 8 9

    15 16 17 18 19 20 21 12 13 14 15 16 17 18 10 11 12 13 14 15 1622 23 24 25 26 27 28 19 20 21 22 23 24 25 17 18 19 20 21 22 2329 30 31 26 27 28 29 30 24/31 25 26 27 28 29 30

  • 7/24/2019 Indonesia Cost Handbook

    9/104

    9CALENDARS

    PUBLIC HOLIDAYS IN INDONESIA

    2015

    INDONESIA

    New Year's DayProphet Muhammad's BirthdayChinese New Year (Imlek)Hindu Day of Quiet (Nyepi)Good FridayInternational Labour Day

    Ascension Day of Jesus Christ

    Ascension of Prophet MohammadWaisak DayIdul Fitri

    National Independence DayIdul Adha Day

    Hijriyah New YearChristmas Day

    01 Jan03 Jan19 Feb21 Mar03 Apr01 May14 May

    16 May02 Jun17 Jul18 Jul17 Aug24 Sep14 Oct25 Dec

  • 7/24/2019 Indonesia Cost Handbook

    10/104

    9CALENDARS

    Sustainability

  • 7/24/2019 Indonesia Cost Handbook

    11/104

    Construction Costs for Indonesia

    M&E Costs for Indonesia

    Construction cost specification for Indonesia

    Cost breakdown for different building types

    Construction Costs for SelectedAsian Cities

    M&E Costs for Selected Asian Cities

    Major Rates for Selected Asian Cities

    Utility Costs for selected Asian Cities

    Detailed Electricity Tariffs for Indonesia

    Office MEP Cost Components

  • 7/24/2019 Indonesia Cost Handbook

    12/104

    1 CONSTRUCTION COST DATA

    CONSTRUCTION COSTS FOR INDONESIA

    12CONSTRUCTION COST DATA

    CONSTRUCTIONCOSTSFORINDONESIA

    BUILDINGTYPE

    Low

    IDR000/m2

    HighID

    R000/m2

    DOMESTIC

    Apartments,

    highrise,averagestandard

    Apartments,

    highrise,

    highend

    8,1

    40

    11,2

    38

    9,2

    34

    12,7

    57

    OFFICE/COMMERCIAL

    Medium/highriseoffices,averagestandard

    Highriseoffices,prestigequality

    8,0

    19

    11,8

    46

    8,9

    30

    13,3

    65

    Theabovecostsareat4thQuarter2014levels.ExchangeRateUsedU

    S$=

  • 7/24/2019 Indonesia Cost Handbook

    13/104

    Theabovecostsareat4thQuarter2014levels.

    CONSTRUCTION COST DATA 13

    HOTELS

    Budgethotels-3-star,midmark

    et

    Businesshotels-4/5-star

    Luxuryhotels-5-star

    13,9

    72

    19,0

    75

    20,4

    12

    16,5

    24

    21,2

    62

    23,0

    85

    INDUSTRIAL

    Industrialunits,shellonly(Conventionalsinglestoreyframedunits)

    Owneroperatedfactories,

    lowrise,

    lightweightindustry

    3,7

    05

    4,0

    09

    4,0

    09

    4

    ,434

    OTHERS

    Underground/basementcarparks(