indonesia cost handbook
TRANSCRIPT
-
7/24/2019 Indonesia Cost Handbook
1/104
Langdon & Seah Indonesia PT.
INDONESIA 2015Construction Cost Handbook
-
7/24/2019 Indonesia Cost Handbook
2/104
PT Langdon & Seah Indonesia would like to acknowledge
the following projects featured on our cover page:
1. The Plaza and Keraton Residence at Plaza
Indonesia, Jakarta2. Sampoerna Strategic Square 2, Jakarta
3. Thamrin 9, Jakarta4. Bvlgari Resort and Spa, Bali
5. Hall D, Jakarta International Expo6. Signature Tower, Jakarta
1 2 3
4
65
-
7/24/2019 Indonesia Cost Handbook
3/104
First Edition 2015
PT. Langdon & Seah Indonesia
All rights reserved. No part of this publication may bere-produced or copied in any form without prior written
permission from PT. Langdon & Seah Indonesia.
The information contained herein should be regarded
as indicative and for general guidance only. Whilstevery effort h a s been made to ensure accu racy , noresponsibility can be accepted for errors andomissions, however caused.
Unless otherwise stated, costs reflected in this handbook
are current at 4th Quarter 2014.
-
7/24/2019 Indonesia Cost Handbook
4/104
TABLE OF CONTENTS4
Table of Contents 4Introduction 6Calendars 7
1. CONSTRUCTION COST DATA
Construction Costs for Indonesia 12
M&E Costs for Indonesia 14Cost Breakdown for different building types 16
Construction Costs for Selected Asian Cities 18
M&E Costs for Selected Asian Cities 24Major Rates for Selected Asian Cities 30
Utility Costs for Selected Asian Cities 36
Detailed Electricity Tariffs for Indonesia 38Office MEP Cost Components 40
2. GENERAL CONSTRUCTION DATA
2015 Construction Outlook 43
Construction Cost Trends in Indonesiaa) Material Price Indices 44b) Consumer Price Indices 46c) Labour Price Indices 48
-
7/24/2019 Indonesia Cost Handbook
5/104
TABLE OF CONTENTS 5
3. CONTRACT PROCUREMENT
Contract Procurement 51
4. OTHER INFORMATION
Exchange Rates 58
Prime Rates 60Currency Fluctuations 61Conversion Factors 64
IDD Codes and Time Differences 70Relevant Websites 71
Current Construction Regulations 72
5. LANGDON & SEAH
Langdon & Seah Values 81
Professional Services 82PT Arcadis Project Management 84
Langdon & Seah Offices 85
-
7/24/2019 Indonesia Cost Handbook
6/104
INTRODUCTION6
ABOUT US
First established in 1934 in Singapore under the name"Waters and Watson" we became the pre-eminent
Quantity Surveying and Construction Cost
Management firm in Asiaoperating for many yearsas Langdon, Every & Seah and subsequently Davis
Langdon & Seah. In April 2012, we merged with
Arcadis, the international consultancy, design,engineering and management services company, to
become Langdon and Seah.
PT. Langdon & Seah Indonesia has had a presence in
Indonesia since 1972, and has been involved in manyof the bestknown and most prestigious projects in the
country. Its varied track record takes in a multitude ofprojects from nearly every sector of the construction
industry.
Since 2013, Langdon & Seah Indonesia haveincreased their profile in Project Management with theestablishment of PT. Langdon & Seah Project
Management, now renamed to PT. Arcadis ProjectManagement.
5
-
7/24/2019 Indonesia Cost Handbook
7/104
CALENDARS 7
2014
2014JANUARY FEBRUARY MARCH
S M T W T F S S M T W T F S S M T W T F S1 2 3 4 1 1
5 6 7 8 9 10 11 2 3 4 5 6 7 8 2 3 4 5 6 7 812 13 14 15 16 17 18 9 10 11 12 13 14 15 9 10 11 12 13 14 1519 20 21 22 23 24 25 16 17 18 19 20 21 22 16 17 18 19 20 21 2226 27 28 29 30 31 23 24 25 26 27 28 23/30 24/31 25 26 27 28 29
APRIL MAY JUNES M T W T F S S M T W T F S S M T W T F S
1 2 3 4 5 1 2 3 1 2 3 4 5 6 7
6 7 8 9 10 11 12 4 5 6 7 8 9 10 8 9 10 11 12 13 1413 14 15 16 17 18 19 11 12 13 14 15 16 17 15 16 17 18 19 20 2120 21 22 23 24 25 26 18 19 20 21 22 23 24 22 23 24 25 26 27 2827 28 29 30 25 26 27 28 29 30 31 29 30
JULY AUGUST SEPTEMBERS M T W T F S S M T W T F S S M T W T F S
1 2 3 4 5 1 2 1 2 3 4 5 66 7 8 9 10 11 12 3 4 5 6 7 8 9 7 8 9 10 11 12 13
13 14 15 16 17 18 19 10 11 12 13 14 15 16 14 15 16 17 18 19 20
20 21 22 23 24 25 26 17 18 19 20 21 22 23 21 22 23 24 25 26 2727 28 29 30 31 24/31 25 26 27 28 29 30 28 29 30
OCTOBER NOVEMBER DECEMBER
S M T W T F S S M T W T F S S M T W T F S1 2 3 4 1 1 2 3 4 5 6
5 6 7 8 9 10 11 2 3 4 5 6 7 8 7 8 9 10 11 12 1312 13 14 15 16 17 18 9 10 11 12 13 14 15 14 15 16 17 18 19 2019 20 21 22 23 24 25 16 17 18 19 20 21 22 21 22 23 24 25 26 2726 27 28 29 30 31 23/30 24 25 26 27 28 29 28 29 30 31
JANUARY
2015FEBRUARY MARCH
S M T W T F S S M T W T F S S M T W T F S1 2 3 1 2 3 4 5 6 7 1 2 3 4 5 6 7
4 5 6 7 8 9 10 8 9 10 11 12 13 14 8 9 10 11 12 13 1411 12 13 14 15 16 17 15 16 17 18 19 20 21 15 16 17 18 19 20 2118 19 20 21 22 23 24 22 23 24 25 26 27 28 22 23 24 25 26 27 2825 26 27 28 29 30 31 29 30 31
APRIL MAY JUNE
S M T W T F S S M T W T F S S M T W T F S
2
1 2 3 4
0
2 1 2
5
3 4 5 65 6 7 8 9 10 11 3 4 5 6 7 8 9 7 8 9 10 11 12 13
12 13 14 15 16 17 18 10 11 12 13 14 15 16 14 15 16 17 18 19 2019 20 21 22 23 24 25 17 18 19 20 21 22 23 21 22 23 24 25 26 2726 27 28 29 30 24/31 25 26 27 28 29 30 28 29 30
JULY AUGUST SEPTEMBERS M T W T F S S M T W T F S S M T W T F S
1 2 3 4 1 1 2 3 4 55 6 7 8 9 10 11 2 3 4 5 6 7 8 6 7 8 9 10 11 12
12 13 14 15 16 17 18 9 10 11 12 13 14 15 13 14 15 16 17 18 1919 20 21 22 23 24 25 16 17 18 19 20 21 22 20 21 22 23 24 25 2626 27 28 29 30 31 23/30 24/31 25 26 27 28 29 27 28 29 30
OCTOBER NOVEMBER DECEMBERS M T W T F S
1 2 3
S M T W T F S
1 2 3 4 5 6 7
S M T W T F S
1 2 3 4 54 5 6 7 8 9 10 8 9 10 11 12 13 14 6 7 8 9 10 11 12
11 12 13 14 15 16 17 15 16 17 18 19 20 21 13 14 15 16 17 18 1918 19 20 21 22 23 24 22 23 24 25 26 27 28 20 21 22 23 24 25 2625 26 27 28 29 30 31 29 30 27 28 29 30 31
1
-
7/24/2019 Indonesia Cost Handbook
8/104
CALENDARS8
2 016
JANUARY 2016FEBRUARY MARCHS M T W T F S S M T W T F S S M T W T F S
1 2 1 2 3 4 5 6 1 2 3 4 53 4 5 6 7 8 9 7 8 9 10 11 12 13 6 7 8 9 10 11 12
10 11 12 13 14 15 16 14 15 16 17 18 19 20 13 14 15 16 17 18 1917 18 19 20 21 22 23 21 22 23 24 25 26 27 20 21 22 23 24 25 2624/31 25 26 27 28 29 30 28 29 27 28 29 30 31
APRIL MAY JUNE
S M T W T F S S M T W T F S S M T W T F S1 2 1 2 3 4 5 6 7 1 2 3 4
3 4 5 6 7 8 9 8 9 10 11 12 13 14 5 6 7 8 9 10 1110 11 12 13 14 15 16 15 16 17 18 19 20 21 12 13 14 15 16 17 1817 18 19 20 21 22 23 22 23 24 25 26 27 28 19 20 21 22 23 24 2524 25 26 27 28 29 30 29 30 31 26 27 28 29 30
JULY AUGUST SEPTEMBER
S M T W T F S S M T W T F S S M T W T F S1 2 1 2 3 4 5 6 1 2 3
3 4 5 6 7 8 9 7 8 9 10 11 12 13 4 5 6 7 8 9 1010 11 12 13 14 15 16 14 15 16 17 18 19 20 11 12 13 14 15 16 1717 18 19 20 21 22 23 21 22 23 24 25 26 27 18 19 20 21 22 23 2424/31 25 26 27 28 29 30 28 29 30 31 25 26 27 28 29 30
OCTOBER NOVEMBER DECEMBERS M T W T F S S M T W T F S S M T W T F S
1 1 2 3 4 5 1 2 32 3 4 5 6 7 8 6 7 8 9 10 11 12 4 5 6 7 8 9 109 10 11 12 13 14 15 13 14 15 16 17 18 19 11 12 13 14 15 16 17
16 17 18 19 20 21 22 20 21 22 23 24 25 26 18 19 20 21 22 23 2423/30 24/3125 26 27 28 29 27 28 29 30 25 26 27 28 29 30 31
2017JANUARY FEBRUARY MARCH
S M T W T F S1 2 3 4 5 6 7
S M T W T F S1 2 3 4
S M T W T F S1 2 3 4
8 9 10 11 12 13 14 5 6 7 8 9 10 11 5 6 7 8 9 10 11
15 16 17 18 19 20 21 12 13 14 15 16 17 18 12 13 14 15 16 17 1822 23 24 25 26 27 28 19 20 21 22 23 24 25 19 20 21 22 23 24 2529 30 31 26 27 28 26 27 28 29 30 31
APRIL MAY JUNE
S M T W T F S S M T W T F S S M T W T F S
2
1
0
1 2 3 4
1
5 6
7
1 2 3
2 3 4 5 6 7 8 7 8 9 10 11 12 13 4 5 6 7 8 9 10
9 10 11 12 13 14 15 14 15 16 17 18 19 20 11 12 13 14 15 16 1716 17 18 19 20 21 22 21 22 23 24 25 26 27 18 19 20 21 22 23 2423/30 24 25 26 27 28 29 28 29 30 30 25 26 27 28 29 30
JULY AUGUST SEPTEMBERS M T W T F S S M T W T F S S M T W T F S
1 1 2 3 4 5 1 22 3 4 5 6 7 8 6 7 8 9 10 11 12 3 4 5 6 7 8 99 10 11 12 13 14 15 13 14 15 16 17 18 19 10 11 12 13 14 15 16
16 17 18 19 20 21 22 20 21 22 23 24 25 26 17 18 19 20 21 22 2323/30 24/3125 26 27 28 29 27 28 29 30 31 24 25 26 27 28 29 30
OCTOBER NOVEMBER DECEMBERS M T W T F S S M T W T F S S M T W T F S1 2 3 4 5 6 7 1 2 3 4 1 28 9 10 11 12 13 14 5 6 7 8 9 10 11 3 4 5 6 7 8 9
15 16 17 18 19 20 21 12 13 14 15 16 17 18 10 11 12 13 14 15 1622 23 24 25 26 27 28 19 20 21 22 23 24 25 17 18 19 20 21 22 2329 30 31 26 27 28 29 30 24/31 25 26 27 28 29 30
-
7/24/2019 Indonesia Cost Handbook
9/104
9CALENDARS
PUBLIC HOLIDAYS IN INDONESIA
2015
INDONESIA
New Year's DayProphet Muhammad's BirthdayChinese New Year (Imlek)Hindu Day of Quiet (Nyepi)Good FridayInternational Labour Day
Ascension Day of Jesus Christ
Ascension of Prophet MohammadWaisak DayIdul Fitri
National Independence DayIdul Adha Day
Hijriyah New YearChristmas Day
01 Jan03 Jan19 Feb21 Mar03 Apr01 May14 May
16 May02 Jun17 Jul18 Jul17 Aug24 Sep14 Oct25 Dec
-
7/24/2019 Indonesia Cost Handbook
10/104
9CALENDARS
Sustainability
-
7/24/2019 Indonesia Cost Handbook
11/104
Construction Costs for Indonesia
M&E Costs for Indonesia
Construction cost specification for Indonesia
Cost breakdown for different building types
Construction Costs for SelectedAsian Cities
M&E Costs for Selected Asian Cities
Major Rates for Selected Asian Cities
Utility Costs for selected Asian Cities
Detailed Electricity Tariffs for Indonesia
Office MEP Cost Components
-
7/24/2019 Indonesia Cost Handbook
12/104
1 CONSTRUCTION COST DATA
CONSTRUCTION COSTS FOR INDONESIA
12CONSTRUCTION COST DATA
CONSTRUCTIONCOSTSFORINDONESIA
BUILDINGTYPE
Low
IDR000/m2
HighID
R000/m2
DOMESTIC
Apartments,
highrise,averagestandard
Apartments,
highrise,
highend
8,1
40
11,2
38
9,2
34
12,7
57
OFFICE/COMMERCIAL
Medium/highriseoffices,averagestandard
Highriseoffices,prestigequality
8,0
19
11,8
46
8,9
30
13,3
65
Theabovecostsareat4thQuarter2014levels.ExchangeRateUsedU
S$=
-
7/24/2019 Indonesia Cost Handbook
13/104
Theabovecostsareat4thQuarter2014levels.
CONSTRUCTION COST DATA 13
HOTELS
Budgethotels-3-star,midmark
et
Businesshotels-4/5-star
Luxuryhotels-5-star
13,9
72
19,0
75
20,4
12
16,5
24
21,2
62
23,0
85
INDUSTRIAL
Industrialunits,shellonly(Conventionalsinglestoreyframedunits)
Owneroperatedfactories,
lowrise,
lightweightindustry
3,7
05
4,0
09
4,0
09
4
,434
OTHERS
Underground/basementcarparks(