inspection test plan for fabrication

Upload: ashwani-dogra

Post on 03-Apr-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/28/2019 Inspection Test Plan for Fabrication

    1/4

    Client Projects Number: A : RKM Inspector

    B : Client inspecto

    Appl icable Codes: C : Third Party Insp

    H : Hold Point

    W : Witness Point

    M : Monitoring

    R : Review Docum

    RI:

    Report IssuancNSF Procedures: RT : Radiographic T

    UT : Ultrasonic Test

    MT : Magnetic Partic

    PT : Liquid Penetran

    HV : Hardness Test

    VT : Visual Test

    DT : Dimensional C

    HT : Hydrostatic Tes

    DFT : Dry Film Thickn

    PWHT : Postweld Heat

    Project :

    INSPECTION AND TEST PLAN

    References

    Job No. : Client :

    AWS D1.1

    NSF-QCD-008 N.D.T control

    NSF- MAT- 001 Store control

    NSF-PRO- 001

    NSF -QCD-005 Ultra sonic Examination

    Weld control

    NSF-TEC-001 Handling and Packing

    NSF-QCD-007

    NSF-GEN-001 Fabrication

    Magnetic particle Examination

    NSF-PRO-003 Painting Control

  • 7/28/2019 Inspection Test Plan for Fabrication

    2/4

    Dwg No. : Rev. :

    I

    1 100%

    2 100%

    3 100%

    II

    1 100%

    2100%

    III

    1 100%Correct Joint design

    APPROVAL

    Drawing approval

    100% Material certificate check

    WPS's,WPQ's,PQR AND NDT

    100% Material check for confirmity and visual

    Marking,Cutting,Rolling and Edge preparation

    MATERIAL PREPARATION

    FABRICATION ASSEMBLY

    Ser.#

    Acceptance Criteria Verifying Document

    Job No. : Client : Project :

    INSPECTION AND TEST PLAN

    Type A

    H

    1

    Drawing specs client approval

    Activity Description %

    H

    AWS D1.1 client approval

    WPS&Approved

    DrawingsITP DT M

    EN 10025 Material Certificate VT&DT H

    WPS&ApprovedITP VT&DT H

    EN 10025 client approval H

  • 7/28/2019 Inspection Test Plan for Fabrication

    3/4

    Dwg No. : Rev. :

    100%

    50%

    %

    50% OF THE LENGTH UT FOR BUTT WELDS FULL

    PENTRATION FOR THICKNESS 8 MM OF ALL WELDS (For

    Dynamic Loads)

    Activity Description

    FOR DOUBLE WALL CJP < 8MM AT TWO STAGES : 1st step100% MT AFTER ROOT PASS DIRECTLY MAX 3 MM -2nd step

    100% MT( AFTER FILLING + CAP )(Dynamic or static )

    AWS D1.1 table 6.3

    10% OF THE LENGTH UT FOR BUTT WELDS FULL

    PENTRATION FOR THICKNESS 8 MM OF ALL WELDS

    1000 MM , 5% OF THE LENGTH UT FOR BUTT WELDS FULL

    PENTRATION FOR THICKNESS 8 MM FOR ALL WELDS