Introduction.........................................................................3 Level Bracket ExternalBracket.......................................................4 InternalBracket.....................................................18 P2Bracket..............................................................22 AngleBracket.....................................................................28 Stair Bracket StairBracket..........................................................33 P2StairBracket.....................................................39 Care&Maintenance/Warranty..........................................43
TABLE OF CONTENTS
Al13 PLUS INSTALLATION 3
INTRODUCTION
READ INSTRUCTIONS COMPLETELY BEFORE STARTING INSTALLATION It is the responsibility of the installer to meet all code and safety requirements, and to obtain all required building permits.Thedeckandrailinginstallershoulddetermine
andimplementappropriateinstallationtechniquesforeachinstallationsituation.FortressBuildingProductsandits
distributors shall not be held liable for improper or unsafe installations.
FortressPostsmustalwaysbesecuredtothedeck framingandshouldneverbeattachedtoonlythedeckboards.
Note • WhencuttingFortressrailing,itisveryimportantto completethefollowingatcutpoints: • Removeallmetalshavingsfromthecutarea. • Fileanysharpedgesleftbycutting.Thoroughlywipeand
removeanyfilings,grime,ordirtfromtherailing. • ApplytwocoatsofFortresszincbasedtouch-uppaintto
thecutarea.Iftouchupisatrailends,allowpainttodry beforeconnectingbrackettopost.
• Be sure to remove any metal shavings from the surface of deck,patio,orbalconytopreventstainsonthedeck
surface.Torx Safety Tips • Alwaysusethelowestspeedsettingondrill. • Toreducechanceofbitbreakage,starttighteningwithdrill
onlowtorquesettingandworkupuntilscrewissecured. Tip: Pre-drill holes with 3/16” [5mm] drill bit.
4 Al13 PLUS INSTALLATION
Required Tools
Goggles
Drill
Tape Measurer
LevelTool
Speed Square
Touch-UpPaint
MiterSawWithAFineToothCarbide
CuttingBlade
T-25Driver Bit
Bit Extender
DrillBits:1/16”,3/16”,3/8”,
[1.5mm,4.5mm,9.5mm]
Al13 PLUS: Evolve External Brackets Installation Options
PencilRubber Mallet
Spring Punch
Safety Gloves
2”x4”Wood
File
EVOLVE EXTERNAL BRACKET
Al13PLUSTraditionalPanelBall Cap FlatPyramidCap
Al13 PLUS I-support
Al13PLUSPostwithPostBaseCover
Evolve External Cap Evolve External Bracket
Al13 PLUS TraditionalPanel69”[1752mm]or93”[2362mm]
Angle Finder
Al13 PLUS INSTALLATION 5
Rail Panel With ATPInstalled
Panel Height* Required Post
Al13 PLUS TraditionalPanelwithAl13 PLUS Accent Top Panel (ATP)Ball Cap FlatPyramidCap
Evolve Large External Cap Evolve Large External Bracket
Al13 PLUS Accent Top Panel
Al13 PLUS I-support
Al13PLUSPostwithPostBaseCover
Evolve External Bracket
Evolve External Cap
*Installed heights include a 3-1/2”[89mm]spacebetweendecksurfaceandbottomedgeofbottomrail.
Evolve External Bracket PostConfiguration
Al13 PLUSPanel Height
Rail Panel Without ATPInstalled
Panel Height* Required Post35-1/2”[902mm]
37-1/2”[953mm]
41-1/2”[1054mm]
32”[813mm]
34”[864mm]
38”[965mm]
39-1/2”[1003mm]
39-1/2”[1003mm]
45-1/2”[1156mm]
45-1/2”[1156mm]40-5/16”[1024mm]
43-1/2”[1105mm]40”[1016mm] 45-1/2”[1156mm]
42-5/16”[1075mm] 45-1/2”[1156mm]
Al13 PLUS TraditionalPanel69”[1752mm]or93”[2362mm]
46-5/16”[1176mm] 55-1/2”[1410mm]
6 Al13 PLUS INSTALLATION
EVOLVE EXTERNAL BRACKET: POST MOUNTING
*IfusingFortressEvolutionFraming,contactFortressforinstructions. Note: It’s recommended to install brackets into post before Post Mounting. Reference page 8 for Bracket Installation steps.
Step 1: Install Wood Blocks 1. InstallWoodBlocklevelwithtopofjoist.Asshownin Fig.1. 2. SecureWoodBlocktoblockingonallfoursideswith #10X3-1/2”[89mm]deckscrews. • WoodBlockmustbeconstructedwithtreateddimensional
lumberwithaminimumthicknessof1-1/2”[38mm].
Step 2: Position Base Plate 1. Positiontheedgeofbaseplateaminimumof1/2”[13mm]
fromtheinsideedgeofrimjoist.AsshowninFig.1.Fig. 1
1/2”[13mm]
1/2”[13mm]
Fig. 1
#10x3-1/3”[85mm]
WoodBlock
Joist Blocking
WoodBlock
Al13 PLUS INSTALLATION 7
Step 4: Mount Posts 1. Markholelocationsandpre-drilla3/8”[10mm]hole. 2. Insert3/8”x3-1/2”[10mmx89mm]HexHeadgalvanized boltsthrough3/8”[10mm]galvanizedwasherandpost
baseplate. Note: • Post Base Plate holes MUSTbepositionedaminimum1/2”
[13mm]fromedgeofdeckboard. • Useonly3/8”[10mm]HexHeadGalvanizedBolts. LagScrewsshouldNOTbeused.Secureeachpostwith fourbolts.
Step 3: Max Post Spacing • 6’panelmaximumpostspacingis69-3/4”[1772mm]. • 8’panelmaximumpostspacingis93-3/4”[2381mm].Note: • Do not exceed the maximum post spacing.
Fig. 1
Panel maximum post spacing
Fig. 1 Fig. 2
OT
P a
nd
Pro
ud
Po
st: M
ax
Po
st S
pa
cin
g• 8
’ pa
ne
l ma
xim
um
po
st sp
acin
g is 9
3-7
/8”.
• 6’ p
an
el m
axim
um
po
st sp
acin
g is 6
9-7
/8”.
No
te: D
o n
ot e
xc
ee
d th
e m
ax
imu
m p
os
t sp
ac
ing
.
8’ P
an
el m
ax p
ost sp
acin
g 9
3-7
/8”
6’ P
an
el m
ax p
ost sp
acin
g 6
9-7
/8”
OT
P a
nd
Pro
ud
Po
st: M
ea
su
ring
Th
e P
an
el O
pe
nin
g L
en
gth
• Me
asu
re th
e d
ista
nce
of th
e p
an
el o
pe
nin
g.
• Me
asu
re fro
m th
e b
ack w
all o
f the
bra
cket to
the
ba
ck wa
ll of th
e b
racke
t on
oth
er p
ost.
• Co
nfirm
tha
t the
me
asu
rem
en
ts for th
e to
p b
racke
ts are
the
sam
e a
s the
bo
ttom
bra
ckets.
Me
asu
re th
e p
an
el o
pe
nin
g
No
t he
re
Me
asu
re fro
mb
ack o
f bra
cket
Ch
eck m
ea
sure
me
nt w
ith to
p
3/1
2
OT
P a
nd
Pro
ud
Po
st: M
ax
Po
st S
pa
cin
g• 8
’ pa
ne
l ma
xim
um
po
st sp
acin
g is 9
3-7
/8”.
• 6’ p
an
el m
axim
um
po
st sp
acin
g is 6
9-7
/8”.
No
te: D
o n
ot e
xc
ee
d th
e m
ax
imu
m p
os
t sp
ac
ing
.
8’ P
an
el m
ax p
ost sp
acin
g 9
3-7
/8”
6’ P
an
el m
ax p
ost sp
acin
g 6
9-7
/8”
OT
P a
nd
Pro
ud
Po
st: M
ea
su
ring
Th
e P
an
el O
pe
nin
g L
en
gth
• Me
asu
re th
e d
ista
nce
of th
e p
an
el o
pe
nin
g.
• Me
asu
re fro
m th
e b
ack w
all o
f the
bra
cket to
the
ba
ck wa
ll of th
e b
racke
t on
oth
er p
ost.
• Co
nfirm
tha
t the
me
asu
rem
en
ts for th
e to
p b
racke
ts are
the
sam
e a
s the
bo
ttom
bra
ckets.
Me
asu
re th
e p
an
el o
pe
nin
g
No
t he
re
Me
asu
re fro
mb
ack o
f bra
cket
Ch
eck m
ea
sure
me
nt w
ith to
p
3/1
2
Step 5: Check Mounted Posts 1. Shimpostasneededtoensurepostislevel.
8 Al13 PLUS INSTALLATION
Step 1: Mark Bracket Hole Locations (without ATP or with ATP) 1. Markthecenterlineofeachpostwithapencil. 2. Takemeasurementsusedtomarkbottomandtopbracket holelocationsontoposts.Reference Fig. 1 and 2 for
Evolve External Bracket without ATP and Fig. 3 and 4 for Evolve External Bracket with ATP.
Note: • AL13PLUShasaspacingof3-1/2”[89mm]betweenthe
decksurfaceandundersideofbottomrail.
EVOLVE EXTERNAL BRACKET: BRACKET INSTALLATION
Fig. 1 Fig. 2Shim post as needed to
ensure post is level
Deck Board
Rim JoistJoist / Blocking
Wood Block1/2”[13mm]
Fig. 1
*DimensionApositionsbottomedgeofbottomrail3-1/2”[89mm]abovedecksurface.*DimensionAismeasuredfromthebottomsurfaceofpostbase.
Bracket Hole Locations: Evolve External Bracket Without ATP
Pre-drill Dimensions: Pre-drillingwitha3/16”[5mm]drillbitisrequired
A* B C
1/2”[13mm]3-13/16”[97mm] 36-11/16”[932mm]
34” [864mm] Panel
3-13/16”[97mm] 40-11/16”[1033mm]1/2”[13mm]
38” [965mm] Panel
3-13/16”[97mm] 42-11/16”[1084mm]1/2”[13mm]
40” [1016mm] Panel
D
13/16”[21mm]
13/16”[21mm]
13/16”[21mm]
1/2”[13mm]3-13/16”[97mm] 34-11/16”[881mm]
32” [813mm] Panel
13/16”[21mm]
Al13 PLUS INSTALLATION 9
A
B
C
B
Fig. 2
Evolve External Bracket Without
ATP
A
Fig. 3 Bracket Hole Locations: Evolve External Bracket With ATP
Pre-drill Dimensions: Pre-drillingwitha3/16”[5mm]drillbitisrequired
•All panel sizes except 40” [1016mm] panel can use the ATP. •Only 32” and 38” panels are used with ATP’s in California.*DimensionApositionsbottomedgeofbottomrail3-1/2”[89mm]abovedecksurface.*DimensionAismeasuredfromthebottomsurfaceofpostbase.
Fig. 4
AB
Evolve External Bracket With ATP
B
D
DC
E B
A
B
D
B
A* B C
ReferenceFIg.1onpage8forA,B,C&Ddimensions.
D E
4-13/16”[122mm]
Step 2: Pre-Drill and Install Brackets Tip: • It’s important to double check dimensions to confirm
accuracy of bracket hole locations before drilling. • If installing Evolve External Brackets with the ATP, be sure
to confirm bracket size used. Reference assembly on page 5. 1. UseSpringPunchtomarktheholes.AsshowninFig.1. 2. Pre-drillbracketholeswitha3/16”[5mm]drillbit.As
showninFig.2.
10 Al13 PLUS INSTALLATION
Fig. 1 Fig. 2
Fig. 3
Fig. 4
3. AttachbrackettothepostswithsuppliedT-25 Thread-CuttingScrews.Usetwoscrewsperbracket, locateddiagonallyfromeachother.Uselowspeedsetting
ondrill.AsshowninFig.3. 4. Oncetopandbottombracketsareinstalled,remeasure
bracketspacingtoconfirmdimensionsusedinFig.2and3 ofstep1(page8).AsshowninFig.4.
5. Removeallmetalshavingsfromdeck,postbase cover,post,andpanelbeforebracketisscrewedtopostto preventcorrosion.
Al13 PLUS INSTALLATION 11
EVOLVE EXTERNAL BRACKET: CUTTING DOWN PANEL & ATP
Step 1: Measure The Panel Opening Length 1. Measurethedistanceofthepanelopening.Asshownin
Fig.1. 2. Confirmthatthemeasurementsforthetopbracketsare
thesameasthebottombrackets.Tip: • Measurefromthebackwallofthebrackettotheback
wallofthebracketonotherpost.AsshowninFig.2. • IfinstallingEvolveExternalBracketswiththeATP,besure
toconfirmmeasurementofbothbracketsizesused.As showninFig.3.
• The panel cutting process (steps 1 - 4) can be used when cutting the ATP.
Fig. 1
Measure the panel opening
Checkmeasurementwithtop
DO NOT measure from post
Measure from back of bracket
Fig. 2
Fig. 3
Evolve Large External CupEvolve External Cup
Evolve External Cup
Evolve External Bracket With ATP
12 Al13 PLUS INSTALLATION
Step 2: Mark Panel Cut Points 1. Positionthepanelonaflatsurface. 2. Toensurerailsaresymmetrical,takethemeasurement foundinstep1anddivideitinhalf. 3. Findandmarkthecenteroftherail. 4. Fromthepreviouslymarkedcenter,measureoutthe dividedlengthineachdirection.AsshowninFig.1. 5. Marktheselocationswithapencilonthetop/bottomrail.Tip: • Foreaseofinstallation,Onlythefinalpanelineachrunwill
needtobecut.Referencethepostmax.spacingused onpage7,step3.
Fig. 1
Mark HereMark Here
Mark Here Mark HereCenter of Rails
Step 3: Cut & Clean Panel 1. Cutthepanelusingasawwithafinetoothcarbidecutting
blade. 2. Usefiletosmoothcutedges. 3. Removeanymetalshavingsanddustwithabrushorrag. 4. Makesuresurfacestobepaintedareclean.
Fig. 1 Fig. 2 Fig. 3
Al13 PLUS INSTALLATION 13
Step 4: Apply Spray Paint To Cut Areas 1. Usingapieceofcardboardasamask,applythe1st coat of
Fortresszincbasedtouch-uppaint. 2. Allowtodrybeforeapplyingsecondcoat. 3. Applythe2ndcoatofFortresszincbasedtouch-uppaint. 4. Allowtodryandinstall.
Fig. 1
2X
EVOLVE EXTERNAL BRACKET: PANEL INSTALLATION
Step 1: Install I-Support On Bottom Rail (Optional) 1. Measureandlocatethecenterofthebottomrail.Using
theI-Supportasaguide,markthecenterofthe2screw holes.AsshowninFig.1.
2. Usinga3/16”[5mm]drillbit,drillthoughtheoutside wall.
3. InstalltheI-SupportwiththeprovidedPhillipsHead Screws.AsshowninFig.2.
Fig. 1
3/16”[5mm]Hole
Fig. 2
Phillips Head Screws
14 Al13 PLUS INSTALLATION
Step 3: Install Panel 1. Installcutpaneltoensureproperfit.Asshownin Fig.1&2.
Fig. 1
Step 2: Install ATP Onto Panel (Only For Panel Using ATP) 1. TheATPispressfitintoplace.AsshowninFig.1.
Fig. 1
Fig. 2
Without ATP
With ATP
Al13 PLUS INSTALLATION 15
Step 4: Attach Panel To Bottom & Top Brackets 1. Pre-drillholesforscrewsusinga3/16”[5mm]drillbit. 2. Applyscrewsintobottom&topbrackets.Asshownin Fig.1. Note: • Onlyonescrewperbracketisneededtosecurethe brackettothepanel. • Screwsshouldbeinstalledonthesamesideofbrackets.
Fig. 1
Step 5: Attach I-Support To Deck (Optional) 1. FastenI-SupporttodecksurfacewiththesuppliedWood
Screw. Tip: • Pre-drillwitha1/16”[2mm]drillbit.
Fig. 1
16 Al13 PLUS INSTALLATION
Step 1: Install Post Base Cover 1. Separatethetwo-piecebaseplatecover.Holdoneside
paralleltothepostbaseplate.AsshowninFig.1. 2. Place2ndhalfofthepostbasecoverontheoppositeside
ofthepost.Hold2ndpieceslightlyunderthe1stpiece.As showninFig.2.
3. Twistthe2ndcover¼turnandmovepieceuntilbothhalf’s touch.AsshowninFig.3.
4. Makesureoneofthelockingpinsonthe2ndcoverengage withtheproperslotonthe1stcoverpiece.Asshownin Fig.4.
5. Oncethefirstlockingpinisstarted,turnthe2ndcover piecebackparalleltothepostbaseplate.Oneyouhave
confirmedbothlockingpinshaveengagedwiththe opposingslotslowerbothhalf’soverthepostbaseplate.
AsshowninFig.5.
EVOLVE EXTERNAL BRACKET: POST BASE COVER, BRACKET CAP & FLAT PYRAMID/BALL CAP INSTALLATION
Fig. 1 Fig. 2
Fig. 3 Fig. 4
Al13 PLUS INSTALLATION 17
Step 2: Install Bracket Caps 1. BracketCapssnapoverBracket Cups.AsshowninFig.1&2.Note: • If installing a drink rail & cap rail clips, install top bracket
capsontheundersideofthebracket.
Fig. 1 Fig. 2
Step 3: Install Flat Pyramid/Ball Cap 1. FlatPyramid/BallCapsarepressfitintoplace.Asshownin
Fig.1&2.Usearubbermallettohelpseatcapintoplace. 2. Useabroomorcompressortoremovedebrisfromrailing
anddecksurface.
Fig. 1 Fig. 2
Fig. 5
18 Al13 PLUS INSTALLATION
Al13 PLUS: Evolve Internal Brackets Installation Options
EVOLVE INTERNAL BRACKET
Al13 PLUS TraditionalPanel
Ball Cap FlatPyramidCap
Al13 PLUS I-support
Al13PLUSPostwithPostBaseCover
Evolve Internal Bracket
*Installed heights include a 3-1/2”[89mm]spacebetweendecksurfaceandbottomedgeofbottomrail.
Evolve Internal Bracket PostConfiguration
EVOLVE INTERNAL BRACKET: POST MOUNTING
• ReferencePostMountinginstructionsonpage6.Note: IT’SRECOMMENDEDTOINSTALLBRACKETSONTOPOSTBEFORE POSTMOUNTING.
Al13 PLUSPanel Height
34”[864mm]
38”[965mm]
40”[1016mm]
32”[813mm]
Rail Panel Without ATPInstalled
Panel Height* Required Post
37-1/2”[953mm]
41-1/2”[1054mm]
43-1/2”[1105mm]
39-1/2”[1003mm]
45-1/2”[1156mm]
45-1/2”[1156mm]
35-1/2”[902mm] 39-1/2”[1003mm]
Al13 PLUS TraditionalPanel69”[1752mm]or93”[2362mm]
Al13 PLUS INSTALLATION 19
Step 1: Mark Bracket Hole Locations 1. Markthecenterlineofeachpostwithapencil. 2. Takemeasurementsusedtomarkbottomandtopbracket holelocationsontoposts.ReferenceFig.1and2.Note: • AL13PLUShasaspacingof3-1/2”[89mm]betweenthe
decksurfaceandundersideofbottomrail.
EVOLVE INTERNAL BRACKET: BRACKET INSTALLATION
A
B
Fig. 2
Evolve Internal Bracket Without
ATP
A
C
Fig. 1
*DimensionApositionsbottomedgeofbottomrail3-1/2”[89mm]abovedecksurface.*DimensionAismeasuredfromthebottomsurfaceofpostbase.
Bracket Hole Locations: Evolve Internal Bracket
Pre-drill Dimensions: Pre-drillingwitha3/16”[5mm]drillbitisrequired
A* B C
36”[914mm]3-1/8”[79mm] 1-13/16”[46mm]
34” [864mm] Panel
3-1/8”[79mm] 1-13/16”[46mm]40”[1016mm]
38” [965mm] Panel
3-1/8”[79mm] 1-13/16”[46mm]42”[1067mm]
40” [1016mm] Panel
34”[864mm]3-1/8”[79mm] 1-13/16”[46mm]
32” [813mm] Panel
20 Al13 PLUS INSTALLATION
Step 2: Pre-Drill Bracket Holes • ReferenceBracketholepre-drillinginstructionson pages9&10.Note: • DO NOTinstallBracketsinthisstep.
EVOLVE INTERNAL BRACKET: CUTTING DOWN PANEL
Step 1: Measure The Panel Opening Length 1. Measurethedistanceofthepanelopening.Asshownin
Fig.1. 2. Confirmthatthemeasurementsforthetopbracketsare
thesameasthebottombrackets.Tip: • For the Internal Bracket, measure from the face shown in
Fig. 2.
Fig. 1
Measure the panel opening
CheckmeasurementwithtopMeasure from this face of bracket
Fig. 2
Evolve Internal Bracket
Step 2: Continue Panel Cutting & Clean Steps 1. Referencesteps2-4onpages12&13fortheremaining
panelcuttingandcleaningsteps.
EVOLVE INTERNAL BRACKET: PANEL INSTALLATION
Step 1: Install I-Support On Bottom Rail (Optional) • ReferenceI-supportinstallationsteponpage13.
Step 2: Mount Evolve Internal Brackets Onto Panel 1. InsertEvolveInternalBracketsintoTopandBottomRails.
AsshowninFig.1.
Al13 PLUS INSTALLATION 21
Fig. 1
Fig. 2Fig. 1
Step 4: Attach I-Support To Deck (Optional) • ReferenceI-supportmountinginstructionsonpage15,
step5.
• ReferencePostBaseCover,BracketCap&FlatPyramid/Ball Capinstructionsonpages16-17.
EVOLVE INTERNAL BRACKET: POST BASE COVER, BRACKET CAP & FLAT PYRAMID/BALL CAP INSTALLATION
Step 3: Mount Panel Onto Posts 1. Securebracketsintopre-drilledbracketholeswithprovided
T-25DriveThread-CuttingScrews.AsshowninFig.1. 2. Pre-drillBracketSetScrewholesonbottom&topRail usinga1/16”[2mm]drillbit. 3. SecureBrackettoRailwithprovidedPhillipsHeadScrew.
Uselowspeedsettingondrill.AsshowninFig.2.
Tip: • Depending on the version of the Evolve Internal Bracket
used,thescrewholesmayneedtobepre-drilledwitha 1/4”[6mm]drillbit.
22 Al13 PLUS INSTALLATION
Al13 PLUS: P2 Bracket Installation Options
EVOLVE P2 BRACKET
Al13 PLUS TraditionalPanelBall Cap FlatPyramidCap
Al13 PLUS I-support
Al13PLUSPostwithPostBaseCover
Evolve P2 Bracket
Al13 PLUS Accent Top Rail
Ball Cap FlatPyramidCap
Al13 PLUS Accent Top Panel
Al13 PLUS I-support
Al13 PLUS TraditionalPanelwithAl13 PLUS Accent Top Panel (ATP)
Al13PLUSPostwithPostBaseCover
Evolve P2 Bracket
Al13 PLUS Accent Top Rail
Al13 PLUS TraditionalPanel69”[1752mm]or93”[2362mm]
Al13PLUSTraditionalPanel69”[1752mm]or93”[2362mm]
Al13 PLUS INSTALLATION 23
Step 1: Mark Bracket Hole Locations (without ATP or With ATP) 1. Markthecenterlineofeachpostwithapencil. 2. Takemeasurementsusedtomarkbottomandtopbracket holelocationsontoposts.Reference Fig. 1 and 2 for
Evolve P2 Bracket without ATP and Fig. 3 and 4 for Evolve P2 Bracket with ATP.
Note: • AL13PLUShasaspacingof3-1/2”[89mm]betweenthe
decksurfaceandundersideofbottomrail.
EVOLVE P2 BRACKET: BRACKET INSTALLATION
Fig. 1
*DimensionApositionsbottomedgeofbottomrail3-1/2”[89mm]abovedecksurface.*DimensionAismeasuredfromthebottomsurfaceofpostbase.
Bracket Hole Locations: Evolve P2 Bracket Without ATP
Pre-drill Dimensions: Pre-drillingwitha3/16”[5mm]drillbitisrequired
A* B C
35-7/8”[911mm]3”[76mm] 1-13/16”[46mm]
34” [864mm] Panel
3”[76mm] 1-13/16”[46mm]39-7/8”[1013mm]
38” [965mm] Panel
3”[76mm] 1-13/16”[46mm]41-7/8”[1064mm]
40” [1016mm] Panel
33-7/8”[860mm]3”[76mm] 1-13/16”[46mm]
32” [813mm] Panel
Rail Panel With ATPInstalled
Panel Height* Required Post
*Installed heights include a 3-1/2”[89mm]spacebetweendecksurfaceandbottomedgeofbottomrail.
Evolve P2 Bracket PostConfiguration
Al13 PLUSPanel Height
Rail Panel Without ATPInstalled
Panel Height* Required Post
37-1/2”[953mm]
41-1/2”[1054mm]
43-1/2”[1105mm]
34”[864mm]
38”[965mm]
40”[1016mm]
39-1/2”[1003mm]
45-1/2”[1156mm]
45-1/2”[1156mm]
45-1/2”[1156mm]42-5/16”[1075mm]
35-1/2”[902mm]32”[813mm] 39-1/2”[1003mm] 45-1/2”[1156mm]40-5/16”[1024mm]
46-5/16”[1176mm] 55-1/2”[1410mm]
24 Al13 PLUS INSTALLATION
A
B
Fig. 2
Evolve P2 Bracket Without ATP
A
C
A
B
DFig. 4
Evolve P2 Bracket With ATP
A
C
Step 2: Pre-Drill Bracket Holes • ReferenceBracketholepre-drillinginstructionson pages9&10.Note: • DO NOTinstallBracketsinthisstep.
EVOLVE P2 BRACKET: POST MOUNTING
• ReferencePostMountinginstructionsonpage6.
Fig. 3 Bracket Hole Locations: Evolve P2 Bracket With ATPPre-drill Dimensions: Pre-drillingwitha3/16”[5mm]drillbitisrequired
•All panel sizes except 40” [1016mm] panel can use the ATP. •Only 32” and 38” panels are used with ATP’s in California.*DimensionApositionsbottomedgeofbottomrail3-1/2”[89mm]abovedecksurface.*DimensionAismeasuredfromthebottomsurfaceofpostbase.
A* B C
ReferenceFIg.1onpage23forA,B&Cdimensions.
D
4-7/8”[124mm]
Al13 PLUS INSTALLATION 25
EVOLVE P2 BRACKET: CUTTING DOWN PANEL, ATP & ATR
Step 1: Measure The Panel Opening Length 1. Measurethedistanceofthepanelopening.Asshownin
Fig.1. 2. Confirmthatthemeasurementsforthetopbracketsare
thesameasthebottombrackets.Tip: • Measurepanelopeninglengthfromthefaceofthepost.
AsshowninFig.2. • The panel cutting process (steps 1 & 2) can be used when
cutting the ATP & ATR.
Fig. 1
Measure the panel opening
Checkmeasurementwithtop
Fig. 2
Measure from Faceofpost
Step 2: Continue Panel Cutting & Clean Steps 1. Referencesteps2-4onpages12&13fortheremaining
panelcuttingandcleaningsteps.
EVOLVE P2 BRACKET: PANEL INSTALLATION
Step 1: Install I-Support On Bottom Rail (Optional) • ReferenceI-supportinstallationsteponpage13.
Step 2: Mount P2 Brackets Onto Panel 1. PositionP2Bracketonthebottomfaceoftherails.Besure
tohavebackfaceofbrackets&railsflushwithrailendcut. 2. Usinganpencil,markbracketscrewholes.Asshownin Fig.1. 3. Pre-drillbracketscrewholesonrailusinga3/16”[5mm]
drillbit.
26 Al13 PLUS INSTALLATION
Fig. 1 Fig. 2
Step 3: Install ATP Onto Panel • ReferenceATPtopanelmountinginstallationsteponpage
14,step2.
Step 4: Mount Panel Onto Posts • Referencepaneltopostmountinginstallationsteponpage
21,step3.
Step 5: Mount ATR Onto Panel • JustastheATP,theATRispressfit.ReferenceATPtopanel
mountinginstallationsteponpage14,step2.
Step 6: Attach I-Support To Deck (Optional) • ReferenceI-supportmountinginstructionsonpage15,
step5.
EVOLVE P2 BRACKET: POST BASE COVER, JOINT COVER & FLAT PYRAMID/BALL CAP INSTALLATION
Step 1: Install Joint Covers 1. JointCoversarepressfitintoplace.AsshowninFig.1&2.
Usearubbermallettohelpseatcapintoplace.
4. SecurebrackettorailwithprovidedT-25Drive Thread-CuttingScrews.Uselowspeedsettingondrill.
AsshowninFig.2.Tip: • Depending on the version of the Evolve P2 Bracket used,
thescrewholesmayneedtobepre-drilledwitha1/4” [6mm]drillbit.
Al13 PLUS INSTALLATION 27
Fig. 1 Fig. 2
Step 2: Install Post Base Covers & Flat Pyramid/ Ball Cap • ReferencePostBaseCover&FlatPyramid/BallCap
instructionsonpages16-17.
2. Useabroomorcompressortoremovedebrisfromrailing anddecksurface.
Note: • Topreventmovementofjointcover,usemetaltometal
epoxytosecureinplace.
28 Al13 PLUS INSTALLATION
Al13 PLUS: Evolve Angle Bracket Installation Option
EVOLVE ANGLE BRACKET
Al13 PLUS TraditionalPanel
Ball Cap FlatPyramidCap
Al13 PLUS I-support
Al13PLUSPostwithPostBaseCover
Evolve Angle Bracket Evolve Angle Cap
Al13PLUSTraditionalPanel69”[1752mm]or93”[2362mm]
*Installed heights include a 3-1/2”[89mm]spacebetweendecksurfaceandbottomedgeofbottomrail.
Evolve Angle Bracket PostConfiguration
Al13 PLUSPanel Height
34”[864mm]
38”[965mm]
40”[1016mm]
32”[813mm]
Rail Panel Without ATPInstalled
Panel Height* Required Post
37-1/2”[953mm]
41-1/2”[1054mm]
43-1/2”[1105mm]
39-1/2”[1003mm]
45-1/2”[1156mm]
45-1/2”[1156mm]
35-1/2”[902mm] 39-1/2”[1003mm]
EVOLVE ANGLE BRACKET: ATP INSTALLATION
• AngleATPcanonlybeinstalledusingtheP2Bracket. ReferenceP2Bracketinstructionsonpages22-27.
Al13 PLUS INSTALLATION 29
Fig. 1
*DimensionApositionsbottomedgeofbottomrail3-1/2”[89mm]abovedecksurface.*DimensionAismeasuredfromthebottomsurfaceofpostbase.
Bracket Hole Locations: Evolve Angle Bracket
Pre-drill Dimensions: Pre-drillingwitha3/16”[5mm]drillbitisrequired
A* B C
36-15/16”[938mm]4-1/16”[103mm] 1”[25mm]
34” [864mm] Panel
4-1/16”[103mm] 1”[25mm]40-15/16”[1040mm]
38” [965mm] Panel
4-1/16”[103mm] 1”[25mm]42-15/16”[1090mm]
40” [1016mm] Panel
34-15/16”[887mm]4-1/16”[103mm] 1”[25mm]
32” [813mm] Panel
Step 1: Mark Bracket Hole Locations 1. Markthecenterlineofeachpostwithapencil. 2. Takemeasurementsusedtomarkbottomandtopbracket holelocationsontoposts.Reference Fig.1and2.Note: • AL13PLUShasaspacingof3-1/2”[89mm]betweenthe
decksurfaceandundersideofbottomrail.
EVOLVE ANGLE BRACKET: BRACKET INSTALLATION
A
B
Fig. 2
Evolve Angle Bracket Without ATP
A
C
30 Al13 PLUS INSTALLATION
Fig. 2Fig. 1
Pre-Drillwitha3/16”[5mm]drill bit
Cent
er o
f Pos
t
1”[25mm]
Step 3: Install Angle Brackets 1. AttachAngleBracketBasetothepostswithsuppliedT-25
Thread-CuttingScrews.Uselowspeedsettingondrill. AsshowninFig.1.
2. AssembleAngleBracketBodypiece&Basepiece. AsshowninFig.2.
Tip: • UseaBitExtender. • Depending on the version of the Evolve Angle Bracket
used,thescrewholesmayneedtobepre-drilledwitha 1/4”[6mm]drillbit.
Fig. 1 Fig. 2
Step 2: Pre-drill Angle Bracket Holes Tip: • It’s important to double check dimensions to confirm
accuracy of bracket hole locations before drilling. 1. UseSpringPunchtomarktheholes.AsshowninFig.1. 2. Pre-drillbracketholeswitha3/16”[5mm]drillbit.
AsshowninFig.2. 3. RemovetheboltfromtheAngleBracketAssembly.
Al13 PLUS INSTALLATION 31
EVOLVE ANGLE BRACKET: CUTTING DOWN PANEL & ATP
Step 1: Measure The Panel Opening Length 1. Checktoensurethatallpostsaresquareandstraight.Shim postsasrequired. 2. EnsurethattheAngleBracketCupsareappropriately
aligned. 3. Measurethedistancefromtheinsidebackofonecupto theinsidebackoftheothercup.Thiswillbethepanel
length.AsshowninFig.2.Tip: • The panel cutting process (steps 1 & 2) can be used when
cutting the ATP.
EVOLVE ANGLE BRACKET: POST MOUNTING
• ReferencePostMountinginstructionsonpage6.Note: IT’SRECOMMENDEDTOINSTALLBRACKETSONTOPOSTBEFORE POSTMOUNTING.
Fig. 1
Evolve Angle Bracket
Fig. 2
Measure from back of bracket
DO NOT measure from post
Evolve Angle Bracket
32 Al13 PLUS INSTALLATION
EVOLVE ANGLE BRACKET: PANEL INSTALLATION
• ReferencePanelinstallationinstructionsonpages13-15.
EVOLVE ANGLE BRACKET: POST BASE COVER, BRACKET CAP/ JOINT COVER & FLAT PYRAMID/BALL CAP INSTALLATION
• ReferencePostBaseCover,BracketCap&FlatPyramid/ BallCapinstructionsonpages16-17.
Step 3: Continue Panel Cutting & Clean Steps • Referencesteps2-4onpages12&13fortheremaining
panelcuttingandcleaningsteps.
Al13 PLUS INSTALLATION 33
EVOLVE STAIR BRACKET
Al13 PLUS: Evolve Stair Bracket Installation OptionAl13PLUSTraditionalAdjustablePanel
Evolve Stair Bracket
• AvailableLengths:8’[2438mm].• AvailableHeights:32”[813mm],34”[864mm],38”[965mm]&40”[1016mm].• AdjustableAngleRange:Maximumrakeangle40°.
FlatPyramidCap
Evolve Stair Bracket
3”x45-1/2”[76mmx1156mm]or3”x55”[76mmx1397mm]Post
Post Base Cover
Stair Angle Maximum40o
Stair Bracket Cup
Chicago Bolt Male
Chicago BoltFemale
Stair Bracket Base
Stair Bracket Cap
Evolve Stair Bracket Cap
34 Al13 PLUS INSTALLATION
EVOLVE STAIR BRACKET: BRACKET INSTALLATION
Step 1: Bottom Bracket Installation 1. Positionwood2”x4”[60mmx102mm]betweenposts.
AsshowninFig.1. 2. Positionbottombracketcenteredflatonpost&
wood2”x4”[60mmx102mm].Use pencil to mark top edgeofbracketlocationonpost.AsshowninFig.2.
3. Dis-assemblethebracketbyremovingthebarrelandscrew. Referencethebracketassemblyonpage35. 4. Placebracketbaseonprevioustopedgemark.Centerthe
base on the post and use pencil to addmarksfortwoscrew holelocations.AsshowninFig.3.
Note: • Forbestresults,besurebracketbaseiscenteredonpost
whenmakingmarks.
Fig. 1 Fig. 2
Fig. 3
Al13 PLUS INSTALLATION 35
Step 2: Bottom Bracket Installation Continued 1. UseSpringPunchtomarktheholes. AsshowninFig.1. 2. Drilloutbracketholewitha3/16”[5mm]drillbit. AsshowninFig.2. 3. UseT-25screwstoattachthebracketbasetothepost.
AsshowninFig.3. 4. Keepbracketbasecenteredasyouinstallsecondscrew. 5. Insertthentightenbarrel&screwtore-assemblebracket. AsshowninFig.4.Tip: • Lower Post may need to be unmounted to install bracket
then remounted. • Depending on the version of the Evolve Stair Bracket used, thescrewholesmayneedtobepre-drilledwitha1/4”
[6mm]drillbit.
Fig. 1 Fig. 2
Fig. 3 Fig. 4
Step 3: Top Bracket Installation 1. Positionwood2”x4”[60mmx102mm]on stairs in line withbottombrackets.AsshowninFig.1.
36 Al13 PLUS INSTALLATION
2. Placepanelontopofwood2”x4”[60mmx 102mm]nexttobottombrackets.AsshowninFig.2.
3. Rakethepaneluntilbalustersareparalleltotheposts. 4. Clampthepaneltothepost.Besuretoclampatfour
touchpointstokeeppanelinposition.AsshowninFig.3. 5. Positiontopbracketcenteredandflatonpost. Make sure inside bottom of bracket is flush with bottom
of rail. As shown in Fig. 4. 6. Usepenciltomark top edge of bracket locationonpost. 7. Dis-assemblethebracketbyremovingthebarreland
screw. 8. Placebracketbaseonprevioustopedgemark.
Center the base on the post and use pencil to add marks fortwoscrewholelocations.AsshowninFig.5.
Note: • Forbestresults,besurebracketbasesarecenteredon
postswhenmakingmarks.
Fig. 1
Fig. 2
Al13 PLUS INSTALLATION 37
Fig. 3
Clamp
Clamp
Clamp
Fig. 5
Step 4: Top Bracket Installation Continued • Referencebottombracketinstallationstep2onpage35.
Fig. 4
PositionbottomofBracketflushwithbottomof rail
Mark top and side locationofAngleBracketon post
EVOLVE STAIR BRACKET: POST MOUNTING
• ReferencePostMountinginstructionsonpage6.Note: IT’SRECOMMENDEDTOINSTALLBRACKETSONTOPOSTBEFORE POSTMOUNTING.
EVOLVE STAIR BRACKET: CUTTING DOWN PANEL
Step 1: Measure & Mark Panels Where Cuts Will Be Made 1. Positionwood2”x4”[60mmx102mm] on stairs in line
withbottomandtopbrackets. 2. Placethepanelontopofwood2”x4”[60mmx102mm]
nexttobottombrackets. 3. Havethepanelrakedandasclosetofinalinstallation
positionaspossible.
Clamp
38 Al13 PLUS INSTALLATION
Fig. 1 Mark on rail in linewiththeback of bracket
Step 2: Cut & Clean Panel • Referencereferencepanelcutting&cleaning instructionssteponpage12,step3.
Step 3: Apply Spray Paint To Cut Areas • Referencereferencecutpanelspraypainting instructionssteponpage13,step4.
Positioninsidebottomofcupflushwithbottomfaceof rail
4. Confirmthatbracketisparalleltotherail. 5. Placecutmarkingonrailsinlinewiththebackofbracket
opening.Besurebottomofbracketandbottomofrailare flush.AsshowninFig.1.
6. Usespeedsquaretoensuremarkingsareperpendicularto panel.
EVOLVE STAIR BRACKET: PANEL INSTALLATION
• Referencepanelinstallationsteps3&4onpage14&15.Tip: • Besuretoconfirmthattherakedpanelislevel.
EVOLVE STAIR BRACKET: POST BASE COVER, BRACKET CAP & FLAT PYRAMID/BALL CAP INSTALLATION
• ReferencePostBaseCover,BracketCap&FlatPyramid/ BallCapinstructionsonpages16-17.
Al13 PLUS INSTALLATION 39
EVOLVE P2 STAIR BRACKET
Al13 PLUS: Evolve P2 Stair Bracket Installation OptionAl13PLUSTraditionalAdjustablePanel
Evolve P2 Stair Bracket
• AvailableLengths:8’[2438mm].• AvailableHeights:32”[813mm],34”[864mm],38”[965mm]&40”[1016mm].• AdjustableAngleRange:Maximumrakeangle40°.
FlatPyramidCap
Post Base Cover
Stair Angle Maximum40o
P2 Stair Bracket Base
Chicago BoltFemale
P2 Stair Bracket Top
Chicago Bolt Male
Evolve P2 Stair Bracket
3”x45-1/2”[76mmx1156mm]or3”x55”[76mmx1397mm]Post
Evolve P2 Stair Joint Cover
40 Al13 PLUS INSTALLATION
EVOLVE P2 STAIR BRACKET: CUTTING DOWN PANEL
Step 1: Measure & Mark Panels Where Cuts Will Be Made 1. Positionwood2”x4”[60mmx102mm]betweenposts.
AsshowninFig.1. 2. Placethepanelontopofwood2”x4”[60mmx102mm]
nexttoposts. 3. Rakethepaneluntilbalustersareparalleltothepostsand
level. 4. Clampthepaneltothepost.Besuretoclampatfour
touchpointstokeeppanelinposition.AsshowninFig.3. 5. Markcutpointsontopandbottomrailsinlinewiththe
frontfaceofthepost.AsshowninFig.3.
Fig. 1 Fig. 2
Clamp
Clamp
Clamp
Clamp
Fig. 3
Step 2: Cut & Clean Panel • Referencereferencepanelcutting&cleaning instructionssteponpage12,step3.
Al13 PLUS INSTALLATION 41
Step 3: Apply Spray Paint To Cut Areas • Referencereferencecutpanelspraypainting instructionssteponpage13,step4.
Fig. 1 Fig. 2
EVOLVE P2 STAIR BRACKET: PANEL & BRACKET INSTALLATION
Step 1: Mount P2 Stair Brackets Onto Panel 1. PositionP2StairBracketonthebottomfaceoftherails.Be
suretohavebackfaceofbracketsandrailsflushwithrail endcut.
2. Usinganpencil,markbracketscrewholes.Asshownin Fig.1. 3. Pre-drillbracketscrewholesonrailusinga3/16”[5mm]
drillbit. 4. SecurebrackettorailwithprovidedT-25Drive Thread-CuttingScrews.Uselowspeedsettingondrill.
AsshowninFig.2.Tip: • Depending on the version of the Evolve P2 Stair Bracket
used,thescrewholesmayneedtobepre-drilledwitha 1/4”[6mm]drillbit.
Step 2: Mark Bracket Hole Locations Onto Posts 1. Positionwood2”x4”[60mmx102mm]betweenposts.
AsshowninFig.1. 2. Positioncutpanelwithmountedbracketson top of wood
2”x4”[60mmx102mm]andinfinalinstallposition. 3. Useapenciltoaddmarksontopostforbracketscrewhole
locations.AsshowninFig.2.
42 Al13 PLUS INSTALLATION
Fig. 1
Step 3: Mount Panel Onto Posts 1. Pre-drillholesforscrewsusinga3/16”[5mm]drillbit. 2. Securebracketsintopre-drilledbracketholesonpostwith
providedT-25DriveThread-CuttingScrews.Asshownin Fig.1. Tip: • Useabitextenderforaneasierdrillingprocess.
Fig. 2
Fig. 1
EVOLVE P2 STAIR BRACKET: POST BASE COVER, BRACKET CAP/ P2 STAIR JOINT COVER & FLAT PYRAMID/BALL CAP INSTALLATION
• ReferencePostBaseCover,BracketCap&FlatPyramid/ BallCapinstructionsonpages16-17.
• ReferenceJointCoverinstructionsonpages26&27.The P2StairJointCoverwillneedtobecutatanangle.
Al13 PLUS INSTALLATION 43
CARE & MAINTENANCE
Care And Maintenance Of Fortress Building Products Powder-Coated Products And Surfaces:
• ImmediatelyafterinstallationofyourFortressBuilding Products,cleanpowder-coatedproductsandsurfaceswitha
solutionofwarmwaterandnon-abrasive,pHneutral detergentsolution.Surfacesshouldbethoroughlyrinsedafter
cleaningtoremoveallresidues.Allsurfacesshouldbecleanedusingasoftclothorsponge.
• Ensureconstructionmaterialssuchasconcrete,plaster,andpaint splashes are removed immediately before they have a chancetodry.Failuretoremovethesematerialsmaycausedamagetothepowder-coatedsurfaces.
• The frequency of cleaning depends in part on the standard of appearance and also the requirements to remove deposits thatmaycausedamagetothepowdercoatingafterprolongedexposure.Fortressrecommendscleaninginthreetofourmonthlyintervalsallproductsandpowder-coated
surfaces.Inareaswherehighertraffic,increasedatmosphericsubstances,orothereffectsmayoccur,thetimeperiod
betweencleaningsshouldbeincreasedtomonthlyintervals.• WARNING: DO NOT use strong solvents such as thinners, or
solutions containing chlorinated hydrocarbons, esters, or ketones. Abrasive cleaners or cutting compounds should not be used.
WARRANTY
Toobtainandreviewacopyofthewarranty,pleasegoto:https://Fortressbp.com/warranties.Youcanalsocontact:(844)909-1999orwriteto:FortressBuildingProductsWarranty,1720N1stSt,Garland,TX75040toobtainacopyofthewarranty.
44 Al13 PLUS INSTALLATION
JOIN THE REVOLUTION.FortressBP.com | 866.323.4766
Unless otherwise noted, all proprietary names are trademarks of Fortress Iron, LP. All rights reserved.
06/2021
© 2021 Fortress Building Products.