integrated management system (ims) ehs aspects and impacts ... · integrated management system...
TRANSCRIPT
Integrated Management System
Document ID
Revision No. 1
Issue Date 29-Sept-19
EHS Aspects and Impacts Assessment
This document has been approved by the School Management System
The only approved and controlled copy of this document is the one available electronically on the school’s network. Printing and distributing of this document is prohibited. Users must verify the Revision Number and Issue Date of the document before use.
Page 1 of 21
Integrated Management System (IMS)
EHS Aspects and
Impacts Assessment
This Document Has Been Reviewed and Approved By:
Name Position Department
Integrated Management System
Document ID
Revision No. 1
Issue Date 29-Sept-19
EHS Aspects and Impacts Assessment
This document has been approved by the School Management System The only approved and controlled copy of this document is the one available electronically on the school’s network. Printing and distributing of this document is prohibited. Users must verify the Revision Number and Issue Date of the document before use.
Page 2 of 21
Revision History of the Document
Revision No. Issue Date Summary of Changes Responsibility References
1.0 01 May 2019 Initial Edition ‐ ‐
Integrated Management System
Document ID
Revision No. 1
Issue Date 29-Sept-19
EHS Aspects and Impacts Assessment
This document has been approved by the School Management System The only approved and controlled copy of this document is the one available electronically on the school’s network. Printing and distributing of this document is prohibited. Users must verify the Revision Number and Issue Date of the document before use.
Page 3 of 21
Contents
1‐ PURPOSE ....................................................................................................................4
2‐ SCOPE .........................................................................................................................4
3‐ TERMS & DEFINITIONS ...............................................................................................4
4‐ RESPONSIBILITIES .......................................................................................................6
5‐ PROCEDURES .............................................................................................................7
6‐ RELATED FORMS AND DOCUMENTS .......................................................................21
7‐ RECORDS ..................................................................................................................21
8‐ REFERENCES .............................................................................................................21
Integrated Management System
Document ID
Revision No. 1
Issue Date 29-Sept-19
EHS Aspects and Impacts Assessment
This document has been approved by the School Management System The only approved and controlled copy of this document is the one available electronically on the school’s network. Printing and distributing of this document is prohibited. Users must verify the Revision Number and Issue Date of the document before use.
Page 4 of 21
1‐ PURPOSE
This document establishes the responsibilities and procedures to ensure a systematic
approach to Environmental, Health and Safety (EHS) Aspects Evaluation and Risks
Assessment and to ensure that EHS Aspects, Impacts, Hazards and Risks are identified,
assessed, and appropriate measures are implemented for their control.
2‐ SCOPE
This procedure applies to all components of the EHS Management System and to
all activities, operations and projects undertaken by the School and requires EHS
aspects and impacts evaluations.
3‐ TERMS & DEFINITIONS
The following Terms and Acronyms are used within this document and are defined
as follows:
Term/Acronym Definition
School
IMS Integrated Management System
MR Management Representative
Procedure EHS Aspects and Impacts Assessment
EHS Environmental, Health and Safety
Accident An uncontrolled, unplanned and/or undesired event that results in undesirable consequences to the personnel (injuries/illness) and/or to the assets (damage/loss) or to
the neighboring community and/or to the environment. The term Accident is synonymous with Incident wherever used in EHS Management System
As Low As Reasonably To reduce a risk to a level which is ALARP, this involves
Practicable (ALARP) balancing reduction in risk against the time, trouble,
difficulty & cost of achieving it. This level represents the
point, objectively assessed, at which the time, trouble,
difficulty and cost of further reduction measures become
unreasonably disproportionate to the additional risk
reduction obtained
Integrated Management System
Document ID
Revision No. 1
Issue Date 29-Sept-19
EHS Aspects and Impacts Assessment
This document has been approved by the School Management System The only approved and controlled copy of this document is the one available electronically on the school’s network. Printing and distributing of this document is prohibited. Users must verify the Revision Number and Issue Date of the document before use.
Page 5 of 21
Environmental Aspect Element of an organizations activities products or services
that can interact with the environment
Barriers Barriers may be physical (materials, protective devices,
segregation, etc.) or non‐physical (procedures, inspection,
training, drills, etc.)
Consequence The result of an accidental event sequence (fire, explosion,
toxic gas dispersion, etc.) that could affect people, the
environment, Entity’s assets or reputation
Effect An adverse impact on people, the environment, Entity’s
assets or reputation
Hazard The potential to cause harm, including ill health and injury,
damage to property, products or the environment;
production losses or increased liabilities
Impact Any change to the environment whether adverse or
beneficial, wholly or partially resulting from Entity’s
facilities, activities, products or services
Risk The product of the measure of the likelihood of an
occurrence of an undesired event and the potential adverse
effects that this event may have on people, the
environment, Entity’s assets or reputation
4‐ RESPONSIBILITIES
4‐1 IMS Management Representative is responsible for:
4‐1‐1 The effective implementation of this procedure.
4‐1‐2 Ensuring that EHS Aspects and Impacts assessments are performed
for all operations, activities and projects that require these
assessments within the School.
4‐1‐3 Review and approval of the EHS Aspects and Impacts Assessment
results, and ensuring that implemented controls and measures are
appropriate and suitable for the specified risk levels.
4‐1‐4 Ongoing assessment and analysis of the status and results of the EHS
control plans to ensure their continued effectiveness and
introducing improvements where necessary.
4‐1‐5 Maintenance and retention of all records relating to the EHS Aspects
Integrated Management System
Document ID
Revision No. 1
Issue Date 29-Sept-19
EHS Aspects and Impacts Assessment
This document has been approved by the School Management System The only approved and controlled copy of this document is the one available electronically on the school’s network. Printing and distributing of this document is prohibited. Users must verify the Revision Number and Issue Date of the document before use.
Page 6 of 21
and Impacts Assessment.
4‐2 Department Heads/Project Managers:
4‐2‐1 Preparing specific EHS Aspects and Impacts Assessments for projects
under their responsibility as necessary.
4‐2‐2 Ensuring that necessary EHS control measures are implemented and
effective to control the identified EHS risks.
4‐2‐3 Ensuring appropriate training and communication to all concerned
employees within their areas of responsibility.
4‐2‐4 Communicating the status and results of the EHS Aspects and Impacts
Assessments to the EHS Management Representative.
4‐3 All Employees:
4‐3‐1 Implementing the control measures identified in the EHS Aspects and
Impacts Assessments as assigned to them and reporting on the
results to their supervisors.
4‐3‐2 Identifying and reporting any additional EHS hazards or risks to the
site/project management.
4‐4 Senior Management:
4‐4‐1 Provision of all necessary resources for the implementation of the EHS
Aspects and Impacts Assessments.
4‐4‐2 Review of the status and results of the EHS controls and measures to
ensure their effectiveness in handling the specified risks within the
EHS aspects and impacts.
Integrated Management System
Document ID
Revision No. 1
Issue Date 29-Sept-19
EHS Aspects and Impacts Assessment
This document has been approved by the School Management System The only approved and controlled copy of this document is the one available electronically on the school’s network. Printing and distributing of this document is prohibited. Users must verify the Revision Number and Issue Date of the document before use.
Page 7 of 21
5‐ PROCEDURES
5‐1 Introduction:
5‐1‐1 The procedure for carrying out a detailed EHS Aspects, Impacts and
Risk Assessment & Management involves the following key stages:
Risk Identification,
Risk Assessment, Risk Management (Elimination, Substitution, Control etc.).
Risk Recording
5‐1‐2 This procedure provides for a qualitative and/or quantitative
estimation of risk, based on an estimated exposure to a workplace
hazard or contaminant (or dose), and the likelihood that this will
give rise to an adverse affect (i.e. the “dose response”).
5‐1‐3 Hazard Identification and Risk Assessment involves a series of steps as
described in the upcoming sections.
5‐2 Risk Identification:
5‐2‐1 This step involves the identification of hazards and aspects in respect
to People, Environment, Assets and Reputation (PEAR), based upon
consideration of factors such as the physical and chemical properties
of the materials being handled, the arrangement of equipment and
tools, operating and maintenance procedures and service
delivery/processing conditions.
5‐2‐2 Hazard Identification Tools: Effective hazard identification requires
evaluating all possible hazard sources, including management
practices, equipment and materials, the physical work environment
and the workforce attitude and behavior. In order to identify all
associated hazards in the workplace during operations, the
following effective tools are appropriately followed:
5‐2‐2‐1 Conducting Job Hazard Analysis: This is a systematic method
of identifying associated hazards in every step of an activity
performed by the employees;
Integrated Management System
Document ID
Revision No. 1
Issue Date 29-Sept-19
EHS Aspects and Impacts Assessment
This document has been approved by the School Management System The only approved and controlled copy of this document is the one available electronically on the school’s network. Printing and distributing of this document is prohibited. Users must verify the Revision Number and Issue Date of the document before use.
Page 8 of 21
Standardize work practices by identifying and
specifying individual task steps. Establish a framework for evaluating adherence to
safe and efficient work practices Create hazard awareness by the continuing focus
on prevention Reduce the number of injuries, illnesses and
incidents Identify causes of incidents that occur
5‐2‐2‐2 Common Workplace Environmental Hazards: Environmental
Hazard is basically something with the potential to cause harm
to the environment or the employees and therefore can
Integrated Management System
Document ID
Revision No. 1
Issue Date 29-Sept-19
EHS Aspects and Impacts Assessment
This document has been approved by the School Management System The only approved and controlled copy of this document is the one available electronically on the school’s network. Printing and distributing of this document is prohibited. Users must verify the Revision Number and Issue Date of the document before use.
Page 9 of 21
range from physical hazards like dust or noise, to long term
hazards such as exposure to certain substances with adverse
effects overtime. Common workplace environmental
hazards include:
Physical hazards such as noise generated by equipment,
electricity from equipment, heat produced by equipment, Chemical hazards such as oils, grease, diesel and other
chemicals used during operation (i.e., transportation
services), noxious fumes from hot works, harmful dust
from pipes cutting and sand bags, etc. Radiation hazards from display screen equipment such
as computer monitors;
5‐3 Risk Assessment:
5‐3‐1 Risk assessment is the process of assessing all of the risks associated
with each of the hazards identified during the hazard identification
process. Risk assessment involves examining and evaluating the
probability and severity (or consequence) of the potential outcomes
in order to prioritize risks for control. In assessing the risks, three
essential steps are taken:
The probability or likelihood of an incident occurring is evaluated The severity of the potential consequences is calculated or estimated
Based on these two factors, the risks are assigned priority for risk control through the use of a risk rating
5‐3‐2 Step One: Probability: How likely it is that the hazard will result in an
incident? Probability also can be measured on a five point scale.
Assign a rating based on the likelihood that hazard will cause an
incident to occur. The Probability rating is presented in the following
table:
Integrated Management System
Document ID
Revision No. 1
Issue Date 29-Sept-19
EHS Aspects and Impacts Assessment
This document has been approved by the School Management System The only approved and controlled copy of this document is the one available electronically on the school’s network. Printing and distributing of this document is prohibited. Users must verify the Revision Number and Issue Date of the document before use.
Page 10 of 21
Description Probability Frequency Rating
Frequent
continuous or will happen 5
frequently
Often 5‐12 times per year 4
Likely 1‐5 times per year 3
Possible once every 2 years 2
Rare less than once every 5 years 1
5‐3‐3 Step Two: Severity (or Consequence): How serious the consequences
would be if the hazard caused an incident? Severity can be measured
on a five point scale, the higher the number, the more serious the
consequences. The table below describes the rating score and
classification process for each severity category:
Consequences Insignificant Minor Moderate Major Catastrophic
Rating 1 2 3 4 5
ENVIRONMENTAL
Land‐based Insignificant Minor impacts Significant Continuous and Long‐term and
ecosystem environmental on fauna/flora changes in serious damage significant
impact. and habitat, but flora/ fauna by erosion or to change in
Occasional no negative populations and flora or fauna. population (e.g.
damage by impacts on habitat. Major eradication of
erosion, or of ecosystem Disruption to, or disruption to, or endangered
flora and fauna. function. some death of, frequent death species) or
Some disruption Limited damage rare flora or of, rare flora or habitat with
to flora or fauna to a minimal fauna, but not fauna. Major negative impact
habitats. area of land of resulting in destruction of on ecosystem
no significant eradication of significant function.
value (i.e. no endangered habitat. Widespread
unique species. Non‐ destruction to a
habitats). persistent but significant area
Temporary possibly of land, rare
damage/ widespread flora and fauna
disruption (<1 damage to land: and/or
month) to flora damage that groundwater
or fauna can be resource.
habitats. remediated
without long‐
term loss;
localized
Integrated Management System
Document ID
Revision No. 1
Issue Date 29-Sept-19
EHS Aspects and Impacts Assessment
This document has been approved by the School Management System The only approved and controlled copy of this document is the one available electronically on the school’s network. Printing and distributing of this document is prohibited. Users must verify the Revision Number and Issue Date of the document before use.
Page 11 of 21
persistent
damage; or
significant
temporary
damage (<1
year) to
ecosystem.
Aquatic Occasional Minor impact Significant Significant Damage to an
ecosystem short‐term on aquatic localized widespread extensive impact and/or ecosystem, impacts but impact on portion of disruption to including flora, without longer‐ protected aquatic aquatic flora fauna and term impact on wildlife (e.g. ecosystem and fauna. habitat. No aquatic migratory resulting in significant ecosystems, shorebirds, severe impacts impact on water and/or short marine plants, on aquatic resources. term impacts on fish breeding populations and water grounds), or habitats and/or resources. aquatic long term ecosystems of impact on water moderate resources. duration.
Atmosphere/ Temporary Minor Creation of Major Catastrophic waste/other nuisance from environmental noise, odor, environmental environmental
noise, odor, impact due to dust, other impact due to impact due to dust, other air contained controlled/ uncontained uncontained emissions, release of uncontrolled air release, fire or release, fire or greenhouse pollutant emissions, explosion with explosion with gases, vibration, (including odor, greenhouse detrimental detrimental visual impact. dust and noise), gases, vibration, effects. Outside effects. Outside Minor use of fire or explosion and visual assistance assistance water, fuels and with no lasting impact at required. required. energy and detrimental significant Extensive other natural effects. No nuisance levels. chronic resources. outside Results in the discharge of Results in the assistance generation of persistent generation of required. significant hazardous significant Significant use quantities of pollutant. quantities of of water, fuels hazardous Results in the non‐hazardous and energy and wastes. generation of wastes. other natural Significant resources. quantities of intractable wastes.
Cultural Minor Minor Moderate Major damage Irreparable
heritage repairable repairable damage to to structures/ damage to damage to damage to structures/ items of cultural highly valued commonplace structures/ items of cultural significance, or structures/ structures. items of cultural significance, or major items/ locations
Integrated Management System
Document ID
Revision No. 1
Issue Date 29-Sept-19
EHS Aspects and Impacts Assessment
This document has been approved by the School Management System The only approved and controlled copy of this document is the one available electronically on the school’s network. Printing and distributing of this document is prohibited. Users must verify the Revision Number and Issue Date of the document before use.
Page 12 of 21
significance, or significant infringement of of cultural
minor infringement of cultural values/ significance or
infringements of cultural values/ Sacred sacred value.
cultural values. sacred locations.
locations.
HEALTH
Health Insignificant Minor Ongoing Major ongoing Extreme health
Effects impact on complaints or complaints from long term risk – potential
surrounding exposure during community. health effects for death in
communities. plant shutdown Significant likely to community.
or maintenance. emission or Surrounding
Maximum discharge that Communities
occurrence impacts on and workers.
limited to two surrounding
times per year. population.
SAFETY
Human Near miss Injuries Serious injuries Single fatality. Multiple
Health and incident or requiring onsite requiring off‐ fatalities.
Safety
trivial injuries, treatment by site treatment
which may medical by medical
require self practitioner. practitioner or
administered Personnel immediate
first aid. Injured unable to evacuation to
personnel can continue to hospital.
continue to perform duties. Potential long‐
perform normal term or
duties. permanently
disabling
effects.
PRODUCTION LOSS
Production Incident event Production loss Production loss Production loss Loss of licence
Loss without causing or delay up to or delay of one or delay for over to operate or
production loss. one week. week to one one month. ability to
month. produce
indefinitely.
FINANCIAL
Total cost of Financial loss Financial loss Financial loss Financial loss Severe financial
impacts or (compensation, (compensation, (compensation, (compensation, penalties or
incident
fines, cost to fines, cost to fines, cost to fines, cost to legal liabilities.
repair, plant repair, plant repair, plant repair, plant Financial loss
event
damage) of less damage) of damage) of damage) of (compensation,
than AED5,000. AED5,000 ‐ AED50,000 ‐ AED500,000 ‐ fines, cost to
AED50,000. AED500,000. AED10M. repair, plant
damage) of
greater than
AED10M.
Integrated Management System
Document ID
Revision No. 1
Issue Date 29-Sept-19
EHS Aspects and Impacts Assessment
This document has been approved by the School Management System The only approved and controlled copy of this document is the one available electronically on the school’s network. Printing and distributing of this document is prohibited. Users must verify the Revision Number and Issue Date of the document before use.
Page 13 of 21
5‐3‐4 Step Three: Risk Estimation: The level of risk is calculated by
multiplying the ratings of the Probability and Consequence, with a
final outcome in relative point scores, rather than actual risks. It
should be noted that risk estimations should be carried out assuming
a well‐managed processes under normal conditions. Risk scores do
not reflect the highest risks under adverse conditions/worst‐case
scenarios.
5‐3‐5 Step Four: Risk Evaluation:
5‐3‐5‐1 The relative risk score estimated as defined in Step Three
enables differentiation between those risks that are
significant, and those that are of a lesser nature. This allows
a better understanding of the least probable events with
high consequence against the highly probable low
consequence events. Having established the comparative
risk level applicable to individual impacts, it is possible to
rank those risks.
5‐3‐5‐2 Risks are classified into four categories: Extreme, High,
Moderate, and Low.
5‐3‐5‐3 The table below represents the Risk Assessment Matrix (RAM).
The risk matrix provides a method for initially quantifying risks
qualitatively (rated as Low, Moderate, High, or Extreme) and
semi‐quantitatively (with respect to assets lost figures). It is
therefore also used as a screening process so that effort can be
concentrated on the higher levels of risks.
Integrated Management System
Document ID
Revision No. 1
Issue Date 29-Sept-19
EHS Aspects and Impacts Assessment
This document has been approved by the School Management System The only approved and controlled copy of this document is the one available electronically on the school’s network. Printing and distributing of this document is prohibited. Users must verify the Revision Number and Issue Date of the document before use.
Page 14 of 21
5‐3‐5‐4 The Risk Matrix (RAM) is color‐coded as follows for ease of
use:
COLOUR RISK REQUIREMENT
RED Extreme Activity or industry should not proceed in current form
BEIGE
Activity or industry should be modified to include remedial
High planning and action and be subject to detailed EHS
Assessment
YELLOW
Moderate
Activity or industry can operate subject to management and /
or modification
GREEN Low No action required, unless escalation of risk is possible
Green – Acceptable Risks: Recognized and need to
be managed by procedures or safe systems of work
and reduced further where possible.
Yellow & Beige‐ Area of Concern and ALARP: Shall be
subject to further semi‐quantitative assessment using
other detailed risk assessment tools, e.g. ‘bow tie’ or
failure modes analyses. Risks in this area shall be subject
to an ALARP demonstration and may be reduced or
managed through design and management control.
Red – Unacceptable: Must be subject to a full,
quantified risk assessment, probably using a specialist
contractor, specific modeling and calculation techniques
and programs and recognized databases. These risks
shall preferably be eliminated but if this is not possible,
will be reduced by design, e.g.: Prevention / Control /
Mitigation / EER (Evacuation, Escape & Rescue).
Integrated Management System
Document ID
Revision No. 1
Issue Date 29-Sept-19
EHS Aspects and Impacts Assessment
This document has been approved by the School Management System The only approved and controlled copy of this document is the one available electronically on the school’s network. Printing and distributing of this document is prohibited. Users must verify the Revision Number and Issue Date of the document before use.
Page 15 of 21
Risk Assessment Matrix (RAM)
Probability
Consequence
Insignificant Minor Moderate Major Catastrophic
(1) (2) (3) (4) (5)
Rare (1) 1 2 3 4 5
Possible (2) 2 4 6 8 10
Likely (3) 3 6 9 12 15
Often (4) 3 8 12 16 20
Frequent (5) 5
10
15
20
25
Almost Certain
15‐25 Extreme Risk Activity or industry should not proceed in current form
8‐12
High Risk
Activity or industry should be modified to include remedial
planning and action and be subject to detailed EHS Assessment
4‐6
Moderate Activity or industry can operate subject to management and / or
Risk modification
1‐3 Low Risk No action required, unless escalation of risk is possible
Integrated Management System
Document ID
Revision No. 1
Issue Date 29-Sept-19
EHS Aspects and Impacts Assessment
This document has been approved by the School Management System The only approved and controlled copy of this document is the one available electronically on the school’s network. Printing and distributing of this document is prohibited. Users must verify the Revision Number and Issue Date of the document before use.
Page 16 of 21
5‐4 Risk Management and Control:
5‐4‐1 Risk Management:
Risk Management measures should follow the hierarchy presented in
the following table:
Order# Control Example
1 Eliminate Removing the hazardous piece of
equipment out of service.
Replacing a hazardous substance or
2 Substitute process with a less hazardous one, e.g.
substituting a hazardous substance with a
non‐hazardous substance.
3 Isolation Isolating the hazard from the person at
risk, e.g. using a guard or barrier.
4 Engineering Redesign a process or piece of equipment
to make it less hazardous.
Adopting safe work practices or providing
5 Administrative appropriate training, instruction or
information.
Personal
The use of personal protective equipment
could include using gloves, glasses,
6 Protective
earmuffs, aprons, safety footwear, and
Equipment
dust masks.
Elimination of the EHS hazard should always be the first choice,
followed by preventative measures, such as using inherently
environmentally‐friendly designs or adopting safe operating
procedures. Mitigation of consequences, e.g., by use of appropriate
PPE, should always be the last choice.
Integrated Management System
Document ID
Revision No. 1
Issue Date 29-Sept-19
EHS Aspects and Impacts Assessment
This document has been approved by the School Management System The only approved and controlled copy of this document is the one available electronically on the school’s network. Printing and distributing of this document is prohibited. Users must verify the Revision Number and Issue Date of the document before use.
Page 17 of 21
5‐4‐2 Risk Control:
5‐4‐2‐1 Risk control must be achieved using a predetermined
hierarchy of controls. The primary aim of risk control is
to eliminate the risk, the best way of achieving this being
to remove the hazard. If this is not possible the risk must
be minimized using one or more of the other control
options from the hierarchy.
5‐4‐2‐2 The risk control measure selected must be the highest
possible option in the hierarchy to minimize the risk to
the lowest level as reasonably practicable.
5‐4‐2‐3 Controlling hazards are critical to the success of reducing the
risk of EHS hazards in the workplace. Based on the risk
assessment, controls will need to be implemented to reduce
the risk to an acceptable level:
Risk Level Corrective Action Time Frame
Extreme Immediately
High 24 hours
Medium 14 days
Low 28 days
Negligible Not applicable
5‐4‐2‐4 At least one control method in the corrective action plan is
required to be implemented within the specified time
frame to reduce the risk to an acceptable level.
5‐4‐2‐5 Depending on the nature of the hazards, control measures
shall be identified and implemented (applicable to moderate
risk, high risk and extreme risk). The hierarchy of control
shall be as follows:
Elimination of the hazard (where possible);
Substitution (e.g. use a less hazardous substance
/ environmentally friendly materials); Engineering ‐ for plant and equipment (e.g.
exhaust ventilation);
Integrated Management System
Document ID
Revision No. 1
Issue Date 29-Sept-19
EHS Aspects and Impacts Assessment
This document has been approved by the School Management System The only approved and controlled copy of this document is the one available electronically on the school’s network. Printing and distributing of this document is prohibited. Users must verify the Revision Number and Issue Date of the document before use.
Page 18 of 21
Procedural (e.g. via improving work methods,
housekeeping); and Personal protective equipment (PPE) – it is the last resort
if the above measures are not practicable.
5‐5 Risk Recording:
5‐5‐1 EHS Aspects, Impacts and Risk Assessment results are recorded using
the Form (IMS‐10‐F01) associated with this procedure.
Documentation process should follow the steps presented in the
following sections.
5‐5‐2 Step 1: Initiating the Aspects/Impacts/Risk Assessment Process:
Determine the operation/project/task to be analyzed and the scope
of activities included in the EHS assessment, and the range of
operating environments to be considered. The scope of work should
also include a clear description of the geographical area in which the
operation/project/task is to take place.
5‐5‐3 Step 2: Breaking down the Operation/Project/Task:
Break down the operation/project/task into its basic steps,
describing what is to be done and in what sequence. If the Risk
Assessment is applied to an existing task, this information can often
be found in the present work procedure.
Each step description should clearly provide a statement of what is to be
done, without giving details on how it s done and by whom. Record the
steps on the EHS Aspects/Impacts/Risks Assessment Worksheet.
5‐5‐4 Step 3: Identifying Hazard Potential:
The most important activity in EHS Aspects/Impacts/Risks
Assessment is the identification of the hazard potential associated
with each of the individual aspects/steps. Examine each basic step for
hazards that could be present as a result of the task itself or of the
work environment.
5‐5‐5 Step 4: Identify Consequences:
Integrated Management System
Document ID
Revision No. 1
Issue Date 29-Sept-19
EHS Aspects and Impacts Assessment
This document has been approved by the School Management System The only approved and controlled copy of this document is the one available electronically on the school’s network. Printing and distributing of this document is prohibited. Users must verify the Revision Number and Issue Date of the document before use.
Page 19 of 21
Establish whether people, environment, assets or reputation can be
harmed.
The severity ratings shall be taken from the Risk Assessment Matrix
(RAM). Describe the consequences on the Risk Assessment Worksheet
(Form IMS‐10‐F01), and assign the associated Severity category under
S on the worksheet.
5‐5‐6 Step 5: Determine Risk:
Determine the risk associated with the process/job step being
analyzed. In order to estimate the risk, both the consequences and
probability of a hazard potential need to be reviewed. The
probability can be assigned for the specific consequences recorded in
the previous step.
5‐5‐7 Step 6: Identify Control Measures:
Use the RAM to determine whether the risk identified is “High”,
“Medium (ALARP)” or “Low”. For process steps that can be associated
with High and Medium risk, it is necessary to identify potential risk
reducing measures, and to assess the effectiveness of these “control
measures”.
5‐5‐8 Step 7: Determine Residual Risk:
Determine the risk level, assuming all of the control measure(s)
identified in Step 6 are in place, this is known as the Residual Risk.
The residual risk is estimated using the same principles as applied for
determining the initial risk, except that the control measures are
assumed to be implemented.
5‐5‐9 Step 8: Implement Control measures:
Once an appropriate control measure has been identified, it may be
necessary to assign an action in order to ensure implementation.
The action as well as the responsible party is recorded on the EHS
Aspects/Impacts/Risks Assessment Worksheet.
5‐5‐10 Step 9: Recording of Risk Assessment:
The completed Risk Assessment Worksheets should be accompanied
by a summary report, detailing as appropriate: The scope of work,
Integrated Management System
Document ID
Revision No. 1
Issue Date 29-Sept-19
EHS Aspects and Impacts Assessment
This document has been approved by the School Management System The only approved and controlled copy of this document is the one available electronically on the school’s network. Printing and distributing of this document is prohibited. Users must verify the Revision Number and Issue Date of the document before use.
Page 20 of 21
Venue and time of the Risk Assessment session(s), Position/
qualifications of team members, Assumptions made, Summary of
actions, and any Abbreviations used,
A copy of the summary should be available at the workplace for
use as a site reference.
5‐5‐11 Step 10: Review and Update of Assessment Results:
EHS Aspects/Impacts/Risks Assessments shall be reviewed and
approved by the IMS Management Representative or designate, and
shall be reviewed on continuous basis to ensure their suitability and
effectiveness, especially whenever a significant change has happened
on the scope or application of the assessment results.
Integrated Management System
Document ID
Revision No. 1
Issue Date 29-Sept-19
EHS Aspects and Impacts Assessment
This document has been approved by the School Management System The only approved and controlled copy of this document is the one available electronically on the school’s network. Printing and distributing of this document is prohibited. Users must verify the Revision Number and Issue Date of the document before use.
Page 21 of 21
6‐ RELATED FORMS AND DOCUMENTS
6‐1 Form (IMS‐10‐F01): EHS Aspects/Impacts/Risks Assessment Worksheet.
7‐ RECORDS
7‐1 All EHS Aspects/Impacts/Risks Assessment records and their supporting
documentation resulting from the implementation of this procedure shall
be maintained by the IMS MR for a minimum of three years.
8‐ REFERENCES
8‐1 ISO 14001:2004 Clause 4.3.1 and 4.4.6
8‐2 OHSAS 18001:2007 Clause 4.3.1 and 4.4.6