integrated power development scheme (ipds)125.19.4.227/whats_new_files/scada_ppt_24_jan_2017.pdf ·...
TRANSCRIPT
24 Jan 2017
Venue – Power Finance Corporation Ltd, New Delhi
URBANJYOTIABHIYAAN @URJA_India
INTEGRATED POWER DEVELOPMENT SCHEME (IPDS)
Review of SCADA /DMS Implementation
2
JAMMU
AMRITSAR JULUNDHUR
LUDHIANAUR
FARIDABADBIKANER
JODHPUR
AJMER
KOTA
DEHRADUN
SAHARANPURMEERUTGHAZIABAD
ALIGARH
MORADABAD
JHANSI
FIROZABAD
ALLAHBAD
GORAKHPUR
VARANASI
GWALIOR
JABALPURAHMEDABAD
BARODASURAT
INDORERAJKOTJAMNAGAR
BHAVNAGAR
G.MUMBAI BHIWANDI
PUNESOLAPUR
NASHIK
GULBARGA
KOCHI
KOZIKHODE
MADURAI
TIRNEVELI
TRICHIRAPAL
LI
SALEM
COIMBATORE
malegaon
SANGLI
KOLHAPURI
CC installed
CC to be installed
Completed
Targetted for commsng in FY
Targetted for completion in FY
Form and groom proper SCADA team for Control centre
and field activities.
Expedite award /installation of SCADA enablers RMU,
Sectionlizer, FPIs and keep Substation SCADA ready.
Provide locational details of SCADA enablers .
Do & expedite progressive end to end testing for RTU /
FRTU and ensure timely and progressive payments as per
milestones for proper cash flow.
Facilitate GIS based DMS data to SIA . In case of problem
in GIS data from ITIA, DMS network with single line
diagram may be drawn & populated for DMS functions.
Get feeder and town-wise daily SAIFI/ SAIDI Reports
generated from SCADA
Common Advisories for DISCOM’s
3
Ensure proper connectivity of network with NBSP
Provide secured login to view SCADA from webclient
link from DISCOM website, if utility agrees
Wherever 3 G is not avlb, 2g connecitiy for FRTU may
be considered till the time it is upgraded
Outage for commissioning shall be provided
Operationalization for completion for commissioned
RTU/FRTU shall be exercised from Control Centre by
deployment of manpower (States such as TN &
Maharashtra have led the way)
Common Advisories for DISCOM’s
4
Timely preparation of Factory Acceptance Test (FAT)
including testing of DMS functionality to enable
commissioning of SCADA/DMS control centre.
Restrain practice of change in make/models of equipment.
The same shall only be permitted as per provisions of Model
Technical Specification (MTS).
Immediate installation of RTU and FRTUs at all available
sites.
In case of problem in GIS data from ITIA, DMS network with
single line diagram may be drawn & populated for DMS
functions.
Readiness of Dispatcher training simulator and
commencement of training of officials
Common Advisories for SIA’s
5
SCADA CC Commissioning (Balance 4 – Achieved - 2)
• 2 Kerala (Kozikhode, Kochi)
• 2 Chattisgarh (Durg-Bhilai , Raipur)
Target by Mar 31,2017
6
(Achieved 5, Balance 26)
0 1 2 3 4 5 6 7
ASSAM
AP-SPDCL
GUJ- MGVCL
GUJ-PGVCL
MAHARASTRA
MP -WEST
MP CENTRAL
PUNJAB
RAJASTHAN- JODHPUR
RAJASTHAN -AJMER
TAMILNADU
TELANGANA -NORTH
UTTARAKHAND
WEST BENGAL
2
3
13
13
4111
21
411
2
SCADA Completion for operationalization
COMPLETED TARGET IN FY
Target by Mar 31,2017
7
STATE-WISE REVIEW
8
SCADA /IMPLEMENTATION UNDER APDRP–West Bengal
SANC DATE : October’2011, Completion by Mar 17 AWARD DATE : Sep. 2012 (Chemtrols)
One Town SANC Cost : Rs 21.82 Cr Disb : Rs 12.75 Released to SIA : Rs 6.19
Part-A (SCADA) town – Guwahati
ASSAM – Guwahati
0
5
10
15
20
25
30
35
40 36
29
26
13
RTU Progress
S/S RTU INSTALLED
LINK AVALAIBILITY RTU E TOT E
0
10
20
30
40
50
60
70 62
50
3 3
FRTU Progress
RMU+SECT FRTU INSTALLATION
LINK AVALAIBILITY FRTU E TO E
9
5 Sub-Stations not constructed
4 sites are having new panel issue
10 sites are compact substation where (ABB-2,Schneider-7) make equipments were installedwhich needs to be integrate with RTU
In Big Bazaar S/s , FRTU will be installed inplace of RTU
RTU at 3 locations is under testing
GIS integration for DMS implementation
I/O List finalization for A/R , Sect
ASSAM – Guwahati Issues
10
SCADA IMPL UNDER APDRP–TSNPDCL , TELANGANA
SANC DATE : 27.09.2013
Completion by Sep 16 ( Requested upto 31 Mar 17 )
AWARD DATE : LOA Dt: 07-01-14,
Agt.Dt: 08-07-14 (Awarded to M/s.Chemtrols)
1 Town SANC Cost : Rs 9.75Cr :Award 10.04 Cr Disbursement : Rs 2.93 Cr, Released to SIA : Rs 5.57
Cr
Part-A (SCADA) towns – 1 (Visakhapatnam)
APEPDCL- Visakhapatnam
0
5
10
15
20
25
3028 28
0 0
RTU Progress
S/S RTU INSTALLED
LINK AVALAIBILITY RTU E TOT E
0
20
40
60
80
100
120
140
160 145
53
0 0
FRTU Progress
RMU+SECT FRTU INSTALLATION
LINK AVALAIBILITY FRTU E TO E
11
FO switch is pending at S/S
Interim solution - using SIM instead of MPLSis being exercised till establishment
NBSP, M/s Bharti Airtel has to extend theconnectivity for 28 Substations by 15.12.16.not done so far
DCPS approved but on hold
APEPDCL – Visakhapatnam Issues
12
SANC DATE : 22.02.2011 Completion by Mar’17 AWARD DATE : 21.01.13 (CHEMTROLS LTD)
3 Towns SANC Cost : Rs 39.19 Crs Disb : Rs 11.76 Crs Released to SIA : Rs 15Cr
Part-A (SCADA) towns – 3 ( Vijayawada, Guntur & Nellore)
APSPDCL - Vijayawada
0
5
10
15
20
25 23 23
4
9
RTU Progress
S/S RTU INSTALLED
LINK AVALAIBILITY RTU E TOT E
0
10
20
30
40
50
60
70
80
90
100
100
2 2 2
FRTU Progress
RMU+SECT FRTU INSTALLATION
LINK AVALAIBILITY FRTU E TO E
13
SCADA /DMS IMPLEMENTATION –
SANC DATE : 22.02.2011 Completion by Mar’17 AWARD DATE : 21.01.13 (CHEMTROLS LTD)
3 Towns SANC Cost : Rs 39.19 Crs Disb : Rs 11.76 Crs Released to SIA : Rs 15Cr
Part-A (SCADA) towns – 3 ( Vijayawada, Guntur & Nellore)
APSPDCL - Guntur
0
5
10
15
20
25
21 21
0 0
RTU Progress
S/S RTU INSTALLED
LINK AVALAIBILITY RTU E TOT E
0
10
20
30
40
50
60
70
80
90
100
100
2 2 2
FRTU Progress
RMU+SECT FRTU INSTALLATION
LINK AVALAIBILITY FRTU E TO E
14
SANC DATE : 22.02.2011 Completion by Mar’17 AWARD DATE : 21.01.13 (CHEMTROLS LTD)
3 Towns SANC Cost : Rs 39.19 Crs Disb : Rs 11.76 Crs Released to SIA : Rs 15Cr
Part-A (SCADA) towns – 3 ( Vijayawada, Guntur & Nellore)
APSPDCL - Nellore
0
2
4
6
8
10
12
1413 13
0 0
RTU Progress
S/S RTU INSTALLED
LINK AVALAIBILITY RTU E TOT E
0
5
10
15
20
25
30
35
40
45
50
50
2 2 2
FRTU Progress
RMU+SECT FRTU INSTALLATION
LINK AVALAIBILITY FRTU E TO E
15
Interim solution - using SIM instead of MPLSis being exercised till establishment
NBSP , M/s Bharti Airtel has to extend theconnectivity for 28 Substations by 15.12.16.Not done
DCPS approved and FAT will be staged on 31Jan
APSPDCL- Issues
16
SCADA /IMPLEMENTATION UNDER APDRP–West Bengal
SCADA /DMS IMPLEMENTATION –
SCADA IMPL UNDER APDRP–TSNPDCL , TELANGANA
SANC DATE : 22.02.2011 Completion by Dec 16 AWARD DATE : 20.12.2012
1 Towns SANC Cost : Rs 12.47 Crs. Disb : Rs 3.74 Crs, SIA Payment :2.33 Cr
Part-A (SCADA) towns – 1 (Warangal)
Telangana- North - Warangal
0
2
4
6
8
10
12
14
16
18
18 1817
18
RTU Progress
S/S RTU INSTALLED
LINK AVALAIBILITY RTU E TOT E
0
10
20
30
40
50
60
70
80
90
100
0 0 0 0
FRTU Progress
RMU+SECT FRTU INSTALLATION
LINK AVALAIBILITY FRTU E TO E
17
RMU to be installed
DCPS approved and FAT will be staged on 31Jan
Telangana- North – Warangal Issues
18
SANC DATE : 30.06.2011 Completion by Dec 16 AWARD DATE : 17.11.2012 (M/s. Chemtrols )
1 Town Sanction : Rs 65.15 Crs Disb : Rs 19.55 Crs, SIA Payment : 4.44 Cr
Part-A (SCADA) towns – 1 (Hyderabad UA)
Telangana- South - Hyderabad
0
50
100
150
200
250 228
175
7450
RTU Progress
S/S RTU INSTALLED
LINK AVALAIBILITY RTU E TOT E
0
100
200
300
400
500
600
700
800
900
1000 917
0 0 0
FRTU Progress
RMU+SECT FRTU INSTALLATION
LINK AVALAIBILITY FRTU E TO E
19
RTU/ FRTU and modem to be expedited
DCPS approved but on hold
Telangana- South – Hyderabad Issues
20
SCADA IMPL UNDER APDRP–TSNPDCL , TELANGANA
SANC DATE : Dec 2010 Completion by DEC16 AWARD DATE : Feb-Apr2013 (Chemtrol)
6 Towns SANC Cost : Rs 138.51Crs Disb : Rs 41.55 Crs
Part-A (SCADA) towns – 6 (Ahmedabad, Baroda, Bhavnagar, Jamnagar, Rajkot, Surat)
Gujarat- UGVCL -Ahmedabad
0
2
4
6
8
10
12
14
16
18
2019
18
4 4
RTU Progress
S/S RTU INSTALLED
LINK AVALAIBILITY RTU E TOT E
0
100
200
300
400
500
600
700 631
510 0
FRTU Progress
RMU+SECT FRTU INSTALLATION
LINK AVALAIBILITY FRTU E TO E
21
Utility to provide to provide shutdown forRTU/ FRTU
Permission for installation of tower fromGETCO not provided
Gujarat -UGVCL–Ahmedabad Issues
22
SCADA IMPL UNDER APDRP–TSNPDCL , TELANGANA
SANC DATE : Dec 2010 Completion by DEC16 AWARD DATE : Feb-Apr2013 (Chemtrol)
6 Towns SANC Cost : Rs 138.51Crs Disb : Rs 41.55 Crs
Part-A (SCADA) towns – 6 (Ahmedabad, Baroda, Bhavnagar, Jamnagar, Rajkot, Surat)
Gujarat- MGVCL -Vadodara
0
2
4
6
8
10
12
14
16
18
18 18 18
4
RTU Progress
S/S RTU INSTALLED
LINK AVALAIBILITY RTU E TOT E
0
100
200
300
400
500
600
700 614
235
0 0
FRTU Progress
RMU+SECT FRTU INSTALLATION
LINK AVALAIBILITY FRTU E TO E
23
3G SIM from RCOMM shall be available
RTU /FRTU to be completed
Gujarat- MGVCL –Vadodara - Issues
24
SCADA IMPL UNDER APDRP–TSNPDCL , TELANGANA
SANC DATE : Dec 2010 Completion by DEC16 AWARD DATE : Feb-Apr2013 (Chemtrol)
6 Towns SANC Cost : Rs 138.51Crs Disb : Rs 41.55 Crs
Part-A (SCADA) towns – 6 (Ahmedabad, Baroda, Bhavnagar, Jamnagar, Rajkot, Surat)
Gujarat- PGVCL - Rajkot
0
2
4
6
8
10
12
14
1615 15
21
RTU Progress
S/S RTU INSTALLED
LINK AVALAIBILITY RTU E TOT E
0
100
200
300
400
500
600
584
0 0 0
FRTU Progress
RMU+SECT FRTU INSTALLATION
LINK AVALAIBILITY FRTU E TO E
25
SCADA IMPL UNDER APDRP–TSNPDCL , TELANGANA
SANC DATE : Dec 2010 Completion by DEC16 AWARD DATE : Feb-Apr2013 (Chemtrol)
6 Towns SANC Cost : Rs 138.51Crs Disb : Rs 41.55 Crs
Part-A (SCADA) towns – 6 (Ahmedabad, Baroda, Bhavnagar, Jamnagar, Rajkot, Surat)
Gujarat- PGVCL - Bhavnagar
0
1
2
3
4
5
6
7
8
9
9 9
1
0
RTU Progress
S/S RTU INSTALLED
LINK AVALAIBILITY RTU E TOT E
0
50
100
150
200
250
300
350
400373
0
54
0
FRTU Progress
RMU+SECT FRTU INSTALLATION
LINK AVALAIBILITY FRTU E TO E
26
SCADA IMPL UNDER APDRP–TSNPDCL , TELANGANA
SANC DATE : Dec 2010 Completion by DEC16 AWARD DATE : Feb-Apr2013 (Chemtrol)
6 Towns SANC Cost : Rs 138.51Crs Disb : Rs 41.55 Crs
Part-A (SCADA) towns – 6 (Ahmedabad, Baroda, Bhavnagar, Jamnagar, Rajkot, Surat)
0
1
2
3
4
5
6
7
8
8
7
1
0
RTU Progress
S/S RTU INSTALLED
LINK AVALAIBILITY RTU E TOT E
0
50
100
150
200
250
300
350
343
0 0 0
FRTU Progress
RMU+SECT FRTU INSTALLATION
LINK AVALAIBILITY FRTU E TO E
Gujarat- PGVCL - Jamnagar
27
Utility to provide to provide shutdown forRTU/ FRTU
Permission for installation of tower fromGETCO not provided
FRTU Installation is lagging
Gujarat- PGVCL - Issues
28
SCADA IMPL UNDER APDRP–TSNPDCL , TELANGANA
SANC DATE : Dec 2010 Completion by DEC16 AWARD DATE : Feb-Apr2013 (Chemtrol)
6 Towns SANC Cost : Rs 138.51Crs Disb : Rs 41.55 Crs
Part-A (SCADA) towns – 6 (Ahmedabad, Baroda, Bhavnagar, Jamnagar, Rajkot, Surat)
Gujarat- DGVCL - Surat
0
5
10
15
20
25
24 23
0 0
RTU Progress
S/S RTU INSTALLED
LINK AVALAIBILITY RTU E TOT E
0
50
100
150
200
250
300 276
0 0 0
FRTU Progress
RMU+SECT FRTU INSTALLATION
LINK AVALAIBILITY FRTU E TO E
29
Utility to provide to provide shutdown forRTU/ FRTU
Permission for installation of tower fromGETCO not provided
RTU/FRTU installation to be expedited
Gujarat- DGVCL – Surat Issues
30
SCADA /IMPLEMENTATION UNDER APDRP–West Bengal
SANC DATE : October’2011, Completion Oct 16 AWARD DATE : February’2013 [Chemtrols]
3 Towns SANC Cost : Rs 32.94 Crs Disb : Rs 9.88 Crs, SIA payment : Rs 7.58 Cr
Part-A (SCADA) towns – 3 (Kolkata, Asansol, Siliguri)
West Bengal- Kolkata
0
5
10
15
20
25
30
35
40
45
45
24
40
0
RTU Progress
S/S RTU INSTALLED
LINK AVALAIBILITY RTU E TOT E
0
10
20
30
40
50
60
70
69
43
69
0
FRTU Progress
RMU+SECT FRTU INSTALLATION
LINK AVALAIBILITY FRTU E TO E
31
SCADA /IMPLEMENTATION UNDER APDRP–West Bengal
SANC DATE : October’2011, Completion Oct 16 AWARD DATE : February’2013 [Chemtrols]
3 Towns SANC Cost : Rs 32.94 Crs Disb : Rs 9.88 Crs, SIA payment : Rs 7.58 Cr
Part-A (SCADA) towns – 3 (Kolkata, Asansol, Siliguri)
West Bengal- Asansol
0
1
2
3
4
5
6
6
5 5
0
RTU Progress
S/S RTU INSTALLED
LINK AVALAIBILITY RTU E TOT E
32
SCADA /IMPLEMENTATION UNDER APDRP–West Bengal
SANC DATE : October’2011, Completion Oct 16 AWARD DATE : February’2013 [Chemtrols]
3 Towns SANC Cost : Rs 32.94 Crs Disb : Rs 9.88 Crs, SIA payment : Rs 7.58 Cr
Part-A (SCADA) towns – 3 (Kolkata, Asansol, Siliguri)
West Bengal- Siliguri
0
1
2
3
4
5
6
7
8
8 8 8
1
RTU Progress
S/S RTU INSTALLED
LINK AVALAIBILITY RTU E TOT E
33
Utility Team to conduct concurrent testing atsites and towns required
DCPS , Modem dispatch is in progress
West Bengal – Issues
34
SCADA /IMPLEMENTATION UNDER APDRP–West Bengal SCADA IMPL UNDER APDRP–TSNPDCL , TELANGANA
SANC DATE : December 2010 Completion by Dec 16
7 Towns SANC Cost : Rs 182.17 Crores
Part-A (SCADA) towns – 7 ( Chennai, Trichy, Madurai, Tirunelvelli, Salem, Tiruppur, Coimbatore)
TamilNadu - Chennai
0
20
40
60
80
100
120
140
160
180
200 183
156 156
125
RTU Progress
S/S RTU INSTALLED
LINK AVALAIBILITY RTU E TOT E
0
200
400
600
800
1000
1200
1400
1600
1800
2000
1905
1657
1905
1283
FRTU Progress
RMU+SECT FRTU INSTALLATION
LINK AVALAIBILITY FRTU E TO E
35
SCADA /IMPLEMENTATION UNDER APDRP–West Bengal SCADA IMPL UNDER APDRP–TSNPDCL , TELANGANA
SANC DATE : December 2010 Completion by Dec 16
7 Towns SANC Cost : Rs 182.17 Crores
Part-A (SCADA) towns – 7 ( Chennai, Trichy, Madurai, Tirunelvelli, Salem, Tiruppur, Coimbatore)
TamilNadu - Salem
0
1
2
3
4
5
6
6 6 6 6
RTU Progress
S/S RTU INSTALLED
LINK AVALAIBILITY RTU E TOT E
0
50
100
150
200
250
300
350
334
184
334
106
FRTU Progress
RMU+SECT FRTU INSTALLATION
LINK AVALAIBILITY FRTU E TO E
36
SCADA /IMPLEMENTATION UNDER APDRP–West Bengal SCADA IMPL UNDER APDRP–TSNPDCL , TELANGANA
SANC DATE : December 2010 Completion by Dec 16
7 Towns SANC Cost : Rs 182.17 Crores
Part-A (SCADA) towns – 7 ( Chennai, Trichy, Madurai, Tirunelvelli, Salem, Tiruppur, Coimbatore)
TamilNadu - Tirupur
0
2
4
6
8
10
12
12 12 12 12
RTU Progress
S/S RTU INSTALLED
LINK AVALAIBILITY RTU E TOT E
0
50
100
150
200
250
300
350
400369
233
119
0
FRTU Progress
RMU+SECT FRTU INSTALLATION
LINK AVALAIBILITY FRTU E TO E
37
SCADA /IMPLEMENTATION UNDER APDRP–West Bengal SCADA IMPL UNDER APDRP–TSNPDCL , TELANGANA
SANC DATE : December 2010 Completion by Dec 16
7 Towns SANC Cost : Rs 182.17 Crores
Part-A (SCADA) towns – 7 ( Chennai, Trichy, Madurai, Tirunelvelli, Salem, Tiruppur, Coimbatore)
TamilNadu - Coimbatore
0
5
10
15
20
25 23 23 23 23
RTU Progress
S/S RTU INSTALLED
LINK AVALAIBILITY RTU E TOT E
0
100
200
300
400
500
600
700
800
799
429
799
0
FRTU Progress
RMU+SECT FRTU INSTALLATION
LINK AVALAIBILITY FRTU E TO E
38
FRTU Commissioning in balance 4 towns andRTU Commissioning in Chennai to beexpedited
TamilNadu - Issues
39
SCADA /IMPLEMENTATION UNDER APDRP–West Bengal SCADA IMPL UNDER APDRP–TSNPDCL , TELANGANA
SANC DATE : MAR 10( 3) & JUN 10 (2)
Completion Dec 16 - Jan 17
AWARD DATE : AUG 2012 (DONGFANG)
5 Towns SANC Cost : Rs 151Crs Disb : Rs 45 Crs
Part-A (SCADA) towns – 5 (Jaipur, Kota , Ajmer, Jodhpur, Bikaner)
Rajasthan – JVVNL - Jaipur
0
20
40
60
80
100
120 105
51
83
51
RTU Progress
S/S RTU INSTALLED
LINK AVALAIBILITY RTU E TOT E
0
200
400
600
800
1000
1200
1400
16001517
5 5 5
FRTU Progress
RMU+SECT FRTU INSTALLATION
LINK AVALAIBILITY FRTU E TO E
40
SCADA /IMPLEMENTATION UNDER APDRP–West Bengal SCADA IMPL UNDER APDRP–TSNPDCL , TELANGANA
SANC DATE : MAR 10( 3) & JUN 10 (2)
Completion Dec 16 - Jan 17
AWARD DATE : AUG 2012 (DONGFANG)
5 Towns SANC Cost : Rs 151Crs Disb : Rs 45 Crs
Part-A (SCADA) towns – 5 (Jaipur, Kota , Ajmer, Jodhpur, Bikaner)
Rajasthan – JVVNL - Kota
0
5
10
15
20
25
30
29
1215
12
RTU Progress
S/S RTU INSTALLED
LINK AVALAIBILITY RTU E TOT E
0
100
200
300
400
500
600
700
700
0 0 0
FRTU Progress
RMU+SECT FRTU INSTALLATION
LINK AVALAIBILITY FRTU E TO E
41
SCADA /IMPLEMENTATION UNDER APDRP–West Bengal SCADA IMPL UNDER APDRP–TSNPDCL , TELANGANA
SANC DATE : MAR 10( 3) & JUN 10 (2)
Completion Dec 16 - Jan 17
AWARD DATE : AUG 2012 (DONGFANG)
5 Towns SANC Cost : Rs 151Crs Disb : Rs 45 Crs
Part-A (SCADA) towns – 5 (Jaipur, Kota , Ajmer, Jodhpur, Bikaner)
Rajasthan – AVVNL - Ajmer
0
5
10
15
20
25
21
16 16 16
RTU Progress
S/S RTU INSTALLED
LINK AVALAIBILITY RTU E TOT E
0
20
40
60
80
100
120
118
0 0 0
FRTU Progress
RMU+SECT FRTU INSTALLATION
LINK AVALAIBILITY FRTU E TO E
42
SCADA /IMPLEMENTATION UNDER APDRP–West Bengal SCADA IMPL UNDER APDRP–TSNPDCL , TELANGANA
SANC DATE : MAR 10( 3) & JUN 10 (2)
Completion Dec 16 - Jan 17
AWARD DATE : AUG 2012 (DONGFANG)
5 Towns SANC Cost : Rs 151Crs Disb : Rs 45 Crs
Part-A (SCADA) towns – 5 (Jaipur, Kota , Ajmer, Jodhpur, Bikaner)
Rajasthan – JdVVNL - Bikaner
0
5
10
15
20
25
30
35
40 36 35 35 35
RTU Progress
S/S RTU INSTALLED
LINK AVALAIBILITY RTU E TOT E
0
20
40
60
80
100
120
116
0 0 0
FRTU Progress
RMU+SECT FRTU INSTALLATION
LINK AVALAIBILITY FRTU E TO E
43
SCADA /IMPLEMENTATION UNDER APDRP–West Bengal SCADA IMPL UNDER APDRP–TSNPDCL , TELANGANA
SANC DATE : MAR 10( 3) & JUN 10 (2)
Completion Dec 16 - Jan 17
AWARD DATE : AUG 2012 (DONGFANG)
5 Towns SANC Cost : Rs 151Crs Disb : Rs 45 Crs
Part-A (SCADA) towns – 5 (Jaipur, Kota , Ajmer, Jodhpur, Bikaner)
Rajasthan – JdVVNL - Jodhpur
40
42
44
46
48
50
52
5453
47 47
45
RTU Progress
S/S RTU INSTALLED
LINK AVALAIBILITY RTU E TOT E
0
20
40
60
80
100
120
140
160148
0 0 0
FRTU Progress
RMU+SECT FRTU INSTALLATION
LINK AVALAIBILITY FRTU E TO E
44
FRTU installation to be expedited by SIA DISCOM to make progressive milestone
payment for end to end test
Rajasthan – Issues
45
SCADA /IMPLEMENTATION UNDER APDRP–West Bengal SCADA IMPL UNDER APDRP–TSNPDCL , TELANGANA
SANC DATE : MAR & JUN 2011 AWARD DATE : Dec’2011 (DONGFANG)
5 Towns SANC Cost : Rs 103Crs Disb : Rs 31 Crs
Part-A (SCADA) towns – 5 (Bhopal, Gwalior, Jabalpur, Indore & Ujjain)
Madhya Pradesh – Bhopal
0
10
20
30
40
50
60
70 63 63
3731
RTU Progress
S/S RTU INSTALLED
LINK AVALAIBILITY RTU E TOT E
46
SCADA /IMPLEMENTATION UNDER APDRP–West Bengal SCADA IMPL UNDER APDRP–TSNPDCL , TELANGANA
SANC DATE : MAR & JUN 2011 AWARD DATE : Dec’2011 (DONGFANG)
5 Towns SANC Cost : Rs 103Crs Disb : Rs 31 Crs
Part-A (SCADA) towns – 5 (Bhopal, Gwalior, Jabalpur, Indore & Ujjain)
Madhya Pradesh – Gwalior
0
5
10
15
20
25
30
35
40
45
50 4643
40
3
RTU Progress
S/S RTU INSTALLED
LINK AVALAIBILITY RTU E TOT E
47
SCADA /IMPLEMENTATION UNDER APDRP–West Bengal SCADA IMPL UNDER APDRP–TSNPDCL , TELANGANA
SANC DATE : MAR & JUN 2011 AWARD DATE : Dec’2011 (DONGFANG)
5 Towns SANC Cost : Rs 103Crs Disb : Rs 31 Crs
Part-A (SCADA) towns – 5 (Bhopal, Gwalior, Jabalpur, Indore & Ujjain)
Madhya Pradesh – Indore
0
10
20
30
40
50
60
70
80 72 72 72 72
RTU Progress
S/S RTU INSTALLED
LINK AVALAIBILITY RTU E TOT E
48
SCADA /IMPLEMENTATION UNDER APDRP–West Bengal SCADA IMPL UNDER APDRP–TSNPDCL , TELANGANA
SANC DATE : MAR & JUN 2011 AWARD DATE : Dec’2011 (DONGFANG)
5 Towns SANC Cost : Rs 103Crs Disb : Rs 31 Crs
Part-A (SCADA) towns – 5 (Bhopal, Gwalior, Jabalpur, Indore & Ujjain)
Madhya Pradesh – Ujjain
0
5
10
15
20
25
21 21 21 21
RTU Progress
S/S RTU INSTALLED
LINK AVALAIBILITY RTU E TOT E
49
SCADA /IMPLEMENTATION UNDER APDRP–West Bengal SCADA IMPL UNDER APDRP–TSNPDCL , TELANGANA
SANC DATE : MAR & JUN 2011 AWARD DATE : Dec’2011 (DONGFANG)
5 Towns SANC Cost : Rs 103Crs Disb : Rs 31 Crs
Part-A (SCADA) towns – 5 (Bhopal, Gwalior, Jabalpur, Indore & Ujjain)
Madhya Pradesh – Jabalpur
0
5
10
15
20
25
30
35
40
3937
31
0
RTU Progress
S/S RTU INSTALLED
LINK AVALAIBILITY RTU E TOT E
50
Acute Delay in installation of enablers(Actual Sanction incld Enablers)
DMS data and locational details to beprovided
Madhya Pradesh – Issues
51
SCADA /IMPLEMENTATION UNDER APDRP–West Bengal SCADA IMPL UNDER APDRP–TSNPDCL , TELANGANA
SANC DATE : Aug 2012 Completion by Sept 16 AWARD DATE : DEC 2012 (M/s. SCHNEIDER)
1 Town SANC Cost : Rs 22.02 Crs Disb : Rs 6.61Crs
Part-A (SCADA) towns – 1 (Patna)
Bihar– Patna
0
10
20
30
40
50
60
5146
1 0
RTU Progress
S/S RTU INSTALLED
LINK AVALAIBILITY RTU E TOT E
0
50
100
150
200
250
300
350 305289
1 0
FRTU Progress
RMU+SECT FRTU INSTALLATION
LINK AVALAIBILITY FRTU E TO E
52
RTU /FRTU End to End test to be expedited
GIS integration to be done
Bihar– Patna - Issues
53
SANC DATE : June-2011 -8 towns
Completion by Dec 2016 (Mar’17 requested )
AWARD DATE : DEC -2011 (SIEMENS)
8 Towns SANC Cost : Rs 116.57Crs Disb : Rs 48.48 CrsPart-A (SCADA) towns – 8 (Amravati, Solapur, Sangli, Malegaon, Greater Mumbai, Pune, Nashik and Kolhapur)
Maharashtra - Solapur
0
2
4
6
8
10
12
14
1615
13
8 8
RTU Progress
S/S RTU INSTALLED
LINK AVALAIBILITY RTU E TOT E
0
20
40
60
80
100
120
140
160
180
200
191 191 191 191
FRTU Progress
RMU+SECT FRTU INSTALLATION
LINK AVALAIBILITY FRTU E TO E
54
SANC DATE : June-2011 -8 towns
Completion by Dec 2016 (Mar’17 requested )
AWARD DATE : DEC -2011 (SIEMENS)
8 Towns SANC Cost : Rs 116.57Crs Disb : Rs 48.48 CrsPart-A (SCADA) towns – 8 (Amravati, Solapur, Sangli, Malegaon, Greater Mumbai, Pune, Nashik and Kolhapur)
Maharashtra - Sangli
0
2
4
6
8
10
12
14
16
18
18 18
8 8
RTU Progress
S/S RTU INSTALLED
LINK AVALAIBILITY RTU E TOT E
0
20
40
60
80
100
120
140
160
153 152 152 152
FRTU Progress
RMU+SECT FRTU INSTALLATION
LINK AVALAIBILITY FRTU E TO E
55
SANC DATE : June-2011 -8 towns
Completion by Dec 2016 (Mar’17 requested )
AWARD DATE : DEC -2011 (SIEMENS)
8 Towns SANC Cost : Rs 116.57Crs Disb : Rs 48.48 CrsPart-A (SCADA) towns – 8 (Amravati, Solapur, Sangli, Malegaon, Greater Mumbai, Pune, Nashik and Kolhapur)
Maharashtra – Greater Mumbai
0
10
20
30
40
50
60
70
80
80
71
6
17
RTU Progress
S/S RTU INSTALLED
LINK AVALAIBILITY RTU E TOT E
0
200
400
600
800
1000
12001025
877
419 419
FRTU Progress
RMU+SECT FRTU INSTALLATION
LINK AVALAIBILITY FRTU E TO E
56
SANC DATE : June-2011 -8 towns
Completion by Dec 2016 (Mar’17 requested )
AWARD DATE : DEC -2011 (SIEMENS)
8 Towns SANC Cost : Rs 116.57Crs Disb : Rs 48.48 CrsPart-A (SCADA) towns – 8 (Amravati, Solapur, Sangli, Malegaon, Greater Mumbai, Pune, Nashik and Kolhapur)
Maharashtra - Pune
0
10
20
30
40
50
60
70
80
90 83
64
2 0
RTU Progress
S/S RTU INSTALLED
LINK AVALAIBILITY RTU E TOT E
57
SANC DATE : June-2011 -8 towns
Completion by Dec 2016 (Mar’17 requested )
AWARD DATE : DEC -2011 (SIEMENS)
8 Towns SANC Cost : Rs 116.57Crs Disb : Rs 48.48 CrsPart-A (SCADA) towns – 8 (Amravati, Solapur, Sangli, Malegaon, Greater Mumbai, Pune, Nashik and Kolhapur)
Maharashtra - Nashik
0
5
10
15
20
25
30
35
34
28
22
0
RTU Progress
S/S RTU INSTALLED
LINK AVALAIBILITY RTU E TOT E
58
SANC DATE : June-2011 -8 towns
Completion by Dec 2016 (Mar’17 requested )
AWARD DATE : DEC -2011 (SIEMENS)
8 Towns SANC Cost : Rs 116.57Crs Disb : Rs 48.48 CrsPart-A (SCADA) towns – 8 (Amravati, Solapur, Sangli, Malegaon, Greater Mumbai, Pune, Nashik and Kolhapur)
Maharashtra - Kolhapur
0
2
4
6
8
10
12
14
16
16 16
5
2
RTU Progress
S/S RTU INSTALLED
LINK AVALAIBILITY RTU E TOT E
59
R-COMM /BSNL to deliver links
Maharashtra - Issues
60
SANC DATE : November 2011 Completion by Aug.16 AWARD DATE : Feb. 2015 (Siemens)
3 Towns SANC Cost : Rs 52.36 Crs Disb : Rs .15.71 Crs
Part-A (SCADA) towns – 3 (Amritsar, Jalandhar & Ludhiana)
Punjab - Amritsar
0
2
4
6
8
10
12
14
16
18
20
20
1 1 1
RTU Progress
S/S RTU INSTALLED
LINK AVALAIBILITY RTU E TOT E
0
5
10
15
20
25
30
30
0 0 0
FRTU Progress
RMU+SECT FRTU INSTALLATION
LINK AVALAIBILITY FRTU E TO E
61
SANC DATE : November 2011 Completion by Aug.16 AWARD DATE : Feb. 2015 (Siemens)
3 Towns SANC Cost : Rs 52.36 Crs Disb : Rs .15.71 Crs
Part-A (SCADA) towns – 3 (Amritsar, Jalandhar & Ludhiana)
0
2
4
6
8
10
12
14
16
18
20
20
7
3 3
RTU Progress
S/S RTU INSTALLED
LINK AVALAIBILITY RTU E TOT E
Punjab - Jalandhar
0
5
10
15
20
25
30
30
0 0 0
FRTU Progress
RMU+SECT FRTU INSTALLATION
LINK AVALAIBILITY FRTU E TO E
62
SANC DATE : November 2011 Completion by Aug.16 AWARD DATE : Feb. 2015 (Siemens)
3 Towns SANC Cost : Rs 52.36 Crs Disb : Rs .15.71 Crs
Part-A (SCADA) towns – 3 (Amritsar, Jalandhar & Ludhiana)
0
5
10
15
20
25
30
35
40
40
11
6 6
RTU Progress
S/S RTU INSTALLED
LINK AVALAIBILITY RTU E TOT E
0
1
2
3
4
5
6
7
8
9
9
0 0 0
FRTU Progress
RMU+SECT FRTU INSTALLATION
LINK AVALAIBILITY FRTU E TO E
Punjab - Ludhiana
63
• RTU and FRTU installation /End to End to bespeeded up
• Link availability to be ensured
Punjab - Issues
64
SCADA /IMPLEMENTATION UNDER APDRP–West Bengal SCADA IMPL UNDER APDRP–TSNPDCL , TELANGANA
SANC DATE : JAN 12 Completion by JAN 17 AWARD DATE : DEC 14
1 Towns SANC Cost : Rs 16.55 Crs. Disb : Rs 8.25 Crs SIA Payment : Rs 4.07 Cr
Part-A (SCADA) towns – 1 (DEHRADUN)
0
5
10
15
20
25 23
13
9
5
RTU Progress
S/S RTU INSTALLED
LINK AVALAIBILITY RTU E TOT E
0
50
100
150
200
250
300
350
400 364
131
194
80
FRTU Progress
RMU+SECT FRTU INSTALLATION
LINK AVALAIBILITY FRTU E TO E
Uttarakhand - Dehradun
65
Delay in installation of RTU/ FRTUinstallation
MPLS Connectivity issue in some sites to beresolved
SIM errors in AIRTEL SIMs to be resolved
SCADA enabler work to expedited tocomplete project in Jan’17
Uttarakhand - Issues
66
Chattisgarh - Both CC to be commissioned by Feb 17
Kerala - Both CC to be commissioned by Feb 17
Chhattisgarh & Kerala
67
URBANJYOTIABHIYAAN
@URJA_India
Download URJA App by giving a missed call on 09220036666
68