24 Jan 2017 Venue Power Finance Corporation Ltd, New Delhi URBANJYOTIABHIYAAN @URJA_India INTEGRATED POWER DEVELOPMENT SCHEME (IPDS) Review of SCADA /DMS Implementation

Upload: vuongduong

Post on 30-Jan-2018

221 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: INTEGRATED POWER DEVELOPMENT SCHEME (IPDS)125.19.4.227/Whats_New_Files/SCADA_PPT_24_JAN_2017.pdf · 24 Jan 2017 Venue –Power Finance Corporation Ltd, New Delhi URBANJYOTIABHIYAAN

24 Jan 2017

Venue – Power Finance Corporation Ltd, New Delhi

URBANJYOTIABHIYAAN @URJA_India

INTEGRATED POWER DEVELOPMENT SCHEME (IPDS)

Review of SCADA /DMS Implementation

Page 2: INTEGRATED POWER DEVELOPMENT SCHEME (IPDS)125.19.4.227/Whats_New_Files/SCADA_PPT_24_JAN_2017.pdf · 24 Jan 2017 Venue –Power Finance Corporation Ltd, New Delhi URBANJYOTIABHIYAAN

2

JAMMU

AMRITSAR JULUNDHUR

LUDHIANAUR

FARIDABADBIKANER

JODHPUR

AJMER

KOTA

DEHRADUN

SAHARANPURMEERUTGHAZIABAD

ALIGARH

MORADABAD

JHANSI

FIROZABAD

ALLAHBAD

GORAKHPUR

VARANASI

GWALIOR

JABALPURAHMEDABAD

BARODASURAT

INDORERAJKOTJAMNAGAR

BHAVNAGAR

G.MUMBAI BHIWANDI

PUNESOLAPUR

NASHIK

GULBARGA

KOCHI

KOZIKHODE

MADURAI

TIRNEVELI

TRICHIRAPAL

LI

SALEM

COIMBATORE

malegaon

SANGLI

KOLHAPURI

CC installed

CC to be installed

Completed

Targetted for commsng in FY

Targetted for completion in FY

Page 3: INTEGRATED POWER DEVELOPMENT SCHEME (IPDS)125.19.4.227/Whats_New_Files/SCADA_PPT_24_JAN_2017.pdf · 24 Jan 2017 Venue –Power Finance Corporation Ltd, New Delhi URBANJYOTIABHIYAAN

Form and groom proper SCADA team for Control centre

and field activities.

Expedite award /installation of SCADA enablers RMU,

Sectionlizer, FPIs and keep Substation SCADA ready.

Provide locational details of SCADA enablers .

Do & expedite progressive end to end testing for RTU /

FRTU and ensure timely and progressive payments as per

milestones for proper cash flow.

Facilitate GIS based DMS data to SIA . In case of problem

in GIS data from ITIA, DMS network with single line

diagram may be drawn & populated for DMS functions.

Get feeder and town-wise daily SAIFI/ SAIDI Reports

generated from SCADA

Common Advisories for DISCOM’s

3

Page 4: INTEGRATED POWER DEVELOPMENT SCHEME (IPDS)125.19.4.227/Whats_New_Files/SCADA_PPT_24_JAN_2017.pdf · 24 Jan 2017 Venue –Power Finance Corporation Ltd, New Delhi URBANJYOTIABHIYAAN

Ensure proper connectivity of network with NBSP

Provide secured login to view SCADA from webclient

link from DISCOM website, if utility agrees

Wherever 3 G is not avlb, 2g connecitiy for FRTU may

be considered till the time it is upgraded

Outage for commissioning shall be provided

Operationalization for completion for commissioned

RTU/FRTU shall be exercised from Control Centre by

deployment of manpower (States such as TN &

Maharashtra have led the way)

Common Advisories for DISCOM’s

4

Page 5: INTEGRATED POWER DEVELOPMENT SCHEME (IPDS)125.19.4.227/Whats_New_Files/SCADA_PPT_24_JAN_2017.pdf · 24 Jan 2017 Venue –Power Finance Corporation Ltd, New Delhi URBANJYOTIABHIYAAN

Timely preparation of Factory Acceptance Test (FAT)

including testing of DMS functionality to enable

commissioning of SCADA/DMS control centre.

Restrain practice of change in make/models of equipment.

The same shall only be permitted as per provisions of Model

Technical Specification (MTS).

Immediate installation of RTU and FRTUs at all available

sites.

In case of problem in GIS data from ITIA, DMS network with

single line diagram may be drawn & populated for DMS

functions.

Readiness of Dispatcher training simulator and

commencement of training of officials

Common Advisories for SIA’s

5

Page 6: INTEGRATED POWER DEVELOPMENT SCHEME (IPDS)125.19.4.227/Whats_New_Files/SCADA_PPT_24_JAN_2017.pdf · 24 Jan 2017 Venue –Power Finance Corporation Ltd, New Delhi URBANJYOTIABHIYAAN

SCADA CC Commissioning (Balance 4 – Achieved - 2)

• 2 Kerala (Kozikhode, Kochi)

• 2 Chattisgarh (Durg-Bhilai , Raipur)

Target by Mar 31,2017

6

Page 7: INTEGRATED POWER DEVELOPMENT SCHEME (IPDS)125.19.4.227/Whats_New_Files/SCADA_PPT_24_JAN_2017.pdf · 24 Jan 2017 Venue –Power Finance Corporation Ltd, New Delhi URBANJYOTIABHIYAAN

(Achieved 5, Balance 26)

0 1 2 3 4 5 6 7

ASSAM

AP-SPDCL

GUJ- MGVCL

GUJ-PGVCL

MAHARASTRA

MP -WEST

MP CENTRAL

PUNJAB

RAJASTHAN- JODHPUR

RAJASTHAN -AJMER

TAMILNADU

TELANGANA -NORTH

UTTARAKHAND

WEST BENGAL

2

3

13

13

4111

21

411

2

SCADA Completion for operationalization

COMPLETED TARGET IN FY

Target by Mar 31,2017

7

Page 8: INTEGRATED POWER DEVELOPMENT SCHEME (IPDS)125.19.4.227/Whats_New_Files/SCADA_PPT_24_JAN_2017.pdf · 24 Jan 2017 Venue –Power Finance Corporation Ltd, New Delhi URBANJYOTIABHIYAAN

STATE-WISE REVIEW

8

Page 9: INTEGRATED POWER DEVELOPMENT SCHEME (IPDS)125.19.4.227/Whats_New_Files/SCADA_PPT_24_JAN_2017.pdf · 24 Jan 2017 Venue –Power Finance Corporation Ltd, New Delhi URBANJYOTIABHIYAAN

SCADA /IMPLEMENTATION UNDER APDRP–West Bengal

SANC DATE : October’2011, Completion by Mar 17 AWARD DATE : Sep. 2012 (Chemtrols)

One Town SANC Cost : Rs 21.82 Cr Disb : Rs 12.75 Released to SIA : Rs 6.19

Part-A (SCADA) town – Guwahati

ASSAM – Guwahati

0

5

10

15

20

25

30

35

40 36

29

26

13

RTU Progress

S/S RTU INSTALLED

LINK AVALAIBILITY RTU E TOT E

0

10

20

30

40

50

60

70 62

50

3 3

FRTU Progress

RMU+SECT FRTU INSTALLATION

LINK AVALAIBILITY FRTU E TO E

9

Page 10: INTEGRATED POWER DEVELOPMENT SCHEME (IPDS)125.19.4.227/Whats_New_Files/SCADA_PPT_24_JAN_2017.pdf · 24 Jan 2017 Venue –Power Finance Corporation Ltd, New Delhi URBANJYOTIABHIYAAN

5 Sub-Stations not constructed

4 sites are having new panel issue

10 sites are compact substation where (ABB-2,Schneider-7) make equipments were installedwhich needs to be integrate with RTU

In Big Bazaar S/s , FRTU will be installed inplace of RTU

RTU at 3 locations is under testing

GIS integration for DMS implementation

I/O List finalization for A/R , Sect

ASSAM – Guwahati Issues

10

Page 11: INTEGRATED POWER DEVELOPMENT SCHEME (IPDS)125.19.4.227/Whats_New_Files/SCADA_PPT_24_JAN_2017.pdf · 24 Jan 2017 Venue –Power Finance Corporation Ltd, New Delhi URBANJYOTIABHIYAAN

SCADA IMPL UNDER APDRP–TSNPDCL , TELANGANA

SANC DATE : 27.09.2013

Completion by Sep 16 ( Requested upto 31 Mar 17 )

AWARD DATE : LOA Dt: 07-01-14,

Agt.Dt: 08-07-14 (Awarded to M/s.Chemtrols)

1 Town SANC Cost : Rs 9.75Cr :Award 10.04 Cr Disbursement : Rs 2.93 Cr, Released to SIA : Rs 5.57

Cr

Part-A (SCADA) towns – 1 (Visakhapatnam)

APEPDCL- Visakhapatnam

0

5

10

15

20

25

3028 28

0 0

RTU Progress

S/S RTU INSTALLED

LINK AVALAIBILITY RTU E TOT E

0

20

40

60

80

100

120

140

160 145

53

0 0

FRTU Progress

RMU+SECT FRTU INSTALLATION

LINK AVALAIBILITY FRTU E TO E

11

Page 12: INTEGRATED POWER DEVELOPMENT SCHEME (IPDS)125.19.4.227/Whats_New_Files/SCADA_PPT_24_JAN_2017.pdf · 24 Jan 2017 Venue –Power Finance Corporation Ltd, New Delhi URBANJYOTIABHIYAAN

FO switch is pending at S/S

Interim solution - using SIM instead of MPLSis being exercised till establishment

NBSP, M/s Bharti Airtel has to extend theconnectivity for 28 Substations by 15.12.16.not done so far

DCPS approved but on hold

APEPDCL – Visakhapatnam Issues

12

Page 13: INTEGRATED POWER DEVELOPMENT SCHEME (IPDS)125.19.4.227/Whats_New_Files/SCADA_PPT_24_JAN_2017.pdf · 24 Jan 2017 Venue –Power Finance Corporation Ltd, New Delhi URBANJYOTIABHIYAAN

SANC DATE : 22.02.2011 Completion by Mar’17 AWARD DATE : 21.01.13 (CHEMTROLS LTD)

3 Towns SANC Cost : Rs 39.19 Crs Disb : Rs 11.76 Crs Released to SIA : Rs 15Cr

Part-A (SCADA) towns – 3 ( Vijayawada, Guntur & Nellore)

APSPDCL - Vijayawada

0

5

10

15

20

25 23 23

4

9

RTU Progress

S/S RTU INSTALLED

LINK AVALAIBILITY RTU E TOT E

0

10

20

30

40

50

60

70

80

90

100

100

2 2 2

FRTU Progress

RMU+SECT FRTU INSTALLATION

LINK AVALAIBILITY FRTU E TO E

13

Page 14: INTEGRATED POWER DEVELOPMENT SCHEME (IPDS)125.19.4.227/Whats_New_Files/SCADA_PPT_24_JAN_2017.pdf · 24 Jan 2017 Venue –Power Finance Corporation Ltd, New Delhi URBANJYOTIABHIYAAN

SCADA /DMS IMPLEMENTATION –

SANC DATE : 22.02.2011 Completion by Mar’17 AWARD DATE : 21.01.13 (CHEMTROLS LTD)

3 Towns SANC Cost : Rs 39.19 Crs Disb : Rs 11.76 Crs Released to SIA : Rs 15Cr

Part-A (SCADA) towns – 3 ( Vijayawada, Guntur & Nellore)

APSPDCL - Guntur

0

5

10

15

20

25

21 21

0 0

RTU Progress

S/S RTU INSTALLED

LINK AVALAIBILITY RTU E TOT E

0

10

20

30

40

50

60

70

80

90

100

100

2 2 2

FRTU Progress

RMU+SECT FRTU INSTALLATION

LINK AVALAIBILITY FRTU E TO E

14

Page 15: INTEGRATED POWER DEVELOPMENT SCHEME (IPDS)125.19.4.227/Whats_New_Files/SCADA_PPT_24_JAN_2017.pdf · 24 Jan 2017 Venue –Power Finance Corporation Ltd, New Delhi URBANJYOTIABHIYAAN

SANC DATE : 22.02.2011 Completion by Mar’17 AWARD DATE : 21.01.13 (CHEMTROLS LTD)

3 Towns SANC Cost : Rs 39.19 Crs Disb : Rs 11.76 Crs Released to SIA : Rs 15Cr

Part-A (SCADA) towns – 3 ( Vijayawada, Guntur & Nellore)

APSPDCL - Nellore

0

2

4

6

8

10

12

1413 13

0 0

RTU Progress

S/S RTU INSTALLED

LINK AVALAIBILITY RTU E TOT E

0

5

10

15

20

25

30

35

40

45

50

50

2 2 2

FRTU Progress

RMU+SECT FRTU INSTALLATION

LINK AVALAIBILITY FRTU E TO E

15

Page 16: INTEGRATED POWER DEVELOPMENT SCHEME (IPDS)125.19.4.227/Whats_New_Files/SCADA_PPT_24_JAN_2017.pdf · 24 Jan 2017 Venue –Power Finance Corporation Ltd, New Delhi URBANJYOTIABHIYAAN

Interim solution - using SIM instead of MPLSis being exercised till establishment

NBSP , M/s Bharti Airtel has to extend theconnectivity for 28 Substations by 15.12.16.Not done

DCPS approved and FAT will be staged on 31Jan

APSPDCL- Issues

16

Page 17: INTEGRATED POWER DEVELOPMENT SCHEME (IPDS)125.19.4.227/Whats_New_Files/SCADA_PPT_24_JAN_2017.pdf · 24 Jan 2017 Venue –Power Finance Corporation Ltd, New Delhi URBANJYOTIABHIYAAN

SCADA /IMPLEMENTATION UNDER APDRP–West Bengal

SCADA /DMS IMPLEMENTATION –

SCADA IMPL UNDER APDRP–TSNPDCL , TELANGANA

SANC DATE : 22.02.2011 Completion by Dec 16 AWARD DATE : 20.12.2012

1 Towns SANC Cost : Rs 12.47 Crs. Disb : Rs 3.74 Crs, SIA Payment :2.33 Cr

Part-A (SCADA) towns – 1 (Warangal)

Telangana- North - Warangal

0

2

4

6

8

10

12

14

16

18

18 1817

18

RTU Progress

S/S RTU INSTALLED

LINK AVALAIBILITY RTU E TOT E

0

10

20

30

40

50

60

70

80

90

100

0 0 0 0

FRTU Progress

RMU+SECT FRTU INSTALLATION

LINK AVALAIBILITY FRTU E TO E

17

Page 18: INTEGRATED POWER DEVELOPMENT SCHEME (IPDS)125.19.4.227/Whats_New_Files/SCADA_PPT_24_JAN_2017.pdf · 24 Jan 2017 Venue –Power Finance Corporation Ltd, New Delhi URBANJYOTIABHIYAAN

RMU to be installed

DCPS approved and FAT will be staged on 31Jan

Telangana- North – Warangal Issues

18

Page 19: INTEGRATED POWER DEVELOPMENT SCHEME (IPDS)125.19.4.227/Whats_New_Files/SCADA_PPT_24_JAN_2017.pdf · 24 Jan 2017 Venue –Power Finance Corporation Ltd, New Delhi URBANJYOTIABHIYAAN

SANC DATE : 30.06.2011 Completion by Dec 16 AWARD DATE : 17.11.2012 (M/s. Chemtrols )

1 Town Sanction : Rs 65.15 Crs Disb : Rs 19.55 Crs, SIA Payment : 4.44 Cr

Part-A (SCADA) towns – 1 (Hyderabad UA)

Telangana- South - Hyderabad

0

50

100

150

200

250 228

175

7450

RTU Progress

S/S RTU INSTALLED

LINK AVALAIBILITY RTU E TOT E

0

100

200

300

400

500

600

700

800

900

1000 917

0 0 0

FRTU Progress

RMU+SECT FRTU INSTALLATION

LINK AVALAIBILITY FRTU E TO E

19

Page 20: INTEGRATED POWER DEVELOPMENT SCHEME (IPDS)125.19.4.227/Whats_New_Files/SCADA_PPT_24_JAN_2017.pdf · 24 Jan 2017 Venue –Power Finance Corporation Ltd, New Delhi URBANJYOTIABHIYAAN

RTU/ FRTU and modem to be expedited

DCPS approved but on hold

Telangana- South – Hyderabad Issues

20

Page 21: INTEGRATED POWER DEVELOPMENT SCHEME (IPDS)125.19.4.227/Whats_New_Files/SCADA_PPT_24_JAN_2017.pdf · 24 Jan 2017 Venue –Power Finance Corporation Ltd, New Delhi URBANJYOTIABHIYAAN

SCADA IMPL UNDER APDRP–TSNPDCL , TELANGANA

SANC DATE : Dec 2010 Completion by DEC16 AWARD DATE : Feb-Apr2013 (Chemtrol)

6 Towns SANC Cost : Rs 138.51Crs Disb : Rs 41.55 Crs

Part-A (SCADA) towns – 6 (Ahmedabad, Baroda, Bhavnagar, Jamnagar, Rajkot, Surat)

Gujarat- UGVCL -Ahmedabad

0

2

4

6

8

10

12

14

16

18

2019

18

4 4

RTU Progress

S/S RTU INSTALLED

LINK AVALAIBILITY RTU E TOT E

0

100

200

300

400

500

600

700 631

510 0

FRTU Progress

RMU+SECT FRTU INSTALLATION

LINK AVALAIBILITY FRTU E TO E

21

Page 22: INTEGRATED POWER DEVELOPMENT SCHEME (IPDS)125.19.4.227/Whats_New_Files/SCADA_PPT_24_JAN_2017.pdf · 24 Jan 2017 Venue –Power Finance Corporation Ltd, New Delhi URBANJYOTIABHIYAAN

Utility to provide to provide shutdown forRTU/ FRTU

Permission for installation of tower fromGETCO not provided

Gujarat -UGVCL–Ahmedabad Issues

22

Page 23: INTEGRATED POWER DEVELOPMENT SCHEME (IPDS)125.19.4.227/Whats_New_Files/SCADA_PPT_24_JAN_2017.pdf · 24 Jan 2017 Venue –Power Finance Corporation Ltd, New Delhi URBANJYOTIABHIYAAN

SCADA IMPL UNDER APDRP–TSNPDCL , TELANGANA

SANC DATE : Dec 2010 Completion by DEC16 AWARD DATE : Feb-Apr2013 (Chemtrol)

6 Towns SANC Cost : Rs 138.51Crs Disb : Rs 41.55 Crs

Part-A (SCADA) towns – 6 (Ahmedabad, Baroda, Bhavnagar, Jamnagar, Rajkot, Surat)

Gujarat- MGVCL -Vadodara

0

2

4

6

8

10

12

14

16

18

18 18 18

4

RTU Progress

S/S RTU INSTALLED

LINK AVALAIBILITY RTU E TOT E

0

100

200

300

400

500

600

700 614

235

0 0

FRTU Progress

RMU+SECT FRTU INSTALLATION

LINK AVALAIBILITY FRTU E TO E

23

Page 24: INTEGRATED POWER DEVELOPMENT SCHEME (IPDS)125.19.4.227/Whats_New_Files/SCADA_PPT_24_JAN_2017.pdf · 24 Jan 2017 Venue –Power Finance Corporation Ltd, New Delhi URBANJYOTIABHIYAAN

3G SIM from RCOMM shall be available

RTU /FRTU to be completed

Gujarat- MGVCL –Vadodara - Issues

24

Page 25: INTEGRATED POWER DEVELOPMENT SCHEME (IPDS)125.19.4.227/Whats_New_Files/SCADA_PPT_24_JAN_2017.pdf · 24 Jan 2017 Venue –Power Finance Corporation Ltd, New Delhi URBANJYOTIABHIYAAN

SCADA IMPL UNDER APDRP–TSNPDCL , TELANGANA

SANC DATE : Dec 2010 Completion by DEC16 AWARD DATE : Feb-Apr2013 (Chemtrol)

6 Towns SANC Cost : Rs 138.51Crs Disb : Rs 41.55 Crs

Part-A (SCADA) towns – 6 (Ahmedabad, Baroda, Bhavnagar, Jamnagar, Rajkot, Surat)

Gujarat- PGVCL - Rajkot

0

2

4

6

8

10

12

14

1615 15

21

RTU Progress

S/S RTU INSTALLED

LINK AVALAIBILITY RTU E TOT E

0

100

200

300

400

500

600

584

0 0 0

FRTU Progress

RMU+SECT FRTU INSTALLATION

LINK AVALAIBILITY FRTU E TO E

25

Page 26: INTEGRATED POWER DEVELOPMENT SCHEME (IPDS)125.19.4.227/Whats_New_Files/SCADA_PPT_24_JAN_2017.pdf · 24 Jan 2017 Venue –Power Finance Corporation Ltd, New Delhi URBANJYOTIABHIYAAN

SCADA IMPL UNDER APDRP–TSNPDCL , TELANGANA

SANC DATE : Dec 2010 Completion by DEC16 AWARD DATE : Feb-Apr2013 (Chemtrol)

6 Towns SANC Cost : Rs 138.51Crs Disb : Rs 41.55 Crs

Part-A (SCADA) towns – 6 (Ahmedabad, Baroda, Bhavnagar, Jamnagar, Rajkot, Surat)

Gujarat- PGVCL - Bhavnagar

0

1

2

3

4

5

6

7

8

9

9 9

1

0

RTU Progress

S/S RTU INSTALLED

LINK AVALAIBILITY RTU E TOT E

0

50

100

150

200

250

300

350

400373

0

54

0

FRTU Progress

RMU+SECT FRTU INSTALLATION

LINK AVALAIBILITY FRTU E TO E

26

Page 27: INTEGRATED POWER DEVELOPMENT SCHEME (IPDS)125.19.4.227/Whats_New_Files/SCADA_PPT_24_JAN_2017.pdf · 24 Jan 2017 Venue –Power Finance Corporation Ltd, New Delhi URBANJYOTIABHIYAAN

SCADA IMPL UNDER APDRP–TSNPDCL , TELANGANA

SANC DATE : Dec 2010 Completion by DEC16 AWARD DATE : Feb-Apr2013 (Chemtrol)

6 Towns SANC Cost : Rs 138.51Crs Disb : Rs 41.55 Crs

Part-A (SCADA) towns – 6 (Ahmedabad, Baroda, Bhavnagar, Jamnagar, Rajkot, Surat)

0

1

2

3

4

5

6

7

8

8

7

1

0

RTU Progress

S/S RTU INSTALLED

LINK AVALAIBILITY RTU E TOT E

0

50

100

150

200

250

300

350

343

0 0 0

FRTU Progress

RMU+SECT FRTU INSTALLATION

LINK AVALAIBILITY FRTU E TO E

Gujarat- PGVCL - Jamnagar

27

Page 28: INTEGRATED POWER DEVELOPMENT SCHEME (IPDS)125.19.4.227/Whats_New_Files/SCADA_PPT_24_JAN_2017.pdf · 24 Jan 2017 Venue –Power Finance Corporation Ltd, New Delhi URBANJYOTIABHIYAAN

Utility to provide to provide shutdown forRTU/ FRTU

Permission for installation of tower fromGETCO not provided

FRTU Installation is lagging

Gujarat- PGVCL - Issues

28

Page 29: INTEGRATED POWER DEVELOPMENT SCHEME (IPDS)125.19.4.227/Whats_New_Files/SCADA_PPT_24_JAN_2017.pdf · 24 Jan 2017 Venue –Power Finance Corporation Ltd, New Delhi URBANJYOTIABHIYAAN

SCADA IMPL UNDER APDRP–TSNPDCL , TELANGANA

SANC DATE : Dec 2010 Completion by DEC16 AWARD DATE : Feb-Apr2013 (Chemtrol)

6 Towns SANC Cost : Rs 138.51Crs Disb : Rs 41.55 Crs

Part-A (SCADA) towns – 6 (Ahmedabad, Baroda, Bhavnagar, Jamnagar, Rajkot, Surat)

Gujarat- DGVCL - Surat

0

5

10

15

20

25

24 23

0 0

RTU Progress

S/S RTU INSTALLED

LINK AVALAIBILITY RTU E TOT E

0

50

100

150

200

250

300 276

0 0 0

FRTU Progress

RMU+SECT FRTU INSTALLATION

LINK AVALAIBILITY FRTU E TO E

29

Page 30: INTEGRATED POWER DEVELOPMENT SCHEME (IPDS)125.19.4.227/Whats_New_Files/SCADA_PPT_24_JAN_2017.pdf · 24 Jan 2017 Venue –Power Finance Corporation Ltd, New Delhi URBANJYOTIABHIYAAN

Utility to provide to provide shutdown forRTU/ FRTU

Permission for installation of tower fromGETCO not provided

RTU/FRTU installation to be expedited

Gujarat- DGVCL – Surat Issues

30

Page 31: INTEGRATED POWER DEVELOPMENT SCHEME (IPDS)125.19.4.227/Whats_New_Files/SCADA_PPT_24_JAN_2017.pdf · 24 Jan 2017 Venue –Power Finance Corporation Ltd, New Delhi URBANJYOTIABHIYAAN

SCADA /IMPLEMENTATION UNDER APDRP–West Bengal

SANC DATE : October’2011, Completion Oct 16 AWARD DATE : February’2013 [Chemtrols]

3 Towns SANC Cost : Rs 32.94 Crs Disb : Rs 9.88 Crs, SIA payment : Rs 7.58 Cr

Part-A (SCADA) towns – 3 (Kolkata, Asansol, Siliguri)

West Bengal- Kolkata

0

5

10

15

20

25

30

35

40

45

45

24

40

0

RTU Progress

S/S RTU INSTALLED

LINK AVALAIBILITY RTU E TOT E

0

10

20

30

40

50

60

70

69

43

69

0

FRTU Progress

RMU+SECT FRTU INSTALLATION

LINK AVALAIBILITY FRTU E TO E

31

Page 32: INTEGRATED POWER DEVELOPMENT SCHEME (IPDS)125.19.4.227/Whats_New_Files/SCADA_PPT_24_JAN_2017.pdf · 24 Jan 2017 Venue –Power Finance Corporation Ltd, New Delhi URBANJYOTIABHIYAAN

SCADA /IMPLEMENTATION UNDER APDRP–West Bengal

SANC DATE : October’2011, Completion Oct 16 AWARD DATE : February’2013 [Chemtrols]

3 Towns SANC Cost : Rs 32.94 Crs Disb : Rs 9.88 Crs, SIA payment : Rs 7.58 Cr

Part-A (SCADA) towns – 3 (Kolkata, Asansol, Siliguri)

West Bengal- Asansol

0

1

2

3

4

5

6

6

5 5

0

RTU Progress

S/S RTU INSTALLED

LINK AVALAIBILITY RTU E TOT E

32

Page 33: INTEGRATED POWER DEVELOPMENT SCHEME (IPDS)125.19.4.227/Whats_New_Files/SCADA_PPT_24_JAN_2017.pdf · 24 Jan 2017 Venue –Power Finance Corporation Ltd, New Delhi URBANJYOTIABHIYAAN

SCADA /IMPLEMENTATION UNDER APDRP–West Bengal

SANC DATE : October’2011, Completion Oct 16 AWARD DATE : February’2013 [Chemtrols]

3 Towns SANC Cost : Rs 32.94 Crs Disb : Rs 9.88 Crs, SIA payment : Rs 7.58 Cr

Part-A (SCADA) towns – 3 (Kolkata, Asansol, Siliguri)

West Bengal- Siliguri

0

1

2

3

4

5

6

7

8

8 8 8

1

RTU Progress

S/S RTU INSTALLED

LINK AVALAIBILITY RTU E TOT E

33

Page 34: INTEGRATED POWER DEVELOPMENT SCHEME (IPDS)125.19.4.227/Whats_New_Files/SCADA_PPT_24_JAN_2017.pdf · 24 Jan 2017 Venue –Power Finance Corporation Ltd, New Delhi URBANJYOTIABHIYAAN

Utility Team to conduct concurrent testing atsites and towns required

DCPS , Modem dispatch is in progress

West Bengal – Issues

34

Page 35: INTEGRATED POWER DEVELOPMENT SCHEME (IPDS)125.19.4.227/Whats_New_Files/SCADA_PPT_24_JAN_2017.pdf · 24 Jan 2017 Venue –Power Finance Corporation Ltd, New Delhi URBANJYOTIABHIYAAN

SCADA /IMPLEMENTATION UNDER APDRP–West Bengal SCADA IMPL UNDER APDRP–TSNPDCL , TELANGANA

SANC DATE : December 2010 Completion by Dec 16

7 Towns SANC Cost : Rs 182.17 Crores

Part-A (SCADA) towns – 7 ( Chennai, Trichy, Madurai, Tirunelvelli, Salem, Tiruppur, Coimbatore)

TamilNadu - Chennai

0

20

40

60

80

100

120

140

160

180

200 183

156 156

125

RTU Progress

S/S RTU INSTALLED

LINK AVALAIBILITY RTU E TOT E

0

200

400

600

800

1000

1200

1400

1600

1800

2000

1905

1657

1905

1283

FRTU Progress

RMU+SECT FRTU INSTALLATION

LINK AVALAIBILITY FRTU E TO E

35

Page 36: INTEGRATED POWER DEVELOPMENT SCHEME (IPDS)125.19.4.227/Whats_New_Files/SCADA_PPT_24_JAN_2017.pdf · 24 Jan 2017 Venue –Power Finance Corporation Ltd, New Delhi URBANJYOTIABHIYAAN

SCADA /IMPLEMENTATION UNDER APDRP–West Bengal SCADA IMPL UNDER APDRP–TSNPDCL , TELANGANA

SANC DATE : December 2010 Completion by Dec 16

7 Towns SANC Cost : Rs 182.17 Crores

Part-A (SCADA) towns – 7 ( Chennai, Trichy, Madurai, Tirunelvelli, Salem, Tiruppur, Coimbatore)

TamilNadu - Salem

0

1

2

3

4

5

6

6 6 6 6

RTU Progress

S/S RTU INSTALLED

LINK AVALAIBILITY RTU E TOT E

0

50

100

150

200

250

300

350

334

184

334

106

FRTU Progress

RMU+SECT FRTU INSTALLATION

LINK AVALAIBILITY FRTU E TO E

36

Page 37: INTEGRATED POWER DEVELOPMENT SCHEME (IPDS)125.19.4.227/Whats_New_Files/SCADA_PPT_24_JAN_2017.pdf · 24 Jan 2017 Venue –Power Finance Corporation Ltd, New Delhi URBANJYOTIABHIYAAN

SCADA /IMPLEMENTATION UNDER APDRP–West Bengal SCADA IMPL UNDER APDRP–TSNPDCL , TELANGANA

SANC DATE : December 2010 Completion by Dec 16

7 Towns SANC Cost : Rs 182.17 Crores

Part-A (SCADA) towns – 7 ( Chennai, Trichy, Madurai, Tirunelvelli, Salem, Tiruppur, Coimbatore)

TamilNadu - Tirupur

0

2

4

6

8

10

12

12 12 12 12

RTU Progress

S/S RTU INSTALLED

LINK AVALAIBILITY RTU E TOT E

0

50

100

150

200

250

300

350

400369

233

119

0

FRTU Progress

RMU+SECT FRTU INSTALLATION

LINK AVALAIBILITY FRTU E TO E

37

Page 38: INTEGRATED POWER DEVELOPMENT SCHEME (IPDS)125.19.4.227/Whats_New_Files/SCADA_PPT_24_JAN_2017.pdf · 24 Jan 2017 Venue –Power Finance Corporation Ltd, New Delhi URBANJYOTIABHIYAAN

SCADA /IMPLEMENTATION UNDER APDRP–West Bengal SCADA IMPL UNDER APDRP–TSNPDCL , TELANGANA

SANC DATE : December 2010 Completion by Dec 16

7 Towns SANC Cost : Rs 182.17 Crores

Part-A (SCADA) towns – 7 ( Chennai, Trichy, Madurai, Tirunelvelli, Salem, Tiruppur, Coimbatore)

TamilNadu - Coimbatore

0

5

10

15

20

25 23 23 23 23

RTU Progress

S/S RTU INSTALLED

LINK AVALAIBILITY RTU E TOT E

0

100

200

300

400

500

600

700

800

799

429

799

0

FRTU Progress

RMU+SECT FRTU INSTALLATION

LINK AVALAIBILITY FRTU E TO E

38

Page 39: INTEGRATED POWER DEVELOPMENT SCHEME (IPDS)125.19.4.227/Whats_New_Files/SCADA_PPT_24_JAN_2017.pdf · 24 Jan 2017 Venue –Power Finance Corporation Ltd, New Delhi URBANJYOTIABHIYAAN

FRTU Commissioning in balance 4 towns andRTU Commissioning in Chennai to beexpedited

TamilNadu - Issues

39

Page 40: INTEGRATED POWER DEVELOPMENT SCHEME (IPDS)125.19.4.227/Whats_New_Files/SCADA_PPT_24_JAN_2017.pdf · 24 Jan 2017 Venue –Power Finance Corporation Ltd, New Delhi URBANJYOTIABHIYAAN

SCADA /IMPLEMENTATION UNDER APDRP–West Bengal SCADA IMPL UNDER APDRP–TSNPDCL , TELANGANA

SANC DATE : MAR 10( 3) & JUN 10 (2)

Completion Dec 16 - Jan 17

AWARD DATE : AUG 2012 (DONGFANG)

5 Towns SANC Cost : Rs 151Crs Disb : Rs 45 Crs

Part-A (SCADA) towns – 5 (Jaipur, Kota , Ajmer, Jodhpur, Bikaner)

Rajasthan – JVVNL - Jaipur

0

20

40

60

80

100

120 105

51

83

51

RTU Progress

S/S RTU INSTALLED

LINK AVALAIBILITY RTU E TOT E

0

200

400

600

800

1000

1200

1400

16001517

5 5 5

FRTU Progress

RMU+SECT FRTU INSTALLATION

LINK AVALAIBILITY FRTU E TO E

40

Page 41: INTEGRATED POWER DEVELOPMENT SCHEME (IPDS)125.19.4.227/Whats_New_Files/SCADA_PPT_24_JAN_2017.pdf · 24 Jan 2017 Venue –Power Finance Corporation Ltd, New Delhi URBANJYOTIABHIYAAN

SCADA /IMPLEMENTATION UNDER APDRP–West Bengal SCADA IMPL UNDER APDRP–TSNPDCL , TELANGANA

SANC DATE : MAR 10( 3) & JUN 10 (2)

Completion Dec 16 - Jan 17

AWARD DATE : AUG 2012 (DONGFANG)

5 Towns SANC Cost : Rs 151Crs Disb : Rs 45 Crs

Part-A (SCADA) towns – 5 (Jaipur, Kota , Ajmer, Jodhpur, Bikaner)

Rajasthan – JVVNL - Kota

0

5

10

15

20

25

30

29

1215

12

RTU Progress

S/S RTU INSTALLED

LINK AVALAIBILITY RTU E TOT E

0

100

200

300

400

500

600

700

700

0 0 0

FRTU Progress

RMU+SECT FRTU INSTALLATION

LINK AVALAIBILITY FRTU E TO E

41

Page 42: INTEGRATED POWER DEVELOPMENT SCHEME (IPDS)125.19.4.227/Whats_New_Files/SCADA_PPT_24_JAN_2017.pdf · 24 Jan 2017 Venue –Power Finance Corporation Ltd, New Delhi URBANJYOTIABHIYAAN

SCADA /IMPLEMENTATION UNDER APDRP–West Bengal SCADA IMPL UNDER APDRP–TSNPDCL , TELANGANA

SANC DATE : MAR 10( 3) & JUN 10 (2)

Completion Dec 16 - Jan 17

AWARD DATE : AUG 2012 (DONGFANG)

5 Towns SANC Cost : Rs 151Crs Disb : Rs 45 Crs

Part-A (SCADA) towns – 5 (Jaipur, Kota , Ajmer, Jodhpur, Bikaner)

Rajasthan – AVVNL - Ajmer

0

5

10

15

20

25

21

16 16 16

RTU Progress

S/S RTU INSTALLED

LINK AVALAIBILITY RTU E TOT E

0

20

40

60

80

100

120

118

0 0 0

FRTU Progress

RMU+SECT FRTU INSTALLATION

LINK AVALAIBILITY FRTU E TO E

42

Page 43: INTEGRATED POWER DEVELOPMENT SCHEME (IPDS)125.19.4.227/Whats_New_Files/SCADA_PPT_24_JAN_2017.pdf · 24 Jan 2017 Venue –Power Finance Corporation Ltd, New Delhi URBANJYOTIABHIYAAN

SCADA /IMPLEMENTATION UNDER APDRP–West Bengal SCADA IMPL UNDER APDRP–TSNPDCL , TELANGANA

SANC DATE : MAR 10( 3) & JUN 10 (2)

Completion Dec 16 - Jan 17

AWARD DATE : AUG 2012 (DONGFANG)

5 Towns SANC Cost : Rs 151Crs Disb : Rs 45 Crs

Part-A (SCADA) towns – 5 (Jaipur, Kota , Ajmer, Jodhpur, Bikaner)

Rajasthan – JdVVNL - Bikaner

0

5

10

15

20

25

30

35

40 36 35 35 35

RTU Progress

S/S RTU INSTALLED

LINK AVALAIBILITY RTU E TOT E

0

20

40

60

80

100

120

116

0 0 0

FRTU Progress

RMU+SECT FRTU INSTALLATION

LINK AVALAIBILITY FRTU E TO E

43

Page 44: INTEGRATED POWER DEVELOPMENT SCHEME (IPDS)125.19.4.227/Whats_New_Files/SCADA_PPT_24_JAN_2017.pdf · 24 Jan 2017 Venue –Power Finance Corporation Ltd, New Delhi URBANJYOTIABHIYAAN

SCADA /IMPLEMENTATION UNDER APDRP–West Bengal SCADA IMPL UNDER APDRP–TSNPDCL , TELANGANA

SANC DATE : MAR 10( 3) & JUN 10 (2)

Completion Dec 16 - Jan 17

AWARD DATE : AUG 2012 (DONGFANG)

5 Towns SANC Cost : Rs 151Crs Disb : Rs 45 Crs

Part-A (SCADA) towns – 5 (Jaipur, Kota , Ajmer, Jodhpur, Bikaner)

Rajasthan – JdVVNL - Jodhpur

40

42

44

46

48

50

52

5453

47 47

45

RTU Progress

S/S RTU INSTALLED

LINK AVALAIBILITY RTU E TOT E

0

20

40

60

80

100

120

140

160148

0 0 0

FRTU Progress

RMU+SECT FRTU INSTALLATION

LINK AVALAIBILITY FRTU E TO E

44

Page 45: INTEGRATED POWER DEVELOPMENT SCHEME (IPDS)125.19.4.227/Whats_New_Files/SCADA_PPT_24_JAN_2017.pdf · 24 Jan 2017 Venue –Power Finance Corporation Ltd, New Delhi URBANJYOTIABHIYAAN

FRTU installation to be expedited by SIA DISCOM to make progressive milestone

payment for end to end test

Rajasthan – Issues

45

Page 46: INTEGRATED POWER DEVELOPMENT SCHEME (IPDS)125.19.4.227/Whats_New_Files/SCADA_PPT_24_JAN_2017.pdf · 24 Jan 2017 Venue –Power Finance Corporation Ltd, New Delhi URBANJYOTIABHIYAAN

SCADA /IMPLEMENTATION UNDER APDRP–West Bengal SCADA IMPL UNDER APDRP–TSNPDCL , TELANGANA

SANC DATE : MAR & JUN 2011 AWARD DATE : Dec’2011 (DONGFANG)

5 Towns SANC Cost : Rs 103Crs Disb : Rs 31 Crs

Part-A (SCADA) towns – 5 (Bhopal, Gwalior, Jabalpur, Indore & Ujjain)

Madhya Pradesh – Bhopal

0

10

20

30

40

50

60

70 63 63

3731

RTU Progress

S/S RTU INSTALLED

LINK AVALAIBILITY RTU E TOT E

46

Page 47: INTEGRATED POWER DEVELOPMENT SCHEME (IPDS)125.19.4.227/Whats_New_Files/SCADA_PPT_24_JAN_2017.pdf · 24 Jan 2017 Venue –Power Finance Corporation Ltd, New Delhi URBANJYOTIABHIYAAN

SCADA /IMPLEMENTATION UNDER APDRP–West Bengal SCADA IMPL UNDER APDRP–TSNPDCL , TELANGANA

SANC DATE : MAR & JUN 2011 AWARD DATE : Dec’2011 (DONGFANG)

5 Towns SANC Cost : Rs 103Crs Disb : Rs 31 Crs

Part-A (SCADA) towns – 5 (Bhopal, Gwalior, Jabalpur, Indore & Ujjain)

Madhya Pradesh – Gwalior

0

5

10

15

20

25

30

35

40

45

50 4643

40

3

RTU Progress

S/S RTU INSTALLED

LINK AVALAIBILITY RTU E TOT E

47

Page 48: INTEGRATED POWER DEVELOPMENT SCHEME (IPDS)125.19.4.227/Whats_New_Files/SCADA_PPT_24_JAN_2017.pdf · 24 Jan 2017 Venue –Power Finance Corporation Ltd, New Delhi URBANJYOTIABHIYAAN

SCADA /IMPLEMENTATION UNDER APDRP–West Bengal SCADA IMPL UNDER APDRP–TSNPDCL , TELANGANA

SANC DATE : MAR & JUN 2011 AWARD DATE : Dec’2011 (DONGFANG)

5 Towns SANC Cost : Rs 103Crs Disb : Rs 31 Crs

Part-A (SCADA) towns – 5 (Bhopal, Gwalior, Jabalpur, Indore & Ujjain)

Madhya Pradesh – Indore

0

10

20

30

40

50

60

70

80 72 72 72 72

RTU Progress

S/S RTU INSTALLED

LINK AVALAIBILITY RTU E TOT E

48

Page 49: INTEGRATED POWER DEVELOPMENT SCHEME (IPDS)125.19.4.227/Whats_New_Files/SCADA_PPT_24_JAN_2017.pdf · 24 Jan 2017 Venue –Power Finance Corporation Ltd, New Delhi URBANJYOTIABHIYAAN

SCADA /IMPLEMENTATION UNDER APDRP–West Bengal SCADA IMPL UNDER APDRP–TSNPDCL , TELANGANA

SANC DATE : MAR & JUN 2011 AWARD DATE : Dec’2011 (DONGFANG)

5 Towns SANC Cost : Rs 103Crs Disb : Rs 31 Crs

Part-A (SCADA) towns – 5 (Bhopal, Gwalior, Jabalpur, Indore & Ujjain)

Madhya Pradesh – Ujjain

0

5

10

15

20

25

21 21 21 21

RTU Progress

S/S RTU INSTALLED

LINK AVALAIBILITY RTU E TOT E

49

Page 50: INTEGRATED POWER DEVELOPMENT SCHEME (IPDS)125.19.4.227/Whats_New_Files/SCADA_PPT_24_JAN_2017.pdf · 24 Jan 2017 Venue –Power Finance Corporation Ltd, New Delhi URBANJYOTIABHIYAAN

SCADA /IMPLEMENTATION UNDER APDRP–West Bengal SCADA IMPL UNDER APDRP–TSNPDCL , TELANGANA

SANC DATE : MAR & JUN 2011 AWARD DATE : Dec’2011 (DONGFANG)

5 Towns SANC Cost : Rs 103Crs Disb : Rs 31 Crs

Part-A (SCADA) towns – 5 (Bhopal, Gwalior, Jabalpur, Indore & Ujjain)

Madhya Pradesh – Jabalpur

0

5

10

15

20

25

30

35

40

3937

31

0

RTU Progress

S/S RTU INSTALLED

LINK AVALAIBILITY RTU E TOT E

50

Page 51: INTEGRATED POWER DEVELOPMENT SCHEME (IPDS)125.19.4.227/Whats_New_Files/SCADA_PPT_24_JAN_2017.pdf · 24 Jan 2017 Venue –Power Finance Corporation Ltd, New Delhi URBANJYOTIABHIYAAN

Acute Delay in installation of enablers(Actual Sanction incld Enablers)

DMS data and locational details to beprovided

Madhya Pradesh – Issues

51

Page 52: INTEGRATED POWER DEVELOPMENT SCHEME (IPDS)125.19.4.227/Whats_New_Files/SCADA_PPT_24_JAN_2017.pdf · 24 Jan 2017 Venue –Power Finance Corporation Ltd, New Delhi URBANJYOTIABHIYAAN

SCADA /IMPLEMENTATION UNDER APDRP–West Bengal SCADA IMPL UNDER APDRP–TSNPDCL , TELANGANA

SANC DATE : Aug 2012 Completion by Sept 16 AWARD DATE : DEC 2012 (M/s. SCHNEIDER)

1 Town SANC Cost : Rs 22.02 Crs Disb : Rs 6.61Crs

Part-A (SCADA) towns – 1 (Patna)

Bihar– Patna

0

10

20

30

40

50

60

5146

1 0

RTU Progress

S/S RTU INSTALLED

LINK AVALAIBILITY RTU E TOT E

0

50

100

150

200

250

300

350 305289

1 0

FRTU Progress

RMU+SECT FRTU INSTALLATION

LINK AVALAIBILITY FRTU E TO E

52

Page 53: INTEGRATED POWER DEVELOPMENT SCHEME (IPDS)125.19.4.227/Whats_New_Files/SCADA_PPT_24_JAN_2017.pdf · 24 Jan 2017 Venue –Power Finance Corporation Ltd, New Delhi URBANJYOTIABHIYAAN

RTU /FRTU End to End test to be expedited

GIS integration to be done

Bihar– Patna - Issues

53

Page 54: INTEGRATED POWER DEVELOPMENT SCHEME (IPDS)125.19.4.227/Whats_New_Files/SCADA_PPT_24_JAN_2017.pdf · 24 Jan 2017 Venue –Power Finance Corporation Ltd, New Delhi URBANJYOTIABHIYAAN

SANC DATE : June-2011 -8 towns

Completion by Dec 2016 (Mar’17 requested )

AWARD DATE : DEC -2011 (SIEMENS)

8 Towns SANC Cost : Rs 116.57Crs Disb : Rs 48.48 CrsPart-A (SCADA) towns – 8 (Amravati, Solapur, Sangli, Malegaon, Greater Mumbai, Pune, Nashik and Kolhapur)

Maharashtra - Solapur

0

2

4

6

8

10

12

14

1615

13

8 8

RTU Progress

S/S RTU INSTALLED

LINK AVALAIBILITY RTU E TOT E

0

20

40

60

80

100

120

140

160

180

200

191 191 191 191

FRTU Progress

RMU+SECT FRTU INSTALLATION

LINK AVALAIBILITY FRTU E TO E

54

Page 55: INTEGRATED POWER DEVELOPMENT SCHEME (IPDS)125.19.4.227/Whats_New_Files/SCADA_PPT_24_JAN_2017.pdf · 24 Jan 2017 Venue –Power Finance Corporation Ltd, New Delhi URBANJYOTIABHIYAAN

SANC DATE : June-2011 -8 towns

Completion by Dec 2016 (Mar’17 requested )

AWARD DATE : DEC -2011 (SIEMENS)

8 Towns SANC Cost : Rs 116.57Crs Disb : Rs 48.48 CrsPart-A (SCADA) towns – 8 (Amravati, Solapur, Sangli, Malegaon, Greater Mumbai, Pune, Nashik and Kolhapur)

Maharashtra - Sangli

0

2

4

6

8

10

12

14

16

18

18 18

8 8

RTU Progress

S/S RTU INSTALLED

LINK AVALAIBILITY RTU E TOT E

0

20

40

60

80

100

120

140

160

153 152 152 152

FRTU Progress

RMU+SECT FRTU INSTALLATION

LINK AVALAIBILITY FRTU E TO E

55

Page 56: INTEGRATED POWER DEVELOPMENT SCHEME (IPDS)125.19.4.227/Whats_New_Files/SCADA_PPT_24_JAN_2017.pdf · 24 Jan 2017 Venue –Power Finance Corporation Ltd, New Delhi URBANJYOTIABHIYAAN

SANC DATE : June-2011 -8 towns

Completion by Dec 2016 (Mar’17 requested )

AWARD DATE : DEC -2011 (SIEMENS)

8 Towns SANC Cost : Rs 116.57Crs Disb : Rs 48.48 CrsPart-A (SCADA) towns – 8 (Amravati, Solapur, Sangli, Malegaon, Greater Mumbai, Pune, Nashik and Kolhapur)

Maharashtra – Greater Mumbai

0

10

20

30

40

50

60

70

80

80

71

6

17

RTU Progress

S/S RTU INSTALLED

LINK AVALAIBILITY RTU E TOT E

0

200

400

600

800

1000

12001025

877

419 419

FRTU Progress

RMU+SECT FRTU INSTALLATION

LINK AVALAIBILITY FRTU E TO E

56

Page 57: INTEGRATED POWER DEVELOPMENT SCHEME (IPDS)125.19.4.227/Whats_New_Files/SCADA_PPT_24_JAN_2017.pdf · 24 Jan 2017 Venue –Power Finance Corporation Ltd, New Delhi URBANJYOTIABHIYAAN

SANC DATE : June-2011 -8 towns

Completion by Dec 2016 (Mar’17 requested )

AWARD DATE : DEC -2011 (SIEMENS)

8 Towns SANC Cost : Rs 116.57Crs Disb : Rs 48.48 CrsPart-A (SCADA) towns – 8 (Amravati, Solapur, Sangli, Malegaon, Greater Mumbai, Pune, Nashik and Kolhapur)

Maharashtra - Pune

0

10

20

30

40

50

60

70

80

90 83

64

2 0

RTU Progress

S/S RTU INSTALLED

LINK AVALAIBILITY RTU E TOT E

57

Page 58: INTEGRATED POWER DEVELOPMENT SCHEME (IPDS)125.19.4.227/Whats_New_Files/SCADA_PPT_24_JAN_2017.pdf · 24 Jan 2017 Venue –Power Finance Corporation Ltd, New Delhi URBANJYOTIABHIYAAN

SANC DATE : June-2011 -8 towns

Completion by Dec 2016 (Mar’17 requested )

AWARD DATE : DEC -2011 (SIEMENS)

8 Towns SANC Cost : Rs 116.57Crs Disb : Rs 48.48 CrsPart-A (SCADA) towns – 8 (Amravati, Solapur, Sangli, Malegaon, Greater Mumbai, Pune, Nashik and Kolhapur)

Maharashtra - Nashik

0

5

10

15

20

25

30

35

34

28

22

0

RTU Progress

S/S RTU INSTALLED

LINK AVALAIBILITY RTU E TOT E

58

Page 59: INTEGRATED POWER DEVELOPMENT SCHEME (IPDS)125.19.4.227/Whats_New_Files/SCADA_PPT_24_JAN_2017.pdf · 24 Jan 2017 Venue –Power Finance Corporation Ltd, New Delhi URBANJYOTIABHIYAAN

SANC DATE : June-2011 -8 towns

Completion by Dec 2016 (Mar’17 requested )

AWARD DATE : DEC -2011 (SIEMENS)

8 Towns SANC Cost : Rs 116.57Crs Disb : Rs 48.48 CrsPart-A (SCADA) towns – 8 (Amravati, Solapur, Sangli, Malegaon, Greater Mumbai, Pune, Nashik and Kolhapur)

Maharashtra - Kolhapur

0

2

4

6

8

10

12

14

16

16 16

5

2

RTU Progress

S/S RTU INSTALLED

LINK AVALAIBILITY RTU E TOT E

59

Page 60: INTEGRATED POWER DEVELOPMENT SCHEME (IPDS)125.19.4.227/Whats_New_Files/SCADA_PPT_24_JAN_2017.pdf · 24 Jan 2017 Venue –Power Finance Corporation Ltd, New Delhi URBANJYOTIABHIYAAN

R-COMM /BSNL to deliver links

Maharashtra - Issues

60

Page 61: INTEGRATED POWER DEVELOPMENT SCHEME (IPDS)125.19.4.227/Whats_New_Files/SCADA_PPT_24_JAN_2017.pdf · 24 Jan 2017 Venue –Power Finance Corporation Ltd, New Delhi URBANJYOTIABHIYAAN

SANC DATE : November 2011 Completion by Aug.16 AWARD DATE : Feb. 2015 (Siemens)

3 Towns SANC Cost : Rs 52.36 Crs Disb : Rs .15.71 Crs

Part-A (SCADA) towns – 3 (Amritsar, Jalandhar & Ludhiana)

Punjab - Amritsar

0

2

4

6

8

10

12

14

16

18

20

20

1 1 1

RTU Progress

S/S RTU INSTALLED

LINK AVALAIBILITY RTU E TOT E

0

5

10

15

20

25

30

30

0 0 0

FRTU Progress

RMU+SECT FRTU INSTALLATION

LINK AVALAIBILITY FRTU E TO E

61

Page 62: INTEGRATED POWER DEVELOPMENT SCHEME (IPDS)125.19.4.227/Whats_New_Files/SCADA_PPT_24_JAN_2017.pdf · 24 Jan 2017 Venue –Power Finance Corporation Ltd, New Delhi URBANJYOTIABHIYAAN

SANC DATE : November 2011 Completion by Aug.16 AWARD DATE : Feb. 2015 (Siemens)

3 Towns SANC Cost : Rs 52.36 Crs Disb : Rs .15.71 Crs

Part-A (SCADA) towns – 3 (Amritsar, Jalandhar & Ludhiana)

0

2

4

6

8

10

12

14

16

18

20

20

7

3 3

RTU Progress

S/S RTU INSTALLED

LINK AVALAIBILITY RTU E TOT E

Punjab - Jalandhar

0

5

10

15

20

25

30

30

0 0 0

FRTU Progress

RMU+SECT FRTU INSTALLATION

LINK AVALAIBILITY FRTU E TO E

62

Page 63: INTEGRATED POWER DEVELOPMENT SCHEME (IPDS)125.19.4.227/Whats_New_Files/SCADA_PPT_24_JAN_2017.pdf · 24 Jan 2017 Venue –Power Finance Corporation Ltd, New Delhi URBANJYOTIABHIYAAN

SANC DATE : November 2011 Completion by Aug.16 AWARD DATE : Feb. 2015 (Siemens)

3 Towns SANC Cost : Rs 52.36 Crs Disb : Rs .15.71 Crs

Part-A (SCADA) towns – 3 (Amritsar, Jalandhar & Ludhiana)

0

5

10

15

20

25

30

35

40

40

11

6 6

RTU Progress

S/S RTU INSTALLED

LINK AVALAIBILITY RTU E TOT E

0

1

2

3

4

5

6

7

8

9

9

0 0 0

FRTU Progress

RMU+SECT FRTU INSTALLATION

LINK AVALAIBILITY FRTU E TO E

Punjab - Ludhiana

63

Page 64: INTEGRATED POWER DEVELOPMENT SCHEME (IPDS)125.19.4.227/Whats_New_Files/SCADA_PPT_24_JAN_2017.pdf · 24 Jan 2017 Venue –Power Finance Corporation Ltd, New Delhi URBANJYOTIABHIYAAN

• RTU and FRTU installation /End to End to bespeeded up

• Link availability to be ensured

Punjab - Issues

64

Page 65: INTEGRATED POWER DEVELOPMENT SCHEME (IPDS)125.19.4.227/Whats_New_Files/SCADA_PPT_24_JAN_2017.pdf · 24 Jan 2017 Venue –Power Finance Corporation Ltd, New Delhi URBANJYOTIABHIYAAN

SCADA /IMPLEMENTATION UNDER APDRP–West Bengal SCADA IMPL UNDER APDRP–TSNPDCL , TELANGANA

SANC DATE : JAN 12 Completion by JAN 17 AWARD DATE : DEC 14

1 Towns SANC Cost : Rs 16.55 Crs. Disb : Rs 8.25 Crs SIA Payment : Rs 4.07 Cr

Part-A (SCADA) towns – 1 (DEHRADUN)

0

5

10

15

20

25 23

13

9

5

RTU Progress

S/S RTU INSTALLED

LINK AVALAIBILITY RTU E TOT E

0

50

100

150

200

250

300

350

400 364

131

194

80

FRTU Progress

RMU+SECT FRTU INSTALLATION

LINK AVALAIBILITY FRTU E TO E

Uttarakhand - Dehradun

65

Page 66: INTEGRATED POWER DEVELOPMENT SCHEME (IPDS)125.19.4.227/Whats_New_Files/SCADA_PPT_24_JAN_2017.pdf · 24 Jan 2017 Venue –Power Finance Corporation Ltd, New Delhi URBANJYOTIABHIYAAN

Delay in installation of RTU/ FRTUinstallation

MPLS Connectivity issue in some sites to beresolved

SIM errors in AIRTEL SIMs to be resolved

SCADA enabler work to expedited tocomplete project in Jan’17

Uttarakhand - Issues

66

Page 67: INTEGRATED POWER DEVELOPMENT SCHEME (IPDS)125.19.4.227/Whats_New_Files/SCADA_PPT_24_JAN_2017.pdf · 24 Jan 2017 Venue –Power Finance Corporation Ltd, New Delhi URBANJYOTIABHIYAAN

Chattisgarh - Both CC to be commissioned by Feb 17

Kerala - Both CC to be commissioned by Feb 17

Chhattisgarh & Kerala

67

Page 68: INTEGRATED POWER DEVELOPMENT SCHEME (IPDS)125.19.4.227/Whats_New_Files/SCADA_PPT_24_JAN_2017.pdf · 24 Jan 2017 Venue –Power Finance Corporation Ltd, New Delhi URBANJYOTIABHIYAAN

URBANJYOTIABHIYAAN

@URJA_India

[email protected]

Download URJA App by giving a missed call on 09220036666

68