integrated tactical networking environment (itne) - · pdf fileintegrated tactical networking...
TRANSCRIPT
TCM-TR (Tactical Radios)
LTC Gregory Grzybowski
Integrated Tactical Networking
Environment (ITNE)
ITNE Concept of Operations
ITNE Capability Requirements
10 September 2013
UNCLASSIFIED
UNCLASSIFIED
Purpose
ITNE Imperatives
ITNE Capability Development Methodology
ITNE Complexity
ITNE Concept of Operations
ITNE Planning Process
ITNE Management Process
ITNE Analysis Process
ITNE Unit Task Reorganization (Appendix K)
ITNE Dependencies
ITNE Troop to Task List
Questions
Agenda
UNCLASSIFIED
UNCLASSIFIED
Purpose
Provide an overview of the ITNE Concept of
Operations (CONOPS) with an emphasis on
Signal Planning, Management, and Analysis
Processes
UNCLASSIFIED
UNCLASSIFIED
ITNE Imperatives
Ensure the materiel integration of all radio platforms,
waveforms, mobile/mounted mission command application
management, ancillary devices and associated Network
Operations (NetOps) Management software capabilities
Ensure the integration and interoperability of network
operations between Joint, Interagency, Multinational, Army
Upper Tactical Internet (UTI) and ITNE capabilities
Ensure the proper development, integration, and sustainment of
comprehensive ITNE training for the S-6 staff
Ensure the development of an ITNE Concept of Operations
(CONOPS) to support the ITNE IS CDD, NIE, Capability Set
Fielding process, Force Structure Analysis, and Personnel
Alignment
5
UNCLASSIFIED
UNCLASSIFIED
ITNE Capability Development
Methodology
Organization Doctrine/Personnel/Training
Materiel
TTPs S-6 Troop to Task
JCIDS
IT Box Approach
Key Leader Training
Individual System NET
SA/DP SA/DP NET 16 hrs. 2 session Min 2 ; Max 8 25A, 25B, 25C, 25W, 53A, 250N,
251A, 254A, BTL CPTs, 25U in
charge of LTI planning
Bde HQ None YES
WIN-T Inc 2 (BCT)
NETOPS
(NOSC-B)
320 (+ 80 hrs. crew drills) 1 session min 17; max 20 25B (8), 25E (1), 25N (1), 25Q
(1), 25S (1), 25W (1), 250N (1),
254A(1), 25A(1), 53A(1), 255S
(1), 255N (1) (FROM MER 26 Jul
12)
Bde HQ See NMIB and MFP. YES
PoP User 40 hrs. (1 day IB training;
+ 80 hrs. crew drills)
1 session 14 (2 per CI) GPU (Vehicle Crew) Bn Driver training on
platform.
YES
SNE User 40 hrs. (1 day IB training;
+ 80 hrs. crew drills)
Up to 20 students per
session. 4 sessions.
min 66 (2 per CI);
max 80
GPU (Vehicle Crew) Co Driver training on
platform.
YES
VWP 24 hrs. (1 day IB training;
+ 80 hrs. crew drills)
1 session 20 (2 per CI) GPU (Vehicle Crew) Bde, Bn Driver training on
platform. CPP NET for CPP
VWPs.
YES
User Support Course 200 hrs. (1 day IB train-ing
to target MOS 25U; + 480
hrs. crew drills)
1 session 20 25U, 25B, 254A Bde, Bn, Co MRAP driver training. YES
Transmission
Operator/Maintainer
Course
64 hrs. (+ 80 hrs. crew
drills)
1 session 19 25Q, 25S Bde HQ STT Delta Course YES
STT Delta 40 hours 1 session 19 (2 25S STT BCT
level, 2 per TRT)
25Q, 25S Bde HQ YES
Staff Overview 2-4 hrs. 1 session 1-20 Senior Leadership Bde, Bn None NO
Integrated Bridge (for
WIN-T Inc 2 KLVs)
IB System NET 6-8 hrs. IB System NET held
immediately prior to
WIN-T Inc 2 PoP, SNE.
VWP and User Support
Courses
20 WIN-T Inc 2 KLV TC/operator.
Not intended for drivers.
Attendees of WIN-T Inc 2 PoP,
SNE, VWP and User Suport
Courses.
Bde, Bn, Co MRAP driver training YES
WIN-T Inc 2 (Div)
NETOPS
(NOSC-D)
320 (+ 80 hrs. crew drills) 1 session min 17; max 20 25B(6). 25E (2), 25N (2), 25Q
(1), 25S (2), 25W (2), 250N (2),
251A(1), 254A(2), 24A (1), 25A
(4), 53A(2)
Div See NMIB and MFP. YES
JGN 176 hrs (+80 hrs crew
drills)
1 session min 4 (2 per CI)'
max 6
25N Div See NMIB and MFP. YES
PoP User 40 hrs. (1 day IB training;
+ 80 hrs. crew drills)
1 session min 6 (2 per CI);
max 10
GPU (Vehicle Crew) Div Driver training on
platform.
YES
VWP 24 hrs. (1 day IB training;
+ 80 hrs. crew drills)
1 session min 4 (2 per CI);
max 6
GPU (Vehicle Crew) Div Driver training on
platform. CPP NET for CPP
VWPs.
YES
User Support Course 200 hrs. (1 day IB train-ing
to target MOS 25U; + 480
hrs. crew drills)
1 session 20 25U, 25B, 254A, 255A, 255N Div Driver training on
platform.
YES
Transmission
Operator/Maintainer
Course
64 hrs. (+ 80 hrs. crew
drills)
1 session min 9; max 10 25Q, 25S Div STT Delta Course YES
STT Delta 40 hours 1 session min 9; max 10 25Q, 25S Div YES
Staff Overview 2-4 hrs. 1 session 1-20 Senior Leadership Bde, Bn None NO
MC 13 Key Leaders Overview 4 hrs. Two sessions offered min 1; max20 Bde/Bn Cdr/XO, S3, key staff
leaders
Bde HQ, Bn None YES
MC13 Mission Command
Work Station (MCWS)
(AKA TMC Client)
TMC Battle Staff/Basic
Operator Course
40 hrs. Enough courses to train
2.5 users per box; 120
pax
4-20 General Purpose CPOF users at
BDE and BN (25B Bn/Bde Staff
Officer/Warrant Officer/NCO)
Bde HQ, Bn Entry level training for
Soldiers with no previous
experience. Also, serves as
the prerequisite CPOF
training to other
Warfighting Functions
(WFFs) (FIRES, LOG, etc.)
CPOF courses under
Collapse/Convergence
strategy.
YES
MC 13 (MCWS and TMC
Gateway)
TMC Maintainer
Course
16 hrs. 1 session 5-20 25B at Bn/Bde responsible for
maintaining/configuring CPOF
Bde HQ, BN None YES
MC 13 (TMC Server
Suite/BCCS)
System Administrator
(Server)
80 hrs. 1 session Max 5 Bde 53A, 255A, 25B Bde HQ None YES
MC 13 Command Web Basic Command Web 8 hrs. 7 session (if necessary;
web enabled laptop
users without C2 box)
20 GPU of the Command Web
environment. Disadvantaged
users. Users who have no
availability to C2 in CP.
Bde HQ, Bn None YES
MC 13 Command Web Command Web
Engineer Course
16 hrs. 1 session 20 BDE and BN Engineer officers Bde Bn None YES
MC 13 Command WebCommand Web CIRS 16 hrs.
1 session 20 CBRN BDE and BN Officers and
NCO
Bde, Bn None YES
2 sessions 25A, 25C, 25E, 25N (BN/BDE),
255N
NETT Warrior IBCT: 16 sessions total (4
sessions per week in
parallel; 4 weeks total);
SBCT 20 sessions (4
sessions per week in
parallel; 5 weeks total)
All leaders/Soldiers identified
(through BOIP) to receive Nett
Warrior system (generally TL
and above)
AN/PRC-154A
Rifleman Radio
Operator
8 hrs. Enough sessions to train
100% NETT Warrior EUD
and 20% of RR only user.
Max 20 GPU. No MOS or echelon
requirements
Bde, Bn, Co YES
COMSEC Key and
Preset Loading 4 hrs.
4 sessions (2 per day for
2 days) max 10 GPU. SKL operators. Co
Complteted AN/PRC 154A
OPNET; COMSEC Access
list; SECRET Clearance
AN/PRC-155 AN/PRC-155 Manpack
Operator
16 hrs. 15 GPU Bde, Bn, Co YES
4 sessions (40 total
trained)
25U (Co Commo Sgt, Bn and
Bde Retrans, Bn S6 25U, 25U10
and 25U20 at BDE); other 25
series depending on position;
other MOS retrans
AN/PRC 154A
JTNT
NET Warrior OPNET 40 hrs per session min 15; max 60 Soldiers already trained on
AN/PRC154A
AN/PRC-155 Manpack
Operator NET
In Co, CAV
Trp
Bde, Bn, Co
YES
25N Min 6 (2 per CI);
Max 9
Div FMTV drivers training. (See
NMIB and MFP for
technical requirements)
YES
YES
YES
YES
JTNT OPNET 80 hrs. Max 20
TCN-OM
Soldiers already trained on
AN/PRC154A and AN/PRC-
155 (working on adding
NETT Warror Maint/Sig
Block to JTNT)
FMTV drivers training. (See
NMIB and MFP for
technical requirements)
Bde HQ, Bn
Bde, Bn
320 (+80 hrs. crew drills) min 16 (2 per CI);
max 24 (3 per CI)
1 session 25N
1 sessionTCN-OM 320 (+80 hrs. crew drills)
AN/PRC-155
(Manpack) FLMNET
24 hrs 10
NET
ITNE
Manpower
Estimate
Report
(MER)
Future
SIGCoE
(FAA)
ITNE Ontology
Personnel Skill
Set Alignment
Force Structure
Alignment
SIGCoE CG
Approved
12 Aug 2013
6
UNCLASSIFIED
UNCLASSIFIED
RPS
ITNE Complexity
CS 13 CNR-to-ITNE Core Evolution
CS 12 and Earlier (CNR) CS 13 and Beyond (ITNE)
Complexity Growth IBCT CO
Plan and Load Plan, Load, Manage, and Monitor
JACS/ACES
ENM
S
R
W
A
N
W
2
UHF
SAT
Rifleman Radio
Sidehat
Sidewinder
ManPack
117G
Vendor NM
Radio Platforms Element Managers
Radio
Platfor