January 30, 2015(Public Law 111-84)
Interagency Coordination Group of Inspectors General
for Guam Realignment Annual Report
Section 2835 of the National Defense Authorization Act for Fiscal Year 2010
Report Documentation Page Form ApprovedOMB No. 0704-0188
Public reporting burden for the collection of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering andmaintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,including suggestions for reducing this burden, to Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, ArlingtonVA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to a penalty for failing to comply with a collection of information if itdoes not display a currently valid OMB control number.
1. REPORT DATE 30 JAN 2015 2. REPORT TYPE
3. DATES COVERED 00-00-2015 to 00-00-2015
4. TITLE AND SUBTITLE Interagency Coordination Group of Inspectors General for GuamRealignment Annual Report
5a. CONTRACT NUMBER
5b. GRANT NUMBER
5c. PROGRAM ELEMENT NUMBER
6. AUTHOR(S) 5d. PROJECT NUMBER
5e. TASK NUMBER
5f. WORK UNIT NUMBER
7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) U.S. Department of Defense Inspector General,4800 Mark Center Drive,Alexandria,VA,22350-1500
8. PERFORMING ORGANIZATIONREPORT NUMBER
9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES) 10. SPONSOR/MONITOR’S ACRONYM(S)
11. SPONSOR/MONITOR’S REPORT NUMBER(S)
12. DISTRIBUTION/AVAILABILITY STATEMENT Approved for public release; distribution unlimited
13. SUPPLEMENTARY NOTES
14. ABSTRACT
15. SUBJECT TERMS
16. SECURITY CLASSIFICATION OF: 17. LIMITATION OF ABSTRACT Same as
Report (SAR)
18. NUMBEROF PAGES
68
19a. NAME OFRESPONSIBLE PERSON
a. REPORT unclassified
b. ABSTRACT unclassified
c. THIS PAGE unclassified
Standard Form 298 (Rev. 8-98) Prescribed by ANSI Std Z39-18
On October 28, 2009, the President signed Public Law 111-84, “The National Defense Authorization Act for FY 2010.” Section 2835 of the Act established the Interagency Coordination Group of Inspectors General for Guam Realignment with the following duties.
PUBLIC LAW 111-84
It shall be the duty of the Interagency Coordination Group to conduct, supervise, and coordinate audits and investigations of the treatment, handling, and expenditure of amounts appropriated or otherwise made available for military construction on Guam and of the programs, operations, and contracts carried out utilizing such funds, including the:
(A) oversight and accounting of the obligation and expenditure of such funds;
(B) monitoring and review of construction activities funded by such funds;
(C) monitoring and review of contracts funded by such funds;
(D) monitoring and review of the transfer of such funds and associated information between and among departments, agencies, and entities of the U.S. and private and nongovernmental entities;
(E) maintenance of records on the use of such funds to facilitate future audits and investigations of the use of such funds; and
(F) monitoring and review of the implementation of the Defense Posture Review Initiative relating to the realignment of military installations and the relocation of military personnel on Guam.
Not later than February 1 of each year, the chairperson of the Interagency Coordination Group shall submit to the congressional defense committees, the Secretary of Defense, and the Secretary of the Interior a report summarizing, for the preceding calendar year,1 the activities under programs and operations funded with amounts appropriated or otherwise made available for military construction on Guam. Each report shall include, for the year covered by the report, a detailed statement of all obligations, expenditures, and revenues associated with such construction.
1 Public Law 113-66, “The National Defense Authorization Act for Fiscal Year 2014,” December 26, 2013, changed the period covered by the annual report from calendar to fiscal year.
I am pleased to provide the sixth annual report of the Interagency Coordination Group of Inspectors General for Guam Realignment. This annual report, as required by Public Law 111-84, “The National Defense Authorization Act for Fiscal Year 2010,” October 28, 2009, covers the reporting period from October 1, 2013, through September 30, 2014.
The Interagency Coordination Group focuses on challenge areas for the realignment, including operational readiness, quality of life, contract management, contractor oversight, asset accountability, and financial management. The group considers risks associated with these challenges when developing oversight initiatives.
Two planning groups support the Interagency Coordination Group: the Interagency Planning Group, consisting of representatives of our interagency partners, and the Joint Planning Group, consisting of representatives of the Department of Defense oversight partners. Both groups are led by Department of Defense Inspector General staff and provide briefings, track trends, coordinate audit de-confliction, and present issues to the Interagency Coordination Group for consideration.
I want to thank those participating as part of the Interagency Coordination Group and those Federal and Defense agencies supporting this effort. As the group goes forward, Congress, the Department, and senior leadership throughout the U.S. Government will use their oversight efforts to minimize the impact on the citizens of Guam, improve the economy and efficiency of vital programs and operations, and sustain the readiness of U.S. forces.
Jon T. Rymer Inspector General
Message from the Chairperson, Interagency Coordination Group
January 30, 2015 │ i
ii │ Guam Realignment Report
Executive SummaryPublic Law 111-84, “The National Defense Authorization Act for Fiscal Year 2010,” (NDAA 2010), October 28, 2009, section 2835, designates the Inspector General of the Department of Defense as the chairperson of the Interagency Coordination Group (ICG) of Inspectors General for Guam Realignment. The chairperson is required to provide an annual report to the congressional defense committees, the Secretary of Defense, and the Secretary of the Interior on the activities of the ICG and the programs and operations funded with amounts appropriated or otherwise made available for military construction on Guam. This report contains data collected from multiple organizations. The Department of Defense Office of Inspector General did not independently verify, analyze, or validate the data provided.
The Defense Posture Review Initiative serves as the framework for the future of U.S. force structure in Japan and the U.S. Marine Corps (Marine Corps) realignment to Guam. The purpose of the Defense Posture Review Initiative is to:
�� develop a common security view;
�� review roles, missions, and capabilities; and
�� review force posture changes.
Included in these initiatives are the relocation of Marine Corps personnel to Guam, the return of selected bases and facilities to the government of Japan (GOJ), and the consolidation of some of the remaining U.S. bases and facilities in Japan. Discussions held October 3, 2013, between the U.S. and the GOJ, through the Security Consultative Committee, resulted in significant changes to the realignment plan as well as funding. The Joint Guam Program Office (JGPO) continues to facilitate, manage, and execute requirements associated with the Guam Realignment.
This report identifies the programs and operations funded with appropriated amounts or funds otherwise made available for military construction on Guam in FY 2014.
�� DoD obligated approximately $85.1 million and expended approximately $106.7 million. Other Federal agencies obligated approximately $44.8 million and expended approximately $15.6 million. (Section 1)
�� DoD identified 205 projects and programs, totaling approximately $112.9 million, with estimated completion costs of approximately $299.1 million. Other Federal agencies identified 34 projects and programs, totaling approximately $14.9 million, with estimated completion costs of approximately $48.8 million. (Section 2)
January 30, 2015 │ iii
�� GOJ provided revenues of $9.8 million and earned approximately $1.3 million in interest associated with revenues. (Section 3)
�� DoD identified operating expenses of approximately $17.6 million. Other Federal agencies identified operating expenses of approximately $15.3 million. (Section 4)
�� DoD identified a total of 53 contracts, grants, agreements, or other funding mechanisms valued at approximately $62.8 million. Other Federal agencies identified a total of 20 contracts, grants, agreements, or other funding mechanisms valued at approximately $44.8 million. (Section 5)
iv │ Guam Realignment Report
Table of Contents
January 30, 2015 │ v
Guam Realignment Posture Changes 1
Efforts of the Interagency Coordination Group 5 (Section 2835[e][1])
Section 1. U.S. Government Obligations and Expenditure Data 11 (Section 2835[e][1][A])
Section 2. Project and Program Costs 15 (Section 2835[e][1][B])
Section 3. Government of Japan Revenue 33 (Section 2835[e][1][C])
Section 4. Operating Expenses 37 (Section 2835[e][1][D])
Section 5. Contracts, Grants, Agreements, or Other Funding Mechanisms Data 41 (Section 2835[e][1][E])
Acronyms 57
vi │ Guam Realignment Report An aerial view of U.S. Naval Base Guam
Guam Realignment Posture Changes
Congressional Actions
On December 19, 2014, the President signed Public Law 113-291, “Carl Levin and Howard P. ‘Buck’ McKeon National Defense Authorization Act for Fiscal Year 2015,” (NDAA 2015). Section 2821 of the Act governs the “Realignment of Marines Corps Forces in Asia-Pacific Region” and provides a limitation on military construction associated with the Guam realignment based on cost estimates. Specifically, in accordance with the Supplemental Environmental Impact Statement for the “Guam and Commonwealth of the Northern Mariana Islands Military Relocation (2012 Roadmap Adjustments),” the total amount obligated or expended from funds appropriated or otherwise made available for military construction for the relocation of Marine Corps forces to Guam may not exceed $8.725 billion. The Secretary of the Navy may adjust the total amount obligated or expended for military construction based on the amount of increase or decrease in costs attributable to:
�� economic inflation after September 30, 2014; or
�� changes in Federal, Guam, Commonwealth of the Northern Marianas Islands, or local laws enacted after September 30, 2014.
Section 2821 requires the Secretary of the Navy to provide a written notice of any adjustment to the total amount obligated or expended from funds appropriated or otherwise made available for military construction for the relocation of Marine Corps forces to Guam.
Section 2821 also provides restrictions on the development of public infrastructure. Specifically, if the Secretary of Defense determines that any grant, cooperative agreement, transfer of funds to another Federal agency, or supplement of funds available under Federal programs administered by agencies other than DoD results in the development of public infrastructure on Guam, the Secretary of Defense may not carry out such unless specifically authorized by law.
Section 2821 also repealed section 2822 of the Military Construction Authorization Act for FY 2014 (division B of Public Law 113-66; 127 Stat. 1016) which was the previous law that governed the “Realignment of Marines Corps Forces in Asia-Pacific Region.”
Security Consultative Committee
In October 2013, the U.S. and GOJ held a round of Security Consultative Committee talks. The U.S. Secretaries of State and Defense and Japan’s Ministers for Foreign Affairs and Defense attended the meetings. The Security Consultative Committee reaffirmed the indispensable role of the U.S. and Japan in the maintenance of international peace and security and reconfirmed the alliance’s commitment to the security of Japan through the full range of U.S. military capabilities. In a joint
January 30, 2015 │ 1
2 │ Guam Realignment Report
statement, the U.S. Secretaries of State and Defense and Japan’s Ministers for Foreign Affairs and Defense stated they had set forth a strategic vision that, reflecting shared values of democracy, the rule of law, free and open markets, and respect for human rights; will effectively promote peace, security, stability, and economic prosperity in the Asia-Pacific region.
The Ministers confirmed that the relocation of Marine Corps personnel from Okinawa to locations outside of Japan, including Guam, contributes to sustaining the forward presence of U.S. forces and facilitates the development of Guam as a strategic hub while also mitigating the impact on Okinawa. Additionally, the Ministers:
�� announced the signing of a protocol to amend the 2009 Guam International Agreement, which forms the basis for the bilateral cooperation necessary to achieve the goals of the relocation;
�� noted the significance of Japanese cash contributions to the development of training areas in Guam and the Commonwealth of Northern Mariana Islands and directed that consultations on the terms and conditions related to the use of these training areas be initiated within this year;
�� completed work reflecting the breakdown of costs associated with developing facilities, including training areas, and infrastructure in Guam and the Commonwealth of Northern Mariana Islands supporting the relocation of Marine Corps; and
�� reconfirmed the relocation plan described in the 2012 Security Consultative Committee Joint Statement. Under the plan, Marine Corps units are required to relocate from Okinawa to Guam in the first half of the 2020s. The Ministers confirmed that this plan’s progress depends on various factors, such as measures taken by the two governments to secure appropriate funding. This plan also facilitates progress in implementing the April 2013 Consolidation Plan for Facilities and Areas in Okinawa.
January 30, 2015 │ 3
4 │ Guam Realignment Report Chairman of the Joint Chiefs of Staff Army Gen. Martin E. Dempsey, center, boards a Navy SH-60 Seahawk helicopter, May 30, 2012, at Andersen Air Force Base, Guam
January 30, 2015 │ 5
§
(SEC
TIO
N 2
835[
e][1
])
Efforts of the Interagency Coordination Group
Efforts of the Interagency Coordination Group
Efforts of the Interagency Coordination Group (Section 2835[e][1])
Public Law 111-84, “The National Defense Authorization Act for Fiscal Year 2010,” (NDAA 2010), October 28, 2009, section 2835, designates the Inspector General of the DoD as the chairperson of the ICG of Inspectors General for Guam Realignment. Additionally, the Inspector General of the Department of the Interior (DOI) is a required member.
The ICG is required to conduct, supervise, and coordinate oversight activities to monitor the use of funding for the Guam realignment. To assist with the developing a strategy for these oversight activities, the ICG chairperson established the Guam Interagency Planning Group.
ICG Oversight Duties
Section 2835 of the NDAA 2010 requires the ICG to provide objective supervision of audits and investigations relating to the programs and operations funded with amounts appropriated or otherwise made available for military construction on Guam. Specifically, the ICG oversight duties are to conduct, supervise, and coordinate audits and investigations of the treatment, handling, and expenditure of amounts appropriated for military construction on Guam.
Summary of Audit and Evaluation Reports Completed in FY 2014
In FY 2014, members of the ICG completed one audit and one evaluation related to the realignment of forces to Guam. The Department of Homeland Security Office of Inspector General (DHS OIG) completed one audit report and the DOI Office of Inspector General (DOI OIG) completed one evaluation report. The reports cover a variety of topics related to the realignment effort.
The DHS OIG issued Report No. OIG-14-06, “Guam’s Management of Homeland Security Grant Program Awards for Fiscal Years 2009 Through 2011,” on November 7, 2013. The audit objectives were to determine whether the territory distributed and spent State Homeland Security Program grant funds effectively and efficiently and in compliance with applicable Federal laws and regulations. The DHS OIG also addressed the extent to which grant funds enhanced the territory’s ability to prevent, prepare for, protect against, and respond to natural disasters, acts of terrorism, and other manmade disasters. The DHS OIG found that in most cases, the State Administrative Agency spent State
6 │ Guam Realignment Report – (Section 2835[e][1])
(Section 2835[e][1])
Homeland Security Program grant funds in compliance with applicable Federal laws and regulations. However, the DHS OIG identified the following areas in which Federal Emergency Management Activity and the territory can improve management of State Homeland Security Program grant programs:
�� strategic planning, performance measurement, and document retention;
�� progress and financial reporting; and
�� subgrant management.
DHS OIG also found that the State Administrative Agency could not fully assess whether State Homeland Security Program funding enhanced its preparedness and security; hampered its and Federal Emergency Management Agency’s ability to effectively and efficiently monitor the grant expenditures; and negatively affected planning and delayed the expenditures of grant funds.
DHS OIG made ten recommendations to the Federal Emergency Management Agency Assistant Administrator, Grants Programs Directorate. The recommendations included developing written policies and procedures to evaluate, assess, and revise the State Homeland Security Strategy to reflect current objectives of the territory; requiring the State Administrative Agency to routinely gather quantitative and qualitative data to allow the State Administrative Agency to determine whether it has accomplished its domestic preparedness goals and objectives; and instructing the State Administrative Agency management to obtain training for staff on the reporting and submission process and deadlines
The DOI OIG issued Report No. HI-EV-GUA-0001-2013, “Guam’s Business Privilege Tax,” on September 24, 2014. The DOI OIG evaluated the Government of Guam’s Department of Revenue and Taxation (DRT) to determine whether it had a process in place to identify and collect the Business Privilege Tax (BPT) from Federal contractors. DOI OIG found that DRT’s procedure to identify contractors that were subject to the BPT and to collect taxes from those contractors was inadequate. The DOI OIG found that because DRT did not have a complete policy to identify Federal contractors who were subject to the BPT, the Government of Guam may not be collecting taxes that it was owed. In addition, DRT did not use a complete list of Federal contractors to identify who was subject to the BPT nor did it follow through with established processes, adding to possible lost revenue for the Government of Guam.
January 30, 2015 │ 7
Efforts of the Interagency Coordination Group
8 │ Guam Realignment Report – (Section 2835[e][1])
DOI OIG made three recommendations to the Government of Guam:
�� resolve whether Guam is owed the $414,414 in taxes identified in the report;
�� develop and implement a BPT collection procedure for all contractors conducting projects for the United States Government on Guam; and
�� expand data sources to identify all contractors that may be subject to the BPT.
Ongoing or Planned Audits
The DoD OIG is currently conducting an audit of the administration of the Guam design-build multiple award construction contract. The audit objective is to determine whether Naval Facilities Engineering Command Pacific and Marianas contracting officials are properly administrating task orders and payments for Guam design-build multiple award construction contract. The contract is for military construction requirements in Guam, including those related to the Defense Policy Review Initiative.
Investigations
In FY 2014, the Defense Criminal Investigative Service and the Naval Criminal Investigative Service engaged in four investigations related to programs and operations funded with amounts appropriated or otherwise made available for military realignment construction on Guam, as shown in Table 1.
Table 1. Guam Military Realignment Investigative Working Group Investigations
Investigative Agency Type of Investigation Status of Investigation
Defense Criminal Investigative Service False Statement/Claims Closed
Naval Criminal Investigative Service Product Substitution/ Cost Mischarging Open
Naval Criminal Investigative Service and the Federal Bureau of Investigation Product Substitution Open
Naval Criminal Investigation Service Procurement Fraud Open
Source: Defense Criminal Investigative Service’s response to DoD OIG data call, 11/17/2014 and 12/01/2014.
January 30, 2015 │ 9
(Section 2835[e][1])
10 │ Guam Realignment Report A U.S. Air Force F-16D Fighting Falcon aircraft departs the runway at Andersen AFB, Guam
January 30, 2015 │ 11 January 30, 2015 │ 11
(SEC
TIO
N 2
835[
e][1
][A
])
U.S. Government Obligations and Expenditure Data1
Section 1: U.S. Government Obligation and Expenditures Data
12 │ Guam Realignment Report – (Section 2835[e][1][A])
Section 1. U.S. Government Obligations and Expenditure Data (Section 2835[e][1][A])
Public Law 111-84 states that not later than February 1 of each year, the ICG chairperson must report on the programs and operations funded with amounts appropriated or otherwise made available for military construction on Guam. Each report shall include a detailed statement of all obligations and expenditures.
DoD Obligations and Expenditures
The DoD OIG requested the Under Secretary of Defense (Comptroller/Chief Financial Officer); Assistant Secretary of the Army (Financial Management and Comptroller); Assistant Secretary of the Navy (Financial Management and Comptroller); Assistant Secretary of the Air Force (Financial Management and Comptroller); Director, Defense Finance and Accounting Service; and the Program Resource Director/Chief Financial Officer, Joint Guam Program Office to provide obligation and expenditure data supporting the Marine Corps realignment to Guam. For FY 2014, DoD obligated approximately $85.1 million and expended approximately $106.7 million. Table 2 identifies the amounts obligated and expended for each appropriation for FY 2014.
Table 2. DoD Obligations and Expenditures Related to the Guam Realignment
Appropriation Obligations Expenditures
Military Construction, Navy and Marine Corps $ 63,363,700.11 $ 63,164,689.56
GOJ $ 5,269,443.17 $ 28,201,095.55 Operation and Maintenance, Marine Corps (Pacific Division, Plans, Policies, and Operations) $ 1,357,325.67 $ 1,357,325.67
Operations and Maintenance, Marine Corps (Marine Corps Forces Pacific, Hawaii) $ 14,193,124.20 $ 6,472,372.06
Operations and Maintenance, Marine Corps (Marine Corps Installation Command, Installations and Logistics) $ 880,186.09 $ 7,543,805.34
Total $ 85,063,779.24 $ 106,739,288.18Source: Naval Facilities Engineering Command’s response to DoD OIG data call, 11/17/2014. Marine Corps’ response to DoD OIG data call, 11/17/2014.
(Section 2835[e][1][A])
Other Government Agencies
For FY 2014, the Department of Transportation (DOT) reported obligations of approximately $44.8 million and expended approximately $15.6 million related to programs and operations funded with amounts appropriated or otherwise made available for military construction on Guam. Table 3 shows other government agency obligations and expenditures.
Table 3. Other Government Agency Obligations and Expenditures Related to the Guam Realignment
Agency Obligations Expenditures
DOT $ 44,761,752.76 $ 15,578,963.64
Total $ 44,761,752.76 $ 15,578,963.64
Source: DOT’s response to DoD OIG data call, 11/14/2014.
January 30, 2015 │ 13
14 │ Guam Realignment Report U.S. Navy attack submarine in the Port of Guam
(SEC
TIO
N 2
835[
e][1
][B
])
January 30, 2015 │ 15
Project and Program Costs2
Section 2: Project and Program Costs
Sect
ion
2. P
roje
ct a
nd P
rogr
am C
osts
(Sec
tion
283
5[e]
[1][
B])
Publ
ic L
aw 1
11-8
4 re
quire
s the
ICG
ann
ual r
epor
t to
cont
ain
a de
taile
d sta
tem
ent o
n th
e co
sts in
curr
ed to
dat
e an
d co
sts e
stim
ated
to
com
plet
e ea
ch D
oD o
r DO
I mili
tary
con
struc
tion
proj
ect o
r pro
gram
. Th
e re
port
mus
t ide
ntify
all
proj
ects
and
prog
ram
s ass
ocia
ted
with
the
real
ignm
ent o
f mili
tary
insta
llatio
ns a
nd th
e re
loca
tion
of m
ilita
ry p
erso
nnel
to G
uam
.
DoD
and
GO
J Pro
ject
and
Pro
gram
Lis
t
For F
Y 20
14, D
oD id
entifi
ed 2
05 p
roje
cts a
nd p
rogr
ams,
tota
ling
appr
oxim
atel
y $1
12.9
mill
ion,
with
esti
mat
ed c
ompl
etio
n co
sts
of a
ppro
xim
atel
y $2
99.1
mill
ion.
Spe
cific
ally,
Nav
al F
acili
ties E
ngin
eerin
g C
omm
and
repo
rted
51
proj
ects
and
the
Mar
ine
Cor
ps
repo
rted
154
pro
ject
s tha
t wer
e di
rect
ly a
ssoc
iate
d w
ith th
e re
alig
nmen
t of m
ilita
ry in
stalla
tions
and
mili
tary
per
sonn
el to
Gua
m.
The
Nav
al F
acili
ties E
ngin
eerin
g C
omm
and
proj
ects
incu
rred
cos
ts of
app
roxi
mat
ely
$92.
8 m
illio
n w
ith a
n es
timat
ed c
ompl
etio
n co
st of
ap
prox
imat
ely
$265
.1 m
illio
n. Th
e M
arin
e C
orps
pro
ject
s inc
urre
d co
sts o
f app
roxi
mat
ely
$20.
1 m
illio
n w
ith a
n es
timat
ed c
ompl
etio
n co
st of
app
roxi
mat
ely
$34.
0 m
illio
n. T
able
4 id
entifi
es th
e D
oD a
nd G
OJ p
roje
cts a
nd p
rogr
ams,
and
thei
r ass
ocia
ted
costs
.2
Tabl
e 4.
Cos
ts fo
r DoD
and
GO
J Pro
ject
s and
Pro
gram
s
Proj
ect
Desc
riptio
n/Sc
ope
Star
t Dat
eTo
tal
Estim
ated
Cost
Cost
Incu
rred
to
Date
(US o
r GOJ
Fu
nds)
Cost
Incu
rred
Janu
ary 1
- Se
ptem
ber 3
0, 20
13
Estim
ated
Cost
s to
Com
plet
e
Nava
l Fac
ilitie
s Eng
inee
ring
Com
man
d
J001
, GoJ
Con
struc
tion;
Utilit
ies &
Site
Impr
ov,
PH 1
(Apr
a Har
bor)
UTIL
& SI
TE IM
PRV,
PH
1 (AP
RA
HARB
OR)
11-A
ug-11
$169
,000,0
00.00
$7
5,806
,422.7
3 $1
1,911
,348.0
1 $9
3,193
,577.2
7
J001
A, G
oJ C
onstr
uctio
n; Ut
ilities
& S
ite
Impr
ov, P
H 1 (
AAFB
)UT
IL &
SITE
IMPR
V, P
H 1 (
AAFB
)11
-Aug
-1140
,260,0
00.00
32
,457,1
71.05
17
,625,1
82.40
7,8
02,82
8.95
J006
, GOJ
Des
ign,
Apra
Med
ical C
linic
APRA
MED
ICAL
CLIN
IC
(APR
HAR
BOR)
18-F
eb-1
02,9
77,92
2.68
2,794
,573.7
7 0.0
0 18
3,348
.91
J007
, GOJ
Des
ign,
Wate
rfron
t Hea
dqua
rters
Bldg
WAT
ERFR
ONT
HEAD
QUAR
TERS
BU
ILDIN
G11
-Jan-
102,0
47,46
3.24
1,972
,746.2
6 0.0
0 74
,716.9
8
J008
, GOJ
Des
ign, F
ire S
tation
FIRE
STA
TION
(FIN
EGAY
AN)
11-Ja
n-10
1,808
,419.7
3 1,0
15,47
4.50
29,65
7.16
792,9
45.23
J0
10, G
OJ D
esign
, BEQ
Com
plex
BEQ
COMP
LEX
27-F
eb-1
03,4
23,81
5.21
3,091
,595.0
3 66
,523.1
8 33
2,220
.18
100;
Cons
tructi
on;
North
Ram
p Utili
ties
DPRI
-NOR
TH R
AMP
UTILI
TIES
, IN
C 1 (
AAFB
)6-
Apr-1
121
,000,0
00.00
19,54
1,270
.99
422,3
55.12
1,
458,7
29.00
2
The
tabl
e in
clud
es n
egat
ive
num
bers
list
ed in
par
enth
esis
, whi
ch re
pres
ent d
e-ob
ligat
ions
.
16 │ Guam Realignment Report – (Section 2835[e][1][B])
(Section 2835[e][1][B])
Proj
ect
Desc
riptio
n/Sc
ope
Star
t Dat
eTo
tal
Estim
ated
Cost
Cost
Incu
rred
to
Date
(US o
r GOJ
Fu
nds)
Cost
Incu
rred
Janu
ary 1
- Se
ptem
ber 3
0, 20
13
Estim
ated
Cost
s to
Com
plet
e
1003
; Con
struc
tion;
Milita
ry W
orkin
g Dog
MI
LITAR
Y W
ORKI
NG D
OG
RELO
C, A
PRA
HRBR
29-S
ep-1
013
,000,0
00.00
9,895
,281.8
7 1,4
62,66
2.34
3,10
4,718
.00
1006
: Con
struc
tion:
Defen
se A
cces
s Roa
d Im
prov
emen
ts (A
gana
)DA
R/DP
RI-D
EFEN
SE A
CCES
S RO
AD IM
PROV
EMEN
TS (A
GANA
)13
-Jul-1
17,8
25,00
0.00
1,012
,273.7
7 34
,503.2
6 6,
812,7
26.00
101;
Cons
tructi
on; N
orth
Ramp
Par
king
DPRI
-NOR
TH R
AMP
PARK
ING,
IN
C 1 (
AAFB
)6-
Apr-1
188
,797,0
00.00
84,06
5,601
.66
849,0
74.97
4,
731,3
98.00
101A
: Con
struc
tion;
North
Ram
p Par
king I
nc 2
DPRI
NOR
TH R
AMP
PARK
ING,
IN
C 2 (
AAFG
)7-
Aug-
1324
,458,0
00.00
6,919
,133.8
4 2,2
46,43
5.04
17,53
8,866
.16
109:
Cons
tructi
on; A
ircra
ft Main
tenan
ce
Hang
er, N
o. Ra
mpDP
RI A
ircra
ft Main
tenan
ce H
ange
r, No
. Ram
p7-
May-1
485
,673,0
00.00
665,9
47.99
53
,851,8
06.00
85
,007,0
52.01
204;
Cons
tructi
on, A
pra H
arbo
r Wha
rf Im
prov
emen
tAP
RA H
ARBO
R W
HARF
IMPR
V,
INC
1 OF
230
-Sep
-10
125,0
00,00
0.00
105,6
20,65
0.81
1,566
,350.3
7 19
,379,3
49 .0
0
204A
: DPR
I APR
A Ha
rbor
W
harf
Impr
ovem
ent 2
DPRI
APR
A HA
RBOR
WHA
RF
IMPR
OVEM
ENT
227
-Nov
-12
39,10
4,634
.0015
,011,4
92.70
1,5
58,25
9.76
24,09
3,141
.00
010;
Desig
n, PD
M IV
MAR
INE
CORP
S MI
LCON
PDM
IV M
ARIN
E CO
RPS
MILC
ON15
-Apr
-08
2,236
,411.7
8 2,2
36,41
1.78
0.00
0.00
100;
Desig
n, DP
RI-N
ORTH
RAM
P UT
ILITI
ES,
INC
1 (AA
FB)
DPRI
-NOR
TH R
AMP
UTILI
TIES
, IN
C 1 (
AAFB
)3-
Dec-0
91,2
21,69
9.65
1,221
,699.6
5 0.0
0 0.0
0
1003
; Des
ign, D
PRI-M
ILITA
RY W
ORKI
NG
DOG
RELO
C, A
PRA
HRBR
DPRI
-MILI
TARY
WOR
KING
DOG
RE
LOC,
APR
A HR
BR25
-Oct-
081,5
39,32
3.09
1,539
,323.0
9 0.0
0 0.0
0
100A
; Des
ign, N
orth
Ramp
Utili
ties
DPRI
-NOR
TH R
AMP
UTILI
TIES
IN
C 2 O
F 2
15-Ja
n-11
743,8
26.97
74
3,826
.97
0.00
0.00
101;
Desig
n, DP
RI-N
ORTH
RAM
P PA
RKIN
G,
INC
1 (AA
FB)
DPRI
-NOR
TH R
AMP
PARK
ING,
IN
C 1 (
AAFB
)3-
Dec-0
92,1
89,29
0.22
2,189
,290.2
2 0.0
0 0.0
0
101A
:Des
ign, D
PRI-N
orth
Ramp
Pa
rking
Inc 2
02DP
RI-N
ORTH
RAM
P PA
RKIN
G,
INC
2 OF
21-
Feb-
1259
8,432
.64
598,4
32.64
35
.00
0.00
109;
Desig
n, DP
RI-A
IRCR
AFT
MAIN
TENA
NCE
HANG
AR (N
ORTH
RAM
P)DP
RI-A
IRCR
AFT
MAIN
TENA
NCE
HANG
AR (N
ORTH
RAM
P)14
-Mar
-09
1,316
,171.4
5 1,3
16,17
1.45
507,2
82.67
0.0
0
110;
Desig
n, DP
RI-S
ITE
PREP
AND
UT
ILITI
ES, P
HASE
1 (F
INEG
AYAN
)DP
RI-S
ITE
PREP
AND
UTI
LITIE
S,
PHAS
E 1 (
FINE
GAYA
N)30
-Sep
-09
6,273
,650.5
5 6,2
73,65
0.55
6,701
.47
0.00
111;
Desig
n, DP
RI-A
PRA
HARB
OR V
ICTO
R W
HARF
IMPR
DPRI
-APR
A HA
RBOR
VIC
TOR
WHA
RF IM
PR25
-Nov
-09
1,251
,285.7
5 1,2
51,28
5.75
0.00
0.00
113;
Desig
n, DP
RI-F
INEG
AYAN
SIT
E PR
EP
AND
UTILI
TIES
- PH
ASE
2DP
RI-F
INEG
AYAN
SIT
E PR
EP
AND
UTILI
TIES
- PH
ASE
213
-Feb
-10
491,1
28.40
49
1,128
.40
0.00
0.00
January 30, 2015 │ 17
Section 2: Project and Program Costs
18 │ Guam Realignment Report – (Section 2835[e][1][B])
Proj
ect
Desc
riptio
n/Sc
ope
Star
t Dat
eTo
tal
Estim
ated
Cost
Cost
Incu
rred
to
Date
(US o
r GOJ
Fu
nds)
Cost
Incu
rred
Janu
ary 1
- Se
ptem
ber 3
0, 20
13
Estim
ated
Cost
s to
Com
plet
e
2006
; Des
ign, D
PRI- A
pra H
arbo
r Emb
ark
Facil
ities (
Agan
a)DP
RI-A
PRA
HARB
OR E
MBAR
K FA
CILT
IES
(AGA
NA)
30-Ja
n-10
509,0
02.54
50
9,002
.54
0.00
0.00
2014
;Bas
e Com
munic
ation
s Cen
terDP
RI-B
ASE
COMM
UNIC
ATIO
NS
CENT
ER9-
Nov-1
028
8,633
.45
288,6
33.45
0.0
0 0.0
0
204;
Desig
n, DP
RI-A
PRA
HARB
OR W
HARF
IM
PRV,
INC
1 OF
2DP
RI-A
PRA
HARB
OR
WHA
RF IM
PRV,
INC
1 OF
214
-Feb
-09
6,395
,660.9
6 6,3
95,66
0.96
0.00
0.00
2048
; Des
ign, D
PRI-F
inega
yan W
ater U
tilitie
sDP
RI-F
INEG
AYAN
W
ATER
UTI
LITIE
S28
-Jan-
1167
7,391
.86
677,3
91.86
0.0
0 0.0
0
205;
Desig
n, DP
RI-D
efens
e Acc
ess R
oad
Impr
ovem
ents
(Aga
na)
DPRI
-DEF
ENSE
ACC
ESS
ROAD
IM
PROV
EMEN
TS (A
GANA
)27
-Jun-
1110
,272.1
1 10
,272.1
1 0.0
0 0.0
0
230:
Desig
n, DP
RI G
SE S
hops
,Nor
th Ra
mp,(A
nder
sen)
DPRI
- GSE
SHO
PS AT
NO
RTH
RAMP
2-Oc
t-13
694,0
00.00
36
8,234
.44
311,8
57.28
32
5,765
.56
240:
Desig
n, DP
RI M
WSS
Fac
ilities
at
No. R
amp
DPRI
-MW
SS FA
CILIT
IES
AT
NORT
H RA
MP2-
Oct-1
359
4,000
.00
370,0
08.19
34
7,366
.28
223,9
91.81
598;
Desig
n, DP
RI-T
raini
ng La
nd A
cquis
ition
(Rt 1
5 And
y Sou
th)DP
RI-T
RAIN
ING
LAND
AC
QUIS
ITIO
N (R
T 15
) (A
NDY
SOUT
H)
28-M
ar-11
79,69
7.92
79,69
7.92
0.00
0.00
599;
Desig
n, DP
RI-C
OMBA
T LO
GIST
IC
COMP
ANY
FACI
LITIE
S (F
INEG
AYAN
)DP
RI-C
OMBA
T LO
GIST
IC
COMP
ANY
FACI
LITIE
S (F
INEG
AYAN
)
19-D
ec-0
940
8,851
.66
408,8
51.66
0.0
0 0.0
0
600;
Desig
n, DP
RI D
AR R
oad
Reali
gnme
nt Rt
15DP
RI-D
AR R
OAD
REAL
IGNM
ENT,
ROUT
E 15
27-Ju
n-11
6,486
.91
6,486
.91
0.00
0.00
601;
Desig
n, DP
RI-A
VIAT
ION
FACI
LITIE
S AT
NO
RTH
RAMP
DPRI
-AVI
ATIO
N FA
CILIT
IES
AT
NORT
H RA
MP19
-Dec
-09
272,2
96.30
27
2,296
.30
0.00
0.00
602;
Desig
n, DP
RI-II
I MAR
INE
EXPE
DITI
ONAR
Y FO
RCE
HQ (F
INEG
AYAN
)DP
RI-II
I MAR
INE
EXPE
DITI
ONAR
Y FO
RCE
HQ
(FIN
EGAY
AN)
13-F
eb-1
046
6,909
.48
466,9
09.48
0.0
0 0.0
0
603;
Desig
n, DP
RI-F
INEG
AYAN
SIT
E PR
EP
AND
UTILI
TIES
- PH
3DP
RI-F
INEG
AYAN
SIT
E PR
EP
AND
UTILI
TIES
- PH
330
-Jan-
1010
4,839
.78
104,8
39.78
0.0
0 0.0
0
604;
Desig
n, DP
RI-O
PERA
TION
S AN
D AR
MORY
FACI
LITIE
S (F
INEG
AYAN
)DP
RI-O
PERA
TION
S AN
D AR
MORY
FACI
LITIE
S (F
INEG
AYAN
)
13-F
eb-1
055
2,138
.33
552,1
38.33
0.0
0 0.0
0
606;
Desig
n, DP
RI-C
ORRO
SION
CON
TROL
FA
CILIT
Y (F
INEG
AYAN
)DP
RI-C
ORRO
SION
CON
TROL
FA
CILIT
Y (F
INEG
AYAN
)19
-Dec
-09
405,1
72.41
40
5,172
.41
0.00
0.00
700;
Desig
n, DP
RI-IN
DOOR
MU
LTIP
URPO
SE R
ANGE
DPRI
-INDO
OR M
ULTI
PURP
OSE
RANG
E27
-Oct-
1079
,598.6
2 79
,598.6
2 0.0
0 0.0
0
Guam RealiGnment RepoRt
FebRuaRy 1, 2013
(Section 2835[e][1][B])
January 30, 2015 │ 19
Proj
ect
Desc
riptio
n/Sc
ope
Star
t Dat
eTo
tal
Estim
ated
Cost
Cost
Incu
rred
to
Date
(US o
r GOJ
Fu
nds)
Cost
Incu
rred
Janu
ary 1
- Se
ptem
ber 3
0, 20
13
Estim
ated
Cost
s to
Com
plet
e
705;D
esign
, DPR
I-GAS
CHA
MBER
DPRI
-GAS
CHA
MBER
27-O
ct-10
34,28
7.07
34,28
7.07
0.00
0.00
710;D
esign
, DPR
I-ENG
INEE
RING
PIT
DPRI
-ENG
INEE
RING
PIT
27-O
ct-10
55,91
7.95
55,91
7.95
0.00
0.00
J001
X; D
esign
, UTI
LITIE
S AN
D SI
TE
IMPR
OVEM
ENTS
- PH
1UT
ILITI
ES A
ND S
ITE
IMPR
OVEM
ENTS
- PH
114
-Feb
-09
8,543
,939.6
1 8,5
43,93
9.61
0.00
0.00
J006
X De
sign,
Apra
Med
ical C
linic
APRA
MED
ICAL
CLIN
IC
(APR
HAR
BOR)
11-A
pr-0
994
0,472
.72
940,4
72.72
0.0
0 0.0
0
J007
X De
sign,
Wate
rfron
t Hea
dqua
rters
Bldg
WAT
ERFR
ONT
HEAD
QUAR
TERS
BU
ILDIN
G11
-Apr
-09
899,8
42.04
89
9,842
.04
0.00
0.00
J008
X De
sign,
Fire S
tation
FIRE
STA
TION
(FIN
EGAY
AN)
25-A
pr-0
986
5,657
.55
865,6
57.55
0.0
0 0.0
0 J0
11; D
esign
, BAS
E AD
MINI
STRA
TIVE
BU
ILDIN
G (F
INEG
AYAN
)BA
SE A
DMIN
ISTR
ATIV
E BU
ILDIN
G (F
INEG
AYAN
)10
-Apr
-10
903,8
75.58
90
3,875
.58
0.00
0.00
J012
; Des
ign, M
ARIN
E LO
GIST
ICS
GROU
P (M
LG) H
Q BU
ILDIN
GMA
RINE
LOGI
STIC
S GR
OUP
(MLG
) HQ
BUILD
ING
10-A
pr-1
091
8,439
.22
918,4
39.22
0.0
0 0.0
0
J015
; Des
ign,
ENLIS
TED
DINI
NG FA
CILIT
YEN
LISTE
D DI
NING
FACI
LITY
10-A
pr-1
086
3,297
.34
863,2
97.34
0.0
0 0.0
0
J016
; Des
ign, B
ACHE
LORS
ENL
ISTE
D QU
ARTE
RS C
OMPL
EXBA
CHEL
ORS
ENLIS
TED
QUAR
TERS
COM
PLEX
10-A
pr-1
074
8,297
.93
748,2
97.93
0.0
0 0.0
0
J017
; Des
ign, U
TILIT
IES
AND
SITE
IM
PROV
EMEN
TS -
PH 2
UTILI
TIES
AND
SIT
E IM
PROV
EMEN
TS -
PH 2
4-Ju
l-09
6,416
,763.0
6 6,4
16,76
3.06
0.00
0.00
Su
btot
al
$6
74,9
72,2
17.7
6$4
09,9
16,8
42.5
0 $9
2,79
7,40
0.31
$
26
5,05
5,37
5
Mar
ine C
orps
M200
2114
SU00
011
Contr
act L
abor
contr
act to
supp
ort
DPRI
Plan
ning
2014
0320
$219
,171.1
2$2
19,17
1.12
$219
,171.1
2$0
.00
M200
2114
SU00
011
Contr
act L
abor
Trav
el to
supp
ort
DPRI
Plan
ning
2014
0320
11,40
0.00
11,40
0.00
11,40
0.00
0.00
M200
2114
SU00
081
Contr
act L
abor
contr
act to
supp
ort
DPRI
Plan
ning
2014
0723
932,7
89.40
932,7
89.40
932,7
89.40
0.00
M200
2114
SU00
081
Contr
act L
abor
Trav
el to
supp
ort
DPRI
Plan
ning
2014
0930
89,80
0.00
89,80
0.00
89,80
0.00
0.00
M200
2114
MP00
060
Fede
ral A
viatio
n Ad
minis
tratio
n (FA
A)
Natio
nal A
irspa
ce S
ystem
Defe
nse
Prog
rams
(NDP
)
2014
0902
515,0
00.00
515,0
00.00
515,0
00.00
0.00
M200
2114
PODP
R01
SPAW
AR C
4ISR
MILC
ON20
1405
291,2
50,00
0.00
1,250
,000.0
01,2
50,00
0.00
0.00
Section 2: Project and Program Costs
20 │ Guam Realignment Report – (Section 2835[e][1][B])
Proj
ect
Desc
riptio
n/Sc
ope
Star
t Dat
eTo
tal
Estim
ated
Cost
Cost
Incu
rred
to
Date
(US o
r GOJ
Fu
nds)
Cost
Incu
rred
Janu
ary 1
- Se
ptem
ber 3
0, 20
13
Estim
ated
Cost
s to
Com
plet
e
M200
2114
PODP
R02
SPAW
AR M
PD fo
r C4I
2014
0512
1,400
,000.0
01,4
00,00
0.00
1,400
,000.0
00.0
0M2
0021
14PO
DPR0
4NW
SC-C
oron
a is t
aske
d to p
repa
re
a cos
t-to-
comp
lete p
lan fo
r the
J-7
55 A
STC
and P
-715
NW
FTC
2014
0714
249,9
00.00
249,9
00.00
249,9
00.00
0.00
M200
2114
PODP
R05
NSW
C Co
rona
Sys
tems
Engin
eerin
g Plan
Pro
ject P
-715
2014
0714
321,0
00.00
321,0
00.00
321,0
00.00
0.00
M200
2114
PODP
R06
SPAW
AR E
lectro
nic H
arbo
r Se
curity
Sys
tem
2014
0821
82,00
0.00
82,00
0.00
82,00
0.00
0.00
M200
2114
RCDP
R04
NAVF
AC A
rcheo
logica
l Inv
entor
y Stud
y20
1401
2754
,378.0
054
,378.0
054
,378.0
00.0
0
M200
2114
RCDP
R05
NACF
AC G
uam
Aviat
ion
Visio
n Plan
2014
0823
289,9
58.00
289,9
58.00
289,9
58.00
0.00
M200
2114
SU00
020
MFP
PG C
ontra
ctor S
uppo
rt20
1408
201,5
69,79
8.95
1,569
,798.9
51,5
69,79
8.95
0.00
M200
2114
SU00
068
MFP
PG C
ontra
ctor S
uppo
rt20
1404
0210
3,723
.2010
3,723
.2010
3,723
.200.0
0M2
0021
14W
R000
04SP
AWAR
Emb
ed C
ontra
ct 20
1405
0822
0,132
.5022
0,132
.5022
0,132
.500.0
0M2
0021
14W
R000
10NA
VSEA
Cor
ona I
nterb
ase
Comm
Stud
y20
1401
1650
0,000
.0050
0,000
.0050
0,000
.000.0
0
M200
2114
WRD
PR01
NACF
AC B
iosec
urity
Pr
ogra
m De
velop
ment
2014
0714
40,28
0.00
40,28
0.00
40,28
0.00
0.00
M200
2114
WRD
PR02
NACF
AC N
AVFA
CPAC
Co
ord a
nd M
gmt
2014
0922
2,242
,559.0
02,2
42,55
9.00
2,242
,559.0
00.0
0
M200
2114
WRD
PR03
NACF
AC N
ation
al
Regis
ter N
omina
tions
2014
0922
24,92
0.00
24,92
0.00
24,92
0.00
0.00
M200
2114
WRD
PR04
NACF
AC O
ahu L
and U
se S
tudy
2014
0519
35,93
5.57
35,93
5.57
35,93
5.57
0.00
M200
2114
WRD
PR05
NACF
AC M
CBH
Op
timiza
tion P
lan20
1405
1920
,563.0
820
,563.0
820
,563.0
80.0
0
M200
2114
WRD
PR06
NACF
AC H
istor
ical
Pres
erva
tion P
lan20
1409
152,1
37.76
2,137
.762,1
37.76
0.00
M200
2114
WRD
PR07
NACF
AC N
AVFA
CMAR
Co
ord a
nd M
gmt
2014
0929
1,227
,896.0
01,2
27,89
6.00
1,227
,896.0
00.0
0
M200
2114
WRD
PR08
NACF
AC G
IS S
urge
Sup
port
2014
0715
2,420
.002,4
20.00
2,420
.000.0
0
Guam RealiGnment RepoRt
FebRuaRy 1, 2013
(Section 2835[e][1][B])
January 30, 2015 │ 21
Proj
ect
Desc
riptio
n/Sc
ope
Star
t Dat
eTo
tal
Estim
ated
Cost
Cost
Incu
rred
to
Date
(US o
r GOJ
Fu
nds)
Cost
Incu
rred
Janu
ary 1
- Se
ptem
ber 3
0, 20
13
Estim
ated
Cost
s to
Com
plet
e
M200
2114
WRD
PR09
NACF
AC E
SS M
EC
Prog
ram
Supp
ort
2014
0728
10,00
0.00
10,00
0.00
10,00
0.00
0.00
M200
2114
WRD
PR10
NACF
AC S
HPO
Repo
rting
2014
0721
15,76
0.00
15,76
0.00
15,76
0.00
0.00
M200
2114
WRD
PR12
NAVS
EA C
oron
a Non
-Live
Fir
e Tra
ining
Ran
ge20
1312
1935
9,400
.0035
9,400
.0035
9,400
.000.0
0
M200
2114
WRD
PR13
NACF
AC A
rcheo
logica
l Inv
entor
y Stud
y20
1409
1010
,040.0
010
,040.0
010
,040.0
00.0
0
M200
2114
WRD
PR14
SPAW
AR C
4I Em
bed
2014
0508
150,0
00.00
150,0
00.00
150,0
00.00
0.00
M200
2114
WRD
PR15
Embe
d Sup
port
(NAV
FACM
AR)
2014
0402
117,0
92.00
117,0
92.00
117,0
92.00
0.00
M200
2114
WRD
PR16
NAVF
AC IH
Labo
r ISO
Gua
m Av
iation
Visi
on P
lan20
1408
187,0
00.00
7,000
.007,0
00.00
0.00
M200
2114
WRD
PR17
SPAW
AR P
M Su
ppor
t20
1405
211,0
86,00
0.00
1,086
,000.0
01,0
86,00
0.00
0.00
M200
2114
WRD
PR18
NAVF
AC T
inian
Pr
oject
Deve
lopme
nt20
1407
308,0
00.00
8,000
.008,0
00.00
0.00
M200
2114
WRD
PR22
NAVF
AC A
CE La
ydow
n20
1409
113,0
00.00
3,000
.003,0
00.00
0.00
D001
3Up
date
to FH
WA
Guam
Bu
ild-u
p Tra
ffic S
tudy
6/18/2
010
56,58
6.58
56,58
6.58
–
–
D001
4Bl
dg 20
7/228
/155
Reno
vatio
n Pro
ject
9/16/2
010
4,37
7,718
.40
4,37
1,669
.61
– 6,
048.7
9
D001
6Co
mpre
hens
ive B
ase D
ev S
tudy,
Ande
rsen A
FB6/1
8/201
0 1,
173,5
57.70
1,
173,4
89.21
15
,209.0
0 68
.49
E000
4Dr
aft E
IS6/1
2/200
9 3,
501,4
35.40
3,
501,4
35.40
–
–E0
005
Final
EIS
Supp
ort
3/17/2
010
1,93
2,139
.18
1,93
2,138
.18
– 1.
00
E000
8On
-Bas
e Tra
ffic A
nalys
is8/2
0/200
9 27
5,262
.00
275
,262.0
0
–
–E0
009
Wate
r Stud
y5/2
8/200
9 13
,080.9
5 13
,080.9
5
–
–E0
011
Elec
trical
Stud
y7/2
3/200
9 40
,713.0
0 40
,713.0
0
–
–E0
012
Solid
Was
te Ma
nage
ment
Pl
an (I
HS)
3/17/2
010
20,00
0.00
20,0
00.00
–
–
E001
6Na
tural
Reso
urce
Stud
y7/2
3/200
9 36
7,066
.00
367,0
66.00
–
–E0
17Cu
ltura
l/ Hist
orica
l Re
sour
ce S
tudy
6/11/2
009
292,7
11.43
29
2,711
.43
–
–
E002
5CN
MI N
atura
l Res
ource
Sur
vey
4/10/2
009
7,01
1,986
.00
5,25
2,445
.24
– 1,
759,5
40.76
E0
031
Admi
nistra
tive R
ecor
d Rev
iew8/6
/2009
1,13
1,734
.95
1,13
0,226
.79
198.4
8 1,
508.1
6
Section 2: Project and Program Costs
22 │ Guam Realignment Report – (Section 2835[e][1][B])
Proj
ect
Desc
riptio
n/Sc
ope
Star
t Dat
eTo
tal
Estim
ated
Cost
Cost
Incu
rred
to
Date
(US o
r GOJ
Fu
nds)
Cost
Incu
rred
Janu
ary 1
- Se
ptem
ber 3
0, 20
13
Estim
ated
Cost
s to
Com
plet
e
E003
3Si
erra
Wha
rf Dr
edge
Ma
terial
Per
mittin
g7/2
3/200
9
–
–
–
–
E003
7Cu
ltura
l Res
ource
s Stud
y5/1
3/201
0 4,
959.0
0 4,
959.0
0
–
–E0
039
Cultu
ral L
ands
cape
Rep
ort, T
inian
N.
Fiel
d5/1
3/201
0 19
,965.0
0 19
,965.0
0
–
–
E004
0So
cioec
onom
ic St
udy
Guam
Buil
dup
5/6/20
11 28
5,397
.00
285,3
97.00
–
–
E004
1Fin
egay
an5/1
3/201
0 10
,375.0
0 10
,375.0
0
–
–E0
044
Utilit
y Stud
y, W
ater (
Lost
Rive
r)5/1
3/201
0 13
,288.0
1 13
,288.0
1
–
–E0
045
Bios
ecur
ity P
lan10
/17/20
11 2,
496,0
44.56
2,
492,3
75.85
19
.80
3,66
8.71
E004
6Ut
ility S
tudy N
ew W
ells
2/28/2
009
1,91
8,150
.74
1,91
2,180
.74
– 5,
970.0
0 E0
047
Air I
mpac
t Stud
y5/2
8/200
9 17
5,706
.00
175,7
06.00
–
–E0
048
Apra
Har
bor L
andfi
ll Gr
ound
water
Stud
y2/2
8/200
9 88
,785.0
0 88
,785.0
0
–
–
E004
9Aq
uifer
Sus
taina
ble Y
ield
2/28/2
009
22,94
8.00
22,94
8.00
–
–
E005
0Cy
cling
Dem
olitio
n (C&
D)
Recy
cling
Stud
y12
/29/20
09 49
1,998
.00
491,9
98.00
–
–
E005
1Ar
chae
ologic
al Cu
ratio
n7/2
4/200
9 31
5,466
.03
308,1
80.90
–
7,28
5.13
E005
2Ha
ul Ro
ads
2/28/2
009
3,78
0,121
.33
3,69
6,610
.00
– 83
,511.3
3 E0
053
Spec
ial A
irspa
ce F
easib
ility S
tudy
7/24/2
009
1,01
0,921
.00
828,5
79.13
44
,200.0
0 18
2,341
.87
E005
4Ba
ts an
d Sna
ils7/2
3/200
9 70
,227.0
0 70
,227.0
0
–
– E0
056
Mod A
lt 27/2
3/200
9 21
9,970
.00
219,9
70.00
–
–E0
057
Adap
tive M
anag
emen
t7/2
3/200
9 22
3,338
.00
223,3
38.00
–
–E0
060
Tinian
Train
ing R
ange
s EIS
8/17/2
009
100,2
37.00
10
0,237
.00
–
–
E006
1LE
ED S
ustai
nabil
ity S
tudy
8/17/2
009
744,9
89.00
74
4,989
.00
–
–
E006
3Dr
ainag
e Low
Impa
ct De
velop
ment
8/20/2
009
518,5
91.78
51
8,591
.78
–
–
E006
4Pa
per W
asp A
ttrac
tant S
tudy
9/1/20
10 90
,886.0
0 90
,870.6
8 40
,015.7
0
–
E006
6On
-Bas
e Utili
ty St
udy
9/24/2
009
69,79
7.00
69,79
7.00
–
–
E006
7W
etlan
ds D
eline
ation
Stud
y12
/29/20
09 18
8,822
.17
180,8
55.35
–
7,96
6.82
E006
9Gr
ound
Wate
r Stud
y12
/22/20
11 1,
368,3
50.00
1,
188,3
75.16
74
,999.9
9 17
9,974
.84
E007
0Em
ission
s Calc
ulatio
ns M
SAT
5/13/2
010
25,74
5.00
25,74
5.00
––
Guam RealiGnment RepoRt
FebRuaRy 1, 2013
(Section 2835[e][1][B])
January 30, 2015 │ 23
Proj
ect
Desc
riptio
n/Sc
ope
Star
t Dat
eTo
tal
Estim
ated
Cost
Cost
Incu
rred
to
Date
(US o
r GOJ
Fu
nds)
Cost
Incu
rred
Janu
ary 1
- Se
ptem
ber 3
0, 20
13
Estim
ated
Cost
s to
Com
plet
e
E007
1No
rther
n Dist
rict W
aste
Wate
r Tr
eatm
ent P
lant (
NDW
TTP)
Di
ffuse
r Stud
y
5/13/2
010
1,24
1.00
1,24
1.00
––
E007
7Pu
blic C
omme
nt As
sistan
ce -
Part
I2/1
8/201
0 36
5,921
.00
365,9
21.00
–
– E0
079
Sewe
r Inte
rcepto
r4/1
0/200
9 10
4,659
.00
104,6
59.00
–
– E0
080
DEIS
Exe
cutiv
e Su
mmar
y Tra
nslat
ion12
/16/20
09 2,
000.0
0 2,
000.0
0 –
–
E008
3EI
S Tig
er Te
am A
dditio
nal S
pt2/1
9/201
0 47
9,134
.65
479,1
34.65
–
– E0
087
Arch
Mitig
ation
10/20
/2011
888,1
39.48
11
9,409
.90
– 76
8,729
.58
E008
9W
WTP
Upg
rade
5/13/2
010
2,44
1.00
2,44
1.00
––
E009
0Ba
rriga
da W
ater U
tility
Stud
y3/3
1/201
0 29
,210.5
5 2
9,210
.55
––
E009
1Po
wer U
tility
Stud
y Upd
ate5/2
1/200
9 39
,484.1
9 38
,862.8
2 –
621.3
7 E0
092
Utilit
y Tec
h Upd
ate
Admi
n Rec
ord
6/17/2
011
52,10
5.65
52,10
5.65
––
E009
3W
aste
Wate
r Utili
ty Up
date
3/31/2
010
45,79
6.07
45,79
6.07
––
E009
5Int
egra
ted S
olid W
aste
Mana
geme
nt Pl
an (I
SWMP
)2/4
/2010
225,3
39.53
15
9,880
.56
– 65
,458.9
7
E009
6Co
astal
Con
sisten
cy D
eterm
inatio
n7/1
5/201
0 19
,956.0
0 19
,879.0
6 –
76.94
E0
098
Revis
ed H
ardc
opies
of F
EIS
8/20/2
010
22,18
8.00
22,18
8.00
––
E009
9Gu
am W
ellhe
ad
Prote
ction
Reg
ulatio
ns9/1
5/201
0 37
,591.0
0 37
,591.0
0 –
–
E010
0Fin
egay
an La
ndfill
No 2
Si
te Inv
estig
ation
9/16/2
010
471,8
71.04
470,6
06.02
–
1,26
5.02
E010
1Fo
llow-
on N
EPA
Te
rrestr
ial M
itigati
on12
/23/20
10
1,01
8,058
.96
26
2,573
.19
30,82
9.46
755
,485.7
7
E010
2Cu
ltura
l Res
ource
s Con
sulta
tion
and M
itigati
on10
/28/20
10
90
9,829
.97
34
4,375
.79
22,63
7.29
565
,454.1
8
E010
3RO
D Lit
igatio
n10
/17/20
11
8
6,595
.00
8
6,595
.00
–
–
E010
4Fo
llow-
on N
EPA
Te
rrestr
ial M
itigati
on10
/25/20
10
31
3,025
.18
12
7,761
.54
2,95
8.91
185
,263.6
4
E010
5Pe
sticid
e Soil
Impa
cted
Mana
geme
nt Pl
an10
/25/20
10
6
2,222
.18
6
2,222
.18
–
–
E010
6Su
ppor
t SIR
Pre
para
tion
5/20/2
011
71,4
71.88
71,4
71.88
–
–
E0
109L
ANa
val M
unitio
ns S
ite A
lts S
EIS
12/23
/2011
2
,325,2
08.58
2,
149,5
05.95
744
,587.6
4
1
75,70
2.63
Section 2: Project and Program Costs
24 │ Guam Realignment Report – (Section 2835[e][1][B])
Proj
ect
Desc
riptio
n/Sc
ope
Star
t Dat
eTo
tal
Estim
ated
Cost
Cost
Incu
rred
to
Date
(US o
r GOJ
Fu
nds)
Cost
Incu
rred
Janu
ary 1
- Se
ptem
ber 3
0, 20
13
Estim
ated
Cost
s to
Com
plet
e
E010
9LB
NEPA
Sco
ping S
EIS
12/23
/2011
635,1
72.00
626,4
74.53
1
,576.5
3
8,69
7.47
E010
9LC
Wate
rshed
Rec
on S
tudies
SEI
S12
/23/20
11
21
0,219
.00
20
6,842
.38
–
3
,376.6
2 E0
109L
DLF
TRC
SEIS
12/23
/2011
1
,242,5
86.00
1,
167,9
48.04
14
,489.2
9
74,63
7.96
E010
9LQ
SEIS
12/23
/2011
9,
717.3
0
9,7
17.30
–
–
E0
109V
ETr
aining
Ran
ge A
lts S
EIS
12/23
/2011
2
,122,2
66.00
2,
096,9
86.41
412
,821.2
1
25,27
9.59
E011
2LA
Cand
idate
Spec
ies S
urve
y7/1
6/201
2
36
8,850
.43
33
5,073
.38
2
33,03
2.19
33
,777.0
5 E0
112L
BSo
cioec
onom
ic St
udy -
SEI
S7/1
6/201
2
80
6,846
.00
56
4,042
.12
1
39,37
3.95
242
,803.8
8 E0
112L
CNO
I Sco
ping,
Draft
, & F
inal S
EIS
7/13/2
012
7
,579,5
53.00
4,
483,8
00.14
2
,231,4
25.43
3,09
5,752
.86
E011
2LD
Addit
ional
Stud
ies8/2
3/201
2
67
8,547
.00
29
3,571
.51
1
67,52
6.83
384
,975.4
9 E0
112L
FFH
WA
Traffi
c Stud
y5/1
6/201
3
1,68
4,053
.47
8,620
.44
5,18
4.79
1
,675,4
33.03
E0
112V
EPh
ase I
I Plan
ning
7/13/2
012
4
,113,7
15.00
3,
404,2
11.14
238
,661.9
5
7
09,50
3.86
H000
1Gu
am H
ousin
g Spe
cial P
urpo
se
Entity
(PPV
)8/2
0/200
9
39
3,191
.00
39
3,191
.00
–
–
J002
3BO
Q 13
91s
4/6/20
10 29
5,613
.62
29
5,613
.62
––
J002
5Fin
egay
an M
ed/D
ental
Cl
inic 1
391s
4/6/20
10 25
9,538
.84
25
9,538
.84
––
J002
XAd
min F
acilit
ies 13
91s
4/6/20
10 68
3,407
.57
68
0,910
.85
–
2
,496.7
2 N0
038
Acou
stic M
onito
ring
10/25
/2010
425.1
3
4
25.13
–
– P0
001
Maste
r Plan
, Pha
se II
(IHS)
3/17/2
010
410,0
00.00
410,0
00.00
–
– P0
01B
Maste
r Plan
Pha
se III
8/5/20
11 4,
647,9
14.07
1,
647,9
14.07
–
3,00
0,000
.00
P000
4Pr
oject
Docu
menta
tion
9/30/2
009
4,00
0,000
.00
47
2,992
.08
436,6
67.84
3
,527,0
07.92
P0
012
Deve
lop 13
91s a
nd D
PRI
Proje
ct Su
ppor
t7/2
4/200
9 93
2,997
.54
93
2,793
.50
362,1
64.98
204.0
4
P001
5Ma
ster P
lan P
hase
II9/3
/2009
776,1
17.00
776,0
89.83
–
2
7.17
P003
0Tin
ian M
P Ph
ase I
I7/2
3/200
9 1,
093,7
90.95
1,
093,7
90.95
9
6,155
.00
– P0
044
SPE
Cons
ultan
t2/6
/2009
198,0
20.00
198,0
20.00
–
– P0
046
SPE
Cons
truct
1/7/20
09 5,
591,7
73.70
5,
591,6
19.95
–
15
3.75
P005
0Hi
storic
al Or
dnan
ce7/1
/2009
108,4
47.00
108,4
47.00
–
– P0
054
Barri
gada
Stud
y5/4
/2009
388,3
67.00
388,3
67.00
–
– P0
055
Maste
r Plan
Alts
1,3,8
8/23/2
011
99,81
7.00
9
9,817
.00
––
P005
7Tr
affic S
tudy
7/24/2
009
163,6
98.00
163,6
98.00
–
–
Guam RealiGnment RepoRt
FebRuaRy 1, 2013
(Section 2835[e][1][B])
January 30, 2015 │ 25
Proj
ect
Desc
riptio
n/Sc
ope
Star
t Dat
eTo
tal
Estim
ated
Cost
Cost
Incu
rred
to
Date
(US o
r GOJ
Fu
nds)
Cost
Incu
rred
Janu
ary 1
- Se
ptem
ber 3
0, 20
13
Estim
ated
Cost
s to
Com
plet
e
P005
9Co
mbus
tion T
urbin
e Stud
y 2/1
9/201
0 42
1,643
.00
29
2,254
.70
–
129
,388.3
0 P0
060
Explo
sive S
afety
4/8/20
11 84
6,183
.21
31
5,681
.56
9,3
30.11
530
,501.6
5 P0
062
ATFP
Blas
t Ana
lysis
4/6/20
10 10
6,937
.33
10
6,937
.33
––
P006
3Tin
ian P
agan
To
pogr
aphic
Con
tour D
ata3/2
5/201
0 28
8,549
.37
28
8,549
.37
––
P006
4Gu
am C
ommu
nity
Integ
rated
Mas
ter P
lan8/2
0/201
0 56
9,204
.44
56
9,204
.44
––
P006
5Fa
cility
Man
agem
ent S
ustai
nmen
t (F
MS) W
ork P
lan3/1
1/201
1
83,77
1.28
8
3,771
.28
––
P006
6Ut
ility E
nerg
y Man
agem
ent (
UEM)
W
ork P
lan3/1
1/201
1
51,80
0.63
5
1,800
.63
––
P007
5Al
terna
tive L
aydo
wn P
lans
8/5/20
11
2,76
5,240
.00
1,84
9,798
.99
744,9
33.88
915
,441.0
1 R0
001
Appr
aisal
Guam
(less
Har
mon)
9/3/20
09
9
67,45
2.01
86
4,948
.74
–
102
,503.2
7 R0
003
Boun
dary
Surve
y (F
AA P
arce
l)7/2
4/200
9
2
10,19
9.00
20
4,360
.38
–
5
,838.6
2 R0
005
Title
Evide
nce (
HIS)
3/18/2
010
14
,606.8
8
14,3
00.00
–
30
6.88
R000
7En
viron
menta
l Bas
eline
Stud
y5/7
/2009
920
,408.0
8
548,3
18.44
–
3
72,08
9.64
R000
8En
viron
menta
l Site
Ass
essm
ent -
Ro
ute 15
10/25
/2010
11
,081.8
3
10,9
56.43
–
12
5.40
R000
9Re
locati
on A
ssist
ance
Plan
11/13
/2009
126
,448.0
0
50,7
56.80
–
75,69
1.20
R001
1Fin
ding o
f Suit
abilit
y, Gu
am
3/17/2
010
533
,141.3
6
8,1
41.36
–
5
25,00
0.00
R001
3En
viron
menta
l Bas
eline
SPE
3/2
2/201
0
4
61,75
6.23
46
0,758
.14
–
998.0
9 S0
004
NAVF
AC H
Q La
bor S
uppo
rt3/2
4/200
9
2,33
1,072
.50
2,16
5,322
.25
–
165
,750.2
5 S0
005
NAVF
ACPA
C Ye
arly
La
bor S
uppo
rt2/2
4/200
9
17,53
9,928
.06
1
5,147
,820.2
3
24
2,787
.16
2,39
2,107
.83
S000
6NA
VFAC
MAR
Year
ly
Labo
r Sup
port
1/26/2
010
5
,565,6
11.00
3,
703,8
75.77
104
.40
1,86
1,735
.23
S001
0Pr
ogra
m Su
ppor
t Con
tract
9/10/2
009
3
,039,9
81.83
2,
663,1
65.92
3
3,953
.78
3
76,81
5.91
S001
2PI
B IP
R Fa
cilita
tion
2/26/2
010
156
,600.0
0
156,6
00.00
–
– S0
014
GPMO
NAV
FACP
AC S
PAW
AR
C4IS
R/IT
Liais
on3/7
/2011
2
,279,7
37.51
256,3
87.87
–
2,02
3,349
.64
S001
5Gu
am P
rogr
am S
uppo
rt9/2
9/201
1
9,04
0,299
.00
3,75
8,737
.31
304,7
18.71
5
,281,5
61.69
S0
016
NAVF
ACPA
C JV
Ma
nage
ment
Supp
ort
9/28/2
010
1
,283,4
79.00
1,
283,4
79.00
–
–
Section 2: Project and Program Costs
26 │ Guam Realignment Report – (Section 2835[e][1][B])
Proj
ect
Desc
riptio
n/Sc
ope
Star
t Dat
eTo
tal
Estim
ated
Cost
Cost
Incu
rred
to
Date
(US o
r GOJ
Fu
nds)
Cost
Incu
rred
Janu
ary 1
- Se
ptem
ber 3
0, 20
13
Estim
ated
Cost
s to
Com
plet
e
U000
1No
rther
n Dist
rict W
aste
Wate
r Tr
eatm
ent P
lant (
NDW
WTP
)7/2
3/200
9
2
96,42
6.16
29
6,426
.16
––
U000
2Inc
reas
e Pum
p Rate
, Ma
rbo W
ells 5
-99/2
5/201
0
1,22
8,387
.00
1,22
8,387
.00
14,2
05.52
–
U000
3Tu
mon M
aui W
ell R
ehab
ilitati
on9/1
6/201
0
3
90,88
3.00
38
0,400
.41
–
10
,482.5
9 U0
004
Comb
ustio
n Tur
bines
(CTs
) Per
mit
Air M
onito
ring
3/11/2
011
1
,068,8
86.54
24,8
86.54
–
1,04
4,000
.00
U000
5Tu
mon M
aui W
ell R
ehab
9/26/2
011
4
,711,9
74.78
4,
042,5
75.58
6,106
.28
6
69,39
9.20
N/A
Guam
Roa
d Pro
jects
- De
fense
Acc
ess R
oads
(DAR
) Pr
ogra
m [F
HWA]
*
8/17/2
009
1
,595,9
40.00
1,
595,9
40.00
28
3,668
.50
–
Sub
tota
l$1
53,5
96,8
86.3
5$1
19,5
73,7
13.2
2 $2
0,12
6,59
9.18
$
34
,023
,173
.13
Tot
al$8
29,5
69,1
04.11
$529
,490
,555
.72
$112
,923
,999
.49
$
99,0
78,5
48.3
9 S
ourc
e: N
aval
Fac
ilitie
s E
ngin
eerin
g C
omm
and’
s re
spon
se to
DoD
OIG
dat
a ca
ll, 1
1/17
/201
4. M
arin
e C
orps
’ res
pons
e to
DoD
OIG
dat
a ca
ll, 1
1/17
/201
4.
Oth
er F
eder
al A
genc
y Pr
ojec
t and
Pro
gram
Lis
t
In F
Y 20
14, t
he D
OT
iden
tified
fund
s dire
ctly
ass
ocia
ted
with
the
real
ignm
ent o
f mili
tary
insta
llatio
ns a
nd m
ilita
ry p
erso
nnel
to G
uam
. Sp
ecifi
cally
, the
age
ncy
repo
rted
a to
tal o
f 34
proj
ects
that
wer
e di
rect
ly a
ssoc
iate
d w
ith th
e re
alig
nmen
t. Th
e D
OT
pro
ject
s inc
urre
d co
sts o
f app
roxi
mat
ely
$14.
9 m
illio
n w
ith a
n es
timat
ed c
ompl
etio
n co
st of
app
roxi
mat
ely
$48.
8 m
illio
n. T
able
5 id
entifi
es th
e D
OT
pr
ojec
ts an
d as
soci
ated
cos
ts.
Tabl
e 5.
Cos
ts fo
r Oth
er F
eder
al A
genc
y Pr
ojec
ts a
nd P
rogr
ams
Agen
cyPr
ojec
tDe
scrip
tion/
Scop
eSt
art D
ate
Tota
l Est
imat
ed
Cost
Cost
Incu
rred
to
Date
(US o
r GOJ
Fu
nds)
Cost
Incu
rred
Janu
ary 1
- Se
ptem
ber 3
1,
2013
Estim
ated
Cost
s to
Com
plet
e
DOT
MARA
D - D
TMA1
D100
02MA
-PR5
10-2
0120
007/M
A-PR
510-
2013
0044
/ Gua
m Pr
oject
Mana
geme
nt Of
fice
(Nov
. 1, 2
012 t
hru
Dec.
31, 2
013)
11/1/
2012
$1,48
2,626
.89$1
,482,6
26.89
$499
,125.6
5$0
.00
Guam RealiGnment RepoRt
FebRuaRy 1, 2013
(Section 2835[e][1][B])
January 30, 2015 │ 27
Agen
cyPr
ojec
tDe
scrip
tion/
Scop
eSt
art D
ate
Tota
l Est
imat
ed
Cost
Cost
Incu
rred
to
Date
(US o
r GOJ
Fu
nds)
Cost
Incu
rred
Janu
ary 1
- Se
ptem
ber 3
1,
2013
Estim
ated
Cost
s to
Com
plet
e
DOT
MARA
D - D
TMA1
D100
02
(Task
Ord
er 10
)MA
-PR5
10-2
0120
024 /
Con
taine
r Fr
eight
Stati
on (C
FS) M
odific
ation
an
d Con
struc
tion
1/23/2
013
1,149
,974.0
01,0
89,10
8.63
728,3
11.27
60,86
5.37
DOT
MARA
D - D
TMA1
D100
02
(Task
Ord
er 6)
MA-P
R510
-201
2002
3A / F
acilit
y Ex
pans
ion
Desig
n Pac
kage
1/10/2
013
2,145
,044.8
01,9
14,97
7.36
452,5
60.87
230,0
67.44
DOT
MARA
D - D
TMA1
D100
02
(Task
Ord
er 11
)MA
-PR5
10-2
0130
054 /
Sele
cted
Demo
lition
and B
reak
Bulk
Yar
d Mod
8/5/20
131,7
93,32
7.00
1,592
,678.9
61,5
92,67
8.96
200,6
48.04
DOT
MARA
D - D
TMA1
D100
02
(Mod
8)St
ructu
ral R
eview
-
Berth
s 4, 5
& 6
(A
ugus
t 1, 2
011 t
hrou
gh S
eptem
ber
05, 2
011)
8/1/20
1110
6,388
.0089
,622.0
40.0
016
,765.9
6
DOT
MARA
D - D
TMA1
D100
02
(Mod
11)
Proje
ct Ma
nage
ment
(Dec
embe
r 11,
'11 -
Febr
uary
18, '1
2)12
/11/20
1193
,351.5
593
,351.5
50.0
00.0
0
DOT
MARA
D - D
TMA1
D100
02
(Task
Ord
er 1,
Inc
luding
all M
ods)
To de
velop
a ge
otech
nical
& se
ismic
evalu
ation
of th
e wha
rf an
d fina
lize t
he
Imple
menta
tion P
lan by
Mar
ch 20
12.
2/29/2
012
245,6
68.00
245,6
68.00
0.00
0.00
DOT
MARA
D - D
TMA1
D100
02
(Task
Ord
er 2)
To de
velop
lighti
ng
plan f
or th
e por
t to
hire a
conta
iner y
ard l
ightin
g co
ntrac
tor
11/2/
2011
160,3
70.00
160,3
70.00
0.00
0.00
DOT
MARA
D - D
TMA1
D100
02
(Task
Ord
er 2,
Mod
1)To
amen
d the
lighti
ng pl
an pe
r ad
dition
al lig
hts ba
sed o
n ava
ilable
FE
MA fu
nds.
1/17/2
012
25,87
4.00
25,87
4.00
0.00
0.00
DOT
MARA
D - D
TMA1
D100
02
(Task
Ord
er 3)
Comp
letion
of th
e Env
ironm
ental
As
sess
ment.
1/1/20
1217
0,811
.0017
0,811
.000.0
00.0
0
DOT
MARA
D - D
TMA1
D100
02
(Mod
13)
MA-P
R510
-201
2004
3 / E
xtend
Pro
ject
Mana
geme
nt Se
rvice
s to M
arch
31 '1
22/1
9/201
241
,195.2
041
,195.2
00.0
00.0
0
DOT
MARA
D - D
TMA1
D100
02
(Mod
14)
Proje
ct Ma
nage
ment
(Apr
il 1-3
0, '12
)4/1
/2012
48,65
5.27
48,65
5.27
0.00
0.00
DOT
MARA
D - D
TMA1
D100
02
(Mod
15)
Proje
ct Ma
nage
ment
(May
1, '1
2 -
July
31, '1
2)5/1
/2012
158,4
01.00
155,5
88.66
0.00
2,812
.34
DOT
MARA
D - D
TMA1
D100
02
(Task
Ord
er 4)
Desig
ning t
hree
bays
of th
e exis
ting
CFS
build
ing to
inclu
de ne
w offi
ce
spac
e com
pone
nts.
7/26/2
012
168,0
92.00
160,3
29.98
51,22
0.06
7,762
.02
Section 2: Project and Program Costs
28 │ Guam Realignment Report – (Section 2835[e][1][B])
Agen
cyPr
ojec
tDe
scrip
tion/
Scop
eSt
art D
ate
Tota
l Est
imat
ed
Cost
Cost
Incu
rred
to
Date
(US o
r GOJ
Fu
nds)
Cost
Incu
rred
Janu
ary 1
- Se
ptem
ber 3
1,
2013
Estim
ated
Cost
s to
Com
plet
e
DOT
MARA
D - D
TMA1
D100
02
(Task
Ord
er 5)
Supp
ort o
vera
ll GCP
I pro
gram
en
viron
menta
l ser
vice a
s well
as
TO 00
5-sp
ecific
envir
onme
ntal te
sting
an
d pro
viding
the f
ollow
ing de
sign
servi
ces i
n the
PAG
Bre
ak B
ulk
(BB)
Yar
d: de
moliti
on of
selec
ted
struc
tures
, rep
lacem
ent o
f ass
ociat
ed
lost li
ghtin
g and
pave
ment
repa
irs,
and i
mplem
entat
ion of
four
oil w
ater
sepa
rator
s.
8/7/20
1247
3,904
.0039
5,443
.7345
,716.3
178
,460.2
7
DOT
MARA
D - D
TMA1
D100
02
(Task
Ord
er 7)
Proje
ct Ma
nage
ment
(Aug
ust 1
, '12 -
Oc
tober
31, '1
2)8/7
/2012
272,9
19.55
245,2
12.41
0.00
27,70
7.14
DOT
MARA
D - D
TMA1
D100
02
(Task
Ord
er 8)
Proje
ct Ma
nage
ment
(N
ovem
ber 1
, '12 -
Apr
il 30,
'13)
11/2/
2012
534,0
91.00
534,0
91.00
0.00
0.00
DOT
MARA
D - D
TMA1
D100
02
(Task
Ord
er 8)
Proje
ct Ma
nage
ment
(Janu
ary 1
, '14 -
De
cemb
er 31
, '14)
1/1/20
141,5
77,17
8.00
776,9
16.47
776,9
16.47
800,2
61.53
DOT
MARA
D - 1
BPC1
1000
004/1
1Ma
ritime
Adm
inistr
ation
En
ginee
ring S
uppo
rt1/1
/2012
242,1
11.73
241,9
64.44
0.00
147.2
9
DOT
MARA
D - D
TMA1
D100
02
(Task
Ord
er 12
)Ma
in Fa
cility
Exp
ansio
n Con
struc
tion
3/13/2
014
32,12
0,174
.004,1
51,75
2.79
4,151
,752.7
927
,968,4
21.21
DOT
FHW
A - G
over
nmen
t of G
uam
Contr
act Is
landw
ide P
rogr
am
Mana
geme
nt Se
rvice
s GU-
NH-
IPMS
(002
) (DT
FH61
09X5
0001
=
fund
s fro
m U
SMC
= $3
,696,6
10.00
/Mod
1; B
UMED
=
$80,0
00.00
/Mod
2; U
SMC
= $1
,595,9
40.00
/Mod
3)
(27X
X66IP
MS00
224C
0 =
USMC
$260
,336.0
8)
Gove
rnme
nt of
Guam
DPW
, FH
WA,
and D
OD10
/1/20
085,6
32,88
6.08
5,535
,188.4
030
6,627
.3097
,697.6
8
DOT
FHW
A - G
over
nmen
t of
Guam
Con
tract
Islan
dwide
Pr
ogra
m Ma
nage
ment
Servi
ces G
U-NH
-IPMS
(003
) (2
7XX6
6IPMS
0032
4C0
= US
MC $1
,415,0
17.39
) (2
7XX6
6IPMS
0037
3V0 =
US
MC $8
50,71
4.27)
Prep
are N
EPA
Docu
ment
and
Coor
dinati
on be
twee
n Gov
ernm
ent o
f Gu
am D
PW, F
HWA,
and D
OD
5/1/20
132,2
65,73
1.66
652,3
35.77
652,3
35.77
1,613
,395.8
9
Guam RealiGnment RepoRt
FebRuaRy 1, 2013
(Section 2835[e][1][B])
January 30, 2015 │ 29
Agen
cyPr
ojec
tDe
scrip
tion/
Scop
eSt
art D
ate
Tota
l Est
imat
ed
Cost
Cost
Incu
rred
to
Date
(US o
r GOJ
Fu
nds)
Cost
Incu
rred
Janu
ary 1
- Se
ptem
ber 3
1,
2013
Estim
ated
Cost
s to
Com
plet
e
DOT
FHW
A - G
over
nmen
t of
Guam
Con
tract
Islan
dwide
Pr
ogra
m Ma
nage
ment
Servi
ces G
U-NH
-IPMS
(002
) 27
XX66
IPMS
0027
3P0
= $2
,702,9
83.38
27
XX66
IPMS
0027
3V0 =
$4
7,307
.45
Prep
are D
esign
/Buil
d req
uest
for
Quali
ficati
ons f
or P
ropo
sals
for
FY20
10 D
AR pr
ojects
, Rou
te 1 e
ast
of Ro
ute 4,
Rou
te 11
/1, R
oute
11,
Route
1/8,
and A
gana
Brid
ge an
d Ut
ility C
oord
inator
2/1/20
102,7
50,29
0.83
2,625
,731.6
90.0
012
4,559
.14
DOT
FHW
A - G
over
nmen
t of
Guam
Con
tract
Route
1 an
d 3 I
nterse
ction
Impr
ovem
ents
GU-N
H-00
01(1
25)
27XX
6600
0112
573P
0 =
$570
,740 2
7XX6
6000
1125
73V0
=
$30,2
32
Cons
ultan
t for
Route
1/3 I
nterse
ction
6/8
/2011
600,9
72.00
439,6
37.05
380,3
75.05
161,3
34.95
DOT
FHW
A - G
over
nmen
t of
Guam
Con
tract
Route
3 fro
m Ro
ute 28
to C
halan
Ka
reta
GU-N
H-00
03(1
05)
27XX
6600
0310
573V
0 =
$2,18
2,765
Cons
ultan
t for R
oute
3 fro
m Ro
ute 28
to
Chala
n Kar
eta5/2
6/201
12,1
82,76
5.00
125,6
64.63
0.00
2,057
,100.3
7
DOT
FHW
A - G
over
nmen
t of
Guam
Con
tract
Route
1 Ag
ana B
ridge
and R
oute
1/8 In
terse
ction
GU-
DAR-
TI01
(001
) 27X
X66T
I0173
V0 =
$1
1,489
,813.9
1
Cons
tructi
on of
Rou
te 1 A
gana
Brid
ge
and R
oute
1/8 In
terse
ction
9/28/2
011
11,48
9,813
.918,1
55,29
6.74
2,936
,647.1
33,3
34,51
7.17
DOT
FHW
A - G
over
nmen
t of G
uam
Contr
act R
oute
11 (R
oute
1 to
Route
11) a
nd R
oute
1/11
Inter
secti
on G
U-DA
R-00
11(0
08)
27XX
6600
1100
873V
0 =
$13,7
69,79
8.99
Cons
tructi
on of
Rou
te 11
and
Route
1/11
Inter
secti
on10
/4/20
1113
,769,7
98.99
13,48
0,655
.9128
2,097
.4628
9,143
.08
DOT
FHW
A - G
over
nmen
t of
Guam
Con
tract
Tech
nical
Supp
ort S
ervic
es Is
landw
ide
GeoT
echn
ical E
ngine
ering
GU
-NH-
TSIS
(001
) 27
XX66
TSIS
0017
3V0 =
$3
3,120
Cons
tructi
on M
anag
emen
t for R
oute
1 Aga
na B
ridge
, Rou
te 1/8
, Rou
te 11
, Ro
ute 1/
11
9/28/2
011
3,309
,481.8
81,9
37,68
4.89
1,489
,583.5
61,3
71,79
6.99
Section 2: Project and Program Costs
30 │ Guam Realignment Report – (Section 2835[e][1][B])
Agen
cyPr
ojec
tDe
scrip
tion/
Scop
eSt
art D
ate
Tota
l Est
imat
ed
Cost
Cost
Incu
rred
to
Date
(US o
r GOJ
Fu
nds)
Cost
Incu
rred
Janu
ary 1
- Se
ptem
ber 3
1,
2013
Estim
ated
Cost
s to
Com
plet
e
DOT
FHW
A - G
over
nmen
t of
Guam
Con
tract
Route
1 an
d 3 I
nterse
ction
Impr
ovem
ents
GU-N
H-00
01(1
25)
27XX
6600
0112
573V
0 =
$7,50
6,000
Arch
aeolo
gical
Supp
ort fo
r Rou
te 1
Agan
a Brid
ge, R
oute
1/8, a
nd
Route
1/11
3/22/2
011
1,977
,404.3
064
6,650
.7230
1,650
.041,3
30,75
3.58
DOT
FHW
A - G
over
nmen
t of
Guam
Con
tract
Tech
nical
Supp
ort S
ervic
es Is
landw
ide
Quali
ty As
sura
nce T
estin
g GU
-NH-
TSIS
(002
) 27
XX66
TSIS
0027
3V0 =
$2
99,48
5.00
Quali
ty As
sura
nce T
estin
g for
Rou
te 1 A
gana
Brid
ge, R
oute
1/8, R
oute
11,
and R
oute
1/11
11/16
/2011
299,4
85.00
297,7
64.12
286,2
71.30
1,720
.88
DOT
FHW
A - G
over
nmen
t of
Guam
Con
tract
Tech
nical
Supp
ort S
ervic
es Is
landw
ide
GeoT
echn
ical E
ngine
ering
GU
-NH-
TSIS
(001
) 27
XX66
TSIS
0017
3V0
= $3
3,120
Geote
chnic
al En
ginee
ring f
or R
oute
1 Ag
ana B
ridge
and R
oute
1/88/2
3/201
033
,120.0
033
,120.0
00.0
00.0
0
DOT
FHW
A - G
over
nmen
t of
Guam
Con
tract
Route
1 an
d 3 I
nterse
ction
Impr
ovem
ents
GU-N
H-00
01(1
25)
27XX
6600
0112
573V
0 =
$7,50
6,00
Contr
actor
for C
ON R
oute
1/39/1
6/201
47,5
06,00
0.00
0.00
0.00
7,506
,000.0
0
DOT
FHW
A - G
over
nmen
t of
Guam
Con
tract
Tech
nical
Supp
ort S
ervic
es Is
landw
ide
Profe
ssion
al Co
nstru
ction
Ma
nage
ment
Servi
ces
GU-N
H-PC
MS(0
02)
27XX
66PC
MS00
273V
0 =
$1,50
1,200
.00
Cons
ultan
t for C
onstr
uctio
n Ma
nage
ment
for R
oute
1/39/1
6/201
41,5
01,20
0.00
0.00
0.00
1,501
,200.0
0
Guam RealiGnment RepoRt
FebRuaRy 1, 2013
(Section 2835[e][1][B])
January 30, 2015 │ 31
Agen
cyPr
ojec
tDe
scrip
tion/
Scop
eSt
art D
ate
Tota
l Est
imat
ed
Cost
Cost
Incu
rred
to
Date
(US o
r GOJ
Fu
nds)
Cost
Incu
rred
Janu
ary 1
- Se
ptem
ber 3
1,
2013
Estim
ated
Cost
s to
Com
plet
e
DOT
FHW
A - G
over
nmen
t of
Guam
Con
tract
Tech
nical
Supp
ort S
ervic
es Is
landw
ide
Subs
urfac
e Utili
ty En
ginee
ring
Servi
ces G
U-NH
-SUE
S(00
1)
27XX
66SU
ES00
173V
0 =
$62,6
77.20
Cons
ultan
t for S
UE S
ervic
es fo
r Ro
ute 1/
39/1
6/201
462
,677.2
00.0
00.0
062
,677.2
0
Tot
al$9
6,39
1,78
3.84
$47,
545,
968.
30$1
4,93
3,86
9.99
$48,
845,
815.
54S
ourc
e: D
OT’
s re
spon
se to
DoD
OIG
dat
a ca
ll, 1
1/14
/201
4.
32 │ Guam Realignment Report U.S. Naval Hospital Ship Mercy at sea
(SEC
TIO
N 2
835[
e][1
][C
])
January 30, 2015 │ 33
Government of Japan Revenue3
Section 3: Government of Japan Revenue
Section 3. Government of Japan Revenue (Section 2835[e][1][C])
Section 2350, title 10 of the United States Code, grants the Secretary of Defense authority to accept cash contributions from any nation in support of a relocation of the armed forces. According to agreements between the U.S. and the GOJ, the GOJ is expected to provide up to $6.09 billion (FY 2008 U.S. dollars) for the Marine Corps relocation from Okinawa to Guam. Public Law 111-84 requires the ICG annual report to contain a detailed statement on the revenues contributed by the GOJ and any obligations or expenditures of these revenues.
GOJ Funding For Realignment
In FY 2014, the Defense Finance and Accounting Services reported that GOJ provided revenues of approximately $9.8 million,3 earned approximately $1.3 million in interest associated with revenues, obligated approximately $5.6 million, and expended approximately $30 million.4 Table 6 shows the revenues, interest, obligations, and expenditures for each project.
Table 6. GOJ Revenues/Interest/Obligations/Expenditures
Project Revenue (Contribution) Earnings on Investment Obligations Expenditures
JFY09 Contribution $ – $ 165,874.95 $ – $ –
JFY10 Contribution 956,347.49
JFY11 Contribution 177,191.19
JFY14 Contribution 9,800,000.00 19.05
Construction APRA 2,922,069.17 12,121,760.13
Construction AAFB 2,547,883.55 17,735,314.31
Construction Finegayan 54,106.21 54,106.21
Design Fire 38,253.82 32,575.08
Design BEQ 73,928.07 69,526.86
Design Medical 2,868.39
Total $ 9,800,000.00 $ 1,299,432.68 $ 5,639,109.21 $ 30,013,282.59
Source: Defense Finance and Accounting Services’ response to DoD OIG data call, 11/13/2014.
34 │ Guam Realignment Report – (Section 2835[e][1][C])
3 Revenues provided from previous years totaled approximately $948.1 million. 4 Expenditures from previous years totaled approximately $87.2 million.
January 30, 2015 │ 35January 30, 2015 │ 35
(Section 2835[e][1][C])
36 │ Guam Realignment Report Marine Corps CH-53 helicopters prepare for flight
(SEC
TIO
N 2
835[
e][1
][D
])
January 30, 2015 │ 37
Operating Expenses 4
Section 4: Operating Expenses
38 │ Guam Realignment Report – (Section 2835[e][1][D])
Section 4. Operating Expenses (Section 2835[e][1][D])
Public Law 111-84 requires the ICG annual report to contain a detailed statement on the operating expenses of agencies or entities receiving amounts appropriated or otherwise made available for military construction on Guam. The DoD Financial Management Regulation states that operating expenses include costs for personnel, travel, communications, contractual services, and other program expenses.
Department of the Navy Operating Expenses
For FY 2014, the Department of the Navy reported operating expenses of $17.6 million. Table 7 lists the operating expenses for Department of the Navy support organizations associated with the military realignment on Guam.
Table 7. Department of the Navy Operating Expenses Related to the Guam Realignment
Organization Description of Expenses Incurred Operating ExpensesMarine Corps Pacific Division Salaries $902,476.55 Marine Corps Pacific Division Travel 216,849.12 Marine Corps Pacific Division Contract 238,000.00 Marine Corps Forces Pacific Travel 343,175.33 Marine Corps Forces Pacific Communications 1,119.14 Marine Corps Forces Pacific Contracts & other services 6,115,926.57 Marine Corps Forces Pacific Supplies & Materials 12,150.72 Marine Corps Installations Command Installations and Logistics
Travel 70,893.70
Marine Corps Installations Command Installations and Logistics
Contracts & other services 518,367.04
Marine Corps Installations Command Installations and Logistics
Expensed via Naval Facilities Engineering Command 6,555,860.41
Marine Corps Installations Command Installations and Logistics
Expensed via Other Agencies 398,684.19
JGPO CIVPAY 1,374,000.00JGPO Travel 119,000.00JGPO Supplies & Materials 13,000.00JGPO Intergovernmental Purchases 698,000.00JGPO Printing 13,000.00 Total $ 17,590,502.77
Source: JGPO’s response to DoD OIG data call, 11/17/2014, Marine Corps’ response to DoD OIG data call, 11/17/2014, and Naval Facilities Engineering Command’s response to DoD OIG data call, 11/17/2014.
January 30, 2015 │ 39
(Section 2835[e][1][D])
Operating Expenses for Other Federal Agencies
For FY 2014, DOT, DHS, and the Environmental Protection Agency (EPA) reported approximately $15.3 million in operating expenses associated with the realignment of military installations and military personnel to Guam. Specifically, DOT identified administrative and travel costs, DHS identified general expenses and payroll costs, and EPA identified salary costs. Table 8 lists operating expenses for DOT, DHS, and the EPA associated with the military realignment on Guam.
Table 8. Other Federal Agency Operating Expenses Related to the Guam Realignment
Agency Description of Expenses Incurred Operating ExpensesDOT Admin $84,021.06 DOT Travel 7,164.00 DHS General Expenses 145,170.58 DHS Payroll 14,977,828.34 EPA Salaries 73,252.00 Total $15,287,435.98
Source: DOT’s response to DoD OIG data call, 11/14/2014, DHS’s response to DoD OIG data call, 11/18/2014, and EPA’s response to DoD OIG data call, 11/14/2014.
40 │ Guam Realignment Report U.S. Air Force personnel perform ongoing construction at Andersen AFB, Guam
January 30, 2015 │ 41
(SEC
TIO
N 2
835[
e][1
][E]
)
5 Contracts, Grants, Agreements, or Other Funding Mechanisms Data
Section 5: Contracts, Grants, Agreements, or Other Funding Mechanisms Data
Sect
ion
5. C
ontr
acts
, Gra
nts,
Agr
eem
ents
, or O
ther
Fun
ding
M
echa
nism
s D
ata
(Sec
tion
283
5[e]
[1][
E])
Publ
ic L
aw 1
11-8
4 re
quire
s the
ICG
ann
ual r
epor
t to
cont
ain
a de
taile
d sta
tem
ent o
n th
e aw
arde
d co
ntra
cts,
gran
ts, a
gree
men
ts, o
r oth
er
fund
ing
mec
hani
sms t
hat u
sed
amou
nts a
ppro
pria
ted
or o
ther
wise
mad
e av
aila
ble
for m
ilita
ry c
onstr
uctio
n on
Gua
m.
DoD
Con
trac
ts/G
rant
s/A
gree
men
ts/O
ther
Fun
ding
Mec
hani
sms
For F
Y 20
14, D
oD re
port
ed a
tota
l of 5
3 co
ntra
cts,
gran
ts, a
gree
men
ts, o
r oth
er fu
ndin
g m
echa
nism
s tot
alin
g ap
prox
imat
ely
$62.
8 m
illio
n th
at w
ere
used
to su
ppor
t mili
tary
con
struc
tion
on G
uam
. S
peci
fical
ly, th
e M
arin
e C
orps
repo
rted
one
con
trac
t tot
alin
g ap
prox
imat
ely
$47,
964
that
was
use
d to
supp
ort t
he m
ilita
ry re
alig
nmen
t to
Gua
m.
Nav
al F
acili
ties E
ngin
eerin
g C
omm
and
repo
rted
a
tota
l of 5
0 co
ntra
cts t
otal
ing
appr
oxim
atel
y $6
0.6
mill
ion
that
wer
e us
ed to
supp
ort t
he m
ilita
ry re
alig
nmen
t to
Gua
m.
The
Offi
ce
of E
cono
mic
Adj
ustm
ent r
epor
ted
a to
tal o
f tw
o gr
ants
tota
ling
appr
oxim
atel
y $2
.1 m
illio
n th
at w
ere
used
to su
ppor
t the
mili
tary
re
alig
nmen
t to
Gua
m.
Tabl
e 9
iden
tifies
Mar
ine
Cor
ps, N
aval
Fac
ilitie
s Eng
inee
ring
Com
man
d, a
nd O
ffice
of E
cono
mic
Adj
ustm
ent c
ontr
acts,
gra
nts,
agre
emen
ts, o
r oth
er fu
ndin
g m
echa
nism
s.5 A
cont
ract
may
be
liste
d m
ultip
le ti
mes
due
to a
task
ord
er, d
eliv
ery
orde
r, or
mod
ifica
tion
incr
easin
g th
e va
lue
of th
e co
ntra
ct.
Tabl
e 9.
DoD
Con
trac
ts, G
rant
s, A
gree
men
ts, o
r Oth
er F
undi
ng M
echa
nism
s Sup
port
ing
the
Gua
m M
ilita
ry R
ealig
nmen
t
Agen
cy
Cont
ract
Num
ber,
Gran
t, Ag
reem
ent,
or Fu
ndin
g M
echa
nism
Title
Ceili
ng A
mou
nt
Amou
nt
Oblig
ated
/ Aw
arde
dOc
tobe
r 1, 2
013
- Sep
tem
ber 3
0,
2014
Scop
e / D
escr
iptio
nM
etho
d Us
ed to
So
licit
Offer
sOff
ers S
olici
ted
Offer
s Rec
eive
d
Mar
ine C
orps
USMC
N001
78-0
4-D-
4024
-MU
T3$2
,536,6
45.52
$47,9
63.94
Engin
eerin
g, Ma
ster P
lannin
g, an
d En
viron
menta
l Sup
port
SEAP
ORT
e-po
rtal;
unre
strict
ed (F
ull
and O
pen)
; FF
P Ta
sk O
rder
N/A
3
Su
btot
al$2
,536
,645
.52
$47,
963.
94
5
The
tabl
e co
ntai
ns n
egat
ive
num
bers
list
ed in
par
enth
esis
, whi
ch re
pres
ent d
e-ob
ligat
ions
.
42 │ Guam Realignment Report – (Section 2835[e][1][E])
(Section 2835[e][1][E])
Agen
cy
Cont
ract
Num
ber,
Gran
t, Ag
reem
ent,
or Fu
ndin
g M
echa
nism
Title
Ceili
ng A
mou
nt
Amou
nt
Oblig
ated
/ Aw
arde
dOc
tobe
r 1, 2
013
- Sep
tem
ber 3
0,
2014
Scop
e / D
escr
iptio
nM
etho
d Us
ed to
So
licit
Offer
sOff
ers S
olici
ted
Offer
s Rec
eive
d
Nava
l Fac
ilitie
s Eng
inee
ring
Com
man
dNA
VFAC
N401
9210
D000
7$5
0,000
,000.0
0($
485.0
0)MO
DIFI
CATI
ON T
O DE
DUCT
MUN
ITIO
N AN
D EX
PLOS
IVES
OF
CONC
ERN
SERV
ICES
FO
R NO
RTH
RAMP
UTI
LITIE
S PH
ASE
2 (IN
CREM
ENT
1) P
ROJE
CT S
ITE
AT
ANDE
RSEN
AIR
FOR
CE B
ASE,
GUA
M.
SUBJ
ECT
TO
MULT
IPLE
AW
ARD
FAIR
OPP
ORTU
NITY
FULL
AND
OPE
N CO
MPET
ITIO
N AF
TER
EXCL
USIO
N OF
SO
URCE
S
3
NAVF
ACN4
0192
10D2
800
$500
,000,0
00.00
$115
,366.0
0 MO
DIFI
CATI
ON F
OR P
ROJE
CT P
-100
NOR
TH
RAMP
UTI
LITIE
S, IN
CREM
ENT
1; RE
QUES
T FO
R EQ
UITA
BLE
ADJU
STME
NT F
OR
GOVE
RNME
NT D
ELAY
OF
MEC
CLEA
RANC
E.
SUBJ
ECT
TO
MULT
IPLE
AW
ARD
FAIR
OPP
ORTU
NITY
COMP
ETIT
ION
AFTE
R EX
CLUS
ION
OF
SOUR
CES
6
NAVF
ACN4
0192
10D2
801
$500
,000,0
00.00
($25
8,467
.65)
THE
PURP
OSE
OF T
HIS
MODI
FICA
TION
IS
TO
INCO
RPOR
ATE
PC 05
TO
ASSE
SS
LIQUI
DATE
D DA
MAGE
S FO
R NA
VAL
HOSP
ITAL R
EPLA
CEME
NT P
ROJE
CT.
SUBJ
ECT
TO
MULT
IPLE
AW
ARD
FAIR
OPP
ORTU
NITY
COMP
ETIT
ION
AFTE
R EX
CLUS
ION
OF
SOUR
CES
5
NAVF
ACN4
0192
10D2
803
$500
,000,0
00.00
($42
,400.0
0)MO
DIFI
CATI
ON F
OR P
ROJE
CT F
Y10 M
CON
P-20
4 WHA
RF IM
PROV
EMEN
TS (U
NIFO
RM
AND
TANG
O) A
PRA
PHAS
E 1 (
SECO
NDAR
Y PA
RT E
); RE
MOVE
OPT
ION
1 (DE
MOLIS
H AN
D RE
MOVE
CON
CRET
E FE
NDER
STA
ND-
OFF
STRU
CTUR
E) F
ROM
THE
CONT
RACT
.
SUBJ
ECT
TO
MULT
IPLE
AW
ARD
FAIR
OPP
ORTU
NITY
COMP
ETIT
ION
AFTE
R EX
CLUS
ION
OF
SOUR
CES
3
NAVF
ACN4
0192
10D2
803
$500
,000,0
00.00
$372
,830.0
0 MO
DIFI
CATI
ON F
OR P
ROJE
CT F
Y10 M
CON
P-20
4 WHA
RF IM
PROV
EMEN
TS (U
NIFO
RM
AND
TANG
O) A
PRA
PHAS
E 1 (
SECO
NDAR
Y PA
RT E
); RE
LOCA
TE N
EW G
ENER
ATOR
BU
ILDIN
G, F
URNI
SH/IN
STAL
L 200
mm
POTA
BLE
WAT
ER LI
NES
AND
INCR
EASE
THE
NU
MBER
OF
TELE
COMM
UNIC
ATIO
N DU
CTS.
SUBJ
ECT
TO
MULT
IPLE
AW
ARD
FAIR
OPP
ORTU
NITY
COMP
ETIT
ION
AFTE
R EX
CLUS
ION
OF
SOUR
CES
3
NAVF
ACN4
0192
10D2
803
$500
,000,0
00.00
$349
,586.0
0 MO
DIFI
CATI
ON F
OR P
ROJE
CT F
Y10 M
CON
P-20
4 WHA
RF IM
PROV
EMEN
TS (U
NIFO
RM
AND
TANG
O) A
PRA
PHAS
E 1 (
SECO
NDAR
Y PA
RT E
); IN
STAL
L A S
EWAG
E LIF
T ST
ATIO
N.
SUBJ
ECT
TO
MULT
IPLE
AW
ARD
FAIR
OPP
ORTU
NITY
COMP
ETIT
ION
AFTE
R EX
CLUS
ION
OF
SOUR
CES
3
NAVF
ACN4
0192
10D2
803
$500
,000,0
00.00
$228
,645.0
0 MO
DIFI
CATI
ON F
OR P
ROJE
CT F
Y10 M
CON
P-20
4 WHA
RF IM
PROV
EMEN
TS (U
NIFO
RM
AND
TANG
O) A
PRA
PHAS
E 1 (
SECO
NDAR
Y PA
RT E
); RE
QUES
T FO
R EQ
UITA
BLE
ADJU
STME
NT F
OR P
ROJE
CT D
ELAY
S FR
OM
THE
LATE
TUR
NOVE
R OF
P20
4 PAR
T A&B
AN
D BA
SE A
CCES
S DE
LAYS
.
SUBJ
ECT
TO
MULT
IPLE
AW
ARD
FAIR
OPP
ORTU
NITY
COMP
ETIT
ION
AFTE
R EX
CLUS
ION
OF
SOUR
CES
3
January 30, 2015 │ 43
Section 5: Contracts, Grants, Agreements, or Other Funding Mechanisms Data
44 │ Guam Realignment Report – (Section 2835[e][1][E])
Agen
cy
Cont
ract
Num
ber,
Gran
t, Ag
reem
ent,
or Fu
ndin
g M
echa
nism
Title
Ceili
ng A
mou
nt
Amou
nt
Oblig
ated
/ Aw
arde
dOc
tobe
r 1, 2
013
- Sep
tem
ber 3
0,
2014
Scop
e / D
escr
iptio
nM
etho
d Us
ed to
So
licit
Offer
sOff
ers S
olici
ted
Offer
s Rec
eive
d
NAVF
ACN4
0192
10D2
810
$500
,000,0
00.00
$650
,000.0
0 FY
10 M
ILCON
P10
03 M
ILITA
RY W
ORKI
NG
DOG
RELO
CATI
ON: M
ODIF
ICAT
ION
FOR
EQUI
TABL
E AD
JUST
MENT
FOR
GO
VERN
MENT
DEL
AYS
RELA
TED
TO
MUNI
TION
S AN
D EX
PLOS
IVES
OF
CONC
ERN/
EX
PLOS
IVE
SAFE
TY S
UBMI
SSIO
N/
UNEX
PLOD
ED O
RDNA
NCE.
SUBJ
ECT
TO
MULT
IPLE
AW
ARD
FAIR
OPP
ORTU
NITY
FULL
AND
OPE
N CO
MPET
ITIO
N AF
TER
EXCL
USIO
N OF
SO
URCE
S
6
NAVF
ACN4
0192
10D2
810
$500
,000,0
00.00
$167
,599.6
6FY
10 M
ILCON
P10
03 M
ILITA
RY W
ORKI
NG
DOG
RELO
CATI
ON: C
RITE
RIA
CHAN
GE
DUE
TO -
HAC
CP R
EQUI
REME
NT A
ND
DOW
NGRA
DE O
F SS
HO LE
VEL.
SUBJ
ECT
TO
MULT
IPLE
AW
ARD
FAIR
OPP
ORTU
NITY
FULL
AND
OPE
N CO
MPET
ITIO
N AF
TER
EXCL
USIO
N OF
SO
URCE
S
6
NAVF
ACN4
0192
10D2
810
$500
,000,0
00.00
($29
,990.8
9)FY
10 M
ILCON
P10
03 M
ILITA
RY W
ORKI
NG
DOG
RELO
CATI
ON:
INCO
RPOR
ATE
CUST
OMER
REQ
UEST
S IN
TO T
HE
CONT
RACT
.
SUBJ
ECT
TO
MULT
IPLE
AW
ARD
FAIR
OPP
ORTU
NITY
FULL
AND
OPE
N CO
MPET
ITIO
N AF
TER
EXCL
USIO
N OF
SO
URCE
S
6
NAVF
ACN4
0192
10D2
810
$500
,000,0
00.00
$89,1
16.73
FY10
MILC
ON P
1003
MILI
TARY
WOR
KING
DO
G RE
LOCA
TION
: IN
CORP
ORAT
E UN
FORS
EEN
COND
ITIO
NS IN
TO T
HE
CONT
RACT
.
SUBJ
ECT
TO
MULT
IPLE
AW
ARD
FAIR
OPP
ORTU
NITY
FULL
AND
OPE
N CO
MPET
ITIO
N AF
TER
EXCL
USIO
N OF
SO
URCE
S
6
NAVF
ACN4
0192
10D2
810
$500
,000,0
00.00
$221
,188.0
1FY
10 M
ILCON
P10
03 M
ILITA
RY W
ORKI
NG
DOG
RELO
CATI
ON:
INCO
RPOR
ATE
PAVI
NG
OF U
NNAM
ED R
OAD
INTO
CON
TRAC
T.
SUBJ
ECT
TO
MULT
IPLE
AW
ARD
FAIR
OPP
ORTU
NITY
FULL
AND
OPE
N CO
MPET
ITIO
N AF
TER
EXCL
USIO
N OF
SO
URCE
S
6
NAVF
ACN4
0192
13C3
001
Not a
pplic
able
$566
.00BA
SE O
PERA
TION
S SU
PPOR
T (B
OS)
SERV
ICES
CON
TRAC
T, VA
RIOU
S IN
STAL
LATI
ONS,
TER
RITO
RY O
F GU
AM:
THE
PURP
OSE
OF T
HIS
MODI
FICA
TION
IS T
O PR
OVID
E BS
V&E
SERV
ICES
.
NEGO
TIAT
ED
PROP
OSAL
/ QUO
TEFU
LL A
ND O
PEN
COMP
ETIT
ION
7
NAVF
ACN6
2742
06D1
870
$40,0
00,00
0.00
($10
4,675
.00)
CTO
0033
, PHA
SE I E
NVIR
ONME
NTAL
SIT
E AS
SESS
MENT
TO
SUPP
ORT
THE
PROP
OSED
RO
UTE
15 R
ANGE
S LA
ND A
CQUI
SITI
ON,
GUAM
. CTO
NO.
0033
IS P
HYSI
CALL
Y AN
D FI
NANC
IALL
Y CO
MPLE
TE A
ND IS
HER
EBY
PLAC
ED IN
FIN
AL C
LOSE
-OUT
STA
TUS
UNDE
R CO
NTRA
CT N
O. N
6274
2-06
-D-1
870.
TH
IS M
ODIF
ICAT
ION
DE-O
BLIG
ATES
THE
RE
MAIN
ING
FUND
S IN
THE
CTO
.
ARCH
ITEC
T-EN
GINE
ER FA
R 6.1
02
FULL
AND
OPE
N CO
MPET
ITIO
N4
(Section 2835[e][1][E])
January 30, 2015 │ 45
Agen
cy
Cont
ract
Num
ber,
Gran
t, Ag
reem
ent,
or Fu
ndin
g M
echa
nism
Title
Ceili
ng A
mou
nt
Amou
nt
Oblig
ated
/ Aw
arde
dOc
tobe
r 1, 2
013
- Sep
tem
ber 3
0,
2014
Scop
e / D
escr
iptio
nM
etho
d Us
ed to
So
licit
Offer
sOff
ers S
olici
ted
Offer
s Rec
eive
d
NAVF
ACN6
2742
06D1
870
$40,0
00,00
0.00
($26
6,431
.00)
CTO
0040
, PHA
SE I E
NVIR
ONME
NTAL
SIT
E AS
SESS
MENT
TO
SUPP
ORT
THE
FORM
ER
FAA
PARC
EL LA
ND A
CQUI
SITI
ON, G
UAM
AND
ENVI
RONM
ENTA
L CON
DITI
ON O
F PR
OPER
TY T
O SU
PPOR
T TH
E OU
TLEA
SE O
F TH
E FI
NEGA
YAN
HOUS
ING
NEIG
HBOR
HOOD
, GU
AM. C
TO N
O. 00
40 IS
PHY
SICA
LLY
AND
FINA
NCIA
LLY
COMP
LETE
AND
IS
HERE
BY P
LACE
D IN
FIN
AL C
LOSE
-OUT
ST
ATUS
UND
ER C
ONTR
ACT
NO. N
6274
2-06
-D-1
870.
MOD
IFIC
ATIO
N DE
-OBL
IGAT
ES
REMA
ININ
G FU
NDS.
ARCH
ITEC
T-EN
GINE
ER
FAR
6.102
FULL
AND
OPE
N CO
MPET
ITIO
N4
NAVF
ACN6
2742
06D1
870
$40,0
00,00
0.00
($76
7,499
.00)
CONT
RACT
TASK
ORD
ER N
O. 00
49,
AMEN
DMEN
T NO
. 57,
ARCH
AEOL
OGIC
AL
AND
CULT
URAL
RES
OURC
ES M
ITIG
ATIO
N PR
IOR
TO M
ASS
GRUB
BING
AND
GR
ADIN
G AN
D U&
SI (U
TILIT
IES
AND
SITE
INFR
ASTR
UCTU
RE) P
LACE
MENT
AT
NCT
S FI
NEGA
YAN,
ISLA
ND O
F G
UAM
IN S
UPPO
RT O
F TH
E JO
INT
GUAM
BU
ILD-U
P. D
EOBL
IGAT
ING
REMA
ININ
G FU
NDIN
G, C
TO IS
TEC
HNIC
ALLY
AND
FI
NANC
IALL
Y CO
MPLE
TE.
ARCH
ITEC
T-EN
GINE
ER
FAR
6.102
FULL
AND
OPE
N CO
MPET
ITIO
N4
NAVF
ACN6
2742
08D0
009
$100
,000,0
00.00
($1,5
02,96
8.48)
TASK
ORD
ER M
ODIF
ICAT
ION
TO
DEOB
LIGAT
E TH
E UN
USED
EST
IMAT
ED
COST
AND
AW
ARD
FEE
AVAI
LABL
E FO
R RE
CAPT
URE.
ARCH
ITEC
T-EN
GINE
ER
FAR
6.102
FULL
AND
OPE
N CO
MPET
ITIO
N6
NAVF
ACN6
2742
09D0
002
$100
,000,0
00.00
$20,2
62.00
TASK
ORD
ER M
ODIF
ICAT
ION
FOR
ADDI
TION
AL P
OST
CONS
TRUC
TION
AW
ARD
SERV
ICES
. TAS
K OR
DER
0006
IS
FOR
FY1
0 MCO
N PR
OJEC
T P-
204
WHA
RF IM
PROV
EMEN
TS, A
PRA
PH
ASE
I.
ARCH
ITEC
T-EN
GINE
ER
FAR
6.102
FULL
AND
OPE
N CO
MPET
ITIO
N4
46 │ Guam Realignment Report – (Section 2835[e][1][E])
Agen
cy
Cont
ract
Num
ber,
Gran
t, Ag
reem
ent,
or Fu
ndin
g M
echa
nism
Title
Ceili
ng A
mou
nt
Amou
nt
Oblig
ated
/ Aw
arde
dOc
tobe
r 1, 2
013
- Sep
tem
ber 3
0,
2014
Scop
e / D
escr
iptio
nM
etho
d Us
ed to
So
licit
Offer
sOff
ers S
olici
ted
Offer
s Rec
eive
d
NAVF
ACN6
2742
10D0
003
$50,0
00,00
0.00
$96,2
67.00
MO
DIFI
CATI
ON T
O DE
LETE
SEW
AGE
LIFT
STAT
ION,
FIR
E PU
MP H
OUSE
, W
ATER
STO
RAGE
TANK
S&FI
RE W
ATER
LO
OP; D
ELET
E CA
THOD
IC P
ROTE
CTIO
N;
REVI
SE T
HE S
ITE,
UTI
LITY
& GR
ADIN
G &
DRAI
NAGE
PLA
NS F
OR R
EVIS
ED N
R AR
EA D
EVEL
OPME
NT P
LAN;
DES
IGN
SITE
UTI
LITIE
S W
/ ORI
GINA
L ACE
ADP
LO
ADS;
REV
ISE
SITE
GRA
DING
SCH
EME
TO P
ROVI
DE S
UITA
BLE
COMP
ACTE
D FI
LL
MATE
RIAL
; CON
NECT
FEE
DERS
TO
NEW
SU
BSTA
TION
, REC
ONNE
CT C
IRCU
ITS
TO
POW
ER D
ISTR
IB S
YS &
DE-
ENER
GIZE
ST
ATIO
N GT
(BLD
G 26
19) S
WIT
CHGE
AR; A
DD
ELEC
TRIC
AL LI
NE N
ORTH
OF
HANG
AR 10
9; IN
CLUD
E DZ
SP &
GUA
M PO
WER
AUT
HORI
TY
(GPA
) SUP
PORT
FOR
ELE
CTRI
CAL D
ESIG
N;
PULL
BAC
K EX
ISTI
NG C
OMM
CABL
ES F
ROM
BLDG
2616
& R
EROU
TE T
O TH
E AD
N IN
TH
E P1
09 H
ANGA
R; T
ERMI
NATE
NW
COM
M CA
BLE
AT T
HE A
DN IN
THE
P10
9 HAN
GAR;
AD
D 4-
4&#X
BF; D
UCT
COMM
ERCI
AL C
OMM
INFR
ASTR
UCTU
RE T
O GO
VT C
OMM
DUCT
BA
NK S
YSTE
M; A
DD G
OVT
& CO
MMER
CIAL
CO
MM D
UCT
BANK
ALO
NG N
R TO
LOOP
W/
THE
SOUT
H RD
COM
M IN
FRAS
TRUC
TURE
; AD
D ME
C TE
CH E
SCOR
T FO
R FI
ELD
SVCS
; AN
ALYZ
E CO
MMER
CIAL
LINE
CON
NECT
IVIT
Y RU
N TO
BLD
G 25
008;
ADD
DUCT
BAN
K FR
OM
B261
6 TO
P-10
9 TMH
AND
CAB
LES
FROM
B2
616 T
O TE
RMIN
ATE
AT A
DN3 (
P109
), ADD
SI
TE G
RADI
NG S
CHEM
ES O
F P1
09 A
ND P
601
IN T
HE J2
00 O
VERA
LL G
RADI
NG P
LAN;
ADD
FA
CILIT
ATOR
FOR
DES
IGN
REVI
EW M
TGS.
ARCH
ITEC
T-EN
GINE
ER
FAR
6.102
FULL
AND
OPE
N CO
MPET
ITIO
N17
Section 5: Contracts, Grants, Agreements, or Other Funding Mechanisms Data
(Section 2835[e][1][E])
January 30, 2015 │ 47
Agen
cy
Cont
ract
Num
ber,
Gran
t, Ag
reem
ent,
or Fu
ndin
g M
echa
nism
Title
Ceili
ng A
mou
nt
Amou
nt
Oblig
ated
/ Aw
arde
dOc
tobe
r 1, 2
013
- Sep
tem
ber 3
0,
2014
Scop
e / D
escr
iptio
nM
etho
d Us
ed to
So
licit
Offer
sOff
ers S
olici
ted
Offer
s Rec
eive
d
NAVF
ACN6
2742
10D0
003
$50,0
00,00
0.00
$268
,925.0
0 TA
SK O
RDER
MOD
IFIC
ATIO
N TO
IN
CORO
RATE
THE
FOL
LOW
ING
CHAN
GES:
R)
TER
MINA
TE T
HE S
UBST
ATIO
N DE
SIGN
. UP
ON C
OMPL
ETIO
N OF
THE
60%
DES
IGN
SUBM
ITTA
L, ST
OP A
LL D
ESIG
N W
ORK
FOR
THE
SUBS
TATI
ON; S
) SW
ITCH
ING
STAT
ION.
UPO
N CO
MPLE
TION
OF
THE
60%
DE
SIGN
SUB
MITT
AL, A
ND T
ERMI
NATI
ON
OF T
HE S
UBST
ATIO
N DE
SIGN
, CON
TINU
E EF
FORT
S ON
THE
SW
ITCH
ING
STAT
ION
ONLY
. PRO
VIDE
APP
ROPR
IATE
DES
IGN
FOR
THE
AREA
S SU
RROU
NDIN
G TH
E NE
W S
WIT
CHIN
G ST
ATIO
N AT
SIT
E #2
; T) A
DDIT
IONA
L TOP
OGRA
PHIC
SU
RVEY
. PRO
VIDE
TOP
O SU
RVEY
IN
THE
VICI
NITY
OF
THE
NEW
SW
ITCH
ING
STAT
ION,
U) E
OMSI
. PRO
VIDE
DES
IGN
SERV
ICES
FOR
THE
INCO
RPOR
ATIO
N OF
THE
EOM
SI; V
) GEO
GRAP
HICA
L IN
FORM
ATIO
N SY
STEM
(GIS
). PR
OVID
E GI
S SP
ECIF
ICAT
IONS
AND
COS
T ES
TIMA
TES
FOR
THE
INCO
RPOR
ATIO
N OF
NEW
GI
S EF
FORT
IN T
HE C
ONST
RUCT
ION
DOCU
MENT
S; W
) GEO
SPAT
IAL D
ATA.
PR
OVID
E SP
ECIF
ICAT
IONS
IN T
HE
CONS
TRUC
TION
DOC
UMEN
TS F
OR
GEOS
PATI
AL D
ATA
FOR
SUBM
ISSI
ON T
O TH
E AC
TIVI
TY; X
) DRA
INAG
E. P
ROVI
DE
DESI
GN IN
CORP
ORAT
ING
THE
2006
GUA
M ST
ORMW
ATER
MAN
AGEM
ENT
PLAN
FOR
TH
E IN
DIVI
DUAL
PRO
JECT
S W
ITHI
N TH
E LA
TEST
GOV
ERNM
ENT
PROV
IDED
ARE
A DE
VELO
PMEN
T PL
AN; Y
) ADD
ITIO
NAL
GEOT
ECHN
ICAL
SUR
VEY.
PROV
IDE
GEOT
ECHN
ICAL
NVE
STIG
ATIO
N RE
QUIR
ED
FOR
THE
NEW
DRA
INAG
E RE
QUIR
EMEN
TS,
WHI
CH IN
CLUD
ES IN
JECT
ION
WEL
LS A
ND
PERC
OLAT
ION
TEST
S; Z
) ADD
ITIO
NAL 1
00%
DE
SIGN
SUB
MITT
AL P
ACKA
GE F
OR III
MEF
IN
OKI
NAW
A.
ARCH
ITEC
T-EN
GINE
ER
FAR
6.102
FULL
AND
OPE
N CO
MPET
ITIO
N17
Section 5: Contracts, Grants, Agreements, or Other Funding Mechanisms Data
48 │ Guam Realignment Report – (Section 2835[e][1][E])
Agen
cy
Cont
ract
Num
ber,
Gran
t, Ag
reem
ent,
or Fu
ndin
g M
echa
nism
Title
Ceili
ng A
mou
nt
Amou
nt
Oblig
ated
/ Aw
arde
dOc
tobe
r 1, 2
013
- Sep
tem
ber 3
0,
2014
Scop
e / D
escr
iptio
nM
etho
d Us
ed to
So
licit
Offer
sOff
ers S
olici
ted
Offer
s Rec
eive
d
NAVF
ACN6
2742
10D0
003
$50,0
00,00
0.00
$3,67
9,658
.00
TASK
ORD
ER F
OR T
HE P
REPA
RATI
ON
OF A
DESI
GN-B
UILD
CON
STRU
CTIO
N PA
CKAG
E FO
R JF
Y16 M
CON
PROJ
ECT
J-001
B UT
ILITI
ES (U
&SI)
PHAS
E I, U
SMC
MAIN
CAN
TONM
ENT,
US N
AVAL
BAS
E GU
AM, T
ELEC
OMMU
NICA
TION
S SI
TE,
FINE
GAYA
NM G
UAM.
ARCH
ITEC
T-EN
GINE
ER
FAR
6.102
FULL
AND
OPE
N CO
MPET
ITIO
N17
NAVF
ACN6
2742
10D1
308
$4,00
0,000
,000.0
0$5
3,728
,000.0
0DE
SIGN
-BUI
LD M
ULTI
PLE
AWAR
D CO
NSTR
UCTI
ON C
ONTR
ACT
(MAC
C) F
OR
U.S.
MILI
TARY
CON
STRU
CTIO
N PR
OJEC
TS
FOR
SITE
S IN
GUA
M AN
D OT
HER
AREA
S UN
DER
THE
COGN
IZAN
CE O
F TH
E NA
VAL
FACI
LITIE
S EN
GINE
ERIN
G CO
MMAN
D PA
CIFI
C. T
ASK
ORDE
R 00
02 F
OR F
Y14
MILC
ON P
-109
AIR
CRAF
T MA
INTE
NANC
E HA
NGAR
- NOR
TH R
AMP,
ANDE
RSEN
AI
R BA
SE, G
UAM.
SUBJ
ECT
TO
MULT
IPLE
AW
ARD
FAIR
OPP
ORTU
NITY
FULL
AND
OPE
N CO
MPET
ITIO
N5
NAVF
ACN6
2742
10D1
309
$4,00
0,000
,000.0
0$1
6,548
.00FY
13 M
ILCON
P-1
01A
NORT
H RA
MP P
ARKI
NG
INCR
EMEN
T 2 O
F 2 A
ND F
Y10 M
ILCON
P-1
00
NORT
H RA
MP U
TILIT
IES
INCR
EMEN
T 1 (
FUEL
DI
STRI
BUTI
ON S
YSTE
M), A
NDER
SEN
AIR
FORC
E BA
SE, G
UAM;
MOD
IFIC
ATIO
N 01
FOR
PR
OPOS
ED C
HANG
E 02
, VAR
IOUS
CHA
NGES
TO
P10
0.
SUBJ
ECT
TO
MULT
IPLE
AW
ARD
FAIR
OPP
ORTU
NITY
FULL
AND
OPE
N CO
MPET
ITIO
N4
NAVF
ACN6
2742
10D1
309
$4,00
0,000
,000.0
0$1
,920,3
07.00
FY13
MILC
ON P
-101
A NO
RTH
RAMP
PAR
KING
IN
CREM
ENT
2 OF
2 AND
FY1
0 MILC
ON P
-100
NO
RTH
RAMP
UTI
LITIE
S IN
CREM
ENT
1 (F
UEL D
ISTR
IBUT
ION
SYST
EM), A
NDER
SEN
AIR
FORC
E BA
SE, G
UAM;
MOD
IFIC
ATIO
N 02
FO
R PC
-01,
VARI
OUS
CUST
OMER
REQ
UEST
CH
ANGE
S TO
P10
1A.
SUBJ
ECT
TO
MULT
IPLE
AW
ARD
FAIR
OPP
ORTU
NITY
FULL
AND
OPE
N CO
MPET
ITIO
N4
NAVF
ACN6
2742
10D1
309
$4,00
0,000
,000.0
0($
89,58
0.00)
FY1
3 MILC
ON P
-101
A NO
RTH
RAMP
PA
RKIN
G IN
CREM
ENT
2 OF
2 AND
FY1
0 MI
LCON
P-1
00 N
ORTH
RAM
P UT
ILITI
ES
INCR
EMEN
T 1 (
FUEL
DIS
TRIB
UTIO
N SY
STEM
), AND
ERSE
N AI
R FO
RCE
BASE
, GUA
M; P
C-03
, MOD
IFIC
ATIO
N 03
, CR
EDIT
THE
GOV
ERNM
ENT
FOR
COST
DI
SCRE
PANC
Y ON
PC-
01.
SUBJ
ECT
TO
MULT
IPLE
AW
ARD
FAIR
OPP
ORTU
NITY
FULL
AND
OPE
N CO
MPET
ITIO
N4
(Section 2835[e][1][E])
January 30, 2015 │ 49
Agen
cy
Cont
ract
Num
ber,
Gran
t, Ag
reem
ent,
or Fu
ndin
g M
echa
nism
Title
Ceili
ng A
mou
nt
Amou
nt
Oblig
ated
/ Aw
arde
dOc
tobe
r 1, 2
013
- Sep
tem
ber 3
0,
2014
Scop
e / D
escr
iptio
nM
etho
d Us
ed to
So
licit
Offer
sOff
ers S
olici
ted
Offer
s Rec
eive
d
NAVF
ACN6
2742
10D1
309
$4,00
0,000
,000.0
0$2
79,43
2.18
UTILI
TIES
INCR
EMEN
T 1 (
FUEL
DI
STRI
BUTI
ON S
YSTE
M), A
NDER
SEN
AIR
FORC
E BA
SE, G
UAM;
MOD
IFIC
ATIO
N 02
FO
R PC
-01,
VARI
OUS
CUST
OMER
REQ
UEST
CH
ANGE
S TO
P10
1A.
SUBJ
ECT
TO
MULT
IPLE
AW
ARD
FAIR
OPP
ORTU
NITY
FULL
AND
OPE
N CO
MPET
ITIO
N7
NAVF
ACN6
2742
10D1
309
$4,00
0,000
,000.0
0$1
32,98
4.12
P-20
4 APR
A HA
RBOR
WHA
RF
IMPR
OVEM
ENTS
UNI
FORM
AND
TANG
O (P
ARTS
A&B
), NA
VAL B
ASE
GUAM
: MO
DIFI
CATI
ON T
O IN
STAL
L APP
ROXI
MATE
LY
1500
LF O
F SE
CURI
TY F
ENCI
NG A
LONG
UN
IFOR
M AN
D TA
NGO
WHA
RVES
.
SUBJ
ECT
TO
MULT
IPLE
AW
ARD
FAIR
OPP
ORTU
NITY
FULL
AND
OPE
N CO
MPET
ITIO
N7
NAVF
ACN6
2742
10D1
309
$4,00
0,000
,000.0
0$2
63,02
2.94
N627
4210
D130
9-00
02 W
AS IS
SUED
TO
PRO
VIDE
REN
OVAT
IONS
AND
IM
PROE
MENT
S FO
R SI
ERRA
AND
UNI
FORM
W
HARV
ES. T
HE P
ROJE
CT W
AS A
SSIG
NED
AS P
204 P
ARTS
A&B
. MOD
1Z IS
ISSU
ED
TO IN
CORP
ORAT
E TH
E CH
ANGE
S AS
A RE
SULT
OF
UNFO
RESE
EN C
ONDI
TION
S EX
PERI
ENCE
D UN
DER
THIS
CON
TRAC
T.
SUBJ
ECT
TO
MULT
IPLE
AW
ARD
FAIR
OPP
ORTU
NITY
FULL
AND
OPE
N CO
MPET
ITIO
N7
NAVF
ACN6
2742
10D1
309
$4,00
0,000
,000.0
0$2
47,28
9.28
N627
4210
D130
9 TO
0002
WAS
ISSU
ED
TO P
ROVI
DE R
ENOV
ATIO
NS A
ND
IMPR
OVEM
ENTS
FOR
SIE
RRA A
ND U
NIFO
RM
WHA
RVES
. THE
PRO
JECT
WAS
ASS
IGNE
D AS
P20
4 PAR
TS A
&B. M
OD 2A
IS IS
SUED
TO
PROV
IDE
SOFT
ROC
K RE
MOVA
L AT
TANG
O W
HARF
.
SUBJ
ECT
TO
MULT
IPLE
AW
ARD
FAIR
OPP
ORTU
NITY
FULL
AND
OPE
N CO
MPET
ITIO
N7
NAVF
ACN6
2742
10D1
312
$4,00
0,000
,000.0
0($
7,599
.23)
MODI
FICA
TION
FOR
PRO
JECT
P10
1, NO
RTH
RAMP
PAR
KING
, TO
CRED
IT T
HE
GOVE
RNME
NT F
OR T
HE Q
C FA
ILURE
OF
HMA
TEST
STR
IP A
S VM
A OF
THE
TES
T ST
RIP
WAS
13.7
WHI
LE S
PECI
FICA
TION
S RE
QUIR
E A
VMA
OF 14
.0.
SUBJ
ECT
TO
MULT
IPLE
AW
ARD
FAIR
OPP
ORTU
NITY
FULL
AND
OPE
N CO
MPET
ITIO
N7
NAVF
ACN6
2742
10D1
312
$4,00
0,000
,000.0
0$1
,194.7
8N6
2742
-10-
D-13
12-JQ
01 P
101&
P101
A,
NORT
H RA
MP P
ARKI
NG, M
ODIF
ICAT
ION
#17 T
O PR
OVID
E QU
ALIF
IED
MEC-
UXO
CONT
RACT
OR T
O AV
OID
ANOM
ALIE
S.
SUBJ
ECT
TO
MULT
IPLE
AW
ARD
FAIR
OPP
ORTU
NITY
FULL
AND
OPE
N CO
MPET
ITIO
N7
NAVF
ACN6
2742
10D1
312
$4,00
0,000
,000.0
0$3
,127.2
0N6
2742
-10-
D-13
12-JQ
01 P
101&
P101
A, N
ORTH
RA
MP P
ARKI
NG, M
ODIF
ICAT
ION
#18 T
O RE
MOVE
ASB
ESTO
S PI
PE.
SUBJ
ECT
TO
MULT
IPLE
AW
ARD
FAIR
OPP
ORTU
NITY
FULL
AND
OPE
N CO
MPET
ITIO
N7
Section 5: Contracts, Grants, Agreements, or Other Funding Mechanisms Data
50 │ Guam Realignment Report – (Section 2835[e][1][E])
Agen
cy
Cont
ract
Num
ber,
Gran
t, Ag
reem
ent,
or Fu
ndin
g M
echa
nism
Title
Ceili
ng A
mou
nt
Amou
nt
Oblig
ated
/ Aw
arde
dOc
tobe
r 1, 2
013
- Sep
tem
ber 3
0,
2014
Scop
e / D
escr
iptio
nM
etho
d Us
ed to
So
licit
Offer
sOff
ers S
olici
ted
Offer
s Rec
eive
d
NAVF
ACN6
2742
10D1
312
$4,00
0,000
,000.0
0$1
,329.6
8N6
2742
-10-
1312
-JQ01
P10
1&P1
01A,
NOR
TH
RAMP
PAR
KING
, MOD
IFIC
ATIO
N #1
9 PC-
16 T
O RE
MOVE
THE
CLO
SED
AIRF
IELD
MA
RKIN
GS X
.
SUBJ
ECT
TO
MULT
IPLE
AW
ARD
FAIR
OPP
ORTU
NITY
FULL
AND
OPE
N CO
MPET
ITIO
N7
NAVF
ACN6
2742
10D1
312
$4,00
0,000
,000.0
0$8
9,020
.12N6
2742
-10-
D-13
12-JQ
01 P
101&
P101
A, N
ORTH
RA
MP P
ARKI
NG, M
ODIF
ICAT
ION
#20 F
OR
PAYM
ENT
OF W
ATER
UTI
LITY
CHAR
GES.
SUBJ
ECT
TO
MULT
IPLE
AW
ARD
FAIR
OPP
ORTU
NITY
FULL
AND
OPE
N CO
MPET
ITIO
N7
NAVF
ACN6
2742
11C0
400
Not a
pplic
able
$13,1
75.00
JF
Y09 M
AMIZ
U J-0
01 U
TILIT
IES
AND
SITE
IM
PROV
EMEN
TS, P
HASE
I, AP
RA H
ARBO
R,
NAVA
L BAS
E GU
AM:
MOD
IFIC
ATIO
N TO
IN
CORP
ORAT
E 8 I
NCH
PVC
C-90
0 SLE
EVE
WIT
H PL
UGS
FOR
ALL W
ATER
LATE
RALS
ON
VICT
OR A
ND S
IERR
A W
HARV
ES T
O PA
SS
UNDE
RNEA
TH T
HE N
EW U
TILIT
Y TR
ENCH
.
NEGO
TIAT
ED
PROP
OSAL
/ QUO
TEFU
LL A
ND O
PEN
COMP
ETIT
ION
5
NAVF
ACN6
2742
11C0
400
Not a
pplic
able
$41,6
67.00
JF
Y09 M
AMIZ
U J-0
01 U
TILIT
IES
AND
SITE
IM
PROV
EMEN
TS, P
HASE
I, AP
RA H
ARBO
R,
NAVA
L BAS
E GU
AM:
MOD
IFIC
ATIO
N TO
IN
CORP
ORAT
E TH
E AU
XILIA
RY C
ONTA
CTS
AND
WAT
ER F
ILTER
S FO
R TH
E DE
-MI
NERA
LIZED
WAT
ER.
NEGO
TIAT
ED
PROP
OSAL
/ QUO
TEFU
LL A
ND O
PEN
COMP
ETIT
ION
5
NAVF
ACN6
2742
11C0
400
Not a
pplic
able
$1,82
3.00
JFY0
9 MAM
IZU
J-001
UTI
LITIE
S AN
D SI
TE
IMPR
OVEM
ENTS
, PHA
SE I,
APRA
HAR
BOR,
NA
VAL B
ASE
GUAM
: M
ODIF
ICAT
ION
TO
REMO
VE A
ND D
ISPO
SE O
F ACM
PIP
ES
LOCA
TED
NEAR
RT9
.
NEGO
TIAT
ED
PROP
OSAL
/ QUO
TEFU
LL A
ND O
PEN
COMP
ETIT
ION
5
NAVF
ACN6
2742
11C0
400
Not a
pplic
able
$182
,140.0
0JF
Y09 M
AMIZ
U J-0
01 U
TILIT
IES
AND
SITE
IM
PROV
EMEN
TS, P
HASE
I, AP
RA H
ARBO
R,
NAVA
L BAS
E GU
AM:
MOD
IFIC
ATIO
N TO
INCO
RPOR
ATE
THE
CHAN
GES
TO
EXTE
ND T
HE W
ATER
LINE
AWAY
FRO
M A
CONT
AMIN
ATED
SW
ELL A
T SI
ERRA
WHA
RF.
NEGO
TIAT
ED
PROP
OSAL
/QUO
TEFU
LL A
ND O
PEN
COMP
ETIT
ION
5
NAVF
ACN6
2742
11C0
400
Not a
pplic
able
$12,8
98.00
N627
42-11
-C-0
400,
JFY0
9 MAM
IZU
J-001
UT
ILITI
ES A
ND S
ITE
IMPR
OVEM
ENTS
(A
CE G
ATE;
MOD
IFIC
ATIO
N TO
REV
ISE
ROUT
E 9 E
NTRA
NCE
GATE
DES
IGN
PER
RECO
MMEN
DATI
ONS
OF F
HWA,
GDP
W,
NAVF
ACPA
C, A
ND A
AFB.
NEGO
TIAT
ED
PROP
OSAL
/QUO
TEFU
LL A
ND O
PEN
COMP
ETIT
ION
5
(Section 2835[e][1][E])
January 30, 2015 │ 51
Agen
cy
Cont
ract
Num
ber,
Gran
t, Ag
reem
ent,
or Fu
ndin
g M
echa
nism
Title
Ceili
ng A
mou
nt
Amou
nt
Oblig
ated
/ Aw
arde
dOc
tobe
r 1, 2
013
- Sep
tem
ber 3
0,
2014
Scop
e / D
escr
iptio
nM
etho
d Us
ed to
So
licit
Offer
sOff
ers S
olici
ted
Offer
s Rec
eive
d
NAVF
ACN6
2742
11C0
400
Not a
pplic
able
$71,0
38.00
N627
42-11
-C-0
400,
JFY0
9 MAM
IZU
J-001
UT
ILITI
ES A
ND S
ITE
IMPR
OVEM
ENTS
(ACE
GA
TE);
MODI
FICA
TION
FOR
REM
OVAL
OF
UNSU
ITABL
E SO
IL, A
AFB,
GUA
M.
NEGO
TIAT
ED
PROP
OSAL
/QUO
TEFU
LL A
ND O
PEN
COMP
ETIT
ION
5
NAVF
ACN6
2742
11C0
400
Not a
pplic
able
$191
,186.0
0N6
2742
11C0
400 W
AS A
WAR
DED
TO P
ROVI
DE
SHOR
E SI
DE U
TILIT
Y IM
PROV
EMEN
TS F
ROM
THE
SIER
RA W
HARF
TO
THE
VICT
OR W
HARF
AT
NBG
, APR
A HA
RBOR
. MOD
IFIC
ATIO
N TO
IN
CORP
ORAT
E TH
E CH
ANGE
S AS
SOCI
ATED
W
ITH
THE
UNFO
RESE
EN C
ONDI
TION
S EX
PERI
ENCE
D UP
TO
JAN
2014
.
NEGO
TIAT
ED
PROP
OSAL
/QUO
TEFU
LL A
ND O
PEN
COMP
ETIT
ION
5
NAVF
ACN6
2742
11C0
400
Not a
pplic
able
($32
9,380
.00)
N627
4211
C040
0 WAS
AW
ARDE
D TO
PRO
VIDE
SH
ORE
SIDE
UTI
LITY
IMPR
OVEM
ENTS
FRO
M TH
E SI
ERRA
WHA
RF T
O TH
E VI
CTOR
WHA
RF
AT N
BG, A
PRA
HARB
OR. M
ODIF
ICAT
ION
TO
REMO
VE T
HE R
EQUI
REME
NT F
OR P
AVIN
G AR
OUND
UNI
FORM
AND
SIE
RRA
WHA
RVES
AN
D TO
REM
OVE
THE
REQU
IREM
ENT
TO
INST
ALL A
PV
ARRA
Y SY
STEM
.
NEGO
TIAT
ED
PROP
OSAL
/QUO
TEFU
LL A
ND O
PEN
COMP
ETIT
ION
5
NAVF
ACN6
2742
11C0
400
Not a
pplic
able
$0.00
N627
42-11
-C-0
400,
JFY0
9 MAM
IZU
J-001
UT
ILITI
ES A
ND S
ITEI
MPRO
VEME
NTS
(ACE
GA
TE);
MODI
FICA
TION
TO
INCO
RPOR
ATE
MOD
E RO
UTE
9 FIN
AL D
RAW
INGS
.
NEGO
TIAT
ED
PROP
OSAL
/QUO
TEFU
LL A
ND O
PEN
COMP
ETIT
ION
5
NAVF
ACN6
2742
11C0
400
Not a
pplic
able
$26,1
39.00
N627
4211
C040
0 WAS
AW
ARDE
D TO
PRO
VIDE
SH
ORE
SIDE
UTI
LITY
IMPR
OVEM
ENTS
FRO
M TH
E SI
ERRA
WHA
RF T
O TH
E VI
CTOR
WHA
RF
AT N
BG, A
PRA
HARB
OR. M
OD A
0003
9 IS
ISSU
ED T
O AW
ARD
THE
REA
BASE
D ON
UN
FORE
SEEN
CON
DITI
ONS
FOR
SL 10
8 TO
110 S
UBMI
TTED
BY
HPG.
NEGO
TIAT
ED
PROP
OSAL
/QUO
TEFU
LL A
ND O
PEN
COMP
ETIT
ION
5
NAVF
ACN6
2742
11C0
400
Not a
pplic
able
$98,0
00.00
N627
4211
C040
0 WAS
AW
ARDE
D TO
PRO
VIDE
SH
ORE
SIDE
UTI
LITY
IMPR
OVEM
ENTS
FRO
M TH
E SI
ERRA
WHA
RF T
O TH
E VI
CTOR
WHA
RF
AT N
BG, A
PRA
HARB
OR. M
OD A
0004
0 IS
ISSU
ED T
O AP
PLY
THE
REA
SUBM
ITTE
D ON
13
JUN
2014
BY
HPG.
NEGO
TIAT
ED
PROP
OSAL
/QUO
TEFU
LL A
ND O
PEN
COMP
ETIT
ION
5
Section 5: Contracts, Grants, Agreements, or Other Funding Mechanisms Data
52 │ Guam Realignment Report – (Section 2835[e][1][E])
Agen
cy
Cont
ract
Num
ber,
Gran
t, Ag
reem
ent,
or Fu
ndin
g M
echa
nism
Title
Ceili
ng A
mou
nt
Amou
nt
Oblig
ated
/ Aw
arde
dOc
tobe
r 1, 2
013
- Sep
tem
ber 3
0,
2014
Scop
e / D
escr
iptio
nM
etho
d Us
ed to
So
licit
Offer
sOff
ers S
olici
ted
Offer
s Rec
eive
d
NAVF
ACN6
2742
11D1
801
$50,0
00,00
0.00
($7,0
74.00
)CT
O 00
06 N
EPA
SCOP
ING
FOR
TRAI
NING
RA
NGES
, MOD
01 IS
SUED
TO
DESC
OPE
NUMB
ER O
F ME
ETIN
G RE
QUIR
EMEN
TS.
ARCH
ITEC
T-EN
GINE
ER
FAR
6.102
FULL
AND
OPE
N CO
MPET
ITIO
N5
NAVF
ACN6
2742
11D1
801
$50,0
00,00
0.00
($11
,018.0
0)MO
D 03
DED
UCTI
VE M
OD IS
SUED
TO
RED
UCE
EFFO
RTS
IN TA
SK 16
AC
ONSI
STEN
T W
ITH
CHAN
GES
PER
REVI
SED
PUBL
ICAT
ION
SUPP
ORT A
ND
PUBL
ICAT
ION
MATE
RIAL
S.
ARCH
ITEC
T-EN
GINE
ER
FAR
6.102
FULL
AND
OPE
N CO
MPET
ITIO
N5
NAVF
ACN6
2742
11D1
801
$50,0
00,00
0.00
$378
,240.0
0GU
AM A
ND C
NMI M
ILITA
RY R
ELOC
ATIO
N SU
PPLE
MENT
AL E
NVIR
ONME
NTAL
IMPA
CT
STAT
EMEN
T (S
EIS)
- ADD
ADD
ITIO
NAL
CANT
ONME
NT A
ND FA
MILY
HOU
SING
RE
ASON
ABLE
ALT
ERNA
TIVE
ARCH
ITEC
T-EN
GINE
ER
FAR
6.102
FULL
AND
OPE
N CO
MPET
ITIO
N5
NAVF
ACN6
2742
11D1
801
$50,0
00,00
0.00
$54,3
78.00
CTO
0017
FFP
, AW
ARDE
D TO
PRO
VIDE
SU
PPLE
MENT
AL ID
ENTI
FICA
TION
AND
EV
ALUA
TION
OF
CULT
URAL
RES
OURC
ES
WIT
HIN
THE
J?20
0 PRO
JECT
ARE
A,
ANDE
RSEN
AIR
FOR
CE B
ASE,
YIG
O, G
UAM
ARCH
ITEC
T-EN
GINE
ER
FAR
6.102
FULL
AND
OPE
N CO
MPET
ITIO
N5
NAVF
ACN6
2742
12D0
003
$5,00
0,000
.00$2
4,604
.00TA
SK O
RDER
MOD
FOR
POS
T CO
NSTR
UCTI
ON A
WAR
D SE
RVIC
ES (P
CAS)
. TA
SK O
RDER
0003
IS F
OR F
Y14 M
CON
PROJ
ECT
P-10
9, AI
RCRA
FT M
AINT
ENAN
CE
HANG
AR, N
ORTH
RAM
P, AN
DERS
EN A
IR
FORC
E BA
SE, G
UAM.
ARCH
ITEC
T-EN
GINE
ER
FAR
6.102
FULL
AND
OPE
N CO
MPET
ITIO
N5
Subt
otal
$58,
225,
000,
000.
00$6
0,61
9,98
4.45
Office
of Ec
onom
ic Ad
just
men
tOE
AG
R07
06-1
4-19
$324
,802.0
0$3
24,80
2.00
Key O
bjecti
ves:
Orga
nizati
onal
& Lo
gistic
al Su
ppor
t to th
e Gua
m Go
vern
or's
Offic
eN/
AN/
AN/
A
OEA
GR
0706
-14-
20$1
,767,0
00.00
$1,76
7,000
.00Ke
y Obje
ctive
s: EA
C Im
pleme
ntatio
n Pl
an S
OWs
N/A
N/A
N/A
Sub
tota
l$2
,091
,802
.00
$2,0
91,8
02.0
0 T
otal
$58,
229,
628,
447.
52$6
2,75
9,75
0.39
Not
e: N
egat
ive
num
bers
are
list
ed in
par
enth
esis
, whi
ch re
pres
ent d
e-ob
ligat
ions
.
Sou
rce:
Mar
ine
Cor
ps’ r
espo
nse
to D
oD O
IG d
ata
call,
11/
17/2
014.
Nav
al F
acili
ties
Eng
inee
ring
Com
man
d’s
resp
onse
to D
oD O
IG d
ata
call,
11/
17/2
014.
Offi
ce o
f E
cono
mic
Adj
ustm
ent’s
resp
onse
to D
oD O
IG d
ata
call,
11/
13/2
014.
(Section 2835[e][1][E])
January 30, 2015 │ 53
Oth
er F
eder
al A
genc
ies
Cont
ract
s/G
rant
s/A
gree
men
ts/O
ther
Fun
ding
Mec
hani
sms
For F
Y 20
14, t
he D
OT
repo
rted
20
cont
ract
s, gr
ants,
agr
eem
ents,
or o
ther
fund
ing
mec
hani
sms,
tota
ling
appr
oxim
atel
y $4
4.8
mill
ion.
Ta
ble
10 id
entifi
es D
OT
con
trac
ts, g
rant
s, ag
reem
ents,
or o
ther
fund
ing
mec
hani
sms.6
Tabl
e 10
. Oth
er F
eder
al A
genc
y Co
ntra
cts,
Gra
nts,
Agr
eem
ents
, or O
ther
Fun
ding
Mec
hani
sms S
uppo
rtin
g th
e G
uam
Mili
tary
Rea
lignm
ent
Agen
cy
Cont
ract
Num
ber,
Gran
t, Ag
reem
ent,
or Fu
ndin
g M
echa
nism
Title
Ceili
ng A
mou
nt
Amou
nt
Oblig
ated
/ Aw
arde
dOc
tobe
r 1, 2
013
- Sep
tem
ber 3
0,
2014
Scop
e / D
escr
iptio
nM
etho
d Us
ed to
So
licit
Offer
sOff
ers S
olici
ted
Offer
s Rec
eive
d
DOT
MARA
D - C
ontra
ct DT
MA1D
1000
2$5
0,000
,000.0
0 $3
3,784
,747.9
9 Pr
ogra
m Ma
nage
ment
Full a
nd O
pen
Unlim
ited
5
DOT
DOC
Econ
omic
Deve
lopme
nt Ag
ency
(M
ARAD
)
$2,00
0,000
.00 $0
.00
Preli
mina
ry De
sign &
Eng
ineer
ing S
ervic
es
for th
e Por
t of G
uam
DOT
FHW
A - G
rant
to Go
vern
ment
of Gu
am
GU-N
H-IP
MS(0
02)
Islan
dwide
Pro
gram
Ma
nage
ment
Servi
ces
(fund
s fro
m US
MC)
DTFH
6109
X500
01
(Adv
ice/M
od #1
)
$3,69
6,610
.00$0
.00Pr
epar
e NEP
A Do
cume
nt an
d Coo
rdina
tion
betw
een G
over
nmen
t of G
uam
DPW
, FHW
A,
and D
OD
ID/IQ
RFP
Base
Con
tract
- Op
en Ad
vertis
emen
t5
DOT
FHW
A - G
rant
to Go
vern
ment
of Gu
am
GU-N
H-IP
MS(0
02)
Islan
dwide
Pro
gram
Ma
nage
ment
Servi
ces
(fund
s fro
m US
MC)
DTFH
6109
X500
01
(Adv
ice/M
od #3
)
$1,59
5,940
.00$0
.00Pr
epar
e NEP
A Do
cume
nt an
d Coo
rdina
tion
betw
een G
over
nmen
t of G
uam
DPW
, FHW
A,
and D
OD
ID/IQ
RFP
Base
Con
tract
- Op
en Ad
vertis
emen
t5
DOT
FHW
A - G
rant
to Go
vern
ment
of Gu
am
GU-N
H-IP
MS(0
02)
Islan
dwide
Pro
gram
Ma
nage
ment
Servi
ces
(fund
s fro
m BU
MED)
DT
FH61
09X5
0001
(A
dvice
/Mod
#2)
$80,0
00.00
$0.00
Prep
are N
EPA
Docu
ment
and C
oord
inatio
n be
twee
n Gov
ernm
ent o
f Gua
m DP
W, F
HWA,
an
d DOD
ID/IQ
RFP
Base
Con
tract
- Op
en Ad
vertis
emen
t5
6
The
tabl
e co
ntai
ns n
egat
ive
num
bers
list
ed in
par
enth
esis
, whi
ch re
pres
ent d
e-ob
ligat
ions
.
Section 5: Contracts, Grants, Agreements, or Other Funding Mechanisms Data
54 │ Guam Realignment Report – (Section 2835[e][1][E])
Agen
cy
Cont
ract
Num
ber,
Gran
t, Ag
reem
ent,
or Fu
ndin
g M
echa
nism
Title
Ceili
ng A
mou
nt
Amou
nt
Oblig
ated
/ Aw
arde
dOc
tobe
r 1, 2
013
- Sep
tem
ber 3
0,
2014
Scop
e / D
escr
iptio
nM
etho
d Us
ed to
So
licit
Offer
sOff
ers S
olici
ted
Offer
s Rec
eive
d
DOT
FHW
A - G
rant
to Go
vern
ment
of Gu
am
GU-N
H-IP
MS(0
02)
Islan
dwide
Pro
gram
Ma
nage
ment
Servi
ces
(fund
s fro
m US
MC)
27XX
66IP
MS00
224C
0 ($
260,3
36.08
)
$260
,336.0
8$2
60,33
6.08
Prep
are N
EPA
Docu
ment
and C
oord
inatio
n be
twee
n Gov
ernm
ent o
f Gua
m DP
W, F
HWA,
an
d DOD
ID/IQ
RFP
Base
Con
tract
- Op
en Ad
vertis
emen
t5
DOT
FHW
A - G
rant
to Go
vern
ment
of Gu
am
GU-N
H-IP
MS(0
02)
Islan
dwide
Pro
gram
Ma
nage
ment
Servi
ces
27XX
66IP
MS00
273P
0 =
$2,70
2,983
.38
27XX
66IP
MS00
273V
0 =
$47,3
07.45
$2,75
0,290
.83($
327,4
48.87
)Pr
epar
e Des
ign/B
uild r
eque
st for
Qua
lifica
tions
for
Pro
posa
ls for
FY2
010 D
AR pr
ojects
, Ro
ute 1
east
of Ro
ute 4,
Rou
te 11
/1, R
oute
11,
Route
1/8,
and A
gana
Brid
ge
ID/IQ
RFP
Base
Con
tract
- Op
en Ad
vertis
emen
t5
DOT
FHW
A - G
rant
to Go
vern
ment
of Gu
am
GU-N
H-00
01(1
25)
27XX
6600
0112
573P
0 =
$570
,740
27XX
6600
0112
573V
0 =
$30,2
32
$600
,972.0
0$3
0,232
.00Co
nsult
ant fo
r Rou
te 1/3
Inter
secti
on
RFP
Open
Adve
rtisem
ent
3
DOT
FHW
A - G
rant
to Go
vern
ment
of Gu
am
GU-N
H-00
03(1
05)
27XX
6600
0310
573V
0 =
$2,18
2,765
$2,18
2,765
.00$0
.00Co
nsult
ant fo
r Rou
te 3 f
rom
Route
28 to
Ch
alan K
areta
RFP
Open
Adve
rtisem
ent
3
DOT
FHW
A - G
rant
to Go
vern
ment
of Gu
am
GU-D
AR-T
I01(0
01)
27XX
66TI
0173
V0 =
$1
1,489
,813.9
1
$11,4
89,81
3.91
($43
5,300
.00)
Cons
tructi
on fo
r Rou
te 1 A
gana
Brid
ges a
nd
Route
1/8 I
nterse
ction
RFP
Open
Adve
rtisem
ent
3
(Section 2835[e][1][E])
January 30, 2015 │ 55
Agen
cy
Cont
ract
Num
ber,
Gran
t, Ag
reem
ent,
or Fu
ndin
g M
echa
nism
Title
Ceili
ng A
mou
nt
Amou
nt
Oblig
ated
/ Aw
arde
dOc
tobe
r 1, 2
013
- Sep
tem
ber 3
0,
2014
Scop
e / D
escr
iptio
nM
etho
d Us
ed to
So
licit
Offer
sOff
ers S
olici
ted
Offer
s Rec
eive
d
DOT
FHW
A - G
rant
to Go
vern
ment
of Gu
am
GU-D
AR-0
011(
008)
27
XX66
0011
0087
3V0 =
$1
3,769
,798.9
9
$13,7
69,79
8.99
($24
6,500
.00)
Cons
tructi
on fo
r Rou
te 11
and
Route
1/11
Inter
secti
onRF
POp
en Ad
vertis
emen
t3
DOT
FHW
A - G
rant
to Go
vern
ment
of Gu
am
GU-N
H-PC
MS(0
01)
27XX
66PC
MS00
173V
0 =
$3,30
9,481
.88
$3,30
9,481
.88$7
92,31
7.30
Cons
tructi
on M
anag
emen
t for R
oute
1 Aga
na
Bridg
es, R
oute
1/8 In
terse
ction
, Rou
te 11
and
Route
1/11
Inter
secti
on
ID/IQ
RFP
Base
Con
tract
- Op
en Ad
vertis
emen
t5
DOT
FHW
A - G
rant
to Go
vern
ment
of Gu
am
GU-N
H-PS
AS(0
01)
27XX
66PS
AS00
173V
0 =
$1,97
7,404
.30
$1,97
7,404
.30($
432,2
40.60
)Pr
ofess
ional
Servi
ces f
or A
rchae
ologic
al Su
ppor
tRF
PBa
se C
ontra
ct -
Open
Adve
rtisem
ent
3
DOT
FHW
A - G
rant
to Go
vern
ment
of Gu
am
GU-N
H-TS
IS(0
02)
27XX
66TS
IS00
273V
0 =
$299
,485.0
0
$299
,485.0
0$0
.00Te
chnic
al Su
ppor
t Ser
vices
Islan
d-wi
de Q
uality
As
sura
nce T
estin
gRF
PBa
se C
ontra
ct -
Open
Adve
rtisem
ent
1
DOT
FHW
A - G
rant
to Go
vern
ment
of Gu
am
GU-N
H-TS
IS(0
01)
27XX
66TS
IS00
173V
0 =
$33,1
20
$33,1
20.00
$0.00
Tech
nical
Supp
ort S
ervic
es Is
land-
wide
Ge
otech
nical
Engin
eerin
gRF
PBa
se C
ontra
ct -
Open
Adve
rtisem
ent
2
DOT
FHW
A - G
rant
to Go
vern
ment
of Gu
am
GU-N
H-IP
MS(0
03)
Islan
dwide
Pro
gram
Ma
nage
ment
Servi
ces
27XX
66IP
MS00
324C
0 =
$1,41
5,017
.39
$1,41
5,017
.39$1
,415,0
17.39
Prep
are T
raffic
Ana
lysis
for S
EIS
RFP
Base
Con
tract
- Op
en Ad
vertis
emen
t1
DOT
FHW
A - G
rant
to Go
vern
ment
of Gu
am
GU-N
H-IP
MS(0
03)
Islan
dwide
Pro
gram
Ma
nage
ment
Servi
ces
27XX
66IP
MS00
373V
0 =
$850
,714.2
7
$850
,714.2
7$8
50,71
4.27
Over
sight
of Ro
ute 3
and R
oute
1/3 D
esign
RFP
Base
Con
tract
- Op
en Ad
vertis
emen
t1
Section 5: Contracts, Grants, Agreements, or Other Funding Mechanisms Data
Agen
cy
Cont
ract
Num
ber,
Gran
t, Ag
reem
ent,
or Fu
ndin
g M
echa
nism
Title
Ceili
ng A
mou
nt
Amou
nt
Oblig
ated
/ Aw
arde
dOc
tobe
r 1, 2
013
- Sep
tem
ber 3
0,
2014
Scop
e / D
escr
iptio
nM
etho
d Us
ed to
So
licit
Offer
sOff
ers S
olici
ted
Offer
s Rec
eive
d
DOT
FHW
A - G
rant
to Go
vern
ment
of Gu
am
GU-N
H-00
01(1
25)
27XX
6600
0112
573V
0 =
$7,50
6,000
$7,50
6,000
.00$7
,506,0
00.00
CON
of Ro
ute 1/
3Lo
w Bi
dOp
en Ad
vertis
emen
tTo
Be A
dver
tised
DOT
FHW
A - G
rant
to Go
vern
ment
of Gu
am
GU-N
H-PC
MS(0
02)
27XX
66PC
MS00
273V
0 =
$1,50
1,200
$1,50
1,200
.00$1
,501,2
00.00
CM fo
r Rou
te 1/3
RFP
Eithe
r ID/
IQ or
Op
en Ad
vertis
emen
t
DOT
FHW
A - G
rant
to Go
vern
ment
of Gu
am
GU-N
H-SU
ES(0
01)
27XX
66SU
ES00
173V
0 =
$62,6
77.20
$62,6
77.20
$62,6
77.20
SUE
for R
oute
1/3RF
PBa
se C
ontra
ct -
Open
Adve
rtisem
ent
2
Tot
al$1
05,3
81,6
26.8
5 $
44,7
61,7
52.7
6 N
ote:
Neg
ativ
e nu
mbe
rs a
re li
sted
in p
aren
thes
is, w
hich
repr
esen
t de-
oblig
atio
ns
Sou
rce:
DO
T’s
resp
onse
to D
oD O
IG d
ata
call,
11/
14/2
014
56 │ Guam Realignment Report – (Section 2835[e][1][E])
Acronyms Appendix.
AcronymsBPT Business Privilege TaxDHS Department of Homeland SecurityDOI Department of the Interior
DOT Department of TransportationDRT Department of Revenue and TaxationEPA Environmental Protection AgencyGOJ Government of JapanICG Interagency Coordination Group
JGPO Joint Guam Program OfficeNDAA National Defense Authorization Act
OIG Office of Inspector General
January 30, 2015 │ 57
58 │ Guam Realignment Report
Whistleblower ProtectionU.S. Department of Defense
The Whistleblower Protection Enhancement Act of 2012 requires the Inspector General to designate a Whistleblower Protection Ombudsman to educate agency employees about prohibitions on retaliation, and rights and remedies against retaliation for protected disclosures. The designated ombudsman is the DoD Hotline Director. For more information on your rights and remedies against
retaliation, visit www.dodig.mil/programs/whistleblower.
For more information about DoD IG reports or activities, please contact us:
Congressional Liaison [email protected]; 703.604.8324
Media [email protected]; 703.604.8324
Monthly Update [email protected]
Reports Mailing List [email protected]
Twitter twitter.com/DoD_IG
DoD Hotline dodig.mil/hotline
Department of Defense Office of Inspector General4800 Mark Center Drive Alexandria, VA 22350-1500
Department of the Interior Office of Inspector General1849 C Street, N.W. Mail Stop 4428 Washington, D.C. 20240
The report is available online at: www.dodig.mil