Page 1: INTERNATIONAL INVESTMENT BANKING, IIB Organizational Chart · E-Mail: egondongwe@cbz.co.zw 2 CABS Budiriro Housing Development Roads Zimbabwe CGM Consulting Engineers 36k m Design

INTERNATIONAL INVESTMENT BANKING, IIB Organizational Chart

��������

���������������� ���

����������������������

����������

������������

���������� ����

�������������

���� ����

����������� ��

��������

�� ��������������

����� �����

��� !�"#�

��������� ��� �

Page 2: INTERNATIONAL INVESTMENT BANKING, IIB Organizational Chart · E-Mail: egondongwe@cbz.co.zw 2 CABS Budiriro Housing Development Roads Zimbabwe CGM Consulting Engineers 36k m Design

International Investment Banking, IIB Past & Ongoing Projects

Page 3: INTERNATIONAL INVESTMENT BANKING, IIB Organizational Chart · E-Mail: egondongwe@cbz.co.zw 2 CABS Budiriro Housing Development Roads Zimbabwe CGM Consulting Engineers 36k m Design

CNM-YBJ Consulting Engineers Harare, Zimbabwe

Past Projects

Item Project Name Location Any JV Partner

Size and Description Contract Amount

Client Contact Name

1 Victoria Falls Housing Development Roads

Victoria Falls

NIL 16km

Construction of Infrastructure in Mkhosana High Density, Mkhosana Buffer and Chinotimba Townships in Victoria Falls

US5 Million CBZ Holdings Limited Eng. E. Gondongwe Tel: + 264 4 705001-9 E-Mail: [email protected]

2 CABS Budiriro Housing Development Roads

Zimbabwe CGM Consulting Engineers

36km Design and Construction supervision of infrastructure including 36km of roads and stormwater drainage.

US$7 Million CABS/Old Mutual Property Mr J. Manley Tel: + 263 4 308400 E-Mail. [email protected]

3 CABS ZRP Hatcliffe Housing Development Roads

Zimbabwe NIL 16km Roads and stormwater drainage, for Low Cost High Density Housing Development in Hatcliffe.

US$3.5 Million ZRP Mr G. Mapfidza Tel: +263 4 308400 E-Mail: [email protected]

4 Bulawayo Maintenance Management Strategy

Zimbabwe NIL 1 920km Conduct Road Condition Survey, Traffic management Studies and produce visual condition indices for the roads in the entire network. Also produce a road rehabilitation and maintenance strategy for the City’s roads over a period of 10 years.

US$200 000 Bulawayo City Council Eng. D. Sibanda Tel: +263 (9) 75011 E-Mail: [email protected]

5 Nsanje - Bangula Road Malawi Romana Consulting Engineers

50km (16 bridges) Supervision of Construction of Nsanje- Bangula Road to Class 1 Bitumen Standard, including design and construction supervision of 16 bridges

US$50 Million Roads Authority Eng. Trevor Hiwa Cell: +265 888 842 503 E-Mail: [email protected]

Page 4: INTERNATIONAL INVESTMENT BANKING, IIB Organizational Chart · E-Mail: egondongwe@cbz.co.zw 2 CABS Budiriro Housing Development Roads Zimbabwe CGM Consulting Engineers 36k m Design

CNM-YBJ Consulting Engineers Harare, Zimbabwe

Past Projects

6 Chiringa- Muloza Road Malawi Romana Consulting Engineers

38km Design and Contract documentation

US$5 Million Roads Authority Eng. Trevor Hiwa Cell: +265 888 842 503 E-Mail: [email protected]

7 Sebina – Nata Road Botswana Pula Consultants

138km Detailed engineering design, including engineering survey, soil survey and gravel location for 138km of a primary road reconstruction

US$0.75 Million Pula Consultants Carthage Matlhaga Tel: +267 318 1634 E-Mail: [email protected]

8 State Road Dualisation & Beitbridge Border Post Ring Road

Zimbabwe NIL 8km Design and Construction Supervision

US$1.5 Million Zimbabwe Revenue Authority Tel: + 263 (4) 795720

9 Cottco Ngundu Access Road

Zimbabwe NIL 5km US$1.5 Million Cottco Mr J. Chapendama Tel:

10 Econet Wireless Access Roads

Zimbabwe NIL 50km US$ 5 Million Econet Mr F. Muzambi Cell: + 263 (0) 772 222 179 E-Mail: [email protected]

11 TelOne Kadoma Access Road

Zimbabwe NIL 6km US$ 1.5 Million Telone

12 Reclassification of Zimbabwe Road Network

Zimbabwe GIBB Africa Assessment and functional classification of Zimbabwe Road Network as part of the road reform program.

US$5 Million Department of Roads Mr N. Pakachena Cell: +263 (0) 712 803 085: E-Mail: [email protected]

13 Kwekwe - Nkayi Road Zimbabwe NIL 100km A 100km secondary road and 2 bridges

US$150 000 Department of Roads Mr N. Pakachena Cell: +263 (0) 712 803 085:

Page 5: INTERNATIONAL INVESTMENT BANKING, IIB Organizational Chart · E-Mail: egondongwe@cbz.co.zw 2 CABS Budiriro Housing Development Roads Zimbabwe CGM Consulting Engineers 36k m Design

CNM-YBJ Consulting Engineers Harare, Zimbabwe

Past Projects

construction. E-Mail: [email protected] 14 Kadoma - Owl Mine

Road

Zimbabwe NIL 8km Tertiary Road

Us$ 1.5 Million Department of Roads Mr N. Pakachena Cell: +263 (0) 712 803 085: E-Mail: [email protected]

15 Gwanda-Maphisa

Birchenough-Murambinda

Mberengwa-West Nicholson

Zimbabwe YBJ and Mott

MacDonald

(UK)

60km Secondary Road 89km Secondary Road 151km Secondary Road Feasibility study and detailed

engineering design, including

engineering survey, soil survey and

gravel location for 300km of rural roads

and 5 river crossing structures

US$57.5 Million US$90 Million US$ 150 Million

Department of Roads/ADB Mr N. Pakachena Cell: +263 (0) 712 803 085: E-Mail: [email protected]

16 Kariba Infrastructure Roads

Zimbabwe NIL 15km Township Roads

US$4.0 Million The Director of Works Eng. Nyaningwe Tel:

17 Mubaira - Kadhani Road

Zimbabwe NIL 37km Upgrading of a tertiary rural road to a secondary road (37km)

US$10 Million District Development Fund Mr Musa Cell: +263 (0) 773 610 336

Page 6: INTERNATIONAL INVESTMENT BANKING, IIB Organizational Chart · E-Mail: egondongwe@cbz.co.zw 2 CABS Budiriro Housing Development Roads Zimbabwe CGM Consulting Engineers 36k m Design

CNM-YBJ Consulting Engineers Harare, Zimbabwe

Past Projects

18 Kriste Mambo - Nyamhunga Road

Zimbabwe NIL 7km Secondary Roads Design and Construction

US$ 2.1 Million District Development Fund Mr Musa Cell: +263 (0) 773 610 336

19 Gutu – Midlothian Road (50km)

Zimbabwe NIL 50km Secondary Roads Design and Construction

US$15 Million Department of Roads Mr N. Pakachena Cell: +263 (0) 712 803 085: E-Mail: [email protected]

20 Kazangarare Road Zimbabwe NIL 6km Rural Roads

1.5 Million District Development Fund Mr Musa Cell: +263 (0) 773 610 336

Page 7: INTERNATIONAL INVESTMENT BANKING, IIB Organizational Chart · E-Mail: egondongwe@cbz.co.zw 2 CABS Budiriro Housing Development Roads Zimbabwe CGM Consulting Engineers 36k m Design

CNM-YBJConsulting Engineers

CNM-YBJ CONSULTING ENGINEERS5th Floor, Shanda House17 Park StreetP.O. Box ST 523, SouthertonHARARE

Tel:+263-4-/706762/252224/752616Fax: +263-4-250539Cell: +263-712-400-523/912-571-317E-mail: [email protected]

BULAWAYO OFFICE:3rd Floor, Fidelity Life CentreCnr 11th Avenue/Fife StreetP.O. Box FM 254, FamonaBULAWAYO

Tel : +263-9-75709/75719Fax: +263-9-75719E-mail: [email protected]

COMPANY RESUME

Page 8: INTERNATIONAL INVESTMENT BANKING, IIB Organizational Chart · E-Mail: egondongwe@cbz.co.zw 2 CABS Budiriro Housing Development Roads Zimbabwe CGM Consulting Engineers 36k m Design

INTRODUCTION

CNM-YBJ Consulting Engineers is a leading Zimbabwean firm of Consulting Engineers practicing in the fields of Civil, Structural, Mechanical and ElectricalEngineering.The firm provides the full range of engineering services from feasibility studies, environmental impact assessments, detailed engineering design, contract documentation, tender evaluation, construction supervision and commissioning.

The firm is registered with both local and international funding services.

CNM-YBJ Consulting Engineers is a full member of the Zimbabwe Association of Consulting Engineers and is also registered with the Engineering Council ofZimbabwe.

The firm has been pre-qualified for tendering on various internationally fundedprojects and successfully completed the design for multi-million dollar World Bank funded projects.

The total staff complement is 38, consisting of Professional Engineers andTechnicians

The firm provides consultancy services to a wide range of Clients that includeGovernment ministries and parastatals, municipalities, town councils, Non-Governmental Organizations, commercial enterprises and individuals.

The firm offers the full range of engineering services from project inception tocompletion. The services offered include:

a) Feasibility studies for projectsb) Planning and cost estimates of projectsc) Engineering designd) Preparation of contract documents and specificationse) Tender evaluationf) Construction supervision, commissioning and handoverg) Project auditsh) Environmental Impact Assessmenti) Institutional development, capacity building and training

OUR STAFF COMPLEMENT

SCOPE OF CLIENTS

FIELDS OF PRACTICE

Structural Engineering

• Office & shopping complexes• Educational buildings• Silos & liquid retaining structures• Road and rail bridges• Site Investigations and Foundations• Project Operational readiness audits

CNM-YBJ Consulting Engineers has experience in capacity building for Small to Medium Building Contractors. It has trained over 50 small to medium building contractors in financial management, contracts, management, project management, health & safety, model building by-laws awareness andinterpretation.

CNM-YBJ Consulting Engineers assisted 18 Rural District Councils to establish technical capacity in their organisations. This was done by employing young Engineers and mentoring these young Engineers through training intervention methods such as on the job training workshops seminars.

CNM-YBJ Consulting Engineers has carried out the design and construction supervision,tender documentation, tender analysis and site supervision for the construction of factorycomplexes, office blocks, among other structural projects.

Institutional Capacity Building Skills Development

Expertise Development

Office complex in Harare Office complex in Bulawayo

Water Reservoir in Kariba

Bridge Construction in Mashonaland West Office & Shopping complex in MasvingoInstitutional Development, Capacity Building & Training

• Organizational Structure Development• Technical Expertise Development• Capacity Building and Skills Development

Office complex in Harare

.

Budiriro Low Cost Housing Project

Low Cost Housing Projects

CNM-YBJ Consulting Engineers was the Lead Engineer responsible for infrastructure (Roads, SWD,Water Supply, Sewage disposal, Public Lights) design and construction of 3 100 low cost houses onthe Old Mutual /CABS Budiriro Housing Project in Harare.

CNM-YBJ Consulting Engineers was the Inception, Preliminary Design, Detailed Design and construction Supervision of the Offsite and Onsite infrastructure of 973 Low Cost Housing Unitson the Hatcliffe ZRP Housing Project.

Page 9: INTERNATIONAL INVESTMENT BANKING, IIB Organizational Chart · E-Mail: egondongwe@cbz.co.zw 2 CABS Budiriro Housing Development Roads Zimbabwe CGM Consulting Engineers 36k m Design

Water Resources & Waste Water Engineering

• Earth dam design

• Water treatment works

• Storage Reservoirs

• Water reticulation and irrigation

• Sewage reticulation

• Sewage treatment works and disposal

• Pollution control and EIA

• Borehole location and equipment

• Small gravity water schemes for rural areas

Highway and Transportation Engineering

• Highway Planning, Design, Maintenance & Rehabilitation

• Airport Pavements Design, Maintenance & Rehabilitation

• Road Traffic Analysis and Safety

• Infrastructural Road Networks and Stormwater Drainage

• Industrial Developments and Railways

CNM-YBJ Consulting Engineers has carried out feasibilitystudies, engineering designs, engineering surveys, and materials location for primary, secondary and tertiary roads since 1988.

CNM-YBJ Consulting Engineers carried out the assessment and functional classification of Zimbabwe Roads Network as part of the road reform program, which established the Zimbabwe National Roads Authority (ZINARA).

CNM-YBJ Consulting Engineers has also worked on airport projects includingthe New Harare International Airport. It carried out the evaluation ofpavements, drainage and building services. In a joint venture with X-Y Base ofMalaysia it carried out the Operational Readiness Audit for reclassificationto IATA runway category AE and level of service Category B for the Civil Aviation Authority of Zimbabwe at Harare International Airport.

CNM-YBJ Consulting Engineers carried out the feasibility study, EIA, detailed design, International

competitive Bidding Documentation and construction supervision of a 4.0Ml Biological Nutrient

Removal Sewage Plant in Harare.

CNM-YBJ Consulting Engineers has worked on water and sewage reticulation systems for

townships.

In a joint venture with NORPLAN of Norway CNM-YBJ Consulting Engineers carried out a study

for detection and registration of piped water and wastewater leakages, computations of leakages

and assessment of the economical and environmental impact of those leakages in the City of

Bulawayo.

Sewage Plant in HarareSewage Ponds

Traffic Analysis

Dam Design

Water Reservoir (UZ)

Abnormal Load Route Survey

Railway Development (Chinhoyi)

Highway Design (Zimbabwe) Low Cost Bridge

Beitbridge Emergency water Supply & Sanitation project

Highway Design (Malawi)

Page 10: INTERNATIONAL INVESTMENT BANKING, IIB Organizational Chart · E-Mail: egondongwe@cbz.co.zw 2 CABS Budiriro Housing Development Roads Zimbabwe CGM Consulting Engineers 36k m Design

Electrical and Mechanical Engineering

• Power distribution• Power reticulation• Street and public lighting• Heat, Ventilation and Air Conditioning• Building Services• Operational Readiness Audit

.

Fire Fighting Equipment Pump Stations

Emergency Power

Heat, Ventilation and Air Conditioning Industrial Equipment

Township Street Lighting

Distribution Box Metering System

Communication Infrastructure

• Communication Towers• Scanners• Tollgates

Communication TowerErection Zimra Vehicle Scanners Beitbridge

Communication Tower - Gweru

Tollgates

Stree Lighting - Tower Lights

Surveying

Engineering, Topographic Survey

Environmental Impact Assessment

• Noise & air pollution assessment• Urban waste management• Construction sites and quarrying EIA• Piped water & waste leakage detection• Ground & surface water pollution control

CNM-YBJ Consulting Engineers has carried out Environmental ImpactAssessment (EIA) on quarrying activities, sewage treatment works, domesticand industrial liquid waste treatment and disposal, water and waste water leakagedetection and infrastructural development in residential and industrial areas.

The services provided on the EIA for quarrying activities included evaluation of the impact on vegetation, quality of surface and underground water regime, noise levels in the environs, seismic disturbances and vibrations due to blasting in quarry operations.

Surface water erosion control Urban Waste Management

Construction Site EIA Management

CNM-YBJ Consulting Engineers was responsible for the study and designof the electrical power supply and installation to Chisipite Shopping Complex.

CNM-YBJ Consulting Engineers provided both electrical and mechanical building services including Heat, Ventilation, Air Conditioning, Fire Fightingand Security Systems at 10 Century Bank in-store banking halls.

CNM-YBJ Consulting Engineers carried out a full spectrum Civil, Structural, Electrical and Mechanical engineering design, tender documentation,site supervision and commissioning of Chinhoyi Cotton Depot andChiredzi Cotton Depot.

Page 11: INTERNATIONAL INVESTMENT BANKING, IIB Organizational Chart · E-Mail: egondongwe@cbz.co.zw 2 CABS Budiriro Housing Development Roads Zimbabwe CGM Consulting Engineers 36k m Design

Other Projects

• Biological Nutrient Removal Plant• Masvingo Mucheke Trunk Sewer• • Harare International Airport Operational Rediness Audit• Fuel Loading Gantry

• Border Post Palisade Fencing

Beitbridge Emergency Water Supply & Sanitation

• NOIC Beitbridge Office Block

Bulawayo Road Condition Survey

Bindura University of Science Education(Faculty of Science)

Biological Nutrient Removal Sewage Plant

Emergency Water Supply & Sanitation Project

Other Projects

• Bulawayo Urban Road Condition Survey• Midlands State University Admin Block• Bindura University of Science Education• Plumtree Block of Flats• ZIMRA Plumtree Physical Search Platform• Nyamapanda Solar System• Budiriro Housing Project Pump House• Africa University Multi Purpose Hall• NUST Ceremonial Hall

Residential Flats ZIMRA Plumtree Search Platform

Solar System

Sewerege Pump Station

Harare International Airport Operational Readiness Audit

Fuel Loading Gantry

Beitbridge Office Block

NUST Ceremonial Hall

Page 12: INTERNATIONAL INVESTMENT BANKING, IIB Organizational Chart · E-Mail: egondongwe@cbz.co.zw 2 CABS Budiriro Housing Development Roads Zimbabwe CGM Consulting Engineers 36k m Design

BUDIRIRO HOUSING PROJECT Harare, Zimbabwe

Road pavement/completed

This project comprised design and construction of 3000 low cost housing units for the Central Africa Building Society (CABS) /Old Mutual Property (OMP) and the City of Harare in Harare, Zimbabwe. The project covers 112 hectares of land located in Budiriro Township. CNM-YBJ/CGM JV provided the professional services; i.e. the design and construction administration for the works consisting of:

• Roads and storm water drainage • Water reticulation • Sewage reticulation • Electrical reticulation • Architectural & structural design • House construction

A total of 12 contractors were engaged under separate contacts to construct different aspects of the project from servicing the plots to construction of the houses for a total value of $70.2 Million. CABS provided mortgage finance for houses at an average price of $27,000 per unit.

Houses under construction

Typical completed house

Typical internal finish

Page 13: INTERNATIONAL INVESTMENT BANKING, IIB Organizational Chart · E-Mail: egondongwe@cbz.co.zw 2 CABS Budiriro Housing Development Roads Zimbabwe CGM Consulting Engineers 36k m Design

Primary School

Commercial

Primary School

Church

Church

Church

Church

C h u r c h20m

road

20m

road

12m road

12m road

12m road

12m road

20m road

12m road

15m road

12m road

12m road

12m road

12m road

12m road

12m road

12m

road

15

m r

oa

d

12m road

12m road

15m road

12m

road

12m road

12m road

12m

road

12

m r

oa

d

12m road

12m road

12m road

12m road

12m

road

15m

road

30m road

12m road

12m road

12m road

12m

road

15m road

12m road

12m road

20m road

Creche

12m

road

12m

road

12m

road 15m

road

12m

road

12m

road

12m

road

12m road

20m

road

12m

road

12m

road

12m

road

15m

road

12m road12m

road

12m road

Creche

15m road

12m road

Creche

ClinicPolice

Post

Commercial

Church

Church

Church

Church

15m

road

3.5ha

Creche

3.5ha

C/Hall

3133m²

2000m²

2208m²

2000m²

2000m²

2000m²

2000m²

2000m²

Creche

12m

road

2000m²

Creche

2000m²

O/S

CRECHE

2000m²

CRECHE

Churc

h

2000m²

2000m²

2000m²

O/S

15m road

1

2

3

4

5

6

7A

8

9A

B U D I R I R O H O U S I N GS t a n d A l l o c a t i o n s0 9 J u n e 2 0 1 5

12m road

12m road

12m road

12m road

12

m r

oa

d

12

m r

oa

d

12

m r

oa

d 12

m r

oa

d

12

m r

oa

d

12m

road

12m road

12m road

12m road

12m road

12m road

12m road

12m road

12

13

11

7B

12m road

12m road

12m

road

Primary School

Church

15m road

12m road

12m

road

12m

road

12m road

12m road

12m

road

12m

road

12m road4.1ha

Commercial

2000m²

9B

10Masimba

Site Office

7A

18m ro ad 12mroad1 2 m r o a d1 2 m r o a d 1 2 m r o a d1 8 m r o a d1 2 m r o a d1 2 m r o a d22667 226682268122682 226 6922680 226702 2679 226 71226 78 2267222677 2267 3226 76 22674226752 268322698 2268422697 2268522696 2268622695 22 68722 694 2 268822693 22699 2272722700227 26227 01227 252270222724 2 2 6 9 22 2 6 9 12 2 6 9 02 2 6 8 92 2 7 2 32 2 7 2 22 2 7 0 72 2 7 0 82 2 7 0 92 2 7 1 2 2 2 7 2 12 270322 7042270522 706 22713 22 714 227152 2720 22 71622719 2271722718 2 2 7 2 82 2 7 2 9 2 2 7 6 52 2 7 3 0 2 2 7 6 42 2 7 3 1 2 2 7 6 32 2 7 3 2 2 2 7 6 22 2 7 3 3 2 2 7 6 12 2 7 3 4 2 2 7 6 02 2 7 3 5 2 2 7 5 92 2 7 3 6 2 2 7 5 82 2 7 5 72 288022879 2 2 8 8 12287 8 2 2 8 8 22287 7 2 2 8 8 322876 2 2 8 8 422875 2 2 8 8 522874 22 85622 8332285522834228 54228 352285 32283 62285 22283 72 28512 2838228 50228 39228492284022 84822 84122 84722 84222846228432284522844 228 6422 863 22 865228 62 228662 2861 2 286722860 2286822859 22869228 58 2 2 8 9 22 2 8 9 12 2 8 9 32 2 8 9 0 2 2 8 9 42 2 8 8 9 2 2 8 9 52 2 8 8 8 2 2 8 9 62 2 8 8 7 2 2 8 9 72 2 8 8 62287 3 2287 2 22 871 228 70 22 857 2 2 9 0 02 2 8 9 9 2293022931229322293 3229342293 52293 62293 72293822 9392294 0 2 2 8 9 82 2 7 3 72 2 7 3 8 2 2 7 5 62 2 7 3 9 2 2 7 5 52 2 7 4 0 2 2 7 5 42 2 7 4 1 2 2 7 5 32 2 7 4 2 2 2 7 5 12 2 7 4 3 2 2 7 5 02 2 7 4 4 2 2 7 4 92 2 7 4 5 2 2 7 4 82 2 7 5 2

14 2 2 7 1 02 2 7 1 1 2 2 7 4 6 2 2 7 4 7H o u s e t y p e A ( c o r e ) , 2 7 s q mH o u s e t y p e B , 4 7 s q mH o u s e t y p e A + , p l i n t h 6 3 s q m

Page 14: INTERNATIONAL INVESTMENT BANKING, IIB Organizational Chart · E-Mail: egondongwe@cbz.co.zw 2 CABS Budiriro Housing Development Roads Zimbabwe CGM Consulting Engineers 36k m Design

($10,750)

Page 15: INTERNATIONAL INVESTMENT BANKING, IIB Organizational Chart · E-Mail: egondongwe@cbz.co.zw 2 CABS Budiriro Housing Development Roads Zimbabwe CGM Consulting Engineers 36k m Design

($12,700)

Page 16: INTERNATIONAL INVESTMENT BANKING, IIB Organizational Chart · E-Mail: egondongwe@cbz.co.zw 2 CABS Budiriro Housing Development Roads Zimbabwe CGM Consulting Engineers 36k m Design

($15,650)

Page 17: INTERNATIONAL INVESTMENT BANKING, IIB Organizational Chart · E-Mail: egondongwe@cbz.co.zw 2 CABS Budiriro Housing Development Roads Zimbabwe CGM Consulting Engineers 36k m Design

Name of Project: Budiriro Housing Project

PROJECT COST BREAKDOWN

a) Surveys 453,082$

b) Geotechnical 82,641$

c) Design (all disciplines) 3,074,843$

d) Contstruction Administration 1,177,400$

e) Planning 52,620$

f) EIA and EMA 129,503$

4,970,089$

a) Roads & Storm Water Drainage 14,851,958$

b) Water Retic 2,254,691$

c) Sewage Retic 5,771,503$

d) Buildings 34,137,695$

e) Two Sewerage Pumbing Stations 2,090,042$

f) 5 ML Water Reservoiir 1,204,851$

60,310,740$

a) Stands Rehabilitation 3,268,957$

b) Intrinsic Land Value 561,597$

c) Approvals City Council 469,146$

d) ZESA Relocation & Connection Fees 110,000$

e) Provision of Access to Site 415,685$

f) Client Audit Fees 91,259$

4,916,643$

70,197,471$

Sub-Total Other Costs

GRAND TOTAL

Sub-Total Professional Services

1) Professional Services

2) Construction

Sub-Total Construction

3) Other Costs

Page 18: INTERNATIONAL INVESTMENT BANKING, IIB Organizational Chart · E-Mail: egondongwe@cbz.co.zw 2 CABS Budiriro Housing Development Roads Zimbabwe CGM Consulting Engineers 36k m Design

CBZ VICTORIA FALLS HOUSING PROJECT Victoria Falls, Zimbabwe

Road pavement construction

This ongoing project comprises the design and construction of infrastructure for 1135 units for the Commercial Bank of Zimbabwe (CBZ) in Victoria Falls, Zimbabwe. The project covers a total of 37.6 hectares of land located in Chinotimba Buffer, Mkhosana Buffer, and Mkhosana High Density Townships in Victoria Falls Town. CNM-YBJ provided the following professional services: i.e. design and construction administration for the works consisting of:

• Roads and storm water drainage • Water reticulation • Sewage reticulation

One contractor was engaged to construct the above work for a total value of $5.2 Million. The project is ongoing and details of the selling price for the stands is not yet available.

Sewage reticulation

Sewer line construction

Road compaction in progress

Page 19: INTERNATIONAL INVESTMENT BANKING, IIB Organizational Chart · E-Mail: egondongwe@cbz.co.zw 2 CABS Budiriro Housing Development Roads Zimbabwe CGM Consulting Engineers 36k m Design
Page 20: INTERNATIONAL INVESTMENT BANKING, IIB Organizational Chart · E-Mail: egondongwe@cbz.co.zw 2 CABS Budiriro Housing Development Roads Zimbabwe CGM Consulting Engineers 36k m Design

Name of Project: Vic Falls Housing Project

PROJECT COST BREAKDOWN

a) Surveys

b) Geotechnical

c) Design (all disciplines) 69,460$

d) Contstruction Administration 38,870.00

e) Other (Specify)

108,330$

a) Roads & Storm Water Drainage 4,163,502$

b) Water Retic 287,853$

c) Sewage Retic 746,058$

d) Buildings

5,197,413$

a) Other (Specify)

b) Other (Specify)

c) Other (Specify)

d) Other (Specify)

e) Other (Specify)

-$

5,305,743$ GRAND TOTAL

1) Professional Services

Sub-Total Professional Services

2) Construction

Sub-Total Construction

3) Other Costs

Sub-Total Other Costs

Page 21: INTERNATIONAL INVESTMENT BANKING, IIB Organizational Chart · E-Mail: egondongwe@cbz.co.zw 2 CABS Budiriro Housing Development Roads Zimbabwe CGM Consulting Engineers 36k m Design

CLIPSHAM HOUSING PROJECT Masvingo, Zimbabwe

Road pavement construction

This ongoing project comprises the Project Management and construction supervision of infrastructure for 772 units for the Infrastructure Development Bank of Zimbabwe (IDBZ) in Masvingo, Zimbabwe. The project covers a total of 205.7 hectares of land located in Masvingo. Construction work on this project started in December, 2015. Since July 2016 Promanint International/CNM-YBJ JV took over responsibility for the Project Management and construction supervision of:

• Roads and storm water drainage • Water reticulation

One contractor was engaged to construct the above work for a total value of $3.65 Million. The serviced 1,390-2,500 square meter plots will be sold for $13 per square 13metre.

Water reticulation

Road pavement construction

Water reticulation trenching

Page 22: INTERNATIONAL INVESTMENT BANKING, IIB Organizational Chart · E-Mail: egondongwe@cbz.co.zw 2 CABS Budiriro Housing Development Roads Zimbabwe CGM Consulting Engineers 36k m Design
Page 23: INTERNATIONAL INVESTMENT BANKING, IIB Organizational Chart · E-Mail: egondongwe@cbz.co.zw 2 CABS Budiriro Housing Development Roads Zimbabwe CGM Consulting Engineers 36k m Design

Name of Project: Clipsham Housing Project

PROJECT COST BREAKDOWN

a) Surveys

b) Geotechnical

c) Design (all disciplines)

d) Contstruction Administration 57,174$

57,174$

a) Roads & Storm Water Drainage 3,145,821$

b) Water Retic 483,985$

c) Sewage Retic

d) Buildings

3,629,807$

a) Other (Specify)

b) Other (Specify)

c) Other (Specify)

d) Other (Specify)

e) Other (Specify)

-$

3,686,980$ GRAND TOTAL

1) Professional Services

Sub-Total Professional Services

2) Construction

Sub-Total Construction

3) Other Costs

Sub-Total Other Costs