irrigation tank
TRANSCRIPT
8/10/2019 Irrigation Tank
http://slidepdf.com/reader/full/irrigation-tank 1/12
mployer: MINISTRY OF HOUSING (MOH)
Consultant: SAUDI ARABIAN PARSONS LTD. (SAPL)
Contractor: AL-AYUNI INVESTMENT & CONTRACTING CO.
Apply on: Month: JUNE, 2014
KINGDOM OF SAUDI ARABIAMINISTRY OF HOUSING
AL-KHARJ SITE (PACKAGE-02)
MONTHLY STATEMENT NO.01
8/10/2019 Irrigation Tank
http://slidepdf.com/reader/full/irrigation-tank 2/12
KINGDOM OF SAUDI ARABIA MONTHLY STATEMINISTRY OF HOUSING AL-KHARJ SITE MonthPACKAGE-02
Employer: MINISTRY OF HOUSING (MOH)Consultants: SAUDI ARABIAN PARSONS LTD. (SAPL)Contractor: AL-AYUNI INVESTMENT & CONTRACTING CO.
Bill No.: IRRIGATION RESERVOIR AND PUMPING STATIONDescription: SITE DEVELOPMENT INCLUDING AUXILIARY STRUCTURES
Item No.: 1.0 (1.1)
د ح و ل
Unit 1 2 3 4 5 6 7
All works should be as per Local Authority requirements
1.0SITE DEVELOPMENT INCLUDING AUXILIARY STRUCTURES
1.1Site Grading Works including clearing and grubbing, earthworks andother items to complete as per specifications
Sq.m 3,785.000 3,600.019 -
Sq.m 3,785.000 3,600.019 -
Prepared By: ChecContractor Representative Consultant RepresenAl-Ayuni Investment & Contracting Co. Saudi Arabian Parson Ltd. (
Total Carried Forward to Grand Summary
ITEM SUMMARY SHEET
Sub-Bill No. DescriptionBOQ Estimated
(Quantity)Upto Date(Quantity)
Previous Month(Quantity)
This(Qu
8/10/2019 Irrigation Tank
http://slidepdf.com/reader/full/irrigation-tank 3/12
Sheet1of1
KINGDOM OF SAUDI ARABIA MONTHLY STATEMENT NO.01MINISTRY OF HOUSING AL-KHARJ SITE Month: JUNE, 2014PACKAGE-02
MINISTRY OF HOUSING (MOH)SAUDI ARABIAN PARSONS LTD. (SAPL)AL-AYUNI INVESTMENT & CONTRACTING CO.
Irrigation Reservoir and Pumping StationClearing & Grading1.0
د ح و ل
Unit 1 3 4 5 6 7 8 = (4x5x6x7) 9
1.1 For Quantity Ref
Drawing No.
1.1
1 002_02_17_03_001
Easting
(i) 734556.000
(ii) 734615.370
(iii) 734564.172
(iv) 734623.541 Sq.m 1 60.00 60.00 3,600.019
3,600.019
-
3,600.019
Prepared By: Checked By:Contractor Representative Consultant RepresentativeAl-Ayuni Investment & Contracting Co. Saudi Arabian Parson Ltd. (SAPL)
2663289.714
2663298.391
2663233.803
2663242.479
Employer:Consultants:Contractor:
ITEM MEASUREMENT SHEETBill No.:Description:Item No.:
Northing
Sr. No. Description Nos L WQuantity
(m 3)Remarks
2
Site Grading works including clearing andgrubing, earthworks and other items tocomplete as per specifications
Approved Northing & Easting
Clearing & Grading
H
Total upto date Quantity (Sq.m)
Previously Certified. (Sq.m)
This Month Quantity (Sq.m)
8/10/2019 Irrigation Tank
http://slidepdf.com/reader/full/irrigation-tank 4/12
KINGDOM OF SAUDI ARABIA MONTHLY STATMINISTRY OF HOUSING AL-KHARJ SITE MonPACKAGE-02
Employer: MINISTRY OF HOUSING (MOH)Consultants: SAUDI ARABIAN PARSONS LTD. (SAPL)Contractor: AL-AYUNI INVESTMENT & CONTRACTING CO.
Bill No.: IRRIGATION RESERVOIR AND PUMPING STATIONDescription: IRRIGATION TANK RESERVOIR & INTAKE CHAMBERSItem No.: 2.0 (2.1)
د ح و ل
Unit 1 2 3 4 5 6
Construction of RC Reservoir & Intake chamber comple with civil,mechanical and electromechanical as shown on the drawings andstardard with MOH.
2.0IRRIGATION TANK RESERVOIR &INTAKE CHAMBERSEarthworks
2.1Excavation in all type of soil including rocks by using equipment,mechanical tools and store excavated soil for backfilling in approved
area and remove the remaining to backfilling area
Cum 5,670.000 3,445.959 -
Cum 5,670.000 3,445.959 -
Prepared By: ChContractor Representative Consultant RepresAl-Ayuni Investment & Contracting Co. Saudi Arabian Parson Ltd
Total Carried Forward to Grand Summary
ITEM SUMMARY SHEET
Sub-Bill No. DescriptionBOQ Estimated
(Quantity)Upto Date(Quantity)
Previous Month(Quantity)
Th(Q
8/10/2019 Irrigation Tank
http://slidepdf.com/reader/full/irrigation-tank 5/12
KINGDOM OF SAUDI ARABIAMINISTRY OF HOUSING AL-KHARJ SITEPACKAGE-02
MINISTRY OF HOUSING (MOH)SAUDI ARABIAN PARSONS LTD. (SAPL)AL-AYUNI INVESTMENT & CONTRACTING CO.
Irri ation Reservoir and Pum in Station
Structural Excavation2.0
د ح و ل
Unit 1 3 4 5 6 7 = (5-6) 8 = Avg- 9 10 11
2.1
1.1 (i) Cum 1 465.673 460.749 4.924(ii) Cum 1 465.441 460.774 4.666 4.795 29.000 5.250 (iii) Cum 1 465.441 460.799 4.642 4.654 29.000 5.000 (iv) Cum 1 465.022 460.824 4.198 4.420 29.000 5.000 (v) Cum 1 465.022 460.649 4.373 4.285 29.000 5.000 (vi) Cum 1 465.208 460.874 4.334 4.354 29.000 5.250 (v)
Cum 1 460.749 459.249 1.500 1.500 2.302 2.877 Cum 1 460.749 459.249 1.500 1.500 2.302 2.877 Cum 1 460.831 459.331 1.500 1.500 3.045 3.500 Cum 1 465.208 461.923 3.285 1.485 1.400 1.400
(vi)Cum 2 465.022 464.123 0.899 0.899 2.000 2.000
(vii)Cum 1 465.208 462.724 2.484 2.484 3.875 3.850 Cum 1 465.208 460.874 4.334 4.334 1.975 3.850
Prepared By:Contractor RepresentativeAl-Ayuni Investment & Contracting Co.
Total upto date Quantity (Cum)Previously Certified. (Cum)
This Month Quantity (Cum)
Grid A Line 1 ~7Grid B Line 1 ~7Grid C Line 1 ~7Grid D Line 1 ~7Grid E Line 1 ~7
Tank Inlet StationInlet Tank PortionInlet Sump Pit Portion
Grid F Line 1 ~7Sump PortionsWith Grid A Line 4 (Section C & D)With Grid A Line 1 (Section C & D)Grid b/w C1~D1 & Line b/w 1~2 (Sec K & I)
Electrical Room FoundationsFooting
Width Length Avg.Height
Differ-Nos
Sump Pit (b/w Grid D1~E1 Line 0~1)
2
Excavation in all type of soil including roaks byusing equipment etc. and store excavated material forbackfillUnderground Storage Tank
Item No.:
Sr. No. Description NGLExc-
Level
Employer:Consultants:Contractor:
ITEM MEASUREMENT SHEETBill No.:
Description:
Avg
Avg
Avg
C/C
Avg
Avg
C/C
C/C
C/C
C/CC/C
Avg
8/10/2019 Irrigation Tank
http://slidepdf.com/reader/full/irrigation-tank 6/12
KINGDOM OF SAUDI ARABIA MONTHLY STATMINISTRY OF HOUSING AL-KHARJ SITE MontPACKAGE-02
Employer: MINISTRY OF HOUSING (MOH)Consultants: SAUDI ARABIAN PARSONS LTD. (SAPL)Contractor: AL-AYUNI INVESTMENT & CONTRACTING CO.
Bill No.: IRRIGATION RESERVOIR AND PUMPING STATIONDescription: IRRIGATION TANK RESERVOIR & INTAKE CHAMBERSItem No.: 2.0 (2.2)
د ح و ل
Unit 1 2 3 4 5 6
Construction of RC Reservoir & Intake chamber comple with civil,mechanical and electromechanical as shown on the drawings andstardard with MOH.
2.0IRRIGATION TANK RESERVOIR &INTAKE CHAMBERS
Concreting works:Supply and installation of the following concrete work items to includeacessories to complete as per specifications
2.2 Blinding Concrete Cum 105.000 80.132 -
Cum 105.000 80.132 -
Prepared By: CheContractor Representative Consultant RepresAl-Ayuni Investment & Contracting Co. Saudi Arabian Parson Ltd.
Total Carried Forward to Grand Summary
ITEM SUMMARY SHEET
Sub-Bill No. DescriptionBOQ Estimated
(Quantity)Upto Date(Quantity)
Previous Month(Quantity)
Th(Q
8/10/2019 Irrigation Tank
http://slidepdf.com/reader/full/irrigation-tank 7/12
Sheet1of1KINGDOM OF SAUDI ARABIA MONTHLY STATEMENT NO.01MINISTRY OF HOUSING AL-KHARJ SITE Month: JUNE, 2014PACKAGE-02
MINISTRY OF HOUSING (MOH)SAUDI ARABIAN PARSONS LTD. (SAPL)AL-AYUNI INVESTMENT & CONTRACTING CO.
Irrigation Reservoir and Pumping Station
Blinding Concrete2.2
د ح و ل
Unit 1 3 4 5 6 7 8 = (4x5x6x7) 9
For Quantity RefDrawing No.
2.2
(i) Cum 1 28.650 25.650 0.100 73.487 002_02_17_03_003
Cum 1 1.850 1.850 0.100 (0.342) 002_02_17_03_003
Cum 1 1.850 1.850 0.100 (0.342) 002_02_17_03_003
Cum 1 3.500 4.045 0.100 (1.416) 002_02_17_03_003
(ii)
Cum 2 1.875 1.425 0.100 0.534 002_02_17_08_006
Cum 1 1.000 1.000 0.100 0.100 002_02_17_08_006
(iii)
Cum 2 1.875 1.425 0.100 0.534 002_02_17_08_006
Cum 1 1.000 1.000 0.100 0.100 002_02_17_08_006
(iv)
Cum 1 3.045 1.803 0.100 0.549 002_02_17_08_006
Cum 2 3.150 1.803 0.100 1.136 002_02_17_08_006
Cum 1 2.500 2.045 0.100 0.511 002_02_17_08_006
(v) Cum 1 1.400 1.400 0.100 0.196 002_02_17_08_006
(vi) Cum 1 4.700 4.700 0.100 2.209 002_02_17_03_006
Cum 3 4.600 0.500 0.100 0.690 002_02_17_03_006
(vii) Cum 1 3.875 3.850 0.100 1.492 002_02_17_03_006
Cum 1 1.800 3.850 0.100 0.693 002_02_17_03_006
80.132
-
80.132
Prepared By: Checked By:Contractor Representative Consultant RepresentativeAl-Ayuni Investment & Contracting Co. Saudi Arabian Parson Ltd. (SAPL)
Item No.:
Sr. No. Description
Employer:Consultants:Contractor:
ITEM MEASUREMENT SHEETBill No.:
Description:
Nos L W
Grid A ~ B Line 1 ~ 7
HQuantity
(m 3)Remarks
2
Supply and installation of concreteing worksitems including accessories as perspecifications
100mm thk Blinding Concrete
Underground Storage Tank
Total upto date Quantity (Cum)
Previously Certified. (Cum)
This Month Quantity (Cum)
Inlet Sump Pit Portion
Inlet Tank Portion
Bed Portion
Grid b/w C1~D1 & Line b/w 1~2
Slope Portion (Avg- width followed)
Bed Portion
Grid C1~D1 Line 0~1 (Section F)
Tank Inlet Station
Slope Portion (Avg- width followed)
Side footing (Section F)
Sump Pit (b/w Grid D1~E1 Line 1)
Electrical Room
Sump DeductionWith Grid A Line 4 (Section C & D)
With Grid A Line 1 (Section C & D)
Grid b/w C1~D1 & Line b/w 1~2
Sump Portion Blinding Concrete
Slope Portion (Avg- width followed)
With Grid A Line 4 (Section C & D)
Slope Portion (Avg- width followed)
Bed Portion
With Grid A Line 1 (Section C & D)
8/10/2019 Irrigation Tank
http://slidepdf.com/reader/full/irrigation-tank 8/12
KINGDOM OF SAUDI ARABIA MONTHLY STATMINISTRY OF HOUSING AL-KHARJ SITE MoPACKAGE-02
Employer: MINISTRY OF HOUSING (MOH)Consultants: SAUDI ARABIAN PARSONS LTD. (SAPL)Contractor: AL-AYUNI INVESTMENT & CONTRACTING CO.
Bill No.: IRRIGATION RESERVOIR AND PUMPING STATIONDescription: IRRIGATION TANK RESERVOIR & INTAKE CHAMBERSItem No.: 2.0 (2.3)
د ح و ل
Unit 1 2 3 4 5 6
Construction of RC Reservoir & Intake chamber comple with civil,mechanical and electromechanical as shown on the drawings andstardard with MOH.
2.0IRRIGATION TANK RESERVOIR &INTAKE CHAMBERS
2.3Concrete including rebars, formwork, waterstop, construction jointsand sealent as per dwg & specifications
2.3.1 Slab on grade Cum 572.000 393.135 -2.3.2 Elevated Slab Cum 330.000 - -2.3.3 Walls Cum 210.000 - -2.3.4 Columns Cum 21.000 - -2.3.5 Beams Cum 21.000 - -
Total Carried Forward to Grand Summary Cum 1,154.000 393.135 -
Prepared By: ChContractor Representative Consultant RepreAl-Ayuni Investment & Contracting Co. Saudi Arabian Parson Lt
ITEM SUMMARY SHEET
Sub-Bill No. DescriptionBOQ Estimated
(Quantity)Upto Date(Quantity)
Previous Month(Quantity)
T(
8/10/2019 Irrigation Tank
http://slidepdf.com/reader/full/irrigation-tank 9/12
#REF!KINGDOM OF SAUDI ARABIA MONTHLY STATEMENT NO.01MINISTRY OF HOUSING AL-KHARJ SITE Month: JUNE, 2014PACKAGE-02
MINISTRY OF HOUSING (MOH)SAUDI ARABIAN PARSONS LTD. (SAPL)AL-AYUNI INVESTMENT & CONTRACTING CO.
Irrigation Reservoir and Pumping Station
Concrete works (Slab on Grade)2.3
د ح و ل
Unit 1 3 4 5 6 7 8 = (4x5x6x7) 9
For QuantityRef Drawing No.
2.3.1 WIR No. 0682 (Rev-1)
(i) Cum 1 28.350 25.350 0.500 359.336 002_02_17_03_003
-
Cum 1 1.850 1.850 0.500 (1.711) 002_02_17_03_003
Cum 1 1.850 1.850 0.500 (1.711) 002_02_17_03_003
Cum 1 3.500 4.045 0.500 (7.079) 002_02_17_03_003
-
(ii) -
Cum 2 1.875 1.425 0.500 2.672 002_02_17_08_006
Cum 1 1.000 1.000 0.500 0.500 002_02_17_08_006
(iii) -
Cum 2 1.875 1.425 0.500 2.672 002_02_17_08_006
Cum 1 1.000 1.000 0.500 0.500 002_02_17_08_006
(iv) -
Cum 1 3.045 1.803 0.500 2.745 002_02_17_08_006
Cum 2 3.150 1.803 0.500 5.679 002_02_17_08_006
Cum 1 2.500 2.045 0.500 2.556 002_02_17_08_006
(v) Cum 1 1.300 1.300 0.300 0.507 002_02_17_08_006
-
(vi) Cum 1 4.700 4.700 0.200 4.418 002_02_17_08_007
Cum 3 4.600 0.300 0.500 2.070 002_02_17_08_007
-
(vii) Cum 1 3.750 3.600 0.300 13.500 002_02_17_03_006
Cum 1 1.800 3.600 0.500 6.480 002_02_17_03_006
393.135
-
393.135
Prepared By: Checked By:Contractor Representative Consultant RepresentativeAl-Ayuni Investment & Contracting Co. Saudi Arabian Parson Ltd. (SAPL)
Employer:Consultants:Contractor:
ITEM MEASUREMENT SHEETBill No.:
Description:Item No.:
Sr. No. Description Nos L W HQuantity
(m 3)Remarks
2
Concrete including rebars, formwork,waterstop,construction of joints and sealantetc.
Slab on Grade (Base Slab)
Underground Tank
Grid A ~ B Line 1 ~ 7
Sump DeductionWith Grid A Line 4 (Section C & D)
With Grid A Line 1 (Section C & D)
Grid b/w C1~D1 & Line b/w 1~2
Sump Portion
With Grid A Line 4 (Section C & D)
Slope Portion (Avg- width followed)
Bed Portion
With Grid A Line 1 (Section C & D)
Slope Portion (Avg- width followed)
Side footing (Section F) under slab
Bed Portion
Grid b/w C1~D1 & Line b/w 1~2
Slope Portion (Avg- width followed)
Slope Portion (Avg- width followed)
Bed Portion
Sump Pit (b/w Grid D1~E1 Line 1)
Total upto date Quantity (Cum)
Previously Certified. (Cum)
This Month Quantity (Cum)
Electrical Room
Grid C1~D1 Line 0~1 (Section F)
Tank Inlet Station (Base Slab)
Inlet Tank Portion
Inlet Sump Pit Portion
8/10/2019 Irrigation Tank
http://slidepdf.com/reader/full/irrigation-tank 10/12
KINGDOM OF SAUDI ARABIA MONTHLY STAMINISTRY OF HOUSING AL-KHARJ SITE MoPACKAGE-02
Employer: MINISTRY OF HOUSING (MOH)Consultants: SAUDI ARABIAN PARSONS LTD. (SAPL)Contractor: AL-AYUNI INVESTMENT & CONTRACTING CO.
Bill No.: IRRIGATION RESERVOIR AND PUMPING STATIONDescription: IRRIGATION TANK RESERVOIR & INTAKE CHAMBERSItem No.: 2.0 (2.5)
د ح و ل
Unit 1 2 3 4 5 6
Construction of RC Reservoir & Intake chamber comple with civil,mechanical and electromechanical as shown on the drawings andstardard with MOH.
2.0IRRIGATION TANK RESERVOIR &INTAKE CHAMBERSWATERPROOFING
2.5Supply and install waterproofing and protection layer including allitems to complete as per specification
2.5.1 Epoxy Sulfide (1000 micron thk.) coating inside Sqm 3,480.000 - -2.5.2 waterproofing membrance with protective board Sqm 600.000 - -2.5.3 waterproofing membrance underslab Sqm 1,176.000 801.318 -2.5.4 Torch applied waterproofing membrane Sqm 998.000 - -2.5.5 waterproofing on pipe opening Sqm 6.000 - -2.5.6 50mm thk minimum cement screed Sqm 2,048.000 801.348 -
Total Carried Forward to Grand Summary Cum 8,308.000 1,602.666 -
Prepared By: CContractor Representative Consultant ReprAl-Ayuni Investment & Contracting Co. Saudi Arabian Parson L
ITEM SUMMARY SHEET
Sub-Bill No. DescriptionBOQ Estimated
(Quantity)Upto Date(Quantity)
Previous Month(Quantity)
T(
8/10/2019 Irrigation Tank
http://slidepdf.com/reader/full/irrigation-tank 11/12
Sheet1of1KINGDOM OF SAUDI ARABIA MONTHLY STATEMENT NO.01MINISTRY OF HOUSING AL-KHARJ SITE Month: JUNE, 2014PACKAGE-02
MINISTRY OF HOUSING (MOH)SAUDI ARABIAN PARSONS LTD. (SAPL)AL-AYUNI INVESTMENT & CONTRACTING CO.
Irrigation Reservoir and Pumping Station
Waterproofing membrane under slab2.5
د ح و ل
Unit 1 3 4 5 6 7 8 = (4x5x6x7) 9
For Quantity RefDrawing No.
2.5.3 WIR No. 0539 & 0442
(i) Sqm 1 28.650 25.650 734.873 002_02_17_03_003
-
Sqm 1 1.850 1.850 (3.423) 002_02_17_03_003
Sqm 1 1.850 1.850 (3.423) 002_02_17_03_003
Sqm 1 3.500 4.045 (14.158) 002_02_17_03_003
-
(ii) -
Sqm 2 1.875 1.425 5.344 002_02_17_08_006
Sqm 1 1.000 1.000 1.000 002_02_17_08_006
(iii) -
Sqm 2 1.875 1.425 5.344 002_02_17_08_006
Sqm 1 1.000 1.000 1.000 002_02_17_08_006
(iv) -
Sqm 1 3.045 1.803 5.490 002_02_17_08_006
Sqm 2 3.150 1.803 11.359 002_02_17_08_006
Sqm 1 2.500 2.045 5.113 002_02_17_08_006
(v) Sqm 1 1.400 1.400 1.960 002_02_17_08_006
-
(vi) Sqm 1 4.700 4.700 22.090 002_02_17_03_006
(vi) Sqm 3 4.600 0.500 6.900 002_02_17_03_006
-
(vii) Sqm 1 3.875 3.850 14.919 002_02_17_03_006
Sqm 1 1.800 3.850 6.930 002_02_17_03_006
801.318
-
801.318
Prepared By: Checked By:Contractor Representative Consultant RepresentativeAl-Ayuni Investment & Contracting Co. Saudi Arabian Parson Ltd. (SAPL)
Employer:Consultants:Contractor:
ITEM MEASUREMENT SHEETBill No.:
Description:Item No.:
Sr. No. Description Nos L W HQuantity
(m 2 )Remarks
2
Supply and installation of waterproofing andprotection layers including all accessories
Waterproofing membrane
Underground Storage Tank
Grid A ~ B Line 1 ~ 7
Sump DeductionWith Grid A Line 4 (Section C & D)
With Grid A Line 1 (Section C & D)
Grid b/w C1~D1 & Line b/w 1~2
Sump Pit (b/w Grid D1~E1 Line 1)
Sump Portion
With Grid A Line 4 (Section C & D)
Slope Portion (Avg- width followed)
Bed Portion
With Grid A Line 1 (Section C & D)
Slope Portion (Avg- width followed)
Total upto date Quantity (Sq.m)
Previously Certified. (Sq.m)
This Month Quantity (Sq.m)
Bed Portion
Grid b/w C1~D1 & Line b/w 1~2
Slope Portion (Avg- width followed)
Slope Portion (Avg- width followed)
Bed Portion
Electrical Room
Grid C1~D1 Line 0~1 (Section F)
Tank Inlet Station
Inlet Tank Portion
Inlet Sump Pit Portion
Side footing (Section F)
8/10/2019 Irrigation Tank
http://slidepdf.com/reader/full/irrigation-tank 12/12
Sheet1of1KINGDOM OF SAUDI ARABIA MONTHLY STATEMENT NO.01MINISTRY OF HOUSING AL-KHARJ SITE Month: JUNE, 2014PACKAGE-02
MINISTRY OF HOUSING (MOH)SAUDI ARABIAN PARSONS LTD. (SAPL)AL-AYUNI INVESTMENT & CONTRACTING CO.
Irrigation Reservoir and Pumping Station
50mm thk minimum Cement Screed2.5
د ح و ل
Unit 1 3 4 5 6 7 8 = (4x5x6x7) 9
For Quantity RefDrawing No.
2.5.3 WIR No. 550 & 556
(i) Sqm 1 28.450 25.450 724.053 002_02_17_03_003
-
Sqm 1 1.850 1.850 (3.423) 002_02_17_03_003
Sqm 1 1.850 1.850 (3.423) 002_02_17_03_003
Sqm 1 3.500 4.045 (14.158) 002_02_17_03_003
-
(ii) -
Sqm 2 1.875 1.425 5.344 002_02_17_08_006
Sqm 1 1.000 1.000 1.000 002_02_17_08_006
(iii) -
Sqm 2 1.875 1.425 5.344 002_02_17_08_006
Sqm 1 1.000 1.000 1.000 002_02_17_08_006
(iv) -
Sqm 1 3.045 1.803 5.490 002_02_17_08_006
Sqm 2 3.150 1.803 11.359 002_02_17_08_006
Sqm 1 2.500 2.045 5.113 002_02_17_08_006
(v) Sqm 1 1.400 1.400 1.960 002_02_17_08_006
-
(vi) Sqm 1 4.700 4.700 22.090 002_02_17_03_006
Sqm 3 4.600 0.500 6.900 002_02_17_03_006
-
(vii) Sqm 1 3.875 3.850 14.919 002_02_17_03_006
Sqm 1 1.800 3.850 6.930 002_02_17_03_006Sqm 1 3.500 3.100 10.850 002_02_17_08_008
801.348
-
801.348
Prepared By: Checked By:Contractor Representative Consultant RepresentativeAl-Ayuni Investment & Contracting Co. Saudi Arabian Parson Ltd. (SAPL)
Employer:Consultants:Contractor:
ITEM MEASUREMENT SHEETBill No.:
Description:Item No.:
Sr. No. Description Nos L W HQuantity
(m 2 )Remarks
2
Supply and installation of waterproofing andprotection layers including all accessories
Waterproofing membrane
Underground Tank (Under Slab)
Grid A ~ B Line 1 ~ 7
Sump DeductionWith Grid A Line 4 (Section C & D)
With Grid A Line 1 (Section C & D)
Grid b/w C1~D1 & Line b/w 1~2
Sump Portion
With Grid A Line 4 (Section C & D)
Slope Portion (Avg- width followed)
Bed Portion
With Grid A Line 1 (Section C & D)
Slope Portion (Avg- width followed)
Bed Portion
Grid b/w C1~D1 & Line b/w 1~2
Slope Portion (Avg- width followed)
Slope Portion (Avg- width followed)
Bed Portion
Sump Pit (b/w Grid D1~E1 Line 1)
Electrical Room (Under Slab)
Grid C1~D1 Line 0~1 (Section F)
Tank Inlet Station (Under Slab)
Inlet Tank Portion
Inlet Sump Pit Portion
Side footing (Section F)
Total upto date Quantity (Sq.m)
Previously Certified. (Sq.m)
This Month Quantity (Sq.m)
Inlet Tank Roof