irrigation tank

12
Employer: MINISTRY OF HOUSING (MOH) Consul tant : SAUDI ARABIAN PARSONS LTD. (SAPL) Cont ractor: AL-AYUNI I NVESTMENT & CONTRACTING CO.  Apply on: Month: JUNE, 2014 KINGDOM OF SAUDI ARABIA MINISTRY OF HOUSING  AL-KHARJ SITE (PACKAGE-02) MONTHLY STATEMENT NO.01

Upload: freann

Post on 02-Jun-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Irrigation Tank

8/10/2019 Irrigation Tank

http://slidepdf.com/reader/full/irrigation-tank 1/12

mployer: MINISTRY OF HOUSING (MOH)

Consultant: SAUDI ARABIAN PARSONS LTD. (SAPL)

Contractor: AL-AYUNI INVESTMENT & CONTRACTING CO.

Apply on: Month: JUNE, 2014

KINGDOM OF SAUDI ARABIAMINISTRY OF HOUSING

AL-KHARJ SITE (PACKAGE-02)

MONTHLY STATEMENT NO.01

Page 2: Irrigation Tank

8/10/2019 Irrigation Tank

http://slidepdf.com/reader/full/irrigation-tank 2/12

KINGDOM OF SAUDI ARABIA MONTHLY STATEMINISTRY OF HOUSING AL-KHARJ SITE MonthPACKAGE-02

Employer: MINISTRY OF HOUSING (MOH)Consultants: SAUDI ARABIAN PARSONS LTD. (SAPL)Contractor: AL-AYUNI INVESTMENT & CONTRACTING CO.

Bill No.: IRRIGATION RESERVOIR AND PUMPING STATIONDescription: SITE DEVELOPMENT INCLUDING AUXILIARY STRUCTURES

Item No.: 1.0 (1.1)

د ح و ل

Unit 1 2 3 4 5 6 7

All works should be as per Local Authority requirements

1.0SITE DEVELOPMENT INCLUDING AUXILIARY STRUCTURES

1.1Site Grading Works including clearing and grubbing, earthworks andother items to complete as per specifications

Sq.m 3,785.000 3,600.019 -

Sq.m 3,785.000 3,600.019 -

Prepared By: ChecContractor Representative Consultant RepresenAl-Ayuni Investment & Contracting Co. Saudi Arabian Parson Ltd. (

Total Carried Forward to Grand Summary

ITEM SUMMARY SHEET

Sub-Bill No. DescriptionBOQ Estimated

(Quantity)Upto Date(Quantity)

Previous Month(Quantity)

This(Qu

Page 3: Irrigation Tank

8/10/2019 Irrigation Tank

http://slidepdf.com/reader/full/irrigation-tank 3/12

Sheet1of1

KINGDOM OF SAUDI ARABIA MONTHLY STATEMENT NO.01MINISTRY OF HOUSING AL-KHARJ SITE Month: JUNE, 2014PACKAGE-02

MINISTRY OF HOUSING (MOH)SAUDI ARABIAN PARSONS LTD. (SAPL)AL-AYUNI INVESTMENT & CONTRACTING CO.

Irrigation Reservoir and Pumping StationClearing & Grading1.0

د ح و ل

Unit 1 3 4 5 6 7 8 = (4x5x6x7) 9

1.1 For Quantity Ref

Drawing No.

1.1

1 002_02_17_03_001

Easting

(i) 734556.000

(ii) 734615.370

(iii) 734564.172

(iv) 734623.541 Sq.m 1 60.00 60.00 3,600.019

3,600.019

-

3,600.019

Prepared By: Checked By:Contractor Representative Consultant RepresentativeAl-Ayuni Investment & Contracting Co. Saudi Arabian Parson Ltd. (SAPL)

2663289.714

2663298.391

2663233.803

2663242.479

Employer:Consultants:Contractor:

ITEM MEASUREMENT SHEETBill No.:Description:Item No.:

Northing

Sr. No. Description Nos L WQuantity

(m 3)Remarks

2

Site Grading works including clearing andgrubing, earthworks and other items tocomplete as per specifications

Approved Northing & Easting

Clearing & Grading

H

Total upto date Quantity (Sq.m)

Previously Certified. (Sq.m)

This Month Quantity (Sq.m)

Page 4: Irrigation Tank

8/10/2019 Irrigation Tank

http://slidepdf.com/reader/full/irrigation-tank 4/12

KINGDOM OF SAUDI ARABIA MONTHLY STATMINISTRY OF HOUSING AL-KHARJ SITE MonPACKAGE-02

Employer: MINISTRY OF HOUSING (MOH)Consultants: SAUDI ARABIAN PARSONS LTD. (SAPL)Contractor: AL-AYUNI INVESTMENT & CONTRACTING CO.

Bill No.: IRRIGATION RESERVOIR AND PUMPING STATIONDescription: IRRIGATION TANK RESERVOIR & INTAKE CHAMBERSItem No.: 2.0 (2.1)

د ح و ل

Unit 1 2 3 4 5 6

Construction of RC Reservoir & Intake chamber comple with civil,mechanical and electromechanical as shown on the drawings andstardard with MOH.

2.0IRRIGATION TANK RESERVOIR &INTAKE CHAMBERSEarthworks

2.1Excavation in all type of soil including rocks by using equipment,mechanical tools and store excavated soil for backfilling in approved

area and remove the remaining to backfilling area

Cum 5,670.000 3,445.959 -

Cum 5,670.000 3,445.959 -

Prepared By: ChContractor Representative Consultant RepresAl-Ayuni Investment & Contracting Co. Saudi Arabian Parson Ltd

Total Carried Forward to Grand Summary

ITEM SUMMARY SHEET

Sub-Bill No. DescriptionBOQ Estimated

(Quantity)Upto Date(Quantity)

Previous Month(Quantity)

Th(Q

Page 5: Irrigation Tank

8/10/2019 Irrigation Tank

http://slidepdf.com/reader/full/irrigation-tank 5/12

KINGDOM OF SAUDI ARABIAMINISTRY OF HOUSING AL-KHARJ SITEPACKAGE-02

MINISTRY OF HOUSING (MOH)SAUDI ARABIAN PARSONS LTD. (SAPL)AL-AYUNI INVESTMENT & CONTRACTING CO.

Irri ation Reservoir and Pum in Station

Structural Excavation2.0

د ح و ل

Unit 1 3 4 5 6 7 = (5-6) 8 = Avg- 9 10 11

2.1

1.1 (i) Cum 1 465.673 460.749 4.924(ii) Cum 1 465.441 460.774 4.666 4.795 29.000 5.250 (iii) Cum 1 465.441 460.799 4.642 4.654 29.000 5.000 (iv) Cum 1 465.022 460.824 4.198 4.420 29.000 5.000 (v) Cum 1 465.022 460.649 4.373 4.285 29.000 5.000 (vi) Cum 1 465.208 460.874 4.334 4.354 29.000 5.250 (v)

Cum 1 460.749 459.249 1.500 1.500 2.302 2.877 Cum 1 460.749 459.249 1.500 1.500 2.302 2.877 Cum 1 460.831 459.331 1.500 1.500 3.045 3.500 Cum 1 465.208 461.923 3.285 1.485 1.400 1.400

(vi)Cum 2 465.022 464.123 0.899 0.899 2.000 2.000

(vii)Cum 1 465.208 462.724 2.484 2.484 3.875 3.850 Cum 1 465.208 460.874 4.334 4.334 1.975 3.850

Prepared By:Contractor RepresentativeAl-Ayuni Investment & Contracting Co.

Total upto date Quantity (Cum)Previously Certified. (Cum)

This Month Quantity (Cum)

Grid A Line 1 ~7Grid B Line 1 ~7Grid C Line 1 ~7Grid D Line 1 ~7Grid E Line 1 ~7

Tank Inlet StationInlet Tank PortionInlet Sump Pit Portion

Grid F Line 1 ~7Sump PortionsWith Grid A Line 4 (Section C & D)With Grid A Line 1 (Section C & D)Grid b/w C1~D1 & Line b/w 1~2 (Sec K & I)

Electrical Room FoundationsFooting

Width Length Avg.Height

Differ-Nos

Sump Pit (b/w Grid D1~E1 Line 0~1)

2

Excavation in all type of soil including roaks byusing equipment etc. and store excavated material forbackfillUnderground Storage Tank

Item No.:

Sr. No. Description NGLExc-

Level

Employer:Consultants:Contractor:

ITEM MEASUREMENT SHEETBill No.:

Description:

Avg

Avg

Avg

C/C

Avg

Avg

C/C

C/C

C/C

C/CC/C

Avg

Page 6: Irrigation Tank

8/10/2019 Irrigation Tank

http://slidepdf.com/reader/full/irrigation-tank 6/12

KINGDOM OF SAUDI ARABIA MONTHLY STATMINISTRY OF HOUSING AL-KHARJ SITE MontPACKAGE-02

Employer: MINISTRY OF HOUSING (MOH)Consultants: SAUDI ARABIAN PARSONS LTD. (SAPL)Contractor: AL-AYUNI INVESTMENT & CONTRACTING CO.

Bill No.: IRRIGATION RESERVOIR AND PUMPING STATIONDescription: IRRIGATION TANK RESERVOIR & INTAKE CHAMBERSItem No.: 2.0 (2.2)

د ح و ل

Unit 1 2 3 4 5 6

Construction of RC Reservoir & Intake chamber comple with civil,mechanical and electromechanical as shown on the drawings andstardard with MOH.

2.0IRRIGATION TANK RESERVOIR &INTAKE CHAMBERS

Concreting works:Supply and installation of the following concrete work items to includeacessories to complete as per specifications

2.2 Blinding Concrete Cum 105.000 80.132 -

Cum 105.000 80.132 -

Prepared By: CheContractor Representative Consultant RepresAl-Ayuni Investment & Contracting Co. Saudi Arabian Parson Ltd.

Total Carried Forward to Grand Summary

ITEM SUMMARY SHEET

Sub-Bill No. DescriptionBOQ Estimated

(Quantity)Upto Date(Quantity)

Previous Month(Quantity)

Th(Q

Page 7: Irrigation Tank

8/10/2019 Irrigation Tank

http://slidepdf.com/reader/full/irrigation-tank 7/12

Sheet1of1KINGDOM OF SAUDI ARABIA MONTHLY STATEMENT NO.01MINISTRY OF HOUSING AL-KHARJ SITE Month: JUNE, 2014PACKAGE-02

MINISTRY OF HOUSING (MOH)SAUDI ARABIAN PARSONS LTD. (SAPL)AL-AYUNI INVESTMENT & CONTRACTING CO.

Irrigation Reservoir and Pumping Station

Blinding Concrete2.2

د ح و ل

Unit 1 3 4 5 6 7 8 = (4x5x6x7) 9

For Quantity RefDrawing No.

2.2

(i) Cum 1 28.650 25.650 0.100 73.487 002_02_17_03_003

Cum 1 1.850 1.850 0.100 (0.342) 002_02_17_03_003

Cum 1 1.850 1.850 0.100 (0.342) 002_02_17_03_003

Cum 1 3.500 4.045 0.100 (1.416) 002_02_17_03_003

(ii)

Cum 2 1.875 1.425 0.100 0.534 002_02_17_08_006

Cum 1 1.000 1.000 0.100 0.100 002_02_17_08_006

(iii)

Cum 2 1.875 1.425 0.100 0.534 002_02_17_08_006

Cum 1 1.000 1.000 0.100 0.100 002_02_17_08_006

(iv)

Cum 1 3.045 1.803 0.100 0.549 002_02_17_08_006

Cum 2 3.150 1.803 0.100 1.136 002_02_17_08_006

Cum 1 2.500 2.045 0.100 0.511 002_02_17_08_006

(v) Cum 1 1.400 1.400 0.100 0.196 002_02_17_08_006

(vi) Cum 1 4.700 4.700 0.100 2.209 002_02_17_03_006

Cum 3 4.600 0.500 0.100 0.690 002_02_17_03_006

(vii) Cum 1 3.875 3.850 0.100 1.492 002_02_17_03_006

Cum 1 1.800 3.850 0.100 0.693 002_02_17_03_006

80.132

-

80.132

Prepared By: Checked By:Contractor Representative Consultant RepresentativeAl-Ayuni Investment & Contracting Co. Saudi Arabian Parson Ltd. (SAPL)

Item No.:

Sr. No. Description

Employer:Consultants:Contractor:

ITEM MEASUREMENT SHEETBill No.:

Description:

Nos L W

Grid A ~ B Line 1 ~ 7

HQuantity

(m 3)Remarks

2

Supply and installation of concreteing worksitems including accessories as perspecifications

100mm thk Blinding Concrete

Underground Storage Tank

Total upto date Quantity (Cum)

Previously Certified. (Cum)

This Month Quantity (Cum)

Inlet Sump Pit Portion

Inlet Tank Portion

Bed Portion

Grid b/w C1~D1 & Line b/w 1~2

Slope Portion (Avg- width followed)

Bed Portion

Grid C1~D1 Line 0~1 (Section F)

Tank Inlet Station

Slope Portion (Avg- width followed)

Side footing (Section F)

Sump Pit (b/w Grid D1~E1 Line 1)

Electrical Room

Sump DeductionWith Grid A Line 4 (Section C & D)

With Grid A Line 1 (Section C & D)

Grid b/w C1~D1 & Line b/w 1~2

Sump Portion Blinding Concrete

Slope Portion (Avg- width followed)

With Grid A Line 4 (Section C & D)

Slope Portion (Avg- width followed)

Bed Portion

With Grid A Line 1 (Section C & D)

Page 8: Irrigation Tank

8/10/2019 Irrigation Tank

http://slidepdf.com/reader/full/irrigation-tank 8/12

KINGDOM OF SAUDI ARABIA MONTHLY STATMINISTRY OF HOUSING AL-KHARJ SITE MoPACKAGE-02

Employer: MINISTRY OF HOUSING (MOH)Consultants: SAUDI ARABIAN PARSONS LTD. (SAPL)Contractor: AL-AYUNI INVESTMENT & CONTRACTING CO.

Bill No.: IRRIGATION RESERVOIR AND PUMPING STATIONDescription: IRRIGATION TANK RESERVOIR & INTAKE CHAMBERSItem No.: 2.0 (2.3)

د ح و ل

Unit 1 2 3 4 5 6

Construction of RC Reservoir & Intake chamber comple with civil,mechanical and electromechanical as shown on the drawings andstardard with MOH.

2.0IRRIGATION TANK RESERVOIR &INTAKE CHAMBERS

2.3Concrete including rebars, formwork, waterstop, construction jointsand sealent as per dwg & specifications

2.3.1 Slab on grade Cum 572.000 393.135 -2.3.2 Elevated Slab Cum 330.000 - -2.3.3 Walls Cum 210.000 - -2.3.4 Columns Cum 21.000 - -2.3.5 Beams Cum 21.000 - -

Total Carried Forward to Grand Summary Cum 1,154.000 393.135 -

Prepared By: ChContractor Representative Consultant RepreAl-Ayuni Investment & Contracting Co. Saudi Arabian Parson Lt

ITEM SUMMARY SHEET

Sub-Bill No. DescriptionBOQ Estimated

(Quantity)Upto Date(Quantity)

Previous Month(Quantity)

T(

Page 9: Irrigation Tank

8/10/2019 Irrigation Tank

http://slidepdf.com/reader/full/irrigation-tank 9/12

#REF!KINGDOM OF SAUDI ARABIA MONTHLY STATEMENT NO.01MINISTRY OF HOUSING AL-KHARJ SITE Month: JUNE, 2014PACKAGE-02

MINISTRY OF HOUSING (MOH)SAUDI ARABIAN PARSONS LTD. (SAPL)AL-AYUNI INVESTMENT & CONTRACTING CO.

Irrigation Reservoir and Pumping Station

Concrete works (Slab on Grade)2.3

د ح و ل

Unit 1 3 4 5 6 7 8 = (4x5x6x7) 9

For QuantityRef Drawing No.

2.3.1 WIR No. 0682 (Rev-1)

(i) Cum 1 28.350 25.350 0.500 359.336 002_02_17_03_003

-

Cum 1 1.850 1.850 0.500 (1.711) 002_02_17_03_003

Cum 1 1.850 1.850 0.500 (1.711) 002_02_17_03_003

Cum 1 3.500 4.045 0.500 (7.079) 002_02_17_03_003

-

(ii) -

Cum 2 1.875 1.425 0.500 2.672 002_02_17_08_006

Cum 1 1.000 1.000 0.500 0.500 002_02_17_08_006

(iii) -

Cum 2 1.875 1.425 0.500 2.672 002_02_17_08_006

Cum 1 1.000 1.000 0.500 0.500 002_02_17_08_006

(iv) -

Cum 1 3.045 1.803 0.500 2.745 002_02_17_08_006

Cum 2 3.150 1.803 0.500 5.679 002_02_17_08_006

Cum 1 2.500 2.045 0.500 2.556 002_02_17_08_006

(v) Cum 1 1.300 1.300 0.300 0.507 002_02_17_08_006

-

(vi) Cum 1 4.700 4.700 0.200 4.418 002_02_17_08_007

Cum 3 4.600 0.300 0.500 2.070 002_02_17_08_007

-

(vii) Cum 1 3.750 3.600 0.300 13.500 002_02_17_03_006

Cum 1 1.800 3.600 0.500 6.480 002_02_17_03_006

393.135

-

393.135

Prepared By: Checked By:Contractor Representative Consultant RepresentativeAl-Ayuni Investment & Contracting Co. Saudi Arabian Parson Ltd. (SAPL)

Employer:Consultants:Contractor:

ITEM MEASUREMENT SHEETBill No.:

Description:Item No.:

Sr. No. Description Nos L W HQuantity

(m 3)Remarks

2

Concrete including rebars, formwork,waterstop,construction of joints and sealantetc.

Slab on Grade (Base Slab)

Underground Tank

Grid A ~ B Line 1 ~ 7

Sump DeductionWith Grid A Line 4 (Section C & D)

With Grid A Line 1 (Section C & D)

Grid b/w C1~D1 & Line b/w 1~2

Sump Portion

With Grid A Line 4 (Section C & D)

Slope Portion (Avg- width followed)

Bed Portion

With Grid A Line 1 (Section C & D)

Slope Portion (Avg- width followed)

Side footing (Section F) under slab

Bed Portion

Grid b/w C1~D1 & Line b/w 1~2

Slope Portion (Avg- width followed)

Slope Portion (Avg- width followed)

Bed Portion

Sump Pit (b/w Grid D1~E1 Line 1)

Total upto date Quantity (Cum)

Previously Certified. (Cum)

This Month Quantity (Cum)

Electrical Room

Grid C1~D1 Line 0~1 (Section F)

Tank Inlet Station (Base Slab)

Inlet Tank Portion

Inlet Sump Pit Portion

Page 10: Irrigation Tank

8/10/2019 Irrigation Tank

http://slidepdf.com/reader/full/irrigation-tank 10/12

KINGDOM OF SAUDI ARABIA MONTHLY STAMINISTRY OF HOUSING AL-KHARJ SITE MoPACKAGE-02

Employer: MINISTRY OF HOUSING (MOH)Consultants: SAUDI ARABIAN PARSONS LTD. (SAPL)Contractor: AL-AYUNI INVESTMENT & CONTRACTING CO.

Bill No.: IRRIGATION RESERVOIR AND PUMPING STATIONDescription: IRRIGATION TANK RESERVOIR & INTAKE CHAMBERSItem No.: 2.0 (2.5)

د ح و ل

Unit 1 2 3 4 5 6

Construction of RC Reservoir & Intake chamber comple with civil,mechanical and electromechanical as shown on the drawings andstardard with MOH.

2.0IRRIGATION TANK RESERVOIR &INTAKE CHAMBERSWATERPROOFING

2.5Supply and install waterproofing and protection layer including allitems to complete as per specification

2.5.1 Epoxy Sulfide (1000 micron thk.) coating inside Sqm 3,480.000 - -2.5.2 waterproofing membrance with protective board Sqm 600.000 - -2.5.3 waterproofing membrance underslab Sqm 1,176.000 801.318 -2.5.4 Torch applied waterproofing membrane Sqm 998.000 - -2.5.5 waterproofing on pipe opening Sqm 6.000 - -2.5.6 50mm thk minimum cement screed Sqm 2,048.000 801.348 -

Total Carried Forward to Grand Summary Cum 8,308.000 1,602.666 -

Prepared By: CContractor Representative Consultant ReprAl-Ayuni Investment & Contracting Co. Saudi Arabian Parson L

ITEM SUMMARY SHEET

Sub-Bill No. DescriptionBOQ Estimated

(Quantity)Upto Date(Quantity)

Previous Month(Quantity)

T(

Page 11: Irrigation Tank

8/10/2019 Irrigation Tank

http://slidepdf.com/reader/full/irrigation-tank 11/12

Sheet1of1KINGDOM OF SAUDI ARABIA MONTHLY STATEMENT NO.01MINISTRY OF HOUSING AL-KHARJ SITE Month: JUNE, 2014PACKAGE-02

MINISTRY OF HOUSING (MOH)SAUDI ARABIAN PARSONS LTD. (SAPL)AL-AYUNI INVESTMENT & CONTRACTING CO.

Irrigation Reservoir and Pumping Station

Waterproofing membrane under slab2.5

د ح و ل

Unit 1 3 4 5 6 7 8 = (4x5x6x7) 9

For Quantity RefDrawing No.

2.5.3 WIR No. 0539 & 0442

(i) Sqm 1 28.650 25.650 734.873 002_02_17_03_003

-

Sqm 1 1.850 1.850 (3.423) 002_02_17_03_003

Sqm 1 1.850 1.850 (3.423) 002_02_17_03_003

Sqm 1 3.500 4.045 (14.158) 002_02_17_03_003

-

(ii) -

Sqm 2 1.875 1.425 5.344 002_02_17_08_006

Sqm 1 1.000 1.000 1.000 002_02_17_08_006

(iii) -

Sqm 2 1.875 1.425 5.344 002_02_17_08_006

Sqm 1 1.000 1.000 1.000 002_02_17_08_006

(iv) -

Sqm 1 3.045 1.803 5.490 002_02_17_08_006

Sqm 2 3.150 1.803 11.359 002_02_17_08_006

Sqm 1 2.500 2.045 5.113 002_02_17_08_006

(v) Sqm 1 1.400 1.400 1.960 002_02_17_08_006

-

(vi) Sqm 1 4.700 4.700 22.090 002_02_17_03_006

(vi) Sqm 3 4.600 0.500 6.900 002_02_17_03_006

-

(vii) Sqm 1 3.875 3.850 14.919 002_02_17_03_006

Sqm 1 1.800 3.850 6.930 002_02_17_03_006

801.318

-

801.318

Prepared By: Checked By:Contractor Representative Consultant RepresentativeAl-Ayuni Investment & Contracting Co. Saudi Arabian Parson Ltd. (SAPL)

Employer:Consultants:Contractor:

ITEM MEASUREMENT SHEETBill No.:

Description:Item No.:

Sr. No. Description Nos L W HQuantity

(m 2 )Remarks

2

Supply and installation of waterproofing andprotection layers including all accessories

Waterproofing membrane

Underground Storage Tank

Grid A ~ B Line 1 ~ 7

Sump DeductionWith Grid A Line 4 (Section C & D)

With Grid A Line 1 (Section C & D)

Grid b/w C1~D1 & Line b/w 1~2

Sump Pit (b/w Grid D1~E1 Line 1)

Sump Portion

With Grid A Line 4 (Section C & D)

Slope Portion (Avg- width followed)

Bed Portion

With Grid A Line 1 (Section C & D)

Slope Portion (Avg- width followed)

Total upto date Quantity (Sq.m)

Previously Certified. (Sq.m)

This Month Quantity (Sq.m)

Bed Portion

Grid b/w C1~D1 & Line b/w 1~2

Slope Portion (Avg- width followed)

Slope Portion (Avg- width followed)

Bed Portion

Electrical Room

Grid C1~D1 Line 0~1 (Section F)

Tank Inlet Station

Inlet Tank Portion

Inlet Sump Pit Portion

Side footing (Section F)

Page 12: Irrigation Tank

8/10/2019 Irrigation Tank

http://slidepdf.com/reader/full/irrigation-tank 12/12

Sheet1of1KINGDOM OF SAUDI ARABIA MONTHLY STATEMENT NO.01MINISTRY OF HOUSING AL-KHARJ SITE Month: JUNE, 2014PACKAGE-02

MINISTRY OF HOUSING (MOH)SAUDI ARABIAN PARSONS LTD. (SAPL)AL-AYUNI INVESTMENT & CONTRACTING CO.

Irrigation Reservoir and Pumping Station

50mm thk minimum Cement Screed2.5

د ح و ل

Unit 1 3 4 5 6 7 8 = (4x5x6x7) 9

For Quantity RefDrawing No.

2.5.3 WIR No. 550 & 556

(i) Sqm 1 28.450 25.450 724.053 002_02_17_03_003

-

Sqm 1 1.850 1.850 (3.423) 002_02_17_03_003

Sqm 1 1.850 1.850 (3.423) 002_02_17_03_003

Sqm 1 3.500 4.045 (14.158) 002_02_17_03_003

-

(ii) -

Sqm 2 1.875 1.425 5.344 002_02_17_08_006

Sqm 1 1.000 1.000 1.000 002_02_17_08_006

(iii) -

Sqm 2 1.875 1.425 5.344 002_02_17_08_006

Sqm 1 1.000 1.000 1.000 002_02_17_08_006

(iv) -

Sqm 1 3.045 1.803 5.490 002_02_17_08_006

Sqm 2 3.150 1.803 11.359 002_02_17_08_006

Sqm 1 2.500 2.045 5.113 002_02_17_08_006

(v) Sqm 1 1.400 1.400 1.960 002_02_17_08_006

-

(vi) Sqm 1 4.700 4.700 22.090 002_02_17_03_006

Sqm 3 4.600 0.500 6.900 002_02_17_03_006

-

(vii) Sqm 1 3.875 3.850 14.919 002_02_17_03_006

Sqm 1 1.800 3.850 6.930 002_02_17_03_006Sqm 1 3.500 3.100 10.850 002_02_17_08_008

801.348

-

801.348

Prepared By: Checked By:Contractor Representative Consultant RepresentativeAl-Ayuni Investment & Contracting Co. Saudi Arabian Parson Ltd. (SAPL)

Employer:Consultants:Contractor:

ITEM MEASUREMENT SHEETBill No.:

Description:Item No.:

Sr. No. Description Nos L W HQuantity

(m 2 )Remarks

2

Supply and installation of waterproofing andprotection layers including all accessories

Waterproofing membrane

Underground Tank (Under Slab)

Grid A ~ B Line 1 ~ 7

Sump DeductionWith Grid A Line 4 (Section C & D)

With Grid A Line 1 (Section C & D)

Grid b/w C1~D1 & Line b/w 1~2

Sump Portion

With Grid A Line 4 (Section C & D)

Slope Portion (Avg- width followed)

Bed Portion

With Grid A Line 1 (Section C & D)

Slope Portion (Avg- width followed)

Bed Portion

Grid b/w C1~D1 & Line b/w 1~2

Slope Portion (Avg- width followed)

Slope Portion (Avg- width followed)

Bed Portion

Sump Pit (b/w Grid D1~E1 Line 1)

Electrical Room (Under Slab)

Grid C1~D1 Line 0~1 (Section F)

Tank Inlet Station (Under Slab)

Inlet Tank Portion

Inlet Sump Pit Portion

Side footing (Section F)

Total upto date Quantity (Sq.m)

Previously Certified. (Sq.m)

This Month Quantity (Sq.m)

Inlet Tank Roof