january 2018 - award tracker cumulative report - small business...

102
1,038 545 77 784 1,115 305 DVBE Awards: 111 1745 Run Date: 1/3/2018 Contract # Award Date Prime Award $ Funding Source Est % Subcontractors Sub Amt. Cert Type 1.) IR93145000 11/29/2017 Blue Towels Ammmm Inc. $8,993 FTA Set- SBE: 100.00% Ammmm Inc. $8,993 SBE Aside (SBE Prime) 2.) PS93186000 11/29/2017 Rail OPS Flyer Distribution Walking Man Inc. $5,200 Non-FTA Set- SBE: 100.00% Walking Man Inc. $5,200 SBE Aside (SBE Prime) 3.) C40590C1156000 11/29/2017 Division 15 Wi-Fi Delta Electric $220,000 Non-FTA Set- SBE: 100.00% Delta Electric $220,000 SBE Aside (SBE Prime) 4.) PS41921001 11/17/2017 Outreach for Sepulveda Pass Arellano Associates LLC $485,439 Non-FTA Set- SBE: 100.00% Arellano Associates LLC $485,439 SBE Transit Feasibility Study Aside (SBE Prime) 5.) DR92470000DR9 11/16/2017 Promotional Items Gorilla Marketing $55,600 Non-FTA Set- SBE: 100.00% Gorilla Marketing $55,600 SBE Metro 25th Anniversary Lapel Pin Aside (SBE Prime) 7.) PS44597000 11/15/2017 State Active Transportation Evan Brooks Associates $2,170,485 Non-FTA Set- SBE: 39.21% Evan Brooks Associates $747,090 SBE Program Aside Deborah Murphy Urban Design $104,000 SBE Stantec $599,821 WSP USA $639,835 Safe Routes to School $79,739 Total SBE: $851,090 8.) C92309000C1159 11/15/2017 Electric Bus Charging Station at D Access Pacific Inc. $1,967,000 Non-FTA Set- SBE: 100.00% Access Pacific Inc. $1,967,000 SBE Aside (SBE Prime) 9.) PS44186000 11/9/2017 Translating & Interpreting Translating Services DBA $129,823 Non-FTA Set- SBE: 100.00% Translating Services DBA Laz $129,823 SBE Services Aside (SBE Prime) 10.) IR91973000 11/8/2017 Welding Respirators A&A Glove & Safety $8,148 FTA Set- SBE: 100.00% A&A Glove & Safety $8,148 SBE Aside (SBE Prime) 11.) IR91538000 11/2/2017 Wypall Inventory JWL Supplies $3,524 FTA Set- SBE: 100.00% JWL Supplies $3,524 SBE Aside (SBE Prime) 12.) CY91286000 10/31/2017 Oil Products Rosemead Oil Products $32,780 FTA Set- SBE: 100.00% Rosemead Oil Products $32,780 SBE Aside (SBE Prime) 13.) C91040000C1139 10/27/2017 Metro Culver City Bike Hub Access Pacific Inc $1,340,704 Local Set- SBE: 100.00% Access Pacific Inc $1,340,704 SBE Aside (SBE Prime) 14.) MA44661010 10/26/2017 Chemcial Supplies Los Angeles Chemical Co $66,000 FTA Set- SBE: 100.00% Los Angeles Chemical Compa $66,000 SBE Aside (SBE Prime) 15.) PS90784000 10/25/2017 Online Mapping Services Civilearth $97,250 Local Set- SBE: 100.00% Civilearth $97,250 SBE Aside (SBE Prime) 16.) DR90060000 10/24/2017 Bluecoat Internet Filter Kambrian Corporation $284,998 Local Set- SBE: 100.00% Kambrian Corporation $284,998 SBE Appliance Aside (SBE Prime) 17.) IR90685000 10/24/2017 Inventory Plastic Bags JWL Supplies $3,569 FTA Set- SBE: 100.00% JWL Supplies $3,569 SBE Black - RQ47975 Aside (SBE Prime) Total: 10/1/2014 - 11/30/17 DEOD AWARD TRACKER REPORT Goals Project Name Comm % Total State/Local Awards: Total Federal Awards: Total Awards: Disclaimer: This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro. SBE Awards: $672,103,372 $763,980,229 $1,436,083,601 DBE Awards: SBE Set Aside Awards: Page 1

Upload: others

Post on 01-Oct-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

1.) IR93145000 11/29/2017 Blue Towels Ammmm Inc. $8,993 FTA Set- SBE: 100.00% Ammmm Inc. $8,993 SBEAside (SBE Prime)

2.) PS93186000 11/29/2017 Rail OPS Flyer Distribution Walking Man Inc. $5,200 Non-FTA Set- SBE: 100.00% Walking Man Inc. $5,200 SBEAside (SBE Prime)

3.) C40590C1156000 11/29/2017 Division 15 Wi-Fi Delta Electric $220,000 Non-FTA Set- SBE: 100.00% Delta Electric $220,000 SBEAside (SBE Prime)

4.) PS41921001 11/17/2017 Outreach for Sepulveda Pass Arellano Associates LLC $485,439 Non-FTA Set- SBE: 100.00% Arellano Associates LLC $485,439 SBETransit Feasibility Study Aside (SBE Prime)

5.) DR92470000 DR9286500011/16/2017 Promotional Items Gorilla Marketing $55,600 Non-FTA Set- SBE: 100.00% Gorilla Marketing $55,600 SBEMetro 25th Anniversary Lapel Pin Aside (SBE Prime)

7.) PS44597000 11/15/2017 State Active Transportation Evan Brooks Associates $2,170,485 Non-FTA Set- SBE: 39.21% Evan Brooks Associates $747,090 SBEProgram Aside Deborah Murphy Urban Design $104,000 SBE

Stantec $599,821WSP USA $639,835Safe Routes to School $79,739

Total SBE: $851,090

8.) C92309000C1159 11/15/2017 Electric Bus Charging Station at Division 8Access Pacific Inc. $1,967,000 Non-FTA Set- SBE: 100.00% Access Pacific Inc. $1,967,000 SBEAside (SBE Prime)

9.) PS44186000 11/9/2017 Translating & Interpreting Translating Services DBA Lazar $129,823 Non-FTA Set- SBE: 100.00% Translating Services DBA Lazar $129,823 SBEServices Aside (SBE Prime)

10.) IR91973000 11/8/2017 Welding Respirators A&A Glove & Safety $8,148 FTA Set- SBE: 100.00% A&A Glove & Safety $8,148 SBEAside (SBE Prime)

11.) IR91538000 11/2/2017 Wypall Inventory JWL Supplies $3,524 FTA Set- SBE: 100.00% JWL Supplies $3,524 SBEAside (SBE Prime)

12.) CY91286000 10/31/2017 Oil Products Rosemead Oil Products $32,780 FTA Set- SBE: 100.00% Rosemead Oil Products $32,780 SBEAside (SBE Prime)

13.) C91040000C1139-210/27/2017 Metro Culver City Bike Hub Access Pacific Inc $1,340,704 Local Set- SBE: 100.00% Access Pacific Inc $1,340,704 SBEAside (SBE Prime)

14.) MA44661010 10/26/2017 Chemcial Supplies Los Angeles Chemical Company $66,000 FTA Set- SBE: 100.00% Los Angeles Chemical Company $66,000 SBEAside (SBE Prime)

15.) PS90784000 10/25/2017 Online Mapping Services Civilearth $97,250 Local Set- SBE: 100.00% Civilearth $97,250 SBEAside (SBE Prime)

16.) DR90060000 10/24/2017 Bluecoat Internet Filter Kambrian Corporation $284,998 Local Set- SBE: 100.00% Kambrian Corporation $284,998 SBEAppliance Aside (SBE Prime)

17.) IR90685000 10/24/2017 Inventory Plastic Bags JWL Supplies $3,569 FTA Set- SBE: 100.00% JWL Supplies $3,569 SBEBlack - RQ47975 Aside (SBE Prime)

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

Page 1

Page 2: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

18.) IR90687000 10/24/2017 Inventory 3M Film A&A Glove & Safety Company $4,012 FTA Set- SBE: 100.00% A&A Glove & Safety Company $4,012 SBEScotchlite - RQ47965 Aside (SBE Prime)

19.) MA44661001-9 10/24/2017 Chemcial Supplies Los Angeles Chemical Company $91,000 FTA Set- SBE: 100.00% Los Angeles Chemical Company $91,000 SBEAside (SBE Prime)

20.) PS90171000 10/24/2017 Physical Security Assessment Claris Strategy $457,367 Local Set- SBE: 48.31% Claris Strategy (SBE Prime) $220,954 SBE-41679 for Metro Operating Divisions Aside HDR Engineering $225,023

Rider Levett Bucknail $11,389

21.) IR90521000 10/23/2017 Inventory Wypall JWL Supplies $8,552 FTA Set- SBE: 100.00% JWL Supplies $8,552 SBEDiv 61 Aside (SBE Prime)

22.) PS90619000 10/23/2017 Consulting Services Kadambala Consulting $88,236 Local Set- SBE: 100.00% Kadambala Consulting $88,236 SBEAside (SBE Prime)

23.) PS90408000 10/20/2017 Consulting Services for Insight Strategies $31,500 Local Set- SBE: 100.00% Insight Strategies $31,500 SBEManagement Team Workshops Aside (SBE Prime)

24.) PS42404000 10/19/2017 Bus Wifi LA Mobile Computing $459,839 Local Set- SBE: 100.00% LA Mobile Computing $459,839 SBEAside (SBE Prime)

25.) AE39820 10/19/2017 Inspection of Structures Owen Group, Inc $2,477,273 Local Set- SBE: 77.34% BRG Engineering $213,555 SBEAside MGE Engineering $342,284 SBE

Brieley Associates $792,926Total SBE: $555,839

26.) PS90353000 10/19/2017 Apex System Support Consulting Kadambala Consulting $88,236 Local Set- SBE: 100.00% Kadambala Consulting $88,236 SBEServices Aside (SBE Prime)

27.) IR90135000 10/17/2017 Inventory Paper Roll AMMMM INC $7,656 FTA Set- SBE: 100.00% AMMMM INC $7,656 SBECONTRACT MA38768 Aside (SBE Prime)

28.) PS45023000 10/17/2017 Inglewood First Last Mile Here Design Studio, LLC $208,164 Local Set- SBE: 66.49% Here Design Studio (SBE Prime) $92,977 SBEPlanning Project Aside The Robert Group $45,428 SBE

Steer Davies Gleave $69,760Total SBE: $138,405

29.) PS44428000 10/16/2017 Workforce Initiative Now The Glue LLC $172,836 Local Set- SBE: 100.00% The Glue LLC $172,836 SBELos Angeles (WIN-LA) Software Aside (SBE Prime)System

30.) PS44538000 10/12/2017 Workforce Initiative Now Madrid Consulting $148,175 Local Set- SBE: 100.00% Madrid Consulting $148,175 SBEEconomic Impact Analysis Aside (SBE Prime)

Page 2

Page 3: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

20.) DR89439000 10/6/2017 Additional Splunk software licensesDigital Sceptor Corp $23,893 Local Set- SBE: 100.00% Digital Sceptor Corp $23,893 SBEAside (SBE Prime)

21.) IR89245000 10/4/2017 Inventory Shop Supplies JWL Supplies $3,477 FTA Set- SBE: 100.00% JWL Supplies $3,477 SBEWYPALL - DIVISION 61 Aside (SBE Prime)

22.) IR89141000 10/3/2017 Inventory Copy Paper Gorilla Stationers $7,280 FTA Set- SBE: 100.00% Gorilla Stationers $7,280 SBEAside (SBE Prime)

23.) IR89161000 10/3/2017 Inventory Respirators A&A Glove & Safety Company $3,580 FTA Set- SBE: 100.00% A&A Glove & Safety Company $3,580 SBEWELDING, DUST FUME MIST Aside (SBE Prime)

24.) MA44661 10/10/2017 Degreaser Cleaner - Speedball Los Angeles Chemical Company $284,998 Local Set- SBE: 100.00% Los Angeles Chemical Company $284,998 SBE2000 Aside (SBE Prime)

25.) PS33710000 10/10/2017 Asset Management & Inventory ALINC Consulting $400,000 Local Set- SBE: 32.50% ALINC Consulting $130,000 SBETracking System Aside Mojix $220,000

ASK-inTag $50,000

26.) PS4192100 10/17/2017 Sepulveda Pass Transit Corridor Arellano Associates $485,439 Local Set- SBE: 97.23% Arellano Associates (SBE Prime) $436,999 SBEFeasibility Study and Technical Aside Two Hundred, Inc. $35,000 SBECompendum Public Marketing & Communications $13,440

Total SBE: $471,999

27.) PS43957000 10/2/2017 RedSeal Service and eDemand, Inc. $299,188 Local Set- SBE: 100.00% eDemand, Inc. $299,188 SBESupport Renewal Aside (SBE Prime)

1.) PS38603000 9/22/2017 Transit To Open Space And Parks Here Design Studio, LLC $251,913 Local Set- SBE: 100.00% Here Design Studio, LLC $251,913 SBEStrategic Plan Services Aside (SBE Prime)

2.) MA88245000 9/21/2017 Vest - Safety, Medium Globe Electric Company $8,465 FTA Set- SBE: 100.00% Globe Electric Company $8,465 SBEAside (SBE Prime)

3.) CY88019000 9/18/2017 Oil - Engine, CNG, Cummins 8.9 Rosemead Oil Products, Inc. $35,760 FTA Set- SBE: 100.00% Rosemead Oil Products, Inc. $35,760 SBEAside (SBE Prime)

4.) PS43957000 9/15/2017 Redseal Software Support eDemand, Inc $299,188 Local Set- SBE: 100.00% eDemand, Inc $299,188 SBEAside (SBE Prime)

5.) PS87998000 9/15/2017 Clean HVAC Ducts At USG Air Management Industries, Inc. $75,000 Local Set- SBE: 100.00% Air Management Industries, Inc. $75,000 SBEAside (SBE Prime)

6.) IR87933000 9/14/2017 Amplifier - Four Channel Kambrian Corporation $6,340 FTA Set- SBE: 100.00% Kambrian Corporation $6,340 SBEAside (SBE Prime)

Page 3

Page 4: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

7.) IR87889000 9/14/2017 Inventory - Kit - Installation Tools Graffiti Shield, Inc. $3,375 FTA Set- SBE: 100.00% Graffiti Shield, Inc. $3,375 SBEAside (SBE Prime)

8.) DR87810000 9/13/2017 Ivanti Standarad Support Peacock Enterprises, Inc. $7,700 Local Set- SBE: 100.00% Peacock Enterprises, Inc. $7,700 SBERenewal Aside (SBE Prime)

9.) IR86941000 IR877940009/13/2017 Inventory Potentiometer - Rotary Pacific Lift & Equipment, Co Inc $11,108 FTA Set- SBE: 100.00% Pacific Lift & Equipment, Co Inc $11,108 SBEAside (SBE Prime)

10.) DR87631000 9/12/2017 Adobe Licenses For Art Kambrian Corporation $13,287 Local Set- SBE: 100.00% Kambrian Corporation $13,287 SBEDept. 20 Total Aside (SBE Prime)

11.) IR87528000 9/11/2017 Inventory - Shop Supplies - Southwest Lift & Equipment, Inc. $3,616 FTA Set- SBE: 100.00% Southwest Lift & Equipment, Inc. $3,616 SBEAside (SBE Prime)

12.) PS26789-3000 9/11/2017 Millwork Cabinetry Countertop Mega Fixtures Installers, Inc. $400,000 FTA Set- SBE: 100.00% Mega Fixtures Installers, Inc. $400,000 SBEProduction Aside (SBE Prime)

13.) PS43295000 9/7/2017 Worker's Compensation California BCA Watson Rice, LLP $85,375 FTA Set- SBE: 100.00% BCA Watson Rice, LLP $85,375 SBELabor Code Compliance Audit Aside (SBE Prime)

14.) IR87102000 IR87701000 IR87907000 IR880810009/6/2017 Inventory - Wypall JWL Supplies $18,326 FTA Set- SBE: 100.00% JWL Supplies $18,326 SBEAside (SBE Prime)

15.) DR87149000 DR877750009/6/2017 Metro "On The Move" Promo Items Gorilla Stationers $48,240 Local Set- SBE: 100.00% Gorilla Stationers $48,240 SBE& Transit Safety Programs Promo Items Aside (SBE Prime)

16.) OP870110003367 9/5/2017 Backflow Device Testing, Verne's Plumbing, Inc. $994,625 Local Set- SBE: 100.00% Verne's Plumbing, Inc. $994,625 SBEMaintenance, and Repairs Aside (SBE Prime)

17.) PS40387000 9/20/2017 Tap Fare Collection Equipment Robnett Electric, Inc. $1,400,000 (NTE) Local Set- SBE: 30.00% Robnett Electric, Inc. $420,000 (NTE) SBEInstallation Services Aside (SBE Prime)

18.) C40590C1156 9/18/2017 Division 15 Wi-Fi Access Delta Electric $220,000 Local Set- SBE: 74.57% Delta Electric $164,050 SBEPoint Installation (D/B/B) Aside (SBE Prime)

19.) PS40129001 9/21/2017 Metro Video Bench ALAS Media $2,900,000 (NTE) Local Set- SBE: 100.00% ALAS Media TBD SBEAside (SBE Prime)

20.) PS40129002 9/21/2017 Metro Video Bench Anti-Villain dba Heritage Tree$2,900,000 (NTE) Local Set- SBE: 100.00% Anti-Villain dba Heritage Tree TBD SBEAside (SBE Prime)

21.) PS40129003 9/21/2017 Metro Video Bench Bubba's Chop Shop $2,900,000 (NTE) Local Set- SBE: 100.00% Bubba's Chop Shop TBD SBEAside (SBE Prime)

Page 4

Page 5: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

22.) PS40129004 9/21/2017 Metro Video Bench Civil Earth $2,900,000 (NTE) Local Set- SBE: 100.00% Civil Earth TBD SBEAside (SBE Prime)

23.) PS40129005 9/21/2017 Metro Video Bench Conceptive $2,900,000 (NTE) Local Set- SBE: 100.00% Conceptive TBD SBEAside (SBE Prime)

24.) PS40129006 9/21/2017 Metro Video Bench The Department of the 4th $2,900,000 (NTE) Local Set- SBE: 100.00% The Department of the 4th Dimension TBD SBEDimension Aside (SBE Prime)

25.) PS40129007 9/21/2017 Metro Video Bench Friendly Filmworks $2,900,000 (NTE) Local Set- SBE: 100.00% Friendly Filmworks TBD SBEAside (SBE Prime)

26.) PS40129008 9/21/2017 Metro Video Bench Lux Virtual $2,900,000 (NTE) Local Set- SBE: 100.00% Lux Virtual TBD SBEAside (SBE Prime)

27.) PS40129009 9/21/2017 Metro Video Bench Producto Studios $2,900,000 (NTE) Local Set- SBE: 100.00% Producto Studios TBD SBEAside (SBE Prime)

28.) PS401290010 9/21/2017 Metro Video Bench Triplace Film + Video $2,900,000 (NTE) Local Set- SBE: 100.00% Triplace Film + Video TBD SBEAside (SBE Prime)

29.) C34599C1139-2 9/27/2017 Metro Expo Line Culver Access Pacific, Inc. $1,340,704 Local Set- SBE: 70.17% Access Pacific, Inc. (SBE Prime) $854,917 SBECity Bike Hub Aside Alameda Park St. Bicycle, Inc. $85,787 SBE

Total SBE: $940,704

1.) C86837000C1148 8/31/2017 Parking Structure Lighting System Delta Electric $324,695 Local Set- SBE: 100.00% Delta Electric $324,695 SBEUpgrades Aside (SBE Prime)

2.) IR85734000 IR867570008/30/2017 Inventory - C-Fold Towel - Ammmm Inc $11,259 FTA Set- SBE: 100.00% Ammmm Inc $11,259 SBEAside (SBE Prime)

3.) IR84618000 IR85327000 IR867580008/30/2017 Inventory Replenishment - Wypall - JWL Supplies $11,701 FTA Set- SBE: 100.00% JWL Supplies $11,701 SBEDivision 22 & 61 Aside (SBE Prime)

4.) DR86524000 8/28/2017 Metro Expresslanes 5th Anniversary Snap Marketing $39,780 Local Set- SBE: 100.00% Snap Marketing $39,780 SBEPromo Items Aside (SBE Prime)

5.) DR86525000 8/28/2017 Cisco Fabric Interconnect SwitchesKambrian Corporation $26,181 Local Set- SBE: 100.00% Kambrian Corporation $26,181 SBEAside (SBE Prime)

6.) PS86502000 8/28/2017 Outside Printing Services Pacific Graphics $90,000 FTA Set- SBE: 100.00% Pacific Graphics $90,000 SBEAside (SBE Prime)

7.) PS86510000 8/28/2017 Outside Printing Services Fusion Media $90,000 FTA Set- SBE: 100.00% Fusion Media $90,000 SBE

Page 5

Page 6: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

Aside (SBE Prime)

8.) PS86026000 PS865080008/28/2017 Printing Of Summer Ridership Rail Peaks & Associates, Inc. $93,990 Local Set- SBE: 100.00% Peaks & Associates, Inc. $93,990 SBEAside (SBE Prime)

9.) DR86391000 8/25/2017 2017 Transit Safety Programs Snap Marketing $22,950 Local Set- SBE: 100.00% Snap Marketing $22,950 SBETote Bags Aside (SBE Prime)

10.) PS4010-3041000 8/15/2017 I-105 Expresslanes Community Arellano Associates, LLC $564,877 Local Set- SBE: 100.00% Arellano Associates, LLC $564,877 SBEParticipation Program Aside (SBE Prime)

11.) PS84960000 8/8/2017 LA Metro Requires Expert Business Kaygen, Inc. $129,520 Local Set- SBE: 100.00% Kaygen, Inc. $129,520 SBEAnd Technical Consulting Services Aside (SBE Prime)

12.) IR84864000 8/7/2017 Inventory Replenishment - Gorilla Stationers $7,280 FTA Set- SBE: 100.00% Gorilla Stationers $7,280 SBECopy Paper Aside (SBE Prime)

13.) IR84079000 IR844210007/28/2017 Inventory Replenishment - Wypall - Extreme Safety, Inc. $10,190 FTA Set- SBE: 100.00% Extreme Safety, Inc. $10,190 SBEDivision 61 & Shop Supplies Aside (SBE Prime)

14.) IR84368000 7/28/2017 Inventory Replenishment - Ammmm Inc $7,656 FTA Set- SBE: 100.00% Ammmm Inc $7,656 SBEPaper Towel Aside (SBE Prime)

15.) DR84388000 7/28/2017 FY17 License Splunk Enterprise Digital Scepter Corporation $76,500 Local Set- SBE: 100.00% Digital Scepter Corporation $76,500 SBEAside (SBE Prime)

16.) DR84401000 7/28/2017 V-locity Software Annual Kambrian Corporation $7,668 Local Set- SBE: 100.00% Kambrian Corporation $7,668 SBEMaintenance Aside (SBE Prime)

17.) DR84282000 7/27/2017 Adobe Creative Cloud Licensing Kambrian Corporation $27,540 Local Set- SBE: 100.00% Kambrian Corporation $27,540 SBEAside (SBE Prime)

18.) CY83967000 CY84011000 CY84019000 CY84033000 CY84043000 CY84071000 CY84072000 CY84073000 CY84082000 CY84171000 CY841720007/24/2017 146687 TA & 147079 TA Ammmm Inc $176,549 FTA Set- SBE: 100.00% Ammmm Inc $176,549 SBEAside (SBE Prime)

19.) CY83860000 CY83867000 CY83902000 CY83914000 CY83907000 CY83912000 CY83916000 CY83919000 CY83921000 CY83922000 CY83923000 CY83933000 CY839380007/21/2017 146602 TA & 146023 TA JWL Supplies $616,329 FTA Set- SBE: 100.00% JWL Supplies $369,797 SBEAside (SBE Prime)

20.) MA38768002 7/20/2017 Shop Towls JWL Supplies $1,158,985 Non-FTA Set- SBE: 60.00% JWL Supplies $695,391 SBEAside (SBE Prime)

21.) MA38768B 7/20/2017 Shop Towls AmmMm, Inc. $19,561 Non-FTA Set- SBE: 60.00% AmmMm, Inc. $11,737 SBEAside (SBE Prime)

22.) MA38768C 7/20/2017 Shop Towls AmmMm, Inc. $19,561 Non-FTA Set- SBE: 60.00% AmmMm, Inc. $11,737 SBE

Page 6

Page 7: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

Aside (SBE Prime)

23.) AE39064000 7/19/2017 Southbound Interstate 605 Civil Works Engineers $2,973,024 Non-FTA Set- SBE: 57.77% Civil Works Engineers (SBE Prime) $1,513,735 SBEBeverly Blvd. Improvements Aside The Robert Group $31,134 SBEEngineering Services Guida Surveying $77,000 SBE

Tatsumi and Partners $88,134 SBE2R Drilling $7,570 SBEHNTB Corporation $1,000,571Cambridge Systematics $108,137Leighton Group $140,963California Barricade $2,800Health Science Associates $1,000American Integrated Services $2,000

SBE Total $1,717,573

24.) TS83054000 7/11/2017 Remedial Repair of Stairwell #3 Fasone Construction $65,000 Local Set- SBE: 100.00% Fasone Construction $65,000 SBEAside (SBE Prime)

25.) MA42294000 7/11/2017 One Year Agreement - Gorilla Stationers $150,000 FTA Set- SBE: 100.00% Gorilla Stationers $150,000 SBEClear Plastic Bag Aside (SBE Prime)

26.) TS82903000 7/7/2017 3rd Floor Balcony Waterproofing Bravo Roofing Inc $14,980 Local Set- SBE: 100.00% Bravo Roofing Inc $14,980 SBERepair Aside (SBE Prime)

27.) PS41929000IT-TO13 7/6/2017 Oracle APEX Developer PI Technology Inc $200,000 Local Set- SBE: 100.00% PI Technology Inc $200,000 SBEAside (SBE Prime)

28.) DR82707000 7/5/2017 Purchase Fujitsu Scanner - Peacock Systems $5,886 FTA Set- SBE: 100.00% Peacock Systems $5,886 SBEWPLE Section 2 Aside (SBE Prime)

29.) IR82478000 6/30/2017 Inventory Replenishment - A&A Glove & Saftey Co. $3,258 FTA Set- SBE: 100.00% A&A Glove & Safety Co. $3,258 SBEShop Supplies - RQ42753 Aside (SBE Prime)

30.) IR82533000 6/30/2017 Inventory Replenishment - AMMMM, Inc. $7,787 FTA Set SBE: 100.00% AMMMM, Inc. $7,787 SBETowel-Paper, Roll Aside (SBE Prime)8" RQ43673

31.) DR82354000 6/29/2017 Bug Eyez LED Lights Gorilla Marketing $30,000 Non-FTA Set- SBE: 100.00% Gorilla Marketing $30,000 SBE84 inch, Core i7 - 8GB - Aside (SBE Prime)128 GB - LCD

32.) IR82176000 6/27/2017 Inventory Replenishment Extreme Safety, Inc. $3,412 FTA Set- SBE: 100.00% Extreme Safety, Inc. $3,412 SBEAside (SBE Prime)

5) IR82177000 6/27/2017 Inventory Replenishment - Extreme Safety, Inc. $4,861 FTA Set- SBE: 100.00% Extreme Safety, Inc. $4,861 SBE

Page 7

Page 8: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

Wypall - Division 22 Aside (SBE Prime)

6) DR82038000 6/26/2017 IT Equipment - Samsung Kambrian Corporation $10,014 Non-FTA Set- SBE: 100.00% Kambrian Corporation $10,014 SBEAside (SBE Prime)

7) PS82039000 6/26/2017 Aruba Care Wireless Support Peacock Systems $39,996 Non-FTA Set- SBE: 100.00% Peacock Systems $39,996 SBEAside (SBE Prime)

8) DR822115000 6/26/2017 Aruba Care Wireless Support Peacock Systems $13,525 FTA Set- SBE: 100.00% Peacock Systems $13,525 SBEAside (SBE Prime)

9) IR81923000 6/22/2017 Inventory Replenishment - Gorilla Stationers $7,280 FTA Set- SBE: 100.00% Gorilla Stationers $7,280 SBECopy Paper - Contract Aside (SBE Prime)

10) PS81817000 6/21/2017 Customer Satisfaction Ivitarus, Inc. $73,975 Non-FTA Set- SBE: 100.00% Ivitarus, Inc. $73,975 SBEFocus Group Aside (SBE Prime)

11) PS37054000 6/19/2017 Bus and Mobile App Connixt, Inc. $469,812 FTA Set- SBE: 100.00% Connixt, Inc. $469,812 SBEfor M3 Users Aside (SBE Prime)

12) AE-4393-3001-1938 6/15/2017 Metro Gold Line Eastside Access Ted Tokio Tanaka Architects $745,718 FTA Set- SBE 41.59% Ted Tokio Tanaka Architects(SBE Prime)$645,512 SBE1st and Central Station Aside Sapphos Environmental, Inc. $19,457 SBE

Systems Consulting, LLC $80,621 SBETotal: $745,590

13) C39746C1148 6/13/2017 Parking Structure Lighting SystemDelta Electric $420,321 FTA Set- SBE 34.35% Delta Electric (SBE Prime) $144,604 SBEUpgrades Main Electric Aside Main Electric $275,717

Total: $420,321

14) IR81028000 6/13/2017 Inventory Replenishment Globe Electric Company, Inc. $5,190 FTA Set- SBE: 100.00% Globe Electric Company, Inc. $5,190 SBEAside (SBE Prime)

15) DR809230 6/12/2017 Inventory Replenishment Atlas Teknology Group, Inc. $5,774 FTA Set- SBE: 100.00% Atlas Teknology Group, Inc. $5,774 SBEAside (SBE Prime)

16) PS38206-GEC 6/9/2017 Facilities Condition Rail Surveyors and Engineers $894,495 FTA Set- SBE: 100.00% Rail Surveyors and Engineers $894,495 SBETO22000 Assessment Aside (SBE Prime)

17) DR43201000 6/8/2017 Microsoft Surface Hub Peacock Systems $31,953 Non-FTA Set- SBE: 100.00% Peacock Systems $31,953 SBE55 and 84 inch with Stands Aside

18) DR806540 6/7/2017 Award 12 Month Contract Novanis $6,250 Non-FTA Set- SBE: 100.00% Novanis $6,250 SBEfor 147082 Aside (SBE Prime)

19) DR42773000 6/6/2017 IT Equipment - Samsung Kambrian Corporation $31,287 FTA Set- SBE: 100.00% Kambrian Corporation $31,287 SBE

Page 8

Page 9: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

Monitors & Bosch DVR Aside (SBE Prime)and Licenses

20) IR80400000 6/5/2017 Inventory Replenishment A&A Glove & Safety Co. $3,222 FTA Set- SBE: 100.00% A&A Glove & Safety Co. $3,222 SBEContract 161536 Aside (SBE Prime)

21) PS804510 6/5/2017 Increase Transit Translink Consulting, LLC $119,004 Non-FTA Set- SBE: 100.00% Translink Consulting, LLC $119,004 SBERideshare Program Aside (SBE Prime)and Overall TransitRidership

22) PS36724000 6/14/2017 West Santa Ana Branch Transit City Design Studio LLC $1,632,788 FTA Set- SBE: 75.26% City Design Studio, LLC (SBE Prime)$1,000,899 SBECorridor Transit Oriented Aside Arellano Associates $227,937 SBEDevelopment Strategic Total: $1,228,836

Implementation Plan

1.) PS37766000 5/31/2017 Corporate Safety Consultant Turner Engineering $499,990 Non-FTA Set- SBE: 100.00% Turner Engineering $499,990 SBEServices Aside (SBE Prime)

2) DR40690000 5/31/2017 Purchase of 15 Engine Stands A&A Glove & Safety Co. $72,610 Non-FTA Set SBE: 100.00% A&A Glove & Safety Co. $72,610 SBE & 10 Transmission Adapters Aside (SBE Prime)

3) DR40699000 5/31/2017 Microsoft Surface Hub Peacock Systems $120,585 Non-FTA Set- SBE: 100.00% Peacock Systems $120,585 SBE84 inch, Core i7 - 8GB - Aside (SBE Prime)128 GB - LCD

4) DR79974000 5/30/2017 "Gate Turn Off" (GTO) Ametrade, Inc. $98,500 Non-FTA Set- SBE: 100.00% Ametrade, Inc. $98,500 SBEThyristor for A650 Breda Aside (SBE Prime)Option Fleet

5) IR79807000 5/26/2017 Amplifier - Four Channel Kambrian Corporation $6,340 FTA Set- SBE: 100.00% Kambrian Corporation $6,340 SBEAside (SBE Prime)

6) DR79770000 5/25/2017 Annual Support for Peacock Systems $24,730 Non-FTA Set- SBE: 100.00% Peacock Systems $24,730 SBEDatAdvantage Aside (SBE Prime)IDU Analytics (Engine)

7) RQ42381000 5/23/2017 Microsoft surface Hub Peacock Systems $43,524 Non-FTA Set- SBE: 100.00% Peacock Systems $43,524 SBEwith Stand Mount Aside (SBE Prime)

8) IR79610000 5/23/2017 Inventory Replenishment Extreme Safety, Inc. $6,685 FTA Set- SBE: 100.00% Extreme Safety, Inc. $6,685 SBEAside (SBE Prime)

9) IR79603000 5/23/2017 Toner - Cartridge, HP 81X Gorilla Stationers $11,328 FTA Set- SBE: 100.00% Gorilla Stationers $11,328 SBEBlack (CF281X) High Yield Aside (SBE Prime)

Page 9

Page 10: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

10) DR41872000 5/19/2017 Purchase of Computer Peacock Systems $12,656 Non-FTA Set- SBE: 100.00% Peacock Systems $12,656 SBEHardware for Inventory Aside (SBE Prime)

11) DR79419000 5/19/2017 Lenovo Tablets (40) Miix Peacock Systems $9,360 Non-FTA Set- SBE: 100.00% Peacock Systems $9,360 SBE310 Model Aside (SBE Prime)

12) IR79392000 5/19/2017 Inventory Replenishment Globe Electric Company, Inc. $7,250 FTA Set- SBE: 100.00% Globe Electric Company, Inc. $7,250 SBEAside (SBE Prime)

13) DR42373000 5/19/2017 Microsoft Surface Pro Peacock Systems $10,030 Non-FTA Set- SBE: 100.00% Peacock Systems $10,030 SBE3 i7 8GB 256GB Device Aside (SBE Prime)Warranty

14) CY79247000 5/18/2017 Towel - Paper, 10" x 10-1/2" Gorilla Stationers $35,100 Non-FTA Set- SBE: 100.00% Gorilla Stationers $35,100 SBESingle Fold, Scott Aside (SBE Prime)

15) AE32681001 5/17/2017 Highway Program Intelligent System Metrics Group, Inc. $499,000 Non-FTA Set- SBE: 40.74% System Metrics Group (SBE Prime) $151,646 SBETransportation Systems Aside EIGER TechSystems, Inc. $51,647 SBEOn-Call Services Cambridge Systematics $47,365

CH2M, Inc. $50,202DKS Associates $51,100Iteris, Inc. $74,275Parsons Brinckerhoff, Inc. $72,765

Total $499,000

16) MA40263000 5/16/2017 Award 12 Month Contract Gorilla Stationers $34,320 FTA Set- SBE: 100.00% Gorilla Stationers $34,320 SBEfor 147082 Aside (SBE Prime)

17) MA33481012 5/16/2017 Award A 12 Month Hawk Importers, Inc. $12,415 FTA Set- SBE: 100.00% Hawk Importers, Inc. $12,415 SBEfor 161537 Aside (SBE Prime)

18) MA33481011 5/16/2017 Award A 12 Month Hawk Importers, Inc. $15,340 FTA Set- SBE: 100.00% Hawk Importers, Inc. $15,340 SBEContract 161536 Aside (SBE Prime)

19) MA33481010 5/16/2017 Award A 12 Month Hawk Importers, Inc. $12,149 FTA Set- SBE: 100.00% Hawk Importers, Inc. $12,149 SBE for 149542 Aside (SBE Prime)

20) MA33481009 5/12/2017 Award A 12 Month Ammmm, Inc. $46,282 FTA Set- SBE: 100.00% Ammmm, Inc. $46,282 SBEContract 149542 Aside (SBE Prime)

21) MA33481008 5/12/2017 Award 12 Month Ammmm, Inc. $59,534 FTA Set- SBE: 100.00% Ammmm, Inc. $59,534 SBEContract 149541 Aside (SBE Prime)

Page 10

Page 11: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

22) MA33481007 5/12/2017 Award A 12 Month Ammmm, Inc. $54,282 FTA Set- SBE: 100.00% Ammmm, Inc. $54,282 SBEContract 149540 Aside (SBE Prime)

23) MA33481006 5/12/2017 Award A 12 Month Ammmm, Inc. $25,473 FTA Set- SBE: 100.00% Ammmm, Inc. $25,473 SBEContract 149539 Aside (SBE Prime)

24) MA33481004 5/11/2017 Award A 12 Month Ammmm, Inc. $6,999 FTA Set- SBE 100.00% Ammmm, Inc. $6,999 SBEContract 146391 Aside (SBE Prime)

25) MA33481003 5/11/2017 Award A 12 Month Jayne Products, Inc. $23,167 FTA Set- SBE 100.00% Jayne Products. Inc. $23,167 SBEContract 149752 Aside (SBE Prime)

26) MA33481002 5/11/2017 Award A 12 Month Jayne Products, Inc. $25,139 FTA Set- SBE 100.00% Jayne Products. Inc. $25,139 SBEContract 149753 Aside (SBE Prime)

27) MA33481001 5/11/2017 Award A 12 Month Jayne Products, Inc. $18,361 FTA Set- SBE 100.00% Jayne Products, Inc. $18,361 SBEContract 178968 Aside (SBE Prime)

28) MA33481000 5/11/2017 Award A 12 Month Hawk Importers, Inc. $12,716 FTA Set- SBE 100.00% Hawk Importers, Inc. $12,716 SBEContract 146398 Aside (SBE Prime)

29) IR78426000 5/8/2017 Oil - Gear Unit, Synthetic Jamison Transportation $11,276 FTA Set- SBE 100.00% Jamison Transportation $11,276 SBEBase, Bulk Oil Tank Aside (SBE Prime)

30) IR78312000 5/5/2017 Inventory Replenishment ExtremeSafety, Inc. $10,224 FTA Set- SBE 100.00% Extreme Saftey, Inc. $10,224 SBEAside (SBE Prime)

31) IR78296000 5/5/2017 Inventory Replenishment - Gorilla Stationers $15,891 FTA Set- SBE 100.00% Gorilla Stationers $15,891 SBEBag - Plastic, Clear Aside (SBE Prime)

1.) PS3707700 4/28/2017 Emergency Response Team First On Compliance, Inc. $196,920 FTA Set- SBE: 69.17% First On Compliance (SBE Prime) $136,218 SBETraining Aside John Warren $60,702

Total: $196,920

2) DR77557000 4/27/2017 Purple Line Extension Tote Gorilla Stationers $31,000 Non-FTA Set SBE: 100.00% Gorilla Stationers (SBE Prime) $31,000 SBEBags Aside

3) MA3831200 4/26/2017 Award A 12 Month Gorilla Stationers $120,960 FTA Set- SBE: 100.00% Gorilla Stationers (SBE Prime) $120,960 SBEContract 188464 Aside

4) PS3446000 4/25/2017 LAC Regional Intelligent Advantec Consulting Engineers, Inc. $388,121 Non-FTA Set- SBE: 30.20% Advantec Consulting (SBE Prime) $117,222 SBETransportation Systems Aside Kimley-Horn & Associates $270,899(ITS) Architecture Total: $388,121

Page 11

Page 12: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

5) IR77507000 4/25/2017 Inventory Replenishment - Extreme Safety, Inc. $4,675 FTA Set- SBE: 100.00% Extreme Safety, Inc. (SBE Prime) $4,675 SBEShop Supplies - Wypall - AsideDivision 22

6) IR77510000 4/25/2017 Shop Supplies - Wypall - Extreme Safety, Inc. $3,506 FTA Set- SBE: 100.00% Extreme Safety, Inc. (SBE Prime) $3,506 SBEDivision 11 Aside

7) MA77393000 4/24/2017 12 Month Mini-Agreement - A&A Glove & Safety Co. $47,740 FTA Set- SBE: 100.00% A&A Glove & Safety Co.(SBE Prime) $47,740 SBEHand Wipes Aside

8) IR77392000 4/24/2017 Inventory Replenishment- A&A Glove & Safety Co. $6,006 FTA Set- SBE: 100.00% A&A Glove & Safety Co.(SBE Prime) $6,006 SBEHand Wipes - Rq40885 Aside

9) IR77297000 4/21/2017 Inventory Replenishment - Gorilla Stationers $7,280 FTA Set- SBE: 100.00% Gorilla Stationers (SBE Prime) $7,280 SBECopy Paper Aside

10) IR77290000 4/21/2017 Inventory Replenishment - Jayne Products, Inc. $3,181 FTA Set- SBE: 100.00% Jayne Products, Inc. (SBE Prime) $3,181 SBEShop Supplies Aside

11) IR7733000 4/21/2017 Inventory Replenishment - Extreme Safety, Inc. $3,506 FTA Set- SBE: 100.00% Extreme Safety, Inc. (SBE Prime) $3,506 SBEWypall - Division 61 Aside

12) PS77069000 4/19/2017 Three Software Toolkits for Peacock Systems $22,334 Non-FTA Set- SBE: 100.00% Peacock Systems (SBE Prime) $22,334 SBESharepoint Aside

13) IR77016000 4/19/2017 Inventory Replenishment Gorilla Stationers $11,352 FTA Set- SBE: 100.00% Gorilla Stationers (SBE Prime) $11,352 SBEAside

14) DR76963000 4/18/2017 Public Relations Kaeser & Blair, Inc. $38,550 Non-FTA Set- SBE: 100.00% Kaeser & Blair, Inc. (SBE Prime) $38,550 SBEPromotional Items Aside

15) DR76909000 4/18/2017 Palo Alto (Firewall) Digital Scepter Corp. $18,130 Non-FTA Set- SBE: 100.00% Digital Scepter Corp (SBE Prime) $18,130 SBEModel PA220 Aside

16) IR76941000 4/18/2017 Radio - 136-174 Mhz, Discount Two-Way Radio $15,840 FTA Set- SBE: 100.00% Discount Two-Way Radio $15,840 SBENarrowband, Digital Rail Aside (SBE Prime)Radio System

17) IR76689000 4/14/2017 Amplifier - 4-Port, Ethernet, Peacock Systems $5,472 FTA Set- SBE: 100.00% Peacock Systems (SBE Prime) $5,472 SBEExtender Aside

18) IR76023000 4/6/2017 Inventory Replenishment - Extreme Safety, Inc. $3,506 FTA Set- SBE: 100.00% Extreme Safety, Inc. (SBE Prime) $3,506 SBEShop Supplies - Wypall - AsideDivision 61

Page 12

Page 13: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

19) DR7572800 4/4/2017 Parking Traffic Equjpment A&A Glove & Safety Co. $29,244 Non-FTA Set- SBE: 100.00% A&A Glove & Safety Co. $29,244 SBE(A-Frames, Barricades, AsideCones, Delineators)

20) DR75766000 4/4/2017 Purchase Network Printers Peacock Systems $24,000 FTA Set- SBE: 100.00% Peacock Systems $24,000 SBEfor ITS Stock Aside

21) PS37872-IT- 4/4/2017 Develop PCI & Information Edemand, Inc. $678,661 Non-FTA Set- SBE: 100.00% Edemand Inc. $678,661 SBETO10000 System For Protection Of Aside

Systems & Data

22) PS6224700 4/20/2017 Metro Mystery Rider Program Mobility Advancement $565,516 Non-FTA Set- SBE: 100.00% Mobility Advancement (SBE Prime) $200,984 SBEAside Temporary Help Services $364,532 SBE

1.) DR75275000 3/29/2017 Microsoft Surface Hub - Peacock Systems $21,762 Non-FTA Set- SBE: 100.00% Peacock Systems $21,762 SBECore i7 Aside (SBE Prime)

2.) IR75311000 3/29/2017 Inventory Replenishment Extreme Safety, Inc. $6,779 FTA Set- SBE: 100.00% Extreme Safety, Inc. $6,779 SBEShop Supplies - Wypall - Aside (SBE Prime)Division 30

3.) IR75267000 3/29/2017 Inventory Replenishment - Extreme Safety, Inc. $5,385 FTA Set- SBE: 100.00% Extreme Safety, Inc. $5,385 SBEShop Supplies Aside (SBE Prime)

4.) IR75144000 3/28/2017 Amplifier - 4-Port Peacock Systems $5,472 FTA Set- SBE: 100.00% Peacock Systems $5,472 SBEEthernet, Extender Aside (SBE Prime)

5.) IR74912000 3/24/2017 Inventory Replenishment A&A Glove & Safety co. $6,304 FTA Set- SBE: 100.00% A&A Glove & Safety co. $6,304 SBEShop Supplies - Hand Wipes Aside (SBE Prime)

6.) DR74786000 3/23/2017 48 Vmturbo Licenses and Kambrian Corporation $45,282 Non-FTA Set- SBE: 100.00% Kambrian Corporation $45,282 SBESoftware Support Aside (SBE Prime)

7.) DR7485000 3/23/2017 Redsky E911 Cloud Peacock Systems $93,613 Non-FTA Set- SBE: 100.00% Peacock Systems $93,613 SBESolution to Provide Enhanced Aside (SBE Prime)Service

8.) DR74856000 3/23/2017 Annual Tableau Software Kambrian Corporation $38,750 Non-FTA Set- SBE: 100.00% Kambrian Corporation $38,750 SBERenewal Aside (SBE Prime)

9.) IR74602000 3/21/2017 Inventory Replenishment - Extreme Safety, Inc. $3,740 FTA Set- SBE: 100.00% Extreme Safety, Inc. $3,740 SBEShop Supplies - Wypall - Aside (SBE Prime)Division 61

Page 13

Page 14: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

10.) IR74513000 3/20/2017 Inventory Replenishment - Gorilla Stationers $14,215 FTA Set- SBE: 100.00% Gorilla Stationers $14,215 SBEShop Supplies - Plastic Bag Aside (SBE Prime)

11.) PS745430002 3/20/2017 Rev. 3 Reallocates $70,000 The Robert Group $70,000 FTA Set- SBE: 100.00% The Robert Group $70,000 SBE737000RV3 Within Section 2 Aside (SBE Prime)

12.) IR74445000 3/17/2017 Amplifier - Four Channel Kambrian Corporation $3,170 FTA Set- SBE: 100.00% Kambrian Corporation $3,170 SBEAside (SBE Prime)

13.) IR74362000 3/16/2017 Inventory Replenishment Extreme Safety, Inc. $4,675 FTA Set- SBE: 100.00% Extreme Safety, Inc. $4,675 SBEShop Supplies - Contract Aside (SBE Prime)

14.) DR74401000 3/16/2017 Nexpose Enterprise Kambrian Corporation $80,139 Non-FTA Set- SBE: 100.00% Kambrian Corporation $80,139 SBE(RNXENTALL) Co-Term Aside (SBE Prime)

15.) IR73964000 3/13/2017 Inventory Replenishment - Gorilla Stationers $7,000 FTA Set- SBE: 100.00% Gorilla Stationers $7,000 SBEOffice Supplies - Copy Paper Aside (SBE Prime)

16.) IR73966000 3/13/2017 Inventory Replenishment - Ammmm Inc. $8,850 FTA Set- SBE: 100.00% Ammmm Inc. $8,850 SBEShop Supplies - Glove Aside (SBE Prime)

17.) IR73988000 3/13/2017 Inventory Replenishment - Ammmm Inc. $3,276 FTA Set- SBE: 100.00% Ammmm Inc. $3,276 SBEShop Supplies - Glove Aside (SBE Prime)

18.) IR73548000 3/8/2017 Inventory Replenishment - Gorilla Stationers $11,430 FTA Set- SBE: 100.00% Gorilla Stationers $11,430 SBEShop Supplies - Wypall - Aside (SBE Prime)Division 11

19.) IR73556000 3/8/2017 Inventory Replenishment - Hawk Importers Inc. $3,192 FTA Set- SBE: 100.00% Hawk Importers Inc. $3,192 SBEShop Supplies - Med Glove Aside

20.) IR73267000 3/6/2017 Inventory Replenishment - Extreme Safety, Inc. $3,273 FTA Set- SBE: 100.00% Extreme Safety, Inc. $3,273 SBEShop Supplies - Wypall - AsideContract Division 11

21.) IR73265000 3/6/2017 Inventory Replenishment Extreme Safety, Inc. $3,366 FTA Set- SBE: 100.00% Extreme Safety, Inc. $3,366 SBEShop Supplies - Wypall Aside

22.) PS7331000 3/6/2017 Public Seating Elucia Inc DBA $12,000 FTA Set- SBE: 100.00% Elucia Inc DBA $12,000 SBEModification American Sheet Metal Aside American Sheet Metal

23.) OP34377000- 3/6/2017 TO19 - Mrl Radio Retrofit Kal Krishnan $1,449,608 Non-FTA Set- SBE: 100.00% Kal Krishnan $1,449,608 SBEGEC-TO19 Eng Support Services Consulting Services Aside Consulting Services

Page 14

Page 15: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

24.) IR73071000 3/2/2017 Inventory Replenishment - Paramount Safety Supply $8,475 FTA Set- SBE: 100.00% Paramount Safety Supply $8,475 SBEShop Supplies - Glove Aside

25.) DR72948000 3/1/2017 System (MVSS) Server for The Greg Group $38,598 Non-FTA Set- SBE: 100.00% The Greg Group $38,598 SBEThe ROC Aside

26.) OP-3960-2965 2/22/2017 MRL Radio System Retrofit Kal Krishnan Consulting $1,449,608 Non-FTA Set- SBE: 31.80% Kal Krishnan Consulting $460,933 SBEEngineering Support Services Services Aside (SBE Prime)

27.) DR72898000 2/28/2017 Electronic Equipment for Union Smiwifi Llc $91,395 Non-FTA Set- SBE: 100.00% Smiwifi Llc $91,395 SBEStation Emergency Op Center Aside (SBE Prime)

28.) C72761000 2/27/2017 Additional CCTV cameras Birdi & Associates, Inc. $76,225 Non-FTA Set- SBE: 100.00% Birdi & Associates, Inc. $76,225 SBEat Amtrak "Garden Track" Aside (SBE Prime)

29.) IR72749000 2/27/2017 Inventory Replenishment - Extreme Safety Llc $7,013 FTA Set- SBE: 100.00% Extreme Safety Llc $7,013 SBEShop Supplies - Wypall Aside (SBE Prime)

30.) DR72515000 2/24/2017 Translating Services Translating Services, Inc. Dba Lazar Translating & Interpreting$5,000 Non-FTA Set- SBE: 100.00% Translating Services, Inc. Dba Lazar Translating & Interpreting$5,000 SBEAside (SBE Prime)

31.) DR72517000 2/24/2017 Translating Services Avantpage Inc $5,000 Non-FTA Set- SBE: 100.00% Avantpage Inc $5,000 SBEAside (SBE Prime)

32.) IR72451000 2/23/2017 Wipes - Hand, 10.5 X 12 Peacock Systems $5,472 FTA Set- SBE: 100.00% Peacock Systems $5,472 SBEAside (SBE Prime)

33.) DR72402000 2/23/2017 Portfolio Enterprise 5 year ASA Peacock Systems $34,373 Non-FTA Set- SBE: 100.00% Peacock Systems $34,373 SBEAside (SBE Prime)

34.) C72327000 2/22/2017 Emergency Notifications Birdi & Associates, Inc. $250,357 Non-FTA Set- SBE: 100.00% Birdi & Associates, Inc. $250,357 SBESystem Aside (SBE Prime)

35.) IR71762000 2/14/2017 Inventory Replenishment - Ammmm Inc $7,523 FTA Set- SBE: 100.00% Ammmm Inc $7,523 SBEShop Supplies - Large Glove Aside (SBE Prime)

36.) PS71581000 2/10/2017 Cal State LA Metro Bus Way Delta Electric $34,750 Non-FTA Set- SBE: 100.00% Delta Electric $34,750 SBEAside (SBE Prime)

37.) IR71394000 2/9/2017 Wipes - Hand, 10.5 X 12 Z Venture Capital Frontiers Inc $6,456 FTA Set- SBE: 100.00% Z Venture Capital Frontiers Inc $6,456 SBEAside (SBE Prime)

38.) PS71174000 2/7/2017 Customer Service and Insight Strategies Inc $102,600 Non-FTA Set- SBE: 100.00% Insight Strategies Inc $102,600 SBECustomer Programs Aside (SBE Prime)

Page 15

Page 16: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

39.) IR71156000 2/6/2017 Inventory Replenishment Gorilla Stationers $7,280 FTA Set- SBE: 100.00% Gorilla Stationers $7,280 SBECopier Paper - Aside (SBE Prime)

40.) IR70991000 2/3/2017 Amplifier - Four Channel Kambrian Corporation $6,340 FTA Set- SBE: 100.00% Kambrian Corporation $6,340 SBEAside (SBE Prime)

41.) VM70889000DIV01 2/2/2017 Engine Oil Rosemead Oil Products, Inc. $716,392 FTA Set- SBE: 100.00% Rosemead Oil Products, Inc. $716,392 SBEAside (SBE Prime)

42.) MA-32483A 2/1/2017 Mop Heads Los Angeles Chemical Co. $406,640 Non-FTA Set- SBE: 100.00% Los Angeles Chemical Co. $406,640 SBEAside (SBE Prime)

43.) MA-32483B 2/1/2017 Mop Heads Gorilla Stationers $4,127 Non-FTA Set- SBE: 100.00% Gorilla Stationers $4,127 SBEAside (SBE Prime)

44.) IR70343000 1/26/2017 JANITORIAL SUPPLIES 15-0003 AMMMM INC $7,056 FTA Set- SBE: 100.00% AMMMM INC $7,056 SBEAside (SBE Prime)

45.) IR70243000 1/25/2017 SHOP SUPPLIES 14-0042 AMMMM INC $8,408 FTA Set- SBE: 100.00% AMMMM INC $8,408 SBEAside (SBE Prime)

46.) IR70247000 1/25/2017 SHOP SUPPLIES 15-0003 EXTREME SAFETY LLC $4,297 FTA Set- SBE: 100.00% EXTREME SAFETY LLC $4,297 SBEAside (SBE Prime)

47.) IR70256000 1/25/2017 PLASTIC BAG RQ37374 GORILLA STATIONERS $12,870 FTA Set- SBE: 100.00% GORILLA STATIONERS $12,870 SBEAside (SBE Prime)

48.) DR70295000 1/25/2017 Safety Tote Bags GORILLA STATIONERS $49,000 Non-FTA Set- SBE: 100.00% GORILLA STATIONERS $49,000 SBEAside (SBE Prime)

49.) PS-67233000 1/23/2017 Talent Management Systems GCAP Services $312,404 Non-FTA Set- SBE: 65.70% GCAP Services (SBE Prime) $205,244 SBEAssessment Aside Plante & Moran $107,160

50.) IR69823000 1/20/2017 SOAP - HAND, GENTLE, AMMMM INC $8,757 Non-FTA Set- SBE: 100.00% AMMMM INC $8,757 SBEANTIMICROBIAL, 4 GL/CS Aside (SBE Prime)

51.) IR69914000 1/20/2017 SHOP SUPPLIES - WYPALL EXTREME SAFETY LLC $3,257 FTA Set- SBE: 100.00% EXTREME SAFETY LLC $3,257 SBEAside (SBE Prime)

52.) IR69749000 1/19/2017 MOP HEAD - RQ37362 GORILLA STATIONERS $14,361 FTA Set- SBE: 100.00% GORILLA STATIONERS $14,361 SBEAside (SBE Prime)

53.) IR69769000 1/19/2017 TONER - RQ36820 GORILLA STATIONERS $10,710 FTA Set- SBE: 100.00% GORILLA STATIONERS $10,710 SBEAside (SBE Prime)

Page 16

Page 17: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

54.) PS69707000TO8-BRM1/19/2017 STAFF AUG TASK ORDER 8 AEON GROUP LLC $75,000 Non-FTA Set- SBE: 100.00% AEON GROUP LLC $75,000 SBEAside (SBE Prime)

55.) OP696350003367 1/18/2017 Consulting Services FUEL SOLUTIONS INC $347,580 FTA Set- SBE: 100.00% FUEL SOLUTIONS INC $347,580 SBEAside (SBE Prime)

56.) IR69375000 1/17/2017 WYPALL 15-0003 EXTREME SAFETY LLC $6,785 FTA Set- SBE: 100.00% EXTREME SAFETY LLC $6,785 SBEAside (SBE Prime)

57.) IR69321000 1/13/2017 SHOP SUPPLIES - GLOVES EXTREME SAFETY LLC $6,405 FTA Set- SBE: 100.00% EXTREME SAFETY LLC $6,405 SBEAside (SBE Prime)

58.) PS69318000 1/13/2017 TAMS and SGT Program THE OMNI GROUP LLC DBA $333,663 Non-FTA Set- SBE: 100.00% THE OMNI GROUP LLC DBA $333,663 SBEOGX CONSULTING Aside (SBE Prime)

59.) PS69166000 1/11/2017 Southern California Go511 MAROON SOCIETY INC $74,895 Non-FTA Set- SBE: 100.00% MAROON SOCIETY INC $74,895 SBEMarket Research Aside (SBE Prime)

60.) DR69131000 1/11/2017 Rail Rodeo 2017 Promo Items GORILLA STATIONERS $10,803 Non-FTA Set- SBE: 100.00% GORILLA STATIONERS $10,803 SBEAside (SBE Prime)

61.) PS69147000 1/11/2017 Creative Graphic Design STUDIO A $93,925 Non-FTA Set- SBE: 100.00% STUDIO A $93,925 SBESupport Services Aside (SBE Prime)

62.) AE33487000 1/10/2017 Metro Orange Line In-Road CHEN RYAN ASSOCIATES, INC. $105,117 FTA Set- SBE: 100.00% CHEN RYAN ASSOCIATES, INC. $105,117 SBEWarning Lights Aside (SBE Prime)

63.) PS69081000 1/10/2017 Southern California Go511 REDHILL GROUP, INC. $62,365 Non-FTA Set- SBE: 100.00% REDHILL GROUP, INC. $62,365 SBEMarket Research Aside (SBE Prime)

64.) IR68952000 1/10/2017 RADIO - 136-174 MHZ ENTERPRISE ELECTRONICS $6,626 FTA Set- SBE: 100.00% ENTERPRISE ELECTRONICS $6,626 SBEAside (SBE Prime)

65.) DR69055000 1/10/2017 Wireless Infrastructure PEACOCK SYSTEMS $12,064 Non-FTA Set- SBE: 100.00% PEACOCK SYSTEMS $12,064 SBEat Division 10 Aside (SBE Prime)

66.) DR31653000 1/9/2017 Aruba wireless PEACOCK SYSTEMS $149,934 Non-FTA Set- SBE: 100.00% PEACOCK SYSTEMS $149,934 SBE(wlan) equipment Aside (SBE Prime)

67.) AE32681000 1/9/2017 Highway Program Intelligent SYSTEM METRICS GROUP INC $499,000 Non-FTA Set- SBE: 100.00% SYSTEM METRICS GROUP INC $499,000 SBETransportation Systems Aside (SBE Prime)

68.) DR68593000 1/3/2017 Lifesize Cloud Premium KAMBRIAN CORPORATION $9,043 Non-FTA Set- SBE: 100.00% KAMBRIAN CORPORATION $9,043 SBEAside (SBE Prime)

Page 17

Page 18: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

69.) PS-6624800 12/6/2016 Enterprise Asset Management The Omni Group dba $407,000 Non-FTA Set- SBE: 100.00% The Omni Group $407,000 SBEAssessment OGx Consulting Aside (SBE Prime)

70.) PS-33816000 12/23/2016 Signal Relocation Design Pacific Rail Enterprises $112,432 Non-FTA Set- SBE: 100.00% Pacific Rail Enterprises $112,432 SBEServices Aside (SBE Prime)

71.) IR68488000 12/30/2016 Office Supplies - Toner GORILLA STATIONERS $10,710 FTA Set- SBE: 100.00% GORILLA STATIONERS $10,710 SBEAside (SBE Prime)

72.) IR68501000 12/30/2016 Wypall - Contract EXTREME SAFETY LLC $26,983 FTA Set- SBE: 100.00% EXTREME SAFETY LLC $26,983 SBEAside (SBE Prime)

73.) IR68467000 12/29/2016 Cleaning Supplies - Mop Head GORILLA STATIONERS $10,709 FTA Set- SBE: 100.00% GORILLA STATIONERS $10,709 SBEAside (SBE Prime)

74.) IR68278000 12/28/2016 WIPES - HAND, 10.5 X 12 Z VENTURE CAPITAL FRONTIERS INC$4,854 FTA Set- SBE: 100.00% Z VENTURE CAPITAL FRONTIERS INC $4,854 SBEAside (SBE Prime)

75.) IR68227000 12/27/2016 GLOVES AMMMM INC $32,943 FTA Set- SBE: 100.00% AMMMM INC $32,943 SBEAside (SBE Prime)

76.) IR68229000 12/27/2016 Glove - Nitrile Coated Nylon JAYNE PRODUCTS, INC $3,694 FTA Set- SBE: 100.00% JAYNE PRODUCTS, INC $3,694 SBEAside (SBE Prime)

77.) PS31651000 12/23/2016 Specialty Paper GORILLA STATIONERS $200,000 FTA Set- SBE: 100.00% GORILLA STATIONERS $200,000 SBEAside (SBE Prime)

78.) DR68042000 12/22/2016 Whatsup Gold Premium KAMBRIAN CORPORATION $8,572 Non-Federal Set- SBE: 100.00% KAMBRIAN CORPORATION $8,572 SBEAside (SBE Prime)

79.) DR68082000 12/22/2016 Fifty (50) Proximity Readers KAMBRIAN CORPORATION $29,542 Non-Federal Set- SBE: 100.00% KAMBRIAN CORPORATION $29,542 SBEAside (SBE Prime)

80.) PS34379000 12/21/2016 Metro Connect Supplemental ZELDESIGN $73,042 Non-Federal Set- SBE: 100.00% ZELDESIGN $73,042 SBEAside (SBE Prime)

81.) PS33816000 12/19/2016 Signal Relocation Engineering PACIFIC RAILWAY ENTERPRISES INC$112,432 FTA Set- SBE: 100.00% PACIFIC RAILWAY ENTERPRISES INC$112,432 SBEDesign Services Aside (SBE Prime)

82.) IR67567000 12/16/2016 Glove - Nitrile Coated Nylon JAYNE PRODUCTS, INC $3,899 FTA Set- SBE: 100.00% JAYNE PRODUCTS, INC $3,899 SBEAside (SBE Prime)

83.) IR67630000 12/16/2016 TONER - CARTRIDGE (OEM) GORILLA STATIONERS $11,176 FTA Set- SBE: 100.00% GORILLA STATIONERS $11,176 SBEAside (SBE Prime)

Page 18

Page 19: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

84.) PS34352000 12/15/2016 Metro Connect Small Business OLIVIER, INC. $57,823 Non-Federal Set- SBE: 100.00% OLIVIER, INC. $57,823 SBEUtilization Assessment Aside (SBE Prime)

85.) PS219328410000 12/14/2016 Partners In Diversity PARTNERS IN DIVERSITY INC $343,750 Non-Federal Set- SBE: 100.00% PARTNERS IN DIVERSITY INC $343,750 SBEAside (SBE Prime)

86.) IR67271000 12/13/2016 PAPER - WHITE, XEROX GORILLA STATIONERS $8,960 FTA Set- SBE: 100.00% GORILLA STATIONERS $8,960 SBEAside (SBE Prime)

87.) OP-33563 12/8/2016 120KW Portable Gonneville, Inc. $160,427 Non-FTA 0% SBE: 0.00%Generators

88.) DR36041000 12/8/2016 Sound Meter & Calibrator MENLO SCIENTIFIC ACOUSTICS INC $4,100 Non-Federal Set- SBE: 100.00% MENLO SCIENTIFIC ACOUSTICS INC $4,100 SBEAside (SBE Prime)

89.) IR67076000 12/8/2016 MOP HEAD - COTTON, 8 PLY GORILLA STATIONERS $14,112 FTA Set- SBE: 100.00% GORILLA STATIONERS $14,112 SBEAside (SBE Prime)

90.) IR67095000 12/8/2016 Glove - Nitrile Coated Nylon JAYNE PRODUCTS, INC $6,997 FTA Set- SBE: 100.00% JAYNE PRODUCTS, INC $6,997 SBEAside (SBE Prime)

91.) PS67092000 12/8/2016 Solarwinds Software PEACOCK SYSTEMS $25,122 Non-Federal Set- SBE: 100.00% PEACOCK SYSTEMS $25,122 SBEAside (SBE Prime)

92.) PS6624800 12/8/2016 Enterprise Asset Management The Omni Group LLC dba OGx Consulting$407,000 FTA Set- SBE: 100.00% The Omni Group LLC dba OGx Consulting$407,000 SBEAside (SBE Prime)

93.) PS66915000-TO7 12/7/2016 APEX ORACLE SUPPORT INFORMATION MANAGEMENT RESOURCES INC (IMRI)$164,022 Non-Federal Set- SBE: 100.00% INFORMATION MANAGEMENT RESOURCES INC (IMRI)$164,022 SBEAside (SBE Prime)

94.) DR66829000 12/6/2016 L A Metro Connect Hosted KAMBRIAN CORPORATION $134,017 Non-Federal Set- SBE: 100.00% KAMBRIAN CORPORATION $134,017 SBELicense Renewal - 24 Months Aside (SBE Prime)

95.) IR66893000 12/6/2016 RADIO - 136-174 MHZ ENTERPRISE ELECTRONICS $7,731 FTA Set- SBE: 100.00% ENTERPRISE ELECTRONICS $7,731 SBEAside (SBE Prime)

96.) DR66785000 12/5/2016 VM Turbo License Software KAMBRIAN CORPORATION $49,645 Non-Federal Set- SBE: 100.00% KAMBRIAN CORPORATION $49,645 SBEAside (SBE Prime)

97.) PS31191000TO21 12/5/2016 Train Control Assessment TO21 PACIFIC RAILWAY ENTERPRISES INC$75,654 FTA Set- SBE: 100.00% PACIFIC RAILWAY ENTERPRISES INC$75,654 SBEAside (SBE Prime)

98.) IR6658900 12/2/2016 Kit - Installation Tools, GRAFFITI SHIELD, INC. $3,375 FTA Set- SBE: 100.00% GRAFFITI SHIELD, INC. $3,375 SBEAnti-Graffiti Film Aside (SBE Prime)

Page 19

Page 20: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

99.) IR6645700 12/1/2016 Janitorial Supplies GORILLA STATIONERS $10,681 FTA Set- SBE: 100.00% GORILLA STATIONERS $10,681 SBEAside (SBE Prime)

100.) PS6619100 11/28/2016 Develop, Implement & Test All Minagar & Associates, Inc. $84,471 Non-Federal Set- SBE: 100.00% Minagar & Associates, Inc. $84,471 SBEHazard Emergency Operation Aside (SBE Prime)Plan (EOP)

101.) PS6610100TO8-PMO11/23/2016 Task Order 8 PMO Services Aeon Group, LLC $100,000 Non-Federal Set- SBE: 100.00% Aeon Group, LLC $100,000 SBEAside (SBE Prime)

102.) DR6601800 11/22/2016 Tap Sweatshirts Ceteramarketing $18,300 Non-Federal Set- SBE: 100.00% Ceteramarketing $18,300 SBEAside (SBE Prime)

103.) PS6594300 11/21/2016 Construction Relations Team Civilian, Inc $9,963 Non-Federal Set- SBE: 100.00% Civilian, Inc $9,963 SBEFor The Crenshaw/LAX Transit Aside (SBE Prime)

104.) IR6581400 11/18/2016 Towel - Paper Wypall, 9.8"X16.4" Extreme Safety, LLC $3,437 FTA Set- SBE: 100.00% Extreme Safety, LLC $3,437 SBEAside (SBE Prime)

105.) IR6566100 11/17/2016 Oil - Gear Unit, Synthetic Base Jamison Professional Services, LLC $5,689 FTA Set- SBE: 100.00% Jamison Professional Services, LLC $5,689 SBEAside (SBE Prime)

106.) PS-6497900 11/10/2016 Arterial Performance TransLink Consulting $360,776 Non-Federal Set- SBE: 30.05% TransLink Consulting $108,422 SBEMeasurement Pilot Aside Iteris Inc. $252,354

$360,776

107.) DR6527500 11/10/2016 Adobe Software Order Kambrian Corporation $111,044 Non-Federal Set- SBE: 100.00% Kambrian Corporation $111,044 SBEAside (SBE Prime)

108.) IR6513100 11/9/2016 Glove - Large, 12", 8 MIL. Paramount Safety Supply $9,630 FTA Set- SBE: 100.00% Paramount Safety Supply $9,630 SBEAside (SBE Prime)

109.) PS6502500TO8 11/8/2016 Task Order 8 - PC eDemand, Inc. $50,000 Non-Federal Set- SBE: 100.00% eDemand, Inc. $50,000 SBE(Project Coordinator) Aside (SBE Prime)

110.) PS6504400TO8 11/8/2016 TO8-SPM Senior Project PI Technology, Inc $50,000 Non-Federal Set- SBE: 100.00% PI Technology, Inc $50,000 SBEManager Aside (SBE Prime)

111.) IR6494100 11/7/2016 Toner - Cartridge (OEM) Gorilla Stationers $11,430 FTA Set- SBE: 100.00% Gorilla Stationers $11,430 SBEAside (SBE Prime)

112.) IR6487800 11/4/2016 Towel - Paper, Roll, 8", 6 RL AMMMM, Inc. $11,930 FTA Set- SBE: 100.00% AMMMM, Inc. $11,930 SBEAside (SBE Prime)

113.) DR6478700 11/3/2016 Custom Steel 5-Step Cantilever Autolift Services, Inc. $47,190 Non-Federal Set- SBE: 100.00% Autolift Services, Inc. $47,190 SBE

Page 20

Page 21: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

Ladders for Rail Maintenance Aside (SBE Prime)

114.) IR6464200 11/2/2016 Wipes - Hand, 10.5 X 12 A&A Glove & Safety Co. $43,751 FTA Set- SBE: 100.00% A&A Glove & Safety Co. $43,751 SBEAside (SBE Prime)

115.) PS601830026445 11/17/2016 Construction Management Destination Enterprises, Inc. $3,000,000 Non-Federal Set- SBE: 56.00% Destination Enterprises, Inc. $1,680,000 SBESupport Services Aside Capitol GCS $1,320,000

116.) IR6440900 10/31/2016 Film - 3m Scotchlite, 48" X A&A Glove & Safety Co. $4,814 FTA Set- SBE: 100.00% A&A Glove & Safety Co. $4,814 SBE50 Yds, Engineer Grade Aside (SBE Prime)

117.) IR6441500 10/31/2016 Glove - X-Large, 12", 8 Mil A&A Glove & Safety Co. $11,380 FTA Set- SBE: 100.00% A&A Glove & Safety Co. $11,380 SBEAside (SBE Prime)

118.) IR6443300 10/31/2016 Towel - Paper Wypall, 9.8"X16.4" Extreme Safety Llc $3,257 FTA Set- SBE: 100.00% Extreme Safety Llc $3,257 SBEAside (SBE Prime)

119.) IR6435900 10/28/2016 Radio - 136-174 Mhz, Handheld Enterprise Electronics $4,418 FTA Set- SBE: 100.00% Enterprise Electronics $4,418 SBEAside (SBE Prime)

120.) PS6269800 10/28/2016 Countywide Baseline System Metrics Group Inc $489,625 Non-Federal Set- SBE: 100.00% System Metrics Group Inc $489,625 SBEConditions Analysis Aside (SBE Prime)

121.) PS5782700 10/27/2016 Digital Incident Management Axiom xCell, Inc. $746,160 Non-Federal Set- SBE: 36.68% Axiom xCell (SBE Prime) $273,706 SBESystems Aside TASER International $472,454

122.) IR6410100 10/26/2016 Towel - Paper Wypall, 9.8"X16.4", Extreme Safety Llc $6,785 FTA Set- SBE: 100.00% Extreme Safety Llc $6,785 SBEAside (SBE Prime)

123.) IR6384300 10/21/2016 Toner - Cartridge (Oem) Gorilla Stationers $12,750 FTA Set- SBE: 100.00% Gorilla Stationers $12,750 SBEAside (SBE Prime)

124.) IR6388500 10/21/2016 Reel - Hose, Samson A&A Glove & Safety Co. $3,650 FTA Set- SBE: 100.00% A&A Glove & Safety Co. $3,650 SBEAside (SBE Prime)

125.) IR6350300 10/17/2016 Mop Head - Cotton, 8 Ply, 24oz A&A Glove & Safety Co. $18,280 FTA Set- SBE: 100.00% A&A Glove & Safety Co. $18,280 SBEAside (SBE Prime)

126.) DR6335900 10/13/2016 Printer Logic Software License Kambrian Corporation $84,006 Non-Federal Set- SBE: 100.00% Kambrian Corporation $84,006 SBEAside (SBE Prime)

127.) IR6335500 10/13/2016 Mop Head - 20oz. Rayon Jwl Supplies $12,324 FTA Set- SBE: 100.00% Jwl Supplies $12,324 SBEAside (SBE Prime)

128.) IR6325600 10/12/2016 Paper - White, Xerox Copier Gorilla Stationers $8,400 FTA Set- SBE: 100.00% Gorilla Stationers $8,400 SBE

Page 21

Page 22: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

Aside (SBE Prime)

129.) IR6315600 10/11/2016 Towel - Paper Wypall, 9.8"X16.4" Extreme Safety Llc $3,302 FTA Set- SBE: 100.00% Extreme Safety Llc $3,302 SBEAside (SBE Prime)

130.) DR6305600 10/10/2016 Support And License Kambrian Corporation $7,800 FTA Set- SBE: 100.00% Kambrian Corporation $7,800 SBEAside (SBE Prime)

131.) DR6275200 10/5/2016 Fitness Center Track Lighting AAA Electrical Supply $4,504 Non-Federal Set- SBE: 100.00% AAA Electrical Supply $4,504 SBEAside (SBE Prime)

132.) PS6259900 10/4/2016 Ctc Lobbying Consulting WM Consulting $378,000 Non-Federal Set- SBE: 100.00% WM Consulting $378,000 SBEAside (SBE Prime)

133.) IR6252700 10/3/2016 Radio - 136-174 Mhz, Handheld Enterprise Electronics $16,566 FTA Set- SBE: 100.00% Enterprise Electronics $16,566 SBEAside (SBE Prime)

134.) PS6249400 10/3/2016 On Call, "As Needed" Translating Services, INC. DBA Lazar Translating & Interpreting$15,000 Non-Federal Set- SBE: 100.00% Translating Services, INC. DBA Lazar Translating & Interpreting$15,000 SBETranslation Service Aside (SBE Prime)

135.) IR6017300 8/31/2016 Towel - Paper Wypall, 9.8"X Extreme Safety Llc $3,257 FTA Set- SBE: 100.00% Extreme Safety Llc $3,257 SBE16.4", Pop-Up, Bonded Aside (SBE Prime)

136.) DR6244100 9/30/2016 Safety Landyards Kaeser & Blair Inc $10,000 FTA Set- SBE: 100.00% Kaeser & Blair Inc $10,000 SBEAside (SBE Prime)

137.) C2829400 9/30/2016 CCTV Furnish & Install for Birdi & Associates $1,244,825 FHWA Set- SBE: 100.00% Birdi & Associates $1,244,825 SBEUnion Station Aside (SBE Prime)

138.) PS6236500 9/29/2016 Metro Non-Woven Tote Bags Ceteramarketing $31,000 Non-Federal Set- SBE: 100.00% Ceteramarketing $31,000 SBEAside (SBE Prime)

139.) DR6217900 9/28/2016 Strapping Machine, Batteries A&A Glove & Safety Co. $7,044 Non-Federal Set- SBE: 100.00% A&A Glove & Safety Co. $7,044 SBEAnd Charger Aside (SBE Prime)

140.) DR6219100 9/28/2016 Vlocity software license renewal Kambrian Corporation $7,668 Non-Federal Set- SBE: 100.00% Kambrian Corporation $7,668 SBEAside (SBE Prime)

141.) IR6196400 9/26/2016 Tape - Slip Resistant Globe Electric Company, Inc. $3,631 FTA Set- SBE: 100.00% Globe Electric Company, Inc. $3,631 SBEAside (SBE Prime)

142.) IR6201000 9/26/2016 Towel - Paper Roll AMMMM Inc $5,557 FTA Set- SBE: 100.00% AMMMM Inc $5,557 SBEAside (SBE Prime)

143.) PS6054900 9/26/2016 West Santa Ana Branch Transit Arellano Associates LLC $861,067 Non-Federal Set- SBE: 100.00% Arellano Associates LLC $861,067 SBE

Page 22

Page 23: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

Corridor Aside (SBE Prime)

144.) DR6174800 9/22/2016 Translation, typesetting Translating Services, Inc. Dba Lazar Translating & Interpreting$5,000 Non-Federal Set- SBE: 100.00% Translating Services, Inc. Dba Lazar Translating & Interpreting$5,000 SBEAside (SBE Prime)

145.) MA6166900 9/21/2016 Finance and Budget Services Kambrian Corporation $61,056 FTA Set- SBE: 100.00% Kambrian Corporation $61,056 SBEAside (SBE Prime)

146.) DR6155100 9/20/2016 Fitness Center Lighting AAA Electrical Supply $17,505 Non-Federal Set- SBE: 100.00% AAA Electrical Supply $17,505 SBEAside (SBE Prime)

147.) DR6156500 9/20/2016 Transit Safety Lapel Pins Ceteramarketing $44,444 Non-Federal Set- SBE: 100.00% Ceteramarketing $44,444 SBEAside (SBE Prime)

148.) DR6156900 9/20/2016 Custom imprinted wayfarer Garuda Promo And Branding Solutions$14,400 Non-Federal Set- SBE: 100.00% Garuda Promo And Branding Solutions $14,400 SBEAside (SBE Prime)

149.) PS6157800 9/20/2016 Professional Photographer Designs By Ardena $5,000 Non-Federal Set- SBE: 100.00% Designs By Ardena $5,000 SBEAside (SBE Prime)

150.) IR6139700 9/19/2016 Glove - Nitrile Coated Nylon Jayne Products, Inc $3,591 FTA Set- SBE: 100.00% Jayne Products, Inc $3,591 SBEAside (SBE Prime)

151.) IR6140100 9/19/2016 Towel - Paper Wypall Jayne Products, Inc $3,899 FTA Set- SBE: 100.00% Jayne Products, Inc $3,899 SBEAside (SBE Prime)

152.) IR6143500 9/19/2016 Towel - Paper Wypall Extreme Safety Llc $6,513 FTA Set- SBE: 100.00% Extreme Safety Llc $6,513 SBEAside (SBE Prime)

153.) IR6143600 9/19/2016 Towel - Paper Wypall Extreme Safety Llc $3,257 FTA Set- SBE: 100.00% Extreme Safety Llc $3,257 SBEAside (SBE Prime)

154.) PS-5251900 9/16/2016 Brighton to Roxford Double Arellano Associates, LLC $367,706 Non-Federal Set- SBE: 80.19% Arellano Associates $294,849 SBETrack Project Facilitation Aside VMA Communications $72,857of Community Outreach Total $367,706

155.) PS-5782700 9/15/2016 Digital Incident Management Axiom xCell Inc. $746,160 Non-Federal Set- SBE: 36.68% Axiom xCell $273,706 SBESystem Aside TASER International $472,454

Total $746,160

156.) IR6120400 9/15/2016 Recorder - Video, ETZ 2082 Technology LLC $12,495 FTA Set- SBE: 100.00% 2082 Technology LLC $12,495 SBEAside (SBE Prime)

157.) MA6120700 9/15/2016 Glove - X - Large AMMMM Inc $7,965 FTA Set- SBE: 100.00% AMMMM Inc $7,965 SBEAside (SBE Prime)

Page 23

Page 24: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

158.) IR6110000 9/14/2016 Toner Cartridge (OEM) Gorilla Stationers $10,710 FTA Set- SBE: 100.00% Gorilla Stationers $10,710 SBEAside (SBE Prime)

159.) PS-29275 9/14/2016 Program Support Consultant Kal Krishnan Consulting $399,798 Non-Federal Set- SBE: 100.00% Kal Krishnan Consulting $399,798 SBEto Assist in the Development Aside (SBE Prime)and Implementation ofConstruction Management BestPractices

160.) IR6097900 9/13/2016 Amplifier - 4-Port, Ethernet Peacock Systems $5,472 FTA Set- SBE: 100.00% Peacock Systems $5,472 SBEAside (SBE Prime)

161.) IR6104300 9/13/2016 Wipes - Hand A&A Glove & Safety Co. $10,445 FTA Set- SBE: 100.00% A&A Glove & Safety Co. $10,445 SBEAside (SBE Prime)

162.) IR6091500 9/12/2016 Bag - Plastic, Clear, HD A&A Glove & Safety Co. $13,679 FTA Set- SBE: 100.00% A&A Glove & Safety Co. $13,679 SBEAside (SBE Prime)

163.) IR6081800 9/9/2016 Holder - Pad, Cleaning Paramount Safety Supply $5,200 FTA Set- SBE: 100.00% Paramount Safety Supply $5,200 SBEAside (SBE Prime)

164.) PS6067700 9/8/2016 Special Event Services And Partyline Events $95,000 Non-Federal Set- SBE: 100.00% Partyline Events $95,000 SBEEquipment Rental Aside (SBE Prime)

165.) PS6063700 9/7/2016 landscape and maintenance Best Landscaping $312,000 Non-Federal Set- SBE: 100.00% Best Landscaping $312,000 SBEservices at USG Aside (SBE Prime)

166.) DR6046500 9/6/2016 Adobe License Kambrian Corporation $7,695 Non-Federal Set- SBE: 100.00% Kambrian Corporation $7,695 SBEAside (SBE Prime)

167.) IR6038800 9/6/2016 Toner Cartridge (OEM) Gorilla Stationers $10,200 Non-Federal Set- SBE: 100.00% Gorilla Stationers $10,200 SBEAside (SBE Prime)

168.) IR6048100 9/6/2016 Reel - Hose, Samson A&A Glove & Safety Co. $4,205 FTA Set- SBE: 100.00% A&A Glove & Safety Co. $4,205 SBE(ReelMaster) Aside (SBE Prime)

169.) PS-19404 8/18/2016 Federated Search Software Fishbowl, Inc. $395,750 Non-Federal Set- SBE: 100.00% Fishbowl, Inc. $395,750 SBEAside (SBE Prime)

170.) IR6017300 8/31/2016 Towel - Paper Wypall, 9.8"X Extreme Safety Llc $3,257 FTA Set- SBE: 100.00% Extreme Safety Llc $3,257 SBE16.4", Pop-Up, Bonded Aside (SBE Prime)

171.) DR5994700 8/29/2016 Bosch Cameras And Equipment Jm Fiber Optics Inc. $65,222 FTA Set- SBE: 100.00% Jm Fiber Optics Inc. $65,222 SBEAside (SBE Prime)

Page 24

Page 25: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

172.) IR5968900 8/25/2016 Wipes - Hand, 10.5 X 12, 72 A&A Glove & Safety Co. $6,782 FTA Set- SBE: 100.00% A&A Glove & Safety Co. $6,782 SBEPer Bucket, 6 Per/Case Aside (SBE Prime)

173.) IR5965900 8/24/2016 Mop Head - 20oz. Rayon, Cut A&A Glove & Safety Co. $11,837 FTA Set- SBE: 100.00% A&A Glove & Safety Co. $11,837 SBEEnd, 1-1/4" Headband Aside (SBE Prime)

174.) IR5942200 8/22/2016 Paper - White, Xerox Copier, Gorilla Stationers $8,680 FTA Set- SBE: 100.00% Gorilla Stationers $8,680 SBE8-1/2 X 11", 20# Long Grain Aside (SBE Prime)

175.) IR5943000 8/22/2016 Towel - Paper, Roll, 8", 6 Rl/Cs Ammmm Inc $5,785 FTA Set- SBE: 100.00% Ammmm Inc $5,785 SBEAside (SBE Prime)

176.) IR5919700 8/18/2016 Film - Orange Reflective, A&A Glove & Safety Co. $8,138 FTA Set- SBE: 100.00% A&A Glove & Safety Co. $8,138 SBEWith Comply, 36" X 50 Yards Aside (SBE Prime)

177.) PS197287140 8/18/2016 Media Planning and Civilian LLC $3,049,769 Non-Federal Set- SBE: 100.00% Civilian LLC (SBE Prime) $3,049,769 SBEPlacement Services Aside

178.) DR5889500 8/16/2016 Metro Bus Rodeo 2016 Promo Gorilla Stationers $18,250 FTA Set- SBE: 100.00% Gorilla Stationers $18,250 SBEItems Aside (SBE Prime)

179.) IR5879700 8/15/2016 Mop Head - Cotton, 8 Ply, Gorilla Stationers $17,123 FTA Set- SBE: 100.00% Gorilla Stationers $17,123 SBE24 Oz. Aside (SBE Prime)

180.) AE5875400 8/12/2016 Professional Survey Services Wagner Engineering & Survey, Inc $8,483 Non-Federal Set- SBE: 100.00% Wagner Engineering & Survey, Inc $8,483 SBEExpo/Crenshaw Station Aside (SBE Prime)

181.) IR5865500 8/11/2016 Towel - Paper Wypall, 9.8"X Extreme Safety Llc $3,257 FTA Set- SBE: 100.00% Extreme Safety Llc $3,257 SBE16.4", Pop-Up, Bonded Aside (SBE Prime)

182.) IR5848700 8/10/2016 Towel - Paper Wypall, 9.8"X Extreme Safety Llc $6,513 FTA Set- SBE: 100.00% Extreme Safety Llc $6,513 SBE16.4", Pop-Up, Bonded Aside (SBE Prime)

183.) PS5845300 8/10/2016 Union Station Master Plan Estolano Lesar Perez Advisors Llc $208,328 Non-Federal Set- SBE: 100.00% Estolano Lesar Perez Advisors Llc $208,328 SBESustainability Strategic Plan Aside (SBE Prime)

184.) PS5244800 8/5/2016 Metro Agency Wide The Omni Group dba $142,773 Non-Federal Set- SBE: 100.00% The Omni Group (SBE Prime) $142,773 SBETechnology Governance Ogx Consulting AsideAssessment

185.) IR5788900 8/2/2016 Toner - Cartridge (OEM) Z Venture Capital Frontiers Inc $10,222 FTA Set- SBE: 100.00% Z Venture Capital Frontiers Inc $10,222 SBEAside (SBE Prime)

Page 25

Page 26: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

186.) IR5834800 8/8/2016 Camera - Ip, Ptz, Licensed, Globe Electric Company, Inc. $12,093 FTA Set- SBE: 100.00% Globe Electric Company, Inc. $12,093 SBESpeed Dome, Rj45, 12vdc Aside (SBE Prime)

187.) PS5766600 7/29/2016 Federated Search Software Fishbowl Solutions, Inc. $395,750 Non-Federal Set- SBE: 100.00% Fishbowl Solutions, Inc. $395,750 SBEPurchase, Testing Aside (SBE Prime)

188.) AE5638700 7/13/2016 Final Design– Plans and AndersonPenna Partners, Inc. $334,154 Non-Federal Set- SBE: 100.00% AndersonPenna Partners, Inc. $334,154 SBESpecifications Estimates for Aside (SBE Prime)the I-605 Arterial Hot Spots in La Mirada and Santa Fe Springs

189.) DR5735100 7/26/2016 Viewsonic LCD Monitor Peacock Systems $6,250 Non-Federal Set- SBE: 100.00% Peacock Systems $6,250 SBEAside (SBE Prime)

190.) IR5735800 7/26/2016 Bag - Plastic, Clear, Hd, Ammmm Inc $12,649 Non-Federal Set- SBE: 100.00% Ammmm Inc $12,649 SBERolls Only, 43 X 48 Aside (SBE Prime)

191.) IR5742400 7/26/2016 Amplifier - 4-Port, Ethernet Peacock Systems $5,472 Non-Federal Set- SBE: 100.00% Peacock Systems $5,472 SBEAside (SBE Prime)

192.) DR5726500 7/25/2016 T & D Promo Items (various) Ceteramarketing $22,470 Non-Federal Set- SBE: 100.00% Ceteramarketing $22,470 SBEAside (SBE Prime)

193.) IR5725900 7/25/2016 Towel - Paper Wypall Extreme Safety LLC $3,257 Non-Federal Set- SBE: 100.00% Extreme Safety LLC $3,257 SBEAside (SBE Prime)

194.) IR5695300 7/20/2016 Soap - Hand, Gentle A&A Glove & Safety Co. $4,947 Non-Federal Set- SBE: 100.00% A&A Glove & Safety Co. $4,947 SBEAside (SBE Prime)

195.) IR5663700 7/15/2016 Towel - Paper, Roll, 8" Ammmm Inc $5,998 Non-Federal Set- SBE: 100.00% Ammmm Inc $5,998 SBEAside (SBE Prime)

196.) IR5628900 7/12/2016 Mop Head – 20oz. Rayon JWL Supplies $12,649 Non-Federal Set- SBE: 100.00% JWL Supplies $12,649 SBEAside (SBE Prime)

197.) IR5621600 7/11/2016 Controller - 8 Channel, Rail Enterprise Electronics $5,022 Non-Federal Set- SBE: 100.00% Enterprise Electronics $5,022 SBEAside (SBE Prime)

198.) DR2971500 7/7/2016 Monitors 22"; 50 Units Peacock Systems $5,925 Non-Federal Set- SBE: 100.00% Peacock Systems $5,925 SBEAside (SBE Prime)

199.) PS5344000 7/6/2016 Generation 511 Traveler OZ Engineering $3,000,000 Non-Federal Set- SBE: 50.66% OZ Engineering (SBE Prime) $1,453,433 SBEInformation Dissemination Aside Media Beef $66,240 SBEServices Kimley Horn $1,462,327

Information Logistics $18,000

Page 26

Page 27: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

SBE Total Only $1,519,673Total All Subs $3,000,000

200.) IR5583500 7/6/2016 Paper - White, Xerox Copier Gorilla Stationers $9,800 Non-Federal Set- SBE: 100.00% Gorilla Stationers $9,800 SBEAside (SBE Prime)

201.) C28294 6/30/2016 CCTV Furnish Install for Birdi & Associates $1,244,825 Non-Federal Set- SBE: 66.11% Birdi & Associates (SBE Prime) $822,911 SBEUnion Station Aside Tereband $248,000

Teleste $173,915Total All Subs $1,244,826

202.) PS5515100 6/27/2016 Digital Asset Management Brandon Services $150,000 Non-Federal Set- SBE: 100.00% Brandon Services $150,000 SBESpecialist Aside (SBE Prime)

203.) PS5517700 6/27/2016 Union Station Master Plan Estolano Lesar Perez Advisors LLC $208,328 Non-Federal Set- SBE: 100.00% Estolano Lesar Perez Advisors LLC $208,328 SBESustainability Plan Aside (SBE Prime)

204.) C5518000C1124 6/27/2016 Hollywood/Vine Metro M3 Services, Inc. $551,626 Non-Federal Set- SBE: 100.00% M3 Services, Inc. $551,626 SBEBike Hub Aside (SBE Prime)

205.) PS5517400 6/27/2016 Federal Consulting Services Cliff Madison Government Relations $96,000 Non-Federal Set- SBE: 100.00% Cliff Madison Government Relations $96,000 SBEAside (SBE Prime)

206.) DR5489800 6/23/2016 RFQ #27707-3 Simulaid EMS Safety Services Inc $8,723 FTA Set- SBE: 100.00% EMS Safety Services Inc $8,723 SBEProducts Aside (SBE Prime)

207.) CY5486300 6/22/2016 Incremental Funding for Jayne Products, Inc $28,401 FTA Set- SBE: 100.00% Jayne Products, Inc $28,401 SBEHazardous Materials Aside (SBE Prime)

208.) DR2995200 6/21/2016 Esignlive Software CTG Inc. $12,500 Non-Federal Set- SBE: 100.00% CTG Inc. $12,500 SBEAside (SBE Prime)

209.) PS5446700 6/17/2016 First/Last Mile Training And Kendall Planning And Design $288,980 Non-Federal Set- SBE: 100.00% Kendall Planning And Design $288,980 SBEDemonstration Program Aside (SBE Prime)

210.) AE2383300 6/16/2016 Rail To River Segment B Evan Brooks $426,635 Non-Federal Set- SBE: 100.00% Evan Brooks $426,635 SBEAside (SBE Prime)

211.) PS4928800 6/16/2016 Rail To River Intermediate Arellano Associates $419,174 Non-Federal Set- SBE: 100.00% Arellano Associates $419,174 SBEActive Transportation Corridor Aside (SBE Prime)

212.) PS23597 6/14/2016 Federal Legislative Advocacy Cliff Madison Gov't Relations $48,000 FTA Set- SBE: 100.00% Cliff Madison Gov't Relations $48,000 SBEProgram Aside

213.) DR2891100 6/14/2016 Site Specific Emergency A&A Glove & Safety Co. $100,612 FTA Set- SBE: 100.00% A&A Glove & Safety Co. $100,612 SBE

Page 27

Page 28: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

Supplies Aside (SBE Prime)

214.) DR5397700 6/13/2016 Adobe Acrobat Pro DC 2015 Peacock Systems $7,665 Non-Federal Set- SBE: 100.00% Peacock Systems $7,665 SBELicenses Withpro 1 Year Support Aside (SBE Prime)

215.) PS5386500 6/9/2016 Metro Recycled Tote Bag CR&A Custom $400,000 Non-Federal Set- SBE: 100.00% CR&A Custom $400,000 SBEProgram Aside (SBE Prime)

216.) DR5359700 6/7/2016 Multi-Gas Meters BBC Electric Inc $18,065 FTA Set- SBE: 100.00% BBC Electric Inc $18,065 SBEAside (SBE Prime)

217.) IR5273400 5/23/2016 Towel - Paper Wypall, Extreme Safety Llc $3,257 Non-Federal Set- SBE: 100.00% Extreme Safety Llc $3,257 SBEBonded Cellulose W Aside (SBE Prime)

218.) DR5237500 5/18/2016 TAP Uniforms T-shirts and Hats Ceteramarketing $15,610 FTA Set- SBE: 100.00% Ceteramarketing $15,610 SBEAside (SBE Prime)

219.) IR5226300 5/17/2016 Paper - White, Xerox Copier, Gorilla Stationers $7,523 Non-Federal Set- SBE: 100.00% Gorilla Stationers $7,523 SBELong Grain Bon Aside (SBE Prime)

220.) IR5227100 5/17/2016 Bag - Plastic, Clear, HD, Rolls A&A Glove & Safety Co. $15,522 Non-Federal Set- SBE: 100.00% A&A Glove & Safety Co. $15,522 SBEOnly, Micron Aside (SBE Prime)

221.) IR5198100 5/12/2016 Bag - Plastic, Clear, HD, Ammmm Inc $4,972 FTA Set- SBE: 100.00% Ammmm Inc $4,972 SBERolls Only, Micron Aside (SBE Prime)

222.) IR5199600 5/12/2016 Towel - Paper Wypall, Bonded Extreme Safety Llc $6,785 FTA Set- SBE: 100.00% Extreme Safety Llc $6,785 SBECellulose W Aside (SBE Prime)

223.) IR5202600 5/12/2016 Z Venture Capital Frontiers Inc $6,647 Non-Federal Set- SBE: 100.00% Z Venture Capital Frontiers Inc $6,647 SBE6 Per/Case Aside (SBE Prime)

224.) PS5172600 5/10/2016 Whatsup Gold Premium 300 Peacock Systems $11,569 Non-Federal Set- SBE: 100.00% Peacock Systems $11,569 SBEUpgrade to Premium 1000 Aside (SBE Prime)

225.) DR5177900 5/10/2016 Two Twisted Pair 16AWG Integrity Wire Inc $9,674 Non-Federal Set- SBE: 100.00% Integrity Wire Inc $9,674 SBECable Aside (SBE Prime)

226.) IR5166600 5/9/2016 Charger - Rapid, Digital Rail Enterprise Electronics $4,719 FTA Set- SBE: 100.00% Enterprise Electronics $4,719 SBERadio SY Aside (SBE Prime)

227.) IR5157000 5/6/2016 Towel - Paper, Roll, 8", 6 Rl/Cs Ammmm Inc $5,292 FTA Set- SBE: 100.00% Ammmm Inc $5,292 SBEAside (SBE Prime)

228.) IR5143900 5/5/2016 Towel - Paper Wypall, Extreme Safety Llc $3,302 FTA Set- SBE: 100.00% Extreme Safety Llc $3,302 SBE

Wipes - Hand, Per

Page 28

Page 29: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

Bonded Cellulose W Aside (SBE Prime)

229.) DR5145100 5/5/2016 Computers and Peripherals Kambrian Corporation $26,149 Non-Federal Set- SBE: 100.00% Kambrian Corporation $26,149 SBEAside (SBE Prime)

230.) PS2466700 5/4/2016 Tableau Data Visualization Kambrian Corporation $266,695 Non-Federal Set- SBE: 100.00% Kambrian Corporation $266,695 SBEProject Aside (SBE Prime)

231.) AE-4706-7002 5/26/2016 Rail to Rail Active Transp Cityworks Design $2,003,317 Non-Federal Set- SBE: 58.52% Cityworks Design (SBE Prime) $775,239 SBE-2889 Corridor Environmental Review Aside Terry A Hayes Associates $126,358 SBE

Lyric Design & Planning $120,200 SBELenax Construction $65,436 SBEFehr & Peers $374,565KPFF $288,500STV, Inc. $49,737Illuminate $66,820Hunt Design $51,660

SBE Total Only $1,087,233

Total All Subs $1,918,515

232.) DR5101100 4/29/2016 Apple Mac Pro Desktop Peacock Systems $20,112 Non-Federal Set- SBE: 100.00% Peacock Systems $20,112 SBEComputers Aside (SBE Prime)

233.) DR5093400 4/28/2016 Hp T620plus Thin Client. Peacock Systems $93,214 FTA Set- SBE: 100.00% Peacock Systems $93,214 SBET620 Plus Aside (SBE Prime)

234.) PS5079800 4/27/2016 Start PO For Video Bench Friendly Filmworks $17,100 Non-Federal Set- SBE: 100.00% Friendly Filmworks $17,100 SBEAside (SBE Prime)

235.) DR5056700 4/25/2016 Drum Truck, 55 Gal, 27 Sunset Survival & First Aid, Inc. $12,191 FTA Set- SBE: 100.00% Sunset Survival & First Aid, Inc. $12,191 SBEQuantity Aside (SBE Prime)

236.) IR5045800 4/22/2016 Toner - Cartridge (OEM) Gorilla Stationers $16,380 FTA Set- SBE: 100.00% Gorilla Stationers $16,380 SBEAside (SBE Prime)

237.) PS5036900 4/21/2016 Transportation Ballot Measure Evitarus, Inc. $83,672 Non-Federal Set- SBE: 100.00% Evitarus, Inc. $83,672 SBE2016 Focus Groups Aside (SBE Prime)

238.) IR5003300 4/18/2016 Towel - Paper Wypall Extreme Safety Llc $3,347 FTA Set- SBE: 100.00% Extreme Safety Llc $3,347 SBEAside (SBE Prime)

239.) DR5001900 4/18/2016 Cradlepoint ECM Renewal Peacock Systems $4,850 Non-Federal Set- SBE: 100.00% Peacock Systems $4,850 SBEAside (SBE Prime)

240.) IR4960000 4/12/2016 Tape - Masking, Performance Globe Electric Company, Inc. $4,186 FTA Set- SBE: 100.00% Globe Electric Company, Inc. $4,186 SBE

Page 29

Page 30: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

Green Aside (SBE Prime)

241.) IR4968800 4/12/2016 Base - Mounting, Cable, Globe Electric Company, Inc. $3,360 FTA Set- SBE: 100.00% Globe Electric Company, Inc. $3,360 SBEAdhesive Backed Aside (SBE Prime)

242.) IR4951600 4/11/2016 Wipes - Hand, 10.5 X 12 A&A Glove & Safety Co. $6,858 FTA Set- SBE: 100.00% A&A Glove & Safety Co. $6,858 SBEAside (SBE Prime)

243.) PS-1181600 4/6/2016 Development of IT Strategy Intueor Consulting, Inc. $339,314 Non-Federal Set- SBE: 86.91% Intueor Consulting, Inc. (SBE Prime) $209,066 SBEPlan Aside Eiger TechSystems $34,998 SBE

Triunity Engineering $50,825 SBEMichael Kilpatrick $44,426

SBE Total Only $294,889

Total All Subs $339,315

244.) PS4901100 4/5/2016 Limited English Proficiency Noble Insight $99,000 Non-Federal Set- SBE: 100.00% Noble Insight $99,000 SBEStudy Factors 2 And 3 Analyses Aside (SBE Prime)

245.) MA4899000 4/4/2016 Award A 12 Month Contract Extreme Safety Llc $45,042 FTA Set- SBE: 100.00% Extreme Safety Llc $45,042 SBEIFB MA22482 Aside (SBE Prime)

246.) MA4894100 4/4/2016 Award A 12 Month For A&A Glove & Safety Co. $17,796 FTA Set- SBE: 100.00% A&A Glove & Safety Co. $17,796 SBERFQ 146610SA Aside (SBE Prime)

247.) PS4883900TO3 4/1/2016 UFS Upgrade & QA Lab Security E-Demand Inc $696,921 Non-Federal Set- SBE: 100.00% E-Demand Inc $696,921 SBEServices Aside (SBE Prime)

248.) IR4881500 3/31/2016 TOWEL - PAPER, ROLL, 8", AMMMM INC $5,292 Non-Federal Set- SBE: 100.00% AMMMM INC $5,292 SBE6 RL/CS Aside (SBE Prime)

249.) DR4878200 3/31/2016 NexGen N5-1000 Storage KAMBRIAN CORPORATION $92,413 Non-Federal Set- SBE: 100.00% KAMBRIAN CORPORATION $92,413 SBEAside (SBE Prime)

250.) DR4882300 3/31/2016 NESPOSE VULNERABILITY KAMBRIAN CORPORATION $25,444 Non-Federal Set- SBE: 100.00% KAMBRIAN CORPORATION $25,444 SBEMANAGEMENT CONSOLE SYSTEM Aside (SBE Prime)

251.) IR4859100 3/29/2016 TOWEL - PAPER WYPALL, EXTREME SAFETY LLC $6,785 Non-Federal Set- SBE: 100.00% EXTREME SAFETY LLC $6,785 SBE9.8"X16.4", POP-UP Aside (SBE Prime)

252.) IR4838900 3/25/2016 TOWEL - PAPER WYPALL EXTREME SAFETY LLC $3,618 Non-Federal Set- SBE: 100.00% EXTREME SAFETY LLC $3,618 SBEAside (SBE Prime)

253.) MA-22482 3/24/2016 Safety Glasses and Respirators EXTREME SAFETY LLC $111,776 Non-Federal Set- SBE: 100.00% EXTREME SAFETY LLC $111,776 SBEAside (SBE Prime)

Page 30

Page 31: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

254.) PS2495900 3/24/2016 Dell Compellent Storage KAMBRIAN CORPORATION $461,955 Non-Federal Set- SBE: 100.00% KAMBRIAN CORPORATION $461,955 SBEAside (SBE Prime)

255.) PS4822100 3/24/2016 SYSTEMS SUPPORT STAFF PI TECHNOLOGY INC $243,840 Non-Federal Set- SBE: 100.00% PI TECHNOLOGY INC $243,840 SBEAUGMENTATION; Aside (SBE Prime)

256.) IR4812600 3/23/2016 OIL - GEAR UNIT, SYNTHETIC BASE, JAMISON PROFESSIONAL SERVICES LLC$13,082 Non-Federal Set- SBE: 100.00% JAMISON PROFESSIONAL SERVICES LLC$13,082 SBEBULK OIL TANK Aside (SBE Prime)

257.) IR4808600 3/22/2016 RESPIRATOR - DISPOSABLE, A&A GLOVE & SAFETY CO. $4,343 Non-Federal Set- SBE: 100.00% A&A GLOVE & SAFETY CO. $4,343 SBETOXIC DUST, 3M BRAND Aside (SBE Prime)

258.) IR4808700 3/22/2016 BAG - PLASTIC, CLEAR, HD, INTERBORO PACKAGING CORPORATION$18,912 Non-Federal Set- SBE: 100.00% INTERBORO PACKAGING CORPORATION$18,912 SBEROLLS ONLY, 43 X 48 Aside (SBE Prime)

259.) DR4778600 3/17/2016 Aruba Network Equipment PEACOCK SYSTEMS $18,162 Non-Federal Set- SBE: 100.00% PEACOCK SYSTEMS $18,162 SBEAside (SBE Prime)

260.) PS4777900TO1 3/17/2016 Video Production AGBOHWORKS $37,820 Non-Federal Set- SBE: 100.00% AGBOHWORKS $37,820 SBEAside (SBE Prime)

261.) PS-451860016612 3/17/2016 Consulting Services for Cambria Solutions $1,149,538 Non-Federal Set- SBE: 37.30% Cambria Solutions (SBE Prime) $428,778 SBEDevelopment of Solicitiaton Aside HNTB Corporation $720,760Packages Total $1,149,538

262.) AE-19565 3/16/2016 Lone Hill Avenue to Wagner Engineering $1,967,376 Non-Federal Set- SBE: 63.98% Wagner Engineering (SBE Prime) $617,903 SBECP White Double Track Aside Arellano Associates $110,616 SBE

Pacific Railway Enterprises $106,202 SBENSI Engineering $58,179 SBEIDC Consulting Engineers $94,396 SBELenax Construction Services $94,193 SBEDiaz Yourman $135,704 SBELIN Consulting $41,572 SBEJacobs $487,722ICF Jones & Stokes $141,791Acoustic Strategies $79,099

SBE Total Only $1,258,764

Total All Subs $1,967,376

263.) DR4756200 3/15/2016 Sophos Endpoint Protection KAMBRIAN CORPORATION $90,518 Non-Federal Set- SBE: 100.00% KAMBRIAN CORPORATION $90,518 SBELicense (4/1/16 - 3/31/19) Aside (SBE Prime)

264.) PS2327500 3/15/2016 Cybersecurity Assessment PREMIER MANAGEMENT CORPORATION$296,499 Non-Federal Set- SBE: 100.00% PREMIER MANAGEMENT CORPORATION$296,499 SBEAside (SBE Prime)

Page 31

Page 32: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

265.) IR4732600 3/11/2016 HOLDER - PAD, CLEANING A&A GLOVE & SAFETY CO. $5,960 Non-Federal Set- SBE: 100.00% A&A GLOVE & SAFETY CO. $5,960 SBEAside (SBE Prime)

266.) IR4733200 3/11/2016 CABLE ASM - 12 METER, SOUTHWEST LIFT & EQUIPMENT INC.$5,007 Non-Federal Set- SBE: 100.00% SOUTHWEST LIFT & EQUIPMENT INC.$5,007 SBEKONI, LIFT MODEL ST 1072 Aside (SBE Prime)

267.) IR4710600 3/9/2016 TOWEL - PAPER WYPALL, 9.8"X16.4"EXTREME SAFETY LLC $3,392 Non-Federal Set- SBE: 100.00% EXTREME SAFETY LLC $3,392 SBEAside (SBE Prime)

268.) DR4705600 3/9/2016 Microsoft Surface Hub KAMBRIAN CORPORATION $84,979 Non-Federal Set- SBE: 100.00% KAMBRIAN CORPORATION $84,979 SBEAside (SBE Prime)

269.) DR4707700 3/9/2016 LED Monitors and Flat KAMBRIAN CORPORATION $24,197 Non-Federal Set- SBE: 100.00% KAMBRIAN CORPORATION $24,197 SBEPanel TVs Aside (SBE Prime)

270.) DR4708000 3/9/2016 HP LaserJet Printers DI TECHNOLOGY GROUP INC DBA DATA IMPRESSIONS$16,980 Non-Federal Set- SBE: 100.00% DI TECHNOLOGY GROUP INC DBA DATA IMPRESSIONS$16,980 SBEAside (SBE Prime)

271.) IR4699100 3/8/2016 PUNCH - TRANSFER,#5 1-1/2" GLOBE ELECTRIC COMPANY, INC. $8,408 Non-Federal Set- SBE: 100.00% GLOBE ELECTRIC COMPANY, INC. $8,408 SBEREACH W/FINGER RING Aside (SBE Prime)

272.) IR4675500 3/3/2016 DRUM - EMPTY, SOLID, JAYNE PRODUCTS, INC $3,185 Non-Federal Set- SBE: 100.00% JAYNE PRODUCTS, INC $3,185 SBEOPEN HEAD, W/BOLT RING Aside (SBE Prime)

273.) PS2563800 3/3/2016 Bug-eyed lights giveaways GORILLA STATIONERS $16,480 Non-Federal Set- SBE: 100.00% GORILLA STATIONERS $16,480 SBEAside (SBE Prime)

274.) CY4649500 3/1/2016 IFB 15-0003 AMMMM INC $7,732 Non-Federal Set- SBE: 100.00% AMMMM INC $7,732 SBEAside (SBE Prime)

275.) IR4636500 2/29/2016 URINAL KIT, WATERFREE A&A GLOVE & SAFETY CO. $3,402 FTA Set- SBE: 100.00% A&A GLOVE & SAFETY CO. $3,402 SBEFILTER, REPLACEMENT Aside (SBE Prime)

276.) IR4633300 2/26/2016 TOWEL - PAPER WYPALL, AMMMM INC $6,174 FTA Set- SBE: 100.00% AMMMM INC $6,174 SBE9.8"X16.4", POP-UP Aside (SBE Prime)

277.) DR4620200 2/25/2016 Nexpose Mid-Tier Console PEACOCK SYSTEMS $77,758 Non-Federal Set- SBE: 100.00% PEACOCK SYSTEMS $77,758 SBEAside (SBE Prime)

278.) PS4625500 2/25/2016 Evaluation of Bus Signal Priority (BSP)SARAKKI ASSOCIATES $101,450 Non-Federal Set- SBE: 41.59% SARAKKI ASSOCIATES $42,193 SBEand Next Generation Aside (SBE Prime)

279.) IR4604700 2/23/2016 FILM - PROTECTIVE, 3M A&A GLOVE & SAFETY CO. $3,480 FTA Set- SBE: 100.00% A&A GLOVE & SAFETY CO. $3,480 SBESCOTCHGARD MULTI-LAYER Aside (SBE Prime)

Page 32

Page 33: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

280.) IR4608700 2/23/2016 TOWEL - PAPER WYPALL, 9.8" EXTREME SAFETY LLC $3,302 FTA Set- SBE: 100.00% EXTREME SAFETY LLC $3,302 SBEAside (SBE Prime)

281.) PS4607000 2/23/2016 Web Animator for New CRM KEITH & COMPANY $15,000 Non-Federal Set- SBE: 100.00% KEITH & COMPANY $15,000 SBEAside (SBE Prime)

282.) IR4572900 2/18/2016 TAPE - MASKING, GORILLA STATIONERS $5,886 FTA Set- SBE: 100.00% GORILLA STATIONERS $5,886 SBEPERFORMANCE GREEN Aside (SBE Prime)

282.) IR4578100 2/18/2016 TOWEL - PAPER WYPALL, EXTREME SAFETY LLC $6,785 Non-Federal Set- SBE: 100.00% EXTREME SAFETY LLC $6,785 SBE9.8"X16.4", POP-UP Aside (SBE Prime)

284.) AE-11938 2/17/2016 1st and Central Station Ted Tokio Tanaka Architects $1,793,023 Non-Federal Set- SBE: 41.58% Ted Tokio Tanaka $645,512 SBEImprovements Aside Sapphos Environmental $19,457 SBE

Systems Consulting, LLC $80,621 SBEAECOM $511,305AHBE Landscape Architects $288,939Hunt Design $73,591Lighting Design Alliance $102,977Murakawa Communications $70,621

SBE Total Only $745,590

Total All Subs $1,793,023

285.) PS4559000 2/16/2016 INTERACTION DESIGN FOR LINDA YOON $50,000 Non-Federal Set- SBE: 100.00% LINDA YOON $50,000 SBEWEB SITE Aside (SBE Prime)

286.) AE455510019565 2/16/2016 Lone Hill to White Environmental WAGNER ENGINEERING & SURVEY, INC$100,000 Non-Federal Set- SBE: 100.00% WAGNER ENGINEERING & SURVEY, INC$100,000 SBEClearance and Preliminary Aside (SBE Prime)Engineering

287.) DR4536700 2/11/2016 FF Scala and FF DINDesign KAMBRIAN CORPORATION $7,341 Non-Federal Set- SBE: 100.00% KAMBRIAN CORPORATION $7,341 SBEStudio. Per Quote #1926 Aside (SBE Prime)

288.) PS2020300 2/10/2016 Industrial Hygiene & AERO ENVIRONMENTAL SERVICES$57,000 Non-Federal Set- SBE: 100.00% AERO ENVIRONMENTAL SERVICES $57,000 SBEEnvironmental Safety Svcs Aside (SBE Prime)

289.) PS4518500TO1 2/9/2016 Task Order 1 Video Bench ANTI-VILLAIN LLC $12,730 Non-Federal Set- SBE: 100.00% ANTI-VILLAIN LLC $12,730 SBEAside (SBE Prime)

290.) PS1145500 2/9/2016 511 & RIITS Support Services JENNILLIAN CORPORATION $623,598 Non-Federal Set- SBE: 100.00% JENNILLIAN CORPORATION $623,598 SBEAside (SBE Prime)

291.) IR4504300 2/8/2016 TOWEL - PAPER WYPALL, EXTREME SAFETY LLC $3,347 FTA Set- SBE: 100.00% EXTREME SAFETY LLC $3,347 SBE 9.8"X16.4", POP-UP Aside (SBE Prime)

Page 33

Page 34: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

292.) MA4511800 2/8/2016 VEST - SAFETY, MEDIUM, GLOBE ELECTRIC COMPANY, INC. $4,228 FTA Set- SBE: 100.00% GLOBE ELECTRIC COMPANY, INC. $4,228 SBEMESH, GENERAL DUTY Aside (SBE Prime)

293.) DR4498800 2/5/2016 Apple iMac and MacBook KAMBRIAN CORPORATION $5,900 Non-Federal Set- SBE: 100.00% KAMBRIAN CORPORATION $5,900 SBEwith AppleCare. Aside (SBE Prime)

294.) 3000004076 2/5/2016 RFP NO. PS12574-49R LABOR ADVANCED AVANT-GARDE CORP. $20,000 FTA Set- SBE: 100.00% ADVANCED AVANT-GARDE CORP. $20,000 SBECOMPLIANCE SERV. AUR FOR Aside (SBE Prime)CONTRACT C1056

295.) IR4485100 2/4/2016 TOWEL - PAPER BLUE, AMMMM INC $7,700 FTA Set- SBE: 100.00% AMMMM INC $7,700 SBEWINDSHIELD #540, 12 PK/CS Aside (SBE Prime)

296.) IR4491400 2/4/2016 FILM - PROTECTIVE, 3M A&A GLOVE & SAFETY CO. $9,275 FTA Set- SBE: 100.00% A&A GLOVE & SAFETY CO. $9,275 SBESCOTCHGARD MULTI-LAYER Aside (SBE Prime)

297.) IR4491700 2/4/2016 REEL - HOSE, SAMSON AUTOLIFT SERVICES, INC $5,600 FTA Set- SBE: 100.00% AUTOLIFT SERVICES, INC $5,600 SBE(REELMASTER), LOW Aside (SBE Prime)PRESSURE - AIR/ANTI FR

298.) IR4492400 2/4/2016 RESPIRATOR - DISPOSABLE, A&A GLOVE & SAFETY CO. $4,362 FTA Set- SBE: 100.00% A&A GLOVE & SAFETY CO. $4,362 SBETOXIC DUST, 3M BRAND ONLY Aside (SBE Prime)

299.) IR4492600 2/4/2016 FILM - PROTECTIVE, 3M A&A GLOVE & SAFETY CO. $8,118 FTA Set- SBE: 100.00% A&A GLOVE & SAFETY CO. $8,118 SBESCOTCHGARD MULTI-LAYER Aside (SBE Prime)

300.) PS4456300 2/1/2016 Consultant to Audit the Medical BCA WATSON RICE LLP $66,500 FTA Set- SBE: 100.00% BCA WATSON RICE LLP $66,500 SBEBilling for Accuracy Aside (SBE Prime)

301.) IR4453500 2/1/2016 FILM - PROTECTIVE, 3M A&A GLOVE & SAFETY CO. $9,715 FTA Set- SBE: 100.00% A&A GLOVE & SAFETY CO. $9,715 SBESCOTCHGARD MULTI-LAYER Aside (SBE Prime)

302.) IR4453900 2/1/2016 FILM - PROTECTIVE, 3M A&A GLOVE & SAFETY CO. $21,561 FTA Set- SBE: 100.00% A&A GLOVE & SAFETY CO. $21,561 SBESCOTCHGARD MULTI-LAYER Aside (SBE Prime)

303.) IR4454700 2/1/2016 FILM - PROTECTIVE, 3M A&A GLOVE & SAFETY CO. $17,335 FTA Set- SBE: 100.00% A&A GLOVE & SAFETY CO. $17,335 SBESCOTCHGARD MULTI-LAYER Aside (SBE Prime)

304.) IR4455000 2/1/2016 FILM - PROTECTIVE, 3M A&A GLOVE & SAFETY CO. $8,198 FTA Set- SBE: 100.00% A&A GLOVE & SAFETY CO. $8,198 SBESCOTCHGARD MULTI-LAYER Aside (SBE Prime)

305.) MA4461800 2/1/2016 VEST - SAFETY, LARGE, MESH, GLOBE ELECTRIC COMPANY, INC. $9,346 FTA Set- SBE: 100.00% GLOBE ELECTRIC COMPANY, INC. $9,346 SBEGENERAL DUTY ANSI 107 Aside (SBE Prime)

306.) DR4449500 1/29/2016 HP Color Laserjet KAMBRIAN CORPORATION $4,673 Non-Federal Set- SBE: 100.00% KAMBRIAN CORPORATION $4,673 SBE

Page 34

Page 35: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

Enterprise M553dn Aside (SBE Prime)

307.) PS4445700 1/29/2016 Metro Safety Culture for Transit THE WATHEN GROUP LLC $315,654 Non-Federal Set- SBE: 100.00% THE WATHEN GROUP LLC $315,654 SBESecurity and Rail Operations Aside (SBE Prime)

308.) DR4433800 1/28/2016 Samsung 65" Pro LED LCDs KAMBRIAN CORPORATION $17,794 Non-Federal Set- SBE: 100.00% KAMBRIAN CORPORATION $17,794 SBE& Articulaing Arm Aside (SBE Prime)

309.) 3000000000 1/28/2016 T.O. #5 - SCRIP AUDIT TAHIM AND ASSOCIATES $15,480 Non-Federal Set- SBE: 100.00% TAHIM AND ASSOCIATES $15,480 SBEAside (SBE Prime)

310.) CY4408700 1/26/2016 AWARD A 12 MONTH EXTREME SAFETY LLC $6,785 Non-Federal Set- SBE: 100.00% EXTREME SAFETY LLC $6,785 SBECONTRACT IFB 15-0003 Aside (SBE Prime)

311.) PS4419800 1/26/2016 Public Relations THE SIERRA GROUP $10,000 Non-Federal Set- SBE: 100.00% THE SIERRA GROUP $10,000 SBEAside (SBE Prime)

312.) IR4406000 1/25/2016 Paper Supplies P & R PAPER SUPPLY COMPANY INC$3,956 Non-Federal Set- SBE: 100.00% P & R PAPER SUPPLY COMPANY INC $3,956 SBEAside (SBE Prime)

313.) MA4408300 1/25/2016 Electrical Supplies GLOBE ELECTRIC COMPANY, INC. $8,920 Non-Federal Set- SBE: 100.00% GLOBE ELECTRIC COMPANY, INC. $8,920 SBEAside (SBE Prime)

314.) OP4397200 1/22/2016 Parts Washing FRS ENVIRONMENTAL $10,000 Non-Federal Set- SBE: 100.00% FRS ENVIRONMENTAL $10,000 SBEAside (SBE Prime)

315.) PS-2279500 1/22/2016 Emergency Supplies Hawk Importers, Inc. $179,589 Non-Federal Set- SBE: 60.00% Hawk Importers (SBE Prime) $107,753 SBEAside

316.) IR4383300 1/21/2016 Engine Oil PATTEN ENERGY ENTERPRISES $5,621 Non-Federal Set- SBE: 100.00% PATTEN ENERGY ENTERPRISES $5,621 SBEAside (SBE Prime)

317.) DR4388100 1/21/2016 Whats Up Gold Premium 500 PEACOCK SYSTEMS $8,849 Non-Federal Set- SBE: 100.00% PEACOCK SYSTEMS $8,849 SBENew Devices 12M Service Aside (SBE Prime)

319.) IR4381300 1/20/2016 Paper Supplies EXTREME SAFETY LLC $3,257 Non-Federal Set- SBE: 100.00% EXTREME SAFETY LLC $3,257 SBEAside (SBE Prime)

320.) TS2170000 1/15/2016 HEAVY EQUIPMENT RENTAL RJ LALONDE INC $46,038 Non-Federal Set- SBE: 100.00% RJ LALONDE INC $46,038 SBESERVICES Aside (SBE Prime)

321.) IR4352200 1/14/2016 Glove & Safety A&A GLOVE & SAFETY CO. $89,073 Non-Federal Set- SBE: 100.00% A&A GLOVE & SAFETY CO. $89,073 SBEAside (SBE Prime)

322.) IR4356000 1/14/2016 Paper Supplies EXTREME SAFETY LLC $6,785 Non-Federal Set- SBE: 100.00% EXTREME SAFETY LLC $6,785 SBE

Page 35

Page 36: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

Aside (SBE Prime)

323.) PS4354200 1/14/2016 DEOD B2GNow Technical GCAP SERVICES $31,500 Non-Federal Set- SBE: 100.00% GCAP SERVICES $31,500 SBEAssistance Program Aside (SBE Prime)

324.) 3000000000 1/12/2016 AUDIT NO. PS16612 - SIMPSON & SIMPSON CPAs $30,000 Non-Federal Set- SBE: 100.00% SIMPSON & SIMPSON CPAs $30,000 SBEPS12251-001-19 Aside (SBE Prime)

325.) IR4338000 1/12/2016 Stationary Supplies GORILLA STATIONERS $11,663 Non-Federal Set- SBE: 100.00% GORILLA STATIONERS $11,663 SBEAside (SBE Prime)

326.) MA4324600 1/8/2016 Electrical Supplies GLOBE ELECTRIC COMPANY, INC. $6,795 Non-Federal Set- SBE: 100.00% GLOBE ELECTRIC COMPANY, INC. $6,795 SBEAside (SBE Prime)

327.) IR4282300 1/4/2016 Paper Supplies EXTREME SAFETY LLC $3,618 Non-Federal Set- SBE: 100.00% EXTREME SAFETY LLC $3,618 SBEAside (SBE Prime)

328.) AE4278600 12/31/2015 SR-91/I-710 Interchange Project JMDIAZ INCORPORATED $50,000 Non-Federal Set- SBE: 100.00% JMDIAZ INCORPORATED $50,000 SBEStudy Report-Project Aside (SBE Prime)

329.) IR4270000 12/30/2015 TAPE - AUTO REFINISHING, GORILLA STATIONERS $13,200 Non-Federal Set- SBE: 100.00% GORILLA STATIONERS $13,200 SBEMASKING Aside (SBE Prime)

330.) IR4270200 12/30/2015 TAPE - SLIP-RESISTANT, GLOBE ELECTRIC COMPANY, INC. $4,235 Non-Federal Set- SBE: 100.00% GLOBE ELECTRIC COMPANY, INC. $4,235 SBE3M SAFETY-WALK, BLACK Aside (SBE Prime)

331.) DR4272400 12/30/2015 Force.Com App Bundle license KAMBRIAN CORPORATION $4,672 Non-Federal Set- SBE: 100.00% KAMBRIAN CORPORATION $4,672 SBEAside (SBE Prime)

332.) DR4272600 12/30/2015 FY16 Quest Software KAMBRIAN CORPORATION $79,689 Non-Federal Set- SBE: 100.00% KAMBRIAN CORPORATION $79,689 SBEMaintenance Aside (SBE Prime)

333.) IR4255800 12/28/2015 TOWEL - PAPER, ROLL, 8", AMMMM INC $7,938 Non-Federal Set- SBE: 100.00% AMMMM INC $7,938 SBE6 RL/CS Aside (SBE Prime)

334.) IR4243000 12/23/2015 FILM - PROTECTIVE, GRAFFITI GUARDS INC $6,799 Non-Federal Set- SBE: 100.00% GRAFFITI GUARDS INC $6,799 SBE3M SCOTCHGARD Aside (SBE Prime)

IR4244000 12/23/2015 FILM - ANTI-GRAFFITI, GRAFFITI GUARDS INC $3,336 Non-Federal Set- SBE: 100.00% GRAFFITI GUARDS INC $3,336 SBESIDE WINDOWS Aside (SBE Prime)

335.) PS4241300 12/23/2015 Continuation of Expert CANNELL TRANSIT CONSULTING $5,000 Non-Federal Set- SBE: 100.00% CANNELL TRANSIT CONSULTING $5,000 SBEAssistance & Advice to the OIG Aside (SBE Prime)on Project

Page 36

Page 37: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

336.) PS4244500 12/23/2015 Interactive Design Services ZEHNER GROUP $100,000 Non-Federal Set- SBE: 100.00% ZEHNER GROUP $100,000 SBEAside (SBE Prime)

337.) 3000003923 12/22/2015 TASK ORDER NO. 42 - TAP BCA WATSON RICE LLP $35,000 Non-Federal Set- SBE: 100.00% BCA WATSON RICE LLP $35,000 SBESETTLEMENT & CLEARING Aside (SBE Prime)

338.) PS42356007140 12/22/2015 TriPlane Film + Video TRIPLANE FILM + VIDEO INC $50,000 Non-Federal Set- SBE: 100.00% TRIPLANE FILM + VIDEO INC $50,000 SBEAside (SBE Prime)

339.) MA4215200FY201612/21/2015 15-0024 IFB Contract GLOBE ELECTRIC COMPANY, INC.$293,390 Non-Federal Set- SBE: 100.00% GLOBE ELECTRIC COMPANY, INC. $293,390 SBEAside (SBE Prime)

340.) DR4206400 12/18/2015 Software and licenses - Bosch MCM INTEGRATED SYSTEMS $39,600 Non-Federal Set- SBE: 100.00% MCM INTEGRATED SYSTEMS $39,600 SBEVideo Management System V5.5 Aside (SBE Prime)

341.) DR4198400 12/17/2015 Part No. 3000-0000-0127 PEACOCK SYSTEMS $9,790 Non-Federal Set- SBE: 100.00% PEACOCK SYSTEMS $9,790 SBELifeSize Cloud Premium Aside (SBE Prime)

342.) DR4204200 12/17/2015 Replacement Parts from PEACOCK SYSTEMS $7,267 Non-Federal Set- SBE: 100.00% PEACOCK SYSTEMS $7,267 SBEPO # DR3654300, DR3737400, Aside (SBE Prime)and DR3722600

343.) IR4186200 12/15/2015 TOWEL - PAPER, "C-FOLD" JWL SUPPLIES $3,754 Non-Federal Set- SBE: 100.00% JWL SUPPLIES $3,754 SBEAside (SBE Prime)

344.) IR4171000 12/14/2015 TOWEL - PAPER WYPALL EXTREME SAFETY LLC $3,302 Non-Federal Set- SBE: 100.00% EXTREME SAFETY LLC $3,302 SBEAside (SBE Prime)

345.) MA4177800 12/14/2015 VEST - SAFETY, XLARGE, GLOBE ELECTRIC COMPANY, INC. $4,750 Non-Federal Set- SBE: 100.00% GLOBE ELECTRIC COMPANY, INC. $4,750 SBEMESH Aside (SBE Prime)

346.) DR2023600 12/11/2015 Single Mode Fiber Optics GLOBE ELECTRIC COMPANY, INC. $13,300 Non-Federal Set- SBE: 100.00% GLOBE ELECTRIC COMPANY, INC. $13,300 SBECables Aside (SBE Prime)

347.) DR4141600 12/9/2015 Purchase fifteen (15) Fujitsu KAMBRIAN CORPORATION $6,119 Non-Federal Set- SBE: 100.00% KAMBRIAN CORPORATION $6,119 SBEScanSnap iX500 scanners Aside (SBE Prime)

348.) DR4145900 12/9/2015 Smart-UPS X 3000VA Rack/ KAMBRIAN CORPORATION $25,128 Non-Federal Set- SBE: 100.00% KAMBRIAN CORPORATION $25,128 SBETower LCD 100-127V Aside (SBE Prime)

349.) DR4149500 12/9/2015 Viewsonic monitors to KAMBRIAN CORPORATION $4,376 Non-Federal Set- SBE: 100.00% KAMBRIAN CORPORATION $4,376 SBEsupport the HASTUS Aside (SBE Prime)

350.) PS1535300 12/8/2015 Crenshaw/LAX Transit JOHN KALISKI ARCHITECTS $150,000 FTA Set- SBE: 100.00% JOHN KALISKI ARCHITECTS $150,000 SBELine Joint Development Aside (SBE Prime)

Page 37

Page 38: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

351.) 3000003883 12/7/2015 Pre-Qualification LOPEZ AND COMPANY LLP $32,000 Non-Federal Set- SBE: 100.00% LOPEZ AND COMPANY LLP $32,000 SBEServices for Vendor Aside (SBE Prime)Client Services

352.) MA4095000 12/1/2015 VEST - SAFETY, XLARGE, GLOBE ELECTRIC COMPANY, INC. $11,000 Non-Federal Set- SBE: 100.00% GLOBE ELECTRIC COMPANY, INC. $11,000 SBEMESH Aside (SBE Prime)

353.) IR4076700 11/30/2015 TOWEL - PAPER WYPALL EXTREME SAFETY LLC $3,347 Non-Federal Set- SBE: 100.00% EXTREME SAFETY LLC $3,347 SBEAside (SBE Prime)

354.) IR4078700 11/30/2015 FILM - PROTECTIVE, 3M GRAFFITI GUARDS INC $4,448 Non-Federal Set- SBE: 100.00% GRAFFITI GUARDS INC $4,448 SBESCOTCHGARD MULTI-LAYER Aside (SBE Prime)

356.) IR4079900 11/30/2015 FILM - PROTECTIVE, 3M GRAFFITI GUARDS INC $21,450 Non-Federal Set- SBE: 100.00% GRAFFITI GUARDS INC $21,450 SBESCOTCHGARD Aside (SBE Prime)

357.) MA4082800 11/30/2015 VEST - SAFETY, LARGE GLOBE ELECTRIC $12,152 Non-Federal Set- SBE: 100.00% GLOBE ELECTRIC $12,152 SBECOMPANY, INC. Aside (SBE Prime)

358.) IR4060200 11/24/2015 TOWEL - PAPER WYPALL EXTREME SAFETY LLC $6,785 Non-Federal Set- SBE: 100.00% EXTREME SAFETY LLC $6,785 SBEAside (SBE Prime)

359.) IR4045800 11/20/2015 DECAL - MATERIAL, WHITE, GORILLA STATIONERS $7,000 Non-Federal Set- SBE: 100.00% GORILLA STATIONERS $7,000 SBEREFLECTIVE Aside (SBE Prime)

360.) IR4019900 11/18/2015 BAG - PLASTIC, CLEAR, HD, AMMMM INC $16,983 Non-Federal Set- SBE: 100.00% AMMMM INC $16,983 SBEROLLS ONLY, 43 X 48 Aside (SBE Prime)

361.) IR4020000 11/18/2015 DECAL - MATERIAL, WHITE, GRAFFITI GUARDS INC $37,656 Non-Federal Set- SBE: 100.00% GRAFFITI GUARDS INC $37,656 SBEREFLECTIVE Aside (SBE Prime)

362.) IR4007500 11/17/2015 VEST - SAFETY, XLARGE, GLOBE ELECTRIC $3,605 Non-Federal Set- SBE: 100.00% GLOBE ELECTRIC $3,605 SBEMESH COMPANY, INC. Aside (SBE Prime)

363.) PS-4004200 11/17/2015 Crenshaw/LAX Transit Line John Kaliski Architects $376,865 Non-Federal Set- SBE: 72.69% John Kaliski Architects (SBE Prime) $170,491 SBEJoint Development - Aside The Robert Group $103,447 SBEOpportunity Sites Feasibility HR & A Advisors $102,927Study, Development Guidelines SBE Total Only $273,938

Total $376,865

364.) MA3983700 11/12/2015 VEST - SAFETY, 2XLARGE, GLOBE ELECTRIC $8,512 Non-Federal Set- SBE: 100.00% GLOBE ELECTRIC $8,512 SBEMESH COMPANY, INC. Aside (SBE Prime)

365.) PS3983400 11/12/2015 Metro's Air Quality & THE BETTER WORLD $120,000 Non-Federal Set- SBE: 100.00% THE BETTER WORLD $120,000 SBE

Page 38

Page 39: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

Sustainability Technical and GROUP INC Aside (SBE Prime)Policy Analysis

366.) DR3977400 11/12/2015 AUTODESK BUILDING KAMBRIAN CORPORATION $6,378 Non-Federal Set- SBE: 100.00% KAMBRIAN CORPORATION $6,378 SBEDESIGN SUITE PREMIUM 2016 Aside (SBE Prime)

367.) IR3970000 11/10/2015 FILM - PROTECTIVE, 3M GRAFFITI GUARDS INC $5,099 Non-Federal Set- SBE: 100.00% GRAFFITI GUARDS INC $5,099 SBESCOTCHGARD MULTI-LAYER Aside (SBE Prime)

368.) IR3972200 11/10/2015 FILM - PROTECTIVE, 3M GRAFFITI GUARDS INC $4,127 Non-Federal Set- SBE: 100.00% GRAFFITI GUARDS INC $4,127 SBESCOTCHGARD MULTI-LAYER Aside (SBE Prime)

369.) PS3973200 11/10/2015 Legal and Advisory Services ROBERTA M YANG $5,000 FTA Set- SBE: 100.00% ROBERTA M YANG $5,000 SBEAside (SBE Prime)

370.) DR3925800 11/4/2015 Shavik Software Renewal KAMBRIAN CORPORATION $6,830 Non-Federal Set- SBE: 100.00% KAMBRIAN CORPORATION $6,830 SBEAside (SBE Prime)

371.) PS1562600 11/4/2015 Joint Development Review - GWYNNE PUGH URBAN $175,000 FTA Set- SBE: 100.00% GWYNNE PUGH URBAN $175,000 SBEEastside Projects STUDIO Aside (SBE Prime)

372.) IR3920100 11/3/2015 SHIELD - VANDAL, 12 MIL GRAFFITI GUARDS INC $15,995 Non-Federal Set- SBE: 100.00% GRAFFITI GUARDS INC $15,995 SBEAside (SBE Prime)

373.) MA3910900 11/2/2015 VEST - SAFETY, 3XLARGE GLOBE ELECTRIC $5,225 Non-Federal Set- SBE: 100.00% GLOBE ELECTRIC $5,225 SBECOMPANY, INC. Aside (SBE Prime)

374.) DR3898100 10/30/2015 Auto Supply AUTOLIFT SERVICES, INC $37,436 Non-Federal Set- SBE: 100.00% AUTOLIFT SERVICES, INC $37,436 SBEAside

375.) DR3890600 10/29/2015 Fujitsu FI-6770 Color PEACOCK SYSTEMS $5,612 Non-Federal Set- SBE: 100.00% PEACOCK SYSTEMS $5,612 SBEDocument Scanner Aside

376.) PS3892900 10/29/2015 Professional Services KNL SUPPORT SERVICES $25,000 Non-Federal Set- SBE: 100.00% KNL SUPPORT SERVICES $25,000 SBEAside

377.) PS3893100 10/29/2015 Accounting Services LOPEZ AND COMPANY LLP $25,000 Non-Federal Set- SBE: 100.00% LOPEZ AND COMPANY LLP $25,000 SBEAside

378.) IR3887400 10/28/2015 Paper Products AMMMM INC $8,820 Non-Federal Set- SBE: 100.00% AMMMM INC $8,820 SBEAside

379.) DR3886400 10/28/2015 Solar Hand Crank Radios SUNSET SURVIVAL & FIRST AID, INC.$13,021 Non-Federal Set- SBE: 100.00% SUNSET SURVIVAL & FIRST AID, INC.$13,021 SBEAside

Page 39

Page 40: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

380.) DR3871000 10/27/2015 Cisco Etherswitch service KAMBRIAN CORPORATION $10,729 Non-Federal Set- SBE: 100.00% KAMBRIAN CORPORATION $10,729 SBEmodule Aside

381.) PS387580014569 10/27/2015 Media Services FUSION MEDIA $4,158 Non-Federal Set- SBE: 100.00% FUSION MEDIA $4,158 SBEAside

382.) PS3870800 10/27/2015 Small Business Consulting MASON TILLMAN ASSOCIATES LTD.$14,450 Non-Federal Set- SBE: 100.00% MASON TILLMAN ASSOCIATES LTD. $14,450 SBEAside

383.) PS19444443000 10/26/2015 Triennial Performance Review MA AND ASSOCIATES $588,192 Non-Federal Set- SBE: 100.00% MA AND ASSOCIATES $588,192 SBEAside

384.) 3000003749 10/26/2015 INCURRED COST AUDIT KNL SUPPORT SERVICES $75,128 Non-Federal Set- SBE: 100.00% KNL SUPPORT SERVICES $75,128 SBESERVICE Aside

385.) PS38407003601CMS10/22/2015 Environmental Services FRS ENVIRONMENTAL $224,457 Non-Federal Set- SBE: 100.00% FRS ENVIRONMENTAL $224,457 SBEAside

386.) DR3838200 10/22/2015 EMERGENCY 55 GALLON SUNSET SURVIVAL & FIRST AID, INC.$16,598 Non-Federal Set- SBE: 100.00% SUNSET SURVIVAL & FIRST AID, INC.$16,598 SBEWATER BARREL KITS Aside(200 UNITS)

387.) 3000003715 10/16/2015 T.O. #41 - METRO EXPRESS BCA WATSON RICE LLP $18,480 Non-Federal Set- SBE: 100.00% BCA WATSON RICE LLP $18,480 SBELANES CHANGE NOTICES Aside FOR ATKINSON AND XEROX

388.) MA3800800 10/16/2015 Electrical Supply GLOBE ELECTRIC COMPANY, INC. $3,443 Non-Federal Set- SBE: 100.00% GLOBE ELECTRIC COMPANY, INC. $3,443 SBEAside

389.) PS3794400 10/15/2015 Community Participation for KATHERINE PADILLA & ASSOCIATES$131,841 Non-Federal Set- SBE: 100.00% KATHERINE PADILLA & ASSOCIATES$131,841 SBEthe East San Fernando Valley AsideTransit Corridor Project

390.) PS376470071406C10/12/2015 Graphics PACIFIC GRAPHICS INC $5,870 Non-Federal Set- SBE: 100.00% PACIFIC GRAPHICS INC $5,870 SBEAside

391.) IR3736500 10/7/2015 Electrical Supply GLOBE ELECTRIC COMPANY, INC. $4,379 Non-Federal Set- SBE: 100.00% GLOBE ELECTRIC COMPANY, INC. $4,379 SBEAside

392.) DR3732800 10/7/2015 ATMS workstation and PEACOCK SYSTEMS $15,862 Non-Federal Set- SBE: 100.00% PEACOCK SYSTEMS $15,862 SBEserver for Div. 13 Aside

393.) DR3737400 10/7/2015 Div. 13 projector system PEACOCK SYSTEMS $14,568 Non-Federal Set- SBE: 100.00% PEACOCK SYSTEMS $14,568 SBEmaterials Aside

Page 40

Page 41: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

394.) DR3722600 10/6/2015 Good line Foothill extension PEACOCK SYSTEMS $7,786 Non-Federal Set- SBE: 100.00% PEACOCK SYSTEMS $7,786 SBEDiv. 24 projector system Aside

395.) MA3704700 10/1/2015 Electrical Supply GLOBE ELECTRIC COMPANY, INC. $11,792 Non-Federal Set- SBE: 100.00% GLOBE ELECTRIC COMPANY, INC. $11,792 SBEAside

396.) PS3697100 9/30/2015 Audit on Contract No. OWEN GROUP, INC. $274,950 Non-Federal Set- SBE: 100.00% OWEN GROUP, INC. $274,950 SBEPS43502000, modification 52 Aside (SBE Prime)

397.) CY3682600 9/29/2015 TOWEL - PAPER, "C-FOLD", JWL SUPPLIES $21,450 Non-Federal Set- SBE: 100.00% JWL SUPPLIES $21,450 SBE13.3" X 10.4", 1 PLY Aside (SBE Prime)

398.) DR3654300 9/24/2015 Expo Line Yard Projectors PEACOCK SYSTEMS $32,735 Non-Federal Set- SBE: 100.00% PEACOCK SYSTEMS $32,735 SBEAside (SBE Prime)

399.) MA3659300 9/24/2015 VEST - SAFETY, MEDIUM, GLOBE ELECTRIC COMPANY, INC. $4,015 Non-Federal Set- SBE: 100.00% GLOBE ELECTRIC COMPANY, INC. $4,015 SBEMESH, W/SLEEVES Aside (SBE Prime)

400.) DR3638400 9/22/2015 V-Locity V5 Software KAMBRIAN CORPORATION $35,594 Non-Federal Set- SBE: 100.00% KAMBRIAN CORPORATION $35,594 SBEAside (SBE Prime)

401.) IR3625000 9/22/2015 TOWEL - PAPER WYPALL EXTREME SAFETY LLC $3,709 Non-Federal Set- SBE: 100.00% EXTREME SAFETY LLC $3,709 SBEAside (SBE Prime)

402.) 3000003639 9/22/2015 Financial Compliance Audit of BCA WATSON RICE LLP $60,000 Non-Federal Set- SBE: 100.00% BCA WATSON RICE LLP $60,000 SBEAccess Services MOU Aside (SBE Prime)

403.) 3000003640 9/22/2015 Crenshaw/LAX Transit Project BCA WATSON RICE LLP $60,000 Non-Federal Set- SBE: 100.00% BCA WATSON RICE LLP $60,000 SBEDesign-Build Audit Aside (SBE Prime)

404.) MA3612500 9/18/2015 VEST - SAFETY, MEDIUM GLOBE ELECTRIC COMPANY, INC. $6,712 Non-Federal Set- SBE: 100.00% GLOBE ELECTRIC COMPANY, INC. $6,712 SBEAside (SBE Prime)

405.) PS1196300 9/17/2015 Kiosk Pilot ZEHNER GROUP $100,000 Non-Federal Set- SBE: 100.00% ZEHNER GROUP $100,000 SBEAside (SBE Prime)

406.) PS1356500 9/17/2015 Transit Policing and Security BCA WATSON RICE LLP $276,300 Non-Federal Set- SBE: 100.00% BCA WATSON RICE LLP $276,300 SBEStaffing and Analysis Aside (SBE Prime)

407.) PS1984200 9/17/2015 Web and Mobile Tools ZEHNER GROUP $100,000 Non-Federal Set- SBE: 100.00% ZEHNER GROUP $100,000 SBEAside (SBE Prime)

408.) IR3601000 9/17/2015 FILM - PROTECTIVE, GRAFFITI GUARDS INC $17,261 Non-Federal Set- SBE: 100.00% GRAFFITI GUARDS INC $17,261 SBE3M SCOTCHGARD Aside (SBE Prime)

Page 41

Page 42: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

409.) CY3594000 9/17/2015 Single Fold Paper Towels GORILLA STATIONERS $54,855 Non-Federal Set- SBE: 100.00% GORILLA STATIONERS $54,855 SBEAside (SBE Prime)

410.) PS-15360111323 9/17/2015 Parts Washer Services for FRS Environmental Inc. $1,223,820 Non-Federal Set- SBE: 100.00% FRS Environmental (SBE Prime) $1,223,820 SBEMetro Maintenance Facilities Aside

411.) AE-11372 9/16/2015 I-710/SR-91 Project Study JMDiaz, Inc. $2,340,084 Non-Federal Set- SBE: 53.13% JMDiaz, Inc. (SBE Prime) $1,202,190 SBEReport Project Development Aside Value Management Strategies $40,980 SBESupport Parsons Brinckerhoff $779,041

Iteris, Inc. $156,265Cambridge Systematic, Inc. $156,975Overland, Pacific & Cutler, Inc. $4,633

SBE Total Only $1,243,170

Total All Subs $2,340,084

412.) PS-15443011442 9/16/2015 Transportation Developmental Ma and Associates $588,192 Non-Federal Set- SBE: 35.03% Ma and Associates (SBE Prime) $206,016 SBETriennial Performance Review Aside Moore & Associates $382,176of LA County Operators and Total $588,192Metro as the Regional Transportation Planning Entity

413.) PS3582000624034599/15/2015 Classification Compensation THE UNISOURCE GROUP $50,000 Non-Federal Set- SBE: 100.00% THE UNISOURCE GROUP $50,000 SBEProgram Review Aside (SBE Prime)

414.) IR3585700 9/15/2015 SHIELD - VANDAL, 12 MIL GRAFFITI GUARDS INC $12,280 Non-Federal Set- SBE: 100.00% GRAFFITI GUARDS INC $12,280 SBEAside (SBE Prime)

415.) MA3575100 9/14/2015 VEST - SAFETY, 2XLARGE, GLOBE ELECTRIC COMPANY, INC. $7,053 Non-Federal Set- SBE: 100.00% GLOBE ELECTRIC COMPANY, INC. $7,053 SBEMESH, GENERAL DUTY Aside (SBE Prime)

416.) PS35600007140 9/11/2015 CEO Vision Statement CETERAMARKETING $10,425 Non-Federal Set- SBE: 100.00% CETERAMARKETING $10,425 SBELapel Pin Aside (SBE Prime)

417.) PS3534900 9/9/2015 Bus and Rail Fleet System EIGER TECHSYSTEMS INC $353,943 Non-Federal Set- SBE: 100.00% EIGER TECHSYSTEMS INC $353,943 SBEStrategic Plan Aside (SBE Prime)

418.) PS3529100 9/8/2015 Construction Project CANNELL TRANSIT CONSULTING $5,000 Non-Federal Set- SBE: 100.00% CANNELL TRANSIT CONSULTING $5,000 SBEManagement and Rail Aside (SBE Prime)Operations Expertise Contract

419.) DR3499800 9/1/2015 Corel Winzip Licenses KAMBRIAN CORPORATION $5,130 Non-Federal Set- SBE: 100.00% KAMBRIAN CORPORATION $5,130 SBEAside (SBE Prime)

420.) IR3491900 9/1/2015 GLOVE - GLASS HANDLING, EXTREME SAFETY LLC $5,155 Non-Federal Set- SBE: 100.00% EXTREME SAFETY LLC $5,155 SBEX-LARGE PERFECT FIT Aside (SBE Prime)

Page 42

Page 43: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

421.) PS3477700 8/28/2015 Stationers GORILLA STATIONERS $3,600 Non-Federal Set- SBE: 100.00% GORILLA STATIONERS $3,600 SBEAside (SBE Prime)

422.) IR3468600 8/28/2015 Graffiti Guards GRAFFITI GUARDS INC $4,513 Non-Federal Set- SBE: 100.00% GRAFFITI GUARDS INC $4,513 SBEAside (SBE Prime)

423.) IR3451000 8/27/2015 Paper Products EXTREME SAFETY LLC $13,026 Non-Federal Set- SBE: 100.00% EXTREME SAFETY LLC $13,026 SBEAside (SBE Prime)

424.) IR3453000 8/27/2015 Oil Provisions PATTEN ENERGY ENTERPRISES $3,733 Non-Federal Set- SBE: 100.00% PATTEN ENERGY ENTERPRISES $3,733 SBEAside (SBE Prime)

425.) IR3445100 8/26/2015 Paper Products AMMMM INC $5,292 Non-Federal Set- SBE: 100.00% AMMMM INC $5,292 SBEAside (SBE Prime)

426.) IR3447600 8/26/2015 Paper Products EXTREME SAFETY LLC $3,483 Non-Federal Set- SBE: 100.00% EXTREME SAFETY LLC $3,483 SBEAside (SBE Prime)

427.) PS34477007140 8/26/2015 Commercial Printing FUSION MEDIA $6,912 Non-Federal Set- SBE: 100.00% FUSION MEDIA $6,912 SBEAside (SBE Prime)

428.) DR1651800 8/25/2015 Left Turn Gate Flower A CONE ZONE, INC. $30,297 Non-Federal Set- SBE: 100.00% A CONE ZONE, INC. $30,297 SBEStreet I-10 Aside (SBE Prime)

429.) IR3430500 8/24/2015 Oil Provisions PATTEN ENERGY ENTERPRISES $16,060 Non-Federal Set- SBE: 100.00% PATTEN ENERGY ENTERPRISES $16,060 SBEAside (SBE Prime)

430.) IR3418000 8/21/2015 Stationers GORILLA STATIONERS $7,289 Non-Federal Set- SBE: 100.00% GORILLA STATIONERS $7,289 SBEAside (SBE Prime)

431.) DR3402800 8/20/2015 Adobe Creative Cloud PEACOCK SYSTEMS $23,249 Non-Federal Set- SBE: 100.00% PEACOCK SYSTEMS $23,249 SBESubscription Renewal Aside (SBE Prime)

432.) IR3398700 8/19/2015 Oil Provisions PATTEN ENERGY ENTERPRISES $3,733 Non-Federal Set- SBE: 100.00% PATTEN ENERGY ENTERPRISES $3,733 SBEAside (SBE Prime)

433.) IR3367800 8/13/2015 Graffiti Guards GRAFFITI GUARDS INC $4,850 Non-Federal Set- SBE: 100.00% GRAFFITI GUARDS INC $4,850 SBEAside (SBE Prime)

434.) 3000003478 8/13/2015 Metro Rideshare Pre-Award TAHIM AND ASSOCIATES $18,000 Non-Federal Set- SBE: 100.00% TAHIM AND ASSOCIATES $18,000 SBEAudit Aside (SBE Prime)

435.) IR3357500 8/12/2015 Oil Provisions AMMMM INC $18,785 Non-Federal Set- SBE: 100.00% AMMMM INC $18,785 SBEAside (SBE Prime)

Page 43

Page 44: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

436.) PS1186000 8/10/2015 North Hollywood Joint MAXIMA GROUP $61,766 FTA Set- SBE: 100.00% MAXIMA GROUP $61,766 SBEDevelopment Project Financial Advisor Aside (SBE Prime)

437.) IR3322700 8/6/2015 Graffiti Guards GRAFFITI GUARDS INC $6,799 Non-Federal Set- SBE: 100.00% GRAFFITI GUARDS INC $6,799 SBEAside (SBE Prime)

438.) PS33252007140 8/6/2015 Commercial Printing FUSION MEDIA $3,467 Non-Federal Set- SBE: 100.00% FUSION MEDIA $3,467 SBEAside (SBE Prime)

439.) PS3326500 8/6/2015 Financial Advisor for Metro BAE URBAN ECONOMICS INC $49,200 FTA Set- SBE: 100.00% BAE URBAN ECONOMICS INC $49,200 SBEBoyle Heights Joint Development Aside (SBE Prime)

440.) PS3326900 8/6/2015 Financial Advisor for the Metro BAE URBAN ECONOMICS INC $29,567 FTA Set- SBE: 100.00% BAE URBAN ECONOMICS INC $29,567 SBEVermont/Santa Monica JD Project Aside (SBE Prime)

441.) 3000003427 7/31/2015 Audit Services KNL SUPPORT SERVICES $75,000 FTA Set- SBE: 100.00% KNL SUPPORT SERVICES $75,000 SBEAside (SBE Prime)

442.) OP327500013917 7/30/2015 Parts Washing FRS ENVIRONMENTAL $68,530 FTA Set- SBE: 100.00% FRS ENVIRONMENTAL $68,530 SBEAside (SBE Prime)

443.) 3000003423 7/30/2015 CPA Support Services KNL SUPPORT SERVICES $50,000 FHWA Set- SBE: 100.00% KNL SUPPORT SERVICES $50,000 SBEAside (SBE Prime)

444.) DR3267500 7/29/2015 Construction Materials AYUS & CO $6,700 Non-Federal Set- SBE: 100.00% AYUS & CO $6,700 SBEAside (SBE Prime)

445.) PS3267400 7/29/2015 Legal and Consulting ROBERTA M YANG $10,000 Non-Federal Set- SBE: 100.00% ROBERTA M YANG $10,000 SBEAside (SBE Prime)

446.) PS325910014SAFE0307/28/2015 Marketing Consulting NOBLE INSIGHT $70,884 Non-Federal Set- SBE: 100.00% NOBLE INSIGHT $70,884 SBEAside (SBE Prime)

447.) IR3248000 7/27/2015 Anti-Graffiti Protection GRAFFITI GUARDS INC $7,027 Non-Federal Set- SBE: 100.00% GRAFFITI GUARDS INC $7,027 SBEAside (SBE Prime)

448.) IR3219500 7/22/2015 Electrical Components DIESEL ELECTRICAL EQUIPMENT, INC.$8,697 Non-Federal Set- SBE: 100.00% DIESEL ELECTRICAL EQUIPMENT, INC.$8,697 SBEAside (SBE Prime)

449.) IR3211700 7/21/2015 Stationers GORILLA STATIONERS $7,289 Non-Federal Set- SBE: 100.00% GORILLA STATIONERS $7,289 SBEAside (SBE Prime)

450.) DR3203100 7/20/2015 Symantec PEACOCK SYSTEMS $14,516 Non-Federal Set- SBE: 100.00% PEACOCK SYSTEMS $14,516 SBEAside (SBE Prime)

Page 44

Page 45: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

451.) DR3172600 7/16/2015 VMware vSphere PEACOCK SYSTEMS $10,023 Non-Federal Set- SBE: 100.00% PEACOCK SYSTEMS $10,023 SBEAside (SBE Prime)

452.) 3000003383 7/15/2015 Staff Augmentation BCA WATSON RICE LLP $23,100 Non-Federal Set- SBE: 100.00% BCA WATSON RICE LLP $23,100 SBEAside (SBE Prime)

453.) DR3166500 7/15/2015 Autodesk AutoCAD Civil 3D KAMBRIAN CORPORATION $6,440 Non-Federal Set- SBE: 100.00% KAMBRIAN CORPORATION $6,440 SBEAside (SBE Prime)

454.) PS307620012491A 7/2/2015 Business Consulting Services GCAP SERVICES $34,123 Non-Federal Set- SBE: 100.00% GCAP SERVICES $34,123 SBEAside (SBE Prime)

455.) C3061100C1118 6/30/2015 Civil Engineering AXIOM ENGINEERING & SCIENCE CORP.$25,267 Non-Federal Set- SBE: 100.00% AXIOM ENGINEERING & SCIENCE CORP.$25,267 SBEAside (SBE Prime)

456.) IR3045200 6/29/2015 Electrical Supplies GLOBE ELECTRIC COMPANY, INC. $9,667 Non-Federal Set- SBE: 100.00% GLOBE ELECTRIC COMPANY, INC. $9,667 SBEAside (SBE Prime)

457.) DR3039600 6/26/2015 AutoCAD 2016 licenses and supportKAMBRIAN CORPORATION $7,623 Non-Federal Set- SBE: 100.00% KAMBRIAN CORPORATION $7,623 SBEAside (SBE Prime)

458.) DR3040300 6/26/2015 Anthro eNook: garnet Fabric, dark cherry laminateKAMBRIAN CORPORATION $14,808 Non-Federal Set- SBE: 100.00% KAMBRIAN CORPORATION $14,808 SBEAside (SBE Prime)

459.) PS1181800 6/25/2015 Survey Services WAGNER ENGINEERING & SURVEY, INC$12,289 Non-Federal Set- SBE: 100.00% WAGNER ENGINEERING & SURVEY, INC$12,289 SBEAside (SBE Prime)

460.) DR3016300 6/24/2015 Fujitsu FI-6770 Scanner KAMBRIAN CORPORATION $5,101 Non-Federal Set- SBE: 100.00% KAMBRIAN CORPORATION $5,101 SBEAside (SBE Prime)

461.) DR3018100 6/24/2015 Aruba Care Wireless Support KAMBRIAN CORPORATION $42,009 Non-Federal Set- SBE: 100.00% KAMBRIAN CORPORATION $42,009 SBEAside (SBE Prime)

462.) DR3010600 6/23/2015 Social Media management Tool software licenses subscriptionPEACOCK SYSTEMS $80,800 Non-Federal Set- SBE: 100.00% PEACOCK SYSTEMS $80,800 SBEAside (SBE Prime)

463.) IR2984700 6/19/2015 Electrical Supplies BBC ELECTRIC INC $7,200 Non-Federal Set- SBE: 100.00% BBC ELECTRIC INC $7,200 SBEAside (SBE Prime)

464.) IR2942100 6/15/2015 Auto Equipment AUTOLIFT SERVICES, INC $6,900 Non-Federal Set- SBE: 100.00% AUTOLIFT SERVICES, INC $6,900 SBEAside (SBE Prime)

465.) IR2948500 6/15/2015 Commercial Equipment ADROIT ENTREPRENEURS $12,600 Non-Federal Set- SBE: 100.00% ADROIT ENTREPRENEURS $12,600 SBEAside (SBE Prime)

Page 45

Page 46: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

466.) IR2940400 6/12/2015 Sign Manufacturing LNI CUSTOM MFG INC $6,095 Non-Federal Set- SBE: 100.00% LNI CUSTOM MFG INC $6,095 SBEAside (SBE Prime)

467.) DR2935000 6/12/2015 EcoSys EPC Contributor licenses PEACOCK SYSTEMS $42,900 Non-Federal Set- SBE: 100.00% PEACOCK SYSTEMS $42,900 SBEAside (SBE Prime)

468.) DR2932400 6/11/2015 Adobe Connect 9 Training Hosted ConcurrentKAMBRIAN CORPORATION $38,960 Non-Federal Set- SBE: 100.00% KAMBRIAN CORPORATION $38,960 SBEAside (SBE Prime)

469.) DR2911600 6/9/2015 Vectorworks Fundamentals and Service Select Software and Training for 8 usersPEACOCK SYSTEMS $24,008 FTA Set- SBE: 100.00% PEACOCK SYSTEMS $24,008 SBEAside (SBE Prime)

470.) PS291270071406D 6/9/2015 Commercial Printing PEAKS & ASSOCIATES, INC. $7,947 Non-Federal Set- SBE: 100.00% PEAKS & ASSOCIATES, INC. $7,947 SBEAside (SBE Prime)

471.) DR2907900 6/8/2015 Palo Alto Firewall Appliance DIGITAL SCEPTER CORPORATION $4,059 Non-Federal Set- SBE: 100.00% DIGITAL SCEPTER CORPORATION $4,059 SBEAside (SBE Prime)

472.) DR2908600 6/8/2015 HP LaserJet printers KAMBRIAN CORPORATION $3,662 Non-Federal Set- SBE: 100.00% KAMBRIAN CORPORATION $3,662 SBEAside (SBE Prime)

473.) DR2908700 6/8/2015 Apple MacBook Pro and accessoriesPEACOCK SYSTEMS $7,851 FTA Set- SBE: 100.00% PEACOCK SYSTEMS $7,851 SBEAside (SBE Prime)

474.) DR2909100 6/8/2015 55" and 65" LED Display / HDTV KAMBRIAN CORPORATION $21,965 Non-Federal Set- SBE: 100.00% KAMBRIAN CORPORATION $21,965 SBEAside (SBE Prime)

475.) DR2910000 6/8/2015 SINTRONES VBOX-3600-3517 INTEL CORE I7 CPU W 8GB RAM/GPS, 64GBPEACOCK SYSTEMS $13,275 Non-Federal Set- SBE: 100.00% PEACOCK SYSTEMS $13,275 SBEAside (SBE Prime)

476.) IR2909500 6/8/2015 Construction Material B & E SUPPLY AND EQUIPMENT, LLC$5,320 Non-Federal Set- SBE: 100.00% B & E SUPPLY AND EQUIPMENT, LLC $5,320 SBEAside (SBE Prime)

477.) DR2896200 6/4/2015 LED monitor KAMBRIAN CORPORATION $24,674 Non-Federal Set- SBE: 100.00% KAMBRIAN CORPORATION $24,674 SBEAside (SBE Prime)

478.) PS28884007140 6/4/2015 Marketing CETERAMARKETING $28,485 Non-Federal Set- SBE: 100.00% CETERAMARKETING $28,485 SBEAside (SBE Prime)

479.) 3000003220 6/2/2015 Accounting & Consulting LOPEZ AND COMPANY LLP $5,036 Non-Federal Set- SBE: 100.00% LOPEZ AND COMPANY LLP $5,036 SBEAside (SBE Prime)

480.) PS28593007140 5/29/2015 Transit Safety Programs FUSION MEDIA $24,153 Non-Federal Set- SBE: 100.00% FUSION MEDIA $24,153 SBEAside (SBE Prime)

Page 46

Page 47: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

481.) IR2837600 5/27/2015 CONTROLLER - 8 CHANNEL ENTERPRISE ELECTRONICS $4,965 Non-Federal Set- SBE: 100.00% ENTERPRISE ELECTRONICS $4,965 SBEAside (SBE Prime)

482.) IR2838200 5/27/2015 SENSOR ASM - MODULE ENTERPRISE ELECTRONICS $11,550 Non-Federal Set- SBE: 100.00% ENTERPRISE ELECTRONICS $11,550 SBEAside (SBE Prime)

483.) PS1178300 5/27/2015 Financial Advisory for MGL BAE URBAN ECONOMICS INC $26,858 Non-Federal Set- SBE: 100.00% BAE URBAN ECONOMICS INC $26,858 SBEAside (SBE Prime)

484.) DR2835900 5/27/2015 MS SURFACE PRO 3 PEACOCK SYSTEMS $4,944 Non-Federal Set- SBE: 100.00% PEACOCK SYSTEMS $4,944 SBEAside (SBE Prime)

485.) DR2842500 5/27/2015 70" Smart Board ADROIT ENTREPRENEURS $10,500 Non-Federal Set- SBE: 100.00% ADROIT ENTREPRENEURS $10,500 SBEAside (SBE Prime)

486.) PS28218007140 5/26/2015 Ballot Measure Promo Items GORILLA STATIONERS $20,461 Non-Federal Set- SBE: 100.00% (SBE Prime) $20,461 SBEAside

487.) PS28183007140 5/22/2015 Ballot Measure Promo Items CETERAMARKETING $18,535 Non-Federal Set- SBE: 100.00% CETERAMARKETING $18,535 SBEAside (SBE Prime)

488.) IR2818600 5/22/2015 DECAL - MATERIAL, WHITE CR&A CUSTOM $40,320 Non-Federal Set- SBE: 100.00% CR&A CUSTOM $40,320 SBEAside (SBE Prime)

489.) PS28143007140 5/22/2015 ADA Promo Items FUSION MEDIA $5,432 Non-Federal Set- SBE: 100.00% FUSION MEDIA $5,432 SBEAside (SBE Prime)

490.) PS2796000 5/20/2015 NH Red Line and Sepulveda Parking Facilities.ESTOLANO LESAR PEREZ ADVISORS LLC$150,000 Non-Federal Set- SBE: 100.00% ESTOLANO LESAR PEREZ ADVISORS LLC$150,000 SBEAside (SBE Prime)

491.) PS278780021491 5/19/2015 Contract Compliance Support GAIL CHARLES CONSULTING SERVICES$59,228 Non-Federal Set- SBE: 100.00% GAIL CHARLES CONSULTING SERVICES$59,228 SBEAside (SBE Prime)

492.) 3000003156 5/19/2015 T.O. #7 - CONTRACT NO. QIU ACCOUNTANCY CORP $15,200 Non-Federal Set- SBE: 100.00% QIU ACCOUNTANCY CORP $15,200 SBEPS12251-001-17 Aside (SBE Prime)

493.) IR2760000 5/13/2015 FILTER - AIR, 24"X24"X4", MEYER GLOBAL $17,064 Non-Federal Set- SBE: 100.00% MEYER GLOBAL $17,064 SBE30-30 PLEATED, CLASS 1 Aside (SBE Prime)

494.) DR2751000 5/12/2015 Puchase of 2 Landa Water AMERICAN WATERWORKS $8,000 Non-Federal Set- SBE: 100.00% AMERICAN WATERWORKS $8,000 SBEPressure Aside (SBE Prime)

495.) PS2737000EEE17TO15/11/2015 Community Outreach for THE ROBERT GROUP $497,404 Non-Federal Set- SBE: 100.00% THE ROBERT GROUP $497,404 SBEWestside Purple Line Extension Aside (SBE Prime)

Page 47

Page 48: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

496.) PS27454007140 5/12/2015 Transit Safety Programs GORILLA STATIONERS $19,250 Non-Federal Set- SBE: 100.00% GORILLA STATIONERS $19,250 SBEAside (SBE Prime)

497.) PS270170071406 5/6/2015 Safety Presentation Folders FUSION MEDIA $35,000 Non-Federal Set- SBE: 100.00% FUSION MEDIA $35,000 SBEAside (SBE Prime)

498.) PS2704700 5/6/2015 Labor Negotiation Support AGREEMENT DYNAMICS, INC. $10,000 Non-Federal Set- SBE: 100.00% AGREEMENT DYNAMICS, INC. $10,000 SBEAside (SBE Prime)

499.) 3000003101 5/7/2015 TASK ORDER NO. 3 - TAHIM AND ASSOCIATES $20,000 Non-Federal Set- SBE: 100.00% TAHIM AND ASSOCIATES $20,000 SBEARCADIS Aside (SBE Prime)

500.) 3000003102 5/7/2015 TASK ORDER NO. #35 BCA WATSON RICE LLP $8,100 Non-Federal Set- SBE: 100.00% BCA WATSON RICE LLP $8,100 SBENORTH HOLLYWOOD Aside (SBE Prime)

501.) 3000003103 5/7/2015 TASK ORDER NO. 36 - BCA WATSON RICE LLP $8,100 Non-Federal Set- SBE: 100.00% BCA WATSON RICE LLP $8,100 SBEVERMONT BRT Aside (SBE Prime)

502.) 3000003105 5/7/2015 TASK ORDER NO. 1 - KNL SUPPORT SERVICES $50,000 Non-Federal Set- SBE: 100.00% KNL SUPPORT SERVICES $50,000 SBEPS12251-001-08 Aside (SBE Prime)

503.) DR2699600 5/6/2015 Apple Computer Hardware KAMBRIAN CORPORATION $10,442 Non-Federal Set- SBE: 100.00% KAMBRIAN CORPORATION $10,442 SBEAside (SBE Prime)

504.) DR2702800 5/6/2015 Purchase Transponders GLOBE ELECTRIC COMPANY, INC. $20,850 Non-Federal Set- SBE: 100.00% GLOBE ELECTRIC COMPANY, INC. $20,850 SBEAside (SBE Prime)

505.) DR270930011766 5/6/2015 MOBOTIX CAMERA/SENSORS PEACOCK SYSTEMS $50,682 Non-Federal Set- SBE: 100.00% PEACOCK SYSTEMS $50,682 SBEAside (SBE Prime)

506.) 3000003086 5/5/2015 TASK ORDER NO. 31 - STAFF BCA WATSON RICE LLP $51,100 Non-Federal Set- SBE: 100.00% BCA WATSON RICE LLP $51,100 SBEAside (SBE Prime)

507.) 3000003087 5/5/2015 T.O. #34 - PRE AWARD AUDIT BCA WATSON RICE LLP $17,900 Non-Federal Set- SBE: 100.00% BCA WATSON RICE LLP $17,900 SBEAside (SBE Prime)

508.) 3000003079 5/1/2015 Pole Banners CR&A CUSTOM $57,640 Non-Federal Set- SBE: 100.00% CR&A CUSTOM $57,640 SBERegional Connectors Aside (SBE Prime)

509.) IR2567300 4/15/2015 GLOVE - X-LARGE, 12", 8 MIL, Ammmm Inc. $18,998 Non-Federal Set- SBE: 100.00% Ammmm Inc. $18,998 SBEPOWDER, FREE Aside (SBE Prime)

510.) 3000003045 4/27/2015 Airport Metro Connector Lopez and Company $30,000 Non-Federal Set- SBE: 100.00% Lopez and Company $30,000 SBETRANSIT STATION - T.O. NO. 7 Aside (SBE Prime)

Page 48

Page 49: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

CONTRACT NO. PS12251-001-10

511.) DR2504500 4/3/2015 ZXP Series 8, Retransfer KAMBRIAN CORPORATION $5,337 Non-Federal Set- SBE: 100.00% KAMBRIAN CORPORATION $5,337 SBECard Printer, USB and Ethernet Aside (SBE Prime)Connectivity, US Power

512.) DR2534700 4/9/2015 Portable Generator GLOBE ELECTRIC CO $12,988 Non-Federal Set- SBE: 100.00% GLOBE ELECTRIC COMPANY, INC. $12,988 SBEAside (SBE Prime)

513.) IR2501400 4/3/2015 PAY INVOICE 540110 PATTEN ENERGY $8,030 Non-Federal Set- SBE: 100.00% PATTEN ENERGY ENTERPRISES $8,030 SBEDELIVERY TICKET 5343 ENTERPRISES Aside (SBE Prime)

514.) IR2547300 4/10/2015 TRANSCEIVER - 100 BASE YBI Management Services $5,600 Non-Federal Set- SBE: 100.00% YBI MANAGEMENT SERVICES $5,600 SBETX TO 100 Aside (SBE Prime)

515.) IR2567300 4/15/2015 KIT - TUBING, NABI 9200-9495 Ammmm Inc. $18,998 Non-Federal Set- SBE: 100.00% Ammmm Inc. $18,998 SBEENGINE CONVERSION Aside (SBE Prime)

516.) IR2574300 4/15/2015 ADHESIVE - BLACK, RTV AUTOLIFT SERVICES, INC $4,620 Non-Federal Set- SBE: 100.00% AUTOLIFT SERVICES, INC $4,620 SBESILICONE SEALANT Aside (SBE Prime)

517.) IR2629100 4/24/2015 TONER - CARTRIDGE (OEM) GORILLA STATIONERS $7,872 Non-Federal Set- SBE: 100.00% GORILLA STATIONERS $7,872 SBEAside (SBE Prime)

518.) MA2505600 4/3/2015 GLOVE - MEDIUM, 12", 8 MIL Ammmm Inc. $6,120 Non-Federal Set- SBE: 100.00% Ammmm Inc. $6,120 SBEAside (SBE Prime)

519.) MA2506300 4/3/2015 GLOVE - LARGE, 12", 8 MIL Ammmm Inc. $10,200 Non-Federal Set- SBE: 100.00% Ammmm Inc. $10,200 SBEAside (SBE Prime)

520.) PS2521300 4/7/2015 Request for Proposal for PARTNERS IN DIVERSITY INC $100,000 Non-Federal Set- SBE: 100.00% PARTNERS IN DIVERSITY INC $100,000 SBETemporary Staff Services for Aside (SBE Prime)DEOD Department

521.) PS253010071406 4/8/2015 Metro Pop-Up Local Bus & FUSION MEDIA $11,600 Non-Federal Set- SBE: 100.00% FUSION MEDIA $11,600 SBERapid Bus Reprint Aside (SBE Prime)

522.) PS257030071406 4/15/2015 Rail Safety Bookmarks Reprint FUSION MEDIA $14,000 Non-Federal Set- SBE: 100.00% FUSION MEDIA $14,000 SBEAside (SBE Prime)

523.) PS257040071406 4/15/2015 Metro Rail Pop-Up Trains FUSION MEDIA $13,000 Non-Federal Set- SBE: 100.00% FUSION MEDIA $13,000 SBEw/Safety Message Reprint Aside (SBE Prime)

524.) PS2654000 4/28/2015 ADA Customer Information Showreel Productions $87,000 Non-Federal Set- SBE: 100.00% Showreel Productions $87,000 SBEVideo Aside (SBE Prime)

Page 49

Page 50: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

525.) PS2325600 3/6/2015 Evaluation of Metro CAMBRIA SOLUTIONS INC $282,725 Non-Federal Set- SBE: 100.00% CAMBRIA SOLUTIONS INC $282,725 SBE& LARTMC Operations Aside (SBE Prime)

526.) IR2307400 3/4/2015 Film - Handimask, 48", 3M JWL CHEMICAL & $3,453 Non-Federal Set- SBE: 100.00% JWL CHEMICAL & INDUSTRIAL DIST $3,453 SBEINDUSTRIAL DIST Aside (SBE Prime)

527.) IR2356100 3/12/2015 Fuse - 160 AMP, 1250 EAST LA WHOLESALE $4,720 Non-Federal Set- SBE: 100.00% EAST LA WHOLESALE ELECTRIC $4,720 SBEVOLT DC ELECTRIC Aside (SBE Prime)

527.) IR2369200 3/13/2015 Transmitter ASM - ENTERPRISE ELECTRONICS $7,630 Non-Federal Set- SBE: 100.00% ENTERPRISE ELECTRONICS $7,630 SBECombustible Methane Aside (SBE Prime)

528.) IR2373200 3/16/2015 Sensor ASM - Module, ENTERPRISE ELECTRONICS $7,166 Non-Federal Set- SBE: 100.00% ENTERPRISE ELECTRONICS $7,166 SBEInfrared Methane Aside (SBE Prime)

529.) IR2430300 3/25/2015 Fuse Panel ASM AAA ELECTRICAL SUPPLY $3,449 Non-Federal Set- SBE: 100.00% AAA ELECTRICAL SUPPLY $3,449 SBEF2, 160 AMP 750 VOLTS Aside (SBE Prime)

530.) IR2431100 3/25/2015 Oil - Engine Cummins PATTEN ENERGY $4,818 Non-Federal Set- SBE: 100.00% PATTEN ENERGY ENTERPRISES $4,818 SBE8.9 LGAS+, ISLG, DOOSAN ENTERPRISES Aside (SBE Prime)

531.) DR2410200 3/20/2015 LifeSize UVC ClearSea and KAMBRIAN CORPORATION $32,259 Non-Federal Set- SBE: 100.00% KAMBRIAN CORPORATION $32,259 SBEMultipoint VM Activation 1 Aside (SBE Prime)

532.) DR2415200 3/23/2015 Display devices for rail yard PEACOCK SYSTEMS $8,870 Non-Federal Set- SBE: 100.00% PEACOCK SYSTEMS $8,870 SBEmanagement software Aside (SBE Prime)

533.) DR2475800 3/31/2015 Bosh Video Management MCM INTEGRATED $49,042 Non-Federal Set- SBE: 100.00% MCM INTEGRATED SYSTEMS $49,042 SBESystem V 5.0 SYSTEMS Aside (SBE Prime)

534.) PS230700071406 3/4/2015 CicLAvia March 2015 PEAKS & ASSOCIATES, INC. $7,200 Non-Federal Set- SBE: 100.00% PEAKS & ASSOCIATES, INC. $7,200 SBEPrints #1 Aside (SBE Prime)

535.) PS242240071406121233/24/2015 CicLAvia March 2015 PEAKS & ASSOCIATES, INC. $10,000 Non-Federal Set- SBE: 100.00% PEAKS & ASSOCIATES, INC. $10,000 SBEPrints #2 Aside (SBE Prime)

536.) 3000002847 3/18/2015 AUDIT OF CONTRACT TAHIM AND ASSOCIATES $20,000 Non-Federal Set- SBE: 100.00% TAHIM AND ASSOCIATES $20,000 SBEPS4710-2769 - I-710 Utility Aside (SBE Prime)Relocation

537.) DR2416700 3/23/2015 FI6770 Fujistsu Scanner KAMBRIAN CORPORATION $5,056 Non-Federal Set- SBE: 100.00% KAMBRIAN CORPORATION $5,056 SBEAside (SBE Prime)

538.) VMI2108500 2/3/2015 Oil - Engine Cummins, 8.9 LGAS+, Patten Energy Enterprises $96,360 Non-Federal Set- SBE: 100.00% Patten Energy Enterprises $96,360 SBE

Page 50

Page 51: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

ISLG, Doosan GL11K Aside (SBE Prime)

539.) 3000002655 2/3/2015 Pre-Award Audits - Brighton BCA Watson Rice LLP $27,000 Non-Federal Set- SBE: 100.00% BCA Watson Rice LLP $27,000 SBEto Roxford & Rosecrans Aside (SBE Prime)to Marquardt

540.) PS2123200G02TO2 2/4/2015 Professional Services to Redhill Group, Inc. $25,000 Non-Federal Set- SBE: 100.00% Redhill Group, Inc. $25,000 SBEConduct Focus Groups Aside (SBE Prime)

541.) PS212530071406 2/5/2015 Through The Eyes Of Local Fusion Media $19,000 Non-Federal Set- SBE: 100.00% Fusion Media $19,000 SBEArtists Rail Posters & Car Cards Aside (SBE Prime)

542.) PS212550071406 2/5/2015 TAP User Guides Straight Fusion Media $16,605 Non-Federal Set- SBE: 100.00% Fusion Media $16,605 SBEReprint Aside (SBE Prime)

543.) IR2138100 2/6/2015 Lamp - LED Tube, 48" Long, Energy Reduction Solutions $9,450 Non-Federal Set- SBE: 100.00% Energy Reduction Solutions $9,450 SBETrue White Aside (SBE Prime)

544.) PS21490007140 2/10/2015 Rail Safety Posters and Flyers Peaks & Associates, Inc. $4,110 Non-Federal Set- SBE: 100.00% Peaks & Associates, Inc. $4,110 SBEAside (SBE Prime)

545.) PS21494007010112182/10/2015 Professional Photographer Gary Leonard dba Take My Picture Inc.$10,000 Non-Federal Set- SBE: 100.00% Gary Leonard dba Take My Picture Inc. $10,000 SBEAside (SBE Prime)

546.) PS21495007010112122/10/2015 Professional Video Producer Juan Ocampo Photography $10,000 Non-Federal Set- SBE: 100.00% Juan Ocampo Photography $10,000 SBEAside (SBE Prime)

547.) MA2158400 2/11/2015 Toner - Cartridge, Magenta, YBI Management Services $15,993 Non-Federal Set- SBE: 100.00% YBI Management Services $4,147 SBEHP Color Laserjet 4700DN Aside (SBE Prime)

548.) DR2158500 2/11/2015 InfoBlox Licenses and Kambrian Corporation $97,369 Non-Federal Set- SBE: 100.00% Kambrian Corporation $97,369 SBEAnnual Maintenance Aside (SBE Prime)

549.) MA2158300 2/11/2015 Cartridge - Toner- Black, YBI Management Services $3,492 Non-Federal Set- SBE: 100.00% YBI Management Services $3,492 SBEHP Color Laserjet, 3800N, Aside (SBE Prime)3800, 380

550.) IR2157500 2/11/2015 Toner - Cartridge (OEM) Gorilla Stationers $7,072 Non-Federal Set- SBE: 100.00% Gorilla Stationers $7,072 SBEAside (SBE Prime)

551.) PS2157700 2/11/2015 Ace Attorney Services FY15 Ace Attorney Services $6,200 Non-Federal Set- SBE: 100.00% Ace Attorney Services $6,200 SBEAside (SBE Prime)

552.) PS21854007010117282/13/2015 Professional Film Producer Seekers Film $10,000 Non-Federal Set- SBE: 100.00% Seekers Film $10,000 SBEAside (SBE Prime)

Page 51

Page 52: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

553.) PS21856007010117252/13/2015 Graphic Design Agbohworks $20,000 Non-Federal Set- SBE: 100.00% Agbohworks $20,000 SBEAside (SBE Prime)

554.) DR2216800 2/19/2015 Purchase Everbridge Sunset Survival & First Aid, Inc. $4,585 Non-Federal Set- SBE: 100.00% Sunset Survival & First Aid, Inc. $4,585 SBEImplementation Incentive Aside (SBE Prime)Program

555.) IR2203500 2/18/2015 Oil - Engine Cummins, 8.9 LGAS+, Patten Energy Enterprises $4,667 Non-Federal Set- SBE: 100.00% Patten Energy Enterprises $4,667 SBEISLG, Doosan GL11K Aside (SBE Prime)

556.) 3000002755 2/25/2015 Task Order No. 7 Rail Kal Krishnan Consulting Services $31,509 Non-Federal Set- SBE: 100.00% Kal Krishnan Consulting Services $31,509 SBECommunications As-Built Aside (SBE Prime)CAD Support

557.) PS227280071406118822/27/2015 Printing Services Pacific Graphic Inc $3,100 Non-Federal Set- SBE: 100.00% Pacific Graphic Inc $3,100 SBEAside (SBE Prime)

558.) 15-0003 1/26/2015 Paper Products Ammmm Inc. $77,370 Non-Federal Set- SBE: 100.00% Ammmm Inc. $77,370 SBEAside (SBE Prime)

559.) 15-0003 1/14/2015 Paper Products Extreme Safety $340,130 Non-Federal Set- SBE: 100.00% Extreme Safety $340,130 SBEAside (SBE Prime)

560.) 15-0002 1/14/2015 Engine Oil Patten Energy, Inc. $1,046,918 Non-Federal Set- SBE: 100.00% Patten Energy, Inc. $1,046,918 SBEAside (SBE Prime)

561.) DR2007800 1/26/2015 Purchase of three (3) Microsoft Surface Pro 3 256GB/8GB configuration and accessories Part No. RF2-00001 Microsoft Surface Pro 3 (Black).Part No. P9X-0002 Microsoft Arc Touch Mouse Surface EditionDi Technology Group $5,166 Non-Federal Set- SBE: 100.00% Di Technology Group $5,166 SBEAside (SBE Prime)

562.) IR2021400 1/26/2015 MODULE - VIDEO, (INFINOVA CODE UP THE COAX PROTOCOL OUT)Earl Security Inc. $6,090 Non-Federal Set- SBE: 100.00% Earl Security Inc. $6,090 SBEAside (SBE Prime)

563.) DR1992600 1/26/2015 One Santa Fe WiFi Infrastucture Kambrian Corporation $19,376 Non-Federal Set- SBE: 100.00% Kambrian Corporation $19,376 SBEAside (SBE Prime)

564.) DR1997200 1/26/2015 HP Designjet T2500 CR359 Kambrian Corporation $8,148 Non-Federal Set- SBE: 100.00% Kambrian Corporation $8,148 SBEAside (SBE Prime)

565.) DR2010200 1/26/2015 HP Color Laserjet Enterprise Kambrian Corporation $7,563 Non-Federal Set- SBE: 100.00% Kambrian Corporation $7,563 SBEM750dn Color Laser Printer Aside (SBE Prime)

566.) IR1907800 1/26/2015 Sensor ASM - Combustable Enterprise Electronics $17,345 Non-Federal Set- SBE: 100.00% Enterprise Electronics $17,345 SBEMethane Gas Analyzer Aside (SBE Prime)

Page 52

Page 53: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

567.) PS1988300 1/26/2015 Valley Service Lines 734,761 Fusion Media $13,000 Non-Federal Set- SBE: 100.00% Fusion Media $13,000 SBEand 788 Westside Express Aside (SBE Prime)

568.) IR2034200 1/26/2015 Vest - Safety, XXL, ANSI Class 3 Globe Electric Company, Inc. $3,465 Non-Federal Set- SBE: 100.00% Globe Electric Company, Inc. $3,465 SBEAside (SBE Prime)

569.) IR2089400 1/26/2015 Camera - 23X Vandal Resistant Globe Electric Company, Inc. $13,455 Non-Federal Set- SBE: 100.00% Globe Electric Company, Inc. $13,455 SBEBlack/White Aside (SBE Prime)

570.) IR2090200 1/26/2015 Flashlight - Underwater Globe Electric Company, Inc. $6,585 Non-Federal Set- SBE: 100.00% Globe Electric Company, Inc. $6,585 SBEAside (SBE Prime)

571.) IR1974000 1/26/2015 Toner Cartrdige - Black Gorilla Stationers $4,575 Non-Federal Set- SBE: 100.00% Gorilla Stationers $4,575 SBEAside (SBE Prime)

572.) C1108 1/14/2015 Bus Shelters, Metro Rapid AP Construction Inc. $3,690,710 Non-Federal Set- SBE: 49.38% AP Construction (SBE Prime) $1,822,473 SBEPylons, and Other Patron Aside Tolar Manufacturing $1,688,131Amenitites ShelterClean Services $180,107

Total $3,690,710

573.) 300000-2383 12/2/2014 Cisco 7945G Telephone Kambrian Corporation $15,246 Non-Federal Set- SBE: 100.00% Kambrian Corporation $15,246 SBEAside (SBE Prime)

574.) DR1772700 12/10/2014 Quest software, TOAD, Foglight software maintenance renewalKambrian Corporation $47,296 Non-Federal Set- SBE: 100.00% Kambrian Corporation $47,296 SBEAside (SBE Prime)

575.) DR1803500 12/15/2014 Anthro Enook Wall Station Kambrian Corporation $5,040 Non-Federal Set- SBE: 100.00% Kambrian Corporation $5,040 SBEAside (SBE Prime)

576.) DR1851000 12/22/2014 VMWare Software Maintenance Kambrian Corporation $85,783 Non-Federal Set- SBE: 100.00% Kambrian Corporation $85,783 SBEAside (SBE Prime)

577.) DR1896800 12/30/2014 Adobe Technical Support Kambrian Corporation $90,301 Non-Federal Set- SBE: 100.00% Kambrian Corporation $90,301 SBEAside (SBE Prime)

578.) IR1749800 12/8/2014 Adhesive - Loctite Blue R. S. Hughes Co. Inc $3,974 Non-Federal Set- SBE: 100.00% R. S. Hughes Co. Inc $3,974 SBEAside (SBE Prime)

579.) IR1750300 12/8/2014 Ahesive - Black RTV Sealant Globe Electric Company, Inc. $4,959 Non-Federal Set- SBE: 100.00% Globe Electric Company, Inc. $4,959 SBEAside (SBE Prime)

580.) IR1750800 12/8/2014 Camera - 23X Vandal Resistant Globe Electric Company, Inc. $5,992 Non-Federal Set- SBE: 100.00% Globe Electric Company, Inc. $5,992 SBEColor Aside (SBE Prime)

581.) IR1751100 12/8/2014 Adhesive - Plexus R. S. Hughes Co. Inc $5,658 Non-Federal Set- SBE: 100.00% R. S. Hughes Co. Inc $5,658 SBE

Page 53

Page 54: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

Aside (SBE Prime)

582.) IR1763300 12/9/2014 Flame Resistant Safety Vests Globe Electric Company, Inc. $20,788 Non-Federal Set- SBE: 100.00% Globe Electric Company, Inc. $20,788 SBE - Small Aside (SBE Prime)

583.) PS000000071401107012/30/2014 TAP G & D Reduced Fare Peaks & Associates, Inc. $10,575 Non-Federal Set- SBE: 100.00% Peaks & Associates, Inc. $10,575 SBECard Carriers Aside (SBE Prime)

584.) PS1776500 12/10/2014 Urban Greening Plan for Park Melendrez $113,700 Non-Federal Set- SBE: 100.00% Melendrez $113,700 SBEand Ride Lot Aside (SBE Prime)

585.) PS18323007160 12/18/2014 C/LAX Printing CeteraMarketing $16,000 Non-Federal Set- SBE: 100.00% CeteraMarketing $16,000 SBEAside (SBE Prime)

586.) PS1833100 12/18/2014 TAP User's Guide Reprint Fusion Media $4,382 Non-Federal Set- SBE: 100.00% Fusion Media $4,382 SBEAside (SBE Prime)

587.) PS1833400 12/18/2014 Reprint of MKTG-67 Zone Check PadsFusion Media $5,802 Non-Federal Set- SBE: 100.00% Fusion Media $5,802 SBEAside (SBE Prime)

588.) PS1842900 12/19/2014 Congestion Reduction Peaks & Associates, Inc. $14,800 Non-Federal Set- SBE: 100.00% Peaks & Associates, Inc. $14,800 SBEAside (SBE Prime)

589.) PS1904500EEE17TO112/31/2014 Community Participation for The Robert Group $200,000 Non-Federal Set- SBE: 100.00% The Robert Group $200,000 SBEAirport Metro Connector Project Aside (SBE Prime)

590.) PS-4340-3406 12/5/2014 Urban Greening Toolkits and Melendrez Associates $196,916 Non-Federal Set- SBE: 65.82% Melendrez (SBE Prime) $101,845 SBEPlan Aside Arellano Associates $27,772 SBE

EPD Consultants $67,298SBE Total Only $129,617

Total All Subs $196,915

591.) 300000-2362 11/26/2014 Development Operations & Zehner Group $160,000 Non-Federal Set- SBE: 100.00% Zehner Group (SBE Prime) $160,000 SBESystems Administration Aside

592.) 300000-2331 11/20/2014 Copper Conductors Electric Design Technology $104,460 Non-Federal Set- SBE: 100.00% Electric Design Technology $104,460 SBEAuxiliary Transformer Aside (SBE Prime)

593.) 300000-2340 11/1/2014 Task Order #45 - Perceptive Enterprises Inc. $100,000 Non-Federal Set- SBE: 100.00% Perceptive Enterprises Inc. $100,000 SBERegional Connector Aside (SBE Prime)

594.) PS161750010642 11/17/2014 Printing of 6 different Benefit Peaks & Associates $19,250 Non-Federal Set- SBE: 100.00% Peaks & Associates $19,250 SBE Enrollment Guides Aside (SBE Prime)

595.) IR1581900 11/12/2014 Camera - 23X Vandal Resistant Globe Electric Company $7,490 Non-Federal Set- SBE: 100.00% Globe Electric Company $7,490 SBE

Page 54

Page 55: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

Aside (SBE Prime)

596.) PS1511400 11/3/2014 Printing of 105,000 TAP Vendor Peaks & Associates $21,185 Non-Federal Set- SBE: 100.00% Peaks & Associates $21,185 SBEAside (SBE Prime)

597.) PS1511300 11/3/2014 Metro FY2015 Metro Pacific Graphics Inc. $5,950 Non-Federal Set- SBE: 100.00% Pacific Graphics Inc. $5,950 SBEBudget Book Aside (SBE Prime)

598.) IR1524100 11/5/2014 Lamp - LED Tube 48" GT Lighting and Electrical $5,518 Non-Federal Set- SBE: 100.00% GT Lighting and Electrical $5,518 SBEAside (SBE Prime)

599.) DR1531000 11/5/2014 Shavlik Landesk Licenses Kambrian Corporation $34,975 Non-Federal Set- SBE: 100.00% Kambrian Corporation $34,975 SBEAside (SBE Prime)

600.) DR1666100 11/24/2014 Samsung 65in LED Kambrian Corporation $23,161 Non-Federal Set- SBE: 100.00% Kambrian Corporation $23,161 SBEAside (SBE Prime)

601.) DR1669300 11/24/2014 Viewsonic CDP4262-L Kambrian Corporation $4,763 Non-Federal Set- SBE: 100.00% Kambrian Corporation $4,763 SBEAside (SBE Prime)

602.) PS1662100TO46 11/21/2014 Labor Compliance Monitoring Casamar Group LLC $60,000 Non-Federal Set- SBE: 100.00% Casamar Group LLC $60,000 SBETask Order 46 (Universal City Aside (SBE Prime)Pedestrian Bridge)

603.) PS16818001476 11/26/2014 JLM Staffing (For PLA/CCP) JLM Staffing Solutions $3,000 Non-Federal Set- SBE: 100.00% JLM Staffing Solutions $3,000 SBEAside (SBE Prime)

604.) EG1514100 10/31/2014 Vernon Yard Surveying Wagner Engineering $46,008 Non-Federal Set- SBE: 100.00% Wagner Engineering $46,008 SBEAside (SBE Prime)

605.) 3000001933 10/1/2014 Task Order No. 2 - Package Lopez and Company LLP $18,302 Non-Federal Set- SBE: 100.00% Lopez and Company LLP $18,302 SBENo. 3 - Soundwall I-710 Aside (SBE Prime)

606.) PS4540-3200-G-02-TO110/1/2014 Sepulveda Pass Stated Redhill Group $98,000 Non-Federal Set- SBE: 100.00% Redhill Group (SBE Prime) $98,000 SBEPreference Survey Aside

607.) 3000001995 10/8/2014 Cisco Enterprise Kambrian Corporation $97,267 Non-Federal Set- SBE: 100.00% Kambrian Corporation $97,267 SBENetwork Switches Aside (SBE Prime)

608.) 3000001998 10/8/2014 HP and Dell Laser Printers Kambrian Corporation $22,484 Non-Federal Set- SBE: 100.00% Kambrian Corporation $22,484 SBEAside (SBE Prime)

609.) 3000002004 10/9/2014 Reprint Forms Peaks & Associates Inc. $9,948 Non-Federal Set- SBE: 100.00% Peaks & Associates Inc. $9,948 SBEAside (SBE Prime)

Page 55

Page 56: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

610.) 3000002072 10/1/2014 DBE Program Subrecipient GCAP Services $47,228 Non-Federal Set- SBE: 100.00% GCAP Services (SBE Prime) $47,228 SBEReporting Aside

611.) 3000002121 10/22/2014 Pre-Award Audit of Contract Lopez and Company LLP $18,000 Non-Federal Set- SBE: 100.00% Lopez and Company LLP $18,000 SBEPS4720-3004 Aside (SBE Prime)

612.) 3000002161 10/27/2014 Banner and Printing Services CR&A Custom $40,000 Non-Federal Set- SBE: 100.00% CR&A Custom (SBE Prime) $40,000 SBE - Crenshaw/LAX Aside

613.) 3000002162 10/27/2014 Banner and Printing Services CR&A Custom $40,000 Non-Federal Set- SBE: 100.00% CR&A Custom (SBE Prime) $40,000 SBE - Purple Line Aside

23.) PS45385000 11/28/2017 Transportation School Consulting CauseIMPACTS, LLC $302,692 Local 17% SBE: 89.56% CauseIMPACTS, LLC (SBE Prime) $271,092 SBEServices 3% DVBE: 3.01% Exit 4 Printing $9,100 DVBE

Da Vinci Institute $22,500

10.) PS44432001 11/16/2017 Communications Support ServicesArellano Associates $9,505,568 (NTE) Local 17% SBE: 17.00% Arellano Associates (SBE Prime) TBD SBEBench 3% DVBE: 3.00% VMA Communications TBD SBE

AVS Consulting TBD SBED. Barton Doyle TBD SBEJarrett Walker + Associates TBD SBETwo Hundred TBD SBEWilson, Sparling & Associates TBD SBEMatthew Zehner, LLCF dba Zehner Group TBD SBESunset Cliffs Productions TBD DVBECeltis Ventures TBDCerrell Associates TBDAbel Associates, Inc. dba ABL, Inc. TBDInterpreting Services International dba ISI TBDTranslation Services TBDT.D. Wang Advertising Group, LLC dba TDW+Co TBDYoung Communicaitons Group TBD

11.) PS44432002 11/16/2017 Communications Support ServicesCeltis Ventures $9,505,568 (NTE) Local 17% SBE: 17.00% Arellano Associates TBD SBEBench 3% DVBE: 3.00% The Walking Man TBD SBE

Proforma DVE Global Marketing TBD DVBEFlagship Marketing TBD DVBEDecision Strategy TBDWorld Language Communications TBDDavid Zaitz Photography TBD

12.) PS44432003 11/16/2017 Communications Support ServicesBarrios and Associates LLC $9,505,568 (NTE) Local 17% SBE 40.00% Barrios and Associates LLC (SBE Prime) TBD SBEBench dba Communications Lab 3% DVBE 5.00% The Walking Man TBD SBE

Brentwood Reprographics TBD DVBECirclepoint TBDDesigned to Win dba Bieber CommunicationsTBDAlta Planning + Design, Inc. TBDJ. Walin Opinion Research TBDWelocalize TBDThomas J. Story Photography TBD

13.) PS44432004 11/16/2017 Communications Support ServicesCommunity Connections, LLC$9,505,568 (NTE) Local 17% SBE: 17.00% Community Connections, LLC (SBE Prime)TBD SBEBench 3% DVBE: 3.00% Alas Media, Inc. TBD SBE

Allied Interpreting Service, Inc. TBD SBECapital Government Contract Specialists, Inc.TBD SBE

Page 56

Page 57: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

Cynthia M. Ruiz & Associates TBD SBEMagna Sol Corporation TBD SBEYoung Communications Group, Inc. TBD SBECapital Government Contract Specialists, Inc.TBD DVBEKleinfelder, Inc. AKA: KLF/SWE TBDAJ Design TBDArrow GTP TBDCardenas Strategy TBDConnected Consulting TBDHammons Strategies TBDPacific Market Research, LLC dba Latino DecisionsTBDSarai Group TBDJudith Norman Transportation Consultant

14.) PS44432005 11/16/2017 Communications Support ServicesConsensus Inc. $9,505,568 (NTE) Local 17% SBE: 17.00% Consensus Inc. (SBE Prime) TBD SBEBench 3% DVBE: 3.00% Translating Services, Inc. TBD SBE

Community Arts Resources TBD SBESaucedo Professional Group, Inc. TBD SBEImprenta Communications Group TBD SBEFriendly Filmworks TBD SBELA1, Inc. TBD SBEThe Glue TBD SBEDeborah Murphy Urban Design & Planning TBD SBEDeborah Murphy Urban Design & Planning TBD DVBEFairbank, Maslin, Maulin, Metz & AssociatesTBDBluEvolutionNow TBDFrazer Communications TBDMichael Kass dba The Center for Story & SpiritTBDKindal Gagan (JV) TBDOwlized TBDHeidi Druckler Dance Theatre TBDIDEO LP TBD

15.) PS44432006 11/16/2017 Communications Support ServicesDakota Communications $9,505,568 (NTE) Local 17% SBE 65.00% Dakota Communications (DBE Prime) TBD SBEBench 3% DVBE 3.00% 360 Total Concept Inc. TBD SBE

JKH Consulting TBD SBEV-Solutions Consulting TBD DVBEMozaic Media & Communications TBDMalcolm Media Advisors TBDCitrus Studios TBDKO & Martin TBDCCE Consulting TBDTulchin Research TBD

16.) PS44432007 11/16/2017 Communications Support ServicesETA Agency, Inc. $9,505,568 (NTE) Local 17% SBE 30.00% ETA Agency, Inc. (SBE Prime) TBD SBEBench 3% DVBE 3.00% Barrantes Enterprises, Inc. dba The Sierra GroupTBD SBE

Matthew Zehner, LLC dba Zehner Group TBD SBEZeldesign, dba ZHA-Harrison Associates TBD SBEThe Walking Man TBD SBEBedrosian & Associates TBD DVBEHiner & Partners, Inc. TBDCRC TBDResearch Now TBDAssistance in Marketing TBDMultiple Other Focus Group TBDSextant Research TBDJ-U Carter, Inc. dba J-U Public TBDRichard Schneider Language Services, Inc.TBD

Page 57

Page 58: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

Towne All Points TBDTRC Solutions, Inc. TBDDavid Gershwin Consulting TBD

17). PS44432008 11/16/2017 Communications Support ServicesLee Andrews Group $9,505,568 (NTE) Local 17% SBE: 80.00% Lee Andrews Group (SBE Prime) TBD SBEBench 3% DVBE: 3.00% DeAngelis Design TBD SBE

Del Richardson & Associates, Inc. TBD SBEEffect Strategies LLC TBD SBENorth Star Alliances TBD SBEParagon Language Services TBD SBETrifiletti Consulting TBD SBEMatthew Zehner, LLC dba Zehner Group TBD SBEJ-Rock Communications TBD DVBEProbolsky Research TBDGreenvale Consulting Services, LLC TBDWave Tech TBDTovar Geospatial Services TBD

18.) PS44432009 11/16/2017 Communications Support ServicesMBI Media $9,505,568 (NTE) Local 17% SBE: 80.00% MBI Media (SBE Prime) TBD SBEBench 3% DVBE: 3.00% ALAS Media, Inc. TBD SBE

North Star Alliances TBD SBEHouse 47 TBD SBEThe Walking Man TBD SBEContinental Interpreting TBD DVBEAJ Design TBDYoung Communications TBDEMC Research TBDKumamoto Associates TBDMarc Littman Strategic Communications TBDPondel Wilkinson, Inc. TBDPower On Digital, LLC TBDSir Speedy Printing TBD

19.) PS44432010 11/16/2017 Communications Support ServicesThe Robert Group $9,505,568 (NTE) Local 17% SBE: 33.00% The Robert Group (SBE Prime) TBD SBEBench 3% DVBE: 3.00% Effect Strategies, LLC TBD SBE

Trifiletti Consulting TBD SBEEmerson & Associates TBD SBEThe Walking Man TBD SBEVPE Public Relations TBD SBEBrentwood Reprographics, Inc. TBD DVBEKoppleman & Associates TBDLos Angeles Conservation Corp. TBDLA Creative Technologies TBDMilner Butcher Media Group TBDNeighborland, Inc. TBDNot So Square Design TBDRichard Schneider Language TBDThe Todd Group TBDDakeLuna TBDadCREASIONs, Inc. TBDGoodwin Simon Strategic Research TBDAlta Planning + Design TBE

OP42642000 11/16/2017 Purchase of Production Plasser American Corporation $3,378,292 Local 0% SBE: 0.00%Rail Tamper DVBE: 0.00%

OP88419000- 11/16/2017 Elevator and Escalator Lerch Bates $853,746 (NTE) Local 0% SBE: 0.00%3367 Inspection Services DVBE: 0.00%

MA27583000 11/16/2017 P2000 Friction Brakes Systems WABTEC Pasenger Transit $3,328,499 Local 0% SBE: 5.00% Altech Services $166,425 SBE

Page 58

Page 59: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

& Air Compressor Overhaul

28.) PS4044200 11/15/2017 Sepulveda Transit Corridor Sepulveda Mobility Partners $6,537,482 Local 24% SBE: 29.38% Terry A. Hayes Associates $174,471 SBEServices 3% DVBE: 3.07% Dunbar Transportation Consulting $82,728 SBE

Wagner Engineering & Survey $105,443 SBEConnectics Transportation Group, Inc $126,462 SBEV & A Inc. $165,080 SBED'Leon Consulting Engineers $210,800 SBETrifiletti Consulting Inc. $117,390 SBEBA Inc. $166,152 SBELENAX Construction Services, Inc. $406,064 SBESystem Metrics Group, Inc. $81,242 SBETranslink Consulting $119,866 SBEGeospatial Professional Solutions, Inc.$164,802 SBEMA Engineering $200,966 DVBEHNTB Corporation $1,892,515WSP USA Inc. $1,746,961Fehr & Peers $295,000AMEC Foster Wheeler Environmental Infra.$356,516Torti Gallas + Partners $100,025

Total SBE: $1,920,500Total DVBE: $200,966

Total: $6,512,483

32.) PS878320003041 11/16/2017 Systemwide Bus Network Cambridge Systematics, Inc. $1,295,762 Local 30% SBE: 60.43% Transportation Management & Design$732,998 SBERestructuring Plan Here LA $49,982 SBE

HDR Engineering $99,232Conifer Research, LLC $45,000

Total SBE: $782,980

22.) PS45835-3041000 11/16/2017 Vermont Transit Corridor IBI Group $792,951 Local 25% SBE: 25.00% The Robert Group $65,501 SBETechnical Study Phase 2,for Terry A. Hayes Associates $69,958 SBEthe Transportation Planning BA, Inc. $62,780 SBEDiscipline #1 under the Countywide Mott MacDonald $162,668Planning Services Bench Resource Systems Group Inc. $69,763

Total SBE: $198,239

4.) AE-30373002-TO3 11/13/2017 Highway Program Project Parsons Transportation Group $55,553 Local 27% SBE: 28.56% GPA Consulting $15,864 SBEDelivery Support Services 3% DVBE: 0.00%

3.) MA42801000 11/6/2017 P865/P2020 Blue Line LRV WABTEC Passenger Transit $519,419 Local 0% SBE: 5.00% Altech Services, Inc. $25,971 SBECoupler Assembly Overhaul 0% DVBE: 0.00%

2.) RQ46058-2 11/1/2017 Light Rail Vehicle (LRV) Bragg Inestment dba Heavy $149,750 Local 0% SBE: 0.00%Transporter Transport Inc. 0% DVBE: 0.00%

28.) OP852420003367 10/19/2017 Pest and Bird Control Services Pestmaster Services Inc. $ 3,906,123 (NTE) Local 12% SBE: 12.00% Willow Street Enterprises $154,445 SBE3% DVBE: 3.00% Willow Street Enterprises $38,611 DVBE

29.) OP838450003367 10/19/2017 Tree Trimming Services (excludingMariposa Landscapes Inc. $ 1,133,750 (NTE) Local 12% SBE: 12.00% International Environment Corp $237,810 SBEMetro Orange Line) 3% DVBE: 3.00% IECLT, Inc. $59,453 DVBE

30.) PS41161A 10/18/2017 Fixed Income Investment ServicesChandler Asset Management$ 3,584,067 (NTE) Local 0% SBE: 0.00%DVBE: 0.00%

31.) PS41161B 10/18/2017 Fixed Income Investment ServicesLM Capital Group $ 3,584,067 (NTE) Local 0% SBE: 0.00%

Page 59

Page 60: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

DVBE: 0.00%

32.) PS41161C 10/18/2017 Fixed Income Investment ServicesRBC Global Asset Management$ 3,584,067 (NTE) Local 0% SBE: 0.00%DVBE: 0.00%

33.) PS41161D 10/18/2017 Fixed Income Investment ServicesUS Bancorp Asset Management$ 3,584,067 (NTE) Local 0% SBE: 0.00%DVBE: 0.00%

34.) OP870110003367 10/9/2017 Backflow Devices Testing, Verne's Plumbing $596,775 Local 7% SBE: 93.97% Verne's Plumbing (SBE Prime) $560,789 SBEMaintenance & Repairs 3% DVBE: 6.03% PN Supply $35,986 DVBE

35.) OP41818 10/2/2017 Live Video Monitors for Safety Vision, LLC $708,280 Local 0% SBE 0.00%NABI Transit Buses DVBE 0.00%

36.) PS41870-3049 10/2/2017 I-605 Express Lanes Traffic & CDM Smith Inc. $721,240 Local 12% SBE 31.72% Redhill Group $228,777 SBERevenue Study (for the Environmental Planning/Engineering Disc. #2 under theP3 Techncal Bench)

37.) PS41932-3049 10/2/2017 I-605 Express Lanes Concept WSB USA, Inc. $695,709 Local 12% SBE 12.05% System Metrics Group, Inc. $83,848 SBEof Operation

31.) PS37647008 9/21/2017 Parking Enforcement Services SP+Municipal Services $4,599,446 Local 0% SBE 0.00%Transition

32.) PS42183000 9/20/2017 Metro Rideshare/Shared Innovative TDM Solutions, Inc. $2,960,445 Local 12% SBE 13.21% The Van Stratten Group Inc. $391,121 SBEMobility Program Support 3% DVBE 3.65% Bayfish Creative Management $108,008 DVBE

33.) C36395C1145-3 9/20/2017 Division 2 Transportation Simgel Co. Inc. $672,000 Local 7% SBE 71.00% Simgel Co. Inc. (SBE Prime) $477,153 SBEBuilding Roof Replacement 3% DVBE 3.13% Paving Net $21,000 DVBE

34.) C36457C1149-2 9/18/2017 Metal Canopies at Divisions 3, AP Construction, Inc. $2,178,000 Local 27% SBE 38.42% AP Construction, Inc. (SBE Prime) $836,835 SBE5, 9, 18 and CMF 3% DVBE 4.26% G & C Equipment Corp. $92,759 DVBE

35.) OP40688 9/18/2017 Vertical Lift Machines Gold McMurray Stern, Inc. $217,489 Local 0% SBE 0.00%Line Monrovia Warehouse DVBE 0.00%

36.) C40555C1150 9/13/2017 CNG Detection System EFS West $1,155,162 Local 20% SBE 30.30% Verduzco Electric $350,000 SBEUpgrade - Various Locations 3% DVBE 3.03% Pacific Industrial Electric $35,000 DVBE

37.) AE39641-3041000 8/10/2017 I-710 Livability: Complete Streets Fehr & Peers $477,573 Local 30% SBE 29.56% The Sierra Group $95,503 SBEand Active Transportation JM Diaz,Inc. $45,656 SBE

Total SBE: $141,159

Page 60

Page 61: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

37.) C36457C1149-2 9/18/2017 Metal Canopies at Divisions 3, AP Construction, Inc. $2,178,000 Local 27% SBE 38.42% AP Construction, Inc. (SBE Prime) $836,835 SBE5, 9, 18 and CMF 3% DVBE 4.26% G & C Equipment Corp. $92,759 DVBE

17.) PS20655 7/20/2017 Environmental Waste Handling TRC Solutions $42,274,495(NTE) Non-FTA 27% SBE: 27.00% A-Tech Consulting, Inc. TBD SBEand Environmentally Related 3% DVBE: 3.00% Calvada Surveying TBD SBE/DVBE

Construction Services GCAP Services TBD SBEHTS Environmental Services TBD SBEMartini Drilling Corp. TBD SBESunWest Engineering Constructors TBD SBEREM Engineering Co. TBD SBE/DVBE

The Sanberg Group TBD SBE/DVBE

The Sierra Group TBD SBE

18.) AE38849000 7/19/2017 I-605 From SR-91 South TranSystems Corporation $5,685,449 Non-FTA 22% SBE: 23.34% Advanced Civil Technologies $239 SBEStreet Improvements 3% DVBE: 4.31% Arellano Associates $65 SBE

Property Specialists, Inc. (CPSI) $35 SBEGeoAdvantec $275 SBEGuida Surveying, Inc. $246 SBEIntueor Consulting, Inc. $177 SBETatsumi and Partners, Inc. $97 SBEGlobal Environmental Network $93 DVBEMA Engineering $116 DVBE

Total SBE $1,135Total DVBE $210

19.) FY34649 7/20/2017 Unleaded Gasoline Pinnacle Petroluem, Inc. $3,886,980(NTE) Non-FTA 0% SBE: 0.00%

20.) MA39865000 7/20/2017 Near Zero Natural Gas Cummins Pacific, LLC $8,160,523(NTE) Non-FTA 0% SBE: 0.00%Fueled Engines

21.) OP-36037 7/17/2017 Hi-Rail Stake Bed Truck with Reynolds Buick, Inc. $405,545 Non-FTA 0% SBE: 0.00%Crane Small & Large

23) C1147-Construction 6/26/2017 Metro Building & Engineers Group $5,517,005 Non-FTA 20% SBE: 20.27% Pacific Lift and Equipment Co., Inc. $482,362 SBEMaintenance Annex Building 3% DVBE: 3.15% T-REX Demolition $130,000 SBE

Global Electric $500,000 SBEG & F Concrete Cutting $6,000 SBEG&C Equipment $290,000 DVBE

Total $1,408,362

24) C1147-Design 6/26/2017 Design Build of Division 1 Metro Building & Engineers Group $202,860 Non-FTA 27% SBE: 29.58% Kendall Plan & Design $40,000 SBEMaintenance Annex Building 3% DVBE: 3.45% Global Electric $20,000 SBE

Design Build of Division

Page 61

Page 62: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

Sugarpine Engineering $7,000 DVBETotal: $67,000

25) C36183C1144-2 6/20/2017 Simgel Co., Inc. $2,318,260 Non-FTA 27% SBE: 38.71% Simgel Co., Inc. $897,376 SBE3% DVBE: 3.17% PN Supply $122,600 DVBE

Total $1,019,976

26) AE36687 6/15/2017 Supplemental Engineering Mott MacDonald Group $20,000,000(NTE) Non-FTA 20% SBE: 17.00% Anil Verma TBD SBEServices (SES) Consultant DVBE: 3.00% Arellano Associates TBD SBEService Contract BA Inc. TBD SBE

Earth Mechanics TBD SBEEngineering Solutions TBD SBEGibson Transportation TBD SBELenax TBD SBEMcLean & Schultz TBD SBEMorgner Construction Management TBD SBEPacRim Engineering TBD SBERail Surveyors Engineers TBD SBETerry Hayes & Associates TBD SBEThe Alliance Group TBD SBEThe Solis Group TBD SBEWagner Engineering TBD SBEMA Engineering TBD DVBEAMEC Foster Wheeler TBDATS Consulting TBDCorrpro TBDDewberry TBDHNTB Corporation TBDIBI Group TBDInteractive Elements TBDLeland Saylor TBDParagon TBDPsomas TBD

27) OP778590003367 6/15/2017 Tunnel Washing Services Parkwood Landscape Maintenance$2,598,727 Non-FTA 10% SBE: 7.00% Briteworks $181,911 SBEDVBE: 3.00% IECLT, Inc. $77,962 DVBE

Total: $259,873

28) MA27585 6/15/2017 P2550 Light Rail Vehicle ORX $4,952,654 Non-FTA 0% SBE: 5.18% Vobecky Enterprises $256,384 SBEComponent Overhaul Traction Motor Service $715,392

Schunk Carbon Tech $10,632Jamaica Bearing Co. $783,360

Total: $1,765,768

29) C1155 6/10/2017 Division 9 Maintenance Annex Metro Building & Engineers Group $4,401,237 Non-FTA 27% SBE: 28.49% Global Electric $460,000 SBE

Bus Wash Systems at Reverse osmosis & 18 (D&B)

Page 62

Page 63: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

Building 3% DVBE: 3.01% T-Rex Demolition, Inc. $82,430 SBEG&C Equipment Corporation $1,135,000 SBESequoia Engineering Corporation $14,443 SBEKendall Planning & Design $16,000 SBEG&C Equipment Corporation $180,000 DVBESugarpine Engineering, Inc. $24,350 DVBE

Total $1,912,223

30) AE30673000 6/22/2017 Highway Program Project AECOM Technical Services$30,000,000(NTE) Non-FTA 30% SBE: 27.00% Arellano Associates TBD SBEDelivery Support Services DVBE: 3.00% Civil Works Engineers TBD SBEfor Los Angeles County Consensus TBD SBE

GPA Consulting TBD SBEGuida Surveying TBD SBEIntueor TBD SBEOptitrans TBD SBEPacRim Engineering TBD SBEPQM, Inc. TBD SBESHA Analytics TBD SBETatsumi & Partners TBD SBEV&A TBD SBEValue Management Strategies TBD SBEWKE TBD SBELeland Saylor Associates TBD DVBEAlta Environmental TBDCostin Outreach TBDGroup Delta Cosultants, Inc. TBDOverland, Pacific & Cutler TBDPsomas TBD

31) AE30673001 6/22/2017 Highway Program Project CH2M Hill $30,000,000(NTE) Non-FTA 30% SBE: 27.00% ACT Consulting Engineers TBD SBEDelivery Support Services DVBE 3.00% AP Engineering & testing, Inc. TBD SBEfor Los Angeles County Arellano Associates TBD SBE

EPIC Land Solutions TBD SBEGeo-Advantec, Inc. TBD SBEHout Construction Services TBD SBEMartini Drilling Corporation TBD SBEMinagar & Associates TBD SBEPacRim Engineering TBD SBERincon Consultants TBD SBESystem Metrics Group TBD SBETatsumi & Partners, Inc. TBD SBEWagner Engineering & Survey TBD SBEVirtek Company TBD DVBEMoffett & Nichol TBD

Page 63

Page 64: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

32) AE30673002 6/22/2017 Highway Program ProjectParsons Transportation Group, Inc. $30,000,000(NTE) Non-FTA 30% SBE: 27.00% Arellano Associates TBD SBEDelivery Support Services DVBE 3.00% Engineering Solutions TBD SBEfor Los Angeles County EPIC Land Solutions TBD SBE

GeoAdvantec, Inc. TBD SBEGPA Consulting TBD SBEGuida Surveying, Inc. TBD SBESHA Analytics, LLC TBD SBEWKE TBD SBEGlobal Environment Network TBD DVBEOhana Vets, Inc. TBD DVBEZMassociates Environmental Corp. TBD DVBE

33) PS36747 5/12/2017 Parking Enforcement ServicesSP Plus $4,599,446 Non-FTA 0% SBE: 0.00% SP + Municipal Services $4,599,446

32) PS27736000 5/17/2017 Bank Services Bank of America $2,648,909 Non-FTA 0% SBE: 0.00%

33) PS36627000 5/17/2017 Audit Services Bench BCA Watson Rice, LLP $11,440,000 (NTE) Non-FTA 30% SBE: 27.00% BCA Watson Rice, LLP (SBE Prime) TBD SBEFY2018 to FY2022 DVBE: 3.00% TBD TBD DVBE

34) PS36627001 5/17/2017 Audit Services Bench Choi Hong Lee & Kang LLP$11,440,000 (NTE) Non-FTA 30% SBE: 27.00% Choi Hong Lee & Kand LLP(SBE Prime) TBD SBEFY2018 to FY2022 DVBE: 3.00% TBD TBD DVBE

35) PS36627002 5/17/2017 Audit Services Bench Chung and Chung Accountancy$11,440,000 (NTE) Non-FTA 30% SBE: 27.00% Chung & Chung Accountancy (SBE Prime) TBD SBEFY2018 to FY2022 DVBE: 3.00% TBD TBD DVBE

36) PS36627003 5/17/2017 Audit Services Bench Conrad, LLP $11,440,000 (NTE) Non-FTA 30% SBE: 70.00% Conrad, LLP (SBE Prime) TBD SBEFY2018 to FY2022 DVBE: 30.00% TBD TBD DVBE

37) PS36627004 5/17/2017 Audit Services Bench CPC Financial, Inc. $11,440,000 (NTE) Non-FTA 30% SBE: 27.00% CPC Financial, Inc. (SBE Prime) TBD SBEFY2018 to FY2022 DVBE: 3.00% TBD TBD DVBE

38) PS36627005 5/17/2017 Audit Services Bench Grant Thornton, Inc. $11,440,000 (NTE) Non-FTA 30% SBE: 27.00% Lopez & Company LLP TBD SBEFY2018 to FY2022 DVBE: 3.00% 347 Group, Inc. TBD DVBE

39) PS36627006 5/17/2017 Audit Services Bench KNLSupport Services $11,440,000 (NTE) Non-FTA 30% SBE: 27.00% KNL Support Services (SBE Prime) TBD SBEFY2018 to FY2022 DVBE: 3.00% TBD TBD DVBE

40) PS36627007 5/17/2017 Audit Services Bench KPMG, LLP $11,440,000 (NTE) Non-FTA 30% SBE: 27.00% KPMG, LLP (SBE Prime) TBD SBEFY2018 to FY2022 DVBE: 3.00% TBD TBD DVBE

41) PS36627008 5/17/2017 Audit Services Bench Lopez and Company, LLP $11,440,000 (NTE) Non-FTA 30% SBE: 30.00% Lopez and Company, LLP (SBE Prime) TBD SBEFY2018 to FY2022 DVBE: 3.00% TBD TBD DVBE

42) PS36627009 5/17/2017 Audit Services Bench Macias Gini O'Connell, LLP$11,440,000 (NTE) Non-FTA 30% SBE: 27.00% Macias Gini & O'Connell LLP (SBE Prime) TBD SBEFY2018 to FY2022 DVBE: 3.00% TBD TBD DVBE

Page 64

Page 65: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

43) PS36627010 5/17/2017 Audit Services Bench Moss Adams, LLP $11,440,000 (NTE) Non-FTA 30% SBE: 27.00% Moss Adams, LLP (SBE Prime) TBD SBEFY2018 to FY2022 DVBE: 3.00% TBD TBD DVBE

44) PS36627011 5/17/2017 Audit Services Bench Qiu Accountancy Corporation$11,440,000 (NTE) Non-FTA 30% SBE: 27.00% Qiu Accountancy Corporation(SBE Prime) TBD SBEFY2018 to FY2022 DVBE: 3.00% TBD TBD DVBE

45) PS36627012 5/17/2017 Audit Services Bench RTJ, CPA, P.C. $11,440,000 (NTE) Non-FTA 30% SBE: 97.00% RTJ CPA, P.C. (SBE Prime) TBD SBEFY2018 to FY2022 DVBE: 3.00% TBD TBD DVBE

46) PS36627013 5/17/2017 Audit Services Bench Simpson and Simpson $11,440,000 (NTE) Non-FTA 30% SBE: 27.00% Qiu Accountancy Corporation TBD SBEFY2017 to FY2022 DVBE: 3.00% Dennis Nelson CPA APC TBD DVBE

47) PS36627014 5/17/2017 Audit Services Bench Susan Hum, CPA $11,440,000 (NTE) Non-FTA 30% SBE: 100.00% Susan Hum, CPA (SBE Prime) TBD SBEFY2017 to FY2022 DVBE: 3.00% TBD TBD DVBE

48) PS36627015 5/17/2017 Audit Services Bench Talson Solutions, LLC $11,440,000 (NTE) Non-FTA 30% SBE: 95.00% Talson Solutions, LLC (SBE Prime) TBD SBEFY2017 to FY2022 DVBE: 5.00% Compendium International TBD DVBE

49) PS36627016 5/17/2017 Audit Services Bench The David Lewis Company$11,440,000 (NTE) Non-FTA 30% SBE: 27.00% The David Lewis Company, LLC(SBE Prime)TBD SBEFY2017 to FY2022 DVBE: 3.00% TBD TBD DVBE

50) PS36627017 5/17/2017 Audit Services Bench TAP International $11,440,000 (NTE) Non-FTA 30% SBE: 27.00% TAP International (SBE Prime) TBD SBEFY2017 to FY2022 DVBE: 3.00% TBD TBD DVBE

51) PS36627018 5/17/2017 Audit Services Bench Vasquez and Company, LLP$11,440,000 (NTE) Non-FTA 30% SBE: 27.00% BCA Watson Rice LLP TBD SBEFY2017 to FY2022 DVBE: 3.00% Daniel R. Arguello TBD DVBE

52) C1081 5/18/2017 Metro Blue Line Signaling Mass Electric Construction Co. $8,831,000 Non-FTA 15% SBE: 12.00% Wagner Engineering $120,102 SBERehabilitation and DESIGN DVBE 3.00% JM Fi ber Optics $259,631 SBEOperational Improvements Fariba Nation Consulting $679,987 SBEProject MA Engineering $264,930 DVBE

Total 4,390,590

53) C1081 5/18/2017 Metro Blue Line Signaling Mass Electric Construction Co. $72,682,000 Non-FTA 15% SBE: 12.00% TSG Enterprises Inc. dba The Solis Group$152,632 SBERehabilitation and CONSTRUCTION DVBE 3.00% TBD $8,569,208 SBEOperational Improvements TBD $2,180,460 DVBEProject Total $7,836,360

23) AE30673000 4/19/2017 Highway Program Project AECOM Technical Services, Inc.$30,000,000 (NTE) Non-FTA 30% SBE: 27.00% Arellano Associates TBD SBEDelivery Support Services DVBE: 3.00% Civil Works Engineers TBD SBEfor Los Angeles County Consensus TBD SBE

GPA Consulting TBD SBEGuida Surveying TBD SBEIntueor TBD SBE

Page 65

Page 66: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

Optitrans TBD SBEPacRim Engineering TBD SBEPQM, Inc. TBD SBESHA Analytics TBD SBETatsumi & Partners TBD SBEV&A TBD SBEValue Mangement Strategies TBD SBEWKE TBD SBELeland Saylor Associates TBD DVBE

24) AE30673001 4/19/2017 Highway Program Project CH2M Hill $30,000,000 (NTE) Non-FTA 30% SBE: 27.00% ACT Consulting Engineers TBD SBEDelivery Support Services DVBE: 3.00% AP Engineering & Testing TBD SBEfor Los Angeles County Arellano Associates TBD SBE

EPIC Land Solutions TBD SBEGeo-Advantec, Inc. TBD SBEHout Contruction Services TBD SBEMartini Drilling Corporation TBD SBEMinagar & Associates TBD SBEPacRim Engineering TBD SBERincon Consultants TBD SBESystem Metrics Group TBD SBETatsumi & Partners, Inc. TBD SBEWagner Engineering & Survey TBD SBEVirtek Company TBD DVBE

25) AE30673002 4/19/2017 Highway Program Project Parsons Transportation Group, Inc.$30,000,000 (NTE) Non-FTA 30% SBE: 27.00% Arellano Associates TBD SBEDelivery Support Services DVBE: 3.00% Engineering Solutions TBD SBEfor Los Angeles County EPIC Land Solutions TBD SBE

GeoAdvantec, Inc. TBD SBEGPA Consulting TBD SBEGuida Surveying, Inc. TBD SBESHA Analytics, LLC TBD SBEWKE TBD SBEGlobal Environmental Network TBD DVBEOhana Vets, Inc. TBD DVBEZMassociates Environmental Corp TBD DVBE

26) OP3614100 4/20/2017 Red Line Vehicle Evaluation Knorr Brake Company, LLC $908,481 Non-FTA 0% SBE: 0.00%of On-Baoard Mist FireSupression System Prototype

27) PS29117000 4/19/2017 TAP Card Manufacturing ASK-intTag, LLC $13,846,050 (NTE) Non-FTA 0% SBE: 0.00%Fulfillment Services

28) PS29117001 4/19/2017 TAP Card Manufacturing ASK-int Tag, LLC $30,000 (NTE) Non-FTA 0% SBE: 0.00%

Page 66

Page 67: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

Fulfillment Services

29) PS29117002 4/19/2017 TAP Care Manufacturing Oberthur Technologies of $20,835 (NTE) Non-FTA 0% SBE: 0.00%Fulfillment Services America Corp.

30) PS29117003 4/19/2017 TAP Care Manufacturing Oberthur Technologies of $15,454,271 (NTE) Non-FTA 0% SBE: 0.00%Fulfillment Services America Corp.

31) PS29117004 4/19/2017 TAP Care Manufacturing Oberthur Technologies of $4,437,300 (NTE) Non-FTA 0% SBE: 0.00%Fulfillment Services America Corp.

32) PS29117005 4/19/2017 TAP Care Manufacturing Gieseck & Devrient Mobile $11,431,629 (NTE) Non-FTA 0% SBE: 0.00%Fulfillment Services Security America, Inc.

33) PS37755-1 4/20/2017 Consultant Bench For Rail CH2M Hill, Inc. $8,027,100 (NTE) Non-FTA 20% SBE: 17.00% Parthenon Corporation TBD SBEVehicle & Systems DVBE: 3.00% LKG-CMC TBD SBEEngineering Support Virginkar and Associates TBD SBE

Turner Engineering Corporation TBD SBECapitol Gov't Contract Specialist TBD SBEE.W. Moon, In.c TBD SBECivil Earth Engineering TBD SBECapitol Gov't Contract Specialist TBD DVBE

34) PS37755-2 4/20/2017 Consultant Bench For Rail LTK Engineering $8,027,100 (NTE) Non-FTA 20% SBE: 17.00% Capitol Gov't Contract Specialists TBD SBEVehicle & Systems DVBE: 3.00% DAV-LEAR Systems, Inc. TBD SBEEngineering Support Ramos Consulting Services TBD SBE

Turner Engineering Inc. TBD SBEVirginkar & Associates TBD SBEDAV-LEAR Systems, Inc. TBD DVBE

35) PS37755-3 4/20/2017 Consultant Bench For Rail Mott MacDonald LLC $8,027,100 (NTE) Non-FTA 20% SBE: 17.00% LKG-CMC TBD SBEVehicle & Systems DVBE: 3.00% NBA Engineering TBD SBEEngineering Support Pacific Railway Enterprises TBD SBE

Raul Bravo + Associates TBD SBEVirginkar and Associates TBD SBEPSM Associates TBD DVBE

36) PS37755-4 4/20/2017 Consultant Bench For Rail Parsons Brinkerhoff, Inc. $8,027,100 (NTE) Non-FTA 20% SBE: 17.00% Capitol Gov't Contract Specialists TBD SBEVehicle & Systems DVBE: 3.00% Casamar Group TBD SBEEngineering Support Information Design Consultants TBD SBE

LKG-CMC, Inc. TBD SBEPacific Railways Enterprises TBD SBESystems Consulting LLC TBD SBETurner Engineering Corporation TBD SBEVirginkar & Associates TBD SBE

Page 67

Page 68: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

VP Engineering TBD SBECapitol Gov't Contract Specialists TBD DVBE

37) PS37755-5 4/20/2017 Consultant Bench For Rail STV, Inc. $8,027,100 (NTE) Non-FTA 20% SBE: 17.00% Capitol Gov't Contract Specialist TBD SBEVehicle & Systems DVBE: 3.00% Casamar Group TBD SBEEngineering Support dHA + CALPEC TBD SBE

ERJ Engineering Consultants TBD SBEE.W. Moon, Inc. TBD SBELKG-CMC, Inc. TBD SBEVirginkar & Associates TBD SBEVP Engineering TBD SBECapitol Gov't Contract Specialist TBD DVBE

38) PS73072000 4/1/2017 L.A. County Metrolink Parsons Brinckerhoff, Inc. $739,405 Non-FTA 25% SBE: 26.30% Michelle Kirkhoff Consulting, LLC $5,028 SBERehabilitation & Renovation Rail Surveyors & Engineers, Inc. $95,014 SBEStudy Pacific Railway Enterprises, Inc. $94,422 SBE

Total: $739,405

39) OP-32548 4/18/2017 Metro Green Line UPS for Nitech, Inc. $384,811 Non-FTA 2% SBE: 0.00%TCC Room

614.) PS67785000 3/15/2017 Bicycle Education Safety Team Estolano LeSar Perez Advisors $2,308,001 Non-FTA 11% SBE: 36.23% ELPA (SBE Prime) $836,250 SBEDVBE: 4.24% Got Bikes LLC $162,951 DVBE

Los Angeles Bicycle Coalition $349,225Multicultural Communities for Mobility $276,871BikeSGV $338,345CICLE $344,360

Total $2,308,002

615.) PS-7248-4000 2/27/2017 LexRay Site License for LexRay $475,000 Non-FTA 0% SBE: 0.00%MDT System & Union StationCCTV

616.) C1137 2/14/2017 MEP Projects & Various Larry Brown Construction $675,432 Non-FTA 30% SBE: 26.97% Reyes & Sons Electric $182,150 SBEFacilities G&G Air Conditioning $169,705

Valley Power $56,576Domingos Plumbing $85,239

Total All Subs $493,670

617.) OP-6753-8000 1/19/2017 Hybrid & Electric Sedans Penske Motor Group $2,936,769 Non-FTA 0% SBE: 0.00%

619.) MA-6274900 1/19/2017 A650 Friction Brake Wabtec Passenger Transit $2,857,400 Non-FTA 2% SBE: 2.00% Altech Services $179,065 SBESystem Overhaul

Page 68

Page 69: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

620.) OP-6714-3000 1/19/2017 Uniform Rental Services Prudential Overall Supply $3,372,104 Non-FTA 8% SBE: 2.70% Becnel Uniforms $91,047 SBE-3367 Program DVBE: 6.30% Image Gear dba Reflective Stripe $212,443 DVBE

Total $303,489

621.) OP-33563 12/21/2016 120KW Portable Generators Gonneville Inc. $160,427 Non-Federal 0% SBE: 0.00%

622.) OP-33563 11/29/2016 120KW Portable Generators Gonneville Inc. $160,427 Non-Federal 0% SBE: 0.00%

623.) OP608960027253 11/20/2016 Citation Processing Services Axiom xCell, Inc. $1,586,533 Non-Federal 10% SBE: 87.69% Axiom xCell, Inc. $1,391,206 SBEDVBE 7.39% Choice Technical $117,196 DVBE

624.) PS6394500 11/17/2016 TAP System Enhancements Vertiba, Inc. $4,750,000 Non-Federal 0% SBE: 0.00%

625.) OP-23788 11/16/2016 FiPlex Bi-directional Amplifier Advanced Electronics $224,105 Non-Federal 0% SBE: 0.00%

626.) C27167C1125R 11/2/2016 Metro Gold Line Pasadena AP Construction $461,000 Non-Federal 30% SBE: 94.25% AP Construction $361,486 SBEStation ADA Concrete Ramp Robnett Electric $73,000 SBEand Metro Red Line Universal Figueroa Iron Works $26,514City Station Knock Out Panel SBE Total Only $434,486

Total $461,000

627.) PS-28909 10/20/2016 Metro Pilot Crenshaw LAX Del Richardson & Associates $849,008 Non-Federal 23% SBE: 62.37% Del Richardson & Associates $529,484 SBETransit Project Business DVBE: 3.09% It Is, LLC $26,267 DVBESolutions Center Vermont Slauson Economic $163,419

Soutwest Advancement Solutions $89,629Los Angeles Urban League $40,208

Total $849,007

628.) PS-4010-3041- 9/22/2016 Quality of Life Study Fehr & Peers $399,213 Non-Federal 15% SBE: 15.14% Cityworks Design $34,008 SBEU-01 BAE $26,443 SBE

Total All Subs $60,451

629.) FSP57678900 9/15/2016 Metro Freeway Service Freeway Towing $5,255,700 Non-Federal 10% SBE: 7.23% Manatek Insurance Services $460,000 SBEB60 Patrol DVBE: 3.42% Casanova Towing Equipment $357,000 SBE

Oasis Fuels $300,000 DVBEW2 Fuels $700,000Tow Industries $980,000Priority Staffing $1,595,000

SBE Total Only $817,000

DVBE Total Only $300,000

Total All Subs $4,392,000

630.) FSP57678900 9/15/2016 Metro Freeway Service All City Towing $4,741,020 Non-Federal 10% SBE: 7.00% Casanova Towing Equipment $331,871 SBEB60 Patrol DVBE: 3.24% Arciero and Sons $110,000 DVBE

Page 69

Page 70: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

Image Gear $43,481 DVBEOasis Fuels $102,320 DVBEWarrior Fuels $596,871

SBE Total Only $331,871

DVBE Total Only $255,801

Total All Subs $1,184,543

631.) PS-26132 9/14/2016 Joint Development Bench IBI Group TBD Non-Federal 28% SBE: 25.00% Katherine Padilla & Associates TBD SBEDVBE: 3.00% Ways2Go TBD SBE

CDS Consulting TBD DVBE

632.) PS-26132 9/14/2016 Joint Development Bench Community Arts Resource TBD Non-Federal 28% SBE: 97.00% Community Arts Resource Center TBD SBECenter DVBE: 3.00%

633.) PS-26132 9/14/2016 Joint Development Bench MBI Media TBD Non-Federal 28% SBE: 25.00% Magna Sol Corp TBD SBEDVBE: 3.00% Casamar Group TBD DVBE

634.) PS-26132 9/14/2016 Joint Development Bench MBI Media TBD Non-Federal 28% SBE: 25.00% Magna Sol Corp TBD SBEDVBE: 3.00% Casamar Group TBD DVBE

635.) PS-26132 9/14/2016 Joint Development Bench Gwynne Pugh Urban Studio TBD Non-Federal 28% SBE: 50.00% Gwynne Pugh Urban Studio TBD SBEDVBE: 3.00% Compendium International TBD SBE

Continental Interpreting Services TBD DVBE

636.) PS-26132 9/14/2016 Joint Development Bench Estolano LeSar Perez Advisors TBD Non-Federal 28% SBE: 97.00% Estolano LeSar Perez Advisors TBD SBEDVBE: 3.00%

637.) PS-26132 9/14/2016 Joint Development Bench The Robert Group TBD Non-Federal 28% SBE: 25.00% The Robert Group TBD SBEDVBE: 3.00%

638.) PS-26132 9/14/2016 Joint Development Bench HR&A Advisors, Inc. TBD Non-Federal 28% SBE: 25.00% HR&A Advisors, Inc. TBD SBEDVBE: 3.00%

639.) PS-26132 9/14/2016 Joint Development Bench Epic Land Solutions TBD Non-Federal 28% SBE: 97.00% Epic Land Solutions TBD SBEDVBE: 3.00%

640.) PS-26132 9/14/2016 Joint Development Bench MIG, Inc. TBD Non-Federal 28% SBE: 25.00% The Sierra Group TBD SBEDVBE: 3.00% Pulsar Advertising TBD SBE

Casamar Group TBD DVBE

641.) PS-26132 9/14/2016 Joint Development Bench Strategic Economic TBD Non-Federal 28% SBE: 25.00% Strategic Economic TBD SBEDVBE: 3.00%

642.) PS-26132 9/14/2016 Joint Development Bench BAE Urban Economics TBD Non-Federal 28% SBE: 97.00% BAE Urban Economics TBD SBEDVBE: 3.00%

Page 70

Page 71: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

643.) PS-26132 9/14/2016 Joint Development Bench Keyser Marston Associates TBD Non-Federal 28% SBE: 25.00% The Maxima Group TBD SBEDVBE: 3.00%

644.) PS-26132 9/14/2016 Joint Development Bench ZELDESIGN TBD Non-Federal 28% SBE: 30.00% ZELDESIGN TBD SBEDVBE: 3.00% Casamar Group TBD DVBE

645.) PS-26132 9/14/2016 Joint Development Bench Los Angeles Neighborhood Initiative TBD Non-Federal 28% SBE: 25.00%DVBE: 3.00%

646.) PS-26132 9/14/2016 Joint Development Bench Lee Andrews Group, Inc. TBD Non-Federal 28% SBE: 97.00% Lee Andrews Group, Inc. TBD SBEDVBE: 3.00%

647.) PS-26132 9/14/2016 Joint Development Bench The Maxima Group, LLC TBD Non-Federal 28% SBE: 65.00% The Maxima Group, LLC TBD SBEDVBE: 3.00%

648.) PS-26132 9/14/2016 Joint Development Bench Studio One Eleven TBD Non-Federal 28% SBE: 25.00% Sussman/Preza & Co. TBD SBEDVBE: 3.00%

649.) PS-26132 9/14/2016 Joint Development Bench Gruen Associates TBD Non-Federal 28% SBE: 25.00%DVBE: 3.00%

650.) PS-26132 9/14/2016 Joint Development Bench Cityworks Design TBD Non-Federal 28% SBE: 25.00% Cityworks Design TBD SBEDVBE: 3.00%

651.) PS-26132 9/14/2016 Joint Development Bench KTGY Group, Inc. TBD Non-Federal 28% SBE: 25.00%DVBE: 3.00%

652.) PS-26132 9/14/2016 Joint Development Bench Johnson Fain TBD Non-Federal 28% SBE: 25.00% Sussman/Preza & Co. TBD SBEDVBE: 3.00% Schwab Engineering TBD DVBE

PacRim Engineering TBD SBERoshain and Associates TBD SBEGlumac TBD SBEACE Structural Engineering Group TBD SBELeland & Saylor Associates TBD DVBEILA Green TBD SBEMelendrez TBD SBEGibson Transportation TBD SBEBASE Architecture Planning TBD SBEKPFF TBD

PJ Consulting TBD

Saiful Bouquet TBD

653.) PS-29406 9/12/2016 Disparity Study 2016 BBC Research and Consulting $437,988 Non-Federal 30% SBE: 27.17% GCAP Services $67,000 SBEDVBE: 3.01% PDA Consulting Group $37,000 SBE

Page 71

Page 72: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

Zann & Associates $15,000 SBEBohica Advisors $13,200 DVBECustomer Research International $30,000Holland & Knight $30,000

SBE Total Only $119,000

DVBE Total Only $13,200

Total All Subs $192,200

654.) C23949C1123-2 8/31/2016 Hoist Replacement at AP Construction $1,396,000 Non-Federal 25% SBE: 97.97% AP Construction $668,961 SBEDivision 8 and 18 Soutwest Lift $670,559 SBE

Robnett Electric $28,200 SBETechniquex $28,280

SBE Total Only $1,367,720

Total All Subs $1,396,000

655.) C26775C1131 8/19/2016 Pavement Replacement at RC Becker and Son $1,983,937 Non-Federal 30% SBE: 0.00% V&E Tree Service $16,000Division 8, El Monte Transit Alcorn Fence Company $10,470Center, and Orange Line Precision Cold Planing, Inc. $50,632Reseda Station H&S Electric $14,732

Total all Subs $91,834

656.) OP5608900 8/18/2016 Landscape and Irrigation Woods Maintenance $1,423,475 Non-Federal 25% SBE: 25.43% Far East Landscape $361,920 SBEGold Line Foothill Extension

657.) OP5766200 8/18/2016 Fire Life Safety Systems Link-Nilsen Corp $2,353,379 Non-Federal 10% SBE: 11.00% Certified Testing Specialists $258,872 SBETesting and Certification

658.) OP4939100 8/18/2016 Elevator Escalator Mitsubishi Electric US $75,077,960 Non-Federal 10% SBE: 7.51% Elevators Etc. LP $2,516,898 SBEMaintenance Services DVBE: 3.05% Lift Solutions $54,000 SBE

Elite Escalator $2,768,308 SBEExcelsior Elevator Corporation $1,684,901 SBEVintage Elevator Services, Inc. $2,585,970 DVBE

SBE Total $7,024,107

DVBE Total $2,585,970

659.) PS520450021002 8/18/2016 Regional Integration of Parsons Transportation Group $4,725,226 Non-Federal 20% SBE: 17.96% Sarakki Associates $774,217 SBEIntelligent Transportation (RITTS) DVBE: 5.17% System Metrics Group $76,254 SBEModernization Virtek Company $244,421 DVBE

USC $49,485SBE Total $850,471

Total All Subs $1,144,377

660.) OP-23455-200 6/30/2016 4x4 Super Duty Trucks with Reynolds Buick $536,463 Non-Federal 0% SBE: 0.00%Hi-Rail Gear

Page 72

Page 73: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

661.) PS5081600 6/14/2016 Federal Legislative Advocacy Kadesh & Associates $283,178 Non-Federal 0% SBE: 0.00%Program

662.) PS5081900 6/14/2016 Federal Legislative Advocacy Holland & Knight LLP $300,000 Non-Federal 0% SBE: 0.00%Program

663.) PS5082100 6/14/2016 Federal Legislative Advocacy Squire Patton Boggs (US) LLP $504,000 Non-Federal 0% SBE: 0.00%Program

664.) PS5295500 6/23/2016 So Cal 511 Traveler Information IBI Group $4,150,000 Non-Federal 25% SBE: 22.00% Zcubed, Inc. $913,077 SBESystem Next Generation DVBE: 3.01% Continental Interpresting Services $125,094 DVBE

Total All Subs $1,038,171

665.) PS527590024649 6/15/2016 Parking Guidance System Parking Sense USA $3,599,934 Non-Federal 10% SBE: 8.33% JD Enterprises $300,000 SBEDVBE: 14.32% Converse Construction $515,466 DVBE

Total All Subs $815,466

666.) AE5204200 6/16/2016 A&E Services for Project HDR Engineering $34,030,555 Non-Federal 25% SBE: 35.40% Arellano Associates $490,040 SBEApproval and Environmental DVBE: 3.03% Civil Works $91,882 SBEDocument on 605 and 60 D'Leon Consulting $64,658 SBE

Earth Mechanics $193,974 SBEGeo-Advantec, Inc. $136,122 SBEGPA Consulting Inc. $4,029,218 SBEGuida Surveying $837,152 SBEIntueor Consulting, Inc. $132,719 SBETatsumi & partners, Inc. $176,959 SBET&T Public Relations $258,632 SBEWKE, Inc. $5,635,460 SBECalvada Surveying $262,035 DVBEGlobal Environmental Network $404,964 DVBEZmassociates Environmental $364,127 DVBE

SBE Total Only $12,046,816

DVBE Total Only $1,031,126

Total All Subs $13,077,942

667.) MA5246200 6/16/2016 Electric Cooling Fan Systems Modine Manufacturing $2,758,124 Non-Federal 0% SBE: 0.00%

668.) OP-2346800 5/25/2016 Cargo Vans Fairway Ford $168,302 Non-Federal 0% SBE: 0.00%

669.) OP-4260900 5/19/2016 Commerical and Industrial Specialty Doors + Automation $1,860,675 Non-Federal 10% SBE: 0.00%Door Repair and Services

670.) PS-21904205074 5/19/2016 Gas Detection System Reliable Monitoring Systems $1,159,860 Non-Federal 5% SBE: 0.00%

671.) OP-4978800 5/19/2016 Blue Line Back Up Power American Power Systems LLC $1,003,974 Non-Federal 0% SBE: 0.00%

Page 73

Page 74: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

672.) OP-2339800 5/6/2016 Dual Fuel Powered Sunrise Forklifts $282,273 Non-Federal 0% SBE: 0.00%Pneumatic Forklifts

673.) PS-4443900 4/14/2016 FTA Platform Track Intrusion Honeywell International $1,553,050 Non-Federal 0% SBE: 0.00%Detection System

674.) OP-14615 4/14/2016 Metro Blue Line Wheel Truing Hegenscheidt - MFD Corp. $1,418,117 Non-Federal 0% SBE: 0.00%Machine

675.) AE-12334 4/13/2016 Project Approval & Environ. Michael Baker International $7,762,669 Non-Federal 20% SBE: 17.00% Brentwood Reprographics $123,305 DVBEDocument for SR-91 I-605 DVBE: 3.00% The Sanberg Group $46,842 DVBE

Southern California Soil & Testing $62,746 DVBEACT Consulting Engineers $369,351 SBEArellano Associates $279,165 SBEEarth Mechanics $125,889 SBEGPA Consulting $316,866 SBEIntueor Consulting $196,667 SBEV&A Inc. $21,505 SBEValue Management Strategies $41,002 SBEWKE, Inc. $563,592 SBECambridge Systematics $424,963LSA Associates $1,315,957Overland Pacific and Cutler $29,280

DVBE Total Only $232,893

SBE Total Only $1,914,037

Total All Subs $3,917,130

676.) AE-15383 4/13/2016 I-5 North Plans Specifications CH2M Hill $30,975,446 Non-Federal 23% SBE: 20.57% Calvada Surveying, Inc. $289,242 DVBEand Estimate DVBE: 3.41% Global Environmental Network, Inc. $315,345 DVBE

USA-EPC Group, Inc. $191,152 DVBEVirtek Company $261,304 DVBEAP Engineering & Testing $112,219 SBEMartini Drilling Group $355,980 SBEACT Consulting Engineers, Inc $748,210 SBEArellano Associates $281,805 SBECivil Works Engineers, Inc. $411,357 SBEFPL and Associates, Inc. $463,889 SBEGuida Surveying, Inc. $804,404 SBEThe Robert Group $33,364 SBETatsumi and Partners, Inc. $574,984 SBEV & A, Inc. $330,293 SBEWagner Engineering and Survey $273,570 SBEWKE, Inc. $1,982,507 SBEKoa Consulting $335,726

Page 74

Page 75: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

Parsons Brinckerhoff Group, LLC $5,546,576Parsons Transportation Group, Inc. $5,678,226Fixing Angelenos Stuck in Traffic $15,000

DVBE Total Only $1,057,043

SBE Total Only $6,372,582

Total All Subs $19,005,153

677.) C1128 4/15/2016 Parking Lot Refurbishments Extreme Safety $859,400 Non-Federal 30% SBE: 14.01% Alameda Construction $23,360 SBENoho, Artesia, and Wardlow Advantage Demolition $97,053 SBE

Interstate Striping and Signs $132,000Mission Paving $150,190

SBE Total Only $120,413

Total All Subs $402,603

678.) OP-2344600 4/25/2016 One Ton Utility Trucks Fairway Ford Sales $825,449 Non-Federal 0% SBE: 0.00%

679.) C23414C1126 3/22/2016 Floor Coating Systems AP Construction $2,014,374 Non-Federal 30% SBE: 30.28% AP Construction (SBE Prime) $610,030 SBEat Div 3, 5, 7, 8 & 10 Performance Abatement $9,944

Techniquex, Inc. $1,332,400Summit Painting $62,000

SBE Total Only $610,030

Total All Subs $1,404,344

680.) PS-21676A 3/17/2016 Consolidated Audit Program Vasquez & Company $2,341,648 Non-Federal 30% SBE: 27.00% BCA Watson Rice $632,295 SBEPackage A DVBE: 3.00% Daniel Arguello $70,275 DVBE

Total $702,570

681.) PS-21676B 3/17/2016 Consolidated Audit Program Simpson & Simpson $3,772,500 Non-Federal 30% SBE: 30.00% QUI Accountancy Corp $1,131,750 SBEPackage B DVBE: 3.00% Dennis Nelson $113,175 DVBE

Total $1,244,925

682.) AE-12007 3/17/2016 Support Services for Ghirardelli Associates $7,201,020 Non-Federal 35% SBE: 99.04% Ghirardelli Associates (SBE Prime) $5,989,591 SBESoundwall 11 MNS Engineers $918,180 SBE

Safework $82,387 SBEZT Consulting Group $141,958 SBENinyo & Moore $68,904

SBE Total Only $7,132,116

Total All Subs $7,201,020

683.) OP-17007 3/17/2016 Bus Operator Barrier NABI Parts $5,443,449 Non-Federal 0% SBE: 0.00%Installation Kits

684.) AE-451150019779 3/17/2016 Emergency Sercurity HDR Engineering $5,936,638 Non-Federal 20% SBE: 30.25% Spectrum Video $435,291 SBEOperations Center DVBE: 3.04% W2 Design $212,210 SBE

Intueor Consulting $105,182 SBE

Page 75

Page 76: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

Jacobus & Yuang, Inc. $159,963 SBEMBI $114,929 SBEPacific Coast Locators $11,959 SBEPremier Management Corp $76,301 SBEQuinnWilliams $60,005 SBESAA Associates $20,463 SBES&K Engineers $599,435 SBECalvada Surveying $24,656 DVBESchwab Engineering $155,584 DVBEAMEC Foster Wheeler $31,827Claris Strategy $191,429E3 Consulting $25,656Hinman $176,021Macro Ross Bar $146,114Saiful Bouquet $357,052

SBE Total Only $1,795,738

DVBE Total Only $180,240

Total All Subs $2,904,077

685.) C17118 3/3/2016 Environmental Graphics at Metro Builders & Engineering $2,414,000 Non-Federal 20% SBE: 39.31% Visible Graphics $949,000 SBEHarbor Gateway Transit Group, Ltd.Center

686.) PS-18445 2/18/2016 Bus Pest Control Isotech Pest Management $4,961,610 Non-Federal 10% SBE: 7.00% BriteWorks $347,313 SBEDVBE: 3.00% IECLT, Inc. $148,848 DVBE

687.) OP-16175-3367 2/18/2016 Fence Repair and Installation Ace Fence Company $1,000,800 Non-Federal 20% SBE: 100.00% Ace Fence Company $1,000,800 SBE-3491 Services (SBE Prime)

688.) OP-16975-200 2/12/2016 120kw Portable Diesel Volvo Construction Equipment $168,997 Non-Federal 5% SBE: 0.00%Generators Services

689.) OP-2224200 2/11/2016 Hybrid Sedan Vehicles Fleet Vehicle Source $292,731 Non-Federal 0% SBE: 100.00% Fleet Vehicle Source $292,731 SBE(SBE Prime)

690.) PS-3920-2965 2/8/2016 Gold Line Uninterrupted Pacific Rail Enterprises $183,861 Non-Federal 45% SBE: 100.00% Pacific Rail Enterprises $183,861 SBEPower System (UPS) (SBE Prime)

691.) PS-4540-3200-1 1/14/2016 Fall and Spring FY16 NuStats LLC $130,792 Non-Federal 20% SBE: 31.35% ANIK International $41,000 SBESatisfaction Survey

692.) C1122 1/20/2016 Pavement Replacement at AP Construction $1,628,700 Non-Federal 30% SBE: 100.00% AP Construction (SBE Prime) $1,556,700 SBEDivision 15 Robnett Electric $72,000 SBE

Total $1,628,700

Page 76

Page 77: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

693.) PS-4313200 1/20/2016 Permit Parking Management iNet, Inc. dba iParq $432,220 Non-Federal 0% SBE: 0.00%Program

694.) OP-4806600 1/21/2016 Uniform Rental Services Prudential Overall Supply $3,108,087 Non-Federal 5% SBE: 0.00%

695.) PS-4169700 12/30/2015 Pedestrian Model Development Cambridge Systematics, Inc. $498,979 Non-Federal 0% SBE: 0.0%Development Project

696.) OP-16977 11/10/2015 Super Duty Trucks w/ Canopy Reynolds Buick $356,300 Non-Federal 5% SBE: 0.00%

697.) AE-13071 11/6/2015 West Santa Ana Branch Parsons Brinckerhoff $920,819 Non-Federal 20% SBE: 31.99% CityWorks Design $135,000 SBEEastside Extension Phase II Epic Land Solutions $9,252 SBEConnection Study Lenax Construction $115,796 SBE

TransLink Consulting $34,514 SBETotal $294,562

698.) OP-1388200 11/16/2015 Curtainside Trailers Western Trailer Co. $142,478 Non-Federal 0% SBE: 0.00%

699.) PS-113344540-R 10/14/2015 Metro Rideshare Program Inland Transportation Services $1,198,055 Non-Federal 15% SBE: 12.37% The Van Stratten Group $148,260 SBESupport DVBE: 3.33% Roger L Reed dba The Blue Pyramid $39,862 DVBE

700.) FSP3469400B3 10/14/2015 Metro Freeway Service Patrol Disco Auto Sales, dba $1,915,326 Non-Federal 10% SBE: 10.20% AAA Oils, Inc. dba California Fuels $195,363 SBEHollywood Car Carrier

701.) FSP3471100B43 10/14/2015 Metro Freeway Service Patrol Disco Auto Sales, dba $1,915,326 Non-Federal 10% SBE: 10.20% AAA Oils, Inc. dba California Fuels $195,363 SBEHollywood Car Carrier

702.) FSP3469500B5 10/14/2015 Metro Freeway Service Patrol Sonic Towing $1,808,057 Non-Federal 10% SBE: 16.70% Casanova Towing Equipment $301,946 SBE

703.) FSP3470200B17 10/14/2015 Metro Freeway Service Patrol Sonic Towing $1,782,209 Non-Federal 10% SBE: 16.70% Casanova Towing Equipment $297,629 SBE

704.) FSP3469600B6 10/14/2015 Metro Freeway Service Patrol Neighborhood Towing 4U, Inc. $1,760,238 Non-Federal 10% SBE: 16.70% Casanova Towing Equipment $293,960 SBE

705.) FSP3469900B7 10/14/2015 Metro Freeway Service Patrol Girard & Peterson, Inc. $2,891,301 Non-Federal 10% SBE: 4.03% AAA Oils, Inc. dba California Fuels $42,003 SBEBuchanan & Associates $34,560 SBECasanova Towing Equipment $40,000 SBE

Total $116,563

706.) FSP3470100B11 10/14/2015 Metro Freeway Service Patrol Girard & Peterson, Inc. $2,891,301 Non-Federal 10% SBE: 4.03% AAA Oils, Inc. dba California Fuels $42,003 SBEBuchanan & Associates $34,560 SBECasanova Towing Equipment $40,000 SBE

Total $116,563

Page 77

Page 78: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

707.) FSP3470000B9 10/14/2015 Metro Freeway Service Patrol Mighty Transport Inc. dba $1,835,200 Non-Federal 10% SBE: 11.32% AAA Oils, Inc. dba California Fuels $186,000 SBEFrank Scotto Towing Buchanan & Associates $16,000 SBE

JCM & Associates $1,800 SBEPerformance Auto Body $4,000 SBE

Total $207,800

708.) FSP3470300B23 10/14/2015 Metro Freeway Service Patrol South Coast Towing, Inc. $1,843,380 Non-Federal 10% SBE: 10.09% AAA Oils, Inc. dba California Fuels $186,000 SBE

709.) FSP3470400B27 10/14/2015 Metro Freeway Service Patrol Hovanwil, Inc. dba Jon's $2,594,126 Non-Federal 10% SBE: 0.00%Towing

710.) FSP3470800B39 10/14/2015 Metro Freeway Service Patrol Hovanwil, Inc. dba Jon's $2,152,353 Non-Federal 10% SBE: 0.00%Towing

711.) FSP3470600B29 10/14/2015 Metro Freeway Service Patrol Platinum Tow & Transport $3,012,024 Non-Federal 10% SBE: 100.00% Platinum Tow & Transport(SBE Prime)

712.) FSP3470700B31 10/14/2015 Metro Freeway Service Patrol Navarro's Towing $2,909,952 Non-Federal 10% SBE: 6.00% AAA Oils, Inc. dba California Fuels $174,597 SBE

713.) FSP3471200B50 10/14/2015 Metro Freeway Service Patrol Navarro's Towing $3,283,230 Non-Federal 10% SBE: 6.00% AAA Oils, Inc. dba California Fuels $196,994 SBE

714.) FSP3471300B70 10/14/2015 Metro Freeway Service Patrol Classic Tow, Inc. dba $3,885,770 Non-Federal 10% SBE: 10.20% AAA Oils, Inc. dba California Fuels $396,349 SBETip Top Tow Services

715.) FSP3471500B71 10/14/2015 Metro Freeway Service Patrol ExpressLanes Towing Services $5,455,124 Non-Federal 10% SBE: 0.00%

716.) C1110 9/17/2015 Patsaouras Plaza Privately AP Construction $5,526,018 Non-Federal 20% SBE: 76.73% AP Construction (SBE Prime) $3,718,453 SBEOwned Vehicle Relocation, Robnett Electric $235,000 SBEPavers, and Storm Drain Repair VCA Engineering $180,000 SBE

MCM Integrated Systems $106,645 SBERepulic Iron Works $243,200Summit Painting $24,720Best Contracting $430,000Paver Plus, Inc. $588,000

SBE Total Only $4,240,098

Total All Subs $5,526,018

717.) PS-11654 9/17/2015 Graffiti Abatement, Landscape Woods Maintenance Services, $27,467,200 Non-Federal 25% SBE: 25.12% Briteworks, Inc. $1,804,600 SBERegion 1 and Irrigation Maintenance, and Inc. BJAG Group, LLC $936,000 SBE

Trash and Vegetation Removal Far East Landscape & Maintenance $4,160,000 SBEServices Total $6,900,600

Page 78

Page 79: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

718.) PS-11654 9/17/2015 Graffiti Abatement, Landscape Parkwood Landscape $21,519,994 Non-Federal 25% SBE: 22.00% Briteworks, Inc. $2,367,199 SBERegion 2 and Irrigation Maintenance, and Maintenance DVBE: 3.00% Far East Landscape & Maintenance $2,367,199 SBE

Trash and Vegetation Removal IECLT, Inc. $645,600 DVBEServices SBE Total Only $4,734,399

Total All Subs $5,379,999

719.) PS-11654 9/17/2015 Graffiti Abatement, Landscape Woods Maintenance Services $28,015,420 Non-Federal 25% SBE: 24.46% Briteworks, Inc. $4,357,080 SBERegion 3 and Irrigation Maintenance, and Inc. Far East Landscape & Maintenance $2,496,000 SBE

Trash and Vegetation Removal Total $6,853,080

Services

720.) PS-11654 9/17/2015 Graffiti Abatement, Landscape Parkwood Landscape $20,485,552 Non-Federal 25% SBE: 22.00% Briteworks, Inc. $2,253,411 SBERegion 4 and Irrigation Maintenance, and Maintenance DVBE: 3.00% Far East Landscape & Maintenance $2,253,411 SBE

Trash and Vegetation Removal IECLT, Inc. $614,557 DVBEServices SBE Total Only $4,506,821

Total All Subs $5,121,378

721.) AE-3319400599 9/16/2015 LA County Grade Crossing AECOM $3,868,848 Non-Federal 26% SBE: 27.18% BA Inc. $138,596 SBEand Corridor Safety Program DVBE: 3.54% Coast Surveying $131,845 SBE

Intueor Consulting, Inc. $245,000 SBELIN Consulting $201,535 SBEPacific Railroad Enterprises $126,429 SBESTC Traffic, Inc. $208,109 SBELeland Saylor Associates $136,903 DVBESTV Incorporated $740,728Kimley-Horn $398,155Overland Pacific & Cutler $17,594

SBE Total Only $1,051,514

Total All Subs $2,344,894

722.) PS-114943046 9/16/2015 Supportive Transit Parking Walker Parking Consultants $619,589 Non-Federal 10% SBE: 14.10% Arellano Associates $66,710 SBEProgram Master Plan Engineers DVBE: 3.23% AVS Consulting $20,680 SBE

Steven T. Kuykendall Associates $20,000 DVBEIteris $88,859

SBE Total Only $87,390

Total All Subs $196,249

723.) OP-1329300 9/16/2015 Heavy Duty Tractors Los Angles Truck $238,682 Non-Federal 0% SBE: 0.00%Centers

724.) AE-333410011375 9/16/2015 I-605 I-5 Project Approval Parsons Transportation $20,697,227 Non-Federal 30% SBE: 27.00% WKE, Inc. $3,345,187 SBEEnvironmental Document Group DVBE 3.00% Arellano Associates $346,450 SBE

D'Leon Consulting Engineering $98,194 SBEEarth Mechanics $396,750 SBEGuida Surveying $1,188,899 SBE

Page 79

Page 80: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

Value Management Strategies $40,310 SBEWagner Engineering and Survey $173,077 SBEGlobal Environmental Network $311,766 DVBEZmassociates Environmental $309,426 DVBEICF Jones & Stokes $4,140,902Cambridge Systematics $473,852Overland, Pacific, & Cutler Inc. $114,084

SBE Total Only $5,588,867

DVBE Total Only $621,192

Total All Subs $10,938,897

725.) PS-11513-X14X 9/1/2015 Long Range Transportation Cambridge Systems, Inc. $968,947 Non-Federal 15% SBE: 15.30% AVS Consulting $25,793 SBE-200 Plan Development D Barton Doyle Associates $23,000 SBE

MBI Media $99,303 SBEEmerson & Associates $25,000STV Incorporated $149,378

SBE Total Only $148,096

Total All Subs $322,474

726.) AE-12029 8/20/2015 Joint Development Design Urban Field Studio $347,193 Non-Federal 10% SBE: 96.26% Urban Field Studio $334,208 SBEReview - Valley Projects DVBE: 3.74% O'Connor Construction $12,985 DVBE

Total All Subs $347,193

727.) PS-9240-3383 7/15/2015 Information Technology Multiple Awards $17,000,000 NTE Non-Federal 12% SBE: 12.00% Aeon Group, LLC TBD SBEServices Bench ALINC Consulting, Inc. TBD SBE

Auriga Corporation TBD SBEBirdi & Associates TBD SBEE Demand TBD SBEEco & Associates TBD SBEIntueor Consulting Inc. TBD SBEPI Technology Inc. TBD SBEWest Coast Cable Inc. TBD SBE22nd Century Technologies, Inc. TBDAccenture LLP TBDAccuvant TBDAST Corporation TBDAT&T TBDBlack Box Network Services TBDCH2M Hill TBDCivic Resource Group TBDDigital Scepter TBDEplus Technology TBDHershey Technologies TBDHUB Technologies TBD

Page 80

Page 81: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

Information Management Resouces Inc. TBDIntratek Computer Inc. TBDMythics TBDPlante Moran PLLC TBDSidepath Inc. TBDSierra Cedar Inc. TBDSierra Cybernetics Inc. TBDT-Kartor TBDTstreet Solutions TBDVan & Associates TBDVision Technologies TBDViva USA Inc. TBDZensar Technologies Inc. TBD

Total All Subs TBD

728.) PS-2415-3412 7/16/2015 Brighton to Roxford Double STV, Inc. $12,500,000 Non-Federal 25% SBE: 37.49% Bullock & Associates $410,888 SBETrack Project Cornerstone Studios, Inc. $72,757 SBE

Diaz Yourman & Associates $389,344 SBEEpic Land Solutions $131,939 SBEJ.L. Patterson & Associates $745,839 SBELin Consulting $457,632 SBEPacific Railway Enterprises $1,782,134 SBERyan Snyder Associates $31,913 SBEWagner Engineering & Surveying $660,106 SBEHNTB $3,285,981ICF International $328,560

SBE Total Only $4,682,552

Total All Subs $8,297,093

729.) AE275020011497 6/17/2015 ExpressLanes Program Parsons Brinckerhoff $7,700,000 NTE Non-Federal 25% SBE: 25.00% AFSHA Consulting TBD SBE(AE11497) Management Support Arellano Associates TBD SBE

Services Diaz Yourman & associates TBD SBEEpic Land Solutions TBD SBEFPL and Associates TBD SBEGalvin Preservation TBD SBEIntueor Consulting TBD SBEKal Krishnan Consulting TBD SBERedhill Group, Inc. TBD SBESystem Metrics Group, Inc. TBD SBETerry Hayes & Associates TBD SBEVCS Environmental TBD SBEValue Management Strategies, Inc. TBD SBEWKE, Inc. TBD SBEHNTB, Inc. TBDArgabright Consulting TBD

Page 81

Page 82: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

Chuck Fuhs LLC TBDECO Northwest TBDFAST TBDIteris TBDPRR, Inc. TBDTransportation Solutions TBD

Total All Subs TBD

730.) OP-3790-3380A 5/15/2015 Expansion & Replacement Wondries Fleet Group $1,519,428 Non-Federal 5% SBE: 0.00%of Non-Revenue Vehicles

731.) PS-11369 5/15/2015 ExpressLanes Operation Jacobs Engineering Group $3,204,988 Non-Federal 10% SBE: 7.21% Power Tech Engineers $231,208 SBEand Maintenance Oversight DVBE: 3.07% Casamar Group $98,355 DVBESupport Services Total All Subs $329,563

732.) PS-2415-3412 4/30/2015 Brighton to Roxford Double STV Incorporated $16,580,291 Non-Federal 25% SBE: 26.62% BA Inc. $675,428 SBETrack Project Cornerstone Studios $90,960 SBE

Diaz Yourman Associates $418,542 SBEEpic Land Solutions $155,258 SBELin Consulting $476,935 SBEPacific Railway Enterprise $1,879,101 SBERyan Snyder Associates $33,860 SBEWagner Engineering & Survey $684,236 SBEHNTB $4,800,448ICF International $421,186JL Patterson & Associates $879,390

SBE Total Only $4,414,320

Total All Subs $10,515,344

733.) PS-2415-3420 3/26/2015 Rosecrans & Marquardt Biggs Cardosa Associates $6,273,305 Non-Federal 27% SBE: 27.54% GPA Consulting $106,625 SBEGrade Separation ArcheoPaleo Resource $20,111 SBE

Arellano Associates $194,230 SBEVA Consulting $485,216 SBEGeospatial Professional Inc. $10,400 SBEW.G. Zimmerman $226,431 SBEUtility Specialists $236,185 SBEEarth Mechanics $191,769 SBETatsumi Partners $43,685 SBENSI Engineering $176,441 SBESafeprobe $36,455 SBEHNTB $1,852,383Ambient Air Quality $12,325Wallace-Kuhl Associates $5,000Overland, Pacific & Cutler $9,373RT Engineering Associates $70,912

Page 82

Page 83: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

SBE Total Only $1,727,548

Total All Subs $3,677,541

734.) 3000002673 3/26/2015 Metro Annual Financial Crowe Horwath $2,333,095 Non-Federal 25% SBE: 25.01% Qui Accountancy Corp $821,432 SBEServices Vasquez & Company LLP $500,000

735.) AE11298421510135 3/26/2015 Burbank/Bob Hope Airport AECOM $1,559,386 Non-Federal 31% SBE: 31.03% Coast Surveying $98,950 SBEStation Pedestrian Bridge Diaz Yourman Associates $115,826 SBE

LIN Consulting $23,584 SBEEpic Land Solutions $48,638 SBELynn Capouya, Inc. $46,940 SBEPacific Railway Enterprise $111,600 SBESafe Probe, Inc. $38,340 SBE

Total $483,878

736.) C1075R 11/5/2014 Division 11 Body Shop Access Pacific, Inc. $966,707 Non-Federal 25% SBE: 69.13%Ventiliation and Dust CollectionUpgrade

737.) C1103 11/3/2014 Interior Improvements at Hoffman Management & $956,729 Non-Federal 30% SBE: 16.00% Floor Tech America $20,720 SBEDivisions 5, 7, 15, & 18 Construction Reyes & Sons Electric, Inc. $132,320 SBE

Total $153,040

738.) OP-3790-3310 11/13/2014 Production Rail Grinder Harsco Rail $3,509,800 Non-Federal 5% SBE: 0.00%

739.) PS-15-5210 11/13/2014 Transaction and Use Tax MuniServices, LLC $60,000 Non-Federal 0% SBE: 0.00%Revenue Audit, Recoveryand Forecasting

740.) C1091 10/15/2014 Stair Replacements at Access Pacific, Inc. $435,424 Non-Federal 25% SBE: 0.00%Terminals 47 & 48

741.) FSP14-1 10/23/2014 Metro Freeway Service EVS, Inc. dba All City Tow $1,651,224 Non-Federal 10% SBE: 100.00% EVS, Inc. dba All City Tow $1,651,224 SBEPatrol - Beat #1 Service (SBE Prime)

742.) FSP14-2 10/23/2014 Metro Freeway Service City Wide Towing $1,562,049 Non-Federal 10% SBE: 100.00% City Wide Towing (SBE Prime) $1,562,049 SBEPatrol - Beat #2

743.) PS-2130-3403 10/23/2014 Business Solutions Del Richardson & Associates $996,144 Non-Federal 15% SBE: 66.97% Del Richardson (SBE Prime) $627,411 SBESupport Center for Crenshaw Turning Point Communications $39,691 SBE/LAX Transit Corridor Project Urban Design Center $65,141

Vermont Slauson Economic $263,900SBE Total Only $667,102

Total All Subs $996,143

Page 83

Page 84: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

744.) PS-2610-2156 10/2/2014 Security Guard Services RMI International, Inc. $24,363,136 Non-Federal 20% SBE: 30.50% Security America, Inc. $7,430,756 SBE

745.) PS-4720-3328 10/23/2014 I-710 Soundwall Design Parsons Transportation $2,418,230 Non-Federal 30% SBE: 32.24% Tatsumi and Partners, Inc. $223,817 SBEPackage #2 North of SR-91 Group WKE, Inc. $458,122 SBEWalls Chris Nelson & Associates $97,802 SBE

Group Delta Consultant $122,899Paragon Partners LTD $55,000

SBE Total Only $779,741

Total All Subs $957,640

746.) PS-4720-3329 10/23/2014 I-710 Soundwall Design TranSystems Corporation $2,472,075 Non-Federal 26% SBE: 29.15% Arellano Associates LLC $79,881 SBEPackage #1 Non-Freeway Coast Surveying, Inc. $38,973 SBEWalls Earth Mechanics, Inc. $44,266 SBE

ACT Consulting, Inc. $557,558 SBEOverland Pacific & Cutler, Inc. $24,509Gruen Associates $168,762LSA Associates, Inc. $74,862

SBE Total Only $720,678

Total All Subs $988,811

747.) PS-4720-3330 10/23/2014 I-710 Soundwall Design CH2M Hill, Inc. $3,347,275 Non-Federal 30% SBE: 35.43% AP Engineering & Testing Inc. $47,460 SBEPackage #3 South of SR-91 Barrio Planners Inc. $121,754 SBEWalls Diaz Yourman & Associates $188,524 SBE

Pac Rim Engineering, Inc. $227,966 SBETatsumi and Partners, Inc. $202,562 SBEJET Drilling, Inc. $74,470 SBEEpic Land Solutions, Inc. $34,903 SBEWagner Engineering & Survey Inc. $288,204 SBE

Total All Subs $1,185,843

748.) PS-9240-3192 10/2/2014 Hastus System v2014 Giro, Inc. $2,616,903 Non-Federal 0% SBE: 0.00%Software Upgrade

Non-Federal Subtotal:

SBE Commitment Subtotal:

SBE Percent Subtotal: 27.95%

DVBE Commitment Subtotal: $13,423,014

DVBE Percent Subtotal: 3.47%

PS43774-3041 11/20/2017 Blue Line Improvements under theAECOM Technical Services, Inc. $785,999 FTA 25% DBE 26.37% Intueor Consulting, Inc. $65,502 DBE Asian-Pac AmericanCountywide Planning Bench, Lenax Construction Services, Inc. $83,686 DBE Caucasian FemaleDiscipline No. 4 Traffic/ Rail Surveyors and Engineers, Inc. (RSE)$58,076 DBE Asian-Pac American

$213,562,023

$763,980,229

Page 84

Page 85: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

Transportation Engineering Kimley-Horn and Associates $185,601Total DBE: $207,264

MA42524000 11/27/2017 Motor-Traction Type 4 Dahl-Beck Electric $241,715 FTA 0% DBE 0.00%ELO 2055C

MA45748 11/30/2017 Head ASM - Cylinder, Valley Power Systems Inc. $315,904 FTA 0% DBE 0.00%S50G, Model 6047 MKG8

5.) PS44432001 11/16/2017 Communications Support ServicesArellano Associates $9,505,568 (NTE) FTA 20% DBE 20.00% Arellano Associates (DBE Prime) TBD DBE Hispanic AmericanBench VMA Communications TBD DBE Hispanic American

Celtis Ventures TBDCerrell Associates TBDAbel Associates, Inc. dba ABL, Inc. TBDAVS Consulting TBDD. Barton Doyle TBDInterpreting Services International dba ISI TBDTranslation Services TBDJarrett Walker + Associates TBDSunset Cliffs Productions TBDT.D. Wang Advertising Group, LLC dba TDW+Co TBDTwo Hundred TBDWilson, Sparling & Associates TBDYoung Communicaitons Group TBDMatthew Zehner, LLCF dba Zehner Group TBD

6.) PS44432002 11/16/2017 Communications Support ServicesCeltis Ventures $9,505,568 (NTE) FTA 20% DBE 20.00% Arellano Associates TBD DBE Hispanic AmericanBench Decision Strategy TBD

World Language Communications TBDDavid Zaitz Photography TBDThe Walking Man TBDProforma DVE Global Marketing TBDFlagship Marketing TBD

7.) PS44432003 11/16/2017 Communications Support ServicesBarrios and Associates LLC $9,505,568 (NTE) FTA 20% DBE 40.00% Barrios and Associates LLC dba TBD DBE Hispanic AmericanBench dba Communications Lab Communications Lab (DBE Prime)

Circlepoint TBDBrentwood Reprographics TBDDesigned to Win dba Bieber CommunicationsTBDAlta Planning + Design, Inc. TBDJ. Walin Opinion Research TBDWelocalize TBDThe Walking Man TBDThomas J. Story Photography TBD

8.) PS44432004 11/16/2017 Communications Support ServicesCommunity Connections, LLC$9,505,568 (NTE) FTA 20% DBE 20.00% Community Connections, LLC (DBE Prime)TBD DBE Hispanic AmericanBench Alas Media, Inc. TBD DBE Hispanic American

Allied Interpreting Service, Inc. TBD DBE Caucasian FemaleCapital Government Contract Specialists, Inc.TBD DBE Hispanic AmericanCynthia M. Ruiz & Associates TBD DBE Hispanic AmericanJudith Norman Transportation Consultant TBD DBE African AmericanMagna Sol Corporation TBD DBE Hispanic AmericanYoung Communications Group, Inc. TBD DBE African AmericanKleinfelder, Inc. AKA: KLF/SWE TBDAJ Design TBDArrow GTP TBDCardenas Strategy TBDConnected Consulting TBDHammons Strategies TBDPacific Market Research, LLC dba Latino DecisionsTBD

Page 85

Page 86: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

Sarai Group TBD

9.) PS44432005 11/16/2017 Communications Support ServicesConsensus Inc. $9,505,568 (NTE) FTA 20% DBE 20.00% Translating Services, Inc. TBD DBE Caucasian FemaleBench Saucedo Professional Group, Inc. TBD DBE Hispanic American

Friendly Filmworks TBD DBE Hispanic AmericanLA1, Inc. TBD DBE Asian-Pac AmericanThe Glue, LLC TBD DBE Caucasian FemaleDeborah Murphy Urban Design & Planning TBD DBE Caucasian FemaleDavis & Associates dba D&A CommunicationsTBD DBE African AmericanCMGRP, Inc. dbe The Axix Agency TBDFairbank, Maslin, Maulin, Metz & AssociatesTBDBluEvolutionNow TBDFrazer Communications TBDMichael Kass dba The Center for Story & SpiritTBDKindal Gagan (JV) TBDImprenta Communications Group TBDOwlized TBDHeidi Druckler Dance Theatre TBDIDEO LP TBD

10.) PS44432006 11/16/2017 Communications Support ServicesDakota Communications $9,505,568 (NTE) FTA 20% DBE 65.00% Dakota Communications (DBE Prime) TBD DBE African AmericanBench 360 Total Concept Inc. TBD DBE African American

JKH Consulting TBD DBE African AmericanMozaic Media & Communications TBDMalcolm Media Advisors TBDCitrus Studios TBDKO & Martin TBDCCE Consulting TBDTulchin Research TBD

11.) PS44432007 11/16/2017 Communications Support ServicesETA Agency, Inc. $9,505,568 (NTE) FTA 20% DBE 30.00% ETA Agency, Inc. (DBE Prime) TBD DBE Caucasian FemaleBench Barrantes Enterprises, Inc. dba The Sierra GroupTBD DBE Hispanic American

J-U Carter, Inc. dba J-U Public TBD DBE Caucasian FemaleZeldesign, dba ZHA-Harrison Associates TBD DBE African AmericanTRC Solutions, Inc. TBDDavid Gershwin Consulting TBDHiner & Partners, Inc. TBDCRC TBDResearch Now TBDAssistance in Marketing TBDMultiple Other Focus Group TBDSextant Research TBDMatthew Zehner, LLC dba Zehner Group TBDRichard Schneider Language Services, Inc.TBDTowne All Points TBDThe Walking Man TBDBedrosian & Associates TBD

12.) PS44432008 11/16/2017 Communications Support ServicesLee Andrews Group $9,505,568 (NTE) FTA 20% DBE 80.00% Lee Andrews Group (DBE Prime) TBD DBE Hispanic AmericanBench DeAngelis Design TBD DBE Caucasian Female

Del Richardson & Associates, Inc. TBD DBE African AmericanEffect Strategies LLC TBD DBE Caucasian FemaleNorth Star Alliances TBD DBE Hispanic AmericanParagon Language Services TBD DBE Caucasian FemaleTovar Geospatial Services TBD DBE Hispanic AmericanTrifiletti Consulting TBD DBE Hispanic AmericanGreenvale Consulting Services, LLC TBDProbolsky Research TBD

Page 86

Page 87: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

J-Rock Communications TBDWave Tech TBDMatthew Zehner, LLC dba Zehner Group TBD

13.) PS44432009 11/16/2017 Communications Support ServicesMBI Media $9,505,568 (NTE) FTA 20% DBE 80.00% MBI Media (DBE Prime) TBD DBE Caucasian FemaleBench ALAS Media, Inc. TBD DBE Hispanic American

North Star Alliances TBD DBE Hispanic AmericanHouse 47 TBD DBE Caucasian FemaleSir Speedy Printing TBD DBE Caucasian FemaleYoung Communications TBD DBE African AmericanAJ Design TBDContinental Interpreting TBDEMC Research TBDKumamoto Associates TBDMarc Littman Strategic Communications TBDPondel Wilkinson, Inc. TBDPower On Digital, LLC TBDThe Walking Man TBD

14.) PS44432010 11/16/2017 Communications Support ServicesThe Robert Group $9,505,568 (NTE) FTA 20% DBE 75.00% The Robert Group (DBE Prime) TBD DBE African AmericanBench Effect Strategies, LLC TBD DBE Caucasian Female

Trifiletti Consulting TBD DBE Hispanic AmericanadCREASIONs, Inc. TBDAlta Planning + Design TBDDakeLuna TBDEmerson & Associates TBDGoodwin Simon Strategic Research TBDKoppleman & Associates TBDLos Angeles Conservation Corp. TBDLA Creative Technologies TBDMilner Butcher Media Group TBDNeighborland, Inc. TBDNot So Square Design TBDRichard Schneider Language TBDThe Todd Group TBDVPE Public Relations TBDThe Walking Man TBDBrentwood Reprographics, Inc. TBD

PS45383 11/16/2017 P2550 Light Rail Vehicle STV Incorporated $1,421,087 FTA 20% DBE: 20.11% Capitol Government Contract Specialists$154,218 DBE Hispanic AmericanMidlife Modernization Program Virginkar & Associates, Inc. $95,256 DBE Subcontinent Asian

Global Innovations, USA $36,280 DBE African AmericanWSP USA, Inc. $264,558

Total DBE: $285,754Total: $550,312

MA24464000 11/16/2017 P2550 & P2020 Friction Brake Knorr Brake Company $4,546,031 (NTE) FTA 0% DBE: 0.00%System Overhaul

1.) OP39497-2000 11/15/2017 Currency Processing Services Los Angeles Federal Armored $457,600 FTA 0% DBE: 0.00%Services

AE39616001 11/15/2017 LA Union Station Forecourt Gruen Associates $2,910,657 FTA 12% DBE: 29.62% Mia Lehrer + Associates $502,437 DBE Hispanic Americanand Esplanade Improvements Horton Lees Brogden Lighting Design $111,500 DBE Caucasian Female

The Alliance Group Enterprise $108,079 DBE Asian-Pac AmericanInfrastructure Factor Consuloting $45,044 DBE Caucasian FemaleVCA Engineers $29,486 DBE Asian-Pac AmericanThe Robert Group $138,942 DBE African AmericanDiaz Yourman Consulting $34,685 DBE Hispanic AmericanGrimshaw Architects $85,407

Page 87

Page 88: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

Psomas $394,457Sherwood Design Engineers $125,696Fehr & Peers $187,285Historic Resources Group $27,168Faithful & Gould $76,880Carlberg Associates $10,574MJM Management Group $29,142Fluidity Design Consultants $80,739Davison Associates $15,120

Total DBE: $970,173Total: $2,002,641

1.) AE87192000 10/19/2017 Westside Purple Line Extension MPPC Partners $ 7,009,872 (NTE) FTA 38% DBE: 39.43% PMCS Group, Inc. $483,681 DBE Caucasian FemaleMC073 Section 3 Project Construction Cornerstone Transportation Consulting$1,152,423 DBE African American

Management Support Services Diaz Yourman $0 DBE Hispanic AmericanInspection Services Inc. $117,065 DBE Asian-Pac AmericanKevin Scott Tunnel Consultants $107,251 DBE African AmericanKroner Environmental Services $210,997 DBE Caucasian FemaleLENAX Construction Services $89,726 DBE Caucasian FemaleMorgner Construction Management $78,511 DBE Hispanic AmericanPaleo Solutions, Inc. $55,378 DBE Caucasian FemaleQuality Engineering, Inc. $185,762 DBE African AmericanThe Alliance Group Consulting $0 DBE Asian-Pac AmericanWagner Engineering & Survey $283,199 DBE Caucasian FemaleMott MacDonald LLC $2,116,981PGH Wong Engineering $1,730,036Babenderede Engineers LLC $100,241RMP Safety Services Inc. $75,006Costin Public Outreach Group $223,615

Total DBE: $2,763,993

2.) MA44930 10/10/2017 Fuel Pressure Regulator Valve Cummins Pacific, LLC $ 557,713 (NTE) FTA 0% DBE: 0.00%

3.) C1153000 10/2/2017 Westside Purple Line Extension Steve Bubalo Construction Co. $11,439,000 FTA 18% DBE: 18.48% Infra-Structure Aggregates $101,166 DBE Caucasian FemaleProject Advanced Utility California Testing & Inspections $150,000 DBE Hispanic AmericanRelocations for Section 3 Precision Engineering Surveyors $162,475 DBE Hispanic American

G&C Equipment Corp. $300,000 DBE African AmericanMorgner Construction Management $400,000 DBE Hispanic AmericanMike Bonsangue Jr. Trucking $250,000 DBE Hispanic AmericanBlackgold Development, AC Paving $450,000 DBE Hispanic AmericanKLP Commercial, LLC $300,000 DBE Native AmericanPrecision Engineering Surveyors - Surveying$42,500Comet Electric $876,191

Total DBE: $2,113,641

4.) MA41584 10/2/2017 Air Condition Compressor TK Service, Inc. $721,799 FTA 0% DBE: 0.00%

Page 88

Page 89: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

5.) MA38054000 10/2/2017 Caliper Housing Kit Assembly American Moving Parts, LLC $864,265 FTA 0% DBE: 0.00%

6.) MA38054001 10/2/2017 Caliper Housing Kit Assembly American Moving Parts, LLC $864,265 FTA 0% DBE: 0.00%

38.) MA3280700 9/21/2017 A650 DC Traction Motor Walco Electric Company $1,188,440 FTA 0% DBE: 0.00%Overhaul

39.) OP83932000-39383 9/21/2017 Bus Tire Leasing and The Goodyear Tire & Rubber Company$40,908,927 FTA 5% DBE: 5.01% Islas Tires $432,890 DBE Hispanic AmericanMaintenance Services Metal Masters $1,582,500 DBE Hispanic American

JCM & Associates $33,730 DBE Hispanic AmericanDaniel's Tire Service $1,973,700Cetera Marketing $3,859Reliance Safety Consultants $9,280USA Waste of CA, Inc. $36,000CRM CO LLC $54,000

DBE Total Only $2,049,120

Total All Subs $4,125,959

42.) MA41702000 9/21/2017 Differential ASM-4.89 Ratio American Moving Parts $1,049,835 FTA 0% DBE: 0.00%71000 Series Axle 141931

41.) MA41586 9/18/2017 Differential Assembly - Carrier American Moving Parts, LLC $690,848 FTA 0% DBE 0.00%5.38 Ratio

40.) MA41592 9/6/2017 Dryer ASM - Air Sludge New Flyer Parts $727,681 FTA 0% DBE: 0.00%Breaker 24V

39.) PS43132 8/22/2017 Business Information (BI) Avatar Enterprises America $359,400 FTA 0% DBE: 0.00%Consultant

38.) M38543 8/10/2017 Kit-Wear Indicator (4EA/BUS) Selective Transit Parts Inc. $386,606 FTA 0% DBE: 0.00%For Brake Pads, W/Sensors

22.) MA41580 7/18/2017 Compressor Air Twin CCYL Cummins Pacific, LLC $568,265 FTA 0% DBE: 0.00%

23.) MA41596 7/20/2017 Harness, Wiring Engine Control Cummins Pacific, LLC $527,378 FTA 0% DBE: 0.00%

24.) PS20655 7/20/2017 Environmental Waste Handling TRC Solutions $42,274,495(NTE) FTA 25% DBE: 25.00% Acoustic Group TBD DBE Asian-Pac Americanand Environmentally Related A-Tech Consulting, Inc. TBD DBE Caucasian FemaleConstruction Services GCAP Services TBD DBE Hispanic American

Global Probe Inc. TBD DBE Hispanic AmericanMartini Drilling Corp. TBD DBE Hispanic AmericanSunWest Engineering Constructors TBD DBE Caucasian FemaleThe Sanberg Group TBD DBE Caucasian Female

Page 89

Page 90: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

The Sierra Group TBD DBE Hispanic American

25.) MA38080 7/20/2017 Kit Disc Pad, Pad & Spring Gillig, LLC $767,691 TA 0% DBE: 0.00%Front & Rear

34) MA35011 6/21/2017 Air Suspension - Front & Rear The After Market Parts Co. $201,004 FTA 2% DBE: 2.00% Say Cargo Express, Inc. $4,020 DBE Hispanic American(New Flyer)

35) OP783190003367 6/15/2017 Automated Public Toilets Public Facilities & Services, Inc. $1,061,530 FTA 0% DBE: 0.00%Maintenance Services

36) OP38384000 6/15/2017 Contracted Bus Service - MV Transportation, Inc. $127,280,617 FTA 5% DBE: 5.39% JCM & Associates, Inc. $76,368 DBE Hispanic AmericanSouth Region J.D. Evans, Inc. $38,184 DBE Caucasian Female

First Fuel, Inc. $6,745,873 DBE Caucasian FemaleTotal: $6,860,425

37) OP38382000 6/15/2017 Contracted Bus Services - Southland Transit, Inc. $65,245,597 FTA 5% DBE: 5.15% Performance Auto Body $1,221,001 DBE Hispanic AmericanEast Region JCM & Associates $224,648 DBE Hispanic American

J.D. Evans, Inc. $31,000 DBE Caucasian FemaleCarl's Electric, Inc. $135,667 DBE Asian-Pac AmericanTranco Upholstery $208,022 DBE Asian-Pac AmericanTrans-Global Services $1,538,540 DBE Asian-Pac American

Total: $3,358,878

38) AE35279 6/22/2017 Program Management Support Kal Krishnan Consulting Services/$24,970,960 FTA 30% DBE: 73.31% KKCS (JV Partner/Prime) $4,966,725 DBE Subcontinent AsianServices Triunity Engineering & Management Triunity (JV Partner /Prime) $4,682,055 DBE African American

Joint Venture Armand Resource Group, Inc. $1,568,176 DBE African AmericanLenax Construction Services, Inc. $5,313,820 DBE Caucasian FemaleLKG-DMC, Inc. $496,922 DBE Caucasian FemaleMBI Media $307,143 DBE Caucasian FemaleThe Omni Group(Ogx Consulting) $424,506 DBE African AmericanRamos Consulting Services $419,512 DBE Hispanic AmericanStellar Services, Inc. $129,849 DBE Asian-Pac AmericanCH2M Hill, Inc. $3,625,783DrMcNatty & Associates $1,400,871EcoSys Management LLC $344,599Gaea Global Technologies, Inc. $224,739Jacobs Engineering Group, Inc. $102,381PSMJ Resources, Inc. $0Thompson Coburn LLP $84,901Destination Enterprises $878,978

Total: $24,970,960

40) PS37755-1 4/20/2017 Consultant Bench For Rail CH2M Hill, Inc. $8,027,100 (NTE) FTA 20% DBE: 20.00% Parthenon Corporation TBD DBE Hispanic AmericanVehicle & Systems LKG-CMC TBD DBE Caucasian Female

Page 90

Page 91: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

Engineering Support Virginkar and Associates TBD DBE Subcontinent AsianCapitol Gov't Contract Specialist TBD DBE Hispanic AmericanE.W. Moon, Inc. TBD DBE African AmericanCivil Earth Engineering TBD DBE Asian-Pac American

41) PS37755-2 4/20/2017 Consultant Bench For Rail LTK Engineering $8,027,100 (NTE) FTA 20% DBE: 20.00% Capitol Gov't Contract Specialists TBD DBE Hispanic AmericanVehicle & Systems DAV-LEAR Systems, Inc. TBD DBE African AmericanEngineering Support Ramos Consulting Serv ices TBD DBE Hispanic American

Virginkar & Associates TBD DBE Subcontinent Asian

42) PS37755-3 4/20/2017 Consultant Bench For Rail Mott MacDonald LLC $8,027,100 (NTE) FTA 20% DBE: 20.00% Electrical Building Systems, Inc. TBD DBE Hispanic AmericanVehicle & Systems LKG-CMG TBD DBE Caucasian FemaleEngineering Support NBA Engineering TBD DBE Caucasian Female

Pacific Railway Enterprises TBD DBE Caucasian FemaleRaul Bravo + Associates TBD DBE Hispanic AmericanVirginkar and Associates TBD DBE Subcontinent Asian

43) PS37755-4 4/20/2017 Consultant Bench For Rail Parsons Brinckerhoff, Inc. $8,027,100 (NTE) FTA 20% DBE: 20.00%Capitol Gov't Contract Specialists TBD DBE Hispanic AmericanVehicle & Systems Casamar Group TBD DBE Hispanic AmericanEngineering Support Information Design Consultants TBD DBE African American

LKG-CMC, Inc. TBD DBE Caucasian FemalePacific Railways Enterprises TBD DBE Caucasian FemaleSystems Consulting LLC TBD DBE African AmericanVirginkar & Associates Inc. TBD DBE Caucasian FemaleVP Engineering TBD DBE Subcontinent Asian

44) PSW37755-5 4/20/2017 Consultant Bench For Rail STV, Inc. $8,027,100 (NTE) FTA 20% DBE: 20.00% Capitol Gov't Contract Specialists TBD DBE Hispanic AmericanVehicle & Systems Casamar Group TBD DBE Hispanic AmericanEngineering Support dHA + CALPEC TBD DBE Subcontinent Asian

ERJ Engineering Consultants TBD DBE Subcontinent AsianE.W. Moon, Inc. TBD DBE African AmericanLKG-CMC, Inc. TBD DBE Caucasian FemaleVirginkar & Associates TBD DBE Subcontinent AsianVP Engineering TBD DBE Subcontinent Asian

45) OP7396000 4/20/2017 Biomethane Provider Clean Energy Renewables $56,048,630 (NTE) FTA 0% DBE: 0.00%

46) MA32758 4/18/2017 Element - Fuel Filter, The Aftermarket Parts Company, LLC$264,278 FTA 2% DBE: 2.20% Say Cargo Express $5,814 DBE Hispanic AmericanCNG Large

749.) AE6675800 3/16/2017 Division 20 Portal Widening T.Y. Lin International $10,265,661 FTA 27% DBE 27.01% Anil Verma Associates $789,284 DBE Subcontinent AsianTurnback Kal Krishnam Consulting Services $287,921 DBE Subcontinent Asian

Wagner Engineering & Survey, Inc. $168,332 DBE Caucasian FemaleLIN Consulting, Inc. $1,262,481 DBE Asian-Pac AmericanEarth Mechanics $223,498 DBE Asian-Pac American

Page 91

Page 92: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

SafeProbe, Inc. $40,831 DBE Asian-Pac AmericanILF Consultants, Inc. $791,189Innovative Solutions in Signaling LLC$1,230,948PGH Wong Engineering $1,081,893

DBE Total Only $2,772,347

Total All Subs $5,876,377

750.) OP20113000 3/16/2017 P2000 Light Rail Vehicle CH2M Hill, Inc. $5,829,626 FTA 20% DBE 24.81% Virginkar & Associates, Inc. $1,070,595 DBE Subcontinent AsianOverhaul Program Consultant Parthenon Corporation $349,632 DBE Hispanic AmericanSupport Services Langford & Carmichael $25,920 DBE Asian-Pac American

LTK Engineering Services $1,215,146Jakes Associates, Inc. $1,171,823HKA Enterprises $33,696

DBE Total Only $1,446,147

Total All Subs $3,866,812

751.) PS28069-2000 3/16/2017 Space Planning/Installation M3 Office, Inc. $7,000,000 FTA 3% DBE 4.12% Décor Interior Design, Inc. $288,400 DBE African AmericanServices and Herman Miller Décor Interior Design, Inc. $411,600Furniture

752.) MA-24957 2/1/2017 P2550 LRV Battery Sets Hoppecke Batteries $555,471 FTA 2% DBE: 2.00% Lin Industries $11,109 DBE Subcontinent Asian

753.) PS-6447400 2/6/2017 Metro Leadership Academy Southern Methodist University $220,435 FTA 3% DBE: 3.00% Sir Speedy Printing and Signs $6,613 DBE Caucasian Female

754.) MA-26104 1/19/2017 Oil - Engine Cummins Rosemead Oil Products $1,626,850 FTA 5% DBE: 5.00% All Petro Resources $81,343 DBE Hispanic American

755.) PS-20394-71406 1/19/2017 Non-Inventory Paper Supplies Bashboy Enterprises dba $600,000 FTA 10% DBE: 80.00% Bashboy Enterprises (DBE Prime) $251,752 DBE Hispanic American-2000/101 California Printing Consultants Veritiv Operating Company $62,938

756.) PS-20394-71406 1/19/2017 Non-Inventory Paper Supplies Gorilla Stationers $150,000 FTA 10% DBE: 60.00% Gorilla Stationers (DBE Prime) $202,717 DBE Caucasian Female-2000/102

757.) PS-20394-71406 1/19/2017 Non-Inventory Paper Supplies Spicer's Paper, Inc. $2,100,000 FTA 10% DBE: 10.00% AFA Suppliers $28,148 DBE African American-2000/103

758.) PS-20394-71406 1/19/2017 Non-Inventory Paper Supplies Veritiv Operating Company $150,000 FTA 10% DBE: 10.00% RGE Truck Lines $36,636 DBE Hispanic American-2000/104

759.) PS-20109 12/14/2016 Sustainability Engineering LSA Associates $10,061,346 FTA 28% DBE: 30.36% GlobalASR Consulting $550,050 DBE Asian-Pac AmericanServices Climate Change Katherine Padilla & Assoc. $299,937 DBE Hispanic Americanand Greenouse Gas Emissions PacRim Engineering $200,094 DBE Asian-Pac American

Pika Environmental $404,386 DBE Caucasian FemaleSapphos Environmental $1,600,029 DBE Hispanic AmericanAtkins $2,000,002Dewberry Engineers $2,012,812

Page 92

Page 93: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

Impact Infrastructure $200,000Element Markets $200,000First Environmental California $202,760California Center for Sustainable Communities$198,600

DBE Total Only $3,054,496

Total All Subs $7,868,670

760.) PS-20111 12/14/2016 CEQA/NEPA Environmental ICF Jones & Stokes, Inc. $25,604,000 FTA 30% DBE: 30.00% A. Ontiveros & Associates $128,020 DBE Hispanic AmericanServices and Support ACT Consulting Engineers $256,040 DBE Asian-Pac American

The Alliance Group Enterprise $128,020 DBE Asian-Pac AmericanArellano Associates $435,268 DBE Hispanic AmericanBRC-Equals3, Inc. $256,040 DBE Caucasian FemaleCivil Works Engineers, Inc. $128,020 DBE Caucasian FemaleCross-Spectrum Acousitcs $768,120 DBE African AmericanCalifornia Watershed Engineering $256,040 DBE Subcontinent AsianDiaz Yourman Consultants $640,100 DBE Hispanic AmericanGeospatial Professional Solutions $128,020 DBE Asian-Pac AmericanGlobal ASR Consulting $256,040 DBE Asian-Pac AmericanKatherine Padilla & Associates $435,268 DBE Hispanic AmericanLRS Program Delivery, Inc. $128,020 DBE Asian-Pac AmericanMorgner Construction Management $256,040 DBE Hispanic AmericanPaleo Solutions Inc. $1,024,160 DBE Caucasian FemalePublic Connections Organization $256,040 DBE African AmericanRamos Consulting Services $128,020 DBE Hispanic AmericanTerry A. Hayes Associates $1,817,884 DBE African AmericanTranslink Consulting LLC $256,040 DBE Asian-Pac American

DBE Total $7,681,200

761.) MA-62074 12/6/2016 Bus Batteries Battery Power, Inc. $583,630 FTA 0% DBE: 0.00%

PS-28069-2000 12/12/2016 Space Planning Installation M3 Office Inc. $47,592 FTA 3% DBE: 4.12% Décor Interior Design $1,960 DBE African AmericanServices and HermanMiller Furniture

MA-26074 12/7/2016 Bus Batteries Battery Power, Inc. $583,630 FTA 0% DBE: 0.00%

762.) AE5818600- 11/17/2016 Construction Management Purple Line 2 CM Partners $8,890,488 FTA 38% DBE: 38.12% Morgner Construction Management $592,290 DBE Hispanic AmericanMC072-PLE2 Support Services Safework, inc. $754,743 DBE Caucasian Female

TEC Construction and Engineering $931,970 DBE African AmericanAnil Verma Associates $766,196 DBE Subcontinent AsianDakota Communications $216,048 DBE African AmericanNew York Geomatics $688,953McMillen Jacobs Associates $1,540,757

DBE Total Only $3,261,247

Total $5,490,957

Page 93

Page 94: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

763.) MA-27107 11/14/2016 Bus Filters Vehicle Maintenance Program $247,120 FTA 2% DBE: 2.00% Lamarr's Trucking Co. $4,942 DBE African American

764.) OP-3043-3488 10/27/2016 Management Support Services LTK Engineering Services $4,494,837 FTA 20% DBE: 30.74% Virginkar & Associates $824,803 DBE Subcontinent Asianfor HRV Overhaul and Ramos Consulting $556,910 DBE Hispanic AmericanCritical Component Replacement Systra Consulting $61,478

DBE Total $1,381,713

Total All Subs $1,443,190

765.) AE-24015-3041 9/15/2016 Design Services for Cesar Gensler $269,041 FTA 10% DBE: 32.92% W2 Design $24,000 DBE Asian-Pac AmericanChavez Bus Stop AHBE Landscape Architecture $34,560 DBE Asian-Pac American

PBS Engineers $30,000 DBE Subcontinent AsianSaiful Bouquet Engineers $31,500Jacobus & Yuang, Inc. $15,726

DBE Total Only $88,560

Total All Subs $135,786

766.) PS-5868500 9/15/2016 HRV Acquisition Program STV/PB Heavy Rail Vehicles $5,651,854 FTA 20% DBE: 20.88% Capitol Government Contract $1,116,174 DBE Hispanic AmericanControl Support Services - II, a Joint Venture Information Design Consultants $63,997 DBE African AmericanElement B Total $1,180,170

767.) OP-3043-3488 9/15/2016 Technical and Program LTK Engineering Services $3,997,195 FTA 20% DBE: 30.74% Virginkar & Associates $733,524 DBE Subcontinent AsianManagement Support Services Ramos Consulting Services $495,389 DBE Hispanic AmericanHRV Overhaul and Critical Systra Consulting $61,478Replacement Program DBE Total Only $1,228,914

Total All Subs $1,290,391

768.) PS-5608100 9/15/2016 Security Guard Services RMI International $81,944,840 FTA 30% DBE: 33.20% Allied Protection Services $11,012,984 DBE African American24798 North American Sercurity Invest. $4,886,386 DBE Hispanic American

Security America $11,304,576 DBE Hispanic AmericanTotal $27,203,946

769.) AE-24904 9/14/2016 West Santa Ana Branch Parsons Brinckerhoff $12,189,477 FTA 25% DBE: 26.12% BA Inc. $175,494 DBE African AmericanScenario 2 Corridor Environmental Study Cityworks Design $432,865 DBE Hispanic American

Connetics Transportation Group $83,103 DBE Asian-Pac AmericanEpic Land Solutions $125,662 DBE Caucasian FemaleGeospatial Professional Services $26,828 DBE Asian-Pac AmericanLenax Construction $671,633 DBE Caucasian FemaleTerry A Hayes Associates $1,616,583 DBE African AmericanTranslink Consulting $478,391 DBE Hispanic AmericanCH2M Hill $995,509Kimley Horn Associates $671,633Rincon Consultants $388,500

DBE Total Only $3,132,168

Total All Subs $5,277,701

Page 94

Page 95: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

770.) MA-24755-1 8/18/2016 CNG Fuel Cylinder Tanks Bus Worthington Cylinders $4,530,434 FTA 0% DBE: 0.00%Series

771.) MA-24755-2 8/18/2016 CNG Fuel Cylinder Tanks Bus Hexagon Lincoln $1,328,250 FTA 0% DBE: 0.00%Series

772.) PS5491000 8/18/2016 Nextrip Bus Arrival Electronic Syncromatics $3,998,865 FTA 15% DBE: 23.64% Cordoba Construction $945,365 DBE Hispanic AmericanSignage ND Construction $600,310

Daktronics $600,310Shelter Clean $141,700

DBE Total $945,365

Total $2,287,685

773.) OP-16523- 5/19/2016 Consulting Services for HRV LTK Engineering Services $21,706,022 FTA 20% DBE: 22.62% Ramos Consulting Services $782,199 DBE Hispanic American30433487 Technical Support Virginkar & Associates $4,128,437 DBE Hispanic American

CH2M Hill $1,036,991Systra Consulting $586,144NDYLTK Rail $73,747

DBE Total Only $4,910,636

Total All Subs $6,607,518

774.) MA-17204 1/21/2016 CNG Cylinder Replacement Worthington Cylinders $1,462,181 FTA 0% DBE: 0.00% IMPCO Technologies $92,299Project

775.) SD-17491 1/21/2016 Cummins, 8.9 ISLG, 280 HP Cummins Pacific $13,211,635 FTA 0% DBE: 0.48% Say Cargo Express, Inc. $63,580 DBE Hispanic AmericanNatural Gas Engines

776.) MA-17944 1/27/2016 Gear Box - Power Steering NABI Parts, LLC $54,528 FTA 0% DBE: 0.00%

777.) 15-0019 12/15/2015 Manifold - Fuel, NABI NABI Parts, LLC $413,982 FTA 0% DBE: 0.00%

778.) PS-3825500 11/19/2015 Convenience Copying Services Xerox Corporation $3,757,066 FTA 5% DBE: 5.22% Atlas Teknology Group $180,000 DBE Asian-Pac American

779.) 15-0004 Item 3 11/19/2015 Purchase of Bus Components New Flyer Industrial $170,286 FTA 5% DBE: 0.18% Say Cargo Express $7,546 DBE Hispanic American

780.) 15-0004 Item 5, 11/19/2015 Purchase of Bus Components Cummins Pacific Inc. $2,416,339 FTA 5% DBE: 0.19% Say Cargo Express $4,529 DBE Hispanic American6, and 11

781.) AE354280011791 10/14/2015 Willowbrook Rosa Parks RNL Interplan, Inc. $5,756,068 FTA 23% DBE: 33.31% AHBE Landscape Architects $159,610 DBE Asian-Pac AmericanStation Improvement Project Base Architects $215,052 DBE African AmericanDesign and Engineering Services Coast Surveying $136,535 DBE Hispanic American

Diaz Yourman & Associates $53,452 DBE Hispanic AmericanLenax Construction Services $215,530 DBE Caucasian FemalePacific Railway $63,826 DBE Caucasian Female

Page 95

Page 96: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

PBS Engineering $315,026 DBE Subcontinent AsianSKA Design $50,322 DBE Hispanic AmericanThe Roberts Group $93,647 DBE African AmericanW2 Design $362,688 DBE Asian-Pac American Pac Rim Engineering $251,390 DBE Asian-Pac AmericanJensen Hughes $30,397Kimley Horn & Associates $577,919Lerch Bates, Inc $115,098Miyamoto International, Inc. $196,354Veneklassen $124,958

DBE Total Only $1,917,078

Total All Subs $2,961,804

782.) PS-9240-3277 9/17/2015 ATMS Countywide Bus Xerox Transportation $952,000 FTA 0% DBE: 0.00%Signal Priority Implementation Solutions, Inc.

783.) PS-9240-3383 7/15/2015 Information Technology Multiple Awards $17,000,000 NTE FTA 12% DBE: 12.00% 22nd Century Technologies, Inc. TBD DBE Subcontinent AsianServices Bench Aeon Group, LLC TBD DBE Caucasian Female

ALINC Consulting, Inc. TBD DBE Asian-Pac AmericanAuriga Corporation TBD DBE Subcontinent AsianBirdi & Associates TBD DBE Subcontinent AsianEco & Associates TBD DBE Caucasian FemaleIntueor Consulting Inc. TBD DBE Subcontinent AsianViva USA Inc. TBD DBE Subcontinent AsianAccenture LLP TBDAccuvant TBDAST Corporation TBDAT&T TBDBlack Box Network Services TBDCH2M Hill TBDCivic Resource Group TBDDigital Scepter TBDE Demand TBDEplus Technology TBDHershey Technologies TBDHUB Technologies TBDInformation Management Resouces Inc. TBDIntratek Computer Inc. TBDMythics TBDPI Technology Inc. TBDPlante Moran PLLC TBDSidepath Inc. TBDSierra Cedar Inc. TBDSierra Cybernetics Inc. TBDT-Kartor TBD

Page 96

Page 97: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

Tstreet Solutions TBDVan & Associates TBDVision Technologies TBDWest Coast Cable Inc. TBDZensar Technologies Inc. TBD

Total All Subs TBD

784.) PS-298340011486 7/15/2015 Airport Metro Connector Gruen Associates $17,789,897 FTA 20% DBE: 22.71% JCE Engineering $492,979 DBE Hispanic American(PS-11486) 96th Street Transit Station Innvoative Engineering Group $1,410,548 DBE Asian-Pac American

BA, Inc. $560,605 DBE African AmericanDRC $386,042 DBE Hispanic AmericanFPL and Associates $215,733 DBE Asian-Pac AmericanBobby Knox Architects $74,984 DBE African AmericanLenax $704,831 DBE Caucasian FemaleDiaz Yourman Associates $125,465 DBE Hispanic AmericanCoast Surveying $70,658 DBE Hispanic AmericanSKA Design $63,686 DBE Hispanic AmericanThe Robert Group $302,929 DBE African AmericanSoteria $294,540 DBE Hispanic AmericanLand Econ Group $41,898 DBE Asian-Pac AmericanGrimshaw $3,560,209Arup $2,920,057Hatch Mott MacDonald $574,215Syska Hennessy $151,656Fehr & Peers $125,922

DBE Total Only $4,744,898

Total All Subs $12,076,957

785.) PS-8420-3243 7/16/2015 Sustainability Program Cumming Construction $12,823,943 FTA 25% DBE: 43.83% ICI Engineers $375,000 DBE Asian-Pac AmericanAssistance Management C2PM $624,489 DBE Asian-Pac American

Paragon $1,269,140 DBE Asian-Pac AmericanGC Green $640,096 DBE Hispanic AmericanCentury Diversified, Inc. $210,765 DBE Hispanic AmericanW2Design $763,605 DBE Asian-Pac AmericanThe Solis Group $390,305 DBE Hispanic AmericanEvans Brooks Associates TBD DBE Asian-Pac AmericanOkapi Architecture TBD DBE Asian-Pac AmericanPower-Tech Engineers $1,347,222 DBE Hispanic AmericanEnpowered Solutions $1,902,500Eckersall $429,359Lentini Design $337,500Coto Consulting, Inc. $543,750Integrated Engineering Management $249,782

DBE Total Only $5,620,622

Total All Subs $9,083,513

Page 97

Page 98: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

786.) PS-8420-3274 7/16/2015 Environmental Engineering Kleinfelder, Inc. $12,000,000 NTE FTA 15% DBE: 15.00% Advanced Technology Laboratories TBD DBE Hispanic Americanand Consulting Services Bench APPL, Inc. TBD DBE Caucasian Female

ASSET Laboratories TBD DBE Asian-Pac AmericanAurora Industrial Hygiene TBD DBE Caucasian FemaleCasamar Group, LLC TBD DBE Hispanic AmericanCoreProbe International TBD DBE Hispanic AmericanEMS Laboaratories TBD DBE Caucasian FemaleE-Nor Innovations TBD DBE African AmericanEntech Northwest, Inc. TBD DBE African AmericanInnovative Construction Solutions TBD DBE Native AmericanIndustrial Hygiene Management, Inc. TBD DBE Caucasian FemaleInterphase Environmental, Inc. TBD DBE Asian-Pac AmericanMARRS Services TBD DBE Subcontinent AsianMartini Drilling Corporation TBD DBE Hispanic AmericanMorgner Construction Management TBD DBE Hispanic AmericanProjectLine Technical Services TBD DBE Asian-Pac AmericanSafeProbe TBD DBE Asian-Pac AmericanTerry A. Hayes Associates TBD DBE African AmericanThe Bodhi Group TBD DBE Subcontinent AsianWagner Engineering & Survey TBD DBE Caucasian FemalePrima Environmental TBDPure Effect, Inc. TBDSouthwest Geophysics, Inc. TBDSubsurface Surveys & Associates TBDVironex TBDWayne Perry, Inc. TBDBarney's Hole Digging Service TBDBC2 Environmental Corporation TBDBelshire Environmental Services TBDCascade Drilling TBDCO's Traffic Control TBDDrewelow Remediation Equipment TBDFielder Group TBDFlat & Vertical TBDForensic Analytical Laboratories TBDGeomorphysis TBDHazardous Tech TBDJones Environmental TBDK-Vac Environmental Services TBD

Total All Subs TBD

787.) PS-272680011357 6/17/2014 Regional Bikeshare Bicycle Transit Systems, Inc. $11,065,673 FTA 22% DBE: 22.37% Say Cargo Express $75,247 DBE Hispanic American(PS-11357) Implementation Plan for Los Accel Employment Services $1,690,835 DBE Asian-Pac American

Angeles County BikeHub $606,399 DBE Asian-Pac American

Page 98

Page 99: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

Toole Design Group, LLC $102,911 DBE Caucasian FemaleB-cycle, LLC $603,079Kiosk Information System $2,349,242RideScout, LLC $14,385

DBE Total Only $2,475,391

Total All Subs $5,442,098

788.) 3000002900 3/27/2015 EN078-01-002 Mod 1 Cultural AECOM Technical Services, Inc. $4,428 FTA 0% DBE: 0.00%Resource Training For Construction

789.) 3000002904 3/27/2015 EN077-12-008 Emegency Arcadis US Inc. $11,571 FTA 0% DBE: 0.00%Generator Diesel AST Installation

790.) 3000002906 3/27/2015 EN078-02-002 MOL/MRL AECOM Technical Services, Inc. $6,590 FTA 0% DBE: 0.00%North Hollywood West Entrance: Archaeological/Paleontological Monitoring Services Mod 1

791.) PS2262600 3/11/2015 Coordinated Public Transit AMMA Transit Planning $273,513 FTA 0% DBE: 60.86% AMMA Transit Planning (ATP) $166,454 DBE Caucasian FemaleHuman Services Transportation Mobility Planners $31,990Plan Update for Los Angeles GIS Workshop $8,480County DBE Total Only $166,454

Total All Subs $206,924

792.) 3000002712 2/2/2015 Civil and Track Engineering J L Patterson and Associates $608,619 FTA 0% DBE: 0.00%Services for the Washington Siding

793.) PM024-22- 2/5/2015 PM024, CWO-22, CADD STV Incorporated $19,358 FTA 10% DALP: 0.00%MOD-00008

794.) HUB11335 (Set Aside)2/9/2015 Group Bicycle Parking Facility AP Construction, Inc. $597,300 FTA Set- DBE: 77.80% AP Construction, Inc. $464,695 DBE Hispanic AmericanAside SJL Plumbing & Piping $26,200

Delta Electric $29,500Grover Hobbs $13,000Techniquex $11,000Interior Plus $52,905

DBE Total Only $464,695

Total All Subs $597,300

795.) C0948-MOD-5.00 2/27/2015 C0948-211001 MOW Siemens Industry Inc $3,313,065 FTA 12% DALP: 0.00%Engineering

Page 99

Page 100: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

796.) C1108 (Set-Aside) 1/15/2015 Installation of Bus Shelters AP Construction, Inc. $3,690,710 FTA Set- DBE: 49.38% AP Construction, Inc. $1,822,472 DBE Hispanic AmericanMetro Rapid Pylons Aside Tolar Manufacturing Company $1,688,131

ShelterClean Services $180,107DBE Total Only $1,822,472

Total All Subs $3,690,710

797.) 3000002626 1/29/2015 Westside (Purple Line) Parcels Kiley Company $14,000 FTA 0% DBE: 100.00% Kiley Company $14,000 DBE Caucasian FemaleW-6102-1, W-6104, W-6106

798.) 3000002628 1/29/2015 Westside (Purple Line) Parcels R.P. Laurain & Associates, Inc $11,200 FTA 0% DBE: 0.00%W-6102-1, W-6104, W-6106

799.) 14-0034 1/29/2015 Rotor - Bus Disc Brakes NABI Parts LLC $317,562 FTA 0% DBE: 0.00%

800.) 14-0034 1/29/2015 Rotor - Bus Disc Brakes JIT Truck Parts LLC $750,269 FTA 0% DBE: 0.00%

801.) 15-0002 (Set-Aside) 1/29/2015 Engine Oil Patten Energy, Inc. $2,026,325 FTA Set- DBE: 100.00% Patten Energy, Inc. $2,026,325 DBE African AmericanAside

802.) PS1779633673325 1/29/2015 Herbicide Application Services Conejo Crest Landscape, Inc. $1,915,506 FTA 5% DBE: 15.50% Far East Landscape $296,903 DBE Asian-Pac Americanfor Bus and Rail Right-Of-Way and Facilities

803.) 14-0047 12/22/2014 Toner Cartridges (A) CVR Computer Supplies $9,350 FTA 0% DBE: 0.00%

804.) 14-0047 12/22/2014 Toner Cartridges (B) Daisy I.T. Supplies $4,658 FTA 0% DBE: 0.00%

805.) 14-0047 12/22/2014 Toner Cartridges (C) General Data Company, Inc. $34,285 FTA 0% DBE: 0.00%

806.) 14-0047 12/22/2014 Toner Cartridges (D) Coast to Coast Computer $99,000 FTA 0% DBE: 0.00%Products, Inc.

807.) 3000002383 12/2/2014 RC: Cisco 7945G Telephone Kambrian Corporation $15,246 FTA 0% DBE: 0.00% Kambrian Corporation $15,246 DBE Asian-Pac American

808.) 14-0044 11/5/2014 Toilet Paper - Line Item 1 CleanSource $52,408 FTA 0% DBE: 0.00%

809.) 14-0044 11/5/2014 Toilet Paper - Line Items 2 - 4 P & R Paper Supply Company $185,794 FTA 0% DBE: 0.00%

810.) C1045 11/1/2014 Westside Subway Extension Skanska, Traylor and Shea, Joint Venture$63,474,000 FTA 20% DBE: 20.26% BA, Inc. $1,879,660 DBE African AmericanProject - DESIGN Martini Drilling $364,501 DBE Hispanic American

California Testing & Inspection $71,587 DBE Hispanic AmericanV&A, Inc. $3,944,893 DBE Hispanic AmericanC2PM $1,589,605 DBE Asian-Pac AmericanTOGO Systems, Inc. $1,870,403 DBE Asian-Pac American

Page 100

Page 101: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

IEG - Innovative Engineering Group $2,239,209 DBE Asian-Pac AmericanMia Lehrer & Associates $455,875 DBE Hispanic AmericanMGE Engineering Inc. $444,815 DBE Asian-Pac AmericanParsons Transportation Group $38,580,472CH2M Hill Engineers, Inc. $10,341,836Group Delta Consultants $1,541,154Psomas $149,990

DBE Total Only $12,860,548

Total All Subs $63,474,000

811.) 3000002162 10/27/2014 Banner and Printing Services CR&A Custom $40,000 FTA 0% DBE: 0.00% CR&A Custom $40,000 DBE Hispanic American - Purple Line

812.) 3000002177 10/28/2014 MCO69-CWO-29- Stantec Consulting Inc $704,566 FTA 0% DBE: 0.00%Patsouras Plaza

813.) 14-0028A 10/23/2014 Bus - Alternators Romaine Electric $2,120,320 FTA 0% DBE: 0.00%(Engine Alternator 24V Belt Drive & Engine Alternator 300 AMP Drive)

814.) 14-0028B 10/23/2014 Bus - Alternators (Engine B & C Truck Electric, Inc. $712,120 FTA 0% DBE: 0.00%Alternator 24v/500 Belt Drive)

815.) 3000002114 10/22/2014 Construction Notice Walking Man, Inc. $30,000 FTA 0% DBE: 0.00%Distribution - Purple Line Extension

816.) 3000001997 10/8/2014 HUB Repair Kits for New Flyer of America $90,000 FTA 0% DBE: 0.00%New Flyer Buses

817.) C1056 10/1/2014 Westside Subway Extension Steve Bubalo $20,250,000 FTA 15% DBE: 15.30% Bradley Tanks, Inc. $250,000 DBE Asian-Pac AmericanProject (PLE) - Advanced Construction Co. Landmark Surveying Solutions, Inc. $352,000 DBE Asian-Pac AmericanUtility Relocations G&C Equipment Corp. $565,351 DBE African American(La Cienega Station) Langford & Carmichael, Inc. $19,250 DBE Asian-Pac American

Morgner Construction Management $383,152 DBE Hispanic AmericanCalifornia Testing & Inspection $329,265 DBE Hispanic AmericanColeman Construction, Inc. $800,000 DBE African AmericanSavala Equipment Company, Inc. $400,000 DBE Hispanic AmericanUAW $35,750ARUP $25,000Comet Electric, Inc. $608,130Sterndahi Enterprises Inc. $38,595

DBE Total Only $3,099,018

Total All Subs $3,806,493

Page 101

Page 102: January 2018 - Award Tracker Cumulative Report - Small Business …media.metro.net/about_us/business/images/sbprmc_report... · 2019. 6. 12. · 11/29/2017: Blue Towels. Ammmm Inc

1,038 54577 784

1,115 305DVBE Awards: 111

1745

Run Date:

1/3/2018

Contract # Award Date Prime Award $Funding

Source

Est

%Subcontractors Sub Amt.

Cert

Type

Total:

10/1/2014 - 11/30/17

DEOD AWARD TRACKER REPORT

Goals

Project Name Comm %

Total State/Local Awards:

Total Federal Awards:

Total Awards:

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period. Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

SBE Awards:

$672,103,372$763,980,229

$1,436,083,601 DBE Awards:

SBE Set Aside Awards:

Federal Subtotal:

DBE Commitment Subtotal:

DBE Percent Subtotal: 19.70%

Legend:

DALP - Disadvantaged Business Enterprise Anticipated Level of ParticipationDBE - Race Conscious Disadvantaged Business EnterpriseSBE - Small Business Enterprise

DVBE - Disabled Veteran Business Enterprise

$132,426,016

$672,103,372

Page 102