kaplan turbines - · pdf filekaplan turbines. 2 low-head kaplan turbine axial. sarihidir....

36
1 Kaplan Turbines

Upload: dodan

Post on 02-Feb-2018

234 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Kaplan Turbines - · PDF fileKaplan Turbines. 2 Low-head Kaplan turbine axial. SARIHIDIR. SCOPE OF SUPPLY: MAIN DATA: Turbines Type: 2 x P-30.6VK3C Generators Output: 2 x 3190 kW Gearboxes

1

Kaplan Turbines

Page 2: Kaplan Turbines - · PDF fileKaplan Turbines. 2 Low-head Kaplan turbine axial. SARIHIDIR. SCOPE OF SUPPLY: MAIN DATA: Turbines Type: 2 x P-30.6VK3C Generators Output: 2 x 3190 kW Gearboxes

2

Low-head Kaplan turbine axial

Page 3: Kaplan Turbines - · PDF fileKaplan Turbines. 2 Low-head Kaplan turbine axial. SARIHIDIR. SCOPE OF SUPPLY: MAIN DATA: Turbines Type: 2 x P-30.6VK3C Generators Output: 2 x 3190 kW Gearboxes

SARIHIDIR

SCOPE OF SUPPLY: MAIN DATA:

Turbines Type: 2 x P-30.6VK3CGenerators Output: 2 x 3190 kWGearboxes Head: 5,51 m Digital and hydraulic governors Speed: 151 min-1Electrical equipment Year: 2012Erection and commissioning Country: Turkey

Page 4: Kaplan Turbines - · PDF fileKaplan Turbines. 2 Low-head Kaplan turbine axial. SARIHIDIR. SCOPE OF SUPPLY: MAIN DATA: Turbines Type: 2 x P-30.6VK3C Generators Output: 2 x 3190 kW Gearboxes

LAHANKOSKI

SCOPE OF SUPPLY: MAIN DATA:

Turbine Type: S-11.2/MR4Generator Output: 535 kWHydraulic governor Head: 10,0 m Electrical equipment Speed: 428 min-1Erection and commissioning Year: 2011

Country: Finland

Page 5: Kaplan Turbines - · PDF fileKaplan Turbines. 2 Low-head Kaplan turbine axial. SARIHIDIR. SCOPE OF SUPPLY: MAIN DATA: Turbines Type: 2 x P-30.6VK3C Generators Output: 2 x 3190 kW Gearboxes

GREINSFURTH

SCOPE OF SUPPLY: MAIN DATA:

Turbine Type: SZ-10.6/MR4Generator Output: 519 kWDigital and hydraulic governor Head: 7,65 m Electrical equipment Speed: 429 min-1Erection and commissioning Year: 2011

Country: Austria

Page 6: Kaplan Turbines - · PDF fileKaplan Turbines. 2 Low-head Kaplan turbine axial. SARIHIDIR. SCOPE OF SUPPLY: MAIN DATA: Turbines Type: 2 x P-30.6VK3C Generators Output: 2 x 3190 kW Gearboxes

NEUBRUCK

SCOPE OF SUPPLY: MAIN DATA:

Turbine Type: T-16.0/MR4Generator Output: 1164 kWHydraulic governor Head: 8,71 m Electrical equipment Speed: 300 min-1Erection and commissioning Year: 2010

Country: Austria

Page 7: Kaplan Turbines - · PDF fileKaplan Turbines. 2 Low-head Kaplan turbine axial. SARIHIDIR. SCOPE OF SUPPLY: MAIN DATA: Turbines Type: 2 x P-30.6VK3C Generators Output: 2 x 3190 kW Gearboxes

GAILITZ

SCOPE OF SUPPLY: MAIN DATA:

Turbine Type: VKS12.5/SK5Generator Output: 1866 kWInlet valve Head: 25,77 m Hydraulic governor Speed: 500 min-1Erection and commissioning Year: 2010

Country: Austria

Page 8: Kaplan Turbines - · PDF fileKaplan Turbines. 2 Low-head Kaplan turbine axial. SARIHIDIR. SCOPE OF SUPPLY: MAIN DATA: Turbines Type: 2 x P-30.6VK3C Generators Output: 2 x 3190 kW Gearboxes

BRUNNENFELD

SCOPE OF SUPPLY: MAIN DATA:

Turbine Type: S-11,8/MR4 Generator Output: 321 kWHydraulic governor Head: 5,38 m Electrical equipment Speed: 333 min-1Erection and commissioning Year: 2011

Country: Austria

Page 9: Kaplan Turbines - · PDF fileKaplan Turbines. 2 Low-head Kaplan turbine axial. SARIHIDIR. SCOPE OF SUPPLY: MAIN DATA: Turbines Type: 2 x P-30.6VK3C Generators Output: 2 x 3190 kW Gearboxes

PRATERKRAFTWERK

SCOPE OF SUPPLY: MAIN DATA:

Turbine Type: RT22,0VK4A Output: 2502 kWHead: 8 m Speed: 210 min-1Year: 2010Country: Germany

Page 10: Kaplan Turbines - · PDF fileKaplan Turbines. 2 Low-head Kaplan turbine axial. SARIHIDIR. SCOPE OF SUPPLY: MAIN DATA: Turbines Type: 2 x P-30.6VK3C Generators Output: 2 x 3190 kW Gearboxes

RENDELSTEIN

SCOPE OF SUPPLY: MAIN DATA:

Turbine Type: SZ-16,0/SR6A Gearbox Output: 1653 kWGenerator Head: 13,50 m Hydraulic governor Speed: 305 min-1Erection and commissioning Year: 2010

Country: Italy

Page 11: Kaplan Turbines - · PDF fileKaplan Turbines. 2 Low-head Kaplan turbine axial. SARIHIDIR. SCOPE OF SUPPLY: MAIN DATA: Turbines Type: 2 x P-30.6VK3C Generators Output: 2 x 3190 kW Gearboxes

KISSAKOSKI

SCOPE OF SUPPLY: MAIN DATA:

Turbine Type: RT-23.00VK3CGenerator Output: 1500 kWHydraulic governor Head: 4,31 m Erection and commissioning Speed: 187,5 min-1

Year: 2012Country: Finland

Page 12: Kaplan Turbines - · PDF fileKaplan Turbines. 2 Low-head Kaplan turbine axial. SARIHIDIR. SCOPE OF SUPPLY: MAIN DATA: Turbines Type: 2 x P-30.6VK3C Generators Output: 2 x 3190 kW Gearboxes

TIRINO INFERIORE

SCOPE OF SUPPLY: MAIN DATA:

Turbine Type: VK-11,2/SK5Generator Out: 1205 kWHydraulic governor Head: 22,40 m Erection and commissioning Speed: 500 min-1

Year: 2008Country: Italy

Page 13: Kaplan Turbines - · PDF fileKaplan Turbines. 2 Low-head Kaplan turbine axial. SARIHIDIR. SCOPE OF SUPPLY: MAIN DATA: Turbines Type: 2 x P-30.6VK3C Generators Output: 2 x 3190 kW Gearboxes

FRÖTUNA

SCOPE OF SUPPLY: MAIN DATA:

Turbine Type: S-17,0/MR4 Generator Output: 859 kWHydraulic governor Head: 6,47 m Erection and commissioning Speed: 250 min-1

Year: 2009Country: Sweden

Page 14: Kaplan Turbines - · PDF fileKaplan Turbines. 2 Low-head Kaplan turbine axial. SARIHIDIR. SCOPE OF SUPPLY: MAIN DATA: Turbines Type: 2 x P-30.6VK3C Generators Output: 2 x 3190 kW Gearboxes

14

LERNBO

SCOPE OF SUPPLY: MAIN DATA:

Turbines Type: 2 x S-17,0/SR6A Generators Output: 2 x 3640 kWHydraulic governors Head: 27 m Erection and commissioning Speed: 428 min-1

Year: 2009Country: Sweden

Page 15: Kaplan Turbines - · PDF fileKaplan Turbines. 2 Low-head Kaplan turbine axial. SARIHIDIR. SCOPE OF SUPPLY: MAIN DATA: Turbines Type: 2 x P-30.6VK3C Generators Output: 2 x 3190 kW Gearboxes

15

GÖLOVA

SCOPE OF SUPPLY: MAIN DATA:

Turbine Type: S-10,6/SR6A Generator Output: 1000 kWDigital and hydraulic governor Head: 19 m Erection and commissioning Speed: 500 min-1

Year: 2009Country: Turkey

Page 16: Kaplan Turbines - · PDF fileKaplan Turbines. 2 Low-head Kaplan turbine axial. SARIHIDIR. SCOPE OF SUPPLY: MAIN DATA: Turbines Type: 2 x P-30.6VK3C Generators Output: 2 x 3190 kW Gearboxes

16

BURENTOBEL

SCOPE OF SUPPLY: MAIN DATA:

Turbine Type: AR-16,5/MR3A Generator Output: 292 kWHydraulic governor Head: 3,35 m Erection and commissioning Speed: 205 min-1

Year: 2008Country: Switzerland

Page 17: Kaplan Turbines - · PDF fileKaplan Turbines. 2 Low-head Kaplan turbine axial. SARIHIDIR. SCOPE OF SUPPLY: MAIN DATA: Turbines Type: 2 x P-30.6VK3C Generators Output: 2 x 3190 kW Gearboxes

17

LUDVIKA

SCOPE OF SUPPLY: MAIN DATA:

Turbine Type: S-21,2/SR6 Generator Output: 3681 kWHydraulic governor Head: 17,00 m Erection and commissioning Speed: 273 min-1

Year: 2007Country: Sweden

Page 18: Kaplan Turbines - · PDF fileKaplan Turbines. 2 Low-head Kaplan turbine axial. SARIHIDIR. SCOPE OF SUPPLY: MAIN DATA: Turbines Type: 2 x P-30.6VK3C Generators Output: 2 x 3190 kW Gearboxes

18

YONGHUNG

SCOPE OF SUPPLY: MAIN DATA:

Turbines Type: 3 x P-21,2/MR4 Generators Output: 3 x 1070 kWCooling water systems Head: 6,92 m Digital and hydraulic governors Speed: 188 min-1Erection and commissioning Year: 2007

Country: South Korea

Page 19: Kaplan Turbines - · PDF fileKaplan Turbines. 2 Low-head Kaplan turbine axial. SARIHIDIR. SCOPE OF SUPPLY: MAIN DATA: Turbines Type: 2 x P-30.6VK3C Generators Output: 2 x 3190 kW Gearboxes

19

CHIPOLE

SCOPE OF SUPPLY: MAIN DATA:

Turbine Type: S-10,0/SR6Generator Output: 418 kWDigital and hydraulic governor Head: 11,83 m Erection and commissioning Speed: 428 min-1

Year: 2003Country: Tanzania

Page 20: Kaplan Turbines - · PDF fileKaplan Turbines. 2 Low-head Kaplan turbine axial. SARIHIDIR. SCOPE OF SUPPLY: MAIN DATA: Turbines Type: 2 x P-30.6VK3C Generators Output: 2 x 3190 kW Gearboxes

20

KÜHHÖRNDLWEHR

SCOPE OF SUPPLY: MAIN DATA:

Turbine Type: S-12,5/MR4 Generator Output: 664 kWInlet valve Head: 8,89 m Hydraulic governor Speed: 375 min-1Erection and commissioning Year: 2005

Country: Austria

Page 21: Kaplan Turbines - · PDF fileKaplan Turbines. 2 Low-head Kaplan turbine axial. SARIHIDIR. SCOPE OF SUPPLY: MAIN DATA: Turbines Type: 2 x P-30.6VK3C Generators Output: 2 x 3190 kW Gearboxes

21

SCHALLAU

SCOPE OF SUPPLY: MAIN DATA:

Turbine Type: ART-11,2/MR4 Generator Output: 254 kWHydraulic governor Head: 4,75 m Erection and commissioning Speed: 315 min-1

Year: 2005Country: Austria

Page 22: Kaplan Turbines - · PDF fileKaplan Turbines. 2 Low-head Kaplan turbine axial. SARIHIDIR. SCOPE OF SUPPLY: MAIN DATA: Turbines Type: 2 x P-30.6VK3C Generators Output: 2 x 3190 kW Gearboxes

22

STIFTSWERK

SCOPE OF SUPPLY: MAIN DATA:

Turbine Type: ART-16,5/MR3 Generator Output: 387 kWHydraulic governor Head: 3,60 m Intake equipment Speed: 210 min-1Erection and commissioning Year: 2005

Country: Austria

Page 23: Kaplan Turbines - · PDF fileKaplan Turbines. 2 Low-head Kaplan turbine axial. SARIHIDIR. SCOPE OF SUPPLY: MAIN DATA: Turbines Type: 2 x P-30.6VK3C Generators Output: 2 x 3190 kW Gearboxes

23

DORFMÜHLE

SCOPE OF SUPPLY: MAIN DATA:

Turbines Type: 2 x S-19,0/MR4Generators Output: 2 x 1338 kWHydraulic governor Head: 7,0 m Erection and commissioning Speed: 231 min-1

Year: 2003Country: Austria

Page 24: Kaplan Turbines - · PDF fileKaplan Turbines. 2 Low-head Kaplan turbine axial. SARIHIDIR. SCOPE OF SUPPLY: MAIN DATA: Turbines Type: 2 x P-30.6VK3C Generators Output: 2 x 3190 kW Gearboxes

24

WALZWERK

SCOPE OF SUPPLY: MAIN DATA:

Turbine Type: S-16,0/MR4 Hydraulic governor Output: 548 kWIntake equipment Head: 5,16 m Erection and commissioning Speed: 250 min-1

Year: 2003Country: Austria

Page 25: Kaplan Turbines - · PDF fileKaplan Turbines. 2 Low-head Kaplan turbine axial. SARIHIDIR. SCOPE OF SUPPLY: MAIN DATA: Turbines Type: 2 x P-30.6VK3C Generators Output: 2 x 3190 kW Gearboxes

25

AUWEHR

SCOPE OF SUPPLY: MAIN DATA:

Turbines Type: SZ-12,5/MR4, SZ-8,5/MR4 Weir system Output: 918 / 432 kWSteel structure Head: 11,4 m Hydraulic governors Speed: 428 / 600 min-1Erection and commissioning Year: 2002

Country: Austria

Page 26: Kaplan Turbines - · PDF fileKaplan Turbines. 2 Low-head Kaplan turbine axial. SARIHIDIR. SCOPE OF SUPPLY: MAIN DATA: Turbines Type: 2 x P-30.6VK3C Generators Output: 2 x 3190 kW Gearboxes

26

ERLENHOLZ

SCOPE OF SUPPLY: MAIN DATA:

Turbine Type: S-9,0/SR6 Generator Output: 449 kWDigital and hydraulic governors Head: 12,80 m Erection and commissioning Speed: 500 min-1

Year: 2002Country: Switzerland

Page 27: Kaplan Turbines - · PDF fileKaplan Turbines. 2 Low-head Kaplan turbine axial. SARIHIDIR. SCOPE OF SUPPLY: MAIN DATA: Turbines Type: 2 x P-30.6VK3C Generators Output: 2 x 3190 kW Gearboxes

27

Kaplan Turbine –vertical

Page 28: Kaplan Turbines - · PDF fileKaplan Turbines. 2 Low-head Kaplan turbine axial. SARIHIDIR. SCOPE OF SUPPLY: MAIN DATA: Turbines Type: 2 x P-30.6VK3C Generators Output: 2 x 3190 kW Gearboxes

AUSLAUFTURBINE

SCOPE OF SUPPLY: MAIN DATA:

Turbine Type: VK-14,5/SK4B Generator Output: 384 kWGearbox Head: 5,7 m Hydraulic governor Speed: 220 min-1Erection and commissioning Year: 2009

Country: Austria

Page 29: Kaplan Turbines - · PDF fileKaplan Turbines. 2 Low-head Kaplan turbine axial. SARIHIDIR. SCOPE OF SUPPLY: MAIN DATA: Turbines Type: 2 x P-30.6VK3C Generators Output: 2 x 3190 kW Gearboxes

KEMNADE

SCOPE OF SUPPLY: MAIN DATA:

Turbine Type: VK30.60VK4BOutput: 726 kWHead: 2,40 m Speed: 91 min-1Year: 2011Country: Germany

Page 30: Kaplan Turbines - · PDF fileKaplan Turbines. 2 Low-head Kaplan turbine axial. SARIHIDIR. SCOPE OF SUPPLY: MAIN DATA: Turbines Type: 2 x P-30.6VK3C Generators Output: 2 x 3190 kW Gearboxes

PROVIANTBACH

SCOPE OF SUPPLY: MAIN DATA:

Turbine Type: VK23.00VK4BOutput: 758 kWHead: 4,69 m Speed: 157,8 min-1Year: 2011Country: Germany

Page 31: Kaplan Turbines - · PDF fileKaplan Turbines. 2 Low-head Kaplan turbine axial. SARIHIDIR. SCOPE OF SUPPLY: MAIN DATA: Turbines Type: 2 x P-30.6VK3C Generators Output: 2 x 3190 kW Gearboxes

VILLA D’ALME

SCOPE OF SUPPLY: MAIN DATA:

Turbine Type: VK-18,0/SK4A Generator Output: 1020 kWInlet gate Head: 7,16 m Hydraulic governor Speed: 231 min-1Electrical equipment Year: 2009Erection and commissioning Country: Italy

Page 32: Kaplan Turbines - · PDF fileKaplan Turbines. 2 Low-head Kaplan turbine axial. SARIHIDIR. SCOPE OF SUPPLY: MAIN DATA: Turbines Type: 2 x P-30.6VK3C Generators Output: 2 x 3190 kW Gearboxes

ST. AEGYD

SCOPE OF SUPPLY: MAIN DATA:

Turbine Type: VK-7,4/KR4 Generator Output: 50 kWSteel structure Head: 3,5 m Hydraulic governor Speed: 400 min-1Erection and commissioning Year: 2006

Country: Austria

Page 33: Kaplan Turbines - · PDF fileKaplan Turbines. 2 Low-head Kaplan turbine axial. SARIHIDIR. SCOPE OF SUPPLY: MAIN DATA: Turbines Type: 2 x P-30.6VK3C Generators Output: 2 x 3190 kW Gearboxes

MÜHLTALWEHR

SCOPE OF SUPPLY: MAIN DATA:

Turbine Type: VK-19,0/SK4A Generator Output: 630 kWGearbox Head: 4,9 m Hydraulic governor Speed: 175 min-1Erection and commissioning Year: 2005

Country: Austria

Page 34: Kaplan Turbines - · PDF fileKaplan Turbines. 2 Low-head Kaplan turbine axial. SARIHIDIR. SCOPE OF SUPPLY: MAIN DATA: Turbines Type: 2 x P-30.6VK3C Generators Output: 2 x 3190 kW Gearboxes

LOFERBACH

SCOPE OF SUPPLY: MAIN DATA:

Turbine Type: VK-11,5/KR4 Inlet gate Output: 197 kWHydraulic governor Head: 4,9 m Erection and commissioning Speed: 285 min-1

Year: 2003Country: Austria

Page 35: Kaplan Turbines - · PDF fileKaplan Turbines. 2 Low-head Kaplan turbine axial. SARIHIDIR. SCOPE OF SUPPLY: MAIN DATA: Turbines Type: 2 x P-30.6VK3C Generators Output: 2 x 3190 kW Gearboxes

Contact:Kössler Gesellschaft m.b.H.WasserkraftanlagenHauptstraße 122-1243151 St. GeorgenPhone: +43/2742/885272E-mail: [email protected]

Page 36: Kaplan Turbines - · PDF fileKaplan Turbines. 2 Low-head Kaplan turbine axial. SARIHIDIR. SCOPE OF SUPPLY: MAIN DATA: Turbines Type: 2 x P-30.6VK3C Generators Output: 2 x 3190 kW Gearboxes