Kent Goldthorpe, President Paul Woods, Vice President Rebecca W. Arnold, Commissioner Sara M. Baker, Commissioner Jim D. Hansen, Commissioner Planning & Programming April 27, 2016 TO: Commissioners, Director, and Deputy Directors FROM: Ryan Head, AICP, Planning Supervisor SUBJECT: FY20172021 Integrated FiveYear Work Plan (IFYWP) Early Issues Commission Work Session – May 11, 2016 Executive Summary The Integrated FiveYear Work Plan (IFYWP) is the District’s fiveyear plan of projects and activities, which provides common direction internally, and strives to establish stability and consistency for the District and its partners, as ACHD implements its mission. After Commission feedback during the work session, staff will finalize the prioritization ranking (technical scores) and begin programming for the Initial Draft. The Integrated FiveYear Work Plan is updated annually and its schedule is coordinated with the preparation of the budget to provide a seamless transition between the fiscal years covered by the budget and the subsequent years programmed in the IFYWP. The purpose of this work session is to update the Commission and affirm direction on emerging issues to be addressed during the upcoming IFYWP. Planning Framework ACHD is in the process of developing a Strategic Plan to provide an umbrella framework for all work done by the District. A key focus of this effort is ensuring ACHD is properly managing and maintaining the public’s transportation assets, while investing in additional infrastructure needed to accommodate growth within Ada County and its six cities. This iteration of the IFYWP includes the principles and basic direction provided by the Commission through the Strategic Planning effort to date. Further, the IFYWP is the tool used to implement ACHD’s longterm plans. This includes the: Capital Improvement Plan Transportation Land Use Integration Plan Bike Master Plan PedestrianBicycle Transition Plan State Street Transit and Traffic Operational Plan Neighborhood Pedestrian and Bicycle Plans Downtown Boise Implementation Plan Kuna Downtown Corridor Plan Other SubArea and Corridor Plan

Upload: others

Post on 08-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

Kent Goldthorpe, President Paul Woods, Vice President

Rebecca W. Arnold, Commissioner Sara M. Baker, Commissioner Jim D. Hansen, Commissioner

Planning & Programming April 27, 2016  

TO:    Commissioners, Director, and Deputy Directors  

FROM:   Ryan Head, AICP, Planning Supervisor  

SUBJECT:  FY2017‐2021 Integrated Five‐Year Work Plan (IFYWP) ‐ Early Issues   Commission Work Session – May 11, 2016 

Executive Summary The Integrated Five‐Year Work Plan (IFYWP) is the District’s five‐year plan of projects and activities, which provides common direction internally, and strives to establish stability and consistency for the District and its partners, as ACHD implements its mission.  After Commission feedback during the work session, staff will finalize the prioritization ranking (technical scores) and begin programming for the Initial Draft. The Integrated Five‐Year Work Plan is updated annually and its schedule is coordinated with the preparation of the budget to provide a seamless transition between the fiscal years covered by the budget and the subsequent years programmed in the IFYWP.   The purpose of this work session is to update the Commission and affirm direction on emerging issues to be addressed during the upcoming IFYWP.   Planning Framework ACHD is in the process of developing a Strategic Plan to provide an umbrella framework for all work done by the District. A key focus of this effort is ensuring ACHD is properly managing and maintaining the public’s transportation assets, while investing in additional infrastructure needed to accommodate growth within Ada County and its six cities.  This iteration of the IFYWP includes the principles and basic direction provided by the Commission through the Strategic Planning effort to date.   Further, the IFYWP is the tool used to implement ACHD’s long‐term plans. This includes the: 

Capital Improvement Plan 

Transportation Land Use Integration Plan 

Bike Master Plan 

Pedestrian‐Bicycle Transition Plan 

State Street Transit and Traffic Operational Plan 

Neighborhood Pedestrian and Bicycle Plans 

Downtown Boise Implementation Plan 

Kuna Downtown Corridor Plan 

Other Sub‐Area and Corridor Plan  

Page 2: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

IFYWP Schedule and Milestones Significant dates for the IFYWP schedule: 

April 1: Agency transportation requests due – COMPLETE o Requests received from all agency partners, with the exception of Garden City. 

May 11: Early Issues Work Session – CURRENT WORK SESSION 

May 20: Send initial feedback to agencies on transportation requests 

August 10: Initial Draft IFYWP Work Session 

September 9: Public/agency comments due 

September 28: Work session on public/agency comments 

October 26: 2017‐2021 IFYWP adoption hearing  Draft Revenue Assumptions Revenue projections used in the development of the IFYWP included revenue assumptions being used in the development of the FY2017 Budget as well as the assumptions included in the ACHD Strategic Plan. In basic terms, the revenue projections assume the following: 

Property tax adjustments (if any) as approved by the Commission for the FY2017 Budget; 3% plus growth FY2019‐FY2023 

3.0% annual increase for impact fees and sales tax revenue 

2.5% annual increase for the highway user fund. Includes the approved state transportation funding increase (HB312) 

2.0% annual increase in labor and operational expenses 

1% annual growth for vehicle registration fees  

Agency Requests This year, ACHD received a total of 409 transportation requests from Ada County, five cities (no new requests submitted by Garden City), and the Boise, Kuna and West Ada School Districts, including: 

263 community programs requests (89 school district requests) 

138 road and intersection project requests 

8 study requests (6 pathway feasibility requests)  Attachments to this memo include a complete summary of the project requests and staff’s proposed response. The original request letter is also provided. These are organized by each individual jurisdiction. Staff makes the proposed responses based on existing policy and practice, with an effort to collaboratively support agency partners wherever possible. Staff seeks Commission confirmation of the proposed responses during the work session.   Economic Development Projects In FY2013, the Commission directed staff to set aside up to $2 million per year in funds for the development of an Economic Development program in the IFYWP. During the FY2014‐2018 update to the IFYWP, projects requested by the cities filled the 5 years of the Plan. Staff did not solicit additional economic development projects the last three years (including 2016), in order to allow the projects approved by the Commission in the FY2014 update to move forward and the program to be analyzed for its effectiveness. Many of the first group of projects will be completed by FY2017. Staff anticipates seeking additional requests during the FY2018‐2022 update cycle.  

Page 3: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

Priority Corridor Update During previous IFYWP efforts, the Capital Improvement Citizens Advisory Committee (CICAC) recommended and the Commission approved several priority corridors. Priority corridors are those corridors where significant investment has occurred, and will be a focus of future programming due to high prioritization. These corridors were also recommended to help focus resources and complete all work in a strategic way. The current status of those priority corridors is as follows: 

Cloverdale, I‐84/Chinden: All major intersections are complete; improvement of segments is under construction with Franklin/Fairview, followed by Fairview/Ustick in 2018, Ustick/McMillan in 2019, and McMillan/Chinden in 2020. 

Fairview Avenue Corridor (Linder/Orchard): The Commission adopted the Fairview Avenue Corridor Management Plan February 2013. On March 25, 2015, this project was put on hold indefinitely by the Commission. That said, ACHD has two intersection projects in the IFYWP: Fairview/Cole in 2017 and Fairview/Locust Grove in preliminary development. 

Five Mile (I‐84/Chinden): Fairview/Ustick is slated for construction in 2016. This would complete Five Mile as a priority corridor. 

Franklin (Black Cat/Five Mile): Completed to Ten Mile; Black Cat/Ten Mile and the Black Cat intersection slated to begin in 2016. This would complete Franklin as a priority corridor. 

Meridian Split Corridor: Complete. 

State Street (Glenwood/27th): Veterans Parkway/36th St intersection is in the right‐of‐way phase, with construction currently slated in 2018. Collister intersection is in design, with construction currently programmed for FY2019. The Pierce Park intersection is slated to begin concept design in FY2017. The Glenwood intersection will be put on hold during this IFYWP update due to the inability to obtain financial partnership on the project at this time from ITD. Widening of the roadway segments will not occur until triggers are met as set forth in the State Street TTOP. 

Ten Mile (Overland/Ustick): All major intersections are complete from Overland to Chinden; segments are completed from Overland to Cherry, with Cherry/Ustick under construction now. The remaining 2 miles (Ustick/Chinden) are both programmed in preliminary development. 

Ustick (Ten Mile/Cole): Completed Cole/Locust Grove. Linder/Locust Grove and the Meridian intersection are slated to begin construction in 2016. These projects are top priorities based on the adopted prioritization system. 

 With the planned completion of multiple priority corridors, Staff has proposed additional corridors for consideration by the CICAC. The Committee is scheduled to make their official recommendation on these new corridors at their meeting on May 16, 2016. During the work session, staff will review the draft corridors for consideration pending CICAC recommendation.  Programming Targets/Considerations Staff recommends continuing the following programming targets/considerations: 

A robust shelf strategy will be presented in the IFYWP draft, increasing efforts in design and right‐of‐way phases and allowing construction phases to be “on shelf” as changes occur in revenues or project costs. The goal will be to have a shelf list of projects whose construction phases represent up to 20% of the capital budget in the out years of the IFYWP. Coupled with a robust list of capital maintenance projects, this strategy will allow the District to move more nimble as conditions change.  

Page 4: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

Staff recommends maintaining the target of $7‐$9 million per year for Community Programs. This target includes: 

o A minimum of 5% of the capital budget toward Core Community Programs.  

o Half of the increase in vehicle registration fee revenues approved in 2008. 

o ACHD’s Safe Sidewalk program. (About $1.1 million/year) 

o Up to $2 million per year for the Economic Development program.  

Staff recommends maintaining the target of $10‐$14 million per year for Capital Maintenance. 

 Direction Needed 

How would the Commission direct staff to respond to the agency requests identified in the attachments? 

Does the Commission concur with the continued approach using priority corridors, including the new priorities when recommended by the CICAC? 

Does the Commission concur with continued use of the identified programming targets?  Next Steps 

August 10: Initial Draft IFYWP Work Session 

September 9: Public/agency comments due 

September 28: Work session on public/agency comments 

October 26: 2017‐2021 IFYWP adoption hearing  Attachments 

1. Ada County Request Summary and Letter 2. Boise Request Summary and Letter 3. Boise School District Request Summary and Letter 4. Eagle Request Summary and Letter 5. Kuna Request Summary and Letter 6. Kuna School District Request Summary and Letter 7. Meridian Request Summary and Letter 8. Star Request Summary and Letter 9. West Ada School District Request Summary and Letter 

 

Page 5: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

Attachment 1

Ada County 2016 Requests and ACHD Proposed Response

In IFYWP 

(Page)DSN YR ROW YR CN YR

Total Cost 

in MillionsProgramming Notes

Road & Intersection

1 1 IN205‐

11

SH 16 and Beacon 

Light Rd

Install a signal and add turn lanes as needed. ITD to lead project, with ACHD 

participating in the design and cost. Subject to cooperative agreement and 

programming with ITD.

Yes (49) 2016 2016 2017 $1.45 Project being led by ITD. To be built in FY2017.

2 2 IN205‐

66

SH 69 (Meridian Rd) 

and Hubbard Rd

Widen intersection to 7 lanes  on all approaches in accordance with the 2012 

CIP.

Yes (50) UF UF UF $5.04 ACHD requested project from ITD in spring 

2016. Project is part of ITD's Strategic 

Initiatives request for FY2021. ACHD with ITD 

on any improvement if funded.

3 3 RC0299 Ten Mile Rd, Victory 

Rd / Overland Rd

Widen Ten Mile Rd to 5 lanes with cubr, gutter, sidewalk and bike lanes in 

accordance with the 2012 CIP.

Yes (40) PD PD UF $4.38

Project design still in preliminary development, 

with construction unfunded. ACHD to evaluate 

potential advancement of project phases 

during IFYWP update.

4 5 RD207‐

21

Maple Grove Rd, Amity 

Rd / Victory Rd

Widen Maple Grove Rd to 5 lanes with curb, gutter, sidewalk, and bike lanes 

in accordance with the 2012 CIP. Project includes bridge #269A.

Yes (35) 2020 PD PD $3.47 Programmed to begin design in FY2020. ACHD 

to evaluate project construction moving 

forward through IFYWP update.

IN215‐

02

Cole Rd and Lake Hazel 

Rd

Construct a new signalized intersection in accordance with the 2012 CIP. 

Project includes bridge #349.

Yes (48) PD PD PD $6.67

Project design still in preliminary development, 

with construction unfunded. ACHD to evaluate 

potential advancement of project phases 

during IFYWP update.

RD209‐

19

Lake Hazel Rd, Cole Rd 

/ Orchard St Extension

Construct a new roadway extension of Lake Hazel Rd, between Cole Rd and 

the Orchard St Extension. 

No $3.90

Proposed developer cooperative project to be 

evaluated for inclusion in the IFYWP update. 

RD207‐

01

Orchard St, Gowen Rd 

/ I‐84 On‐Ramp

Realign and widen Orchard St to 5 lanes with curb, gutter, sidewalk and bike 

lanes.

No $4.76 ACHD to complete an alignment study and 

concept design in FY2017.

Orchard St, Lake Hazel 

Rd / Gowen Rd

Construct a new roadway extension of Orchard St, between Gowen Rd and 

the Lake Hazel Rd Extension. 

No $5.89

Proposed developer cooperative project to be 

evaluated for inclusion in the IFYWP update. 

RD209‐

19

Lake Hazel Rd, Orchard 

St Extension / Pleasant 

Valley Rd

Construct a new roadway extension of Lake Hazel Rd, between the Orchard 

St Extension and Pleasant Valley Rd. 

No $5.28 Prioritize and program after completion of the  

connection between Lake Hazel and Orchard.

5 NEW

6 NEW

ACHD Proposed Response

2016 

County 

Priority 

Ranking

2015 

County 

Priority 

Ranking

GIS # ACHD Project Name     Project Description

Current Programming Status

PD ‐ Preliminary Development

UF ‐ Unfunded

CN ‐ Construction Year Page 1 of 2

Page 6: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

Attachment 1

7 8 MA215‐

05

Swan Falls Railroad 

Overpass (Kuna 

Railroad Overpass)

Install a new bridge over Indian Creek and Union Pacific Railroad on Swan 

Falls Rd.

No $18.50 Included on ACHD's Master Street Map. 

Project to occur in accordance with the Kuna 

Crossing Feasibility and Implementation Plan.

8 4 RC0207 Linder Rd, Overland Rd 

/ Franklin Rd

Widen Linder Rd to 5 lanes and construct a new 4‐lane I‐84 overpass, 

including curb, gutter, sidewalk, and bike lanes in accordance with the 2012 

CIP. Project would be a joint project between ACHD and ITD.

No $3.15 Cost do not include overpass.  ACHD requested project from ITD in spring 

2016. Project is not on ITD's planned projects 

at this time. ACHD will continue to pursue 

project with ITD.

9 9 N/A Midway Dr/Glenwood 

St

New signal. No N/A ACHD has no right‐of‐way at this location. 

ACHD to share request with ITD. 

Community Programs

1 1 CM213‐

64

Linder Rd, Main St / 

Deer Flat Rd (Linder 

Rd, Deer Flat Rd / 

Boise St)

Complete curb, gutter, detached sidewalk and bike lanes on both sides  of 

Linder Rd, between 4th St (Linder/Main/3rd project limits) to Deer Flat Rd. 

Project will construct a Rectangular Rapid Flashing Beacon at Porter St.

Yes 

(116)

PD PD PD $1.44

Project design still in preliminary development. 

ACHD to evaluate potential advancement of 

project phases during IFYWP update.

2 2 PPI208‐

91, 

CM212‐

05

Lake Hazel Rd, west of 

Maple Grove Rd

Two pedestrian projects programmed: 1) Lake Hazel Rd, Cloverdale Rd / 

Lowland View Way and 2) Lake Hazel, Pearl Jensen Ave / Acacia Ave.

Yes 

(115)

Done 2016 2016‐

2017

$0.62 Projects to be built in FY2016 and FY2017.

3 3 CM212‐

27

Garrett St, Chinden 

Blvd / Marigold St           

Complete sidewalks and bike lanes on both sides of Garrett Street between 

Chinden Blvd and Marigold St for greater pedestrian and bike connectivity 

between the west bench and the greenbelt.

Yes 

(112)

2017 2018 2019 $0.15 To be built in FY2019.

4 NEW Warm Springs Ave, 

Signal Rock Dr / Lysted 

Ave

Drainage improvements. No N/A Prioritize and scope. 

PD ‐ Preliminary Development

UF ‐ Unfunded

CN ‐ Construction Year Page 2 of 2

Page 7: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded
Page 8: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded
Page 9: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

Ada County Courthouse 200 West Front Street Boise ID 83702 208.287.7900 Fax 208.287.7909 www.adacounty.id.gov

Department Divisions Building Engineering & Surveying Permitting Planning & Zoning

Ada County Commissioners Jim Tibbs, First District Rick Yzaguirre, Second District David L. Case, Third District

Megan M. Leatherman, MCRP Director

ADA COUNTY

Development Services Department

April 1, 2016 Ryan Head, AICP Planning Supervisor Ada County Highway District 3775 Adams Street Garden City, ID 83714 RE: Ada County FY 2017-2021 IFYWP Narratives Community

Programs #1 – Pedestrian Improvements along Linder Road

Dear Mr. Head: Thank you for the opportunity to describe Ada County’s transportation priorities for the FY17-2021 IFYWP. The County respectfully requests sidewalks be installed along both sides of Linder Road between Deer Flat Road and Boise Street. Both sides of the street have some sidewalk but there are large gaps that should be completed. There are also several schools in the immediate vicinity and the complete sidewalks would benefit the children walking to-and-from school. I appreciate your consideration of the information contained herein as you prepare a draft IFYWP. If you have any questions or need additional detail about the project(s) please do not hesitate to contact me. Sincerely yours,

Megan Basham, AICP Community and Regional Planner

Page 10: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

Ada County Courthouse 200 West Front Street Boise ID 83702 208.287.7900 Fax 208.287.7909 www.adacounty.id.gov

Department Divisions Building Engineering & Surveying Permitting Planning & Zoning

Ada County Commissioners Jim Tibbs, First District Rick Yzaguirre, Second District David L. Case, Third District

Megan M. Leatherman, MCRP Director

ADA COUNTY

Development Services Department

April 1, 2016 Ryan Head, AICP Planning Supervisor Ada County Highway District 3775 Adams Street Garden City, ID 83714 RE: Ada County FY 2017-2021 IFYWP Narratives Community

Programs #2 – Lake Hazel Road Bicycle & Pedestrian Improvements

Dear Mr. Head: Thank you for the opportunity to describe Ada County’s transportation priorities for the FY17-2021 IFYWP. There are sections of Lake Hazel Road, west of Maple Grove Road, that lack adequate or safe bicycle and pedestrian facilities. To increase safety for non-motorized users of the identified roadway segment, the County requests that the roadway be improved with sidewalk and that the shoulders be widened. I appreciate your consideration of the information contained herein as you prepare a draft IFYWP. If you have any questions or need additional detail about the project(s) please do not hesitate to contact me. Sincerely yours,

Megan Basham, AICP Community and Regional Planner

Page 11: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

Ada County Courthouse 200 West Front Street Boise ID 83702 208.287.7900 Fax 208.287.7909 www.adacounty.id.gov

Department Divisions Building Engineering & Surveying Permitting Planning & Zoning

Ada County Commissioners Jim Tibbs, First District Rick Yzaguirre, Second District David L. Case, Third District

Megan M. Leatherman, MCRP Director

ADA COUNTY

Development Services Department

April 1, 2016 Ryan Head, AICP Planning Supervisor Ada County Highway District 3775 Adams Street Garden City, ID 83714 RE: Ada County FY 2017-2021 IFYWP Narratives Community Programs #3 – Garrett Street Improvements Dear Mr. Head: Thank you for the opportunity to describe Ada County’s transportation priorities for the FY17-2021 IFYWP. The County respectfully requests that sidewalks and bike lanes be constructed on both sides of Garrett Street between Chinden Boulevard and Marigold Street. These improvements would provide greater bicycle and pedestrian connectivity between the west bench and the greenbelt. This request is made in support of the City of Garden City. I appreciate your consideration of the information contained herein as you prepare a draft IFYWP. If you have any questions or need additional detail about the project(s) please do not hesitate to contact me. Sincerely yours,

Megan Basham, AICP Community and Regional Planner

Page 12: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

Ada County Courthouse 200 West Front Street Boise ID 83702 208.287.7900 Fax 208.287.7909 www.adacounty.id.gov

Department Divisions Building Engineering & Surveying Permitting Planning & Zoning

Ada County Commissioners Jim Tibbs, First District Rick Yzaguirre, Second District David L. Case, Third District

Megan M. Leatherman, MCRP Director

ADA COUNTY

Development Services Department

April 1, 2016 Ryan Head, AICP Planning Supervisor Ada County Highway District 3775 Adams Street Garden City, ID 83714 RE: Ada County FY 2017-2021 IFYWP Narratives Community

Programs #4 – Drainage Improvements on Warm Springs between Gergerson Property (Signal Rock Drive) and Lysted Avenue

Dear Mr. Head: Thank you for the opportunity to describe Ada County’s transportation priorities for the FY17-2021 IFYWP. The County respectfully requests that drainage improvements be installed along Warm Springs Avenue between Signal Rock Drive and Lysted Avenue. The greenbelt runs parallel to Warm Springs Avenue in this location within the ACHD ROW and is maintained by Ada County Parks and Waterways. The road consistently floods several segments of the greenbelt in this area, creating a hazardous experience for greenbelt users. I appreciate your consideration of the information contained herein as you prepare a draft IFYWP. If you have any questions or need additional detail about the project(s) please do not hesitate to contact me. Sincerely yours,

Megan Basham, AICP Community and Regional Planner

Page 13: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

Ada County Courthouse 200 West Front Street Boise ID 83702 208.287.7900 Fax 208.287.7909 www.adacounty.id.gov

Department Divisions Building Engineering & Surveying Permitting Planning & Zoning

Ada County Commissioners Jim Tibbs, First District Rick Yzaguirre, Second District David L. Case, Third District

Megan M. Leatherman, MCRP Director

ADA COUNTY

Development Services Department

April 1, 2016 Ryan Head, AICP Planning Supervisor Ada County Highway District 3775 Adams Street Garden City, ID 83714 RE: Ada County FY 2017-2021 IFYWP Narratives Road & Intersection #1 – Traffic Control Signal at Beacon Light Road & SH-16 Dear Mr. Head: Thank you for the opportunity to describe Ada County’s transportation priorities for the FY17-2021 IFYWP. The County respectfully requests that a traffic control signal be installed at the intersection of SH-16 and Beacon Light Road to increase safety. As traffic flows are influenced by the extension of SH-16 to US-20/26, the need for a controlled intersection appears warranted to ensure safer interaction with east-west flowing traffic. I appreciate your consideration of the information contained herein as you prepare a draft IFYWP. If you have any questions or need additional detail about the project(s) please do not hesitate to contact me. Sincerely yours,

Megan Basham, AICP Community and Regional Planner

Page 14: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

Ada County Courthouse 200 West Front Street Boise ID 83702 208.287.7900 Fax 208.287.7909 www.adacounty.id.gov

Department Divisions Building Engineering & Surveying Permitting Planning & Zoning

Ada County Commissioners Jim Tibbs, First District Rick Yzaguirre, Second District David L. Case, Third District

Megan M. Leatherman, MCRP Director

ADA COUNTY

Development Services Department

April 1, 2016 Ryan Head, AICP Planning Supervisor Ada County Highway District 3775 Adams Street Garden City, ID 83714 RE: Ada County FY 2017-2021 IFYWP Narratives

Road & Intersection #2 – Traffic Control Signal at SH-69 and Hubbard Road

Dear Mr. Head: Thank you for the opportunity to describe Ada County’s transportation priorities for the FY17-2021 IFYWP. The County respectfully requests that a traffic control signal be installed at the intersection of SH-69 and Hubbard Road to increase safety. According to ITD’s High Accident Location summary report, the intersection is seeing an increase in traffic accidents and its ranking has gone from 255 to 180.5. The area is growing and as people move in, the pressure at the intersection will continue. I appreciate your consideration of the information contained herein as you prepare a draft IFYWP. If you have any questions or need additional detail about the project(s) please do not hesitate to contact me. Sincerely yours,

Megan Basham, AICP Community and Regional Planner

Page 15: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

Ada County Courthouse 200 West Front Street Boise ID 83702 208.287.7900 Fax 208.287.7909 www.adacounty.id.gov

Department Divisions Building Engineering & Surveying Permitting Planning & Zoning

Ada County Commissioners Jim Tibbs, First District Rick Yzaguirre, Second District David L. Case, Third District

Megan M. Leatherman, MCRP Director

ADA COUNTY

Development Services Department

April 1, 2016 Ryan Head, AICP Planning Supervisor Ada County Highway District 3775 Adams Street Garden City, ID 83714 RE: Ada County FY 2017-2021 IFYWP Narratives

Road & Intersection #3 – Ten Mile Road Widening between Overland Road and Victory Road

Dear Mr. Head: Thank you for the opportunity to describe Ada County’s transportation priorities for the FY17-2021 IFYWP. In 2011, Ada County identified Ten Mile Road widening north of Interstate 84 as a top priority. The County is appreciative of all of the improvements that have been completed by the ACHD thus far. Completing remaining improvements between Overland Road and Victory Road will help to move traffic more efficiently south of the I-84. That segment of the road is currently operating at a LOS F. I appreciate your consideration of the information contained herein as you prepare a draft IFYWP. If you have any questions or need additional detail about the project(s) please do not hesitate to contact me. Sincerely yours,

Megan Basham, AICP Community and Regional Planner

Page 16: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

Ada County Courthouse 200 West Front Street Boise ID 83702 208.287.7900 Fax 208.287.7909 www.adacounty.id.gov

Department Divisions Building Engineering & Surveying Permitting Planning & Zoning

Ada County Commissioners Jim Tibbs, First District Rick Yzaguirre, Second District David L. Case, Third District

Megan M. Leatherman, MCRP Director

ADA COUNTY

Development Services Department

April 1, 2016 Ryan Head, AICP Planning Supervisor Ada County Highway District 3775 Adams Street Garden City, ID 83714 RE: Ada County FY 2017-2021 IFYWP Narratives Road &

Intersection #4 – Maple Grove Widening between Victory Road and Amity Road

Dear Mr. Head: Thank you for the opportunity to describe Ada County’s transportation priorities for the FY17-2021 IFYWP. The County respectfully requests that Maple Grove Road be widened to 5 lanes with curb, gutter, sidewalk and bike lanes south of Victory Road to improve mobility in the Southwest, to help alleviate congestion, and to increase safety. It is a priority corridor and is functioning at a LOS F. I appreciate your consideration of the information contained herein as you prepare a draft IFYWP. If you have any questions or need additional detail about the project(s) please do not hesitate to contact me. Sincerely yours,

Megan Basham, AICP Community and Regional Planner

Page 17: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

Ada County Courthouse 200 West Front Street Boise ID 83702 208.287.7900 Fax 208.287.7909 www.adacounty.id.gov

Department Divisions Building Engineering & Surveying Permitting Planning & Zoning

Ada County Commissioners Jim Tibbs, First District Rick Yzaguirre, Second District David L. Case, Third District

Megan M. Leatherman, MCRP Director

ADA COUNTY

Development Services Department

April 1, 2016 Ryan Head, AICP Planning Supervisor Ada County Highway District 3775 Adams Street Garden City, ID 83714 RE: Ada County FY 2017-2021 IFYWP Narratives Road &

Intersection #5 – Lake Hazel/Cole Road Intersection and Extension to Orchard Street

Dear Mr. Head: Thank you for the opportunity to describe Ada County’s transportation priorities for the FY17-2021 IFYWP. Ada County respectfully requests that the intersection of Lake Hazel and Cole Road be constructed as well as the extension of Lake Hazel Road over the New York Canal to Orchard Street be built prior to the construction of homes in the Syringa Valley proposed development. Residents in this area are very concerned about the impacts the development will have on the efficiency and safety of the transportation network for cars, bikes and pedestrians. Cole Road from Amity to Victory is already operating at LOS F and the intersection of Cole Road and Victory Road is operating at LOS E. I appreciate your consideration of the information contained herein as you prepare a draft IFYWP. If you have any questions or need additional detail about the project(s) please do not hesitate to contact me. Sincerely yours,

Megan Basham, AICP Community and Regional Planner

Page 18: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

Ada County Courthouse 200 West Front Street Boise ID 83702 208.287.7900 Fax 208.287.7909 www.adacounty.id.gov

Department Divisions Building Engineering & Surveying Permitting Planning & Zoning

Ada County Commissioners Jim Tibbs, First District Rick Yzaguirre, Second District David L. Case, Third District

Megan M. Leatherman, MCRP Director

ADA COUNTY

Development Services Department

April 1, 2016 Ryan Head, AICP Planning Supervisor Ada County Highway District 3775 Adams Street Garden City, ID 83714 RE: Ada County FY 2017-2021 IFYWP Narratives Road & Intersection #6 – Orchard Street Extension Dear Mr. Head: Thank you for the opportunity to describe Ada County’s transportation priorities for the FY17-2021 IFYWP. Ada County respectfully requests that the both legs of the Orchard Steet extension (Lake Hazel to Orchard Street and Gowen Road to Pleasant Valley) be constructed prior to the construction of homes in the Syringa Valley proposed development. Residents in this area are very concerned about the impacts the development will have on the efficiency and safety of the transportation network for cars, bikes and pedestrians. The extension of Orchard Road will help to alleviate the pressure on Cole Road and its intersections. Cole Road from Amity to Victory is already operating at LOS F and the intersection of Cole Road and Victory Road is operating at LOS E. I appreciate your consideration of the information contained herein as you prepare a draft IFYWP. If you have any questions or need additional detail about the project(s) please do not hesitate to contact me. Sincerely yours,

Megan Basham, AICP Community and Regional Planner

Page 19: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

Ada County Courthouse 200 West Front Street Boise ID 83702 208.287.7900 Fax 208.287.7909 www.adacounty.id.gov

Department Divisions Building Engineering & Surveying Permitting Planning & Zoning

Ada County Commissioners Jim Tibbs, First District Rick Yzaguirre, Second District David L. Case, Third District

Megan M. Leatherman, MCRP Director

ADA COUNTY

Development Services Department

April 1, 2016 Ryan Head, AICP Planning Supervisor Ada County Highway District 3775 Adams Street Garden City, ID 83714 RE: Ada County FY 2017-2021 IFYWP Narratives Road & Intersection #7 – Kuna Railroad Overpass Dear Mr. Head: Thank you for the opportunity to describe Ada County’s transportation priorities for the FY17-2021 IFYWP. The County respectfully requests that an overpass be installed above the railroad track that runs through the City of Kuna. An overpass will provide residents and emergency responders with the ability to cross the railroad as trains pass through or stop on the tracks. This request is made in support of the City of Kuna. I appreciate your consideration of the information contained herein as you prepare a draft IFYWP. If you have any questions or need additional detail about the project(s) please do not hesitate to contact me. Sincerely yours,

Megan Basham, AICP Community and Regional Planner

Page 20: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

Ada County Courthouse 200 West Front Street Boise ID 83702 208.287.7900 Fax 208.287.7909 www.adacounty.id.gov

Department Divisions Building Engineering & Surveying Permitting Planning & Zoning

Ada County Commissioners Jim Tibbs, First District Rick Yzaguirre, Second District David L. Case, Third District

Megan M. Leatherman, MCRP Director

ADA COUNTY

Development Services Department

April 1, 2016 Ryan Head, AICP Planning Supervisor Ada County Highway District 3775 Adams Street Garden City, ID 83714 RE: Ada County FY 2017-2021 IFYWP Narratives Road &

Intersection #8 – Linder Road Overpass, Overland Road / Franklin Road

Dear Mr. Head: Thank you for the opportunity to describe Ada County’s transportation priorities for the FY17-2021 IFYWP. In 2011, Ada County requested that installation of the Linder Road Overpass be advanced in priority. Moving this project up in priority will help alleviate traffic on north-south corridors as well as east-west corridors such as Chinden Blvd (SH-20/26) and State St (SH-44). This request is made in support of the City of Meridian. I appreciate your consideration of the information contained herein as you prepare a draft IFYWP. If you have any questions or need additional detail about the project(s) please do not hesitate to contact me. Sincerely yours,

Megan Basham, AICP Community and Regional Planner

Page 21: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

Ada County Courthouse 200 West Front Street Boise ID 83702 208.287.7900 Fax 208.287.7909 www.adacounty.id.gov

Department Divisions Building Engineering & Surveying Permitting Planning & Zoning

Ada County Commissioners Jim Tibbs, First District Rick Yzaguirre, Second District David L. Case, Third District

Megan M. Leatherman, MCRP Director

ADA COUNTY

Development Services Department

April 1, 2016 Ryan Head, AICP Planning Supervisor Ada County Highway District 3775 Adams Street Garden City, ID 83714 RE: Ada County FY 2017-2021 IFYWP Narratives Road &

Intersection #9 – Traffic Control Signal at Midway Drive and Glenwood Street

Dear Mr. Head: Thank you for the opportunity to describe Ada County’s transportation priorities for the FY17-2021 IFYWP. The County respectfully requests that a traffic control signal be installed at the intersection of Midway Drive and Glenwood Street to increase safety for visitors of Idaho Expo turning left onto Glenwood Street. I appreciate your consideration of the information contained herein as you prepare a draft IFYWP. If you have any questions or need additional detail about the project(s) please do not hesitate to contact me. Sincerely yours,

Megan Basham, AICP Community and Regional Planner

Page 22: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

Attachment 2

City of Boise 2016 Requests and ACHD Proposed Response

In IFYWP 

(Page)DSN YR ROW YR CN YR

Total Cost 

in MillionsProgramming Notes

LTP LTP RD208‐

07

State St, 36th St / 27th 

St

Widen State St to 7 lanes with HOV/transit lanes, curb, gutter, sidewalk and 

bike lanes, in accordance with the State St TTOP and the 2012 CIP. This 

project may include an access management component. 

Yes (38) UF UF UF $5.01 Project will advance when land use, transit and 

roadway triggers are met as per the State 

Street TTOP.

LTP LTP RD208‐

06

State St, Collister Dr / 

36th St

Widen State St to 7 lanes with HOV/transit lanes, curb, gutter, sidewalk and 

bike lanes, in accordance with the State St TTOP and the 2012 CIP. This 

project may include an access management component. 

Yes (38) UF UF UF $10.12 Project will advance when land use, transit and 

roadway triggers are met as per the State 

Street TTOP.

LTP LTP RD208‐

05

State St, Pierce Park Ln 

/ Collister Dr

Widen State St to 7 lanes with HOV/transit lanes, curb, gutter, sidewalk and 

bike lanes, in accordance with the State St TTOP and the 2012 CIP. This 

project may include an access management component. 

Yes (39) UF UF UF $6.67 Project will advance when land use, transit and 

roadway triggers are met as per the State 

Street TTOP.

LTP LTP RD208‐

04

State St, Glenwood St / 

Pierce Park Ln

Widen State St to 7 lanes with HOV/transit lanes, curb, gutter, sidewalk and 

bike lanes, in accordance with the State St TTOP and the 2012 CIP. This 

project may include an access management component. 

Yes (38) UF UF UF $1.28 Project will advance when land use, transit and 

roadway triggers are met as per the State 

Street TTOP.

1 1 IN205‐

112

State St and Veterans 

Memorial Pkwy

Widen intersection in accordance with the State St/Veterans Memorial 

Pkwy/36th St Intersection Concept Study, including installation of median U‐

turns and installation of two‐phased pedestrian crossings. Project identified 

as a key piece of the State St TTOP.

Yes (46) Done 2016‐

2017

2018 $10.08 To be built in FY2018.

2 2 IN203‐

21

State St and Collister 

Dr

Federal aid project to improve the intersection of State St and Collister Dr, 

including realignment of the Collister Dr leg, curb, gutter, sidewalk, and bike 

lanes in accordance with the State St TTOP and the 2012 CIP. Project includes 

replacing bridge #090B.

Yes (45) 2015‐

2016

2016 2018 $9.36 Federal CN funding in 2018. 

Actual construction to occur in 

2019.

To be built in FY2019.

3 3 IN207‐

03

State St and Glenwood 

St

Widen and modify intersection in order to improve traffic and transit 

operations in accordance with the State St TTOP and the 2012 CIP. Joint 

project with ITD.

Yes (46) 2018 2019 PD $3.31 Project to be delayed during IFYWP update. 

ACHD requested project from ITD in spring 

2016. Project not on ITD's planned projects at 

this time. ACHD will continue to pursue project 

with ITD and develop concept when 

construction funding is more eminent.

4 4 IN210‐

03

State St and Pierce 

Park Ln

Widen intersection to 3 lanes on Pierce Park and 7 lanes on State St, including 

curb, gutter, sidewalk, and bike lanes in accordance with the State St TTOP 

and the 2012 CIP. 

Yes (46) 2019 2020 PD $4.08 Concept design to begin in FY2017. ACHD to 

evaluate project construction moving forward 

through IFYWP update.

ACHD Proposed Response

2016 City 

Priority 

Ranking

2015 City 

Priority 

Ranking

GIS # ACHD Project Name     Project Description

Current Programming Status

LTP ‐ Long Term Priority

PD ‐ Preliminary Development

CN ‐ Construction Year Page 1 of 10

Page 23: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

Attachment 2

In IFYWP 

(Page)DSN YR ROW YR CN YR

Total Cost 

in MillionsProgramming Notes

ACHD Proposed Response

2016 City 

Priority 

Ranking

2015 City 

Priority 

Ranking

GIS # ACHD Project Name     Project Description

Current Programming Status

5 6 IN213‐

01

Fairview Ave and Cole 

Rd

Widen intersection to 8 lanes on Fairview Ave and 7 lanes on Cole Rd, 

including curb, gutter, sidewalk, and bike lanes in accordance with the 2012 

CIP. Project includes non‐traversable raised medians.

Yes (44) Done 2016 2017 $4.97 To be built in FY2017.

6 7 SM215 ‐ 

SM220

Downtown Boise 

Implementation Plan 

(DBIP)

Perform road rehabilitation and 2‐way conversion of select streets in 

downtown Boise in concert with CCDC and other projects in accordance with 

the Downtown Boise Implementation Plan. 

Yes (83‐

85)

Varies Varies Varies $12.99 Ongoing construction to continue through 

FY2020. City's request for bike facilities and 2‐

way 5th and 6th streets under evaluation. 

These treatments, if approved, to be installed 

with planned maintenance work.

7 8 CM212‐

08

Emerald  St and 

Americana Blvd, 

Orchard St / Ann 

Morrison Park 

Entrance

Reconfigure Emerald St and Americana Blvd to add continuous bike lanes and 

complete the sidewalk on both sides of Emerald St in accordance with the 

Central Bench Neighborhood Plan.

Yes 

(129)

2016 2016 2017 $1.49 To be built in FY2017.

8 9 1180‐

705

Fairview Ave and Main 

St, Whitewater Park 

Blvd / 16th St

Restripe to add on‐street parking by removing a travel lane. No TBD Fairview‐Main Local Streets Improvement Plan 

is underway. This plan is exploring the 

feasibility and future cross section of Fairview 

and Main. The adopted study will inform 

future programming and construction.

9a 10 1180‐

705

Orchard St, Chinden St 

/ Overland Rd

Convert 4 lanes to 3 lanes and add bike lanes. No TBD As per the City's request, during the FY2017 

Budget process, ACHD will propose delaying its 

planned Orchard Street Operational Analysis 

project until after the City completes its 

planning work. Lane reconfiguration feasibility 

to be explored through Operational Analysis 

when completed.

9b 11 1180‐

705

Orchard St, Emerald St 

/ Morris Hill Rd

Develop concept plan to construct a complete street. No TBD As per the City's request, during the FY2017 

Budget process, ACHD will propose delaying its 

planned Orchard Street Operational Analysis 

project until after the City completes its 

planning work.

10 13 IN205‐

95

Broadway Ave/Avenue 

B and Idaho St/Warm 

Springs Ave

Widen and/or modify intersection to improve safety and reduce congestion 

for all users in accordance with the 2012 CIP. Design, right‐of‐way, and 

construction costs are tentative until completion of the concept design. 

Project includes bridge #549.

Yes (42) 2017 2018 2019 $1.54 Costs based on 

implementation of CIP.

Concept design underway. Adopted concept 

will drive what is ultimately implemented. 

11 14 IN215‐

14

Fort St / Hays St / 5th 

St

Improve intersection for pedestrians, bicyclists, and motorists. (The City 

requests ACHD put its current accessible pedestrian signal project on hold 

pending completion of the 2‐way conversion evaluation of 5th St.)

Yes 

(112)

2016 N/A 2017 $0.14 ACHD to evaluate potential delay of APS 

project during budgeting and IFYWP update. 

Outcome is dependent on 5th/6th 2‐way 

conversion analysis.

LTP ‐ Long Term Priority

PD ‐ Preliminary Development

CN ‐ Construction Year Page 2 of 10

Page 24: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

Attachment 2

In IFYWP 

(Page)DSN YR ROW YR CN YR

Total Cost 

in MillionsProgramming Notes

ACHD Proposed Response

2016 City 

Priority 

Ranking

2015 City 

Priority 

Ranking

GIS # ACHD Project Name     Project Description

Current Programming Status

12 15 N/A 32nd St, Moore 

St/Whitewater Park 

Blvd

Extend roadway. No N/A Defer for completion as part of a future 

development application.

13 16 N/A 28th St, Main 

St/Fairview Ave

Extend roadway. No TBD Defer for completion as part of a future 

development application. Future location 

being evaluated as part of the Fairview‐Main 

Local Streets Improvement Plan.

14 17 CM215‐

27

Beacon St, Boise Ave / 

Broadway Ave

Reconfigure travel lanes from 4‐lanes to 3‐lanes with bike lanes. Add refuge 

medians and pedestrian crossings.

No TBD Defer pending ongoing discussions with Boise 

State and their long range Master Plan. 

15 21 RC0087 Cloverdale Rd, 

Fairview Ave / Ustick 

Rd

Widen Cloverdale Rd to 5 lanes with curb, gutter, sidewalk and bike lanes, in 

accordance with the Cloverdale Rd Concept Design and the 2012 CIP. Project 

includes bridge #472.

Yes (31) Done 2016 2018 $3.40 To be built in FY2018.

16 22 RC0092 Cloverdale Rd, Ustick 

Rd / McMillan Rd

Widen Cloverdale Rd to 5 lanes with curb, gutter, sidewalk and bike lanes, in 

accordance with the Cloverdale Rd Concept Design and the 2012 CIP.

Yes (32) 2016 2017 2019 $4.00 To be built in FY2019.

17 23 RD207‐

16, 

IN203‐

14

Cole Rd, I‐84 / Franklin 

Rd and Cole Rd and 

Franklin Rd

Widen Cole Rd to 5 lanes with curb, gutter, sidewalk and bike lanes in 

accordance with the Cole Rd Concept Design and the 2012 CIP. Project to be 

constructed concurrently with Cole/Franklin and Cole/McMullen 

intersections.  Project includes bridge #281.

Yes (33, 

43)

Done 2016‐

2017

2019 $10.55 To be built in FY2019.

18 24 RD207‐

22

Maple Grove Rd, 

Victory Rd / Overland 

Rd

Widen Maple Grove Rd to 5 lanes with curb, gutter, sidewalk, and bike lanes 

in accordance with the 2012 CIP. Project includes bridges #267P, #268, and 

#269P.

Yes (36) 2016 2017 2020 $4.94 To be built in FY2020.

19 25 RD207‐

21

Maple Grove Rd, Amity 

Rd / Victory Rd

Widen Maple Grove Rd to 5 lanes with curb, gutter, sidewalk, and bike lanes 

in accordance with the 2012 CIP. Project includes bridge #269A.

Yes (35) 2020 PD PD $3.47 Programmed to begin design in FY2020. ACHD 

to evaluate project construction moving 

forward through IFYWP update.

20 26 RD207‐

13

Cloverdale Rd, 

McMillan Rd / Chinden 

Blvd (US 20/26)

Widen Cloverdale Rd to 5 lanes with curb, gutter, sidewalk and bike lanes, in 

accordance with the Cloverdale Rd Concept Design and the 2012 CIP.   

Project includes bridge #137A.

Yes (32) 2018 2019 2020 $4.33 To be built in FY2020.

21 27 RD207‐

11

Cloverdale Rd, Victory 

Rd / Overland Rd

Widen to 5 lanes with curb, gutter, sidewalk and bike lanes in accordance 

with 2012 CIP.

No $6.51 Prioritized. ACHD to evaluate potential 

programming during IFYWP update.

22 28 IN205‐

97

Cole Rd and Victory Rd Widen intersection in accordance with the 2012 CIP and widen Cole Rd south 

to McGlochlin St to 5 lanes with bike lanes, sidewalks and/or asphalt 

pathways in accordance to the 2012 CIP. Project includes bridge #282.

Yes (43) 2017 2019 2020 $5.59 To be built in FY2020.

23 29 N/A Warm Springs Avenue, 

near the Mesa

Rock fall mitigation. No N/A Defer until long‐term effectiveness of spring 

2015 improvements can be evaluated.

LTP ‐ Long Term Priority

PD ‐ Preliminary Development

CN ‐ Construction Year Page 3 of 10

Page 25: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

Attachment 2

In IFYWP 

(Page)DSN YR ROW YR CN YR

Total Cost 

in MillionsProgramming Notes

ACHD Proposed Response

2016 City 

Priority 

Ranking

2015 City 

Priority 

Ranking

GIS # ACHD Project Name     Project Description

Current Programming Status

24 30 1180‐

705

S. Orchard St 

Realignment, Gowen 

Rd/Victory Rd

New alignment. No TBD Alignment study to be completed in FY2017.

25 31 MI215‐

01

Barber Dr Bridge #366, 

1.0 miles NW/O Warm 

Springs Blvd

Replace/widen bridge #366 over Warm Springs Creek on Barber Dr as part of 

ACHD's Bridge Maintenance Program.

Yes (54) 2019 N/A 2020 $0.38 To be built in FY2020. Based on ACHD 

Commission direction, ACHD to evaluate 

advacing project construction during IFYWP 

update.

Community Programs

1 1 MMP21

4‐02

Capitol Blvd and 

Crescent Rim Dr, Yale 

Ln/Eastover Ter

Improve bike and pedestrian connection. No TBD Concept evaluation underway. Project to be 

programmed once alternative is selected.

2 2 CM210‐

25

Camas St, Orchard St / 

Roosevelt St

Construct sidewalk on both sides of Camas Street from Orchard Street to 

Roosevelt Street in accordance with the Central Bench Neighborhood Plan.  

Project to include roadway reclamation.

Yes 

(107)

2016 2016 2017 $1.17 To be built in FY2017.

3 3 CM214‐

18

Orchard St and Alpine 

St Pedestrian Crossing

Install an enhanced pedestrian crossing at the intersection. No TBD Location does not currently meet warrants. 

ACHD to reevaluate warrants upon completion 

of the Alpine sidewalk project in FY2017.

4 4 CM214‐

21

Phillippi St, Overland 

Rd / Franklin Rd 

(Overland Rd/Phillippi 

St Pedestrian Signal)

Rebuild roadway to include 8' detached sidewalk, parking, 5' bike lanes, 2 

auto lanes, and a center turn land/island. Full rebuild of roadway required 

due to steep cross slope issues. Includes pedestrian signal at Phillippi St / 

Overland Rd intersection on west side and replacement of bridge #1366 or 

#404.

No TBD Scoped in 2015. Further refinement of scope 

underway due to high cost associated with 

sidewalk project and roadway crown issues.

5 5 CM212‐

08

Emerald St and 

Americana Blvd, 

Orchard St / Ann 

Morrison Park 

Entrance 

Reconfigure Emerald St and Americana Blvd to add continuous bike lanes and 

complete the sidewalk on both sides of Emerald St in accordance with the 

Central Bench Neighborhood Plan.

Yes 

(129)

2016 2016 2017 $1.49 To be built in FY2017.

6 6 CM211‐

38

Kootenai St, Vista Ave 

/ Federal Way

Construct curb, gutter, sidewalks and bike lanes on both sides of Kootenai St 

from Vista Ave to Federal Way in accordance with the Central Bench 

Neighborhood Plan. Project includes removal of on‐street parking.

Yes 

(115)

Done 2016 2017 $0.84 To be built in FY2017.

7 7 PPI208‐

15

Victory Rd, Virginia 

Ave / Federal Way

Construct sidewalk on both sides of Victory Rd, between Virginia Ave and 

Federal Way. Improve rail crossing.

No $2.04 Scoped ‐ High cost project. Programming 

pending Kootenai and Overland crossings to 

improve coordination with Union Pacific.

LTP ‐ Long Term Priority

PD ‐ Preliminary Development

CN ‐ Construction Year Page 4 of 10

Page 26: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

Attachment 2

In IFYWP 

(Page)DSN YR ROW YR CN YR

Total Cost 

in MillionsProgramming Notes

ACHD Proposed Response

2016 City 

Priority 

Ranking

2015 City 

Priority 

Ranking

GIS # ACHD Project Name     Project Description

Current Programming Status

8 8 CM210‐

70

Overland Rd, 

Columbus St / Federal 

Way

Complete curb, gutter and sidewalk on both sides of Overland Rd, between 

Columbus St and Federal Way in accordance with the Central Bench 

Neighborhood Plan. Includes an improved UPRR crossing.

Yes 

(118)

2016 2016 2018 $1.11 To be built in FY2018.

9 9 CM214‐

19

McMillan Rd Refuge 

Medians, Eagle Rd / 

Cloverdale Rd

Install pedestrian refuge islands at locations along McMillan Rd, between 

Eagle Rd and Cloverdale at locations to be determined. Design and 

construction will be programmed once locations are identified.

Yes 

(117)

TBD ACHD Traffic Engineering has determined that 

additional crossing treatments are not 

warranted at this time. One installed with 

Eagle/ McMillan intersection project. Addition 

signalized crossing exists.

10 10 CGSP20

7‐02

Collister Dr, Hillside 

Ave / Briarhill Dr

Construct curb, gutter and sidewalk on the east side of Collister Dr 

connecting with the existing sidewalk south of Hillside Ave and at Briarhill Dr 

in order to improve neighborhood connectivity and pedestrian safety.

Yes 

(109)

2016 2017 2019 $0.38 Currently to be built in FY2019. ACHD to 

investigate advancing project to align with 

planned maintenance during IFYWP update.

11 NEW Columbus St Bikeway, 

Canal St / Kootenai St 

Improve Columbus St as a bikeway to include way finding signs and/or shared 

lane markings in accordance with the Central Bench Neighborhood Plan. 

Concept design will further clarify project scope.

No TBD Prioritize and scope.

12 NEW Spaulding St, Vista Ave 

/ Columbus St

Construct curb, gutter, and sidewalk on both sides of Spaulding St between 

Vista Ave and Columbus St in accordance with the City of Boise's Energize 

Vista Neighborhood effort.

No TBD Prioritize and scope.

13 NEW Malad St, Kerr St / 

Vista Ave

Construct curb, gutter, and sidewalk on the north side of Malad St between 

Kerr St and Vista Ave in accordance with the City of Boise's Energize Vista 

Neighborhood effort.

No TBD Prioritize and scope.

14 NEW Annett St, Malad St / 

Targee St

Construct curb, gutter, and sidewalk on the west side of Annett St between 

Malad St and Targee St in accordance with the Central Bench Neighborhood 

Plan.

No TBD Prioritize and scope.

15 11 BIK213‐

03

Leadville Ave Bikeway, 

Linden St / Greenbelt

Improve Leadville Ave as a bikeway to include enhanced crossing at Boise 

Ave, shared lane markings, possible modification of two‐way stop control at 

Iowa, Pennsylvania, Warren, Highland, and Rossi, and traffic calming in 

accordance with the Southeast Boise Neighborhood Plan.

Yes 

(126)

2017 2018 2020 $0.24 To be built in FY2020.

16 12 CM210‐

50

Cole Rd, Kettering Ave 

/ Mountain View Dr

Construct curb, gutter, and sidewalk on both sides of Cole Rd between 

Kettering Ave and Mountain View Dr in accordance with the West Bench 

Neighborhood Plan.

Yes 

(109)

2016 2016 2018 $0.72 To be built in FY2018.

17 13 CGS205‐

20

Columbus St, Overland 

Rd / Kootenai St

Construct curb, gutter and sidewalk on both sides of Columbus St from 

Overland Rd to Kootenai St in accordance with the Central Bench 

Neighborhood Plan.

Yes 

(110)

2016 2017 2019 $1.40 To be built in FY2019.

18 NEW Latah St Bikeway, 

Targee St / Overland 

Rd

Improve Latah St as a bikeway to include way finding signs and/or shared 

lane markings in accordance with the City of Boise's Energize Vista 

Neighborhood effort. Concept design will further clarify project scope.

No TBD Prioritize and scope.

LTP ‐ Long Term Priority

PD ‐ Preliminary Development

CN ‐ Construction Year Page 5 of 10

Page 27: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

Attachment 2

In IFYWP 

(Page)DSN YR ROW YR CN YR

Total Cost 

in MillionsProgramming Notes

ACHD Proposed Response

2016 City 

Priority 

Ranking

2015 City 

Priority 

Ranking

GIS # ACHD Project Name     Project Description

Current Programming Status

19 14 BK215‐

01

Owyhee St bikeway, 

Elder St / Alpine St 

(Bikeway parallel to 

Vista)

Improve Owyhee St as a bikeway to include way finding signs, shared lane 

markings, and enhanced crossing at Rose Hill in accordance with the Central 

Bench Neighborhood Plan. Concept design will further clarify project scope.

Yes 

(127)

2019 2020 PD $0.12 Concept design to begin in FY2018. ACHD to 

evaluate potential opportunities to advance 

construction during IFYWP update.

20 14 BK213‐

04

Shoshone St Bikeway, 

Linden St / Greenbelt 

(Bikeway parallel to 

Vista)

Improve Shoshone St as a bikeway to include wayfinding signage, shared lane 

markings, signal modification at Overland Rd, and pedestrian ramps in 

accordance with the Central Bench Neighborhood Plan. Project includes an 

enhanced pedestrian signal to replace existing flashing caution light at Rose 

Hill St. Concept design will further clarify project scope.

Yes 

(127)

2020 PD PD $0.12 Concept design to begin in FY2018. ACHD to 

evaluate potential opportunities to advance 

construction during IFYWP update.

21 15 N/A East‐West Bikeway, 

Ave B/Whitewater 

Park Blvd

Wayfinding signage and arterial crossings. No TBD ACHD to identify route through Downtown 

Boise Implementation projects and the 

Fairview‐Main Local Streets Improvement Plan 

(underway).

22 16 CM211‐

57

Columbia Village 

Bikeway to Amity Rd

See description under City priority #18 below. Yes 

(113)

2016 2017 2019 $0.25 Project to be completed as part of City priority 

#24.

23 17 CM210‐

89

Heron St, 13th St / 9th 

St (north side)

Construct curb, gutter, parking and detached concrete pathway on north side 

of Heron St. from 13th St. to 9th St. Project includes a full road rebuild due to 

poor pavement condition.

Yes 

(113)

2016 N/A 2018 $0.54 To be built in FY2018.

24 18 CM211‐

57

Holcomb Rd, Mimosa 

Way / Amity Rd

Construct detached 5’ sidewalk on the east side of Holcomb Rd between 

Mendota Dr and Amity Rd in accordance with the Southeast Boise 

Neighborhood Plan. Stripe bike lane and install wayfinding signage for a bike 

facility from Amity to Mimosa Way. Project will provide ped/bike connection 

from Oregon Trail Heights/Columbia Village to Holcomb path/bridge and 

Southeast Boise.

Yes 

(113)

2016 2017 2019 $0.25 To be built in FY2019.

25 19 CM212‐

07

Alpine St, Orchard St / 

Randall St

Complete sidewalk on the south side of Alpine St from Orchard St to Randall 

St in accordance with the Central Bench Neighborhood Plan.

Yes 

(104)

2016 2016 2017 $0.64 To be built in FY2017.

26 20 NE204.0

1

Phillippi St, Malad St / 

Targee St

Complete curb, gutter and sidewalk improvements on both sides of Phillippi 

St, between Malad St and Targee St in accordance with the Central Bench 

Neighborhood Plan.

Yes 

(119)

2016 2017 2019 $0.26 To be built in FY2019.

27 21 CM210‐

49

Phillippi St, Targee St / 

Overland Rd

Construct curb, gutter and sidewalk on both the sides of Phillippi St, between 

Targee St and Overland Rd in accordance with the Central Bench 

Neighborhood Plan. Project includes full road rehabilitation.

Yes 

(119)

2017 2019 2020 $2.13 To be built in FY2020.

LTP ‐ Long Term Priority

PD ‐ Preliminary Development

CN ‐ Construction Year Page 6 of 10

Page 28: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

Attachment 2

In IFYWP 

(Page)DSN YR ROW YR CN YR

Total Cost 

in MillionsProgramming Notes

ACHD Proposed Response

2016 City 

Priority 

Ranking

2015 City 

Priority 

Ranking

GIS # ACHD Project Name     Project Description

Current Programming Status

28 22 CM210‐

24

Clark St, Orchard St / 

Roosevelt St

Construct sidewalk on both sides of Clark St between Orchard St and 

Roosevelt St to provide pedestrian connectivity and reduce the need for 

safety busing for Monroe Elementary School.

Yes 

(108)

2015‐

2016

2016 2018 $1.00 To be built in FY2018.

29 24 CM213‐

38

Jefferson St, 

Whitewater Park Blvd 

/ 27th St

Complete curb, gutter, and sidewalk on both sides of Jefferson St east of 

Whitewater Park Blvd where gaps currently exist in accordance with Boise' 

30th Area Master Plan. Project includes road rehabilitation.

Yes 

(114)

2016 2016 2017 $0.17 To be built in FY2017.

30 25 CM213‐

39

Madison Ave, 

Whitewater Park Blvd 

/ 27th St

Complete curb, gutter, and sidewalk on both sides of Madison St, between 

Whitewater Park Blvd and 27th St in accordance with the City of Boise's 30th 

St Area Master Plan. Project will create standard parallel parking between 

Whitewater Park Blvd and 30th St. Project also includes full road 

rehabilitation.

Yes 

(117)

2016 2016 2017 $0.13 To be built in FY2017.

31 26 CM215‐

28

Coston St, Bannock St 

/ Franklin St

Construct sidewalk on the west side of Coston St between Bannock St and 

Franklin St. (City's request was for sidewalk on both sides. Working in 

coordination with the City Forester, project will only construct sidewalks on 

the west side due to landscape/tree impacts.)

No $0.23 Scoped "Go" in 2015. ACHD to evaluate 

potential programming during IFYWP update.

32 27 CM213‐

40

Peasley St / Alpine St 

(Railroad Crossing)

Extend railroad crossing planking to the east side for a pedestrian crossing. 

Extend detached sidewalk with swales to intersection from existing sidewalk 

on the northeast side of the crossing. 

No $0.15 Scoped "Go" in 2015. ACHD to evaluate 

potential programming during IFYWP update.

33 28 PPI209‐

05

Cherry Ln, Owyhee St / 

Vista Ave

Complete sidewalk on the south side of Cherry Ln between Owyhee St and 

Vista Ave in accordance with the Central Bench Neighborhood Plan.

Yes 

(108)

PD PD PD $0.77 All project phases currently in preliminary 

development. ACHD to evaluate project 

construction moving forward through IFYWP 

update.

34 29 PPI208‐

22

Garden St, Franklin Rd 

/ Emerald St

Construct curb, gutter and sidewalk on both sides of Garden Street from 

Emerald St to Franklin Road to provide pedestrian connectivity in an 

established neighborhood. Fill in the missing sidewalk across 2 lots on the 

northwest corner of Emerald.

No $2.57 Scoped in 2011. ACHD to evaluate potential 

programming during IFYWP update. Delay in 

programming due to high project cost.

35 30 CM210‐

18

Eckert Rd and Arrow 

Junction Dr Pedestrian 

Crossing (Eckert Rd, 

Boise Ave / Arrow 

Junction Dr)

Install a striped crosswalk and pedestrian ramps at the intersection. (City's 

request was for sidewalks on the east side. Sidewalks already exist on the 

west side with only one house on the east side.)

No $0.06 Pedestrian signal scoped "Go" in 2015. ACHD 

to evaluate potential programming during 

IFYWP update.

LTP ‐ Long Term Priority

PD ‐ Preliminary Development

CN ‐ Construction Year Page 7 of 10

Page 29: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

Attachment 2

In IFYWP 

(Page)DSN YR ROW YR CN YR

Total Cost 

in MillionsProgramming Notes

ACHD Proposed Response

2016 City 

Priority 

Ranking

2015 City 

Priority 

Ranking

GIS # ACHD Project Name     Project Description

Current Programming Status

36 31 CGSP20

5‐16

Liberty St, Emerald 

St/Franklin Rd

Complete sidewalk on the east side of Liberty St in accordance with the 

Central Bench Neighborhood Plan. (City request was for sidewalk on both 

sides.)

Yes 

(116)

2016 2017 2019 $0.54 Project scope originally assumed completion of 

bridge and RRX widening to occur with 

improvements at Liberty and Franklin 

intersection. That project did not move 

forward, thus placing much added expense 

($2.5 million) to sidewalk project. Project will 

be pushed back in IFYWP update until bridge 

widening can be completed. 

37 32 N/A Vista Neighborhood 

Local Streets

Install curb, gutter, and/or innovative storm drainage on local streets. No TBD Energize Vista Transportation Group did not 

identify as a priority. Further exploration of 

project scope with City is desired.

38 33 CM214‐

47

Vista Ave and 

Spaulding St 

Pedestrian Signal

Install an enhanced pedestrian crossing on Vista Ave at Spaulding St, including 

bike push buttons.

Yes 

(122)

2019 2019 2020 $0.26 At City's request, ACHD to place pedestrian 

signal at Spaulding St, in lieu of at Nez Perce St. 

To be built in FY2020.

39 NEW Vista Ave Traffic 

Calming, Elder St / 

Rose Hill St

Explore opportunities to reduce vehicle speeds along Vista Ave, between 

Elder St and Rose Hill St by narrowing travel lanes, providing bike lanes, or 

other traffic calming measures.

No TBD ACHD Traffic Engineering to evaluate potential 

opportunities for traffic calming.

40 NEW Cleveland St, Palouse 

St / Nez Perce St

Construct curb, gutter, and sidewalk on both sides of Cleveland St between 

Palouse St and Nez Perce St in accordance with the City of Boise's Energize 

Vista Neighborhood effort.

No TBD Prioritize and scope.

41 NEW Palouse St, Roosevelt 

St / Cleveland St

Construct curb, gutter, and sidewalk on both sides of Palouse St between 

Roosevelt St and Cleveland St in accordance with the City of Boise's Energize 

Vista Neighborhood effort.

No TBD Prioritize and scope.

42 NEW Hervey St, Cherry Ln / 

Lemhi St

Construct curb, gutter, and sidewalk on the west side of Hervey St between 

Cherry Ln and Lemhi St in accordance with the City of Boise's Energize Vista 

Neighborhood effort.

No TBD Prioritize and scope.

43 34 CM215‐

29

State St and Wylie Ln 

Pedestrian Crossing

Install an enhanced pedestrian crossing on State St on the east side of Wylie 

Ln.

No $0.30 Scoped "Go" in 2015. ACHD to evaluate 

potential programming during IFYWP update.

44 35 CM213‐

53

Ash Park St, Northview 

Rd / Ustick Rd

Complete sidewalk on both sides of Ash Park Lane between Northview St and 

Ustick Rd in accordance with the West Bench Neighborhood Plan. (City 

requested sidewalk and bikeway.)

Yes 

(104)

2016 2017 2019 $0.56 To be built in FY2019.

45 36 CM214‐

21

Phillippi St, Overland 

Rd / Cassia St

Rebuild roadway to include 8' detached sidewalk, parking, 5' bike lanes, 2 

auto lanes, and a center turn land/island. Full rebuild of roadway required 

due to steep cross slope issues. Includes pedestrian signal at Phillippi St / 

Overland Rd intersection on west side and replacement of bridge #1366 or 

#404.

No TBD Scoped in 2015. Further refinement of scope 

underway due to high cost associated with 

sidewalk project and roadway crown issues.

LTP ‐ Long Term Priority

PD ‐ Preliminary Development

CN ‐ Construction Year Page 8 of 10

Page 30: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

Attachment 2

In IFYWP 

(Page)DSN YR ROW YR CN YR

Total Cost 

in MillionsProgramming Notes

ACHD Proposed Response

2016 City 

Priority 

Ranking

2015 City 

Priority 

Ranking

GIS # ACHD Project Name     Project Description

Current Programming Status

46 37 CM213‐

52

Allumbaugh St, 

Fairview 

Ave/Northview St

Complete curb, gutter, and sidewalk on the west side of Allumbaugh St, 

between Fairview Ave and Northview St. (City requested sidewalk on both 

sides. Sidewalk on east side infeasible at this time due to significant land use, 

utility, and drainage impacts.)

No $0.98 Scoped "Go" in 2015. ACHD to evaluate 

potential programming during IFYWP update.

47 NEW Grand St, Miller St, and 

Ash St Pedestrian 

Enhancements

Fix hazardous sidewalks, construct ADA compliant pedestrian ramps, and fill 

sidewalk gaps where appropriate.

No TBD Prioritize and scope.

48 NEW 10th St and Myrtle St Construct a new intersection at 10th St and Myrtle St. No TBD Requires coordination with 

ITD.

Prioritize and scope.

49 38 CM214‐

28

De Meyer St, 

Cloverdale Rd / Lena 

Ave; Lena Ave, De 

Meyer St / Arlen St

Complete sidewalk on the south side of DeMeyer St by narrowing the 

roadway and constructing sidewalk on the inside of existing curb. Construct 

at‐grade sidewalks through asphalt eyebrows to connect sidewalk segments. 

Install bikeway (signage, pavement markings) from Demeyer / Cloverdale to 

Lena / Arlen. 

No $0.26 Scoped "Go" in 2015. ACHD to evaluate 

potential programming during IFYWP update.

50 39 CM214‐

23

Cassia St, Franklin Park 

Dr / Troxel Dr

Complete sidewalk on the north side of Cassia St, between Franklin Park Dr 

and Troxel Dr. Install bike lanes from Franklin Park Dr to Curtis Rd. Install an 

enhanced pedestrian crossing (rectangular rapid flashing beacon) at Cassia St 

and Troxel on the west side of the intersection at an existing crosswalk.

No $0.24 Scoped "Go" in 2015. ACHD to evaluate 

potential programming during IFYWP update.

51 40 CM215‐

30

Amity Rd, Federal Way 

/ Holcomb Rd

Install pathway on the south side of Amity Rd, between Federal Way and 

Rimview Way. Install an enhanced pedestrian crossing (pedestrian hybrid 

beacon) at Amity and Rimview to access the pathway on the north side of 

Amity and the regional pathway system in the area.

No $0.44 Scoped "Go". ACHD to evaluate potential 

programming during IFYWP update.

52 41 RD207‐

12

Cloverdale Rd, 

Overland Rd / Franklin 

Rd (Cloverdale Rd I‐84 

Overpass)

Widen Cloverdale Rd and overpass from 2 to 5 lanes with curb, gutter, 

sidewalk, and bike lanes. (City request for sidewalk and bikelanes to be 

constructed as part of roadway widening project.

No $2.33 ACHD requested project from ITD in spring 

2016. Project is not on ITD's planned projects 

at this time. ACHD will continue to pursue 

project with ITD.

53 42 CM213‐

58

Broadway Ave and 

Boise Ave

Improve intersection for bikes and pedestrians in accordance with the 

Southeast Boise Neighborhood Plan. Includes accessible pedestrian signal.

Yes 

(106)

2019 2019 2020 $0.17 ACHD to coordinate with ITD 

maintenance project.

To be built in FY2020.

LTP ‐ Long Term Priority

PD ‐ Preliminary Development

CN ‐ Construction Year Page 9 of 10

Page 31: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

Attachment 2

In IFYWP 

(Page)DSN YR ROW YR CN YR

Total Cost 

in MillionsProgramming Notes

ACHD Proposed Response

2016 City 

Priority 

Ranking

2015 City 

Priority 

Ranking

GIS # ACHD Project Name     Project Description

Current Programming Status

54 43 CM214‐

26

Horseshoe Bend Rd, 

State St / Hill Rd 

(Horseshoe Bend Rd 

Bikeway, Hill Rd / 

Greenbelt)

Complete detached sidewalks, curb & gutter, seepage beds, bike lanes on 

both sides of Horseshoe Bend Rd. Widen shoulder on the west side for  

parallel parking. Project includes road rehabilitation due to poor pavement 

condition. (City request for a bikeway extending to Greenbelt to be 

completed in part through this project.)

Yes 

(114)

PD PD PD $1.68 All project phases currently in preliminary 

development. ACHD to evaluate project 

construction moving forward through IFYWP 

update.

55 44 RD215‐

20

Emerald St, Curtis Rd / 

Orchard St

Widen Emerald St to 5‐lanes with curb, gutter, sidewalk and bike lane in 

accordance with the 2012 CIP. (City request is for sidewalk on both sides. Due 

to significant cross slope issues, roadway will need to be rebuilt. Roadway will 

be widening to CIP lanes at the same time.)

No $3.47 Defer. Currently operating at a LOS D. City 

request for sidewalks to be built with the 

roadway widening. 

56 45 CM209‐

11

Bogus Basin Rd, 

Curling Dr / 550' N/O 

Curling Dr (Bogus 

Basin, east of Curling 

Dr)

Widen pavement and install curb, gutter, and atached sidewalk on both sides 

of Bogus Basin to fill in a 550' gap north of Curling Dr. Install retaining wall on 

east side as necessary.

Yes 

(106)

2018 2019 2020 $0.36 To be built in FY2020.

Studies

1 2 1180 State Street Alignment 

and Right‐of‐Way 

Study

Expedite completion. No TBD ACHD considers the draft plan complete and 

formal adoption is not necessary. Draft plan 

will be used to inform capital projects as they 

move forward. 

2 3 1180 Neighborhood Bike 

and Pedestrian Plan 

for the North End/East 

End Planning Area

Complete a neighborhood pedestrian and bicycle plan. No TBD North Boise Bike and Pedestrian Plan is under 

way. Portion of North End south of State St to 

be evaluated after completion of Jefferson and 

Madison sidewalks to be built in FY2017. ACHD 

to propose completion the East End Plan 

during FY2017 Budget process. 

LTP ‐ Long Term Priority

PD ‐ Preliminary Development

CN ‐ Construction Year Page 10 of 10

Page 32: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

April 1, 2016 Kent Goldthorpe, President Ada County Highway District 3775 Adams Street Garden City, ID 83714 Re: Annual Transportation Requests ACHD Integrated Five Year Work Plan FY 2017-2021 Dear President Goldthorpe: The Boise City Council recently approved the attached annual, prioritized list of transportation projects for consideration to be included in the Ada County Highway District’s 2017-2021 Integrated Five Year Work Plan. The list of council priorities includes capital improvement projects, community program projects and studies. We are particularly eager to begin working with ACHD on the South Orchard Street Realignment Study. The realignment and extension of this roadway will provide much needed connectivity to Southwest Boise and offer additional mobility choices for residents of that area. Also, as you are aware, the City of Boise is preparing the final version of its Transportation Action Plan (TAP). The TAP includes a prioritization matrix to better align the City’s transportation priorities with its values and vision of a sustainable, modern transportation system that offers choices. We plan to introduce the matrix in next year’s prioritization process. A major component of the TAP’s vision is improving transportation infrastructure that promotes bicycle and pedestrian modes. In the past, bicycle and pedestrian improvement projects on non-arterial streets have been limited to the funds within ACHD’s Community Programs. These projects contribute highly to our residents’ quality of life. As ACHD completes each new Neighborhood Bicycle Pedestrian Plan, the list of potential Community Program Projects greatly increases. The City of Boise finds the current funding level for Community Programs low and disproportionate to the amount of need. The City is dedicated to increasing the amount of funds for complete streets on collectors and local streets to improve bicycle and pedestrian connectivity

Page 33: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

throughout the city. We are not making an official request this year to increase funding for Community Programs by shifting funds from Capital Projects. However, we anticipate that future project requests to ACHD will emphasize these values and that additional Community Program funds will be necessary. We look forward to reviewing the draft ACHD IFYWP FY 2017-2021 soon. Please contact Karen Gallagher at 384-3910 with any questions. Sincerely,

Mayor David H. Bieter cc: Rodney Ashby, ACHD

Karen Gallagher, Boise PDS

Page 34: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

City of Boise 2016 Annual Priortized Transportation Requests for ACHD's IFYWP FY 2017‐2021

March 29, 2016

In IFYWP 

(Page)

DSN 

YR

ROW 

YRCN YR

Total 

Cost in 

Millions

ACHD Programming Notes

LTP LTP

State St, 36th St / 27th St Priority east‐west mobility corridor on north side of Boise River.  

Current PM LOS E & F. Widen to 7 lanes. Develop transition plan to 

achieve 2 lanes dedicated for transit.

Yes (38) UF UF UF $5.01 Project will advance when land use, 

transit, and roadway triggers met.

Widen State St to 7 lanes with HOV/transit lanes, curb, gutter, sidewalk and 

bike lanes, in accordance with the State St TTOP and the 2012 CIP. This 

project may include an access management component. 

LTP LTP

State St, Collister Dr / 36th St Priority east‐west mobility corridor on north side of Boise River.  

Current PM LOS F. Widen to 7 lanes. Develop transition plan to 

achieve 2 lanes dedicated for transit.

Yes (38) UF UF UF $10.12 Project will advance when land use, 

transit, and roadway triggers met.

Widen State St to 7 lanes with HOV/transit lanes, curb, gutter, sidewalk and 

bike lanes, in accordance with the State St TTOP and the 2012 CIP. This 

project may include an access management component. 

LTP LTP

State St, Pierce Park Ln / 

Collister Dr

Priority east‐west mobility corridor on north side of Boise River.  

Current PM LOS E. Widen to 7 lanes. Develop transition plan to 

achieve 2 lanes dedicated for transit.

Yes (39) UF UF UF $6.67 Project will advance when land use, 

transit, and roadway triggers met.

Widen State St to 7 lanes with HOV/transit lanes, curb, gutter, sidewalk and 

bike lanes, in accordance with the State St TTOP and the 2012 CIP. This 

project may include an access management component. 

LTP LTP

State St, Glenwood St / Pierce 

Park Ln

Priority east‐west mobility corridor on north side of Boise River.  

Current PM LOS E. Widen to 7 lanes. Develop transition plan to 

achieve 2 lanes dedicated for transit.

Yes (38) UF UF UF $1.28 Project will advance when land use, 

transit, and roadway triggers met.

Widen State St to 7 lanes with HOV/transit lanes, curb, gutter, sidewalk and 

bike lanes, in accordance with the State St TTOP and the 2012 CIP. This 

project may include an access management component. 

1 1

State St and Veterans Memorial 

Pkwy

High volume intersection connecting to a river crossing.  Current PM 

LOS E.

Yes (46) Done 2016‐

2017

2018 $10.08 Widen intersection in accordance with the State St/Veterans Memorial 

Pkwy/36th St Intersection Concept Study, including installation of median U‐

turns and installation of two‐phased pedestrian crossings. Project identified 

as a key piece of the State St TTOP.

2 2

State St and Collister Dr Priority east‐west mobility corridor on north side of Boise River. Yes (45) 2015‐

2016

2016 2018 $9.36 Federal CN funding in 2018. Actual 

construction to occur in 2019.

Federal aid project to improve the intersection of State St and Collister Dr, 

including realignment of the Collister Dr leg, curb, gutter, sidewalk, and bike 

lanes in accordance with the State St TTOP and the 2012 CIP. Project 

includes replacing bridge #090B.

3 3

State St and Glenwood St High volume intersection connecting to a river crossing. Priority 

corridor.  Current PM LOS E.

Yes (46) 2018 2019 PD $3.31 Concept design to begin in spring of 

2016. 

Widen and modify intersection in order to improve traffic and transit 

operations in accordance with the State St TTOP and the 2012 CIP. Joint 

project with ITD.

4 4

State St and Pierce Park Ln Intersection on priority east‐west mobility corridor on north side of 

Boise River. 

Yes (46) 2019 2020 PD $4.08 Concept design to begin in 2017.  Widen intersection to 3 lanes on Pierce Park and 7 lanes on State St, 

including curb, gutter, sidewalk, and bike lanes in accordance with the State 

St TTOP and the 2012 CIP. 

5 6

Fairview Ave and Cole Rd  Priority east‐west corridor. Current PM LOS E. Yes (44) Done 2016 2017 $4.97 Widen intersection to 8 lanes on Fairview Ave and 7 lanes on Cole Rd, 

including curb, gutter, sidewalk, and bike lanes in accordance with the 2012 

CIP. Project includes non‐traversable raised medians.

6 7

Downtown Boise 

Implementation Plan (DBIP)

Add bicycle facilities to major downtown destinations.  Convert 5th 

and 6th to two‐way streets for multiple benefits. Request moving 

signal retiming up to 2017.

Yes (83‐85) Varies Varies Varies $12.99 Perform road rehabilitation and 2‐way conversion of select streets in 

downtown Boise in concert with CCDC and other projects in accordance with 

the Downtown Boise Implementation Plan. 

7 8

Emerald  St and Americana Blvd, 

Orchard St / Ann Morrison Park 

Entrance

Improve safety.  Complete street by adding bike lanes. Convert 4 

lanes to 3 and add bike lanes. Also restripe Americana, Latah to Ann 

Morrision Park with bike lanes.

Yes (129) 2016 2016 2017 $1.49 Reconfigure Emerald St and Americana Blvd to add continuous bike lanes 

and complete the sidewalk on both sides of Emerald St in accordance with 

the Central Bench Neighborhood Plan.

2016 City 

Priority 

Ranking

2015 City 

Priority 

Ranking

ACHD Project Name            

(City Project Name)ACHD Project Description

Current Programming Status

Boise's Request

LTP ‐ Long Term Priority

PD ‐ Preliminary Development

CN ‐ Construction Year Page 1 of 8

Page 35: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

In IFYWP 

(Page)

DSN 

YR

ROW 

YRCN YR

Total 

Cost in 

Millions

ACHD Programming Notes

2016 City 

Priority 

Ranking

2015 City 

Priority 

Ranking

ACHD Project Name            

(City Project Name)ACHD Project Description

Current Programming Status

Boise's Request

8 9

Fairview Ave and Main St, 

Whitewater Park Blvd / 16th St

Restripe to add on‐street parking by trading a travel lane. No TBD 2016 Budget Planning Project ‐ Project 

to be evaluated in concept as part of 

the Fairview‐Main Local Streets Plan 

and Bike Facilities project.

Restripe to add on‐street parking by removing a travel lane.

9a 10

Orchard St, Chinden Blvd / 

Overland Rd

Improve safety.  Complete street by adding bike lanes. Convert 4 

lanes to 3 and add bike lanes. 

No TBD 2017 Budget Planning Project ‐ Project 

to be evaluated in concept as part of 

the Orchard Street Operational 

Analysis project. 

Convert 4 lanes to 3 lanes and add bike lanes.

9b 11

Orchard St, Emerald St / Morris 

Hill Rd

Road segment lacks pedestrains facilities. Also included as an 

Economic Development Project. Boise to develop a Concept Plan to 

construct a complete street in 2017. We request ACHD delaying 

their operational analysis to 2018.

No TBD 2017 Budget Planning Project ‐ Project 

to be evaluated in concept as part of 

the Orchard Street Operational 

Analysis project.

Develop concept plan to construct a complete street.

10 13

Broadway Ave/Avenue B and 

Idaho St/Warm Springs Ave

Develop innovative solution to improve intersection for pedestrians, 

bicyclists, and motorist.

Yes (42) 2017 2018 2019 $1.54 Concept design underway. Widen and/or modify intersection to improve safety and reduce congestion 

for all users in accordance with the 2012 CIP. Design, right‐of‐way, and 

construction costs are tentative until completion of the concept design. 

Project includes bridge #549.

11 14

5th St / Fort St / Hays St Develop innovative solution at 5‐leg intersection to improve 

intersection for pedestrians, bicyclists, and motorists. Delay APS 

project until after the two‐way conversion of 5th Street.

No TBD Defer until conversion of 5th Street 

decided. 5th St evaluation underway.

Improve intersection for pedestrians, bicyclists, and motorists.

12 15

32nd St, Moore St/Whitewater 

Park Blvd

Better access to Esther Simplot Park for this neighborhood area. 

Extend the local street to provide the neighborhood and an 

undeveloped, higher density parcel critical access to Whitewater 

Park Blvd. and Esther Simplot Park. Include coordination with CCDC.

No N/A Add to Master Street Map. Defer until 

development.

Extend roadway.

13 16

28th St, Main St/Fairview Ave Extend the local street through this superblock to secure the street 

network for better circulation and to create a local town center 

typology street with buildings fronting the street. Coordinate with 

CCDC. Need to create smaller blocks for redevelopment and secure 

secondary circulation network.

No TBD Include analysis as part of local roads 

plan for the Fairview‐Main sub‐area. 

See City of Boise study priority #1.

Extend roadway.

14 17

Beacon St, Boise Ave / Broadway 

Ave

Create a complete street by converting Beacon from 4 Lanes to 3 

Lanes. Keep two vehicular lanes, dedicate one lane to left‐turns, add 

medians, pedestrian crossings and bike lanes. Current configuration 

lacks bicycle facilities, and pedestrians find it difficult to cross.  

Coordinate with BSU.

No TBD Evaluate after BSU Master Planning 

effort is complete.

Reconfigure travel lanes from 4‐lanes to 3‐lanes with bike lanes. Add refuge 

medians and pedestrian crossings.

15 21

Cloverdale Rd, Fairview Ave / 

Ustick Rd

Improve this north‐south arterial segment before expanding the 

Ustick Corridor to Cloverdale.  Current PM LOS F.

Yes (31) Done 2016 2018 $3.40 Widen Cloverdale Rd to 5 lanes with curb, gutter, sidewalk and bike lanes, in 

accordance with the Cloverdale Rd Concept Design and the 2012 CIP. Project 

includes bridge #472.

16 22Cloverdale Rd, Ustick Rd / 

McMillan Rd

 Current PM LOS F. Complete this priority corridor. Yes (32) 2016 2017 2019 $4.00 Widen Cloverdale Rd to 5 lanes with curb, gutter, sidewalk and bike lanes, in 

accordance with the Cloverdale Rd Concept Design and the 2012 CIP.

17 23

Cole Rd, I‐84 / Franklin Rd and 

Cole Rd and Franklin Rd

Connects to interstate interchanges at I‐84 and I‐184. Improve 

safety. Current PM LOS D & F for segment, LOS E for intersection. 

Concept work started in 2011.

Yes (33, 

43)

Done 2016‐

2017

2019 $10.55 Widen Cole Rd to 5 lanes with curb, gutter, sidewalk and bike lanes in 

accordance with the Cole Rd Concept Design and the 2012 CIP. Project to be 

constructed concurrently with Cole/Franklin and Cole/McMullen 

intersections.  Project includes bridge #281.

LTP ‐ Long Term Priority

PD ‐ Preliminary Development

CN ‐ Construction Year Page 2 of 8

Page 36: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

In IFYWP 

(Page)

DSN 

YR

ROW 

YRCN YR

Total 

Cost in 

Millions

ACHD Programming Notes

2016 City 

Priority 

Ranking

2015 City 

Priority 

Ranking

ACHD Project Name            

(City Project Name)ACHD Project Description

Current Programming Status

Boise's Request

18 24

Maple Grove Rd, Victory Rd / 

Overland Rd

Improve the arterial grid in southwest Boise for pedestrians, 

bicycles, and vehicles.  Utilizes 4 lane overpass. Current PM LOS F.

Yes (36) 2016 2017 2020 $4.94 Widen Maple Grove Rd to 5 lanes with curb, gutter, sidewalk, and bike lanes 

in accordance with the 2012 CIP. Project includes bridges #267P, #268, and 

#269P.

19 25Maple Grove Rd, Amity Rd / 

Victory Rd

Improve the arterial grid in southwest Boise for pedestrians, 

bicycles, and vehicles.  Utilizes 4 lane overpass. Current PM LOS F.

Yes (35) 2020 PD PD $3.47 Widen Maple Grove Rd to 5 lanes with curb, gutter, sidewalk, and bike lanes 

in accordance with the 2012 CIP. Project includes bridge #269A.

20 26

Cloverdale Rd, McMillan Rd / 

Chinden Blvd (US 20/26)

Complete this priority corridor.  Current PM LOS F.  Yes (32) 2018 2019 2020 $4.33 Widen Cloverdale Rd to 5 lanes with curb, gutter, sidewalk and bike lanes, in 

accordance with the Cloverdale Rd Concept Design and the 2012 CIP.   

Project includes bridge #137A.

21 27

Cloverdale Rd, Victory Rd / 

Overland Rd

Improve the arterial grid in southwest Boise for pedestrians, 

bicycles, and vehicles.   Current PM LOS F for segment, LOS A for 

intersections.

No $6.51 Prioritized (Ranks 50 of 78). Awaits 

programming.

Widen to 5 lanes with curb, gutter, sidewalk and bike lanes in accordance 

with 2012 CIP.

22 28

Cole Rd and Victory Rd  Improve safety. Connects to only interstate interchange for 

southwest Boise. PM Peak Hour LOS E.  Shifted down in priority, 

while shifting Maple Grove up in priority.

Yes (43) 2017 2019 2020 $5.59 Widen intersection in accordance with the 2012 CIP and widen Cole Rd 

south to McGlochlin St to 5 lanes with bike lanes, sidewalks and/or asphalt 

pathways in accordance to the 2012 CIP. Project includes bridge #282.

23 29

Warm Springs Avenue, near the 

Mesa

Provide long‐term safety upgrades for protection from falling rocks. No N/A Defer until long‐term effectiveness of 

spring 2015 improvements can be 

evaluated.

Rock fall mitigation.

24 30S. Orchard St Realignment, 

Gowen Rd/Victory Rd

Improve arterial grid in southwest Boise. PM Peak LOS Map 2015 

showed LOS F and 2016 Map shows LOS D.

No TBD 2017 Budget Planning Project ‐ 

Alignment study.

New alignment.

25 31

Barber Dr Bridge (Bridge #1335), 

1000' E/O Old Hickory Way

Widen Bridge with new box culvert. Add signage and striping to give 

drivers additional advance notice of narrow bridge until bridge can 

be widened. 

Yes (54) 2019 N/A 2020 $0.57 Commission directed project be 

accelerated if possible. Will investigate 

in next IFYWP update.

Replace/widen bridge #366 over Warm Springs Creek on Barber Dr as part of 

ACHD's Bridge Maintenance Program.

1 1

Capitol Blvd and Crescent Rim 

Dr, Yale Ln/Eastover Ter

Capitol Boulevard and Crescent Rim Drive, Yale (Elmer’s) to Eastover 

Terrace (entrance to Depot) or other logical termini. Improved 

bicycle and pedestrian connection.

No TBD Concept evaluation underway. Project 

to be programmed once alternative 

selected.

Improve bike and pedestrian connection.

2 2

Camas St, Orchard St / Roosevelt 

St

Camas, Orchard / Roosevelt: s/w on both sides, north at a 

minimum: 1,900 ft.

Yes (107) 2016 2016 2017 $1.17 Construct sidewalk on both sides of Camas Street from Orchard Street to 

Roosevelt Street in accordance with the Central Bench Neighborhood Plan.  

Project to include roadway reclamation.

3 3

Orchard St and Alpine St 

Pedestrian Crossing

Orchard / Alpine, signalized pedestrian crossing No TBD Does not meet traffic warrants. 

Reevaluate warrants upon completion 

of the Alpine sidewalk project.

Install an enhanced pedestrian crossing at the intersection.

4 4

Phillippi St/ Overland Rd Ped 

Signal

PHB Enhanced Pedestrian Signal for access to library, shopping, and 

park.

No $0.29 Scoped 2015. Final report pending. 

(City request for pedestrian signal to be 

built with sidewalk project.)

Combine with project to rebuild roadway to include 8' detached sidewalk, 

parking, 5' bike lanes, 2 auto lanes, and a center turn land/island. Full 

rebuild of roadway required due to steep cross slope issues. Includes 

replacement of bridge #1366 or #404.

5 5

Emerald St and Americana Blvd, 

Orchard St / Ann Morrison Park 

Entrance

Remove a traffic lane, add bike lanes, and fill sidewalk gaps on both 

sides.

Yes (129) 2016 2016 2017 $1.49 City request for sidewalk to be build 

with lane reconfiguration.

Reconfigure Emerald St and Americana Blvd to add continuous bike lanes 

and complete the sidewalk on both sides of Emerald St in accordance with 

the Central Bench Neighborhood Plan.

6 6

Kootenai St, Vista Ave / Federal 

Way

Kootenai, Vista / Federal Way, sidewalk on both sides, includes 

improved rail crossing.

Yes (115) Done 2016 2017 $0.84 Construct curb, gutter, sidewalks and bike lanes on both sides of Kootenai St 

from Vista Ave to Federal Way in accordance with the Central Bench 

Neighborhood Plan. Project includes removal of on‐street parking.

Community Programs

LTP ‐ Long Term Priority

PD ‐ Preliminary Development

CN ‐ Construction Year Page 3 of 8

Page 37: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

In IFYWP 

(Page)

DSN 

YR

ROW 

YRCN YR

Total 

Cost in 

Millions

ACHD Programming Notes

2016 City 

Priority 

Ranking

2015 City 

Priority 

Ranking

ACHD Project Name            

(City Project Name)ACHD Project Description

Current Programming Status

Boise's Request

7 7

Victory Rd, Virginia Ave / Federal 

Way

Victory, Virginia / Federal Way: 845 ft sidewalk gaps on both sides 

(1,690 ft total). Includes railroad crossing.

No $2.04 Scoped ‐ High cost project. 

Programming pending Kootenai and 

Overland crossings to improve 

coordination with Union Pacific.

Construct sidewalk on both sides of Victory Rd, between Virginia Ave and 

Federal Way. Improve rail crossing.

8 8

Overland Rd, Columbus St / 

Federal Way

Overland, Columbus / Federal Way: fill sidewalk gaps on both sides. 

Includes railroad crossing.

Yes (118) 2016 2016 2018 $1.11 Complete curb, gutter and sidewalk on both sides of Overland Rd, between 

Columbus St and Federal Way in accordance with the Central Bench 

Neighborhood Plan. Includes an improved UPRR crossing.

9 9

McMillan Rd Refuge Medians, 

Eagle Rd / Cloverdale Rd

McMillan Road Pedestrian Refuge Medians and Traffic Calming 

Medians, Eagle / Cloverdale ‐ Hold input meetings with schools and 

parents to identify best locations

Yes (117) TBD ACHD Traffic evaluating potential 

location. One installed with Eagle/ 

McMillan intersection project. Addition 

signalized crossing exists.

Install pedestrian refuge islands at locations along McMillan Rd, between 

Eagle Rd and Cloverdale at locations to be determined. Design and 

construction will be programmed once locations are identified.

10 10

Collister Dr, Hillside Ave / 

Briarhill Dr

Fill 420 ft sidewalk gap on east side of Collister, north of Hill Rd Yes (109) 2016 2017 2019 $0.38 ACHD to investigate advancing project 

to align with planned maintenance.

Construct curb, gutter and sidewalk on the east side of Collister Dr 

connecting with the existing sidewalk south of Hillside Ave and at Briarhill Dr 

in order to improve neighborhood connectivity and pedestrian safety.

11

Columbus Bike Way, Canal to 

Kootenai.

Provide on‐street bicycle facilities in Vista Neighborhood. No

12

Spaulding Sidewalk, Vista to 

Columbus

Add curb, gutter and min 5' wide sidewalk along north and south 

sides of Spaulding  in Vista Neighborhood.

No

13

Malad Sidewalk, Kerr to Vista Add curb, gutter and min 5' wide sidewalk along the north side of 

Malad in Vista Neighborhood.

No

14

Annett Sidewalk, Malad to 

Targee

Add curb, gutter and min 5' wide sidewalk along the west side of 

Annett in Vista Neighborhood.

No $0.49 This project is #48 on BSD list.  

Move curb, remove on‐street parking in order to save mature trees.

15 11

Leadville Ave Bikeway, Linden St 

/ Greenbelt

Bikeway on Leadville, Linden to Greenbelt: Signs installed, enhanced 

crossing at Linden; crossing at Boise Ave not recommended by 

ACHD. 

Yes (126) 2017 2018 2020 $0.24 Improve Leadville Ave as a bikeway to include enhanced crossing at Boise 

Ave, shared lane markings, possible modification of two‐way stop control at 

Iowa, Pennsylvania, Warren, Highland, and Rossi, and traffic calming in 

accordance with the Southeast Boise Neighborhood Plan.

16 12

Cole Rd, Kettering Ave / 

Mountain View Dr

Continuous sidewalks, both sides  Yes (109) 2016 2016 2018 $0.72 Construct curb, gutter, and sidewalk on both sides of Cole Rd between 

Kettering Ave and Mountain View Dr in accordance with the West Bench 

Neighborhood Plan.

17 13

Columbus St, Overland Rd / 

Kootenai St

Sidewalk on both sides Yes (110) 2016 2017 2019 $1.40 Construct curb, gutter and sidewalk on both sides of Columbus St from 

Overland Rd to Kootenai St in accordance with the Central Bench 

Neighborhood Plan.

18Latah Bike Way, Targee to 

Overland

Provide on‐street bicycle facilities to tie into existing bicycle lanes 

on Latah, north of Overland  in Vista Neighborhood.

No

19 14

Owyhee St bikeway, Elder St / 

Alpine St (Bikeway parallel to 

Vista)

Bikeway with signalized crossings Yes (127) 2019 2020 PD $0.12 Improve Owyhee St as a bikeway to include way finding signs, shared lane 

markings, and enhanced crossing at Rose Hill in accordance with the Central 

Bench Neighborhood Plan. Concept design will further clarify project scope.

City request for bikeway parallel to 

Vista to be completed by these two 

projects. Also evaluating bikeway on 

Columbus. Joint concept design will be 

completed in FY2018.

LTP ‐ Long Term Priority

PD ‐ Preliminary Development

CN ‐ Construction Year Page 4 of 8

Page 38: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

In IFYWP 

(Page)

DSN 

YR

ROW 

YRCN YR

Total 

Cost in 

Millions

ACHD Programming Notes

2016 City 

Priority 

Ranking

2015 City 

Priority 

Ranking

ACHD Project Name            

(City Project Name)ACHD Project Description

Current Programming Status

Boise's Request

20 14

Shoshone St Bikeway, Linden St 

/ Greenbelt (Bikeway parallel to 

Vista)

Bikeway with signalized crossings Yes (127) 2020 PD PD $0.12 Improve Shoshone St as a bikeway to include wayfinding signage, shared 

lane markings, signal modification at Overland Rd, and pedestrian ramps in 

accordance with the Central Bench Neighborhood Plan. Project includes an 

enhanced pedestrian signal to replace existing flashing caution light at Rose 

Hill St. Concept design will further clarify project scope.

21 15

East‐West Bikeway, Ave 

B/Whitewater Park Blvd

East‐West Bikeway from Ave B to Whitewater Park Blvd No TBD Identify route as part DBIP and local 

roads plan for this sub‐area. FY2016 

Planning Budget includes sub‐area 

plan. See City of Boise study priority #1.

Wayfinding signage and arterial crossings.

22 16Columbia Village Bikeway to 

Amity Rd

North‐South bikeway connection to Amity Yes (113) 2016 2017 2019 $0.25 Project to be completed as part of City 

priority # 18.

See description under City priority #18 below.

23 17

Heron St, 13th St / 9th St (north 

side)

Heron, 13th to 9th: <1/3 mile of sidewalk on north side Yes (113) 2016 N/A 2018 $0.54 Construct curb, gutter, parking and detached concrete pathway on north 

side of Heron St. from 13th St. to 9th St. Project includes a full road rebuild 

due to poor pavement condition.

24 18

Holcomb Rd, Mimosa Way / 

Amity Rd

Holcomb, Eastgate to Amity: 1/3 mile: sidewalk Yes (113) 2016 2017 2019 $0.25 Construct detached 5’ sidewalk on the east side of Holcomb Rd between 

Mendota Dr and Amity Rd in accordance with the Southeast Boise 

Neighborhood Plan. Stripe bike lane and install wayfinding signage for a bike 

facility from Amity to Mimosa Way. Project will provide ped/bike connection 

from Oregon Trail Heights/Columbia Village to Holcomb path/bridge and 

Southeast Boise.

25 19Alpine St, Orchard St / Randall St Alpine, Orchard / Randall, sidewalk on south side  Yes (104) 2016 2016 2017 $0.64 Complete sidewalk on the south side of Alpine St from Orchard St to Randall 

St in accordance with the Central Bench Neighborhood Plan.

26 20

Phillippi St, Malad St / Targee St Phillippi, Malad / Targee: sidewalk on east side  Yes (119) 2016 2017 2019 $0.26 Complete curb, gutter and sidewalk improvements on both sides of Phillippi 

St, between Malad St and Targee St in accordance with the Central Bench 

Neighborhood Plan.

27 21

Phillippi St, Targee St / Overland 

Rd

Phillippi, Targee / Overland: sidewalk on both sides  Yes (119) 2017 2019 2020 $2.13 Construct curb, gutter and sidewalk on both the sides of Phillippi St, 

between Targee St and Overland Rd in accordance with the Central Bench 

Neighborhood Plan. Project includes full road rehabilitation.

28 22

Clark St, Orchard St / Roosevelt 

St

Clark, Orchard / Roosevelt: s/w on both sides, one side at a min. 

(2,100 ft on north side)

Yes (108) 2015‐

2016

2016 2018 $1.00 Construct sidewalk on both sides of Clark St between Orchard St and 

Roosevelt St to provide pedestrian connectivity and reduce the need for 

safety busing for Monroe Elementary School.

29 24

Jefferson St, Whitewater Park 

Blvd / 27th St

Jefferson, gaps in sidewalk between 27th St. and Whitewater Park 

Blvd.

Yes (114) 2016 2016 2017 $0.17 Complete curb, gutter, and sidewalk on both sides of Jefferson St east of 

Whitewater Park Blvd where gaps currently exist in accordance with Boise' 

30th Area Master Plan. Project includes road rehabilitation.

LTP ‐ Long Term Priority

PD ‐ Preliminary Development

CN ‐ Construction Year Page 5 of 8

Page 39: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

In IFYWP 

(Page)

DSN 

YR

ROW 

YRCN YR

Total 

Cost in 

Millions

ACHD Programming Notes

2016 City 

Priority 

Ranking

2015 City 

Priority 

Ranking

ACHD Project Name            

(City Project Name)ACHD Project Description

Current Programming Status

Boise's Request

30 25

Madison Ave, Whitewater Park 

Blvd / 27th St

Madison gaps in sidewalk between 27th St. and Whitewater Park 

Blvd.

Yes (117) 2016 2016 2017 $0.13 Complete curb, gutter, and sidewalk on both sides of Madison St, between 

Whitewater Park Blvd and 27th St in accordance with the City of Boise's 30th 

St Area Master Plan. Project will create standard parallel parking between 

Whitewater Park Blvd and 30th St. Project also includes full road 

rehabilitation.

31 26

Coston St, Bannock/ Franklin St Coston, Warm Springs / north of Franklin, sidewalk on both sides No $0.23 Scoped 2015. Final report pending. Construct 5' attached sidewalk on the west side of Coston St between Warm 

Springs Ave and Franklin St. (City's request was for sidewalk on both sides. 

Working in coordination with the City Forrester, project will only construct 

sidewalks on the west side due to landscape/tree impacts.)

32 27

Peasley St / Alpine St (Railroad 

Crossing)

Improved Railroad Crossing at Peasley for Pedestrians (connected 

sidewalks) and Bicyclists

No $0.15 Scoped 2015. Final report pending. Extend railroad crossing planking to the east side for a pedestrian crossing. 

Extend detached sidewalk with swales to intersection from existing sidewalk 

on the northeast side of the crossing. 

33 28

Cherry Ln, Owyhee St / Vista Ave Cherry Ln, Owyhee / Vista: 1,550 ft sidewalk gap on south side. 

Connects to transit stop. (ACHD: Defer, sidewalk exists on north 

side)

Yes (108) PD PD PD $0.77 Complete sidewalk on the south side of Cherry Ln between Owyhee St and 

Vista Ave in accordance with the Central Bench Neighborhood Plan.

34 29

Garden St, Franklin Rd / Emerald 

St

Garden St, Emerald / Franklin: sidewalk on both sides No $2.57 Scoped 2011. Awaits programming. 

High cost project. 

Construct curb, gutter and sidewalk on both sides of Garden Street from 

Emerald St to Franklin Road to provide pedestrian connectivity in an 

established neighborhood. Fill in the missing sidewalk across 2 lots on the 

northwest corner of Emerald.

35 30

Eckert Rd and Arrow Junction Dr 

Pedestrian Crossing (Eckert Rd, 

Boise Ave / Arrow Junction Dr)

Eckert, Boise / Arrow Junction: sidewalk on east  side No $0.06 Scoped 2015. Final report pending. 

(City request for pedestrian signal to be 

built with sidewalk project.)

Install a striped crosswalk and pedestrian ramps at the intersection. (City's 

request was for sidewalks on the east side. Sidewalks already exist on the 

west side with only house on the east side.)

36 31

Liberty St, Emerald St/Franklin 

Rd

Liberty, Emerald / Franklin, sidewalk on both sides Yes (116) 2016 2017 2019 $0.54 Complete sidewalk on the east side of Liberty St in accordance with the 

Central Bench Neighborhood Plan. (City request was for sidewalk on both 

sides.)

37 32

Vista Neighborhood Local 

Streets

Vista Neighborhood, curb, gutter, innovative stormdrainage on local 

streets. Work with ACHD to identify candidates.

No TBD Vista LIV transportation group did not 

identify as a priority. Further City input 

requested.

Install curb, gutter, and/or innovative storm drainage on local streets.

38 33

Vista Ave and Spaulding St 

Pedestrian Signal

Vista signalized ped crossing at Spaulding mainly for transit users. 

Project is in the Vista Neighborhood.

Yes (122) 2019 2019 2020 $0.26 Scoped signal at Nez Perce. Willing to 

consider location at Spaulding at City's 

request.

Install an enhanced pedestrian crossing on Vista Ave at Nez Perce St, 

including bike push buttons.

39

Vista Traffic Calming, Elder to 

Rose Hill

Reduce vehicle speeds along corridor by narrowing travel lanes, 

providing bike lanes, or implementing other traffic calming 

measures in Vista Neighborhood.

No

40Cleveland Sidewalk, Palouse to 

Nez Perce

Construct curb, gutter and minimum 5' wide sidewalks on both 

sides of Cleveland in Vista Neighborhood.

No

41Palouse Sidewalk, Roosevelt to 

Cleveland

Construct curb, gutter and minimum 5' wide sidewalks on both 

sides of Palouse in Vista Neighborhood.

No

42Hervey Sidewalk, Cherry to 

Lemhi

Construct curb, gutter and minimum 5' wide sidewalks on west side 

of Hervey in Vista Neighborhood.

No

43 34State St and Wylie Ln Pedestrian 

Crossing

State St, east of Collister, signalized pedestrian crossing No $0.30 Project to be scoped in 2016. Install an enhanced pedestrian crossing (PHB) on State St on the east side of 

Wylie Ln.

LTP ‐ Long Term Priority

PD ‐ Preliminary Development

CN ‐ Construction Year Page 6 of 8

Page 40: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

In IFYWP 

(Page)

DSN 

YR

ROW 

YRCN YR

Total 

Cost in 

Millions

ACHD Programming Notes

2016 City 

Priority 

Ranking

2015 City 

Priority 

Ranking

ACHD Project Name            

(City Project Name)ACHD Project Description

Current Programming Status

Boise's Request

44 35

Ash Park St, Northview Rd / 

Ustick Rd

Ash St, Northview to Ustick, sidewalk & bike way Yes (104) 2016 2017 2019 $0.56 Complete sidewalk on both sides of Ash Park Lane between Northview St 

and Ustick Rd in accordance with the West Bench Neighborhood Plan. (City 

requested sidewalk and bikeway.)

45 36

Phillippi St, Overland Rd / Cassia 

St

Phillippi, Overland to Cassia, less than 1/2 mi. sidewalk gap No TBD Scoped 2015.  Rebuild roadway to include 8' detached sidewalk, parking, 5' bike lanes, 2 

auto lanes, and a center turn land/island. Full rebuild of roadway required 

due to steep cross slope issues. Includes pedestrian signal at Phillippi St / 

Overland Rd intersection on west side and replacement of bridge #1366 or 

#404.

46 37

Allumbaugh St, Fairview 

Ave/Northview St

Allumbaugh, Fairview to Northview, on both sides. No $0.89 Scoped 2015. Final 2016 scoping report 

for sidewalk on one side.

Complete curb, gutter, and sidewalk on the west side of Allumbaugh St, 

between Fairview Ave and Northview St. (City requested sidewalk on both 

sides. Sidewalk on east side infeasible at this time due to significant land use, 

utility, and drainage impacts.)

47Grand, Miller, Ash Pedestrian 

Enhancements and Upgrades

Fix hazardous sidewalk, construct ADA compliant pedestrian ramps.  

Fill in sidewalk gaps. 

No

48 10th Street/Myrtle Extend 10th Street to Myrtle for street grid connectivity. No

49 38

De Meyer St, Cloverdale Rd / 

Lena Ave; Lena Ave, De Meyer St 

/ Arlen St

Sidewalk connection to DeMeyer Park ‐ Lena Ave, DeMeyer to 

Hickory 1/4 mi. sidewalk gap on east side. Connect Shamrock 

bikeway to signal at Cloverdale & DeMeyer by adding bike way on 

DeMeyer & Lena.

No $0.28 Scoped 2015. Final report pending. Complete 5' attached sidewalk on the south side of DeMeyer St by 

narrowing the roadway and constructing sidewalk on the inside of existing 

curb. Construct at‐grade sidewalks through asphalt eyebrows to connect 

sidewalk segments. Install bikeway (signage, pavement markings) from 

Demeyer / Cloverdale to Lena / Arlen. 

50 39

Cassia St, Franklin Park Dr / 

Troxel Dr

Cassia, east of Franklin Park Dr, 0.2 mi. sidewalk gap on north side No $0.40 Scoped 2015. Final report pending. Complete sidewalk on the north side of Cassia St, between Franklin Park Dr 

and Troxel Dr. Install bike lanes from Franklin Park Dr to Curtis Rd. Install an 

enhanced pedestrian crossing (rectangular rapid flashing beacon) at Cassia 

St and Troxel on the west side of the intersection at an existing crosswalk.  

Restripe with bike lanes after chipsealing in 2018 (separate project).

51 40

Amity Rd, Federal Way / 

Holcomb Rd

Amity, sidewalk gap on north side, Federal Way to Holcomb No $0.44 Scoped. Awaits programming. Install pathway on the south side of Amity Rd, between Federal Way and 

Rimview Way. Install an enhanced pedestrian crossing (pedestrian hybrid 

beacon) at Amity and Rimview to access the pathway on the north side of 

Amity and the regional pathway system in the area.

52 41

Cloverdale Rd, Overland Rd / 

Franklin Rd (Cloverdale Rd I‐84 

Overpass)

I‐84 Cloverdale Overpass, add sidewalk & bike way No $2.33 ACHD requested project from ITD in fall 

2015. Project is not of ITD's bridge 

replacement list and will not be 

developed at this time. ACHD will 

continue to pursue project with ITD.

Widen Cloverdale Rd and overpass from 2 to 5 lanes with curb, gutter, 

sidewalk, and bike lanes. (City request for sidewalk and bikelanes to be 

constructed as part of roadway widening project.

53 42Broadway Ave and Boise Ave Broadway & Boise Ave Improve bicycle and pedestrian friendliness 

at intersection

Yes (106) 2019 2019 2020 $0.17 ACHD to coordinate with ITD. Improve intersection for bikes and pedestrians in accordance with the 

Southeast Boise Neighborhood Plan. Includes accessible pedestrian signal.

54 43

Horseshoe Bend Rd, State St / 

Hill Rd (Horseshoe Bend Rd 

Bikeway, Hill Rd / Greenbelt)

Bike Way on Horseshoe Bend Rd from Hill Road to State Street and 

then to Greenbelt

Yes (114) PD PD PD $1.68 Complete detached sidewalks, curb & gutter, seepage beds, bike lanes on 

both sides of Horseshoe Bend Rd. Widen shoulder on the west side for  

parallel parking. Project includes road rehabilitation due to poor pavement 

condition. (City request for a bikeway extending to Greenbelt to be 

completed in part through this project.)

LTP ‐ Long Term Priority

PD ‐ Preliminary Development

CN ‐ Construction Year Page 7 of 8

Page 41: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

In IFYWP 

(Page)

DSN 

YR

ROW 

YRCN YR

Total 

Cost in 

Millions

ACHD Programming Notes

2016 City 

Priority 

Ranking

2015 City 

Priority 

Ranking

ACHD Project Name            

(City Project Name)ACHD Project Description

Current Programming Status

Boise's Request

55 44

Emerald St, Curtis Rd / Orchard 

St

Emerald, Curtis to Orchard, sidewalk No $5.37 Defer. Operating at LOS D. (City 

request for sidewalks will be built with 

the roadway widening.)

Widen Emerald St to 5‐lanes with curb, gutter, sidewalk and bike lane in 

accordance with the 2012 CIP. (City request is for sidewalk on both sides. 

Due to significant cross slope issues, roadway will need to be rebuilt. 

Roadway will be widening to CIP lanes at the same time.)

56 45

Bogus Basin Rd, Curling Dr / 550' 

N/O Curling Dr (Bogus Basin, 

east of Curling Dr)

Fill sidewalk gaps of approximately 500 feet north of Curling Drive Yes (106) 2018 2019 2020 $0.36 Widen pavement and install curb, gutter, and atached sidewalk on both 

sides of Bogus Basin to fill in a 550' gap north of Curling Dr. Install retaining 

wall on east side as necessary.

1 2

State Street Alignment and Right‐

of‐Way Study

Expedite completion. No TBD Draft plan is a working document to be 

used during design phase of State St 

projects.

Expedite completion.

2 3

Neighborhood Bike and 

Pedestrian Plan for the North 

End/East End Planning Area

Complete a neighborhood pedestrian and bicycle plan. Next area is 

the East End and the portion of the North End south of State Street.

No TBD ACHD to complete a North End‐

Highlands Neighborhood Plan in 

FY2016. This area covers 28th to 

Military Reserve, State to Hill and the 

Highlands planning area.

Complete a neighborhood pedestrian and bicycle plan.

Studies

LTP ‐ Long Term Priority

PD ‐ Preliminary Development

CN ‐ Construction Year Page 8 of 8

Page 42: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

Attachment 3

Boise School District 2016 Requests and ACHD Proposed Response

In IFYWP 

(Page)DSN YR ROW YR CN YR

Total 

Cost in 

Millions

Programming Notes

Road and Intersection

1 IN205‐

18

Bergeson St and Law 

Ave

Signalize intersection to improve safety. No $0.68 Location does not warrant a 

traffic signal based on volumes 

and crash history. ACHD to 

clarify purpose with the School 

District.

Community Programs

1 1 CM215‐

03

Bogart Ln, SH 44 (State 

St) / Hill Road Pkwy

Widen shoulders on both sides and complete curb, gutter, and detached 

sidewalk on the east side of Bogart Ln between Hwy 44 and Hill Rd Pkwy. 

Widen bridge #41 over Eagle Drain as necessary. Install an enhanced 

pedestrian crossing at Sloan St.

Yes 

(106)

2020 PD PD $1.32 Programmed to begin design in FY2020. ACHD 

to evaluate project construction moving 

forward through IFYWP update.

2 2 CM214‐

24

Caswell St, Bogart Ln / 

Roe St

Complete sidewalk on both sides of Caswell between Bogart Ln an Roe St. No $0.29 Scoped "Go" in 2015, but defer until 

development. ACHD to review for 

programming in 2018.

3 NEW Warm Springs Ave, 

Glacier Dr / Glacier Dr

Construct sidewalk on the north side of Warm Springs Ave, between Glacier Dr 

E and Glacier Dr W. 

No TBD Prioritize and scope.

4 4 CM212‐

07

Alpine St, Orchard St / 

Randall St

Complete sidewalk on the south side of Alpine St from Orchard St to Randall St 

in accordance with the Central Bench Neighborhood Plan.

Yes 

(104)

2016 2016 2017 $0.64 To be built in FY2017.

5 6 CM211‐

14

Owyhee St, Malad St / 

Overland Rd (east side)

Complete curb, gutter and sidewalk on the east side of Owyhee St, between 

Malad St and Overland Rd in accordance with the Central Bench Neighborhood 

Plan.

Yes 

(118)

Done Done 2016 $0.46 Construction to start summer 2016.

6 8 3341 Targee St School Zone Install flashing school zone beacons near Hawthorne Elementary. No TBD Traffic analysis complete. ACHD Traffic analysis showed good compliance 

with the existing 20 mph speed limit. 

Recommend no additional treatment at this 

time. 

7 9 CM211‐

24

State St and Mercer St 

or Arthur St Pedestrian 

Signal

See description for priority #11 below. Yes 

(121)

Done Done 2016 $0.47 School District request for 

pedestrian signal will be 

completed as part of sidewalk 

project.

Construction to start summer 2016.

8 13 CM215‐

22

15th St and Resseguie 

St Pedestrian Crossing

Install an enhanced pedestrian crossing (rectangular rapid flashing beacon) on 

the south leg of the intersection. Project will also remove markings for crossing 

on the north leg to encourage use of new signal.

No TBD Traffic analysis complete.  Prioritize and scope.

9 NEW Ustick Rd and 

Milwaukee St

Install flashing school zone beacons at the intersection of Ustick Rd and 

Milwaukee St for students at Valley View Elementary School.

No TBD ACHD Traffic Engineering to evaluate location 

for warrants. 

ACHD Proposed Response

2016 SD 

Priority 

Ranking

2015 SD 

Priority 

Ranking

GIS # ACHD Project Name     Project Description

Current Programming Status

PD ‐ Preliminary Development

CN ‐ Construction Year Page 1 of 6

Page 43: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

Attachment 3

In IFYWP 

(Page)DSN YR ROW YR CN YR

Total 

Cost in 

Millions

Programming NotesACHD Proposed Response

2016 SD 

Priority 

Ranking

2015 SD 

Priority 

Ranking

GIS # ACHD Project Name     Project Description

Current Programming Status

10 14 CM213‐

05

Christine St, Northview 

St / Ustick Rd

Construct sidewalk on both sides of Christine, from Northview to Ustick in 

accordance with the West Bench Neighborhood Plan.

Yes 

(108)

2017 2018 2019 $0.45 To be built in FY2019.

11 15 CM211‐

24

State St, Willow Ln / 

Veterans Pkwy (south 

side)

Complete sidewalks on the southside of State St, between Willow Ln and VMP, 

and install an enhanced pedestrian corssing at Arthur St in accordance with the 

State St TTOP and the State St/VMP/36th St Intersection Concept Design.

Yes 

(121)

Done Done 2016 $0.47 Project also completes School 

District priority #9.

Construction to start summer 2016.

12 16 CM210‐

70

Overland Rd, 

Columbus St / Federal 

Way

Complete curb, gutter and sidewalk on both sides of Overland Rd, between 

Columbus St and Federal Way in accordance with the Central Bench 

Neighborhood Plan. Includes an improved UPRR crossing.

Yes 

(118)

2016 2016 2018 $1.11 To be built in FY2018.

13 17 CM215‐

13

13th St and Resseguie 

St Pedestrian Signal

Install an enhanced pedestrian crossing at the intersection.  No TBD ACHD Traffic Engineering to evaluate location 

for warrants. 

14 18 CM211‐‐

34

Pierce St, Washington 

St / Shenandoah Dr

Complete sidewalks on Pierce Street, between Washington St and Shenandoah 

Dr to improve pedestrian safety students walking to Roosevelt Elementary.

Yes 

(120)

2018 2019 2020 $0.76 To be built in FY2020.

15 19 CGSP20

5‐16

Liberty St, Franklin Rd 

/ Emerald St

Complete sidewalk on the east side of Liberty St in accordance with the Central 

Bench Neighborhood Plan.

Yes 

(116)

2016 2017 2019 $0.54 Project scope originally assumed completion of 

bridge and RRX widening to occur with 

improvements at Liberty and Franklin 

intersection. That project did not move 

forward, thus placing much added expense 

($2.5 million) to sidewalk project. Project will 

be pushed back in IFYWP update until bridge 

widening can be completed. 

16 20 CM210‐

25

Camas St, Orchard St / 

Roosevelt St

Construct sidewalk on both sides of Camas Street from Orchard Street to 

Roosevelt Street in accordance with the Central Bench Neighborhood Plan.  

Project to include roadway reclamation.

Yes 

(107)

2016 2016 2017 $1.17 To be built in FY2017.

17 NEW Maple Grove Rd, N/O 

Victory Rd

Relocate pedestrian crossing and flashing school zone beacons to ensure 

proper location with new park and school parking redesign. 

No TBD ACHD and Boise School District to coordinate 

potential project and cost share as planned 

projects move forward. 

18 21 PPI208‐

22

Garden St, Franklin Rd 

/ Emerald St

Construct curb, gutter and sidewalk on both sides of Garden Street from 

Emerald St to Franklin Road to provide pedestrian connectivity in an 

established neighborhood. Fill in the missing sidewalk across 2 lots on the 

northwest corner of Emerald.

No $2.57 Scoped in 2011. ACHD to evaluate potential 

programming during IFYWP update. Delay in 

programming due to high project cost.

19 22 CM211‐

22

Poplar St, Cole Rd / 

Raymond St (north 

side)

Complete curb, gutter, and sidewalk on the north side of Poplar St, between 

Cole Rd and Raymond St in accordance with the West Bench Neighborhood 

Plan.

Yes 

(120)

2016 2017 2019 $0.62 To be built in FY2019.

20 23 CM215‐

24

14th St and Fort St 

Pedestrian Signal

Install an enhanced pedestrian crossing (rectangular rapid flashin beacon) on 

both sides of the existing crosswalk across Fort St to North JHS.

No $0.20 Scoped "Go" in 2015. ACHD to evaluate 

potential programming during IFYWP update.

PD ‐ Preliminary Development

CN ‐ Construction Year Page 2 of 6

Page 44: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

Attachment 3

In IFYWP 

(Page)DSN YR ROW YR CN YR

Total 

Cost in 

Millions

Programming NotesACHD Proposed Response

2016 SD 

Priority 

Ranking

2015 SD 

Priority 

Ranking

GIS # ACHD Project Name     Project Description

Current Programming Status

21 24 CM211‐

21

Aurora Dr, Randolph 

Dr, and Cameron St 

See description for priority #23 below. Yes 

(107)

Done 2016 2019 $0.53 Intersection improvements to be built as part 

of sidewalk project on Cameron St.

22 25 CM213‐

12

Cassia St, Latah St / 

Edson St

Complete sidewalk on the north side of Cassia St and upgrade pedestrian 

ramps on both sides between Latah St and Edson St in accordance with the 

Central Bench Neighborhood Plan. 

Yes 

(107)

2018 2019 2020 $1.04 To be built in FY2020. School District requested 

sidewalk on both sides. Sidewalk already exists 

on the south side.

23 26 CM211‐

21

Cameron St, Hummel 

Dr / Aurora Dr 

(Cameron St, Holiday 

Dr/Randolph Dr)

Construct sidewalk on Cameron Street from Hummel to Randolph in 

accordance with the Central Bench Neighborhood Plan. Includes pedestrian 

improvements to the Cameron, Randolph, and Aurora intersection.

Yes 

(107)

Done 2016 2019 $0.53 To be built in FY2019.

24 NEW Curling Dr, at 

Highlands Elementary

Provide pedestrian safety improvements in front of Highlands Elementary 

School.

No TBD Project to move forward pending outcome of 

the traffic calming evaluations for the 

Highlands neighborhood. 

25 27 CM215‐

25

Bogus Basin Rd and 

Curling St Pedestrian 

Crossing

Install an enhanced pedestrian crossing at the intersection. No TBD Project to move forward pending outcome of 

the traffic calming evaluations for the 

Highlands neighborhood. 

26 10 3341 Sloan St School Zone Install flashing school zone beacons near Shadow Hills Elementary. No TBD Traffic analysis complete.  Prioritize and scope.

27 28 CM215‐

26

Troxel Dr and Cassia St 

Pedestrian Crossing

Install an enhanced pedestrian crossing (rectangular rapid flashing beacon) at 

the intersection.

No TBD Traffic analysis complete.  Prioritize and scope.

28 29 CM210‐

24

Clark St, Orchard St / 

Roosevelt St

Construct sidewalk on both sides of Clark St between Orchard St and Roosevelt 

St to provide pedestrian connectivity and reduce the need for safety busing for 

Monroe Elementary School.

Yes 

(108)

2016 2016 2018 $1.00 To be built in FY2018.

29 30 CM213‐

09

Linda Vista Ln, 

Canterbury Dr / Ustick 

Rd (Linda Vista Ln, 

Cory Ln / Ustick Rd)

Complete curb, gutter, and sidewalk on west side of Linda Vista Ln, between 

Canterbury Dr and Ustick Rd. (School District request was for sidewalk on both 

sides)

Yes 

(116)

2020 2020 PD $0.69 District request partially 

moving forward. Focus on 

more developed section. 

Remaining section on hold 

pending development.

Programmed to begin design in FY2020. ACHD 

to evaluate project construction moving 

forward through IFYWP update.

30 32 CGSP20

6‐16

Cory Ln, Mitchell St / 

Maple Grove Rd

Complete sidewalk on the north side of Cory Ln, between Maple Grove Rd and 

Mitchell St for students attending Valley View Elementary.

No $0.29 Scoped "Go" in 2015. ACHD to evaluate 

potential programming during IFYWP update.

31 33 CM213‐

15

Franklin St, McKinley 

St / Pierce St

Construct sidewalks on the north side of Franklin St, between McKinley St and 

Pierce St.

No $0.37 Scoped "Go" in 2015. ACHD to evaluate 

potential programming during IFYWP update.

32 NEW Curling Dr and 

Braemere Rd

Provide pedestrian enhancements at the intersection of Curling Dr and 

Braemere Rd.

No TBD Project to move forward pending outcome of 

the traffic calming evaluations for the 

Highlands neighborhood. 

PD ‐ Preliminary Development

CN ‐ Construction Year Page 3 of 6

Page 45: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

Attachment 3

In IFYWP 

(Page)DSN YR ROW YR CN YR

Total 

Cost in 

Millions

Programming NotesACHD Proposed Response

2016 SD 

Priority 

Ranking

2015 SD 

Priority 

Ranking

GIS # ACHD Project Name     Project Description

Current Programming Status

33 34 CM211‐

25

Roosevelt St, Rose Hill 

St / Emerald St (west 

side)

Construct sidewalk on the west side of Roosevelt St, between Rose Hill St and 

Emerald St in accordance with the Central Bench Neighborhood Plan.

Yes 

(121)

2016 2017 2019 $1.00 To be built in FY2019.

34 35 CM213‐

11

Milwaukee St, Marcum 

St/Ustick Rd

Install curb, gutter, and sidewalk on the west side of Milwaukee St, between 

Marcum St and Ustick Rd. Sidewalk would be placed between the canal and the 

roadway.

No $1.00 Scoped "Go" in 2014. ACHD to evaluate 

potential programming during IFYWP update.

35 36 CM214‐

21

Phillippi St, Overland 

Rd / Franklin Rd

Rebuild roadway to include 8' detached sidewalk, parking, 5' bike lanes, 2 auto 

lanes, and a center turn land/island. Full rebuild of roadway required due to 

steep cross slope issues. Includes pedestrian signal at Phillippi St / Overland Rd 

intersection on west side and replacement of bridge #1366 or #404.

No TBD Scoped in 2015. Further refinement of scope 

underway due to high cost associated with 

sidewalk project and roadway crown issues.

36 49 CM210‐

19

Braemere Rd, Highland 

View Dr / Curling Dr

Construct sidewalk and vertical curb on Braemere Road between Highland  

View Drive and Curling Drive to improve safety for students walking to and 

from Highlands Elementary School.

No $0.76 Scoped. Project to move forward pending 

outcome of traffic calming evaluations for the 

Highlands neighborhood.

37 NEW Braemere Rd and 

Highland View Dr

Provide pedestrian enhancements at the intersection of Braemere Rd and 

Highland View Dr.

No TBD Project to move forward pending outcome of 

the traffic calming evaluations for the 

Highlands neighborhood. 

38 11 3341 Hidden Springs Drive 

School Zone

Install flashing school zone beacons near Hidden Springs Elementary. No TBD Traffic analysis complete. Prioritize and scope.

39 NEW E. Braemere Rd Provide pedestrian improvements along E. Braemere Rd above the Crane 

Creek Country Club.

No TBD Project to move forward pending outcome of 

the traffic calming evaluations for the 

Highlands neighborhood. Sidewalks already 

exist the full length of E. Braemere Rd.

40 NEW 38th St, Sunset Ave / 

Taft St

Connect roadway and complete curb, gutter sidewalk on 38th St, between 

Sunset Ave and Taft St.

No $0.44 Scoped "Go" in 2015. ACHD to evaluate 

potential programming during IFYWP update.

41 37 CM211‐

30

Targee St, Maple 

Grove Rd / Penninger 

Dr

Complete sidewalks on the south side of Targee St, between Maple Grove Rd 

and Penninger Dr to create a safe walking route to Maple Grove Elementary.

Yes 

(122)

Done 2016 2017 $0.44 To be built in FY2017.

42 38 CM211‐

26

Fairfield Ave, Holiday 

Dr S / Holiday Dr N

Construct sidewalks on the south side of Fairfield Ave between Holiday Dr 

intersections in accordance with the Central Bench Neighborhood Plan. 

Yes 

(110)

Done 2016 2019 $0.36 To be built in FY2019.

43 39 BK213‐

04

Shoshone St Bikeway, 

Linden St / Greenbelt 

(Shoshone St and Rose 

Hill St Pedestrian 

Signal)

Improve Shoshone St as a bikeway to include wayfinding signage, shared lane 

markings, signal modification at Overland Rd, and pedestrian ramps in 

accordance with the Central Bench Neighborhood Plan. Project includes an 

enhanced pedestrian signal to replace existing flashing caution light at Rose Hill 

St. (School District requested flashing light be replaced with pedestrian signal)

Yes 

(127)

2020 PD PD $0.12 School District request for 

pedestrian signal will be 

completed as part of bikeway 

project.

Concept design to begin in FY2018. ACHD to 

evaluate potential opportunities to advance 

construction during IFYWP update.

PD ‐ Preliminary Development

CN ‐ Construction Year Page 4 of 6

Page 46: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

Attachment 3

In IFYWP 

(Page)DSN YR ROW YR CN YR

Total 

Cost in 

Millions

Programming NotesACHD Proposed Response

2016 SD 

Priority 

Ranking

2015 SD 

Priority 

Ranking

GIS # ACHD Project Name     Project Description

Current Programming Status

44 40 CGSP20

6‐03

Dalton Ln, Cory Ln / 

Ustick Rd

Install sidewalk on both sides of the roadway to match the existing paved 

sidewalk sections. (School District requested sidewalk on the east side)

No $0.28 Scoped "Go". ACHD to evaluate potential 

programming during IFYWP update.

45 42 CM213‐

14

Kimball St, Cory Ln / 

Ustick Rd

Construct sidewalks on west side of Kimball St from Ustick Rd to Cory Ln. No $0.32 Scoped "Go" in 2015, but defer until 

development. ACHD to review for 

programming in 2018.

46 43 CGSP20

6‐05

Taft St, Sycamore Dr / 

36th St

Construct sidewalk on the south side of Taft St, between Sycamore to 36th St, 

by relocating curb and narrowing roadway. Parking will be limited to only one 

side.

No $1.80 Scoped "Go" in 2015. ACHD to evaluate 

potential programming during IFYWP update.

47 45 CM215‐

10

Sunflower Ln, Yonkers 

Ln/Maple Grove Rd

Construct sidewalk on the north side of Sunflower Ln, between Yonkers Ln and 

Maple Grove Rd.

No $0.32 Scoped "Go" in 2015. ACHD to evaluate 

potential programming during IFYWP update.

48 NEW Warm Springs, Parsnip 

Peak Dr / Barber Dr

Construct sidewalk on Warm Springs Ave, between Parsnip Peak Dr and Barber 

Dr

No TBD Prioritize and scope.

49 48 CM210‐

61

Annett St, Malad 

St/Targee St

Construct sidewalk on the west side of Annett St, between Malad St and 

Targee St, by moving curb out and removing on‐street parking to avoid 

property impacts.

No $0.49 Scoped "Go" in 2015. ACHD to evaluate 

potential programming during IFYWP update.

50 NEW Cole Rd and Diamond 

St Pedestrian Crossing

Install an enhanced pedestrian crossing on Cole Rd at Diamond St to improve 

safety for students attending West Junior High.

No TBD ACHD to consider signal for inclusion in the 

Cole Rd and Victory Rd intersection project. 

This project will widen Cole Rd, from Victory to 

McGlochlin.

Study (Pathway Feasibility)

1 N/A Pathway ‐ Maple 

Grove Rd/Bienapfl

Pathway between Maple Grove and West Jr High No N/A ACHD has no unopened right‐of‐way in this 

area and cannot acquire additional right‐of‐

way through eminent domain for a pathway. 

Recommend the School District work with the 

City of Boise to obtain a pathway through 

development.

2 N/A Pathway ‐ Targee 

between 

Milwaukee/Maple 

Grove

Pathway between Milwaukee and Maple Grove to access Maple Grove 

Elementary

No N/A ACHD has no unopened right‐of‐way in this 

area and cannot acquire additional right‐of‐

way through eminent domain for a pathway. 

Recommend the School District work with the 

City of Boise to obtain a pathway through 

development.

PD ‐ Preliminary Development

CN ‐ Construction Year Page 5 of 6

Page 47: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

Attachment 3

In IFYWP 

(Page)DSN YR ROW YR CN YR

Total 

Cost in 

Millions

Programming NotesACHD Proposed Response

2016 SD 

Priority 

Ranking

2015 SD 

Priority 

Ranking

GIS # ACHD Project Name     Project Description

Current Programming Status

3 N/A Pathway ‐ Between 

Mossy Cup or 

Chinkapin Ave

Pathway between Mossy Cup and Chinkapin to access Maple Grove 

Elementary

No N/A ACHD has no unopened right‐of‐way in this 

area and cannot acquire additional right‐of‐

way through eminent domain for a pathway 

that would connect into the park. Recommend 

the School District work with the City of Boise 

to obtain a pathway through development of 

the park.

4 N/A Pathway ‐ Between 

Gary Ln/Pierce Park Ln

Pathway between Gary Ln and Pierce Park Ln and Pierce Park Ln No N/A ACHD has no unopened right‐of‐way in this 

area and cannot acquire additional right‐of‐

way through eminent domain for a pathway. 

Recommend the School District work with the 

City of Boise to obtain a pathway through 

development.

5 N/A Pathway ‐ Between 

North St/Bloom St

Pathway between North St and Bloom St west of Collister No N/A ACHD has no unopened right‐of‐way in this 

area and cannot acquire additional right‐of‐

way through eminent domain for a pathway. 

Recommend the School District work with the 

City of Boise to obtain a pathway through 

development.

6 N/A Pathway ‐ Between 

Willow Ln and 

Alomosa St

Pathway between Willow and Alomosa No N/A ACHD has unopened right‐of‐way in this area. 

On hold due to public opposition. To be 

explored again when State St expands to 7 

lanes.

PD ‐ Preliminary Development

CN ‐ Construction Year Page 6 of 6

Page 48: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded
Page 49: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded
Page 50: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded
Page 51: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded
Page 52: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded
Page 53: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded
Page 54: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded
Page 55: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded
Page 56: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded
Page 57: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

Attachment 4

City of Eagle 2016 Requests and ACHD Proposed Response

In IFYWP 

(Page)DSN YR ROW YR CN YR

Total 

Cost in 

Millions

Programming Notes

Road & Intersection

1 1 IN205‐

11

SH 16 and Beacon 

Light Rd

Install a signal and add turn lanes as needed. ITD to lead project, with ACHD 

participating in the design and cost. Subject to cooperative agreement and 

programming with ITD.

Yes (49) 2016 2016 2017 $1.45 Project being led by ITD. To be built in FY2017 in partnership with ITD.

2 NEW Palmetto Ave, SH 44 / 

Plaza Dr

Extend Palmetto Ave from Plaza Dr to SH 44. Install a right‐in/right‐out acces 

onto SH‐44.

New TBD New request. Collector roadway to be built by development 

or it could be considered as part of a future 

economic development request.

3 2 IN211‐

04

Eagle Rd and State St Construct a quadrant intersection, including local system improvements, as per 

the Eagle Rd and State St Intersection Concept Study. 

No $4.23 Intersection operating at LOS C 

or better. Roadway segment at 

LOS E.

Prioritize and program. ACHD to complete 

currently programmed collector and local road 

improvements prior to programming 

construction.

4 3 RD209‐

27

Eagle Rd, Floating 

Feather Rd / Beacon 

Light Rd

Widen shoulders for bike lanes and complete curb, gutter, and sidewalk on 

both sides of Eagle Rd, between Floating Feather Rd and Beacon Light Rd.

No $0.87 Project to be prioritized as a 

community programs project.

Scoped "Go" in 2015. ACHD to evaluate 

potential programming during IFYWP update 

as a community programs project.

Floating Feather 

Corridor Study

Study to evaluate Floating Feather Rd, between Linder Rd and Eagle Middle 

School with emphasis on expansion to 3 lanes, bike lanes, detached sidewalks 

and other improvements including the following:

No Based on study description in request, ACHD 

can proceed with programming individual 

projects without additional study. Corridor 

currently operating at an acceptable level of 

service. ACHD to seperately evaluate 

intersections listed below as follows:

Floating  Feather Rd 

and Linder Rd

Install signal No ACHD Traffic Engineering to evaluate location 

for signal warrants.

Floating Feather and 

Ballantyne Rd

Improve intersection including east leg No ACHD Traffic Engineering to evaluate location 

for signal warrants.

Floating Feather Rd 

and Park Ln

Improve intersection specifically for bike and pedestrian flow. Review school 

peak hour congestion

No Prioritize and scope as a Community Programs 

project. 

6 5 RD209‐

28

Linder Rd, SH 44 / 

Floating Feather Rd

Widen Linder Rd to 5‐lanes, with curb, gutter, sidewalk, and bike lanes in 

accordance with the 2012 CIP.

No $3.30 Roadway currently operating at a level of 

service C or better. Defer until warranted.

7 6 RD207‐

19

Linder Rd, Chinden 

Blvd (US 20/26) / SH 

44 (State St) (Linder 

Rd, Boise River/SH 44)

Widen Linder Rd to 5‐lanes, with curb, gutter, sidewalk, and bike lanes in 

accordance with the 2012 CIP.

No $22.95 Project combined with priority 

#8.

Prioritized (Ranks 70 of 78). Awaits 

programming.

1180 Evaluate and scope individual 

projects as warranted. 

TBD

ACHD Proposed Response

Current Programming Status2016 

City 

Priority 

Ranking

2015 

City 

Priority 

Ranking

GIS # ACHD Project Name Project Description

5 4

PD ‐ Preliminary Development

CN ‐ Construction Year Page 1 of 3

Page 58: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

Attachment 4

In IFYWP 

(Page)DSN YR ROW YR CN YR

Total 

Cost in 

Millions

Programming NotesACHD Proposed Response

Current Programming Status2016 

City 

Priority 

Ranking

2015 

City 

Priority 

Ranking

GIS # ACHD Project Name Project Description

8 7 RD207‐

19

Linder Rd, Chinden 

Blvd (US 20/26) / SH 

44 (State St) (Linder 

Rd, Chinden Blvd/Boise 

River)

Widen Linder Rd to 5‐lanes, with curb, gutter, sidewalk, and bike lanes in 

accordance with the 2012 CIP.

No $22.95 Project combined with priority 

#7.

Prioritized (Ranks 70 of 78). Awaits 

programming.

9 8 RD209‐

25

Beacon Light Rd, SH 55 

/ SH 16

Preserve right‐of‐way for up to 3 lanes. No N/A Approved by ACHD Commission action on 

February 24, 2016. 

10 9 RD209‐

29

Floating Feather Rd 

Alignment

Realign roadway in accordance with the Floating Feather Realignment Study. 

Install curb, gutter, and sidewalk.

No TBD New alignment to be built through 

development. 

11 10 C202‐01 Three Cities River 

Crossing

Construct a new bridge between SH 44 and US 20/26. No $82.50 ACHD Commission selected the "no build" 

option on July 21, 2010. 

Community Programs

1 1 CM214‐

13

Park Ln and Cardon St 

(Eagle High School) 

Pedestrian Crossing

Install and enhanced pedestrian crossing and curb ramps for students crossing 

Park Ln to access Eagle High School.

Yes 

(119)

2016 2016 2017 $0.08 To be built in FY2017.

Horseshoe Bend Rd 

and Floating Feather 

Rd Pedestrian Crossing

Convert intersection to an all‐way stop and install pedestrian crossing markings 

and signage.

New Seperated request into two 

projects for scoping and 

programming purposes.

Prioritize and scope.

Horseshoe Bend Rd 

and Bucktail Dr 

Pedestrian Crossing

Install an enhanced pedestrian crossing near the intersection of Horseshoe 

Bend Rd and Bucktail Dr.

New Seperated request into two 

projects for scoping and 

programming purposes.

Prioritize and scope. ACHD Traffic Engineering 

to evaluate location for signal warrants.

CM214‐

26

Horseshoe Bend Rd, 

State St / Hill Rd

Complete detached sidewalks, curb & gutter, seepage beds, bike lanes on both 

sides of Horseshoe Bend Rd. Widen shoulder on the west side for  parallel 

parking. Project includes road rehabilitation due to poor pavement condition. 

(City request is for 3‐lane cross section)

Yes 

(114)

PD PD PD $1.68 Project programmed in preliminary 

development. Will evaluate opportunities to 

move forward through IFYWP update. 

Proposed scopes seeks to address the request 

for bike and ped facilities while minimizing 

right‐of‐way/topography impacts. 

PPI208‐

52

Hill Rd, Hwy 55 / 

Horseshoe Bend Rd

Install bike lanes and a paved pathway with raised curb on both sides of Hill Rd, 

between Hwy 55 and Horseshoe Bend Rd in accordance with the Northwest 

Boise Neighborhood Plan. Project includes road rehabilitation due to poor 

pavement condition.

No TBD Project to be built when the intersection of Hill 

Rd and Horseshoe Bend Rd is widened. 

Intersection is currently operating at at a level 

of service C or better. 

4 4 CM211‐

63

SH 44, Edgewood Ln / 

Horseshoe Bend Rd

Install pedestrian improvements. No N/A ACHD has no right‐of‐way at this location. 

ACHD to share request with ITD.

2 NEW

3 3

PD ‐ Preliminary Development

CN ‐ Construction Year Page 2 of 3

Page 59: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

Attachment 4

In IFYWP 

(Page)DSN YR ROW YR CN YR

Total 

Cost in 

Millions

Programming NotesACHD Proposed Response

Current Programming Status2016 

City 

Priority 

Ranking

2015 

City 

Priority 

Ranking

GIS # ACHD Project Name Project Description

5 5 RD209‐

25

Beacon Light Rd, SH 55 

/ SH 16

Install sidewalks and bike lanes on Beacon Light Rd, between SH 55 and SH 16. No TBD ACHD to implement improvements with 

development or maintenance where feasible.

6 2 IN205‐

48

Eagle Rd and Ranch Dr 

Pedestrian Signal

Install an enhanced pedestrian crossing and curb ramps on Eagle Rd at Ranch 

Dr.

No TBD Defer. Traffic evaluation shows minimal 

crossings at this location.

7 6 N/A Dry Creek Pedestrian 

Underpass                        

Connect pathway from SH 44 (existing pathway) to Dry Creek Valley. No N/A ACHD will support a City‐led effort.

8 NEW SH 44 Bike/ Pedestrian 

Crossing

Install a grade seperated bike and pedestrian crossing of SH 44 between Eagle 

Rd and Edgewood Ln.

No TBD ACHD will support a City‐led effort. ACHD will 

evaluate partnership opportunities for 

improvements made within the ACHD right‐of‐

way.

9 NEW State St and Stierman 

Way Pedestrian Signal

Install an enhanced pedestrian signal on State St at Stierman Way.  No TBD Prioritize and scope. ACHD Traffic Engineering 

to evaluate location for signal warrants.

1 (Econ. 

Devel.)

1 (Econ. 

Devel.)

RD203‐

08

Plaza Dr, 02nd St / Iron 

Eagle Dr

Construct a new 2‐lane roadway alignment with curb, gutter, detached 

pathway on the north side, and bike lanes between the existing Plaza 

alignments, in accordance with the Eagle Rd and State St Intersection Concept 

Study.

Yes 

(129)

Done 2016 2017 $1.35 To be built in FY2017 in partnership with the 

City of Eagle.

2 (Econ. 

Devel.)

2 (Econ. 

Devel.)

RD209‐

11

Aikens St, Eagle Rd / 

2nd St

Extend Aikens Rd east to 2nd St from its current terminus and complete the 

street section with curb, gutter, and sidewalk in accordance with the Eagle Rd 

and State St intersection concept study.

Yes 

(128)

2017 2018 2019 $1.40 To be built in FY2019.

PD ‐ Preliminary Development

CN ‐ Construction Year Page 3 of 3

Page 60: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded
Page 61: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded
Page 62: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded
Page 63: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded
Page 64: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded
Page 65: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded
Page 66: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded
Page 67: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

Attachment 5

City of Kuna 2016 Requests and ACHD Proposed Response

In IFYWP 

(Page)DSN YR ROW YR CN YR

Total Cost 

in 

Millions

Programming Notes

Road & Intersection

1 2 IN207‐

01

Linder Ave and Main St 

and 3rd St Roundabout 

Construct a single‐lane roundabout and pedestrian facilities at the intersection 

of Main Street/3rd Street/Linder Avenue to improve vehicular mobility and 

capacity.

Yes (49) Done Done 2016 $1.18 Under construction. Expected completion in 

July 2016. 

2 1 IN211‐

01

Linder Rd and Deer 

Flat Rd

Federal aid project to improve intersection of Linder Rd and Deer Flat Rd, 

including curb, gutter, sidewalk and bike lanes. Right‐of‐way funding will 

advance to a year prior to construction as funds become available.

Yes (45) 2016 2020 2020 $3.34 To be built in FY2020.

6 N/A Kay St, Deer Flat Rd / 

Boise St

Construct curb, gutter, sidewalk and on‐street parking on the east side of Kay 

St, between Deer Flat Rd and Boise St.

No N/A Improvements to the east side of Kay St to be 

built through development. Complete sidewalk 

currently exists on the west side of Kay St.

NEW N/A Deer Flat Rd and Kay St Install traffic signal or add a left turn lane from Kay onto Deer Flat due to traffic 

concerns prior to and after school.

No N/A Location did not meet warrants for additional 

traffic control when investigated in 2015. 

ACHD Traffic Engineering to review to 

determine if conditions have changed. 

4 3 CM214‐

10

Deer Flat Rd and Kuna 

HS Pedestrian Crossing 

(Deer Flat Rd, Kuna 

High School/LDS 

Church)

Install an enhanced pedestrian crossing on Deer Flat Rd east of the central 

driveway of Kuna HS. Project also includes completion of  of sidewalk on the 

north side of Deer Flat from where it ends near the west school boundary and 

the identified signal location. (City request was for a deceleration lane at this 

location.)

No $0.42 City request for a deceleration 

lane to be evaluated as part of 

this project.

Scoped "Go" in 2015. ACHD to evaluate 

potential programming during IFYWP update.

5 8 

Comm. 

Prog.

CM215‐

12

Main St, Ave C / Ave A Streetscape improvements, including road reconstruction, wider sidewalks, on‐

street parking, drainage, and bike markings in accordance with Kuna 

Downtown Corridor Plan.

No TBD ACHD to support a City‐led effort upon 

clarification of expected partnership and 

subsequent Commission approval.

6 9 MA215‐

05

Swan Falls Railroad 

Overpass (Swan Falls 

Rd and Shortline St)

Install a new bridge over Indian Creek and Union Pacific Railroad on Swan Falls 

Rd in accordance with the Kuna Crossing Feasibility and Implementation Plan.

No $18.50 Included on ACHD's Master Street Map. 

Project to occur in accordance with the Kuna 

Crossing Feasibility and Implementation Plan.

7 NEW Main St, Ave E / Ave C Streetscape improvements, including road reconstruction, wider sidewalks, on‐

street parking, drainage, and bike markings in accordance with Kuna 

Downtown Corridor Plan.

No TBD ACHD to support a City‐led effort upon 

clarification of expected partnership and 

subsequent Commission approval.

8 11 IN209‐

15

Avalon St/Kuna Rd and 

Kay Ave

Install a traffic signal (5 x 3 intersection) in accordance with Kuna Downtown 

Corridor Plan (Project I‐1).

No N/A Location did not meet warrants for additional 

traffic control when investigated in 2015. 

ACHD Traffic Engineering to review to 

determine if conditions have changed. 

3

ACHD Proposed Response

2016 

City 

Priority 

Ranking

2015 

City 

Priority 

Ranking

GIS # ACHD Project Name     Project Description

Current Programming Status

PD ‐ Preliminary Development

CN ‐ Construction Year Page 1 of 4

Page 68: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

Attachment 5

In IFYWP 

(Page)DSN YR ROW YR CN YR

Total Cost 

in 

Millions

Programming NotesACHD Proposed Response

2016 

City 

Priority 

Ranking

2015 

City 

Priority 

Ranking

GIS # ACHD Project Name     Project Description

Current Programming Status

9 8 IN205‐

127

Ten Mile Rd and 

Columbia Rd

Install a single‐lane expandable roundabout in accordance with the Ten Mile 

Corridor Intersection Analysis.

No $1.34 Defer. Currently operating at a LOS C or better. 

10 10 IN214‐

02

Ten Mile Rd and 

Hubbard Rd

Install a multilane roundabout in accordance with the Ten Mile Corridor 

Intersection Analysis.

No TBD Project is not identified in the 2012 CIP. Will 

evaluate project for inclusion during the 2016 

CIP update. 

11 4 MMP21

3‐01

Kuna Mora Rd and 

Cole Rd

Road improvements to sustain truck traffic Yes (88) 2016 2017 2018/ 

2019

$2.60 Maintenance project. To be built in FY2018/2019.

Community Programs

1 7 CM214‐

10 and 

IN211‐

01

Deer Flat Rd, Linder Rd 

/ Kay Ave

Install sidewalk. Partial 

(45)

2016 2020 2020 $3.34 Costs show full cost of 

intersection project. Project to 

be complete as part of Road & 

Intersection Priorities #2/#4 

and Community Programs 

Priority #4

To be built in FY2019. ACHD to evaluate 

potential programming of sidewalk portion in 

front of High School during IFYWP update.

2 1 CM214‐

04

Orchard St Greenbelt 

Connection

Provide pedestrian and bicycle access to greenbelt extension via proposed 

sidewalk/path in Orchard Street right of way. Install ADA ramps at south side of 

Avalon at Orchard. Install 5' attached pathway on the west side of Orchard St.

No Done Done 2016 $0.11 Design modifications to reduce cost underway. 

Project will be rebid upon completion.

3 12 CM212‐

11

02nd St, Ave C / Linder 

Ave, including 

Pedestrian Crossing       

Construct curb, gutter, and sidewalk on the south side of 2nd St from Ave C to 

Linder Rd, and install an enhanced pedestrian crossing on Linder Rd in 

accordance with the Kuna Downtown Corridor Plan. Project includes road 

rehabilitation.

Yes 

(103)

Done Done 2016 $0.41 To be completed with Linder / 

Main / 3rd Roundabout 

project.

Under construction. Expected completion in 

July 2016. 

4 3 CM214‐

10

Deer Flat Rd and Kuna 

HS Pedestrian Crossing 

(Deer Flat Rd and Kuna 

HS)

Install an enhanced pedestrian crossing on Deer Flat Rd east of the central 

driveway of Kuna HS. Project also includes completion of  of sidewalk on the 

north side of Deer Flat from where it ends near the west school boundary and 

the identified signal location.

No $0.43 Scoped "Go" in 2015. ACHD to evaluate 

potential programming during IFYWP update.

5 NEW Boise St and School St 

Pedestrian Crossing

Install an enhanced pedestrian crossing on Boise St at School St. No TBD ACHD Traffic Engineering to evaluate location 

for warrants. 

6 NEW Ten Mile Rd and 

Crenshaw St

Install an enhanced pedestrian crossing on Ten Mile Rd at Crenshaw St. No TBD ACHD Traffic Engineering to evaluate location 

for warrants. 

7 2 CM213‐

64

Linder Rd, Main St / 

Deer Flat Rd (Linder 

Rd, south of Porter 

St/Art Ct)

Complete curb, gutter, detached sidewalk and bike lanes on both sides  of 

Linder Rd, between 4th St (Linder/Main/3rd project limits) to Deer Flat Rd. 

Project will construct a Rectangular Rapid Flashing Beacon at Porter St.

Yes 

(116)

PD PD PD $1.44

Project design still in preliminary development. 

ACHD to evaluate potential advancement of 

project phases during IFYWP update.

8 5 CM213‐

64

Linder Rd, Main St / 

Deer Flat Rd (Linder 

Rd, Main St/Boise St)

Complete curb, gutter, detached sidewalk and bike lanes on both sides  of 

Linder Rd, between 4th St (Linder/Main/3rd project limits) to Deer Flat Rd. 

Project will construct a Rectangular Rapid Flashing Beacon at Porter St.

Yes 

(116)

PD PD PD $1.44 This request is included in priority #7 above.

PD ‐ Preliminary Development

CN ‐ Construction Year Page 2 of 4

Page 69: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

Attachment 5

In IFYWP 

(Page)DSN YR ROW YR CN YR

Total Cost 

in 

Millions

Programming NotesACHD Proposed Response

2016 

City 

Priority 

Ranking

2015 

City 

Priority 

Ranking

GIS # ACHD Project Name     Project Description

Current Programming Status

9 NEW 2nd St and Ave D, 

Main St / Avalon St

Install bike lanes in accordance with the Kuna Downtown Corridor Plan. No TBD Sidewalks on 2nd St, Ave C / Linder Ave under 

construction. ACHD to verify if bike lanes is the 

appropriate treatment for this roadway and 

consider striping with current project if 

feasible.

10 NEW Linder Ave/Avalon St, 

2nd St / Orchard St

Construct curb, gutter, sidewalk on both sides of Linder Ave/Avalon St, 

between 2nd St and Orchard St.

No TBD Prioritize and scope.

11 NEW Swan Falls Rd and 

Indian Creek Pathway 

Pedestrian Crossing

Install an enhanced pedestrian crossing on Swan Falls Rd at the Indian Creek 

Pathway.

No TBD ACHD Traffic Engineering to evaluate location 

for warrants. 

NEW Ave A, Main St / 4th St 

(North Downtown 

Blocks Sidewalk 

Addition)

Construct curb, gutter, and sidewalk on both sides of Ave A, between Main St 

and 4th St in accordance with the Kuna Downtown Corridor Plan.

No TBD Prioritize and scope.

NEW Ave B, Main St / 4th St 

(North Downtown 

Blocks Sidewalk 

Addition)

Construct curb, gutter, and sidewalk on both sides of Ave B, between Main St 

and 4th St in accordance with the Kuna Downtown Corridor Plan.

No TBD Prioritize and scope.

NEW Ave C, Main St / 4th St 

(North Downtown 

Blocks Sidewalk 

Addition)

Construct curb, gutter, and sidewalk on both sides of Ave C, between Main St 

and 4th St in accordance with the Kuna Downtown Corridor Plan.

No TBD Prioritize and scope.

NEW Ave D, Main St / 4th St 

(North Downtown 

Blocks Sidewalk 

Addition)

Construct curb, gutter, and sidewalk on both sides of Ave D, between Main St 

and 4th St in accordance with the Kuna Downtown Corridor Plan.

No TBD Prioritize and scope.

13 NEW Dear Flat Rd and 

School St Pedestrian 

Crossing

Install an enhanced pedestrian crossing on Deer Flat Rd at School St. No TBD ACHD Traffic Engineering to evaluate location 

for warrants. 

NEW Ave A, 2nd St / Main St 

(Southeast Downtown 

Blocks Sidewalk 

Addition)

Construct curb, gutter, and sidewalk on both sides of Ave A, between 2nd St 

and Main St in accordance with the Kuna Downtown Corridor Plan.

No TBD Prioritize and scope.

NEW Ave B, 2nd St / Main St 

(Southeast Downtown 

Blocks Sidewalk 

Addition)

Construct curb, gutter, and sidewalk on both sides of Ave B, between 2nd St 

and Main St in accordance with the Kuna Downtown Corridor Plan.

No TBD Prioritize and scope.

15 6 CM215‐

13

Swan Falls, Shortline St 

/ Initial Point

Sidewalk and bike lane. Done Done Done Done Done Bike facility built in 2015. ACHD to discuss 

scope of sidewalk with the City.

12

14

PD ‐ Preliminary Development

CN ‐ Construction Year Page 3 of 4

Page 70: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

Attachment 5

In IFYWP 

(Page)DSN YR ROW YR CN YR

Total Cost 

in 

Millions

Programming NotesACHD Proposed Response

2016 

City 

Priority 

Ranking

2015 

City 

Priority 

Ranking

GIS # ACHD Project Name     Project Description

Current Programming Status

16 9 RS203‐

07

Park and Ride Lot Park and ride lot. Location to be determined No TBD ACHD will support a City‐led site selection 

effort. Project to be prioritized and scoped 

after site selected.

17 10 N/A Greenbelt Extension 

(West)

Extend greenbelt west to Deer Flat Rd No N/A ACHD will support a City‐led effort.

18 11 N/A Greenbelt Extension 

(East)

Extend greenbelt east to Stroebel Rd No N/A ACHD will support a City‐led effort.

PD ‐ Preliminary Development

CN ‐ Construction Year Page 4 of 4

Page 71: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded
Page 72: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded
Page 73: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded
Page 74: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded
Page 75: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded
Page 76: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

Attachment 6

Kuna School District 2016 Requests and ACHD Proposed Response

In IFYWP 

(Page)DSN YR ROW YR CN YR

Total 

Cost in 

Millions

Programming Notes

Road & Intersection

1 1 IN211‐

01

Linder Rd and Deer 

Flat Rd

Federal aid project to improve intersection of Linder Rd and Deer Flat Rd, 

including curb, gutter, sidewalk and bike lanes. Right‐of‐way funding will 

advance to a year prior to construction as funds become available.

Yes (45) 2016 2020 2020 $3.34 To be built in FY2020.

Community Programs

1 NEW N/A Kay St, Deer Flat Rd / 

Boise St

Construct curb, gutter, and sidewalk on the east side of Kay St, between Deer 

Flat Rd and Boise St.

No N/A Complete sidewalk exists on the west side 

already. Defer addition of sidewalk on the east 

side until development occurs. 

2 NEW Kay St and Kuna High 

School Enterance

Repair deteriorated asphalt in crosswalk. No TBD ACHD Maintenance to investigate and identify 

solution. 

3 6 N/A Deer Flat Rd and Kay St Install traffic signal due to traffic concerns prior to and after school. No N/A Location did not meet warrants for additional 

traffic control when investigated in 2015. 

ACHD Traffic Engineering to review to 

determine if conditions have changed. 

4 4 CM214‐

10

Deer Flat Rd and Kuna 

HS Pedestrian Crossing 

(Deer Flat Rd and 

School Zone 

Pedestrian Signal)

Install an enhanced pedestrian crossing on Deer Flat Rd east of the central 

driveway of Kuna HS. Project also includes completion of  of sidewalk on the 

north side of Deer Flat from where it ends near the west school boundary and 

the identified signal location.

No $0.42 Scoped "Go" in 2015. ACHD to evaluate 

potential project programming during IFYWP 

update.

5 NEW Deer Flat Rd, Linder Rd 

/ Kay St

Complete sidewalk on the south side of Deer Flat Rd, between Linder Rd and 

SH 69.

Yes (45) 2016 2020 2020 $3.34 Costs show full cost of 

intersection project. 

Sidewalk to be completed with intersection 

project to be built in FY2020. 

6 NEW Linder Rd and Reed 

Elementary School 

Enterance

Expand driveway with Linder Rd and Deer Flat intersection project to improve 

bus access to Reed Elementary School

Yes (45) 2016 2020 2020 $3.34 Costs show full cost of 

intersection project. 

ACHD to evaluate improvement in the design 

of the intersection project. The School District 

will be responsible for any additional 

modifications needed on the school property.

7 8 3341‐

00269

Ridgewood Rd, 

Columbia Rd/Lake 

Hazel Rd

Install speed limit sign No N/A ACHD Traffic Engineering to complete a speed 

study and install signage.

ACHD Proposed Response

2016 SD 

Priority 

Ranking

2015 SD 

Priority 

Ranking

GIS #ACHD Project Name    

(City Project Name)Project Description

Current Programming Status

PD ‐ Preliminary Development

CN ‐ Construction Year Page 1 of 1

Page 77: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

Kuna School District 2016 Requests Status and 2016 Prioritization

Community Programs 2016

Ranking Project Name Project Description

1 Kay Street S. Side of Kay St. needs sidewalks, curb and gutter.

2 Kay Street Repair deteriorating asphalt in crosswalk

3 Deer Flat Rd & Kay St.

Install 3 way traffic controls. During school release and at commute times it is very difficult for buses and vehicles to pull out onto Deer flat because of the high volumes of traffic. In addition, making it very difficult for pedestrian to safely cross the street.

4 Deer Flat Rd & Kuna Install enhanced Pedestrian Crossing on Deer Flat Rd East of the central driveway of Kuna HS. Project includes completion of sidewalk on the north side of Deer Flat near the west school boundary and the identified signal location. School advises that the current two crosswalks needs to be dissolved and a sidewalk installed on the north side of Deer Flat. Or move the crosswalks away from the turn lane going into the high school to help mitigate between vehicles and pedestrians.

5 E Deer Flat Rd. Install sidewalks (fill in the gaps) N. Linder Rd to N. Kay Street

6 Linder @ Reed Elementary School

Expand the width of the driveway apron at the entrance of Reed Elementary school, currently buses are having a very difficult time pulling into the entrance and therefore riding on the sidewalk causing safety concern for students walking to school.

7 Ridgewood Rd., Columbia Rd/Lake Hazel Rd.

Install speed limit sign.

Please note: Road and intersection request stay the same.

Page 78: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

Attachment 7

City of Meridian 2016 Requests and ACHD Proposed Response

In IFYWP 

(Page)DSN YR ROW YR CN YR

Total Cost 

in MillionsProgramming Notes

Road & Intersection

1 1 (1 

Road)

RD202‐

37

Ustick Rd, Meridian Rd 

/ Locust Grove Rd

Widen Ustick Rd to 5 lanes with curb, gutter, sidewalk and bike lanes in 

accordance with 2012 CIP. Project to be constructed concurrently with the 

Ustick Rd / Meridian Rd intersection and Ustick Rd, Linder Rd / Meridian Rd 

widening.

Yes (41) Done Done 2016‐

2018

$2.83  Construction to start summer 2016.

2 2 (2 

Road)

RD213‐

16

Linder Rd, Franklin Rd 

/ Pine Ave (Linder Rd, 

Franklin Rd/Cherry Ln)

Widen Linder Rd to 5 lanes with curb, gutter, sidewalk and bike lanes in 

accordance with 2012 CIP. Project includes upgrade of the Union Pacific 

Railroad crossing and bridge #131.

Yes (35) 2016 2017‐

2018

2019 $3.43 #1 Community Programs 

request from the West Ada 

School District.

To be built in FY2019.

3 5 (5 

Road)

RD208‐

01

Pine Ave, Meridian Rd 

/ Locust Grove Rd

Reconstruct roadway to include widening at intersections, curb, gutter, 

sidewalk and bike lanes in partnership with the City of Meridian and the 

Meridian Development Corporation. Project includes bridge #134.

Yes (37) 2016 2017 2018 $3.67 Economic Development 

Project

To be built in FY2018. 

4 6 (1 Int) IN202‐

06

Ustick Rd and 

Meridian Rd

Widen intersection to 7 lanes on all approaches in accordance with the 2012 

CIP. Project to be constructed concurrently with the Ustick Rd, Meridian Rd / 

Locust Grove Rd and Ustick Rd, Linder Rd / Meridian Rd widenings.

Yes (48) Done Done 2016‐

2018

$4.53 Construction to start summer 2016.

5 9 (6 

Road)

RD202‐

44

Locust Grove Rd, 

Victory Rd / Overland 

Rd

Widen Locust Grove Rd to 5 lanes with curb, gutter, sidewalk and bike lanes in 

accordance with the 2012 CIP.

No $3.10 Prioritized. ACHD to evaluate potential 

programming during IFYWP update.

6 7 (2 Int) IN211‐

05

Fairview Ave and 

Locust Grove Rd

Widen intersection to 9 lanes on Fairview Ave and 7 lanes on Locust Grove Rd, 

including curb, gutter, sidewalk, and bike lanes in accordance with the 2012 

CIP.

Yes (45) 2020 PD PD $6.23 Programmed to begin design in FY2020. ACHD 

to evaluate project construction moving 

forward through IFYWP update.

7 10 ( 7 

Road)

RD202‐

35

Ustick Rd, Linder Rd / 

Meridian Rd

Widen Ustick Rd to 5 lanes with curb, gutter, sidewalk and bike lanes in 

accordance with 2012 CIP. Project to be constructed concurrently with the 

Ustick Rd / Meridian Rd intersection and Ustick Rd, Meridian Rd / Locust Grove 

Rd widening.

Yes (40) Done Done 2016‐

2018

$2.56 Construction to start summer 2016.

8 18 Road RD215‐

03

McMillan Rd, Linder 

Rd / Meridian Rd

Widen McMillan Rd to 3 lanes with curb, gutter, sidewalk, and bike lanes. No TBD Project is not identified in the 

2012 CIP. Will evaluate project 

for inclusion during the 2016 

CIP update.

Not a 2012 ACHD CIP project. ACHD is 

evaluating this project for potential inclusion 

in the 2016 CIP. 

9 12 (9 

Road)

RD207‐

33

Eagle Rd, Amity Rd / 

Victory Rd

Widen Eagle Rd to 5 lanes with curb, gutter, sidewalk and bike lanes in 

accordance with the 2012 CIP.

Yes (33) 2019 2020 PD $3.35 Programmed to begin design in FY2019. ACHD 

to evaluate project construction moving 

forward through IFYWP update.

2015 City 

Priority 

Ranking

2016 City 

Priority 

Ranking

ACHD Proposed Response

Current Programming Status

Project DescriptionACHD Project Name    

(City Project Name)GIS #

PD ‐ Preliminary Development

UF ‐ Unfunded

CN ‐ Construction Year

LOS ‐ Level of Service Page 1 of 10

Page 79: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

Attachment 7

In IFYWP 

(Page)DSN YR ROW YR CN YR

Total Cost 

in MillionsProgramming Notes

2015 City 

Priority 

Ranking

2016 City 

Priority 

Ranking

ACHD Proposed Response

Current Programming Status

Project DescriptionACHD Project Name    

(City Project Name)GIS #

10 10 Road RD207‐

23

Meridian Rd, Cherry Ln 

/ Ustick Rd

Widen Meridian Rd to 5 lanes with curb, gutter, sidewalk, and bike lanes  in 

accordance with the 2012 CIP. Project includes bridge #124 and #126X.

Yes (36) 2016 2018 2020 $4.39 To be built in FY2020.

11 11 Road RC0299 Ten Mile Rd, Victory 

Rd / Overland Rd

Widen Ten Mile Rd to 5 lanes with curb, gutter, sidewalk, and bike lanes in 

accordance with the 2012 CIP.

Yes (40) PD PD UF $4.38 ACHD to evaluate project construction 

moving forward through IFYWP update.

12 23 Road RD202‐

27

McMillan Rd, Meridian 

Rd / Locust Grove Rd

Widen McMillan Rd to 3 lanes with curb, gutter, sidewalk, and bike lanes. No TBD Not a 2012 ACHD CIP project. ACHD is 

evaluating this project for potential inclusion 

in the 2016 CIP. May be opportunities to 

address sidewalk concerns in this developing 

area with a temporarily solution ahead of the 

future widening.

13 12 Road RD215‐

02

Victory Rd, Locust 

Grove Rd / Eagle Rd

Widen Victory Rd to 3 lanes with curb, gutter, sidewalk, and bike lanes in 

accordance with the 2012 CIP.

No $3.77 Prioritized. ACHD to evaluate potential 

programming during IFYWP update.

14 16 Road RD210‐

02

Locust Grove Rd, 

Fairview Ave / Ustick 

Rd

Widen Locust Grove Rd to 5 lanes with curb, gutter, sidewalk, and bike lanes in 

accordance with the 2012 CIP.

No $3.08 Fairview and Locust Grove 

intersection should occur prior 

to project.

Prioritized. ACHD to evaluate potential 

programming during IFYWP update.

15 17 Road RD202‐

20

Locust Grove Rd, 

Ustick Rd / McMillan 

Rd

Widen Locust Grove Rd to 3 lanes with curb, gutter, sidewalk, and bike lanes in 

accordance with the 2012 CIP.

No $2.45 Prioritized. ACHD to evaluate potential 

programming during IFYWP update.

16 11 (8 

Road)

RC0152 Franklin Rd, Black Cat 

Rd/Ten Mile Rd

Federal aid project to widen Franklin Rd to 5 lanes with curb, gutter, and 

sidewalks in accordance with the 2012 CIP. Drainage will include green 

stormwater infrastructure strategies. Project includes bridge #170CX. Project 

to be constructed concurrently with the Franklin Rd and Black Cat Rd 

intersection widening.

Yes (48) Done Done 2016‐

2017

$9.54 Federal project. Cost is 

combined cost with IN203‐01. 

Construction to start summer/fall 2016.

17 3 (3 

Road)

RD188 Ten Mile Rd, McMillan 

Rd / Chinden Blvd (US 

20/26)

Widen Ten Mile Rd to 5 lanes with curb, gutter, sidewalk and bike lanes in 

accordance with 2012 CIP. Project includes bridge #113P over Nine Mile Creek.

Yes (39) 2020 PD PD $3.31 Programmed to begin design in FY2020. ACHD 

to evaluate project construction moving 

forward through IFYWP update.

18 4 (4 

Road)

RD202‐

32

Ten Mile Rd, Ustick Rd 

/ McMillan Rd

Widen Ten Mile Rd to 5 lanes with curb, gutter, sidewalk and bike lanes in 

accordance with 2012 CIP. Project includes bridges #114 and #115P.

Yes (40) 2019 2020 PD $3.85 Programmed to begin design in FY2019. ACHD 

to evaluate project construction moving 

forward through IFYWP update.

19 15 (6 Int) IN215‐

06

Locust Grove Rd and 

Victory Rd 

Roundabout

Construct a dual‐lane roundabout with a southbound right turn bypass lane in 

accordance with the 2012 CIP.

No $1.78 Defer. Interim signal installed in 2013. 

Operating at a LOS C or better.

20 21 Road RD207‐

34

Locust Grove Rd, 

Amity Rd / Victory Rd

Widen Locust Grove Rd to 3 lanes with curb, gutter, sidewalk, and bike lanes. No $2.75 Defer. Operating at a LOS C or better.

21 15 Road RD202‐

17

Linder Rd, McMillan 

Rd / Chinden Blvd (US 

20/26)

Widen Linder Rd to 5 lanes with curb, gutter, sidewalk, and bike lanes in 

accordance with 2012 CIP.

No $1.42 Prioritized. ACHD to evaluate potential 

programming during IFYWP update.

PD ‐ Preliminary Development

UF ‐ Unfunded

CN ‐ Construction Year

LOS ‐ Level of Service Page 2 of 10

Page 80: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

Attachment 7

In IFYWP 

(Page)DSN YR ROW YR CN YR

Total Cost 

in MillionsProgramming Notes

2015 City 

Priority 

Ranking

2016 City 

Priority 

Ranking

ACHD Proposed Response

Current Programming Status

Project DescriptionACHD Project Name    

(City Project Name)GIS #

22 14 Road RD202‐

18

Linder Rd, Ustick Rd / 

McMillan Rd

Widen Linder Rd to 5 lanes with curb, gutter, sidewalk, and bike lanes in 

accordance with 2012 CIP.

No $2.73 Prioritized. ACHD to evaluate potential 

programming during IFYWP update.

23 13 Road RD209‐

15

Linder Rd, Cherry Ln / 

Ustick Rd

Widen Linder Rd to 5 lanes with curb, gutter, sidewalk, and bike lanes in 

accordance with 2012 CIP.

No $5.97 Prioritized. ACHD to evaluate potential 

programming during IFYWP update.

24 19 Road RC0207 Linder Rd, Overland Rd 

/ Franklin Rd

Widen Linder Rd to 5 lanes and construct a new 4‐lane I‐84 overpass, including 

curb, gutter, sidewalk, and bike lanes in accordance with the 2012 CIP. Project 

would be a joint project between ACHD and ITD.

No $3.15 Cost do not include overpass.  ACHD requested project from ITD in spring 

2016. Project not on ITD's planned projects at 

this time. ACHD will continue to pursue 

project with ITD.

25 8 (3 Int) IN203‐

01

Franklin Rd and Black 

Cat Rd

Federal aid project to widen and signalize the intersection to 7 lanes on all 

approaches in accordance with the 2012 CIP. Project to be constructed 

concurrently with the Franklin Rd, Black Cat Rd / Ten Mile Rd widening.

Yes (48) Done Done 2016‐

2017

$9.54 Federal project. Cost is 

combined cost with RC0152. 

Construction to start summer/fall 2016.

26 14 (5 Int) IN206‐

02

Overland Rd and 

Linder Rd

Widen and signalize intersection to 7 lanes on Linder Rd and 8 lanes on 

Overland Rd in accordance with the 2012 CIP. 

No $4.69 Defer until further development in area or 

overpass built. Operating at a LOS C or better.

27 13 (4 Int) IN202‐

09

Ustick Rd and Black 

Cat Rd

Widen and signalize intersection to 7 lanes on all approaches in accordance 

with the 2012 CIP. 

No $3.43 Defer. Operating at a LOS C or better.

28 20 Road RD207‐

24

Ustick Rd, Ten Mile Rd 

/ Linder Rd

Widen Ustick Rd to 5 lanes with curb, gutter, sidewalk, and bike lanes in 

accordance with the 2012 CIP.

No $2.77 Prioritized. ACHD to evaluate potential 

programming during IFYWP update.

29 22 Road RD202‐

30

Meridian Rd, Ustick Rd 

/ McMillan Rd

Widen Meridian Rd to 3 lanes with curb, gutter, sidewalk, and bike lanes in 

accordance with the 2012 CIP.

No $2.09 Defer. Operating at a LOS D.

30 24 Road RD202‐

29

Meridian Rd, McMillan 

Rd / Chinden Blvd

Widen Meridian Rd to 3 lanes with curb, gutter, sidewalk, and bike lanes in 

accordance with the 2012 CIP.

No $3.07 Defer. Operating at a LOS D.

31 25 Road RC0161 Franklin Rd, 

McDermott Rd / Black 

Cat Rd

Widen Franklin Rd to 5 lanes with curb, gutter, sidewalk, and bike lanes in 

accordance with the 2012 CIP.

No $2.91 Defer. Operating at a LOS D. Implementation 

will be coordinated with  Franklin Rd 

improvements in Canyon County and SH16 

Extension. 

32 7 Int IN205‐

03

Ten Mile Rd and Amity 

Rd

Construct a roundabout. Project includes bridge #205AX.  Yes (50) 2017 2018 2019 $1.33 To be built in FY2019. 

33 8 Int IN209‐

06

US 20/26 (Chinden 

Blvd) and Locust Grove 

Rd

Widen Locust Grove Rd intersection legs in coordination with ITD. Yes (47) UF UF UF TBD ACHD requested project from ITD in spring 

2016. Project is part of ITD's Strategic 

Initiatives request for FY2021. ACHD with ITD 

on any improvement if funded.

34 9 Int IN209‐

05

US 20/26 (Chinden 

Blvd) and Meridian Rd

Widen Meridian Rd intersection legs in coordination with ITD. Yes (47) UF UF UF TBD ACHD requested project from ITD in spring 

2016. Project is not part of ITD's planned 

projects. ACHD will continue to pursue project 

with ITD.

PD ‐ Preliminary Development

UF ‐ Unfunded

CN ‐ Construction Year

LOS ‐ Level of Service Page 3 of 10

Page 81: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

Attachment 7

In IFYWP 

(Page)DSN YR ROW YR CN YR

Total Cost 

in MillionsProgramming Notes

2015 City 

Priority 

Ranking

2016 City 

Priority 

Ranking

ACHD Proposed Response

Current Programming Status

Project DescriptionACHD Project Name    

(City Project Name)GIS #

35 10 Int IN205‐

20

US 20/26 (Chinden 

Blvd) and Black Cat Rd

Widen intersection in accordance with the 2012 CIP in coordination with ITD. No $1.21 ACHD requested project from ITD in spring 

2016. Project is not part of ITD's planned 

projects. ACHD will continue to pursue project 

with ITD.

36 11 Int IN205‐

32

US 20/26 (Chinden 

Blvd) and Ten Mile Rd

Widen intersection in accordance with the 2012 CIP in coordination with ITD. No $1.23 ACHD legs built out in accordance with the 

2012 CIP by development in 2014. ACHD to 

coordinate with ITD on improvements to 

Chinden legs.

37 12 Int IN215‐

05

Eagle Rd and Amity Rd 

Roundabout (Dual 

Lane)

Widen roundabout to a dual lane roundabout, with curb, gutter, sidewalk, and 

bike lanes. Project to be constructed concurrently with Eagle Rd, Amity Rd / 

Victory Rd.

Yes (44) 2020 N/A PD $0.77 Programmed to begin design in FY2020. ACHD 

to evaluate project construction moving 

forward through IFYWP update.

38 16 Int IN205‐

70

SH 69 (Meridian Rd) 

and Lake Hazel Rd

Install an interim signal in cooperation with ITD maintenance project. Project 

also includes installation of an interim signal at SH 69 (Meridian Rd) and 

Hubbard Rd. All costs for both signals included with this project.

Yes (50) UF UF UF $0.68 ACHD requested project from ITD in spring 

2016. Project is part of ITD's Strategic 

Initiatives request for FY2021. ACHD with ITD 

on any improvement if funded.

39 13 Int IN211‐

06

Cherry Ln and Linder 

Rd

Widen intersection to 7 lanes  on all approaches in accordance with the 2012 

CIP.

No $4.30 Defer. Operating at a LOS C or better.

40 14 Int IN215‐

07

Cherry Ln and Black 

Cat Rd 

Widen intersection to 6/7 lanes on all approaches in accordance with the 2012 

CIP.

No $4.34 Defer. Interim signal installed in 2013. 

Operating at a LOS C or better.

41 15 Int IN214‐

03

Victory Rd and Ten 

Mile Rd

Widen intersection to 6 lanes on Ten Mile and 5 lanes on Victory in accordance 

with the 2012 CIP.

No $2.53 Defer. Interim signal installed in 2013. 

Operating at a LOS C or better.

42 26 Road RC0130 Fairview Ave, SH 55 

(Eagle Rd) / Cloverdale 

Rd

Widen Fairview Ave to 7 lanes with curb, gutter, sidewalk, and bike lanes in 

accordance with the 2012 CIP.

No $3.31 Defer. Operating at a LOS D. ACHD to 

coordinate with the City of Meridian 

regarding implementing the Fairview Ave 

Corridor Management Plan through 

development.

43 27 Road RD207‐

19

Linder Rd, Chinden 

Blvd (US 20/26) / SH 

44 (State St)

Widen Linder Rd to 7 lanes with curb, gutter, sidewalk, and bike lanes in 

accordance with the 2012 CIP. Project includes bridges #80, #81, and #82.

Part 

(102)

$20.66 Linder Rd, 1/4 mile to 2/3 mile 

N/O Chinden programmed.

Prioritized. ACHD to evaluate potential 

programming during IFYWP update.

44 28 Road RC0133 Fairview Ave, Locust 

Grove Rd / SH 55 

(Eagle Rd)

Widen Fairview Ave to 7 lanes with curb, gutter, sidewalk, and bike lanes in 

accordance with the 2012 CIP.

No $3.65 Defer. Operating at a LOS D. ACHD to 

coordinate with the City of Meridian 

regarding scope of widening.

45 29 Road RC0135 Fairview Ave, Meridian 

Rd / Locust Grove Rd

Widen Fairview Ave to 7 lanes with curb, gutter, sidewalk, and bike lanes. No $4.01 Defer. Operating at a LOS D. ACHD to 

coordinate with the City of Meridian 

regarding scope of widening.

PD ‐ Preliminary Development

UF ‐ Unfunded

CN ‐ Construction Year

LOS ‐ Level of Service Page 4 of 10

Page 82: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

Attachment 7

In IFYWP 

(Page)DSN YR ROW YR CN YR

Total Cost 

in MillionsProgramming Notes

2015 City 

Priority 

Ranking

2016 City 

Priority 

Ranking

ACHD Proposed Response

Current Programming Status

Project DescriptionACHD Project Name    

(City Project Name)GIS #

46 30 Road RD215‐

17

Cherry Ln, Linder Rd / 

Meridian Rd

Widen Cherry Ln to 5 lanes with curb, gutter, sidewalk, and bike lanes. No TBD Not a 2012 ACHD CIP project. ACHD to 

evaluate project for potential inclusion in the 

2016 CIP. Previous statement that roadway 

would be widened to 7 lanes in error. See 

corrected project description.

47 31 Road RD208‐

10

Fairview Ave Corridor 

Management, Linder 

Rd / Orchard St

Improve safety and traffic operations along Fairview Ave in accordance with 

the Fairview Avenue Corridor Management Strategy. Project may include 

bicycle and pedestrian facilities and other access management treatments.

No TBD Project to be implemented through 

development. ACHD and Meridian to 

coordinate on implementation with 

appropriate development applications.

48 32 Road RD209‐

03

Ten Mile Rd, Amity Rd 

/ Victory Rd

Widen Ten Mile Rd to 5 lanes with curb, gutter, sidewalk, and bike lanes in 

accordance with the 2012 CIP.

No $3.03 Defer. Operating at a LOS D.

49 33 Road RD215‐

18

East 03rd St Extension, 

Carlton St / Fairview 

Ave (Phase 2)

Extend roadway and construct streetscape improvements, including curb, 

gutter, sidewalk, and improved UPRR crossing, from Carlton Ave to Fairview 

Ave in accordance with the Downtown Meridian Neighborhood Plan.

No TBD Defer until after completion of Phase 1 

(Franklin Rd / Carlton St)

50 34 Road RD209‐

04

Broadway Ave / Idaho 

Ave Extension, East 

06th St / Locust Grove 

Rd

Extend roadway and construct streetscape improvements, including curb, 

gutter, sidewalk, and improved UPRR crossing, from Carlton Ave to Fairview 

Ave.

No TBD Defer. Potential future economic 

development request or to be built by 

development.

51 17 Int IN205‐

21

McMillan Rd and Black 

Cat Rd

Widen intersection to 6 lanes on Black Cat and 4 lanes on McMillan in 

accordance with the 2012 CIP.

No $2.34 Defer. Operating at a LOS C or better.

52 18 Int IN208‐

02

Amity Rd and Black Cat 

Rd

Widen intersection to 4 lanes on Amity and 6 lanes on McMillan in accordance 

with the 2012 CIP.

No $2.21 Defer. Operating at a LOS C or better.

53 19 Int IN203‐

25

McMillan Rd and Star 

Rd

Widen intersection to 6 lanes on Star and 4 lanes on McMillan in accordance 

with the 2012 CIP.

No $2.47 Defer. Operating at a LOS C or better.

54 20 Int IN215‐

08

Amity Rd and Linder 

Rd

Widen intersection to 6 lanes on Linder and 5 lanes on Amity in accordance 

with the 2012 CIP.

No $3.04 Defer. Operating at a LOS C or better.

55 21 Int IN215‐

09

Cherry Ln and 

McDermott Rd

Widen intersection to 3 lanes on McDermott and 5 lanes on Cherry in 

accordance with the 2012 CIP.

No $1.18 Defer. Operating at a LOS C or better.

56 22 Int IN215‐

10

Franklin Rd and 

McDermott Rd

Widen intersection to 3 lanes on McDermott and 5/6 lanes on Franklin in 

accordance with the 2012 CIP.

No $1.19 Defer. Operating at a LOS C or better.

57 23 Int IN202‐

20

Ustick Rd and 

McDermott Rd

Widen and signalize intersection to 5 lanes on McDermott and 6 lanes on 

Ustick in accordance with the 2012 CIP.

No $1.96 Defer. Operating at a LOS C or better.

58 24 Int IN215‐

11

McMillan Rd and 

McDermott Rd

Intersection improvement. No TBD Project is not identified in the 2012 CIP. Will 

evaluate project for inclusion during the 2016 

CIP update.

59 25 Int IN205‐

88

Ustick Rd and Star Rd Widen and signalize intersection to 5 lanes on Star and 7 lanes on Ustick in 

accordance with the 2012 CIP.

No $1.70 Defer. Operating at a LOS C or better.

60 NEW Ten Mile Rd and 

Chateau Dr

Signalize intersection.  No TBD ACHD Traffic Engineering to evaluate location 

for signal warrants.

PD ‐ Preliminary Development

UF ‐ Unfunded

CN ‐ Construction Year

LOS ‐ Level of Service Page 5 of 10

Page 83: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

Attachment 7

In IFYWP 

(Page)DSN YR ROW YR CN YR

Total Cost 

in MillionsProgramming Notes

2015 City 

Priority 

Ranking

2016 City 

Priority 

Ranking

ACHD Proposed Response

Current Programming Status

Project DescriptionACHD Project Name    

(City Project Name)GIS #

61 NEW Lake Hazel Rd and 

Eagle Rd

Widen and signalize intersection to 6 lanes on Eagle and 7 lanes on Lake Hazel 

in accordance with the 2012 CIP.

No $4.27 Defer. Operating at a LOS C or better.

62 NEW Lake Hazel Rd and 

Locust Grove Rd

Widen and signalize intersection to 5 lanes on Locust Grove and 6 lanes on 

Lake Hazel in accordance with the 2012 CIP.

No $3.32 Defer. Operating at a LOS C or better.

63 NEW Amity Rd and Locust 

Grove Rd

Construct a dual‐lane roundabout with westbound and eastbound right turn 

bypass lanes in accordance with the 2012 CIP.

No $1.95 Defer. Operating at a LOS C or better.

64 NEW Victory Rd and Linder 

Rd

Widen and signalize intersection to 5/6 lanes on Linder and 3/4 lanes on 

Victory in accordance with the 2012 CIP.

No $2.40 Defer. Operating at a LOS C or better.

65 NEW Locust Grove Rd, 

McMillan Rd / Chinden 

Blvd (US 20/26)

Widen Locust Grove Rd to 3 lanes with curb, gutter, sidewalk, and bike lanes in 

accordance with the Master Street Map.

No TBD Project is not identified in the 2012 CIP. Will 

evaluate project for inclusion during the 2016 

CIP update. Agency staffs to discuss lane 

designation as requested.

66 NEW Ustick Rd, McDermott 

Rd / Black Cat Rd 

Widen Ustick Rd to 6 lanes with curb, gutter, sidewalk, and bike lanes in 

accordance with the 2012 CIP.

No $3.06 Prioritize and evaluate potential programming 

during IFYWP update.

Community Programs

1 1 CM212‐

09

West 04th St, 

Broadway Ave / Maple 

Ave

Construct curb, gutter and sidewalk on the east side of West 4th St, between 

Broadway Ave and Maple Ave and a pathway between Maple Ave and Cherry 

Ln in accordance with the Downtown Meridian Neighborhood Plan. Project will 

provide pedestrian connectivity and a safer walking route for students 

attending Meridian Elementary.

Yes 

(123)

Done 2016 2017 $0.45 To be built in FY2017.

2 2 CM209‐

31

West 01st St, 

Broadway Ave / Pine 

Ave

Construct sidewalk on both sides of West 01st St, between Broadway Ave and 

Pine Ave, including replacing existing substandard sidewalks and pedestrian 

ramps in accordance with the Downtown Meridian Neighborhood Plan. Project 

to be completed in partnership with the Meridian Development Corporation. 

Project will improve pedestrian connectivity and safety for children walking to 

Meridian Elementary School.

Yes 

(123)

2016 2016 2017 $0.46 To be built in FY2017.

3 4 RD208‐

01

Pine Ave, Meridian Rd 

/ Locust Grove Rd

Reconstruct roadway to include widening at intersections, curb, gutter, 

sidewalk and bike lanes in partnership with the City of Meridian and the 

Meridian Development Corporation. Project includes bridge #134.

Yes (37) 2016 2017 2018 $3.67 Economic Development 

Project

To be built in FY2018. 

4 5 N/A Meridian Rail‐with‐

Trail

Improve arterial crossing with pathway. No TBD ACHD to prioritize and scope arterial crossing 

improvements when pathway moves forward.

5 6 CM213‐

43

McMillan Rd, Locust 

Grove Rd / Red Horse 

Way

Complete sidewalk on the north side of McMillan Rd, between Locust Grove Rd 

and Red Horse Way.

No TBD Project is in a developing area. ACHD to scope 

interim pedestrian facilities until a permanent 

solution completed through development or 

road widening.

PD ‐ Preliminary Development

UF ‐ Unfunded

CN ‐ Construction Year

LOS ‐ Level of Service Page 6 of 10

Page 84: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

Attachment 7

In IFYWP 

(Page)DSN YR ROW YR CN YR

Total Cost 

in MillionsProgramming Notes

2015 City 

Priority 

Ranking

2016 City 

Priority 

Ranking

ACHD Proposed Response

Current Programming Status

Project DescriptionACHD Project Name    

(City Project Name)GIS #

6 7 CM214‐

31

West 02nd St, UPRR / 

Broadway Ave

Complete sidewalk on both sides of West 02nd, between the Union Pacific 

Railroad and Broadway Ave to address parking concerns in this area.

No $0.15 Scoped No Go in 2015. ACHD to coordinate 

with the City of Meridian on alternative 

treatments to address parking concerns. 

7 8 CM210‐

55

Black Cat Rd, 

Moonlake Dr / Ustick 

Rd (Black Cat Rd and 

Moon Lake Dr 

Pedestrian Signal)

Construct an asphalt pathway from the north west corner of Ustick and Black 

Cat on the west side south to Moon Lake. Install an enhanced pedestrian signal 

at or near Moon Lake Dr.

Yes 

(105)

Done 2016 2016 $0.21 Under construction.

8 9 5345 Eagle Rd and 

Ridenbaugh Canal 

Pedestrian Signal

Install an enhanced pedestrian signal on Eagle at Ridenbaugh Canal. No Done TBD Construction to be built in coordination with 

adjacent development.

9 10 PPI208‐

99

Locust Grove Rd and 

Palermo Dr Pedestrian 

Signal

Install an enhanced pedestrian signal and lighting on the north side of Palermo 

at Locust Grove.

No $0.36 Scoped "Go" in 2015. ACHD to evaluate 

potential programming during IFYWP update.

10 11 CM212‐

28

Locust Grove Rd, 

Overland Rd/Puffin St

Detached asphalt or concrete pathway on east side of Locust Grove between 

Puffin and Overland.

No $0.16 Scoped "Go" in 2014. ACHD to evaluate 

potential programming during IFYWP update.

11 12 N/A Meridian Rd and 

Railroad Pedestrian 

Signal

Signalized pedestrian crossing. Part of Rails‐with‐Trails project. No TBD ACHD to prioritize and scope arterial crossing 

improvements when pathway moves forward.

12 13 N/A Main St and Railroad 

Pedestrian Signal

Signalized pedestrian crossing. Part of Rails‐with‐Trails project. No TBD ACHD to prioritize and scope arterial crossing 

improvements when pathway moves forward.

13 14 PPI208‐

96

Locust Grove Rd, 

Paradise Ln/Grand 

Canyon Dr

Asphalt path on the east side of Locust Grove Rd to connect with an existing 

path to the school.

No N/A This project is complete. An interim treatment 

was built in 2010.

14 15 N/A Five Mile Creek Path, 

Badley Ave/Fairview 

Ave

Off‐system pathway. No N/A ACHD will support a city‐led effort.

15 18 Stoddard Rd, Victory 

Rd / Kodiak Dr 

Sidewalk on the west side of Stoddard Rd, between Victory and Kodiak. No TBD Scoped "Go" in 2015. ACHD to evaluate 

potential programming during IFYWP update.

16 19 CM211‐

54

Duane Dr, Granger Dr 

/ Ustick Rd

Sidewalk on east side of Duane Dr, between Granger and Ustick. No TBD Prioritize and scope.

PD ‐ Preliminary Development

UF ‐ Unfunded

CN ‐ Construction Year

LOS ‐ Level of Service Page 7 of 10

Page 85: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

Attachment 7

In IFYWP 

(Page)DSN YR ROW YR CN YR

Total Cost 

in MillionsProgramming Notes

2015 City 

Priority 

Ranking

2016 City 

Priority 

Ranking

ACHD Proposed Response

Current Programming Status

Project DescriptionACHD Project Name    

(City Project Name)GIS #

17 21 RD207‐

33

Eagle Rd, Amity Rd / 

Victory Rd (Eagle Rd, 

Falcon Dr / Victory Rd)

Widen Eagle Rd to 5 lanes with curb, gutter, sidewalk and bike lanes in 

accordance with the 2012 CIP. 

Yes (33) 2019 2020 PD $3.35 City request is for sidewalk. This will be 

completed with the roadway widening project 

to start design in FY2019.

18 22 RD202‐

35

Ustick Rd, Linder Rd / 

Meridian Rd (Ustick 

and West 03rd 

Pedestrian Signal)

Widen Ustick Rd to 5 lanes with curb, gutter, sidewalk and bike lanes in 

accordance with 2012 CIP. Project to be constructed concurrently with the 

Ustick Rd / Meridian Rd intersection and Ustick Rd, Meridian Rd / Locust Grove 

Rd widening.

Yes (40) Done 2016 2016‐

2018

$2.56 City request is for a pedestrian signal at Ustick 

and W. 03rd St. This will be completed with 

the roadway widening project. Construction 

to start summer 2016.

19 23 CM213‐

45

McMillan Rd, Linder 

Rd / Meridian Rd

Complete sidewalk on the north side of McMillan Rd, between Linder Rd and 

Meridian Rd.

No TBD Developing area. ACHD to coordinate with the 

City on the scope and timing of 

improvements.

20 24 CM210‐

68

Broadway Ave, West 

07th St / West 04th St

Complete sidewalks on the south side of Broadway Ave, between West 07th St 

and West 04th St.

No TBD Scoped "Go" in 2015. ACHD to evaluate 

potential programming during IFYWP update.

21 25 CM215‐

19

Victory Rd and 

Standing Timber Ave 

Pedestrian Crossing 

(Victory Rd, west of 

Mesa)

Install an enhanced pedestrian crossing and curb ramps on Victory Rd at 

Standing Timber Ave.

No TBD ACHD Traffic to review location for warrants. 

Prioritize and scope in 2016.

22 27 CM214‐

37

McMillan Rd, Ten Mile 

Rd/Linder Rd

Install extruded curb pathway on north side of McMillan Rd between Cortona 

Way and Goddard Creek Way and detached concrete sidewalk with curbing 

between Goddard Creek Way and Wild Goose Way.

No $0.47 Developing area. ACHD to coordinate with the 

City on the scope and timing of 

improvements.

23 28 RD207‐

33

Eagle Rd, Amity Rd / 

Victory Rd (Eagle Rd, 

Zaldia Dr / Victory Rd)

Widen Eagle Rd to 5 lanes with curb, gutter, sidewalk and bike lanes in 

accordance with the 2012 CIP. 

Yes (33) 2019 2020 PD $3.35 City request is for sidewalk. This will be 

completed with the roadway widening project 

to start design in FY2019.

24 29 RD213‐

16

Linder Rd, Franklin Rd 

/ Pine Ave

Widen Linder Rd to 5 lanes with curb, gutter, sidewalk, and bike lanes in 

accordance with the 2012 CIP. Project includes upgrade of the Union Pacific 

Railroad crossing and bridge #131.

Yes (35) 2016 2017‐

2018

2019 $3.43 City request is for sidewalk. This will be 

completed with the roadway widening project 

to be built in FY2019.

25 30 RD209‐

02

East 03rd St, Franklin 

Rd / Carlton Ave 

(Phase 1)

Construct streetscape improvements, including curb, gutter, sidewalk, and 

improved UPRR crossing, from Franklin Rd to Carlton Ave in accordance with 

the Downtown Meridian Neighborhood Plan.

Yes 

(128)

2019 2020 PD $2.05 Economic Development 

Project.

Programmed to begin design in FY2019. ACHD 

to evaluate project construction moving 

forward through IFYWP update.

PD ‐ Preliminary Development

UF ‐ Unfunded

CN ‐ Construction Year

LOS ‐ Level of Service Page 8 of 10

Page 86: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

Attachment 7

In IFYWP 

(Page)DSN YR ROW YR CN YR

Total Cost 

in MillionsProgramming Notes

2015 City 

Priority 

Ranking

2016 City 

Priority 

Ranking

ACHD Proposed Response

Current Programming Status

Project DescriptionACHD Project Name    

(City Project Name)GIS #

26 16 CM214‐

43

State Ave, East 2nd St 

/ Cathy Ln

Sidewalk repair. Requested by land owner in this area. No $0.50 Scoped "No Go" in 2015. This section has 

connectivity already on the south side and the 

original requestor no longer owns the 

property.

27 17 Kentucky Ridge Way, 

Riodosa Dr / Victory 

Rd

Sidewalk on the west side of Kentucky Ridge Way, between Victory and 

Riodosa.

No TBD Scoped "Go ‐ Defer" in 2015. New sidewalk 

recently built on the east side. 

28 31 CM214‐

37

McMillan Rd and 

Palantine Way 

Pedestrian Crossing

Install an enhanced pedestrian crossing and curb ramps on McMillan Rd at 

Palantine Way.

No TBD Developing area. ACHD to coordinate with the 

City on the scope and timing of 

improvements.

29 32 N/A Eagle Rd, River Valley 

St / Ustick Rd

Complete sidewalks on Eagle Rd, between River Valley St and Ustick Rd. No N/A ACHD has no right‐of‐way at this location. 

ACHD to share request with ITD.

30 33 N/A Chinden Blvd, east of 

Ten Mile Rd

Complete sidewalks on Chinden Blvd, east of Ten Mile Rd. No N/A ACHD has no right‐of‐way at this location. 

ACHD to share request with ITD.

31 34 CM214‐

44

Cherry Ln and 

Meridian Library 

Pedestrian Crossing

Install an enhanced pedestrian crossing on Cherry Lane approximately midway 

between the existing signalized intersections at West 8th and Linder. This will 

require relocation of the existing school zone beacon to the west. 

No $0.25 Scoped "Go" 2014. ACHD to evaluate 

potential programming during IFYWP update. 

32 36 3341‐

00269

W. 8th St and 

Meridian Middle 

School

School Crossing Ahead signage on W. 8th St. Project is the #12 request from 

the West Ada School District (2015).

No TBD ACHD Traffic Engineering to coordinate 

improvement.

33 NEW N/A Amity and Mary 

McPherson 

Elementary School 

Pedestrian Signal

Signalized pedestrian crossing No N/A ACHD Traffic evaluation shows good vehicle 

compliance with existing crossing. ACHD to 

reevaluate at a later date.

34 NEW Pine Ave and W. 1st St 

Pedestrian Crossing

Signalized pedestrian crossing (RRFB) No TBD Conduit is being placed for a future crossing 

with the W. 1st sidewalk project. ACHD Traffic 

Engineering to evaluate for signal warrants.

35 NEW Washington St and W. 

1st St Pedestrian 

Crossing

Pedestrian crossing near Meridian Elementary School No TBD ACHD Traffic Engineering to evaluate location 

for enhanced pedestrian crossing 

opportunities. 

36 NEW Bower St, Meridian Rd 

/ E. 03rd St

Complete sidewalks  and add wayfinding signage on Bower St, between 

Meridian Rd and E. 03rd St

No TBD Prioritize and scope.

37 NEW Linder Rd, I‐84 / 

Franklin Rd

Complete sidewalks on Linder Rd, between I‐84 and Franklin Rd No TBD Prioritize and scope.

PD ‐ Preliminary Development

UF ‐ Unfunded

CN ‐ Construction Year

LOS ‐ Level of Service Page 9 of 10

Page 87: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

Attachment 7

In IFYWP 

(Page)DSN YR ROW YR CN YR

Total Cost 

in MillionsProgramming Notes

2015 City 

Priority 

Ranking

2016 City 

Priority 

Ranking

ACHD Proposed Response

Current Programming Status

Project DescriptionACHD Project Name    

(City Project Name)GIS #

38 NEW Linder Rd, Washington 

St / Maple St

Complete sidewalk on the west side of Linder Rd, between Washington St and 

Maple St.

No TBD Complete pedestrian facilities exist in this 

section. There is one parcel where sidewalk 

does not exist, however, there is a paved 

pathway with extruded curb.  

39 NEW Victory Rd, Glacier Bay 

Way / Mesa Way

Complete sidewalk on the south side adjacent to county parcel. No TBD Developing area. ACHD to coordinate with the 

City on the scope and timing of 

improvements.

40 NEW Main St and Williams 

St Pedestrian Crossing

Install an enhanced pedestrian crossing of Main St at Williams St. No TBD ACHD Traffic Engineering to evaluate location 

for enhanced pedestrian crossing 

opportunities. 

41 NEW Washington St, W. 

07th St / Main St

Complete sidewalk on Washington St, between W. 07th St and Main St. No TBD Prioritize and scope.

42 NEW Gordon Harris 

Pathway Lighting

Pedestrian lighting on pathway between Mountain View HS and Eagle Rd. No N/A ACHD to support a city‐led effort. 

43 NEW Locust Grove Rd and 

Time Zone Dr 

Pedestrian Crossing 

Install an enhanced pedestrian crossing of Locust Grove Rd at Time Zone Dr. No TBD Prioritize and scope.

44 NEW Locust Grove Rd and 

Woodbridge Dr 

/Watertower St 

Pedestrian Crossing 

Install an enhanced pedestrian crossing of Locust Grove Rd at Woodbridge Dr 

or Watertower St.

No TBD Prioritize and scope.

PD ‐ Preliminary Development

UF ‐ Unfunded

CN ‐ Construction Year

LOS ‐ Level of Service Page 10 of 10

Page 88: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded
Page 89: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded
Page 90: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded
Page 91: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded
Page 92: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded
Page 93: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded
Page 94: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded
Page 95: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded
Page 96: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded
Page 97: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded
Page 98: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded
Page 99: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded
Page 100: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded
Page 101: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

Attachment 8

City of Star 2016 Requests and ACHD Proposed Response

In IFYWP 

(Page)DSN YR ROW YR CN YR

Total 

Cost in 

Millions

Programming Notes

Community Programs

1 1 CM‐215‐

04

Floating Feather Rd, 

Munger Rd / Star Rd

Complete Floating Feather Rd with bike lanes, curb, gutter, borrow ditches, 

and detached sidewalk on both sides between Munger Rd and Star Rd. Project 

includes bridge #068.

Yes 

(111)

PD PD PD $1.85

Project design still in preliminary development. 

ACHD to evaluate potential advancement of 

project phases during IFYWP update.

2 2 CM211‐

61

Plummer Rd Bridge 

#16,  1700' N/O State 

St (Plummer Rd, State 

St / Pembridge Dr)

Replace/widen bridge #16 over Middleton Canal including sidewalk and bike 

facility as part of ACHD's Bridge Maintenance Program.

No $0.53 Scoped "Go" in 2015. ACHD to evaluate 

potential programming during IFYWP update. 

Sidewalk exists the full length of the City 

request with the exception of the bridge. 

Sidewalk on the east side will be built through 

development.

3 NEW Floating Feather Rd, 

Brandon Rd / 

Hornback Ave

Construct curb, gutter, and sidewalk on north side of Floating Feather Rd, 

between Brandon Rd and Hornback Ave.

No TBD Prioritize and scope.

4 NEW Floating Feather Rd, 

Hornback Ave / 

Plummer Rd

Construct curb, gutter, and sidewalk on both sides of Floating Feather Rd, 

between Hornback Ave and Plummer Rd.

No TBD Developing area. ACHD to coordinate with the 

City on the scope and timing of improvements.

5 NEW Plummer Rd, 

Streamfield St / 

Floating Feather Rd

Construct curb, gutter, and sidewalk on the west side of Plummer Rd, between 

Streamfield St and Floating Feather Rd.

No TBD Developing area. ACHD to coordinate with the 

City on the scope and timing of improvements.

2016 

City 

Priority 

Ranking

Current Programming Status

ACHD Proposed ResponseProject DescriptionACHD Project Name    GIS #

2015 

City 

Priority 

Ranking

PD ‐ Preliminary Development

CN ‐ Construction Year Page 1 of 1

Page 102: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

1

Ryan Head

Subject: FW: Star transportation extra projects

From: Cathy Ward [mailto:[email protected]] Sent: Tuesday, March 29, 2016 6:12 PM To: Mitch Skiles Subject: Star transportation extra projects  Hi Mitch,  I can’t seem to find Brooks phone number to ask if we can add the four sidewalk projects to our transportation projects and I am leaving town tomorrow and won’t be back until next Tuesday – a little after the April 1st deadline.  The list I have to add is:  Floating Feather Road, Brandon Rd/Hornback Ave. Floating Feather Rd, Hornback Ave./Plummer Rd. Plummer Rd, State Street / Pembridge Drive Plummer Road, Streamfield Street/Floating Feather Road  I wish I had more time, but would you forward these four to her please.  I promise to do better next year!  Thanks, Cathy 

Page 103: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

Attachment 9

West Ada School District 2016 Requests and ACHD Proposed Response

In IFYWP 

(Page)DSN YR ROW YR CN YR

Total 

Cost in 

Millions

Programming Notes

Road & Intersection

1 2 IN215‐

13

Linder Rd and Saguaro 

Dr

Signalize intersection. No TBD Defer. Location does not meet 

traffic warrants for 

signalization.

Location does not currently meet signal 

warrants. ACHD Traffic Engineering to 

reevaluate as conditions change in the area.

2 1 IN215‐

12

Linder Rd and Chateau 

Dr

Install dedicated left turn lanes. No Done Done Done N/A Project is complete.

Community Programs

1 NEW W. 1st St at 

Washington and 

Carlton Ave at 

Meridian Rd

Post school zone (20 MPH) speed limit signage. No TBD ACHD Traffic Engineering to evaluate potential 

sign placement.

2 14 3341‐

00269

Moon Lake St and Inlet 

Way

Painted crosswalk No N/A Traffic review in 2015 indicated that current 

markings meet standards. ACHD Traffic to 

review again to determine if conditions have 

changed.

3 15 3341‐

00269

Braddock Dr at 

Spalding STEM

Repaint faded crosswalks No N/A Traffic review in 2015 indicated that current 

markings meet standards. ACHD Traffic to 

review again to determine if conditions have 

changed.

4 12 3341‐

00269

W 8th St and Meridian 

Middle School

School Crossing Ahead signage on W. 8th St No TBD ACHD to coordinate with Meridian Police and 

School District regarding parents parking in 

bike lane.

5 16 3341‐

00269

Valley St and Lake 

Hazel Middle School

Install pedestrian ramps and paint crosswalk at Lake Hazel Middle School 

entrance on Valley St.

No TBD ACHD to coordinate improvement in 2016 with 

in‐house resources. 

6 17 3341‐

00269

Chateau Dr and 

Barbara Morgan STEM

Repaint faded crosswalks No N/A Traffic review in 2015 indicated that current 

markings meet standards. ACHD Traffic to 

review again to determine if conditions have 

changed.

7 NEW Pine St and W 1st St Repaint faded crosswalks No TBD ACHD Traffic Engineering to evaluate location 

for repainting.

8 NEW Valley Heights Dr 

Pedestrian Crossing

Painted crosswalk on Valley Heights Dr at the pedestrian pathway about 400 

feet south of Lake Hazel Rd.

No TBD ACHD Traffic Engineering to evaluate location 

for crossing.

9 18 3341‐

00269

McMillan Rd and 

Lowell Scott Middle 

School Parking Lot

"Do Not Block Intersection" signage and paint No TBD ACHD Traffic to monitor new intersection to 

determine if warranted.

ACHD Proposed Response

2016 SD 

Priority 

Ranking

2015 SD 

Priority 

Ranking

GIS #ACHD Project Name    

(City Project Name)Project Description

Current Programming Status

PD ‐ Preliminary Development

UF ‐ Unfunded

CN ‐ Construction Year Page 1 of 4

Page 104: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

Attachment 9

In IFYWP 

(Page)DSN YR ROW YR CN YR

Total 

Cost in 

Millions

Programming NotesACHD Proposed Response

2016 SD 

Priority 

Ranking

2015 SD 

Priority 

Ranking

GIS #ACHD Project Name    

(City Project Name)Project Description

Current Programming Status

10 NEW Alley of Pine St, 

between West 1st and 

W 2nd

Install gate at the north end to restrict alley access to emergency vehicles and 

pedestrians only. 

No TBD ACHD to explore feasibility.

11 20 3341 Cloverdale Rd and 

Spalding STEM

Additional speed limit signage due to cars speeding on overpass and do not 

slow in school zone

No TBD ACHD Traffic Engineering to evaluate potential 

improvement.

12 21 3341 Linder Rd, Chateau Dr 

/ Barbara Morgan 

STEM

Way finding signage on Linder. Renamed school has caused confusion. Signage 

on Chateau installed in 2014

No TBD ACHD Traffic Engineering to coordinate with 

School District on improvement.

13 NEW CM210‐

55

Black Cat Rd, 

Moonlake Dr / Ustick 

Rd (Black Cat Rd and 

Moon Lake Dr 

Pedestrian Signal)

Construct an asphalt pathway from the north west corner of Ustick and Black 

Cat on the west side south to Moon Lake. Install an enhanced pedestrian signal 

at or near Moon Lake Dr.

Yes 

(105)

Done 2016 2016 $0.21 Under construction.

14 2 CM215‐

20

Floating Feather Rd 

and Pimlico Dr 

Pedestrian Crossing

Signalized pedestrian crossing. No $0.33 Scoped "Go" in 2015. ACHD to evaluate 

potential programming during IFYWP update.

15 4 CM214‐

34

Hollandale Dr and 

Pepper Ridge 

Elementary Pedestrian 

Signal

Install an enhanced pedestrian signal at Hollandale Dr and the entrance to 

Pepper Ridge Elementary.

Yes 

(113)

2018 2018 2019 $0.13 To be built in FY2019.

16 5 CM212‐

28

Locust Grove Rd, 

Overland Rd / Puffin St

Detached asphalt or concrete pathway on east side of Locust Grove between 

Puffin and Overland.

No $0.17 Scoped "Go" in 2014. ACHD to evaluate 

potential programming during IFYWP update.

17 6 PPI208‐

91

Lake Hazel Rd, 

Cloverdale Rd / 

Lowland View Way 

(Lake Hazel Rd, 

Cloverdale Rd/Fruithill 

Pl)

Construct asphalt pathway and extruded curb on both sides of Lake Hazel Rd, 

between Cloverdale Rd and Lowland View Way. In‐house design.

Yes 

(115)

Done 2016 2016 $0.23 To be built summer 2016.

18 NEW Linder Rd, Escalante Dr 

/ Maricopa Dr

Construct curb, gutter, and sidewalk on Linder Rd, between Escalante Dr and 

Maricopa Dr. Project requires the widening of Linder Rd Bridge #1022. (See 

project request #30)

No TBD Prioritize and scope.

19 13 CM214‐

38

Musket Dr / Frontier 

Elementary Crossing

Install painted crosswalk with ADA curbs on Musket Drive and the entrance to 

Frontier School.

No N/A Per email from WASD dated 

10/24/14, project no longer 

needed.

Please confirm if request is still desired as this 

request conflicts with previous direction from 

the School District.

20 19 N/A Amity and Mary 

McPherson 

Elementary School 

Pedestrian Signal

Signalized pedestrian crossing No N/A ACHD Traffic evaluation shows good vehicle 

compliance with existing crossing. ACHD to 

reevaluate if location meets warrants for 

additional crossing treatments.

PD ‐ Preliminary Development

UF ‐ Unfunded

CN ‐ Construction Year Page 2 of 4

Page 105: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

Attachment 9

In IFYWP 

(Page)DSN YR ROW YR CN YR

Total 

Cost in 

Millions

Programming NotesACHD Proposed Response

2016 SD 

Priority 

Ranking

2015 SD 

Priority 

Ranking

GIS #ACHD Project Name    

(City Project Name)Project Description

Current Programming Status

21 NEW W. 1st St and Carlton 

Ave

Complete missing sidewalk gap at the corner of W. 1st St and Carlton Ave. No TBD Prioritize and scope.

22 NEW Locust Grove Rd, 

Amity Rd / 

Wrightwood Dr

Construct curb, gutter, and sidewalk on the west side of Locust Grove Rd, 

between Amity Rd and Wrightwood Dr.

No TBD Prioritize and scope.

23 NEW Amity Rd, Margaret Ln 

/ Locust Grove Rd

Construct curb, gutter, and sidewalk on both sides of Amity Rd, between 

Margaret Ln and Locust Grove Rd

No TBD Prioritize and scope.

24 NEW McMillan Rd and 

Leather Way 

Pedestrian Crossing

Install an enhanced pedestrian signal at McMillan Rd and Leather Way. No TBD ACHD Traffic Engineering to determine if 

location meets warrants.

25 NEW McMillan Elementary 

School Zone

Modify existing flashing school zone beacons to relocate them on mastarms 

over roadway to increase compliance.

No TBD ACHD Traffic Engineering to evaluate request. 

School District should work with the Police 

Department to enforce compliance of existing 

school zone.

26 1 RD213‐

16

Linder Rd, Franklin Rd 

/ Pine Ave (Linder Rd, 

Railroad / Franklin Rd)

Widen Linder Road to 5 lanes with curb, gutter, sidewalk, and bike lanes in 

accordance with the 2012 CIP. Project includes upgrade  of the Union Pacific 

Railroad crossing and bridge #131. 

Yes (35) 2016 2017‐

2018

2019 $3.43 School District request for 

sidewalk to be completed with 

the road widening.

To be built in FY2019.

27 7 RD202‐

34

Ustick Rd, McDermott 

Rd / Black Cat Rd 

Widen Ustick Rd to 5 lanes with curb, gutter, sidewalk and bike lanes in 

accordance with the 2012 CIP.

No $3.06 School district request for sidewalk will be 

completed as part of the roadway widening 

project. Pedestrian connectivity exists through 

existing neighborhoods. Black Cat Rd, 

Ustick/Moon Lake programmed.

28 8 RD207‐

33

Eagle Rd, Amity Rd / 

Victory Rd 

Widen Eagle Rd to 5 lanes with curb, gutter, sidewalk and bike lanes in 

accordance with the 2012 CIP. 

Yes (33) 2019 2020 PD $3.35 Programmed to begin design in FY2019. ACHD 

to evaluate project construction moving 

forward through IFYWP update. School district 

request for sidewalk and a crosswalk at Eagle 

and Rome will be considered as part of the 

road widening project.

29 9 RD202‐

14

Cloverdale Rd, Franklin 

Rd / Fairview Ave

Widen Cloverdale Rd to 5 lanes with curb, gutter, sidewalk and bike lanes, in 

accordance with the Cloverdale Rd Concept Design and the 2012 CIP. Project 

includes the Cloverdale/ Executive intersection.

Yes (31) Done Done 2016 $3.33 Under construction. School district request for 

sidewalk will be completed as part of the road 

widening project.

30 10 MA214‐

03

Linder Rd Bridge #1021 

and #1022, 0.3 miles 

N/O Hwy 44

Replace/widen bridge #1021 over the Middleton Mill Canal and bridge #1022 

over the Foothills Ditch to accommodate pedestrian facilities and the future 

widening of Linder Rd.

Yes (61) UF UF UF $1.05 Prioritize and scope.

31 11 RD207‐

12

Cloverdale Rd, 

Overland Rd / Franklin 

Rd

Widen road and overpass from 2 to 5 lanes with curb, gutter, sidewalk, and 

bike lanes.

No $2.33 ACHD requested project from ITD in spring 

2016. Project is not of ITD's bridge 

replacement list and will not be developed at 

this time. ACHD will continue to pursue project 

with ITD.

PD ‐ Preliminary Development

UF ‐ Unfunded

CN ‐ Construction Year Page 3 of 4

Page 106: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

Attachment 9

In IFYWP 

(Page)DSN YR ROW YR CN YR

Total 

Cost in 

Millions

Programming NotesACHD Proposed Response

2016 SD 

Priority 

Ranking

2015 SD 

Priority 

Ranking

GIS #ACHD Project Name    

(City Project Name)Project Description

Current Programming Status

32 NEW Lake Hazel Rd and Star 

Struck Ave Pedestrian 

Crossing

Painted crosswalk. No N/A To be built by in‐house forces in 2016.

PD ‐ Preliminary Development

UF ‐ Unfunded

CN ‐ Construction Year Page 4 of 4

Page 107: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

West Ada School District Request Status and 2016 Prioritization

In IFYWP

(Page)DSN YR ROW YR CN YR

Total

Cost in

Millions

Programming Notes

Road & Intersection

1 2 IN215-

13

Linder Rd and Saguaro

Dr

Signalize intersection. No TBD Defer. Location does not meet

traffic warrants for

signalization.

WASD is requesting a traffic light at Linder Rd and Saguaro Dr. The request is in

response to increased traffic on Linder Road with the addition of North Star

Charter school we need a 4 way stop light for the traffic control during pick up

and drop off times (aproximately 8:15-8:45 AM; 12:00-12:15 PM; 12:45-1:00

PM; and 3:40-4:00PM). The crosswalk at this intersection will be used more as

the subdivisions are developed on the West side of Linder Road. For students

to be able to walk to Galileo there will need to be a light to stop traffic so the

students can cross safely at this intersection.

2 1 IN215-

12

Linder Rd and Chateau

Dr

Install dedicated left turn lanes. No Done Done Part Part Pavement widening complete.

Pavement striping to occur in

spring 2016.

WASD is requesting a turn signal installed at the current traffic light on Linder

Rd & W. Chateau Dr. As is, traffic turning from Linder onto W. Chateau must

yield to oncoming Linder traffic. During pick up and drop off times

(aproximately 8:15-8:45 AM; 12:00-12:15 PM; 12:45-1:00 PM; and 3:40-

4:00PM) traffic waiting to turn onto W. Chateau significantly backs up traffic

on Linder Rd. (both North bound and South bound).

Community Programs

1 New NW 1st St at W

Washington St and W

Carlton Ave at N

Meridian Rd

WASD is requesting 20mph speed limit signs be posted for Meridian

Elementary School.

2 14 3341-

00269

Moon Lake St and Inlet

Way

Painted crosswalk No N/A Traffic review in 2015

indicated that current

markings meet standards.

WASD is requesting to have the crosswalk repainted on N Moon Lake Street

and Inlet Way 

3 15 3341-

00269

Braddock Dr at

Spalding STEM

Repaint faded crosswalks No N/A Traffic review in December

2015 indicated that current

markings meet standards.

WASD is requesting the crosswalk on W Braddock be repainted. It is faded and

difficult for cars to see on the road.

4 12 3341-

00269

W. 8th St and Meridian

Middle School

School Crossing Ahead signage on

W. 8th St

No TBD ACHD to coordinate with

Meridian Police and School

District regarding parents

parking in bike lane.

WASD is requesting a School Crossing Ahead sign be added for northbound

traffic on W 8th St prior to the crosswalk.

5 16 3341-

00269

Valley St and Lake

Hazel Middle School

Install pedestrian ramps and paint

crosswalk at Lake Hazel Middle

School entrance on Valley St.

No TBD ACHD to coordinate

improvement in 2016 with in-

house resources. WASD is requesting a crosswalk for students to cross Valley St at the school

entrance.

6 17 3341-

00269

Chateau Dr and

Barbara Morgan STEM

Repaint faded crosswalks No N/A Traffic review in December

2015 indicated that current

markings meet standards.

WASD is requesting the crosswalk be repainted for students to cross W

Chateau Dr at the school entrance.

7 New W Pine St at NW 1st St Painted crosswalk WASD is requesting the crosswalk be repainted for students to cross. The

current paint is no longer easily visible or reflective.

Instructions - Please insert your agency's ranking for each project in the column "2016 City Priority Ranking". Please add any additional comments or information in the last column. The remaining columns are for your information to

Additional Project Specific City Input

2016

City

Priority

Ranking

2015

City

Priority

Ranking

GIS #

ACHD Project Name

(School District

Project Name)

Project Description

Current Programming Status

PD - Preliminary Development

UF - Unfunded

CN - Construction Year Page 1 of 5

Page 108: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

In IFYWP

(Page)DSN YR ROW YR CN YR

Total

Cost in

Millions

Programming NotesAdditional Project Specific City Input

2016

City

Priority

Ranking

2015

City

Priority

Ranking

GIS #

ACHD Project Name

(School District

Project Name)

Project Description

Current Programming Status

8 New S Valley Heights Dr

about 400ft south of

W Lake Hazel Rd

Painted crosswalk WASD is requesting to have a crosswalk added on S Valley Heights Dr adjacent

to the neighborhood walkway at the corner of Portola and Red Shine (walkway

is parcel # R3526470080) for Lake Hazel ES. There is currently a crosswalk at W

Napia St that is unsafe due to the curve in Valley Heights and inattentive

drivers.

9 18 3341-

00269

McMillan Rd and

Lowell Scott Middle

School Parking Lot

"Do Not Block Intersection" signage

and paint

No TBD ACHD Traffic to monitor new

intersection to determine if

warranted.

WASD is requesting “Do not block the intersection” signage and road paint at

the McMillan Rd and the new LSMS parking lot, so traffic can safely get out of

the parking lot and onto McMillian. It is difficult to turn right to get across to

the shared turned lane. Turning left can be dangerous for students who use

the crosswalk.

10 New Alley off Pine Ave

between W 2nd St and

NW 1st St

WASD is requesting this alley be gated south of parcel R6066000130 and only

made accessible to pedestrian and emergency vehichles. The alley has low

visibility on the corner of Pine due to the trees on either side (on private

property). The alley has no signage warning cars to look for children and other

pedestrians walking down Pine Ave sidewalks.

11 20 3341 Cloverdale Rd and

Spalding STEM

Additional speed limit signage due

to cars speeding on overpass and do

not slow in school zone

No TBD ACHD Traffic Engineering to

evaluate potential

improvement.

WASD is requesting more speed limit signs. Cars speed over the overpass

through the school zone, and not all cars stop at the

flashing light/crosswalk.

12 21 3341 Linder Rd, Chateau Dr

/ Barbara Morgan

STEM

Way finding signage on Linder.

Renamed school has caused

confusion. Signage on Chateau

installed in 2014

No TBD ACHD Traffic Engineering to

coordinate with School District

on improvement.

WASD is requesting signage on Linder and Chateau directing traffic to or

identifying the location of Barbara Morgan Stem Academy Elementary. The

school used to be Linder Elementary and was recently renamed when it

became a magnet school. The address is 1825 W Chateau Drive, Meridian, ID

13 New Black Cat and Moon

Lake St

Painted crosswalk WASD is requesting to have a crosswalk with HAWK light added on Black Cat at

Moon Lake St. There is a large development on the west side of Black Cat that

could be added to the walk zone and potenially eliminate 1 bus at Pondersosa

ES.

14 2 CM215-

20

Floating Feather Rd

and Pimlico Dr

Pedestrian Crossing

Signalized pedestrian crossing. No TBD Scoped Fall 2015. Final report

pending. WASD is requesting a HAWK light be installed in front of Eagle Middle School

at the cross walk of W Floating Feather Rd and N Pimlico Dr. There are

approximately 140 students in the walk zone that could utilize the cross walk

around approximately 8:00 AM and 3:15 PM.

15 4 CM214-

34

Hollandale Dr and

Pepper Ridge

Elementary Pedestrian

Signal

Install an enhanced pedestrian

signal at Hollandale Dr and the

entrance to Pepper Ridge

Elementary.

Yes

(113)

2018 2018 2019 $0.13 WASD is requesting a HAWK light at West Hollandale Drive and the entrance to

Pepper Ridge Elementary or a 20 MPH zone with flashing school traffic lights.

Literally hundreds of student cross at the crosswalk at school start and end

times (aproximately 8:15-8:45 AM; 12:00-12:15 PM; 12:45-1:00 PM; and 3:40-

4:00PM). Congestion will increase because of new building within the

immediate area.

16 5 CM212-

28

Locust Grove Rd,

Overland Rd / Puffin St

Detached asphalt or concrete

pathway on east side of Locust

Grove between Puffin and

Overland.

No $0.17 Scoped "Go" 2014. Awaits

programming. WASD is requesting a concrete sidewalk or an asphalt temporary path to

connect the missing section on Locust Grove just south of Overland to Puffin.

There is about a 200 foot gap in the sidewalk.

PD - Preliminary Development

UF - Unfunded

CN - Construction Year Page 2 of 5

Page 109: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

In IFYWP

(Page)DSN YR ROW YR CN YR

Total

Cost in

Millions

Programming NotesAdditional Project Specific City Input

2016

City

Priority

Ranking

2015

City

Priority

Ranking

GIS #

ACHD Project Name

(School District

Project Name)

Project Description

Current Programming Status

17 6 PPI208-

91

Lake Hazel Rd,

Cloverdale Rd /

Lowland View Way

(Lake Hazel Rd,

Cloverdale Rd/Fruithill

Pl)

Construct asphalt pathway and

extruded curb on both sides of Lake

Hazel Rd, between Cloverdale Rd

and Lowland View Way. In-house

design.

Yes

(115)

Done 2016 2016 $0.23

WASD is requesting a portion of sidewalk completed between Cloverdale and

Lowland View Way on Lake Hazel Road. We could eliminate approximately 2

busses by increasing the Lake Hazel ES walk zone.

18 New Linder Road between

W Maricopa Dr and W

Escalante Dr

WASD is requesting contiguos sidewalks. This bridge does not have a walk path

for students to cross the bridge safely without walking in the narrow street.

There is a large new development on the west side of Linder. If the canal is

closed off and the road has sidewalks, we can potentially reduce 1 bus.

19 13 CM214-

38

Musket Dr / Frontier

Elementary Crossing

Install painted crosswalk with ADA

curbs on Musket Drive and the

entrance to Frontier School.

No N/A Per email from WASD dated

10/24/14, project no longer

needed.

WASD is requesting a painted crosswalk with ADA curbs on Musket Drive and

the entrance to Frontier Elementary School. remove?

20 19 N/A Amity and Mary

McPherson

Elementary School

Pedestrian Signal

Signalized pedestrian crossing No N/A ACHD Traffic evaluation shows

good vehicle compliance with

existing crossing. ACHD to

reevaluate at a later date.

WASD is requesting an Hawk crossing light at the existing school crosswalk.

Traffic is increasing and the road is 45 mph. Student attendance will be

increasing with two new subdivisions and a new apartment complex feeding

into our school.

21 New NW 1st St at W Carlton

Ave

WASD is requesting the sidewalk be finished at the corner on NW 1st St. The

sidewalk was demolished during a costruction project, and then never

replaced.

22 New S Locust Grove

between E

Wrightwood Dr and E

Amity Rd

WASD is requesting sidewalks be added to the west side of Locust Grove. The

new devlopement at S Locust Grove and E Wrightwood Dr as well as the

existing Pitkin and S Ramona neighborhood would benefit from contiguous

sidewalks to Mary McPherson.

23 New Amity Rd. between

Locust Grove and

Margaret Lane

WASD is requesting sidewalks be added to both sides of Amity Rd between

Locust Grove and Margaret Ln. The new devlopement at S Locust Grove and E

Wrightwood Dr as well as the existing Pitkin and S Ramona neighborhood

would benefit from contiguous sidewalks to Mary McPherson.

24 New McMillan Rd. and

Leather Way.

Signalized pedestrian crossing WASD is requesting to have a HAWK light added to the crosswalk on McMillan

Rd at Leather Way. Traffic on McMillan moves very quickly despite the 20mph

speed limit and poses a great danger to the crossing guard and students. There

are approximately 90 Gateway ES students who could be utilizing that

crosswalk.

25 New McMillan Rd between

N Farrow St and N Five

Mile Rd

WASD is requesting an enhanced flashing speed limit system at the two ends

of the school zone that hangs out over the street. The current lights are on the

sides of the street and trafic tends to ignore them. There are potentially

hundreds of students walking down McMillan to get to Gateway ES each

morning, midday, and afternoon. These students are in danger if traffic does

not notice the speed limit signs.

PD - Preliminary Development

UF - Unfunded

CN - Construction Year Page 3 of 5

Page 110: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

In IFYWP

(Page)DSN YR ROW YR CN YR

Total

Cost in

Millions

Programming NotesAdditional Project Specific City Input

2016

City

Priority

Ranking

2015

City

Priority

Ranking

GIS #

ACHD Project Name

(School District

Project Name)

Project Description

Current Programming Status

26 1 RD213-

16

Linder Rd, Franklin Rd

/ Pine Ave (Linder Rd,

Railroad / Franklin Rd)

Widen Linder Road to 5 lanes with

curb, gutter, sidewalk, and bike

lanes in accordance with the 2012

CIP. Project includes upgrade of the

Union Pacific Railroad crossing and

bridge #131.

Yes (35) 2016 2017-

2018

2019 $3.43 School District request for

sidewalk to be completed with

the road widening.

WASD is asking for the sidewalks to be connected on either side of the road

and a better crossing for pedestrians on the railroad tracks

27 7 RD202-

34

Ustick Rd, McDermott

Rd / Black Cat Rd

(Ustick Rd, West of

Black Cat Rd)

Widen Ustick Rd to 5 lanes with

curb, gutter, sidewalk and bike lanes

in accordance with the 2012 CIP.

No $3.06 School district request for

sidewalk will be completed as

part of the roadway widening

project. Pedestrian

connectivity exists through

existing neighborhoods. Black

Cat Rd, Ustick/Moon Lake

programmed.

To the west on Ustick Road at Black Cat Road sidewalks and crosswalks need

to be completed, along with ditch and canal safeguards. If the area to the

west was completed, this would accommodate approximately 193 students.

This could eliminate approximately five buses.

28 8 RD207-

33

Eagle Rd, Amity Rd /

Victory Rd (Eagle Rd,

Victory Rd /

Kingsbridge Dr)

Widen Eagle Rd to 5 lanes with curb,

gutter, sidewalk and bike lanes in

accordance with the 2012 CIP.

Yes (33) 2019 2020 PD $3.35 School district request for

sidewalk and a crosswalk at

Eagle and Rome will be

considered as part of the road

widening project.

WASD is requesting continuous sidewalk on the east side of S Eagle Rd

between E Victory Rd and the canal (north of Kingsbridge), a crosswalk from

east side of S Eagle Rd to the north side of E Rome Dr, and continuous sidewalk

on the west side of S Eagle Rd from S Milan Ave to E Rome Dr.

29 9 RD202-

14

Cloverdale Rd, Franklin

Rd / Fairview Ave

(Cloverdale Rd,

Fairview Ave/Pine Ave)

Widen Cloverdale Rd to 5 lanes with

curb, gutter, sidewalk and bike

lanes, in accordance with the

Cloverdale Rd Concept Design and

the 2012 CIP. Project includes the

Cloverdale/ Executive intersection.

Yes (31) Done Done 2016 $3.33 School district request for

sidewalk will be completed as

part of the road widening

project.

WASD is requesting a continuous sidewalk on the east side of N. Cloverdale

Road, along with fixing the northeast corner of N. Cloverdale Road and

Executive Drive with a sidewalk, and a continuous sidewalk on N. Dawn Drive

from Sunnydale Lane to W. Irving St. would increase the walk zone for the

students traveling from the north and east. This would eliminate two buses

for approximately 127 students for Lewis and Clark Middle School. Continuing

the sidewalk on the north side of E. Executive Drive east of E. Cloverdale Road

to Meadowland would extend the walk zone further for students.

30 10 MA214-

03

Linder Rd Bridge #025

and #026, 0.3 miles

N/O Hwy 44 (Linder Rd

and State St)

Replace/widen bridge #025 over the

Middleton Mill Canal and bridge

#026 over the Foothills Ditch to

accommodate future widening of

Linder Rd.

Yes (61) UF UF UF $1.05 School district request for

sidewalk will be completed as

part of the bridge project. WASD is requesting improvements to the bridge over the canal on Linder road

just north of State Street and just south of Galileo Elementary. This bridge is

narrow and does not have a sidewalk or good path on which to cross.

31 11 RD207-

12

Cloverdale Rd,

Overland Rd / Franklin

Rd (Cloverdale Rd I-84

Overpass)

Widen road and overpass from 2 to

5 lanes with curb, gutter, sidewalk,

and bike lanes.

No $2.33 ACHD requested project from

ITD in fall 2015. Project is not

of ITD's bridge replacement list

and will not be developed at

this time. ACHD will continue

to pursue project with ITD.

WASD is requesting a sidewalk or bike walk over the Cloverdale Overpass

PD - Preliminary Development

UF - Unfunded

CN - Construction Year Page 4 of 5

Page 111: Kent Goldthorpe, President Paul Woods, Vice President ...€¦ · 2016. Project is part of ITD's Strategic Initiatives request for FY2021. ACHD with ITD on any improvement if funded

In IFYWP

(Page)DSN YR ROW YR CN YR

Total

Cost in

Millions

Programming NotesAdditional Project Specific City Input

2016

City

Priority

Ranking

2015

City

Priority

Ranking

GIS #

ACHD Project Name

(School District

Project Name)

Project Description

Current Programming Status

32 NEW Lake Hazel Rd an S Star

Struck Ave

Painted crosswalk

WASD is requesting a painted crosswalk at the intersection. This would allow

elementary, middle, and high school age students to cross the street more

safely to access bus stops. The crosswalk would be in use for students between

the hours of 6:00 am and 8:30am and 3:00pm to 5:00pm.

PD - Preliminary Development

UF - Unfunded

CN - Construction Year Page 5 of 5