kik-kop-40-pe-ge-0016-0_linear actuator override tool operation & maintenance manual
DESCRIPTION
Kik-kop-40-Pe-ge-0016-0_linear Actuator Override Tool Operation & Maintenance ManualTRANSCRIPT
Document Front Page
0 2006-06-16 Issued for Construction EMY AMS TSP A 2006-04-19 Issued for IDC EMY AMS KFG
Rev. Date Reason for issue Made by Disc. check Proj. appr. Client appr.
Company Document Number: KIK-KOP-40-PE-GE-0016 Company Revisions:
0 2006-06-16 Issued for Construction A 2006-04-19 First Draft for Internal Review
Rev. Date Reason for Issue
Document title: KIKEH PROJECT LINEAR ACTUATOR OVERRIDE TOOL OPERATION & MAINTENANCE MANUAL
Aker Kværner Document no.:
P124049-0009
This document contains Aker Kværner proprietary and confidential information that is legally privileged and is intended only for the person or entity to which it is addressed and any unauthorised use is strictly prohibited. It is provided for limited purpose and shall not be reproduced, stored electronically, transferred to other documents, disseminated or disclosed to any third parties without the prior written consent of Aker Kværner. Any attachment is subject to the specific restrictions and confidentiality regulations stated therein and shall be treated accordingly. The document is to be returned upon request and in all events upon completion of use for which it was provided
AKER KVAERNER SUBSEA AS OPERATIONS & MAINTENANCE MANUAL
LINEAR ACTUATOR OVERRIDE TOOL
____________________________________________________________________________________________
36813/021/D Page 1 of 25 Rev A H:\SCANNER\Ops & Maint Manual.doc
AKER KVAERNER SUBSEA AS
OPERATIONS & MAINTENANCE MANUAL
LINEAR ACTUATOR OVERRIDE TOOL
Prepared by:
Oceaneering Intervention Engineering Oceaneering House
Pitmedden Road, Dyce Aberdeen
AB21 0DP
Oceaneering Intervention Engineering is a division of Oceaneering International Services Ltd Registered Office: Royal London House, 22/25 Finsbury Square, London EC2A 1DS
(Reg No: 1023217 England)
AKER KVAERNER SUBSEA AS OPERATIONS & MAINTENANCE MANUAL
LINEAR ACTUATOR OVERRIDE TOOL
____________________________________________________________________________________________
36813/021/D Page 2 of 25 Rev A H:\SCANNER\Ops & Maint Manual.doc
OIE Document Number: 36813/021/D DOCUMENT REVISION:
A 01/01/06 DDE LB
Rev Date Description Originator OIE
Checked OIE
Approved Client
Revision Status Approval DOCUMENT DISTRIBUTION:
Copy Number Holder Status
Copy No 1 Client Controlled?
Copy No 2 Client Uncontrolled?
Copy No 3 Oceaneering Intervention Engineering (Working Copy)
Original Oceaneering Intervention Engineering (Central File)
Proprietary Information:- This document contains proprietary information and may not be partly or wholly reproduced without prior written permission.
AKER KVAERNER SUBSEA AS OPERATIONS & MAINTENANCE MANUAL
LINEAR ACTUATOR OVERRIDE TOOL
____________________________________________________________________________________________
36813/021/D Page 3 of 25 Rev A H:\SCANNER\Ops & Maint Manual.doc
TABLE OF CONTENTS
1.0 INTRODUCTION............................................................................................................... 5 1.1 Purpose and Scope .................................................................................................. 5 1.2 Abbreviations .......................................................................................................... 5 1.3 Safety Notes ............................................................................................................ 5
1.3.1 Safety Check List ........................................................................................ 5 1.3.2 Handling and Transportation....................................................................... 5 1.3.3 Operation..................................................................................................... 5
1.4 Contact Addresses ................................................................................................... 5 1.5 Technical Description ............................................................................................. 6
1.5.1 Technical Description of ROV Marking and Operational Indicators ......... 6 1.5.2 Technical Description of LAOT Sub-components...................................... 7
1.6 Technical Data......................................................................................................... 7
2.0 TOOL PREPARATION AND SETUP............................................................................... 9
3.0 TOOL OPERATION........................................................................................................... 9 3.1 Instructions for Manipulator Deployed LAOT ....................................................... 9 3.2 Failure Scenarios and Contingency Instructions................................................... 10
3.2.1 Contingency Instructions. ......................................................................... 10 3.3 Instructions for Release / Recovery of Tool ......................................................... 11
4.0 TOOL CALIBRATION .................................................................................................... 11
5.0 TOOL MAINTENANCE AND STORAGE PROCEDURE. ........................................... 12 5.1 Maintenance Schedule .......................................................................................... 12 5.2 Piston Seal Replacement ....................................................................................... 12 5.3 Seal Change Procedure.......................................................................................... 13 5.4 Recommended Spare Parts.................................................................................... 15
6.0 INVENTORY LIST .......................................................................................................... 16
7.0 REFERENCED DRAWINGS, DOCUMENTS AND DATA SHEETS .......................... 17 7.1 Drawing Index....................................................................................................... 17 7.2 Document Index .................................................................................................... 24
8.0 CALIBRATION CHART ................................................................................................. 25
AKER KVAERNER SUBSEA AS OPERATIONS & MAINTENANCE MANUAL
LINEAR ACTUATOR OVERRIDE TOOL
____________________________________________________________________________________________
36813/021/D Page 4 of 25 Rev A H:\SCANNER\Ops & Maint Manual.doc
APPENDIX 1 DRAWINGS APPENDIX 2 SECOND APPENDIX TITLE APPENDIX 3 THIRD APPENDIX TITLE
AKER KVAERNER SUBSEA AS OPERATIONS & MAINTENANCE MANUAL
LINEAR ACTUATOR OVERRIDE TOOL
____________________________________________________________________________________________
36813/021/D Page 5 of 25 Rev A H:\SCANNER\Ops & Maint Manual.doc
1.0 INTRODUCTION
1.1 Purpose and Scope
The purpose of this document is to provide the necessary technical information to allow the Linear Actuator Override Tool (LAOT) to be operated and maintained efficiently and safely during planned ROV operations and all subsequent repair and maintenance tasks.
1.2 Abbreviations
LAOT Linear Actuator Override Tool ROV Remotely Operated Vehicle PPE Personal Protection Equipment
1.3 Safety Notes
Operators of this equipment are required to read this manual thoroughly before attempting workshop or offshore operations to familiarize themselves with the Tool and it’s safe operation.
1.3.1 Safety Check List
1.3.2 Handling and Transportation
The LAOT is supplied fully assembled and tested in an Aluminium transportation box. (apart from the ROV deployment handles) The Tool has been fitted with a handling pad eye that should be used in conjunction with the certified soft lifting strop and shackle for lifting the Tool in and out of the Transportation box. The assembled in-air weight of the Tool is 41 Kg.
1.3.3 Operation
When testing and operating the LAOT in the workshop or on deck it is important to remember that this Tool will be under pressure when operated and therefore all necessary safety precautions associated with High Pressure Hydraulics must be observed. Full PPE must be worn and safe working practices observed at all times.
1.4 Contact Addresses
Oceaneering Intervention Engineering, Oceaneering House, Pitmedden Road, Dyce Aberdeen AB21 0DP. Tel 01224 758500.
AKER KVAERNER SUBSEA AS OPERATIONS & MAINTENANCE MANUAL
LINEAR ACTUATOR OVERRIDE TOOL
____________________________________________________________________________________________
36813/021/D Page 6 of 25 Rev A H:\SCANNER\Ops & Maint Manual.doc
TECHNICAL DESCRIPTION AND DATA
1.5 Technical Description
The LAOT is a lightweight Titanium Piston assembly with an interface designed to override the Aker Kvaerner 2-1/16 & 5-1/8-10M Actuators. (See Kvaerner drgs ) The tool will be manipulator deployed, either carried by the ROV and manipulator deployed, or manipulator positioned with the tool being surface deployed on a down line. The Piston assembly comprises of 3 main parts, the Piston Body, the Piston and the Piston End Cap. The Piston Body Interface is designed to locate on the Actuator Override Adaptors and when rotated 86 degrees will locate behind the 2 Actuator lugs. When pressurised the Piston will overcome the actuator spring and stroke open the valve. The full stroke of the Piston is 170mm. The Piston is actuated via a lightweight Dual Port Receptacle and Hot Stab. The Stab will be supplied directly from the host ROV at a maximum pressure of 200 Bar. One port from the receptacle is connected directly to the return side of the Piston and the other to the High pressure side of the Piston via a Swagelok isolation valve. Once the piston has been actuated OPEN to overcome the “default to close spring” of the valve actuator, the piston can be hydraulically locked in this condition by closing the isolation valve. The LAOT can then be left on the valve to keep it actuated open.
1.5.1 Technical Description of ROV Marking and Operational Indicators
The LAOT will interface with the 2-1/16 & 5-1/8-10M Actuators by means of an 86 degree clockwise rotation (when viewed from the ROV) To confirm that the LAOT is in the correct position for location and removal from the valve interface 2 position markings “O” and “CL” have been placed at the front of the LAOT. When “O” is in the 12 o’clock position the tool can be located and removed from the valve. When “CL” is in the 12 o’clock position the tool is in the locked position ready for either actuation or ccw rotation.
Note the LAOT is fitted with rotation stops to ensure correct angle of rotation.
Rotational Stops
AKER KVAERNER SUBSEA AS OPERATIONS & MAINTENANCE MANUAL
LINEAR ACTUATOR OVERRIDE TOOL
____________________________________________________________________________________________
36813/021/D Page 7 of 25 Rev A H:\SCANNER\Ops & Maint Manual.doc
1.5.2 Technical Description of LAOT Sub-components
Pressure Isolation Valve The Pressure Isolation Valve comprises of a Swagelok Whitey 83 series Ball Valve mounted in an ROV friendly Receptacle assembly. The valve will be used to hydraulically lock the LAOT, in the actuated position, to the required linear valve. The purpose of the valve assembly is to provide the valve with a suitable manipulator interface that will allow accurate and easy 90 degree rotation of the valve without transferring any damaging loadings to the valve or valve stem. For details of the Isolation Valve Assembly See drg 36813-017 rev 0. Lightweight 38mm Dual Port Manifold The Dual Port Manifold will be attached to the LAOT Receptacle plate at the rear of the Tool. The 2 off Manifold ports will be connected by ¼” st.steel tube to the return side of the LAOT, and to the extend side via the Pressure Isolation Valve. For details of the Manifold see OAS drg 36665-322 rev 0
1.6 Technical Data
Item Specification
Piston Material Grade 5 Titanium
Piston Stroke 171 mm
Piston Body Max Dia 215.4 mm
Piston Bore 150 mm
Piston Rod Dia 50 mm
O/A Length Piston 402 mm
O/A Length Piston Assembly 618 mm
Piston Weight (in Air) 41 kg
Hydraulic Fluid Specification Shell Tellus 22 or Ocean-Rite 22
Max Operating Pressure 3,000 psi (207 Bar)
Piston Test Pressure 3,750 psi (258 Bar)
Piston Force at 2,900 psi (200 Bar) 35.3 Tonnes
Isolation Ball Valve max working pressure 6,000 psi (400 bar)
Isolation Ball Valve Material 316 SS
Operation of Isolation Ball Valve 90 Degree rotation - open / close
AKER KVAERNER SUBSEA AS OPERATIONS & MAINTENANCE MANUAL
LINEAR ACTUATOR OVERRIDE TOOL
____________________________________________________________________________________________
36813/021/D Page 8 of 25 Rev A H:\SCANNER\Ops & Maint Manual.doc
Item Specification
ROV Friendly Valve assembly material 316 SS & POM
Valve assembly Max Torque 120 N.m
AKER KVAERNER SUBSEA AS OPERATIONS & MAINTENANCE MANUAL
LINEAR ACTUATOR OVERRIDE TOOL
____________________________________________________________________________________________
36813/021/D Page 9 of 25 Rev A H:\SCANNER\Ops & Maint Manual.doc
2.0 TOOL PREPARATION AND SETUP
1. Establish required override force necessary to operate Client Linear Valve. 2. Establish how Tool is to be deployed, by ROV or surface line.
3. Ensure that Tool handles are suitable for the Manipulator Jaw type.
4. Establish a mounting position and secure location for the LAOT so that it can be
easily accessed by the Manipulator
5. Use the Pressure / Force Chart in Appendix 8.0 to establish required supply pressure from the ROV. ROV crew to verify accurate supply pressure if not operating LAOT from RCU.
6. Open LAOT Isolation Valve, fit Hot Stab and function test Tool by stroking Piston
out and then fully back. Check pipe and fittings for leaks. Close Valve.
7. Check that the Piston Rod is fully retracted – it should protrude 1.5 mm from inside face of Piston Body.
Note: It is important that the Piston is fully retracted in order to allow piston to
interface with valve Actuator. 3.0 TOOL OPERATION
3.1 Instructions for Manipulator Deployed LAOT
1. Locate ROV in suitable position to allow Starboard Manipulator deployment of LAOT.
2. Using the Starboard Manipulator locate Tool. Tool should be sitting in a deployment cradle / receptacle positioned between manipulators.
3. Deploy LAOT using handle on Tool centreline, this can be either the D-handle or Fish Tail handle depending on which is selected by ROV operator.
4. Present Tool to Valve interface so that the “O” Indicator is in the 12 O’clock position. This will allow the Tool to slide over the Valve profile. Note: - The Tool is not fully located or locked in this position – Do not release the Tool.
Rotate the Tool Clockwise to fully locate - until the “CL” Indicator is in the 12 O’clock position. The Tool can now be safely released.
Note: If the Tool fails to rotate, or turns less than the required rotation, the
alignment of the Tool and Valve is not concentric. Adjust Tool / Manipulator alignment while continuing to rotate.
5. Insert the Dual Port Stab into the Receptacle mounted on the Tool. Ensure that the
Stab is fully located.
AKER KVAERNER SUBSEA AS OPERATIONS & MAINTENANCE MANUAL
LINEAR ACTUATOR OVERRIDE TOOL
____________________________________________________________________________________________
36813/021/D Page 10 of 25 Rev A H:\SCANNER\Ops & Maint Manual.doc
6. Check the status of the Isolation valve. Valve should have been set to the Open position during Tool preparation. Open valve if required.
7. Check that the Tool “CL” Indicator is still in the 12 O’clock position. Rotate Clockwise if required.
Note:- Before the Tool is operated and under pressure the Centre line will be a few degrees below horizontal. When pressure is applied the Centrelines will be fully aligned. 8. Apply the pre-determined pressure to the LAOT for a period of 30 seconds. 9. Close the Isolation Valve with the operating pressure still applied to the Stab. 10. Remove the Stab. Observe the LAOT for a period of 5 minutes to confirm no
leakage. 3.2 Failure Scenarios and Contingency Instructions
The most probable failure scenarios when operating the LAOT are a) Loss of pressure from either the Piston seal or the Piston End Cap seal. This
will result in the closure of the Linear Valve. b) Loss of pressure from the Isolation Valve or pipe and fittings. This will
result in the closure of the Linear Valve. c) Failure of the Isolation Valve to open. This will result in the Tool being
stuck on the Linear Valve Interface.
3.2.1 Contingency Instructions.
a) Replace failed seal as per instructions in Section 5.2 Conduct & record Pressure test. b) Establish faulty component and Replace. Conduct & record Pressure test. c) Conduct Emergency Tool release by cutting ¼” Tube in position shown in
Photograph below. Replace Valve and piping. Conduct & record Pressure test.
Cut Tube ForEmergency Release
AKER KVAERNER SUBSEA AS OPERATIONS & MAINTENANCE MANUAL
LINEAR ACTUATOR OVERRIDE TOOL
____________________________________________________________________________________________
36813/021/D Page 11 of 25 Rev A H:\SCANNER\Ops & Maint Manual.doc
3.3 Instructions for Release / Recovery of Tool
To release and recover the Tool after it has been used to override a Linear valve it will first be necessary to bleed off the internal pressure inside the LAOT. Note:- To prevent the possibility of water being sucked into the annulus side of the piston as the Linear Valve closes and the piston rod retracts it will be necessary to fit and operate the Dual Port Hot Stab before opening the Isolation Valve. 1. Set supply pressure to 30 Bar 2. Fit and confirm correct location of Dual Port Hot Stab. 3. Apply 30 Bar pressure to Annulus side of LAOT. 4. Open Isolation Valve. Maintain pressure for 30 seconds. Observe the Tool Centreline
drop. If the piston is fully retracted it will be possible to rock the Tool while still on the Valve interface.
5. Remove the Dual Port Hot Stab. 6. Rotate the Tool CCW, remove and stow back on the ROV.
4.0 TOOL CALIBRATION
See Appendix 8.0 for the Pressure / Force Chart for this tool. The output force from Titanium Piston is directly proportional to the input pressure, and can be calculated knowing the Piston ID. It is therefore not a requirement to calibrate the tool before each operation.
AKER KVAERNER SUBSEA AS OPERATIONS & MAINTENANCE MANUAL
LINEAR ACTUATOR OVERRIDE TOOL
____________________________________________________________________________________________
36813/021/D Page 12 of 25 Rev A H:\SCANNER\Ops & Maint Manual.doc
5.0 TOOL MAINTENANCE AND STORAGE PROCEDURE.
The following maintenance instructions should be followed to keep the tool in good mechanical condition and state of readiness.
5.1 Maintenance Schedule
Item Task Frequency
1. Fresh water rinse of tool. After every dive.
2. Light exterior lubrication. After fresh water rinse.
3. Repeat Task 2. Prior to long term storage.
4. Function tool on LP (50 Bar max) from HPU using clean oil. Stroke piston fully out/in - 5 cycles.
After every dive and then every 3 months during storage. Date and sign maintenance log.
5. Pressure Test Tool & Isolation Valve to 200 Bar (Piston side only)
Every 12 months Date and sign maintenance log.
6. Inspect Hoses pipework and fittings for leaks or signs of damage.
Every time tool is used.
5.2 Piston Seal Replacement
Should it become necessary to change any of the piston seals it is recommended that this procedure is conducted in the Base workshop because a number of specific installation tools are required (See Photo 006). For the main piston seals a hydraulic or mechanical press is required due to the size and rigidity of this seal. The following procedure describes removal and replacement of the Piston seals.
AKER KVAERNER SUBSEA AS OPERATIONS & MAINTENANCE MANUAL
LINEAR ACTUATOR OVERRIDE TOOL
____________________________________________________________________________________________
36813/021/D Page 13 of 25 Rev A H:\SCANNER\Ops & Maint Manual.doc
Important Note:
Great care must be taken when assembling, disassembling and changing seals to avoid any dirt or contamination entering the piston. Any damage to the piston or piston bore could result in seal failure or leakage at high pressure. The tolerances between parts are tight therefore care must be taken to avoid hard metal to metal contact.
5.3 Seal Change Procedure
1. Slacken Tube fittings on End Cap and remove Tube between Isolation Valve and Piston End Cap.
2. Mark hole position between End Cap and piston Body. 3. Remove 12 x M16 cap screws. 4. Remove End Cap
SEAL TRANSFER
SLEEVE SEAL CONE
COLLET PUSHER
PUSHER RING
SEAL COMPRESSION
RING
INTERNAL SEAL COMPRESSION
SHAFT
PHOTO 006
AKER KVAERNER SUBSEA AS OPERATIONS & MAINTENANCE MANUAL
LINEAR ACTUATOR OVERRIDE TOOL
____________________________________________________________________________________________
36813/021/D Page 14 of 25 Rev A H:\SCANNER\Ops & Maint Manual.doc
5. Stand Piston Body on blocks so that piston can be driven out by striking piston rod with a plastic drift. Ensure that piston remains concentric after piston rod is no longer supported in front end of housing.
6. Remove Tape Bearing and 1 off Rod Seal from Piston body. Do not use sharp tools
likely to scratch or damage seal area. 7. Remove Piston Seal and 2 off Tape Bearings from piston. 8. Clean Piston and Piston Housing. Ensure there is no dirt in seal housings. 9. Pre-warm Rod Seal in HOT WATER prior to Step 11. 10. Fit Rod seal O-Ring 11. Fit new Rod Seal to Piston Housing. Ensure that O-Ring is not trapped. It will be
necessary to deform seal as shown in Appendix 5. Use fingers and then Internal Seal Compression Shaft immediately to gently return seal to original shape and secure in housing. Leave for 10 minutes.
12. Form new Tape Bearing around Piston Shaft then fit into housing. Again insert Seal
Compression Shaft and leave for 10 minutes. 13. Pre-warm Piston Seal in HOT WATER. 14. Fit Piston seal O-Ring. 15. Load replacement Piston Seal on to Transfer Sleeve as per Drawing No : 36071-1099.
Note:- some form of mechanical press will be required to stretch seal. Do not leave seal on Transfer Sleeve for long, transfer immediately to Piston.
16. Seal will be greatly oversized when it comes off the Transfer Sleeve. Leave in
position for 10 minutes to let it contract slightly. 17. Lubricate the Seal Compression Ring ID with WD 40 and place over Piston rod so
that chamfered end of Ring goes over 50 dia rod first.
Note: It is important to fit in this orientation for when piston is inserted into Housing. Clean all hand tools before use to ensure no debris is transferred into Piston during use.
18. Tap Compression Ring over seal, take great care at this point as the Seal will still be
considerably oversized and can easily be pinched (See Drawing No : 36071-1332). Leave compression ring in position shown in drawing.
AKER KVAERNER SUBSEA AS OPERATIONS & MAINTENANCE MANUAL
LINEAR ACTUATOR OVERRIDE TOOL
____________________________________________________________________________________________
36813/021/D Page 15 of 25 Rev A H:\SCANNER\Ops & Maint Manual.doc
19. Check that Piston Housing is clean then spray coat the entire bore area with WD 40. 20. Stand Housing vertically and locate the Piston and Compression Ring assembly into
housing so that Piston is hanging on flat face of Compression Ring. 21. Ensure that the two are concentric then gently drive Piston into Housing. The Seal
Compression Ring will ensure that the Tape Bearings and Seal remain in their respective groves during insertion. Monitor the position of the end of the piston rod to ensure that it is CONCENTRIC when it enters the 50 dia hole so that it does not catch or lift the Tape bearing.
22. When the piston is inserted far enough the End Cap can be fitted. Ensure hole
alignment is correct as per Step 2, and that End cap is concentric with bore. 23. Finger tighten all cap screws, then fully tighten using calibrated Torque wrench in a
diametrically opposed sequence to 198N.M (146 ft.Lbs)
24. Reconnect Swagelok pipe between Isolation Valve and End Cap.
5.4 Recommended Spare Parts
Item Qty Description Drawing / Part No
1 1 1m Length of ¼” 16 Gauge St St Tube
2 4 ¼” BSPP Male Bonded Washers
3 1 Swagelok Whitey 83 series Ball Valve SS-83KS4
4 4 Swagelok Male Connector - NPT SS-400-1-4
5 4 Swagelok Male Connector - BSP SS-400-1-4RS
6 4 Parker O-Ring 2-357-90
7 8 Parker Backup Ring 8-357 N300-90
8 7 Claron Double Acting Piston Seal CS51500/C
9 8 Claron Double Acting Rod Seal 751-0500/C
10 7 Claron Bearing Tape - Rod CT 25150/162/R
11 8 Claron Bearing Tape - Piston CT 25100/475/R
12 3 PTFE Bearing Disk 36813-018 Item 8
14 6 Valve Rotation Stop Pin 36813-018 Item 6
AKER KVAERNER SUBSEA AS OPERATIONS & MAINTENANCE MANUAL
LINEAR ACTUATOR OVERRIDE TOOL
____________________________________________________________________________________________
36813/021/D Page 16 of 25 Rev A H:\SCANNER\Ops & Maint Manual.doc
6.0 INVENTORY LIST
Item Qty Description Drawing / Part No
1 2 Linear Actuator Override Tool c/w Valve & Receptacle
36813-019
2 1 Spare Parts kit as per manual section 5.4
3 1 0.75 T Lifting Shackle
4 1 1 T Duplex Webbing Sling
5 1 Seal Transfer Sleeve 36813-021
6 1 Seal Cone 36813-022
7 1 Collet Pusher 36813-023
8 1 Seal Compression Ring 36813-024
9 2 Fishtail Handle 36813-001
10 2 LAOT Vertical Handle 36813-020
11 2 Square Handle 36813-027
12 1 Manufacturing Record Book 36813/022/D
AKER KVAERNER SUBSEA AS OPERATIONS & MAINTENANCE MANUAL
LINEAR ACTUATOR OVERRIDE TOOL
____________________________________________________________________________________________
36813/021/D Page 17 of 25 Rev A H:\SCANNER\Ops & Maint Manual.doc
7.0 REFERENCED DRAWINGS, DOCUMENTS AND DATA SHEETS
7.1 Drawing Index
ITEM TITLE DRG No 1 Adaptor Override for 2 1/16-10M Actuator 18-HS0079-81 rev1 2 Adaptor Override for 5 1/8-10M Actuator 18-HS0020-36 rev1 3 38mm manifold Dual Port – Light Weight 366665-322 rev0 4 ROV Friendly Valve – Exploded view & G.A. 36813-017 rev0 5 LAOT General Arrangement 36813-019 rev0 6 Piston Seal Assembly Installation Sequence 36071-1332 rev 0
AKER KVAERNER SUBSEA AS OPERATIONS & MAINTENANCE MANUAL
LINEAR ACTUATOR OVERRIDE TOOL
_______________________________________________________________________________________________________________________________________________
36813/021/D Page 18 of 25 Rev A H:\SCANNER\Ops & Maint Manual.doc
1
D
C
2 3
B
A
1 2 3
4 5 6
D
C
4 5
B
A
6
Ø38mm MANIFOLD DUAL PORT
GENERAL ASSEMBLY
36665
LIGHT WEIGHT
Drawn
WT
±0.4 ±0.2 ±0.05 ±0.5°
by OCEANEERING ASCopyright CSize
A3Drawing no.
TOL'S UNLESS OTHERWISE SPECIFIED (in mm):NO DEC. DEC .X DEC .XX ANGLES
51 825290Telephone:
4068 Stavanger, Norway
OCEANEERING ASP. O. Box 8024 Telefax:
DESCRIPTION
ISSUED FOR REVIEW
Rev.
0
51 825100
Dwg. ref.
By
GR 06/10-04
Date
- 32211Sheet
of 0Rev.
Date
06/10-04
Date Check
Scale
Appr.
1:2
Date
WEIGTH:
WEIGTH IN WATER:
SURFACE FINISH U.S.O BREAK ALL SHARP EDGES3.2
MD REF. 36665-323
1/4" NPT (x2)
SECTION A-A
PREVIOUS DWG REF. 36570-070
135
38 50
10
ITEM NO. QTY. PART NO. DESCRIPTION MATERIAL1 1 36665-322-r0 DUAL PORT MANIFOLD NITRONIC
72
M6 8 (x4)ON P.C.D 61.0
A
A
AKER KVAERNER SUBSEA AS OPERATIONS & MAINTENANCE MANUAL
LINEAR ACTUATOR OVERRIDE TOOL
_______________________________________________________________________________________________________________________________________________
36813/021/D Page 19 of 25 Rev A H:\SCANNER\Ops & Maint Manual.doc
THIS DO CUMENT CO NTAINS INFO R MATIO N WHICH IS PR O PR IETAR Y TO O CEANEER ING INTER NATIO NAL INC.THE INFO R MATIO N CO NTAINED HER EIN SHALL NO T BE DISCLO SED,DUPLICATED, USED IN WHO LE O R INPAR T FO R ANY PUR PO SE O THER THAN TO EVALUATE THIS DO CUMENT WITHO UT WR ITTEN CO NSENT O F
O CEANEER ING INTER NATIO NAL, INC..
CLIENT'S DR G . No.:
No.
DR G .
DATE:DR AWN:
PR O JECT:
DR AWING :TITLE O F
CHECKED:
CLIENT:
JO B/BID No.:
SHEET R EV.
O F
APPR .: SCALE(S):
CAD R EF. No.
DR AWING No.U N L ESS O T HER W ISE SP EC IF IED A L L
D IM EN S IO N S A R E IN M IL L IM ET R ES
± 0. 13
SU RF AC E F INISH U .S .O .
U NL ESS O T HERW ISE SPEC IF IED DIMENS IO NS
NO DEC
ARE IN MIL L IMET ERS . T O L ERANC ES O N:
± O .5 ± 0. 25
3 .2
± 0.5°
A1SIZE
ROV FRIENDLY VALVEEXPLODED VIEW & GA
AKER KVAERNER
KIKEH ROV TOOLING
36813
36813-017
36813-017
36813- 017
1:1
01 1
LB 11/10/05 DDN DDN
DEC . X ANG L ESDEC . X X
WEIGHT: 2.1 KG
OCEANEERING HOUSEPITMEDDEN ROAD, DYCEABERDEEN AB21 0DPTEL: +44 (0) 1224 758500 FAX: +44 (0) 1224 758593 WEB: www.oceaneering.com
OCEANEERING
REV. DESCRIPTION BY DATE CHK APPR.
FOR CONSTRUCTION LB 11/10/05 DDN DDN 0
OCEANEERING INTERVENTIONENGINEERING
11
5 1
8
7
62 43
9
13
11
10
5
2
3
6
12
8
1
7
9
4
ITEM QTY. DESCRIPTION. DRG No1 1 VALVE RECEPTACLE HOUSING 36813-0082 1 HANDLE BEARING 36813-0183 1 STEM LOCK SLEEVE 36813-0164 1 HANDLE BASE 36813-0075 1 VALVE HOUSING BASE PLATE 36813-0106 1 ROTATION STOP PIN 36813-0117 1 VALVE HANDLE 36813-0098 1 PTFE BEARING DISC 36813-0129 1 M5 SOC HD CAP x 40 LG A4 ST.STL10 4 M5 SOC HD CAP x 16 LG A4 ST.STL11 1 VALVE WHITEY 83KS412 2 DOWEL PIN DP6.0-30/A413 1 PANEL NUT 83KS4
AKER KVAERNER SUBSEA AS OPERATIONS & MAINTENANCE MANUAL
LINEAR ACTUATOR OVERRIDE TOOL
_______________________________________________________________________________________________________________________________________________
36813/021/D Page 20 of 25 Rev A H:\SCANNER\Ops & Maint Manual.doc
28
SECTION C-C
29
131226
9
10
5
15
14
25 4
SECTIONAL ELEVATIONFISHTAIL HANDLE OMITTED
28
3 126
730
D
E
383.0
216.
0
ITEM QTY. DESCRIPTION. DRG No1 1 PISTON END CAP 36813-0052 1 PISTON BODY 36813-0043 1 LVOT GUIDE CONE 36813-0284 1 PISTON 36813-0065 1 RECEPTACLE PLATE 36813-0136 1 LIFT BRACKET 36813-0257 1 LIFT BRACKET BOTTOM 36813-0268 1 FISHTAIL HANDLE 36813-0019 1 SHOT-OFF VALVE 36813-01910 1 DUAL PORT MANIFOLD 36665-32211 4 M5 SOC HD CAP x 16 LG A4 ST.STL12 12 M16 WASHER A4 ST.STL13 12 M16 x 50 LG SH CAP GR 12.914 3 M8 x 20 LG SH CAP A4 ST.STL15 3 M6 X 20 LG SH C'SK A4 ST.STL16 11 M6 WASHER A4 ST.STL17 7 M6 NUT A4 ST.STL18 8 M6 x 25 LG SH CAP A4 ST.STL19 1 PISTON SEAL CS51500-C20 2 BEARING TAPE CT25100-457-R21 1 O-RING 2-35722 1 BACKING RING 8-35723 1 ROD SEAL 7510500-C24 1 BEARING TAPE CT25150-162-R25 2 SPIRAL PIN EP6-60 ST.STL26 1 0.75T ANCHOR SHACKLE 1018400 (S-209)27 2 SWAGELOK FITTING NPT SS-400-1-428 2 SWAGELOK FITTING BSPP SS-400-1-4RS29 1 0.25" TUBE x 266 LG ST.STL30 1 0.25" TUBE x 404 LG ST.STL31 1 0.25" TUBE x 200 LG ST.STL
C
C
27
1817 16
11
31
19 20
SCALE 2 : 1.5
2221
DETAIL D
20
8
17
16
16
18
THIS DOCUMENT CONTAINS INFORMATION WHICH IS PROPRIETARY TO OCEANEERING INTERNATIONAL INC.THE INFORMATION CONTAINED HEREIN SHALL NOT BE DISCLOSED,DUPLICATED, USED IN WHOLE OR INPART FOR ANY PURPOSE OTHER THAN TO EVALUATE THIS DOCUMENT WITHOUT WRITTEN CONSENT OF
OCEANEERING INTERNATIONAL, INC..
CLIENT'S DRG. No.:
No.DRG.
DATE:DRAWN:
PROJECT:
DRAWING:TITLE OF
CHECKED:
CLIENT:
JOB/BID No.:
SHEET REV.
OF
APPR.: SCALE(S):
CAD REF. No.
DRAWING No.
UNLESS OTHERWISE SPECIFIED ALLDIMENSIONS ARE IN MILLIMETRES
± 0.13
SURFACE FINISH U.S.O.
UNLESS OTHERWISE SPECIFIED DIMENSIONS
NO DEC
ARE IN MILLIMETERS. TOLERANCES ON:
± O.5 ± 0.25
3.2
± 0.5°
A1SIZE
LVOT GENERAL ARRANGEMENT-
AKER KVAERNER
KIKEH ROV TOOLING
36813
36813-019
36813-019
36813-019
1:1.5
01 1
LB 08/12/05 DDN DDN
DEC .X ANGLESDEC .XX
WEIGHT: 40 KG
OCEANEERING HOUSEPITMEDDEN ROAD, DYCEABERDEEN AB21 0DPTEL: +44 (0) 1224 758500 FAX: +44 (0) 1224 758593 WEB: www.oceaneering.com
OCEANEERING
REV. DESCRIPTION BY DATE CHK APPR.
FOR CONSTRUCTION LB 08/12/05 DDN DDN 0
OCEANEERING INTERVENTIONENGINEERING
24
SCALE 2 : 1.5DETAIL E
23
AKER KVAERNER SUBSEA AS OPERATIONS & MAINTENANCE MANUAL
LINEAR ACTUATOR OVERRIDE TOOL
_______________________________________________________________________________________________________________________________________________
36813/021/D Page 21 of 25 Rev A H:\SCANNER\Ops & Maint Manual.doc
POSITION 1
POSITION 2
POSITION 3
A
A
SEAL
A-A
PISTON
DOUBLE ACTING
PRESS
RING (START)COMPRESSION
30100BEARING TAPE
PISTON SEAL
1. SEAL COMPRESSION RING PRESSED OR DRIFTED ONTO PISTON
PRESS
SEALCOMPRESSIONRING (FINISH)
OR REPRODUCED WITHOUT PRIOR WRITTEN PERMISSION.OCEANEERING INTERNATIONAL SERVICES LIMITED AND MUST NOT BE USED
THIS DOCUMENT AND THE INFORMATION HEREIN, IS THE PROPERTY OF
CLIENT'S DRG. No.:
No.DRG.
DATE:DRAWN:
PROJECT:
DRAWING:TITLE OF
CHECKED:
CLIENT:
JOB/BID No.:
SHEET REV.
OF
APPR.: SCALE(S):
CAD REF. No.
DRAWING No.
DESCRIPTION
PARTS LIST
PART No.
UNLESS OTHERWISE SPECIFIED ALLDIMENSIONS ARE IN MILLIMETRES
ITEM MATERIAL QTY.
± 0.13
SURFACE FINISH U.S.O.
UNLESS OTHERWISE SPECIFIED DIMENSIONS
NO DEC
ARE IN MILLIMETERS. TOLERANCES ON:
± O.8 ± 0.25
1.6
± 0.5°
A1SIZE
PISTON SEALS ASSEMBLYINSTALLATION SEQUENCE
OCEANEERING
LAOT
36071
36071-1332
36071-1332
R1332
1:2
01 1
SP 21/02/01 BJG DdN
1 36071-1332 ---- ---- 1
DEC .X ANGLESDEC .XX
WEIGHT: N/A KG
REV. DESCRIPTION BY DATE ENG. APPR.
UNIT 7, AIRWAYS INDUSTRIAL ESTATEPITMEDDEN ROAD, DYCEABERDEEN AB21 0DPTEL: +44 (0) 1224 796215 FAX: +44 (0) 1224 796218 WEB: www.oceaneering.com
IAN MURRY ENGINEERING
B
B
C-C
1. PISTON & SEALS IN POSITION
20.0 (MIN)C
C
PISTON
B-B
PLASTIC DRIFT
BODY
1. PISTON & RING OFFERED UP TO PISTON BODY
2. PISTON DRIFTED INTO BODY
AKER KVAERNER SUBSEA AS OPERATIONS & MAINTENANCE MANUAL
LINEAR ACTUATOR OVERRIDE TOOL
_______________________________________________________________________________________________________________________________________________
36813/021/D Page 22 of 25 Rev A H:\SCANNER\Ops & Maint Manual.doc
AKER KVAERNER SUBSEA AS OPERATIONS & MAINTENANCE MANUAL
LINEAR ACTUATOR OVERRIDE TOOL
_______________________________________________________________________________________________________________________________________________
36813/021/D Page 23 of 25 Rev A H:\SCANNER\Ops & Maint Manual.doc
AKER KVAERNER SUBSEA AS OPERATIONS & MAINTENANCE MANUAL
LINEAR ACTUATOR OVERRIDE TOOL
____________________________________________________________________________________________
36813/021/D Page 24 of 25 Rev A H:\SCANNER\Ops & Maint Manual.doc
7.2 Document Index
1 Design Calculation for LAOT 36813/003/D
AKER KVAERNER SUBSEA AS OPERATIONS & MAINTENANCE MANUAL
LINEAR ACTUATOR OVERRIDE TOOL
____________________________________________________________________________________________
36813/021/D Page 25 of 25 Rev A H:\SCANNER\Ops & Maint Manual.doc
8.0 CALIBRATION CHART
LAOT Pressure / Force Equivalent Chart
0
50
100
150
200
250
0.0 3.5 7.1 10.6 14.1 17.7 21.2 24.7 28.3 31.8 35.3
Force (tonnes)
Pres
sure
(bar
)