LAKESHORE TRANSMISSION STATIONS PROJECT OCTOBER 1, 2019

Upload: others

Post on 12-Mar-2021

7 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: LAKESHORE TRANSMISSION STATIONS PROJECT ......Transmission Lines 230,000 volts - 500,000 volts Transmission Lines 28,000 volts Generation Step-up Transformer Station Distribution Station

LAKESHORE TRANSMISSION STATIONS PROJECT OCTOBER 1, 2019

Page 2: LAKESHORE TRANSMISSION STATIONS PROJECT ......Transmission Lines 230,000 volts - 500,000 volts Transmission Lines 28,000 volts Generation Step-up Transformer Station Distribution Station

COMMUNITY INFORMATION CENTRE OVERVIEW Meet our project team and learn more about:

• Project update & description

• Description of the class environmental assessment process

• Selection of the preferred option for the transformer station

• Next steps & anticipated project schedule

We’re here to share information, listen to your comments or concerns, obtain your feedback and answer questions.

Page 3: LAKESHORE TRANSMISSION STATIONS PROJECT ......Transmission Lines 230,000 volts - 500,000 volts Transmission Lines 28,000 volts Generation Step-up Transformer Station Distribution Station

OUR ROLE IN DELIVERING POWER TO YOU

ONTARIO POWER GENERATION AND PRIVATE GENERATION

COMPANIES

Generation Step-up

Transformer Station

HYDRO ONE

Transmission Lines 230,000 volts - 500,000 volts

Lakeshore Transformer

Station

Transmission Lines 28,000 volts

Distribution Station

Distribution Lines

HYDRO ONE/YOUR LOCAL UTILITY

Pole-Mounted Transformer

Home Wiring 120-240 volts

Page 4: LAKESHORE TRANSMISSION STATIONS PROJECT ......Transmission Lines 230,000 volts - 500,000 volts Transmission Lines 28,000 volts Generation Step-up Transformer Station Distribution Station

")

") #* ") [

TRANSMISSION NETWORK SOUTHWESTERN ONTARIO

HIG

HW

AY 7

7

ST CLAIR RD

HIGHWAY

HIGHWAY 40

1

IGH

HW

AY40

TOWNSHIP OF ST. CLAIR TOWNSHIP OF DAWN-EUPHEMIA

LL AA MM BB TT OO NN CC OO UU NN TT YY EE LL GG II NN CC OO UU NN TT YY

MUNICIPALITY OF WEST ELGIN

") DELAWARE FIRST NATION

") #*

BKWEJWANONG TERRITORY

#*

#* #*

") ##**Lake St Clair

# MM UU NN II CC II PP AA LL II TT YY OO FF -

* CC HH AA TT HH AA MM - KK EE NN TT

#*") "##**) #**##*") *#") #* #*#*)"

##** ###***") #* CITY OF WINDSOR #*

#*") HIGHWAY 401

#* LASALLE #* #*

TOWN OF LAKESHORETOWN OF

TOWN OF ") TECUMSEH

EE SS SS EE XX CC OO UU NN TT YYDetroit River #*

TOWN OF AMHERSTBURG ")TOWN OF MUNICIPALITY OF Lake Erie

KINGSVILLE LEAMINGTONTOWN OF ESSEX 3

")

Point Pelee National Park

Produced By: Inergi LP, GIS Services Date: Jun 17, 2019 Map19-105_SouthwestOntario_WindsorChatham_v2 (C) Copyr ight Hydro One Networks Inc. All rights reserved. No part o f this drawing may be redistributed or reproduced in any form by any photographic, e lectronic, mechanical or any other means, or used in any information storage or retrieval system. Nei ther Hydro One Networks Inc. nor any of its affiliates assumes liability for any errors or omissions.

Produced by Hydro One under Licence with the Ontario Min istry of Natura l Resources © Queen’s Pr inter for Ontario , 2009.

NOT TO BE REPRODUCED OR REDISTRIBUTED CONFIDENTIAL TO HYDRO ONE NETWORKS INC.

Transmission Station 115 kV 230 kV Proposed Lakeshore TS

Junction 115 kV 230 kV

Transmission Line 115 kV 230 kV

First Nation Reserve Lower Tier Municipal Boundaries Upper Tier Municipal Boundaries

Highway National Park Water

Southwest Ontario Transmission Network #*

1:350,000 0 5 10 km

Page 5: LAKESHORE TRANSMISSION STATIONS PROJECT ......Transmission Lines 230,000 volts - 500,000 volts Transmission Lines 28,000 volts Generation Step-up Transformer Station Distribution Station

KEY ORGANIZATIONS

Builds, owns, operates and maintains electricity transmission and distribution facilities across Ontario.

Develops plans to ensure electricity needs are met for the benefit of Ontario, both now and in the future.

Ministry of Environment Conservation and Parks

Reviews the environmental assessment process to ensure potential environmental effects are considered before an infrastructure project begins.

Page 6: LAKESHORE TRANSMISSION STATIONS PROJECT ......Transmission Lines 230,000 volts - 500,000 volts Transmission Lines 28,000 volts Generation Step-up Transformer Station Distribution Station

PROJECT OVERVIEW The IESO completed an assessment of the electrical load forecast for Essex County and requested Hydro One to construct a new switching station which will help meet the growing needs of the area.

Hydro One has also identified the need for additional transformers, in order to supply more low-voltage electricity to homes and businesses in the area.

The proposed Lakeshore Transmission Stations Project will involve a new 230 kV switching station and a separate 230/27.6 kV Transformer Station, which together will:

• Improve reliability of the transmission system in Essex County, and;

• Supply the distribution system which carries power to local homes and businesses.

Page 7: LAKESHORE TRANSMISSION STATIONS PROJECT ......Transmission Lines 230,000 volts - 500,000 volts Transmission Lines 28,000 volts Generation Step-up Transformer Station Distribution Station

CLASS ENVIRONMENTAL ASSESSMENT • The project is subject to the Class Environmental Assessment for

Minor Transmission Facilities (Hydro One, 2016) process, in accordance with the Ontario Environmental Assessment Act.

• This process ensures that transmission projects that have a predictable range of effects are planned and carried out in an environmentally acceptable manner.

• The Class EA process includes:

• Consultation with municipal, provincial and federal government officials; government agencies; First Nation and Métis communities; potentially affected and interested persons, affected businesses and interest groups.

• Collection of environmental inventory data and description of the existing baseline conditions.

• Identification and evaluation of alternative methods of undertaking the project.

• Identification of potential environmental effects of the project and mitigation measures.

Page 8: LAKESHORE TRANSMISSION STATIONS PROJECT ......Transmission Lines 230,000 volts - 500,000 volts Transmission Lines 28,000 volts Generation Step-up Transformer Station Distribution Station

CLASS ENVIRONMENTAL ASSESSMENT • As part of the Class EA process, a draft Environmental Study

Report (ESR) will be made available for a 30-day public review and comment period. An ESR is an easy-to-follow record of the decision making process and generally includes:

• A description of the need for the project;

• A description of the existing environment;

• The preferred solution;

• The rationale behind the selection of the preferred solution;

• A description of the Indigenous and stakeholder consultation undertaken; and,

• A description of the potential environmental effects of the preferred solution and mitigation measures to address these effects.

• Hydro One will make best efforts to resolve concerns raised during public consultation and the draft ESR review period, prior to filing the final ESR with the Ontario Ministry of the Environment, Conservation and Parks (MECP).

• If a concern cannot be resolved, the concerned party may submit a written request (“Part II Order Request”) to the MECP during the public review period to request a higher level of assessment, known as an Individual Environmental Assessment.

Page 9: LAKESHORE TRANSMISSION STATIONS PROJECT ......Transmission Lines 230,000 volts - 500,000 volts Transmission Lines 28,000 volts Generation Step-up Transformer Station Distribution Station

CLASS EA STUDY AREA The proposed Lakeshore TS location is best suited to be near the existing Leamington Junction (JCT), where the existing 230kV circuits join.

East Malden Road Drain

Ale

xand

er D

rain

Jones Drain Riv

ard

Dra

in

Knister Drain

Pott

s D

rain

Bellmore D&W Drain

S ilver Creek Drain

Malden Road Drain

TLIN

E RO

AD

RO

CH

EST

ER

S MIDDLE RD

MIT

CH

ELL

RD

TLIN

E RO

AD

RO

CH

EST

ER

LAKESHORE ROAD 310

COUNTY ROAD 46 ( E ROAD)

HYDRO ONE – LAKESHORE TS CLASS ENVIRONMENTAL ASSESSMENT

MIDDL PROJECT LOCATION AND CLASS EA STUDY AREA

"

Existing 230 kV Electrical Transmission Line

) Junction

Class EA Study Area

Watercourse/Constructed Drain

Woodland

Leamington JCT ")

T O W N O F L A K E S H O R E Lake

Huron Brampton ! !

Guelph ! Toronto ! Mississauga Kitchener

! Lake Hamilton

! Ontario Brantford St. !

Catharines Sarnia !

!

London !

Lake St. Clair

! Chatham

Lake Erie Windsor ^

!

_

1:9,000

0 100 200 400 m ² MAP CREATED BY: GM MAP CHECKED BY: JW MAP PROJECTION: NAD 1983 UTM Zone 17N

The study is bounded by Middle Road to the north, Rochester Townline Road to the east, South Middle Road to the south, and will extend west approximately 550 metres from the Leamington JCT.

Page 10: LAKESHORE TRANSMISSION STATIONS PROJECT ......Transmission Lines 230,000 volts - 500,000 volts Transmission Lines 28,000 volts Generation Step-up Transformer Station Distribution Station

STATION CONFIGURATIONS Hydro One has identified one technically feasible configuration for the 230 kV switching station and assessed three feasible configurations for the locations of the transformer station.

Based on the research and consultation to date, the preferred location of the transformer station has been selected.

") Leamington Junction

Preferred Transformer Station Location (Alternative B)

Alternative C

Alternative A

Switching Station

Jones DrainJones Drain

Bellmore D&W Drain

Bellmore D&W Drain

Knister DrainKnister Drain

East Malden Road DrainEast Malden Road Drain

Riv

ard

Dra

inR

ivar

d D

rain

SS

kk DD

iillvv eerr CCrreeeerraaiinn

Malden Road Drain

Malden Road Drain

Ale

xand

er D

rain

Ale

xand

er D

rain

Potts

Dra

inPo

tts D

rain

S Middle RdS Middle Rd

Lake

shor

e R

d 24

5La

kesh

ore

Rd

245

Roc

hest

er T

Roc

hest

er T

ownl

ine

Rd

ownl

ine

Rd

County Road 46 (Middle Rd)County Road 46 (Middle Rd)Mitc

hell

Rd

Mitc

hell

Rd

Lakeshore Rd 310Lakeshore Rd 310

Town of Lakeshore

Legend

Class EA Study Area

Existing 230 kV Electrical Transmission Line

Watercourse/ Constructed Drain

0 200100 400 m ²1:10,000

!

Windsor

Essex County

Lake St. Clair

Lake Ontario

Switching Station

Page 11: LAKESHORE TRANSMISSION STATIONS PROJECT ......Transmission Lines 230,000 volts - 500,000 volts Transmission Lines 28,000 volts Generation Step-up Transformer Station Distribution Station

EVALUATION OF THE PREFERRED CONFIGURATION

CRITERIA OPTION A OPTION B OPTION C

TECHNICAL & COST

Constructability Preferred

Cost Preferred Preferred

NATURAL ENVIRONMENT

V egetation No Preference

Aquatic habitat/waterbodies No Preference

Terrestrial wildlife No Preference

Potential natural hazards No Preference

Species at risk or sensitive species No Preference

SOCIO ECONOMIC

Distance from residences Preferred

Proximity to existing infrastructure Preferred Preferred

Total project footprint/size, and effects to agricultural land

Preferred

Archaeology & built heritage resources No Preference

Source water protection No Preference

Indigenous interests No Preference

Based on the outcome of the evaluation, Option B is the most preferred for the project.

Page 12: LAKESHORE TRANSMISSION STATIONS PROJECT ......Transmission Lines 230,000 volts - 500,000 volts Transmission Lines 28,000 volts Generation Step-up Transformer Station Distribution Station

PREFERRED CONFIGURATION

Page 13: LAKESHORE TRANSMISSION STATIONS PROJECT ......Transmission Lines 230,000 volts - 500,000 volts Transmission Lines 28,000 volts Generation Step-up Transformer Station Distribution Station

CONSTRUCTION ACTIVITIES The construction phase for the project will involve the following activities:

• Site preparation such as vegetation removal, grading, temporary access and laydown area

• Construction of temporary 230 kV bypass line to ensure continued power

• Installation of station fences, entrances, concrete foundations and station drainage

• Installation of new transmission line structures and station electrical equipment

• Delivery and installation of new transformers

• Connection of transmission lines and station electrical equipment, testing and commissioning

• Site clean up and reclamation

• Hydro One will be installing additional distribution lines to carry power from the new stations to the customers in the vicinity. These distribution power lines are expected to be on the road allowance of South Middle Rd, County Rd 31, Lakeshore Rd 243, Lakeshore Rd 245, and Rochester Townline road. Hydro One will be contacting affected property owners and road authorities in advance of construction.

Page 14: LAKESHORE TRANSMISSION STATIONS PROJECT ......Transmission Lines 230,000 volts - 500,000 volts Transmission Lines 28,000 volts Generation Step-up Transformer Station Distribution Station

MINIMIZING CONSTRUCTION AND PROJECT EFFECTS The following mitigation measures will be implemented to minimize potential construction and project effects:

• Dust, sediment and erosion controls, as required

• Hydro One will work in accordance with local bylaws with respect to noise and working hours, and if necessary obtain permit(s)

• Hydro One will minimize effects to existing agricultural resources to the extent feasible

• Landscaping and visual screening

• Hydro One does not anticipate power interruptions during construction of the switching and transformer stations.

Page 15: LAKESHORE TRANSMISSION STATIONS PROJECT ......Transmission Lines 230,000 volts - 500,000 volts Transmission Lines 28,000 volts Generation Step-up Transformer Station Distribution Station

TYPICAL CONSTRUCTION EQUIPMENT

Boom truck Cable puller

Page 16: LAKESHORE TRANSMISSION STATIONS PROJECT ......Transmission Lines 230,000 volts - 500,000 volts Transmission Lines 28,000 volts Generation Step-up Transformer Station Distribution Station

TYPICAL HYDRO ONE SWITCHING STATION AND TRANSFORMER STATION

Transformer station

Switching station

Page 17: LAKESHORE TRANSMISSION STATIONS PROJECT ......Transmission Lines 230,000 volts - 500,000 volts Transmission Lines 28,000 volts Generation Step-up Transformer Station Distribution Station

NEXT STEPS • Hydro One will complete environmental surveys within the study

area to complete the identification of potential environmental effects.

• Hydro One will continue to consult Indigenous communities, government agencies, municipal staff, elected officials, interest groups and the public to obtain feedback and answer questions about the project.

• Hydro One will release a Draft Environmental Study Report (ESR) for a 30 day public review, anticipated for release later this fall.

• If no Part II Order Requests are submitted during the 30 day review period, Hydro One will file the final ESR with the Ministry of the Environment, Conservation and Parks, concluding the Class EA.

Page 18: LAKESHORE TRANSMISSION STATIONS PROJECT ......Transmission Lines 230,000 volts - 500,000 volts Transmission Lines 28,000 volts Generation Step-up Transformer Station Distribution Station

ANTICIPATED PROJECT SCHEDULE

ACTIVITY TIMELINE

Notice of Commencement of the Class Environmental Assessment Early June 2019

Community Information Centre #1 Introduction of proposed project and alternatives June 26, 2019

Community Information Centre #2 Presentation of preferred alternative October 1, 2019

Draft Environmental Study Report Review period (30 days) November 2019

File final Environmental Study Report with Ministry of the Environment, Conservation and Parks (MECP) January 2020

Detailed engineering and permitting Early 2020

Anticipated start of construction Mid 2020

Anticipated construction completion Late 2023

Page 19: LAKESHORE TRANSMISSION STATIONS PROJECT ......Transmission Lines 230,000 volts - 500,000 volts Transmission Lines 28,000 volts Generation Step-up Transformer Station Distribution Station

THANK YOU FOR JOINING US TODAY Your input is important to us.

Please share your feedback with our team and complete a comment form before you go.

To provide comments or to be added to the project contact list, please contact the Community Relations team at: 1.877.345.6799 [email protected]

For additional project information please visit: www.HydroOne.com/Lakeshore