A Twin Office Block Development in Osborne Park.TRANSCRIPT
Institute of ArchitectsThe Royal Australian
Oldfield Knott Architects Pty Ltd567 Hay Street, Daglish, WA. 6008Phone (08)9381 6788 . Fax (08) 9381 4619 PO Box 849, Subiaco, WA 6904
Project Number
Date
Design/drawn by
Checked by Scalefor 1 : 1
Lot 9,35- 37 Walters RoadOsborne Park
C:\Users\achachad\Desktop\07001 DA options110624.rvt 8/07/2011 4:09:11 PM
07001NOV 2010
Cover sheet
P 00
Proposed Office Development
Skippers Transport and Quinco Properties P/Ldas
Development Application
PROPOSED OFFICE DEVELOPMENT35 WALTERS DRIVE, OSBORNE PARK
Sheet ListSheet
Number Sheet NameCurrentRevision
P 00 Cover sheetP 01 Location and Site planP 02 Ground floor PlanP 03 Level 1-3 PlansP 04 Levels 4-7P 05 Level 8, RoofP 06 ElevationsP 07 SectionsP 08 Area analysisP 09 Perspective renderingsP 10 Perspective renderings
Revision ScheduleNo. Date Description
SUMMARY
Accommodation
Office accommodation of approximately 15600sqm with floor plates varying from 400 to1500sqm per floor within 2 buildings of 8 and 9 storeys. Parking is provided for 310 cars and100 bicycles plus dedicated moped/motorcycle places. A cafe is located on the ground floorand roof terraces on the top floors.
External Finishes :
Ground floor : Bitumen and concrete to vehiclular areas with exposed aggregate and selectedstone to pedestrian pathways. Walls to be painted concrete and selected stone to featurewalls. Frameless and semi framed glazing to lobbies, street front offices and entries. Metallicpowdercoated finishes to free standing columns and canopies.
Upper floors : Full height semi framed glazing to all office areas. Vertical and horizontalpowdercoated aluminium blades set approx. 600mm clear of the wall line to allow formaintenance access and venting of heated air away from the facade. Blades are set atvarious angles for maximum sun protection. Glazing to be tinted thermal resistant.
Roof : Colorbond roofing and cladding to plant room.
Internal Finishes :
Common and Public areas : Good quality stone/granite/marble to floors of lobbies and somefeature walls. Ceramic tile to floor and walls of washrooms. Paint to walls and ceilingsgenerally.
Office areas: Floor, wall and ceiling finishes to tenant requirement. Bare shell approach withbackground services to prevent waste due to tenant variations.
Services :
Aim to provide 4.5 to 5 NABERS energy rating
Air conditioning : HVAC services to be high efficiency variable refrigerant volume (VRV)systems with heat exchange capability.
Electrical : Sub metering to allow for monitoring and contraol of energy usage, High efficiencyfittings and dimming according to daylight conditions. Potential for photovoltaics to run somecommon sevices
Hydraulics : 5 star water saving fittings, treatment and recycling of waste water, fireservices test water capture and possibly stormwater capture and storage(noted high watertable)
Lifts: To incorporate energy regeneration and monitoring of energy use.
BIM : Building information management systems to monitor and control energy usage