      Monthly Report No. 01 (NOV, 2015)-

    PROJECT: C727/2

    DESIGN AND CONSTRUCTION OF LATERAL INTERCEPTOR SEWERS

    (CONTRACT LIS-02)

    MONTHLY REPORT: 01Re! N"! :

  • 8/19/2019 Lis 02 Monthly Report 4 Nov 2015 (Draft)

    2/37

      Monthly Report No. 01 (NOV, 2015)-

    1. PRO"RAMM# AN$ PRO"R# ................................................................................... 5

    1.1 # %#CUTIV#  UMMAR&  .................................................................................... 5  Health Safety and

    Environment……………………………………………………………………………..

    ………….5

     

     Approval and permitting

     progress……………………………………………………………….……………………5

     

    Document submittal………………………………….………………………………………………………….………….5

     

    Engineering and Submittal……………………..…………………………………..…………………….……………..5

     

    Design Progress…………………………………………………………………..…………………………….……………..5• Design

    anagement……………………………………………………………………………………………..5

    • Surveys and siteinvestigation………………………………………………………………………………..5

    • !eotechnical andmonitoring…………………………………………………………………………………5

    • Hydraulic analysis andmodeling……………………………………………………………………………5

    • Preliminarydesign………………………………………………………………………………………………..5

    • DetailDesign…………………………………………………………………………………………………………5

    • "ther categories as

  • 8/19/2019 Lis 02 Monthly Report 4 Nov 2015 (Draft)

    3/37

      Monthly Report No. 01 (NOV, 2015)-

    Environment……………………………………………………………………………..…………./

       Approval and permitting progress……………………………………………………………….……………………

    0

     

    Document submittal………………………………….

    ………………………………………………………….………….0

     

    Engineering and Submittal……………………..…………………………………..

    …………………….……………..0

     

    Design Progress…………………………………………………………………..

    …………………………….……………..0

    • Designanagement……………………………………………………………………………………………..0

    • Surveys and siteinvestigation………………………………………………………………………………..0

    • !eotechnical andmonitoring…………………………………………………………………………………0

    • Hydraulic analysis andmodeling……………………………………………………………………………0

    • Preliminarydesign………………………………………………………………………………………………..0

    • DetailDesign…………………………………………………………………………………………………………0

    • "ther categories asnecessary……………………………………………………………………………….0

      Procurement …………….……….0

  • 8/19/2019 Lis 02 Monthly Report 4 Nov 2015 (Draft)

    4/37

      Monthly Report No. 01 (NOV, 2015)-

    +. C*AN"# LO"................................................................................................./

    . RI R#"IT#R............................................................................................../

    . $#TAIL O' INP#CTION 3 APPROVAL TO PROC##$ IT*ORP#RONN#L,#UIPM#NT 3 MAT#RIAL..................................................../!

    10. P#RONN#L-PLANN#$ V. ACTUAL................................................................./5

    11. #UIPM#NT-PLANN#$ V. ACTUAL................................................................................................/+

    12. C*AN"# OR A$$ITION TO CONTRACTOR UP#RVIOR& P#RONN#L.........../

    1. IN'ORMATION R#UIR#$ & T*# AUT*ORIT&................................................../

    1.1 U CONTRACTOR #RVIC#.............................................................................................../

    1.2 C*#$UL# O' INURANC# AN$ INURANC# CLAIM.........................................................../

    1. R#U#T 'OR IN'ORMATION TATU..................................................................................+0

    1.! UMITTAL UMMAR& AN$ TATU...................................................................................+0

    1.5 IT# INTRUCTION UMMAR& AN$ TATU.........................................................................+1

    1./ IN'ORMATION R#"AR$IN" AN& VARIATION........................................................................+1

    1.+ $#'##CT UMMAR& TATU...........................................................................+2

    1!. #AT*#R R#COR$ ................................................................................................ +

    15. 'INANC# ................................................................................................................ +5

    15.1 'ORCAT VALU# PLANN#$ V OR$ON# ........................................................................... +/

    15.2 MONT*L& PA&M#NT $#TAIL AN$ 'OR#CAT.......................................................................+/ 

    1/. PRO"R# P*OTO"RAP* ...................................................................................... ++

  • 8/19/2019 Lis 02 Monthly Report 4 Nov 2015 (Draft)

    5/37

      Monthly Report No. 01 (NOV, 2015)-

    Contract No: C!"!/"

    Project Na#e: De$%&n an' Con$tr(ct%on o) Latera* Interce+tor Se,er$-Contract LIS.0"

    C*%ent:

    En&%neer:

    S(+er%$%on Con$(*tant: -TO BE ADISED

    2(a*%t Contro* En&%neer:

    Ma%n Contractor:

    Co##ence#ent Date: 4t  OCTOBER "015

    Contract Per%o': 1167 'a$

  • 8/19/2019 Lis 02 Monthly Report 4 Nov 2015 (Draft)

    6/37

      Monthly Report No. 01 (NOV, 2015)-

     This repr! "#ers !he peri$ %e!&ee'  T * O"!%er 20+, ! !h * N#e%er 20+,'$ i#es ' #er#ie& * !he "!i#i!ies *r !he *r!h"i' '!hs.

     The "rre'! "1!i#e prress * !he pre"! is 0.7 4. The "rre'! !!1 '-hrs (&i!h LTI) s ! 2+0! '-hrs '$ 2+0! (LTI *ree).

    1.1. #%#CUTIV# UMMAR&Health Safety and Environment

    Occupation health and safety plan is being prepared and will be submitted to the Engineer upon

    review by the internal PMO.

    QBC have started the process of registering with CEEQU! "nternational and #$$ 

    Approval and permitting progress

     After completion of CEMP and Preliminary traffic management plan, approval and

    permitting progress will start. These submittal preparations are in progress. 

    Document submittal

    Submission of resumes to the Engineer Client for Mobili!ing "ey personnel as per

    schedule C, Clause #.$, table %&' is under process

      Engineering and submittals

    (ased on the discussion during at the pre scheduling meeting held on ')th *ctober

    $+' the draft baseline program has been submitted for review and approval from theEngineer Client.

      Design

    Design Management

    Preparation of -esign management plan is in progress

    Surveys and site investigation

     Additional Site investigation wors has been designed and is under internal review

    Geotechnical and monitoring

    /othing to report on the progress

  • 8/19/2019 Lis 02 Monthly Report 4 Nov 2015 (Draft)

    7/37

      Monthly Report No. 01 (NOV, 2015)-

     

    pdated !aseline Program "Draft baseline#$not approved%&

    'D (!SL

    Proe6t

    $7r8t9o

    n

    Or9:9n8l

    $7r8t9

    on

    6he;7le4

    Co

  • 8/19/2019 Lis 02 Monthly Report 4 Nov 2015 (Draft)

    8/37

      Monthly Report No. 01 (NOV, 2015)-

    "P2&8 94 Time&(aseline variance is #' days

    "P2& '++4 1eporting

    "P2&; '++4 Construction 0uality&/C1&Construction wors not started

    "P2&7 /A Payment Status&/ot started

    "P2&) '++4 %ateway Status

    "P2&9 /A Change

    "P2&'+ ' 1is

      Earned ,alue Analysis

    I

    $

    #ARN#$ VALU#

    ANAL&I

    'ORMULA PR#VIOU

    MONT*

    T*I MONT* CUMULATIV#

    + 9$e! !

    Cp1e!i' (9AC) +!,!,/

    +./2

    2 Er'e$ :1e (E:)

    0 ,++2,115.0

    ,++2,115.0

  • 8/19/2019 Lis 02 Monthly Report 4 Nov 2015 (Draft)

    9/37

  • 8/19/2019 Lis 02 Monthly Report 4 Nov 2015 (Draft)

    10/37

      Monthly Report No. 01 (NOV, 2015)-

     

    Procurement

    Submission of materials will commence

    Construction

    /othing to report on the progress

      Other categories as necessary

      !onds and 'nsurances

    Bond and "nsurances have been submitted to the Engineer.  *ey Personnel

    Mobili!ing ey personnel will be continued upon receiving no&ob?ection from the Engineer.

      Engineer-s +e.uirementsEngineer6s and Contractor6s site *ffice location and designs are under preparation

    -C1MS documentation software has been chosen and will be implemented

  • 8/19/2019 Lis 02 Monthly Report 4 Nov 2015 (Draft)

    11/37

      Monthly Report No. 01 (NOV, 2015)-

    1.. UP$AT#$ A#LIN# PRO"RAM ($RA'T A#LIN#-?NOT APPROV#$@)

    Re*er ! !he e'"1se$ !!"he'!s

    C727/2DESIGN AND CONSTRUCTION OF LATERAL INTERCEPTOR SEWERS (CONTRACT LIS-02)

  • 8/19/2019 Lis 02 Monthly Report 4 Nov 2015 (Draft)

    12/37

      Monthly Report No. 01 (NOV, 2015)-

    1.!. N#%T MONT* (0-$A&) LOO A*#A$ OR PRO"RAM ($RA'T A#LIN#-?NOTAPPROV#$@)

      Re*er ! !he e'"1se$ !!"he'!s

    C727/2DESIGN AND CONSTRUCTION OF LATERAL INTERCEPTOR SEWERS (CONTRACT LIS-02)

  • 8/19/2019 Lis 02 Monthly Report 4 Nov 2015 (Draft)

    13/37

      Monthly Report No. 01 (NOV, 2015)-

    1.5. T*R## MONT* ROLLIN" PRO"RAM ($RA'T A#LIN#-?NOT APPROV#$@)

      Re*er ! !he e'"1se$ !!"he'!s

    C727/2DESIGN AND CONSTRUCTION OF LATERAL INTERCEPTOR SEWERS (CONTRACT LIS-02)

  • 8/19/2019 Lis 02 Monthly Report 4 Nov 2015 (Draft)

    14/37

      Monthly Report No. 01 (NOV, 2015)-

    1./. MONT*L& PRO"R# -CURV# AN$ PI M#AUR#M#NT ($RA'T A#LIN#-?NOTAPPROV#$@)

      Re*er ! !he e'"1se$ !!"he'!s

    C727/2DESIGN AND CONSTRUCTION OF LATERAL INTERCEPTOR SEWERS (CONTRACT LIS-02)

  • 8/19/2019 Lis 02 Monthly Report 4 Nov 2015 (Draft)

    15/37

      Monthly Report No. 01 (NOV, 2015)-

    1.+. #ARN#$ VALU# ANAL&I

    I'"rpr!e$ i' +.+ E;e"!i#e sr<

    1.. UR"#NT AN$ CRITICAL IT#M

    %ey Personal pproval

    1.. *I"*LI"*T 'ROM T*# R#PORTIN" MONT*

    Pre"! hs "e'"e$ '$ =9C hs s%i!!e$ re>isi!e %'$s '$

    i'sr'"es.

    ?%i1i@!i' * e< pers'1 is i' prress

    Dr*! %se1i'e prr hs %ee' s%i!!e$

    Desi' &rs hs "e'"e$

  • 8/19/2019 Lis 02 Monthly Report 4 Nov 2015 (Draft)

    16/37

      Monthly Report No. 01 (NOV, 2015)-

    2. *#ALT* AN$ A'#T& P#R'ORMANC# R#PORTIN"

    MONT*L& *#ALT* AN$ A'#T& R#PORT

    "#N#RAL IN'ORMATION

    R#PORT $#PARTM#NT

    ?'!h N%er 0-NO:-20+, Depr!e'! =SE

    Pre"! ?'!h 0+ SE ?ANAGER Ser! A$e'i@

    ?'!h S!r! -OCT-20+, S*e!< A$i'is!r!r

    ?'!h E'$ -NO:-20+,

    Repr! D!e ,-NO:-20+,

    INCI$#NT

    INCI$#NT OV#RVI#

    In69;ent UP TO LATP#RIO$

    T*I P#RIO$ TOTAL

    C C TOT

    AL

    C C TOTA

    L

    C C TOT

    ALF!1i!< 0 0 0 0 0 0 0 0 0

    Ls! !ie i'r< 0 0 0 0 0 0 0 0 0

  • 8/19/2019 Lis 02 Monthly Report 4 Nov 2015 (Draft)

    17/37

      Monthly Report No. 01 (NOV, 2015)-

    @r$/'eriss (N?)

    0 0 0 0 0 0 0 0 0

    INCI$#NT UMMAR& 

    7

  • 8/19/2019 Lis 02 Monthly Report 4 Nov 2015 (Draft)

    18/37

      Monthly Report No. 01 (NOV, 2015)-

    3 INFORMATION RE9ARDIN9 AN DESI9N C;AN9ES -NOT;IN9 TO REPORT FOR T;E MONT;

    I$ $#I"N C*AN"#

    UMMAR& 

    $#I"N

    INTRUCTION NO.

    $AT#

    IU#$

    UMII

    ON O'AM#N$#N

    T $#IN"

    R#'.NO

    $AT# O'

    UMIION O'

    AM#N$M#

    NT $#I"N

    R#VIION

    NUM#R

    APPROVAL $AT#

    & T*##N"IN##R

    !. LIT O' #UIPM#NT MOILI#$ ON IT# -NOT;IN9 TO REPORT FOR T;E MONT;

    I$ #UIPM#NT #UIPM#NT

    R#'#R#NC#

    NUM#R

    $AT# O'

    ARRIVAL

    ON IT#

    CON$ITION A'#T&  

    CL#ARANC#

    C727/2DESIGN AND CONSTRUCTION OF LATERAL INTERCEPTOR SEWERS (CONTRACT LIS-02)

  • 8/19/2019 Lis 02 Monthly Report 4 Nov 2015 (Draft)

    19/37

      Monthly Report No. 01 (NOV, 2015)-

    5. TATU O' MAT#RIAL $#LIV#RI# -NOT;IN9 TO REPORT FOR T;E MONT;

    /. TATU O' T#TIN" AN$ R#ULT -NOT;IN9 TO REPORT FOR T;E MONT;

    I$ UMITTAL

    R#'#R#NC# NUM#R

    R#U#T

    UMIION

    $AT#

    T&P# O'

    T#T

    P#R'ORM#

    $

    LOCATION T#T

    P#R'ORM#$

    $AT#

    TATU

    +. C*AN"# LO" -NOT;IN9 TO REPORT FOR T;E MONT;

    C727/2DESIGN AND CONSTRUCTION OF LATERAL INTERCEPTOR SEWERS (CONTRACT LIS-02)

    I$ MAT#RIAL

    $#CRIPTION

    UMITTAL

    R#'#R#NC#NUM#R

    R#V. R' $AT# ARRIVAL $AT#

    C*#$UL#$ ACTUAL C*#$UL#

    $

    ACTUAL

  • 8/19/2019 Lis 02 Monthly Report 4 Nov 2015 (Draft)

    20/37

      Monthly Report No. 01 (NOV, 2015)-

    I$ C*AN"# LO" UMMAR& C*AN"# LO" INTRUCTION NO. $AT#

    IU#$

    C*AN"# OR$#R VALU#

    8 RI R#"IT#R -NOT;IN9 TO REPORT FOR T;E MONT;

    RI 

    NO.RI CONC#RN

    PRO#CT C*#$UL# #%P#CT#$ $URATION(MONT*)

    RI MITI"ATION

    PLAN

    LI#LI*OO$

    IMPACT

    RI L#V#

    L

    LO MOTLI#L& 

    *I"*

    C727/2DESIGN AND CONSTRUCTION OF LATERAL INTERCEPTOR SEWERS (CONTRACT LIS-02)

  • 8/19/2019 Lis 02 Monthly Report 4 Nov 2015 (Draft)

    21/37

      Monthly Report No. 01 (NOV, 2015)-

    I$ R'I RAI#$ $AT# R'I $#TAIL INP#CTION AN$

    APPROVAL O'

    OR

    CLOIN" OUT

    R'I

    R#MAR

    . $#TAIL O' INP#CTION AN$ APPROVAL TO PROC##$ IT* ORP#RONN#L,#UIPM#NT AN$ MAT#RIAL -NOT;IN9 TO REPORT FOR T;E MONT;

    10. P#RONN#L B PLANN#$ V. ACTUAL

    C727/2DESIGN AND CONSTRUCTION OF LATERAL INTERCEPTOR SEWERS (CONTRACT LIS-02)

  • 8/19/2019 Lis 02 Monthly Report 4 Nov 2015 (Draft)

    22/37

      Monthly Report No. 01 (NOV, 2015)-

    MANPO#R

    M

    1

    M

    2

    M

    M

    !

    M

    5

    M

    /

    M

    +

    M

    M

    M

    10

    M

    11

    M

    12

    M

    1

    M

    1!

    M

    15

    M

    1/

    M

    1+

    M

    1

    M

    1

    M

    20

    L8o7r

    PLANN#$0 0 7 + + 23 7 ,+ 40 7 63 7

    +++

    ++6

    +2,

    +30

    +,6

    +,6

    +,6

    +,6

    AC*I#V#$ 

    D9lle; PLANN#$0 0 + 2 2 3 4 6 ++ +2 + +, +4 +7 +6 23 23 23 23

    AC*I#V#$ 

    Oper8tor3 $r9Eer>

    PLANN#$0 0 0 ++ +, +6 27 36 , ,4 43 7 6, + 4

    +37

    +37

    +37

    +37

    AC*I#V#$ 

    C8rpenter

    PLANN#$0 0 + + 2 2 , 4 6 6 +0 ++ +2 +2 +3 +7 + + +

    AC*I#V#$ 

    M8>on PLANN#$0 0 + + + + 2 3 3 , , 4 4 7 7

    AC*I#V#$ 

    teelFGer PLANN#$0 0 + 3 3 ++ +3 +, +7 20 22 2 2, 24 3 3 3 3

    AC*I#V#$ 

    PLANN#$ TOTAL 'OR

    T*# MONT* 0 0

    1

    1

    2

    !

    2

    5

    1

    5

    11

    /

    1

    /

    1/

    1

    22

    0

    25

    0

    2/

    +

    2

    2

    2

    +

    0

    0

    0AC*I#V#$ 'OR T*#MONT* 0

    C727/2DESIGN AND CONSTRUCTION OF LATERAL INTERCEPTOR SEWERS (CONTRACT LIS-02)

  • 8/19/2019 Lis 02 Monthly Report 4 Nov 2015 (Draft)

    23/37

      Monthly Report No. 01 (NOV, 2015)-

    MANPO#RM21

    M22

    M2

    M2!

    M25

    M2/

    M2+

    M2

    M2

    M0

    M1

    M2

    M

    M!

    M5

    M/

    M+

    M

    M

    L8o7r

    PLANN#$ +,

    6

    +,

    6

    +,

    6

    +,

    6

    +,

    6

    +,

    6

    +,

    6

    +,

    6

    +,

    6

    +,

    6

    +,

    6

    +,

    6

    +,

    6

    +2

    +

    +0

    2 7 ,2 27 +6AC*I#V#$

     D9lle; PLANN#$

    23 23 23 23 23 23 23 23 23 23 23 23 23 +4 + ++ 6 , 3AC*I#V#$

     Oper8tor3 $r9Eer>

    PLANN#$ +37

    +37

    +37

    +37

    +37

    +37

    +37

    +37

    +37

    +37

    +37

    +37

    +37 3 76 ,4 3 + 6

    AC*I#V#$ 

    C8rpenter PLANN#$+ + + + + + + + + + + + + +2 +0 +0 +0 +0 4

    AC*I#V#$  M8>on PLANN#$

    4 , , , , ,AC*I#V#$

     teelFGer PLANN#$

    3 3 3 3 3 3 3 3 3 3 3 3 3 2 2+ 2+ 2+ 2+ 2+AC*I#V#$

     

    PLANN#$ TOTAL 'ORT*# MONT*

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    2+2

    20

    1++

    15

    + /1

    AC*I#V#$ 'OR T*#MONT*

    C727/2DESIGN AND CONSTRUCTION OF LATERAL INTERCEPTOR SEWERS (CONTRACT LIS-02)

  • 8/19/2019 Lis 02 Monthly Report 4 Nov 2015 (Draft)

    24/37

      Monthly Report No. 01 (NOV, 2015)-

    11 E2UIPMENT < PLANNED S ACTUAL

    MAOR-MAC*IN#R& M1

    M2

    M

    M!

    M5

    M/

    M+

    M

    M

    M10

    M11

    M12

    M1

    M1!

    M15

    M1/

    M1+

    M1

    M1

    M20

    #%CAVATOR-20 3 0 T

    PLANN#$ 0 0 0 0 + + 2 4 4 6 6 +2AC*I#V#$  

    #%CAVATOR-! T

    PLANN#$ 0 0 0 0 0 0 0 6 +2 +4 +6 2+ 2+ 2+ 26 26 26 26 32AC*I#V

    #$  #CANT PIL#MAC*IN#

    PLANN#$ 0 0 0 0 0 0 0 + 2 2 2 2 2 2 2 2 2 2 2 2AC*I#V#$  

    $IAP*RA"MALLMAC*IN#

    PLANN#$ 0 0 0 0 0 0 0 0 0 0 0 0 + 2 2 2 2 2 2 2AC*I#V#$  

    VM PLANN#$ 0 0 0 0 0 0 0 0 0 0 0 + + + + + + + + +AC*I#V#$  

    MTM PLANN#$ 0 0 0 0 0 0 0 0 0 0 + 3 3 3 , , , ,AC*I#V#$  

    PLANN#$ TOTAL 'ORT*# MONT* 0 0 0 0 1 1 2

    11

    1/

    22

    2+

    +

    !/

    !+

    !+

    !+

    5!

    AC*I#V#$ 'OR T*# 0

    C727/2DESIGN AND CONSTRUCTION OF LATERAL INTERCEPTOR SEWERS (CONTRACT LIS-02)

  • 8/19/2019 Lis 02 Monthly Report 4 Nov 2015 (Draft)

    25/37

      Monthly Report No. 01 (NOV, 2015)-

    MONT*

    MAOR-MAC*IN#R& 

    M21

    M22

    M2

    M2!

    M25

    M2/

    M2+

    M2

    M2

    M0

    M1

    M2

    M

    M!

    M5

    M/

    M+

    M

    M

    #%CAVATOR-20 3 0 T

    PLANN#$ +2 +2 +2 +2 +2 +2 +2 +2 +2 +2 +2 +2 +2 +2 +2 +2 +2 4 0AC*I#V#$  

    #%CAVATOR-! T

    PLANN

    #$ 32 32 32 32 32 32 32 32 32 32 26 2 +6 +2 0 0 0 0 0AC*I#V#$  

    #CANT PIL#MAC*IN#

    PLANN#$ 2 2 2 2 2 2 + + 0 0 0 0 0 0 0 0 0 0 0AC*I#V#$  

    $IAP*RA"MALLMAC*IN#

    PLANN#$ 2 2 2 2 2 2 2 2 + + 0 0 0 0 0 0 0 0 0AC*I#V  

    C727/2DESIGN AND CONSTRUCTION OF LATERAL INTERCEPTOR SEWERS (CONTRACT LIS-02)

  • 8/19/2019 Lis 02 Monthly Report 4 Nov 2015 (Draft)

    26/37

  • 8/19/2019 Lis 02 Monthly Report 4 Nov 2015 (Draft)

    27/37

      Monthly Report No. 01 (NOV, 2015)-

    12. C*AN"# OR A$$ITION TO CONTRACTOR UP#RVIOR&P#RONN#L

    I$ NAM# POITION TART

    $AT#

    #N$

    $AT#

    R#PLAC#$

    + D#i$ W r'e I'!eri Pre"!Dire"!r

    -OCT-+,

    1. IN'ORMATION R#UIR#$ & T*# AUT*ORIT&1.1 U CONTRACT #RVIC#

    I$ COMPAN& NAM# OR AN$

    #RVIC#

    R#N$#R#$

    AAR$ $AT# CONTRACT

    CLO# $AT#

    + COWI Desi' Wrs -OCT-20+,

  • 8/19/2019 Lis 02 Monthly Report 4 Nov 2015 (Draft)

    28/37

      Monthly Report No. 01 (NOV, 2015)-

    1. R#U#T 'OR IN'ORMATION TATU

    -NOT;IN9 TO REPORT FOR T;E MONT;

    I$ $#CRIPTION R#U#TIN"

    $#PARTM#NT

    $AT#

    R#U#T#$

    $AT#

    R#UIR#$

    #N"IN##RH

    R#PON#

    R'I TATU

    134 UMITTAL UMMAR& AN$ TATU

    I$ C UMITTAL

    R#'#R#NC#

    NUM#R

    UMITTAL R#V. CONTRACTUA

    L A# LIN#

    UMIION

    $AT#

    C

    UMIIO

    N $AT#

    C#

    ACC#PT

    #$

    $AT#

    #N"IN##

    RH

    #%P#CT#

    $ R#PL& 

    $AT#

    #N"IN##

    RH

    R#PLI#$

    $AT#

    UMITTAL

    TATU

    ) *raft Baseline program '&+ ,-&Oct&,+) ,/&Oct&,+) 0

    , "$+ )-++)Compliant 1)&Oct&,+) ,&0ov&,+) 0

    C727/2DESIGN AND CONSTRUCTION OF LATERAL INTERCEPTOR SEWERS (CONTRACT LIS-02)

  • 8/19/2019 Lis 02 Monthly Report 4 Nov 2015 (Draft)

    29/37

      Monthly Report No. 01 (NOV, 2015)-

    1.5 IT# INTRUCTION UMMAR& AN$ TATU (NOT;IN9 TO REPORT FOR T;E MONT;

    I$ INTRUCTION UMMAR& IT# INTRUCTION

    NO.

    $AT# IU#$ INTRUCTION

    TATU

    C R#PON#

    1./ IN'ORMATION R#"AR$IN" AN& VARIATION (NOT;IN9 TO REPORT FOR T;E MONT;

    I$ VARIATION UMMAR& VARIATION

    OR$#R

    INTRUCTION

    NO.

    $AT#

    IU#$

    VARIATION OR$#R

    IU#$ $AT#

    VARIATION

    OR$#R VALU#

    R#MAR

    C727/2DESIGN AND CONSTRUCTION OF LATERAL INTERCEPTOR SEWERS (CONTRACT LIS-02)

  • 8/19/2019 Lis 02 Monthly Report 4 Nov 2015 (Draft)

    30/37

      Monthly Report No. 01 (NOV, 2015)-

    1.+ $#'#CT UMMAR& TATU (NOT;IN9 TO REPORT FOR T;E MONT;

    I$ NC

    R

    NO.

    NCR

    T&P#

    $#PARTM#NT $#CRIPTION O'

    NONCOMPLIANC#

    ACTION

    TA#N

    PROPO#

    $ $AT#

    ACTUAL $AT# TATU O'

    NC

    (OP#N

    CLO#$)

    C727/2DESIGN AND CONSTRUCTION OF LATERAL INTERCEPTOR SEWERS (CONTRACT LIS-02)

  • 8/19/2019 Lis 02 Monthly Report 4 Nov 2015 (Draft)

    31/37

      Monthly Report No. 01 (NOV, 2015)-

    14 #AT*#R R#COR$

    15

    1/ $AT# 1+ $A & 

    1 #AT*#R

    1 T#MP#RATUR#

    20 (C#LIU)

    21 PR#CIPITATION

    2/ TART 2+ #N$

    2 !-OCT-

    2015

    2 1 0 UNN& 1 !1 2 NA NA

    ! 5-OCT-2015

    5 2 / UNN& + NA NA

    !0 /-OCT-

    2015

    !1 !2 UNN& ! !! NA !5 NA

    !/ +-OCT-

    2015

    !+ ! ! UNN& ! !1 50 NA 51 NA

    52 -OCT-2015

    5 5 5! UNN& 55 !1 5/ NA 5+ NA

    5 -OCT-

    2015

    5 / /0 UNN& /1 !2 /2 NA / NA

    /! 10-OCT-

    2015

    /5 + // UNN& /+ / NA / NA

    +0 11-OCT-2015

    +1 +2 UNN& + +! NA +5 NA

    +/ 12-OCT- ++ + UNN& + + 0 NA 1 NA

  • 8/19/2019 Lis 02 Monthly Report 4 Nov 2015 (Draft)

    32/37

      Monthly Report No. 01 (NOV, 2015)-

    11 1-

    OCT-2015

    111/

    120 UNN & 

    121 + 122 NA 12 NA

    12! 20-

    OCT-2015

    1251+

    12/ UNN & 

    12+ / 12 NA 12 NA

    10 21-

    OCT-2015

    111

    12 UNN & 

    1 ! 1! NA 15 NA

    1/ 22-

    OCT-2015

    1+1

    1 UNN & 

    1 ! 1!0 NA 1!1 NA

    1!2 2-

    OCT-2015

    1!20

    1!! UNN & 

    1!5 5 1!/ NA 1!+ NA

    1! 2!-

    OCT-2015

    1!21

    150 UNN & 

    151 5 152 NA 15 NA

    15! 25-

    OCT-2015

    15522

    15/ UNN & 

    15+ ! 15 NA 15 NA

    1/0 2/-

    OCT-2015

    1/12

    1/2 UNN & 

    1/ 1/! NA 1/5 NA

    1// 2+-

    OCT-2015

    1/+2!

    1/ UNN & 

    1/ ! 1+0 NA 1+1 NA

    1+2 2-

    OCT-2015

    1+25

    1+! UNN & 

    1+5 1+/ NA 1++ NA

    1+ 2-

    OCT-2015

    1+2/

    10 UNN & 

    11 5 12 NA 1 NA

    1! 0 15 1/ UNN 1+ ! 1 NA 1 NA

  • 8/19/2019 Lis 02 Monthly Report 4 Nov 2015 (Draft)

    33/37

      Monthly Report No. 01 (NOV, 2015)-""6

    ,,2

    ,,3

  • 8/19/2019 Lis 02 Monthly Report 4 Nov 2015 (Draft)

    34/37

      Monthly Report No. 01 (NOV, 2015)-

    22 'INANC#

    20"301 FORCAST ALUE.PLANNED S =OR> DONE

    "31

    "3"2

    2!

    25

    2/

    2+MONT*

    2

    2

    2!0

    2!1

    2!2CONTRACTVALU#

    2!

    2!!T*I P#RIO$

    2!5

    2!/CUMULATIV# UP TO $AT#

    2!+

    250

    251PLANN#$OR VALU#

    252

    25

    25!ACTUAL

    ORVALU#

    255

    25/

    25+P#R'ORMANC#IN$#%

    25

    25

    2/0PLANN#$OR VALU#

    2/1

    2/2

    2/ACTUALORVALU#

    2/!

    2/5

    2//P#R'ORMANC#IN$#%

    2/+"68

    "67 1"!0

    2+1 +!,!,/

    +./2

    "!"

    "!3

    "!4 !,51,/.5

    "!5

    2+/ ,+

    +2,11

    5.0

    "!!

    "!8

    2+ 0.+

    "80

    "81 !,51,/.5

    "8"

    2 ,++

    2,115.

    0

    "84

    "85

    2/ 0

    .+

    "8! "88 "87 "70 "71 "7" "73 "74

    "75 "76 "7! "78 "77 300 301 30"

    303 304 305 306 30! 308 307 310

    311 31" 313 314 315 316 31! 318

    317 3"0 3"1 3"" 3"3 3"4 3"5 3"6

    3"! 3"8 3"7 330 331 33" 333 334

    335336

    C727/2DESIGN AND CONSTRUCTION OF LATERAL INTERCEPTOR SEWERS (CONTRACT LIS-02)

  • 8/19/2019 Lis 02 Monthly Report 4 Nov 2015 (Draft)

    35/37

      Monthly Report No. 01 (NOV, 2015)-33!338337340341

    34"34"1 MONT;L PAMENT DETAILS AND FORCAST

    343344

    !5

    !/

    !+

    !

    !I$

    50

    51

    52

    5

    5!CONTRACTVALU#

    55

    5/LAT MONT* 5+T*I P#RIO$

    5

    5CUMULATIV#

    /0

    /ACTUALVALU#

    /!CLAMI#$

    /5PA&M#NT

    C#RTI'I#$

    //ACTUALVALU#

    /+CLAMI#$

    /PA&M#NTC#RTI'I#

    $

    /ACTUALVALU#

    +0CLAMI#$

    +1PA&M#NT

    C#RTI'I#$

    3!"3!33!4 1

    +5

    +/ +!,!,/

    +./2

    3!! 3!8 3!7 380 381 38"

    383 384 385 386 38! 388 387 370

    371 37" 373 374 375 376 37! 378

    377 400 401 40" 403 404 405 406

    40! 408 407 410 411 41" 413 414

    415 416 41! 418 417 4"0 4"1 4""

    4"34"44"54"6

    C727/2DESIGN AND CONSTRUCTION OF LATERAL INTERCEPTOR SEWERS (CONTRACT LIS-02)

  • 8/19/2019 Lis 02 Monthly Report 4 Nov 2015 (Draft)

    36/37

      Monthly Report No. 01 (NOV, 2015)-4"!4"84"7

    !0

    !1 PRO"R# P*OTO"RAP*

    !2

    !

    !!

    C727/2DESIGN AND CONSTRUCTION OF LATERAL INTERCEPTOR SEWERS (CONTRACT LIS-02)