locally preferred alternative - city of fort collins · 21 slide service modifications alternative...

32
Locally Preferred Alternative

Upload: others

Post on 26-Sep-2019

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Locally Preferred Alternative - City of Fort Collins · 21 slide service modifications Alternative Roadway Infrastructure Transit Infrastructure on Harmony Transit Service on Harmony

Locally Preferred Alternative

Page 2: Locally Preferred Alternative - City of Fort Collins · 21 slide service modifications Alternative Roadway Infrastructure Transit Infrastructure on Harmony Transit Service on Harmony

2 slide

PRESENTAT IO N

Study Overview

Existing Conditions

A proposed Locally Preferred Alternative

(The details)

Page 3: Locally Preferred Alternative - City of Fort Collins · 21 slide service modifications Alternative Roadway Infrastructure Transit Infrastructure on Harmony Transit Service on Harmony

3 slide

PURPOSE STATEMENT

The purpose of the project is to

implement multi-modal transportation

improvements that enhance mobility and

safety along the Harmony Road Corridor.

Improvements will support local and

regional travel needs, land uses,

economic health and environmental

stewardship goals.

Page 4: Locally Preferred Alternative - City of Fort Collins · 21 slide service modifications Alternative Roadway Infrastructure Transit Infrastructure on Harmony Transit Service on Harmony

4 slide

Tier 1 Alternatives

Tier 1 Screening

Tier 2 Alternatives

Broad Range of Ideas

Fatal Flaw Analysis

Most Promising

VisionPhasing

CostTriple Bottom Line

Tier 2 Screening

Refinement

Locally Preferred Alternative

PublicBoards / Commissions

City Council

Page 5: Locally Preferred Alternative - City of Fort Collins · 21 slide service modifications Alternative Roadway Infrastructure Transit Infrastructure on Harmony Transit Service on Harmony

5 slide

1950 1960 1970 1980 1990 2000 2010

Farm Road

I-25 Built

Becomes State Hwy

Harmony Road transferred to City

HP Builds Facility

Harmony Corridor Plan

Harmony Bicycle Plan

6-lanes to Boardwalk

Harmony Road History H I S TO RY

Page 6: Locally Preferred Alternative - City of Fort Collins · 21 slide service modifications Alternative Roadway Infrastructure Transit Infrastructure on Harmony Transit Service on Harmony

Taft

Hill

Rd

Shie

lds

St

Co

llege

Ave

Lem

ay A

ve

Tim

be

rlin

e R

d

Zie

gle

r R

d

Harmony Rd

$3,100,000 2012 $8,000,000 2009 $2,200,000 2010

$5,500,000 2011 $6,000,000 2008 $60,000 2010

Page 7: Locally Preferred Alternative - City of Fort Collins · 21 slide service modifications Alternative Roadway Infrastructure Transit Infrastructure on Harmony Transit Service on Harmony

7 slide

Source: NFRMPO Travel Demand Model, as modified for Fort Collins Transportation Master Plan

Page 8: Locally Preferred Alternative - City of Fort Collins · 21 slide service modifications Alternative Roadway Infrastructure Transit Infrastructure on Harmony Transit Service on Harmony

8 slide

Source: NFRMPO Travel Demand Model, as modified for Fort Collins Transportation Master Plan

Page 9: Locally Preferred Alternative - City of Fort Collins · 21 slide service modifications Alternative Roadway Infrastructure Transit Infrastructure on Harmony Transit Service on Harmony

9 slide

Page 10: Locally Preferred Alternative - City of Fort Collins · 21 slide service modifications Alternative Roadway Infrastructure Transit Infrastructure on Harmony Transit Service on Harmony

10 slide

Page 11: Locally Preferred Alternative - City of Fort Collins · 21 slide service modifications Alternative Roadway Infrastructure Transit Infrastructure on Harmony Transit Service on Harmony

11 slide

Route 1 about 300 on and offs

Route 16 & 17 over 300 on and offs combined

Page 12: Locally Preferred Alternative - City of Fort Collins · 21 slide service modifications Alternative Roadway Infrastructure Transit Infrastructure on Harmony Transit Service on Harmony

12 slide

Existing Bus Stop

Page 13: Locally Preferred Alternative - City of Fort Collins · 21 slide service modifications Alternative Roadway Infrastructure Transit Infrastructure on Harmony Transit Service on Harmony

13 slide

Existing Bus Stop

Page 14: Locally Preferred Alternative - City of Fort Collins · 21 slide service modifications Alternative Roadway Infrastructure Transit Infrastructure on Harmony Transit Service on Harmony

14 slide

Walking Conditions

Page 15: Locally Preferred Alternative - City of Fort Collins · 21 slide service modifications Alternative Roadway Infrastructure Transit Infrastructure on Harmony Transit Service on Harmony

15 slide

Walking Conditions on Harmony Road

Page 16: Locally Preferred Alternative - City of Fort Collins · 21 slide service modifications Alternative Roadway Infrastructure Transit Infrastructure on Harmony Transit Service on Harmony

16 slide

Page 17: Locally Preferred Alternative - City of Fort Collins · 21 slide service modifications Alternative Roadway Infrastructure Transit Infrastructure on Harmony Transit Service on Harmony

17 slide

Page 18: Locally Preferred Alternative - City of Fort Collins · 21 slide service modifications Alternative Roadway Infrastructure Transit Infrastructure on Harmony Transit Service on Harmony

18 slide

Page 19: Locally Preferred Alternative - City of Fort Collins · 21 slide service modifications Alternative Roadway Infrastructure Transit Infrastructure on Harmony Transit Service on Harmony

19 slide

Page 20: Locally Preferred Alternative - City of Fort Collins · 21 slide service modifications Alternative Roadway Infrastructure Transit Infrastructure on Harmony Transit Service on Harmony

20 slide

Proposed Locally Preferred Alternative

Roadway & Intersection Improvements

Transit Service

Bicycle Facilities

Pedestrian Facilities

Page 21: Locally Preferred Alternative - City of Fort Collins · 21 slide service modifications Alternative Roadway Infrastructure Transit Infrastructure on Harmony Transit Service on Harmony

21 slide

Alternative Roadway

Infrastructure

Transit

Infrastructure

on Harmony

Transit

Service

on Harmony

Bicycle and

Pedestrian

Accommodation

No Action Existing Existing • Committed FY14 Transfort

service modifications Existing

Transportation

System Management

(TSM)

• Widen Harmony

(Boardwalk to College)

to 6 Lanes

• Intersection

improvements

Existing

• Expanded Local Bus service

(Phase 1 of TSOP) FRCC to

HTC Options:

• Bike lanes +

detached sidewalks

• Buffered bike lanes +

detached sidewalks

• Cycle tracks + detached

sidewalks

• Shared use paths

Enhanced Bus Same as TSM

• Queue jumps

at major

intersections

• Enhanced bus service

(FRCC to HTC)

• Increased frequency

End to End BRT/HOV Same as TSM

• Outside lanes for

bus/HOV (one in

each direction)

• BRT service (FRCC to HTC)

• Increased frequency

Interlined BRT/HOV Same as TSM

• Outside lanes for

bus/HOV (one in

each direction)

• BRT service interlined with

Mason corridor

• Increased frequency

Page 22: Locally Preferred Alternative - City of Fort Collins · 21 slide service modifications Alternative Roadway Infrastructure Transit Infrastructure on Harmony Transit Service on Harmony

22 slide

Widen College to 6 lanes

Widen Timberline to 6 lanes

Improve intersections with turn lanes

Widen Harmony to 6 lanes

Page 23: Locally Preferred Alternative - City of Fort Collins · 21 slide service modifications Alternative Roadway Infrastructure Transit Infrastructure on Harmony Transit Service on Harmony

23 slide

Harmony Rd.

Tim

berl

ine

Lem

ay

College

Shie

lds

Zie

gle

r

Horsetooth

Board

walk

Lady M

oon

South Transit Center

Harmony Transfer Center

Harmony Route Runs every 20 minutes

Page 24: Locally Preferred Alternative - City of Fort Collins · 21 slide service modifications Alternative Roadway Infrastructure Transit Infrastructure on Harmony Transit Service on Harmony

24 slide

Page 25: Locally Preferred Alternative - City of Fort Collins · 21 slide service modifications Alternative Roadway Infrastructure Transit Infrastructure on Harmony Transit Service on Harmony

25 slide

Page 26: Locally Preferred Alternative - City of Fort Collins · 21 slide service modifications Alternative Roadway Infrastructure Transit Infrastructure on Harmony Transit Service on Harmony

26 slide

Page 27: Locally Preferred Alternative - City of Fort Collins · 21 slide service modifications Alternative Roadway Infrastructure Transit Infrastructure on Harmony Transit Service on Harmony

27 slide

Seattle San Francisco

Page 28: Locally Preferred Alternative - City of Fort Collins · 21 slide service modifications Alternative Roadway Infrastructure Transit Infrastructure on Harmony Transit Service on Harmony

28 slide

Harmony Rd.

Tim

berl

ine

Lem

ay

College

Shie

lds

Zie

gle

r

Horsetooth

Board

walk

Lady M

oon

Pedestrian and bicycle Under or overpasses

Maso

n T

rail

Pow

er

Tra

il

Page 29: Locally Preferred Alternative - City of Fort Collins · 21 slide service modifications Alternative Roadway Infrastructure Transit Infrastructure on Harmony Transit Service on Harmony

29 slide

Page 30: Locally Preferred Alternative - City of Fort Collins · 21 slide service modifications Alternative Roadway Infrastructure Transit Infrastructure on Harmony Transit Service on Harmony

30 slide

Proposed Locally Preferred Alternative

Widen Harmony (Boardwalk to College) to 6 Lanes &

Intersection improvements

Enhanced bus service with queue jumps at major

intersections, increased frequency with improved

bus plazas

Fill in missing sidewalks, pursue over or

underpasses and improve crossings at signalized

intersections

Buffered bike lanes with green marking, along with

detached multi-use paths

Bus

Bike

Walk

Road

Page 31: Locally Preferred Alternative - City of Fort Collins · 21 slide service modifications Alternative Roadway Infrastructure Transit Infrastructure on Harmony Transit Service on Harmony

31 slide

Next Steps

Conduct final public outreach

Develop conceptual cost estimates

Develop implementation plan

(phasing and funding)

Complete ETC Master Plan report

City Council this Summer for Adoption

Page 32: Locally Preferred Alternative - City of Fort Collins · 21 slide service modifications Alternative Roadway Infrastructure Transit Infrastructure on Harmony Transit Service on Harmony

32 slide

For More Information

Project Website:

fcgov.com/harmony

Contact: Aaron Iverson

[email protected]

or

970-416-2643