Blue Sheet No. 20070579-UTL Lee County Board Of County Commissioners Agenda Item Summary 1. ACTION REQUESTED/PURPOSE: Developer Contributed Asset: Approve final acceptance, as a donation of a water main extension, and twelve 6” diameter fire lines, to provide potable water service and fire protection to Magnolia Landing Entry Road, a phased residential development. This is a Developer contributed asset and the project is located on the west side of U S . 41 North approximately ?4 mile south of the Lee/Charlotte county line. 2. FUNDING SOURCE: No funds required. 3. WHAT ACTION ACCOMPLISHES: Provides adequate utility infrastructure to support development of the subject property and complies with the Lee County Utilities Operations Manual. 4. MANAGEMENT RECOMMENDATION: Approval. Commissioner Administrative Admin. Code 10. Background: The Board granted permission to construct on 06-20-06, Blue Sheet #20060625. The installation has been inspected for conformance to the Lee County Utilities Operations Manual. Satisfactory pressure and bacteriological testing has been completed. Record drawings have been received. Engineer’s Certification of Completion has been provided-copy attached. Project Location Map-copy attached. Warranty has been provided-copy attached. Waiver of Lien has been provided-copy attached. Certification of Contributed Assets has been provided-copy attached. 100% of the connection fees have been paid. Sanitary sewer service will be provided by North Fort Myers Utilities. No funds required. SECTION 04 TOWNSHIP 43s RANGE 24E DISTRICT # 4 COMMISSIONERHALL 11 11. Review for Scheduling.: County Director Budget Services Manager1P.M Analyst Risk Grants Mgr. S:\ENGR\W P\BLUE SHEETS-ENGMAGNOLIA LANDING ENTRY ROAD - WM FL - FA - MMM - 20070579.DOC

Upload: others

Post on 21-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Magnolia Landing Entry Road, - Lee County Southwest Florida Agendas/2007/05-01-07/Cons… · Magnolia Landing Entry Road to be free fiom defects in material and workmanship for a

Blue Sheet No. 20070579-UTL Lee County Board Of County Commissioners Agenda Item Summary

1. ACTION REQUESTED/PURPOSE: Developer Contributed Asset: Approve final acceptance, as a donation of a water main extension, and twelve 6” diameter fire lines, to provide potable water service and fire protection to Magnolia Landing Entry Road, a phased residential development. This is a Developer contributed asset and the project is located on the west side of US. 41 North approximately ?4 mile south of the Lee/Charlotte county line. 2. FUNDING SOURCE: No funds required. 3. WHAT ACTION ACCOMPLISHES: Provides adequate utility infrastructure to support development of the subject property and complies with the Lee County Utilities Operations Manual. 4. MANAGEMENT RECOMMENDATION: Approval.

Commissioner Administrative

Admin. Code

10. Background: The Board granted permission to construct on 06-20-06, Blue Sheet #20060625. The installation has been inspected for conformance to the Lee County Utilities Operations Manual. Satisfactory pressure and bacteriological testing has been completed. Record drawings have been received. Engineer’s Certification of Completion has been provided-copy attached. Project Location Map-copy attached. Warranty has been provided-copy attached. Waiver of Lien has been provided-copy attached. Certification of Contributed Assets has been provided-copy attached. 100% of the connection fees have been paid. Sanitary sewer service will be provided by North Fort Myers Utilities. No funds required.

SECTION 04 TOWNSHIP 43s RANGE 24E DISTRICT # 4 COMMISSIONERHALL

11 11. Review for Scheduling.: County

Director Budget Services Manager1P.M

Analyst Risk Grants Mgr.

S:\ENGR\W P\BLUE SHEETS-ENGMAGNOLIA LANDING ENTRY ROAD - WM FL - FA - MMM - 20070579.DOC

Page 2: Magnolia Landing Entry Road, - Lee County Southwest Florida Agendas/2007/05-01-07/Cons… · Magnolia Landing Entry Road to be free fiom defects in material and workmanship for a

RESOLUTION NO.

RESOLUTION ESTABLISHING U T I L I T Y ACCEPTANCE OF DEVELOPER CONTRIBUTED ASSETS

I N LEE COUNTY, FLORIDA

WHEREAS, i t i s t h e d e s i r e o f “TAYLOR WOODROW COMMUNITIES AT HERONS GLEN, LLCR, owner o f record, t o make a c o n t r i b u t i o n t o Lee County U t i l i t i e s o f water f a c i l i t i e s water main extension and twelve six inch diameter fire lines), s e r v i ng “MA 6 NOLIA LANDING ENTRY ROAD”; and,

WHEREAS, Lee County U t i l i t i e s requ i res p roo f o f a Release o f L ien , a Warranty (one-year) on a l l l a b o r and ma te r ia l s , an accurate va lue o f c o n t r i b u t e d assets , and r igh t -o f -way and/or easement-i ndemni t y granted f o r a l l systems being con t r i bu ted t o Lee County U t i l i t i e s ; and,

WHEREAS, a l l o f t h e above in fo rma t ion has been received and approved as complete by Lee County U t i l i t i e s ; and,

WHEREAS, Lee County U t i l i t i e s has recommended t o t h e Board o f County Commissioners t h a t t h e above-named system be accepted f o r ownership, o p e r a t i on, and mai ntenance.

NOW, THEREFORE, BE I T RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS OF LEE COUNTY, FLORIDA, t h a t t h e above f a c i l i t i e s , f o r a c o n t r i b u t e d va lue o f $309,299.64 i s hereby ACCEPTED and acknowledged as an a d d i t i o n t o Lee County U t i 1 i ti es .

THE FOREGOING RESOLUTION was o f f e r e d by Commissioner who moved f o r i t s adopt ion. The motion was seconded by Commissioner

and, upon being p u t t o a vo te , t h e v o t e was as f o l l o w s :

Commi s s i oner Bob Janes :

Commi s s i oner B r i an B i ge l ow:

Commissioner Ray Judah:

Commi s s i oner Tammara Hal 1 :

Cornmi s s i oner Frank Mann:

(3)

(4)

(5)

DULY PASSED AND ADOPTED t h i s day o f , 2007.

ATTEST : CHARLIE GREEN, CLERK

By: DEPUTY CLERK

BOARD OF COUNTY COMMISSIONERS OF LEE COUNTY, FLORIDA

By: CHAIR

APPROVED AS TO FORM

OFFICE OF COUNTY AITORNEY BS 20070579 - UTL

S:\ENGR\W P\BLUE SHEETS-ENG\O-RESOLUTION-DEV CONTRIB ASSET, W 0NLY.DOC

Page 3: Magnolia Landing Entry Road, - Lee County Southwest Florida Agendas/2007/05-01-07/Cons… · Magnolia Landing Entry Road to be free fiom defects in material and workmanship for a

LETTER OF COMPLETION

DATE: January 24,2007

Department of Lee County Utilities Division of Engineering Post Office Box 398 Fort Myers, FL 33902

Gentlemen:

This is to certify that the water distribution and fire line up to and including 1st OS + Y valve(s)

Magnolia Landing Entry Road DOS2005-00352 (Name of DevelopmentProject)

located in

was designed by me and has been constructed in conformance with:

the approved plans and the approved specifications

Upon completion of the work, we observed the following successful tests of the facilities:

Bacteriologicai Test and Pressure Test(s) - Water Main

Very truly yours,

Johnson Engineering, Inc.

S L E E COrJNI'Y (Fonns - Lettw ofCornpletion - Revised 2004) L O l l l l l r L l T , I " * l " A

(Seal of Engineering Firm)

L\20050000\20055665 - Magnolia Landing - Entrance Improvements - Tw\LCU TURNOVERktter of Completion - foim.doc

Page 4: Magnolia Landing Entry Road, - Lee County Southwest Florida Agendas/2007/05-01-07/Cons… · Magnolia Landing Entry Road to be free fiom defects in material and workmanship for a

MAGNOLIA LANDING ENTRY ROAD 04-43-24-00-00003.1000 & 04-43-24-00-00003.1020

ION DIS TRICT # 4 - TAMMY HALL \ A \ I

S l l

LEE COUNTY COMMISSION DISTRICTS 1. ROBERT JANES 2. BRIAN BIGELOW 3. RAY JUDAH 4. TAMMY HALL 5. F R A N K U N

COMMISSION DISTRICT BOUNDARIES DECEMBER 2000

Page 5: Magnolia Landing Entry Road, - Lee County Southwest Florida Agendas/2007/05-01-07/Cons… · Magnolia Landing Entry Road to be free fiom defects in material and workmanship for a

11.2

THE UNDERSIGNED parties

contractor on the water system of

W A R R A N T Y

do hereby warrant andor guaranty dl work executed by the

Magnolia Landing Entry Road to be free fiom defects in

material and workmanship for a period of one (1) year From the date of acceptance by the Lee

County Board of County Commissioners. The undersigned parties further agree that they will, at

their own expense, repair and replace all such defective work and all other work damaged by said

defective work under this Warranty-Guaranty

It is furthermore understood that the consideration for the giving of this warranty andlor

guaranty is the requirement by the General Conditions and Specifications under which the contract

was let that such warranty and/or guaranty would be given.

Mitchell & Stark Const. Co., Inc. (Contractor/Cornpany Name)

Dennis Short, Project M W r

BY:

STATEOF FL ) ) ss:

COUNTY OF Collier )

The foregoing instrument was s,gned and acknowledged before me this 10 th day of Januw, 20 - 07 by Dennis Short who is personally known to me - , and who did not take an oath.

Printed Name of Notary Public (Notary Seal & Commission Number)

%LEE COUNTY , O , . , , , \\ I \T b I ,I R I II h

(Forms - Warranty - Revised 04/2003)

Water Warrdnly - .doc

Page 6: Magnolia Landing Entry Road, - Lee County Southwest Florida Agendas/2007/05-01-07/Cons… · Magnolia Landing Entry Road to be free fiom defects in material and workmanship for a

WAIVER AND RELEASE OF LIEN UPON FINAL PAYMENT

The undersigned lienor, in consideration of the final payment in the amount of

Three hundred nine thousand two hundred ninety nine dollars and sixty four cents ($309,299.64 1 hereby waivers and releases its lien and right to claim a lien for labor, services, or materials hrnished to

Tavlor Woodrow Communities at Herons Glen on the job of Mamolia Landing Entry Road to the

following described property:

Water Distribution Svstem Mafznolia Landing Entrv Road (Name of DevelopmeiitProject)

Mamolia Landinp Lane and US. 4 1. North Fort Mvers (Location)

Rv: L.D. Neal (Print Name of Authorized Representative)

Title: Proiect Manager

Phone #: (239)597-2165 Ext.23

(Facilities Constructed)

04-43-24-00-00003.1000 and 04-43-24-00-00003.1020 (Strap # or Section, Township & Range)

Mitchell & Stark Construction Co, Inc. (Name of Firm or Corporation)

6100 Shirlev Street (Address of Firm or Corporation)

Naples, FL 34109- (City, State & Zip Of Firm Or Corporation)

Fax#: (239)566-7865

STATEOF FL 1 ) ss:

COUNTY OF Collier )

The foregoing instrument was signed and acknowledged before me this 5th day of -Apri1,2007 by L.D. Neal, Proiect Manager who is personally known to me - , and who did not take an oath.

I\OTM:' PUBLIC. S T A E OF FLORU).h Belinda Burgbacher Commission # DD625455 Expires: JAN. 22,2011

~ O ~ T I E D l'i!RC' rTTL:ISTIC BOSDBG CO., INC.

Belinda Burpbacher (Printed Name of Notary Public) (Notary Seal & Commission Number)

,c,t T , , ( I I I T P I " Y I I 1 ,

(Forms - Waiver of Lien - Revised Januarv 2004)

Page 7: Magnolia Landing Entry Road, - Lee County Southwest Florida Agendas/2007/05-01-07/Cons… · Magnolia Landing Entry Road to be free fiom defects in material and workmanship for a

11.5

SINGLE WATER SERVICE/COMPLETE WATER MAIN SfNGLE WATER SERVICWCOMPLETE WATER MAIN

CERTIFICATION OF CONTRIBUTORY ASSETS

1 ” 3 .O EA $1,205.00 $3,615.00 2“ 1 .o EA $1,630.00 16 1,630.00

PROJECT NAME: Marmolia Landing: Entrv Road

TOTAL

STRAP NUMBER: 04-43-24-00-00003.1000 and 04-43-24-00-00003.1020

LOCATION Magnolia Landing Lane and US 41, Nor& Fort Myers

$309,299.64

OWNER’S NAME: (as shown on Deed) TAYLOR WOODROW COMMUNITTES AT HERON GLEN LLC

OWNER’S ADDRESS: 8430 ENTERPRJSE CIRCLE STE 100 -~

3WNER’S ADDRESS: BRADENTON, FL 34202-

3WNER’S TELEPHONE #: (941) 554-2000

TYPE UTILITY SYSTEM: Potable Water (Please provide separate ‘Certifications’ for potable water, sanitary sewer and ef€luent reuse facilities.)

DESCRIPTION AND COST OF MATERIAL, LABOR, AND SERVICES Please list each element of the system from the drop-down list provided.

$LEE COUNTY \n , ., A t < 7 I oxrll Contractor’s Ccrtification of Contributory Assets - Form (Julv2006)

J:WOI - Jobs Current\dlObl828 Maginola Landing Entry RoadUliscelianeousLevised water CERTIFICATION OF CONTRIBUTORY ASSETS TAB THRU FORM (2) 040507.doc

Page 8: Magnolia Landing Entry Road, - Lee County Southwest Florida Agendas/2007/05-01-07/Cons… · Magnolia Landing Entry Road to be free fiom defects in material and workmanship for a

11.5

I do hereby certify that the quantities of material and services described above are a true and accurate representation of the as-installed cost of the system being contributed to Lee County and corresponds with the record drawings.

L.D. Neal, Project Manager (Name & Title of Certifying Agent)

Mitchell & Stark Construction Company, Inc. (Name of Firm or Corporation)

6100 Shirlev Street (Address of Firm or Corporation)

Naples, FL 34109 -

STATEOF FL ) ) ss:

COUNTY OF Collier 1

The foregoing instrument was signed and acknowledged before me this a day of April, 20m by Neal, Proiect Manager who is personally known to me - , and who did not take an oath.

L.D.

XOTARY PL%LIC -STATE OF FLORIDA Belinda Burgbacher

2 Commission # DD620455 Expires: JAN. 22,2011

BONDED THau h T m c ImMQ co,, mc, Belinda Burnbacher Printed Name of Notary Public

Notary Commission Number (NOTARY SEAL,)

%LEE COUNTY S O L I

J:WOI- Jobs CumtWO61828 Maginola Landing Entry Road\Miscellaneous\revised water CERTIFICATION OF CONTRIBUTORY ASSETS - TAB THRU FORM (2) 040507.doc