manoa school gt program 2012-1013

10
MANOA SCHOOL GT PROGRAM 2012-1013 Mrs. Chung & Mr. Leong

Upload: mai

Post on 06-Feb-2016

44 views

Category:

Documents


0 download

DESCRIPTION

Manoa School GT Program 2012-1013. Mrs. Chung & Mr. Leong. Teacher Bios. Mrs. Chung Curriculum Coordinator 4 th grade teacher 5 th grade teacher. Mr. Leong Technology Teacher BS Civil Engineering AS Information Technology. The GT Program. Integrated with all content areas - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Manoa  School GT Program 2012-1013

MANOA SCHOOL GT PROGRAM 2012-1013

Mrs. Chung & Mr. Leong

Page 2: Manoa  School GT Program 2012-1013

Teacher Bios

Mrs. Chung Curriculum

Coordinator 4th grade teacher 5th grade teacher

Mr. Leong Technology

Teacher BS Civil

Engineering AS Information

Technology

Page 3: Manoa  School GT Program 2012-1013

The GT Program

Integrated with all content areas Co-taught 2 class sessions per week for 1hour 45

minutes Grades 3/4 Schedule

Fri. 10:45-11:45, Mon. 10:00-10:45 Grades 4/5 Schedule

Tues. 8:45-9:45, Thurs. 9:00-9:45 Project based

Page 4: Manoa  School GT Program 2012-1013

What is Project-Based Learning?

a systematic teaching method that engages students in learning essential knowledge and life-enhancing skills through an extended, student-influenced inquiry process structured around complex, authentic questions and carefully designed products and tasks.

Page 5: Manoa  School GT Program 2012-1013

Marshmallow Challenge

Create the tallest free standing structure with the following materials:

20 raw spaghetti noodles 1 yard of tape 1 yard of string 1 marshmallow

The marshmallow has to be at the top of the structure

Page 6: Manoa  School GT Program 2012-1013

This Year’s Projects

Vermicomposting Waste management, student citizenship,

math & science

Page 7: Manoa  School GT Program 2012-1013

This Year’s Projects (cont.)

Yearbook Writing & reporting, photography,

layout/editing, schedules & deadlines, sales/advertising

Toy Design Design/Build, writing & reporting, Proposal

Challenge/Problems Project

Page 8: Manoa  School GT Program 2012-1013

Student Expectations

Comes to class prepared Produces work that demonstrates their

level of potential Displays a positive attitude Is able to stay current with GT and

homeroom assignments and projects Maintains acceptable grades in all

classes Consistently demonstrates GLOs

Page 9: Manoa  School GT Program 2012-1013

Exit Policy

1st offence Verbal warning from teacher

2nd offence Student meeting with both teachers Parent notification

3rd offence Meeting with parents and student 3 week probation

Dismissal from program Exit meeting (parent, student, teachers and

administrator)

Page 10: Manoa  School GT Program 2012-1013

GT Webpage

manoaschool.com