Home Power Workshop
![Page 2: March9 2009-workshop-slides](https://reader034.vdocuments.net/reader034/viewer/2022051400/55c8e848bb61eb5c648b4642/html5/thumbnails/2.jpg)
Agenda
6:30 Introduction/Purpose…………………5 min……...Alan Gibson6:35 Energy Design ……………………...15min…..….Jeremy Neven6:55 Solar Photovoltaic…………….…….40min……...Joshua Pearce
Break……..…………15 min……
7:45 Wind………….…………….………40 min……..Jason Wamboldt8:25 Closing……………………………..5 min ………....Alan Gibson8:30 Networking………………………..30 min
![Page 3: March9 2009-workshop-slides](https://reader034.vdocuments.net/reader034/viewer/2022051400/55c8e848bb61eb5c648b4642/html5/thumbnails/3.jpg)
Workshop Purpose
To provide more indepth knowledge of solar photovoltaic and wind renewable clean technologies and the process to implement that will support participant home power project actions To provide points of contact and resource assistance to participants post workshop
![Page 4: March9 2009-workshop-slides](https://reader034.vdocuments.net/reader034/viewer/2022051400/55c8e848bb61eb5c648b4642/html5/thumbnails/4.jpg)
Technical HOW TO Workshops -Outline-
Follow -
up HOW TO workshops focused on :
Home Heating : March 5 from 6:30-8:30 at SLC – Rm 01040
Home Power : March 9 at SLC from 6:30-8:30 in Rm 01000
Biomass and Conservation : March 10 from 6:30- 8:30 in Rm 01040
You will be able to :decide which system(s) is best for your purposes
compare costs and understand more on grants
evaluate whether you want to do it yourself or
Interact one on one with qualified contractors and how to proceed with your project
![Page 5: March9 2009-workshop-slides](https://reader034.vdocuments.net/reader034/viewer/2022051400/55c8e848bb61eb5c648b4642/html5/thumbnails/5.jpg)
Energy Efficient Design
![Page 6: March9 2009-workshop-slides](https://reader034.vdocuments.net/reader034/viewer/2022051400/55c8e848bb61eb5c648b4642/html5/thumbnails/6.jpg)
![Page 7: March9 2009-workshop-slides](https://reader034.vdocuments.net/reader034/viewer/2022051400/55c8e848bb61eb5c648b4642/html5/thumbnails/7.jpg)
Energy Performance - Codes
![Page 8: March9 2009-workshop-slides](https://reader034.vdocuments.net/reader034/viewer/2022051400/55c8e848bb61eb5c648b4642/html5/thumbnails/8.jpg)
“R” Values – (RSI)
![Page 9: March9 2009-workshop-slides](https://reader034.vdocuments.net/reader034/viewer/2022051400/55c8e848bb61eb5c648b4642/html5/thumbnails/9.jpg)
Thermal Bridging
•“R”
value of a 2”x6”
= 6.87
•“R”
value of a 2”x4”
= 4.3
•Lumber accounts for approx 25% of a wall
![Page 10: March9 2009-workshop-slides](https://reader034.vdocuments.net/reader034/viewer/2022051400/55c8e848bb61eb5c648b4642/html5/thumbnails/10.jpg)
Truss Design
![Page 11: March9 2009-workshop-slides](https://reader034.vdocuments.net/reader034/viewer/2022051400/55c8e848bb61eb5c648b4642/html5/thumbnails/11.jpg)
Air Tightness
![Page 12: March9 2009-workshop-slides](https://reader034.vdocuments.net/reader034/viewer/2022051400/55c8e848bb61eb5c648b4642/html5/thumbnails/12.jpg)
Lighting
![Page 13: March9 2009-workshop-slides](https://reader034.vdocuments.net/reader034/viewer/2022051400/55c8e848bb61eb5c648b4642/html5/thumbnails/13.jpg)
Wiring
•Heavier gauge wires have less “Line Loss”
•Shortest distance traveled will have less “Line Loss”
•Minimized circuit loads will reduce “Line Loss”
![Page 14: March9 2009-workshop-slides](https://reader034.vdocuments.net/reader034/viewer/2022051400/55c8e848bb61eb5c648b4642/html5/thumbnails/14.jpg)
Water Conservation
•“Power Pipe”
•Composting Toilets
•Low Flush Toilets
•Grey Water re-use
•Rain Water Capture
•Pumps
![Page 15: March9 2009-workshop-slides](https://reader034.vdocuments.net/reader034/viewer/2022051400/55c8e848bb61eb5c648b4642/html5/thumbnails/15.jpg)
HVAC
ECM Motors
Electrically Commutated Motor
![Page 16: March9 2009-workshop-slides](https://reader034.vdocuments.net/reader034/viewer/2022051400/55c8e848bb61eb5c648b4642/html5/thumbnails/16.jpg)
HVAC
![Page 17: March9 2009-workshop-slides](https://reader034.vdocuments.net/reader034/viewer/2022051400/55c8e848bb61eb5c648b4642/html5/thumbnails/17.jpg)
Energy Efficiency
•Site•Structure•Envelope
•Mechanical•Electrical
•Use
![Page 18: March9 2009-workshop-slides](https://reader034.vdocuments.net/reader034/viewer/2022051400/55c8e848bb61eb5c648b4642/html5/thumbnails/18.jpg)
SOLAR PHOTOVOLTAIC WORKSHOP
![Page 19: March9 2009-workshop-slides](https://reader034.vdocuments.net/reader034/viewer/2022051400/55c8e848bb61eb5c648b4642/html5/thumbnails/19.jpg)
Workshop outline
Introduction
Technology (available systems)
Installation Issues
Getting Your Project Done
Case Study
Cost Calculations & Financial Projections
Questions and Follow-up
![Page 20: March9 2009-workshop-slides](https://reader034.vdocuments.net/reader034/viewer/2022051400/55c8e848bb61eb5c648b4642/html5/thumbnails/20.jpg)
Commonly known as “solar cells.”Photovoltaic (PV) systems convert light energy into electricity. The simplest systems power the small calculators we use every day. More complicated systems will provide a large portion of the electricity in the near future.PV represents one of the most promising means of maintaining our energy intensive standard of living while not contributing to global warming and pollution.
What are Photovoltaics?
![Page 21: March9 2009-workshop-slides](https://reader034.vdocuments.net/reader034/viewer/2022051400/55c8e848bb61eb5c648b4642/html5/thumbnails/21.jpg)
PV Solar System
SolarPV
Arrays
DC Voltage
AC Voltage
Inverter
Solar PowerTo the Grid
Main Utility Breaker Panel
Utility Meter
![Page 22: March9 2009-workshop-slides](https://reader034.vdocuments.net/reader034/viewer/2022051400/55c8e848bb61eb5c648b4642/html5/thumbnails/22.jpg)
Solar PV Materials: Crystalline & Polycrystalline Silicon
Advantages:•
High Efficiency (14-22%)
•
Established technology (The leader) •
Stable
Disadvantages:•
Expensive production
•
Low absorption coefficient•
Large amount of highly purified feedstock
![Page 23: March9 2009-workshop-slides](https://reader034.vdocuments.net/reader034/viewer/2022051400/55c8e848bb61eb5c648b4642/html5/thumbnails/23.jpg)
c-Si Manufacture
![Page 24: March9 2009-workshop-slides](https://reader034.vdocuments.net/reader034/viewer/2022051400/55c8e848bb61eb5c648b4642/html5/thumbnails/24.jpg)
CrystallineSilicon
Amorphous Silicon
![Page 25: March9 2009-workshop-slides](https://reader034.vdocuments.net/reader034/viewer/2022051400/55c8e848bb61eb5c648b4642/html5/thumbnails/25.jpg)
Amorphous SiliconAdvantages:
High absorption (don’t need a lot of material) Established technology Ease of integration into buildingsExcellent ecological balance sheetCheaper than the glass, metal, or plastic you deposit it on
DisadvantagesOnly moderate stabilized efficiency 7-10%
![Page 26: March9 2009-workshop-slides](https://reader034.vdocuments.net/reader034/viewer/2022051400/55c8e848bb61eb5c648b4642/html5/thumbnails/26.jpg)
Other thin film technologies
Cd-Te – inexpensive, CdCIGS – just starting mass productionGaAs – expensiveTiO2 dye sensitized**********************************************Many technologies all over 6% efficientEfficiency doesn't matter - $/W
![Page 27: March9 2009-workshop-slides](https://reader034.vdocuments.net/reader034/viewer/2022051400/55c8e848bb61eb5c648b4642/html5/thumbnails/27.jpg)
Installation Issues
Types of PV systems - aestheticsModeling - RETScreenBuilding Codes, Inspections
![Page 28: March9 2009-workshop-slides](https://reader034.vdocuments.net/reader034/viewer/2022051400/55c8e848bb61eb5c648b4642/html5/thumbnails/28.jpg)
Residential Rooftops
BIPV or Retrofit
![Page 29: March9 2009-workshop-slides](https://reader034.vdocuments.net/reader034/viewer/2022051400/55c8e848bb61eb5c648b4642/html5/thumbnails/29.jpg)
![Page 30: March9 2009-workshop-slides](https://reader034.vdocuments.net/reader034/viewer/2022051400/55c8e848bb61eb5c648b4642/html5/thumbnails/30.jpg)
Solar Shingles
![Page 31: March9 2009-workshop-slides](https://reader034.vdocuments.net/reader034/viewer/2022051400/55c8e848bb61eb5c648b4642/html5/thumbnails/31.jpg)
Paperwork
Leave it up to the installerComplete the application for SOC with the local utility as well as OPA. All the connections to an existing electric service without any scheduled service disconnect and reconnect
![Page 32: March9 2009-workshop-slides](https://reader034.vdocuments.net/reader034/viewer/2022051400/55c8e848bb61eb5c648b4642/html5/thumbnails/32.jpg)
Getting Your Project Done
Assessing Needs – 100% solar or fractionSpecification of Equipment - $/Wp or
$/kW-hrEngaging Contractors – multiple quotes• Acquiring Approvals• Project Planning
Follow-ups & Maintenance ~0
![Page 33: March9 2009-workshop-slides](https://reader034.vdocuments.net/reader034/viewer/2022051400/55c8e848bb61eb5c648b4642/html5/thumbnails/33.jpg)
Case Study
PV RequirementsAbout $10,000 per kW (or $10/W) South Facing RoofOntario Power Authority (OPA) StandardOffer Contract (SOC) – on-line applicationKingston Electricity Distribution Limited(KEDL) Connection Agreementwww.xantrex.com (Burnaby, BC)
![Page 34: March9 2009-workshop-slides](https://reader034.vdocuments.net/reader034/viewer/2022051400/55c8e848bb61eb5c648b4642/html5/thumbnails/34.jpg)
Home Power Plant
![Page 35: March9 2009-workshop-slides](https://reader034.vdocuments.net/reader034/viewer/2022051400/55c8e848bb61eb5c648b4642/html5/thumbnails/35.jpg)
PV – Inverter - Helpers
RJ (Rob) Kennedy ElectricQuantum Renewable Energy (Rick Rooney) Utilities Kingston•
Kingston Electricity Distribution Limited (KEDL)
•
Until Sept KEDL will rebate 50% of the connection costs up to $1,000. Talk to Steve Sottile.*
![Page 36: March9 2009-workshop-slides](https://reader034.vdocuments.net/reader034/viewer/2022051400/55c8e848bb61eb5c648b4642/html5/thumbnails/36.jpg)
Meters & Inverter
228 / 575 = 40%Earn 42 cents per kWh with SOCExpect between 1,600 to 1,700 kWh/yr
![Page 37: March9 2009-workshop-slides](https://reader034.vdocuments.net/reader034/viewer/2022051400/55c8e848bb61eb5c648b4642/html5/thumbnails/37.jpg)
Economics
@$10/Wp installed cost - payback is about 18-yearsShould not use payback time as decision making metric – use ROI and compare to cost of money Or opportunity cost of other investments –AFTER taxesNeed lifetime – 25 – 30 years
![Page 38: March9 2009-workshop-slides](https://reader034.vdocuments.net/reader034/viewer/2022051400/55c8e848bb61eb5c648b4642/html5/thumbnails/38.jpg)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 300
5
10
15
20
25
30
35
40
45
50
Calculating ROI from Payback time and lifetime
2.50%3.00%4.00%
Payback Time (P/S) [Years]
Life
tim
e (T
) [ Y
ears
]
![Page 39: March9 2009-workshop-slides](https://reader034.vdocuments.net/reader034/viewer/2022051400/55c8e848bb61eb5c648b4642/html5/thumbnails/39.jpg)
CONCLUDING REMARKS:
PV provides green electricity for the homeSimplest system uses grid for storage –two meters - $0.42/kW-hr feed inLong lifetime – 25+ year warrantyEconomic now, PV module prices dropping
![Page 40: March9 2009-workshop-slides](https://reader034.vdocuments.net/reader034/viewer/2022051400/55c8e848bb61eb5c648b4642/html5/thumbnails/40.jpg)
Solar Photovoltaics NOW!
![Page 41: March9 2009-workshop-slides](https://reader034.vdocuments.net/reader034/viewer/2022051400/55c8e848bb61eb5c648b4642/html5/thumbnails/41.jpg)
Small Wind Power
Jason Wamboldt B.Sc. (Eng), MESRenewable Energy of Plum Hollow
![Page 42: March9 2009-workshop-slides](https://reader034.vdocuments.net/reader034/viewer/2022051400/55c8e848bb61eb5c648b4642/html5/thumbnails/42.jpg)
Workshop outlineSmall wind for homeowners –
Technical Workshop
• Wind Availability• Choosing the right turbine• Using the power• Paybacks•
Are there noise, safety, maintenance or environmental concerns?
![Page 43: March9 2009-workshop-slides](https://reader034.vdocuments.net/reader034/viewer/2022051400/55c8e848bb61eb5c648b4642/html5/thumbnails/43.jpg)
Wind Availability
• Average annual wind speeds of > 4.0-4.5 m/s
(9-10.2mph)
• Great resource: www.windatlas.ca
![Page 44: March9 2009-workshop-slides](https://reader034.vdocuments.net/reader034/viewer/2022051400/55c8e848bb61eb5c648b4642/html5/thumbnails/44.jpg)
Wind Availability
![Page 45: March9 2009-workshop-slides](https://reader034.vdocuments.net/reader034/viewer/2022051400/55c8e848bb61eb5c648b4642/html5/thumbnails/45.jpg)
Wind Availability
![Page 46: March9 2009-workshop-slides](https://reader034.vdocuments.net/reader034/viewer/2022051400/55c8e848bb61eb5c648b4642/html5/thumbnails/46.jpg)
Wind Availability
![Page 47: March9 2009-workshop-slides](https://reader034.vdocuments.net/reader034/viewer/2022051400/55c8e848bb61eb5c648b4642/html5/thumbnails/47.jpg)
Wind Availability
![Page 48: March9 2009-workshop-slides](https://reader034.vdocuments.net/reader034/viewer/2022051400/55c8e848bb61eb5c648b4642/html5/thumbnails/48.jpg)
Wind AvailabilitySkystream 3.7
![Page 49: March9 2009-workshop-slides](https://reader034.vdocuments.net/reader034/viewer/2022051400/55c8e848bb61eb5c648b4642/html5/thumbnails/49.jpg)
Siting Issues•
Power is the cube of wind speed –
height matters!
•
Guy wires are roughly the same diameter as tower height.
![Page 50: March9 2009-workshop-slides](https://reader034.vdocuments.net/reader034/viewer/2022051400/55c8e848bb61eb5c648b4642/html5/thumbnails/50.jpg)
How to choose the right turbineRELIABILITY AND SAFETY ARE NUMBER 1RELIABILITY AND SAFETY ARE NUMBER 1
• Towers require proper structural engineering
• Electrical connections require safety inspections
• Maintain setback from home, building, and neighbours.
In a far distant second…
How much power do I need/want/use now?
• Average home uses 30 kWh of power per day.
• How much of this do you want to make.
• How much is reasonable for your wind resource?
![Page 51: March9 2009-workshop-slides](https://reader034.vdocuments.net/reader034/viewer/2022051400/55c8e848bb61eb5c648b4642/html5/thumbnails/51.jpg)
How to choose the right turbine• Find your anticipated annual wind speed.
• Convert this POWER (W) into ENERGY (kWh)
![Page 52: March9 2009-workshop-slides](https://reader034.vdocuments.net/reader034/viewer/2022051400/55c8e848bb61eb5c648b4642/html5/thumbnails/52.jpg)
Energy Output• Manufacturer estimated output: 300 kWh/month
• Wind atlas estimated: 325 kWh/mo. (3.91 MWh/y)
• Average Ontario consumption: 930 kWh/month
% of monthly loads met: 32-35%
July
Wind
Solar
Load
Jan Dec
![Page 53: March9 2009-workshop-slides](https://reader034.vdocuments.net/reader034/viewer/2022051400/55c8e848bb61eb5c648b4642/html5/thumbnails/53.jpg)
Using the Power1.
Net-metering: reduce your electricity bill by consuming your own wind-generated electricity.
2.
Standard Offer Contract: sell your wind-generated electricity to the grid for $0.11/kWh.
3.
Battery Backup: for later use in the event of grid failure or for off-grid applications.
![Page 54: March9 2009-workshop-slides](https://reader034.vdocuments.net/reader034/viewer/2022051400/55c8e848bb61eb5c648b4642/html5/thumbnails/54.jpg)
Net Metering
+ _
Charge Controller
Inverter
Battery Bank
+ _
+
_
Grid
Ground
DC AC
$0.11/kWh
![Page 55: March9 2009-workshop-slides](https://reader034.vdocuments.net/reader034/viewer/2022051400/55c8e848bb61eb5c648b4642/html5/thumbnails/55.jpg)
Standard Offer Contract
+ _
Charge Controller
Inverter
Battery Bank
+ _
+
_
Grid
DC AC
$0.11/kWh$0.11/kWh
Ground
![Page 56: March9 2009-workshop-slides](https://reader034.vdocuments.net/reader034/viewer/2022051400/55c8e848bb61eb5c648b4642/html5/thumbnails/56.jpg)
What are the costs and paybacks?
Equipment64%
Labour27%
Wiring and misc.9%
•
Average winds of 13 mph would generate 400 kWh/month or 44% of average Ontario home demand.
•
Equates to $528/y at current electricity pricing ($0.11/kWh).
Case-study:Skystream
2.4 kW, Cost: $16,576.77 + tax
![Page 57: March9 2009-workshop-slides](https://reader034.vdocuments.net/reader034/viewer/2022051400/55c8e848bb61eb5c648b4642/html5/thumbnails/57.jpg)
Maintenance and Warranty
•
Annual inspection of bolts, guy wires, and electrical connections.
• May require greasing of bearings.
•
Blades need to be visually inspected for cracks or stress signs.
•Warranties are typically 2-5 years.
![Page 58: March9 2009-workshop-slides](https://reader034.vdocuments.net/reader034/viewer/2022051400/55c8e848bb61eb5c648b4642/html5/thumbnails/58.jpg)
Safety, Environmental, and Noise Concerns
•
Wind turbines DO generate noise and vibrations (be a good neighbour)
•
Check with local zoning and building code requirements for safe installation of tower and foundation
•
Electrical permits must be taken and approved by the Electrical Safety Authority
•
All turbines have mechanisms to slow blades in high winds
![Page 59: March9 2009-workshop-slides](https://reader034.vdocuments.net/reader034/viewer/2022051400/55c8e848bb61eb5c648b4642/html5/thumbnails/59.jpg)
Conclusions
• Small wind turbines are less than 100 kW.
•
Need good site with clean, strong, consistent wind with buffers from buildings and neighbours.
•
Power can be used to offset electricity bills or store in batteries for later use.
•
Costs are significantly tied to equipment costs and expect long paybacks at current electricity prices.
• SAFETY IS PARAMOUNT.
![Page 60: March9 2009-workshop-slides](https://reader034.vdocuments.net/reader034/viewer/2022051400/55c8e848bb61eb5c648b4642/html5/thumbnails/60.jpg)
Closing
Purpose /products reviewFeedback forms pleaseFurther resource support requirementsOur support
![Page 61: March9 2009-workshop-slides](https://reader034.vdocuments.net/reader034/viewer/2022051400/55c8e848bb61eb5c648b4642/html5/thumbnails/61.jpg)
Brought to you by: