mark cruz portfolio

86
Portfolio Mark Cruz

Upload: mark-cruz

Post on 29-Mar-2016

227 views

Category:

Documents


6 download

DESCRIPTION

UCLA Graduate Portfolio

TRANSCRIPT

  • PortfolioMark Cruz

  • Acad

    emic

    Mark CruzM. Arch. 1640 Brooklyn Ave, Apt. 6Oakland, CA 94606415 689 [email protected]

  • Contents:Creative WorksAesthetically oriented, but mindful of fabrication logic, my aesthetic theory of design deals with the expressions of intelligent complexity using techniques of parametric and biomimicry. With a strong interest in the morphogenetic and biological, I have always been a geometrician and my explorations in scripting, parametrics, and 3-D modeling have shown me the power of computation in aesthetics. I seek to harness more processing power, but with a delicate human sensibility to scale. My work as an artist continues to change with each new technological leap.

    Academic Selected projects from studios and competitions executed at UCLA. In this intense three year program, our agendas of study were largely about exploring advanced geometry and expressions of the Architec-tural Avant Garde. Imagability and fabrication were the themes of most studios and I also pursued a parallel interest in Real Estate Devel-opment as well as participating as Lead Architect on the NAIOP Real Estate Challenge Team (1st Place). Additionally, I chose a course of research on themes in Infrastructure and Urbanism by taking a traveling studio in China and a research studio in Brazil.

    Solar DecathlonSelected photos and drawings from my experience as Design Team lead on the 2005 (1st Place) and as SR Designer on the 2007 University of Colorado Solar Decathlon Teams. This collegiate com-petition of 20 schools must successfully design, engineer, and build solar-powered homes and compete with them on the National Mall. Its an intense 18 month design/build debacle that empowers students to deal first hand with the broad range of AEC industries, and under the extreme constraints of stainability, buildability, and marketability. We had to not only design, build, and ship our houses across the country, but were tasked with educating thousands of people about the virtues of sustainable design once we arrived.

    ProfessionalI have 10 years of Construction Management, and Drafting/Design ex-perience. I have included here samples of design and PM work I have done on small residences, tenant interior (TI), and assorted commercial and modeling projects.

  • Creativ

    e Work

    s

  • 1000.0[kp/n]

    2000.0[kp/n]

    3000.0[kp/n]

    4000.0[kp/n]

    5000.0[kp/n]

    6000.0[kp/n]

    Topographic Characteristics

    There are three divisions to the body of the horseshoe crab: the prosoma , the opisthosoma, and the telson. These are sometimes referred to as the cephalothorax, the abdomen, and the tail. (You can mouse over the "Divisions of the Body" in the illustration for a closer look)

    The prosoma contains a sizeable intestinal tract with an esophagus and proventriculus (used to grind food), a nervous system concentrated into a bulbous brain, a tubular heart, excretory glands at the bases of the walking legs and connective tissue and cartilagenous plates.

    The opithosoma contains chiefly the musculature for the operation of the book gills and the telson, though the horseshoe's 113 distinct muscle groups (comprising over 750 individual muscles) are not limited to this section of the body.

    Of the six "pages" of the book gills, the first has an operculum with genital openings and the other five have small sensory branches and gill leaflets. (See appendages for more). There are three main regions on the underside of the horseshoe crab: the doublure , the vault, and the axial platform. (Mouse over the "Primary Regions" in the illustration.)

    The illustration shows the underside of the horseshoe with the appendages removed. The bases of the appendages attach to the axial platform, beginning at the top with the chelicerae, which the crab uses to place food in its mouth and ending with the book gills, which are five branchial "legs" used for propulsion when swimming and for "breathing".

    Viewing the horseshoe crab from the front, you can easily see the flare of the shell and the ridge of the midcardiac spine. Note that the view shown to the right is of the male limulus.

    When both males and females are present (during spawning), it is easy to tell the gender of the horseshoe because the females are significantly larger than their male counterparts. Based on studies done by Carl Shuster, the width of the prosoma on females ranges from 243-351 cm (with an average of 291 cm); the prosoma of the males averages 169 cm in width, but can range from 137 to 213 cm.

    A single horseshoe crab can still be sexed, however, by noting a few subtle differences. The axial area on a female is lower, with the underside of the crab barely visible from the front view. The flange on the female is also wider in front.

    FlangeHingeOgees

    VentradosIntradosPosterior SlopeBook GillsAxial Area Opicular AngleTail Spike Ventrical Aeorta

    VENTRAL MEMBRANE

    AMTERIOR MEMBRANE

    POSTERIOR SLOPE SHELL

    BOOK GILL

    BOOK GILL

    BOOK GILL

    BOOK GILL

    Mark CruzDIGITAL WORKSHOP

    LIMULUS POLYPHEMIS

    / 2008 UCLA Department of Architecture and Urban Design

    :AN EXERCISE IN INTERPOLATIVE MODELING OF A HORSESHOE CRAB

    Object Projections

    Plan

    Elevation

    Axonometric

    Analytical Technique < Contours

    Analytical Technique < Sectioning

    Analytical Technique < Kit of Parts

    Analytical Technique < Kit of Parts

    ectioning

    Kit of Parts

    TAIL SPIKE Book GillsAnteior Cavity

    Ostium Heart Midgut

    Posterior Heptic

    Duct

    Anteriror Heptic Duct

    Valve

    Anterior Aorta

    Proventriculus

    Esophaogus

    This is work from a digital workshop to learn advanced NURBS modeling techniques using Rhino. The hand drawing below was the template used to duplicate and model the horse show crab geometry.

    UCLA Digital WorkshopAug 2008Prof. Georgina Huljich

  • Creativ

    e Work

    s

    Continuity of theoretical and mate-rial surfaces, both actual and digital were themes of our surface explora-tions. The veneer wood lends itself well to multi-directional force-flows to achieve a static shape that involves the calibration through pattern mak-ing, and finally vacuum forming to a specific form. We were quickly introduced to many possibilities in shaping the wood to explicit angles and curves in order to achieve the final ergonomic shape of the Eames Splint. We learned of the Eames processes and developed our own knowledge of their techniques through a kind of reverse engineering of their pattern exercises, which often proved challenging when met with such conditions as splices, bends, blends, joins, and lateral adjust-ments. As we relied not only on the strength of accumulated laminations to hold such ergonomic shapes, we were naturally led to seek to control certain specific locations to a degree of substantiated localized resistanceand flexibility in the final form.

    Mathematically speaking, we were conscious of the topological meaning of these kinds of surface mathemat-ics, as we surveyed geometries taken from Topological Catastrophe Theory, yet the Mbius strip geom-etry emerged as a simple inspiration to frame the material problem at hand. In our attempts to avoid an obvious formal one-liner of a just a Mobius-Strip-Board, as a formal agenda in and of itself,.. we took a step back to study the relationship of the raw material behavior to the 3-D modeling exercises. This duality of digital simulation and form finding alongside material testing became an enlightening and successfulWorkflow for us, which expedited production problem solving through the original pattern-makingexercises and in concert with more increasingly ambitious envelope-pushing geometry.

    The WrinkleAs a result of our pattern refinement and development of our tactile vacuum forming skills, we were forced to reckon with issues of accumulation of veneer in ways that isolated the tension between material limits , surface rigidity and global shaping. We consider the wrinkle to be an emergent quality of the process that defines a indeterminate yet desirable effect.

    UCLA Technology Seminar:Manifold Destiny & The BendsWinter 2010 AUD_289.5Professor Jason PayneIn collaboration with Stephanie, Willsley, Ryan Wilson, and Renee Smith

  • Acad

    emic

  • This research explores a biomimetic supposition that serial propagation occurs sequentially and graduates to creat enclosure. This form was created from a simple L-Systems branch generator and sprouts form a single source code. Enclosure and affect were drivers for the form evalu-ation, and random vaurbles were intoduced to add heterogenity.

    Geometry Studies:Growing a StructureWinter 2006

  • Creativ

    e Work

    s

    Cumulative CoherenceFall 2009ARC_411 Professor Georgina Huljich

    Willy NillyPlywood veneer units or willy nillies, coalesce into a fervently arranged massing. The pieces themselves are symmetrical leaf shaped assemblies with rolled internal connection pieces. The fl exibility of the units are manually curled to vary in a range laterally free to fi nd its own way through the loose calibration of the material logic of the heated plywood veneer and the accumulation pattern.

    70

    70

    70

    70

    xytoxz

    110

    40

    150

    Side

    Plan y = SinX

    y = -SinX

    y=e x y=-e x y = SinX

    Spiral: a = x-.1

    y = SinX

    (x,y)

    !

    AQ1.32

    AQ1.31

    BW1.32

    BW1.31 BQ1.32

    BQ1.31AZ1.51

    AZ1.52

    AZ1.51

    AZ1.32

    AZ1.31AQ1.52

    AQ1.51

    AZ1.34

    AZ1.33

    AZ1.32

    AZ1.31

    AZ1.54

    AZ1.53

    AZ1.52

    AZ1.51

    AQ1.32

    AQ1.31

    BW1.12BW1.11

    BQ1.34

    BQ1.33

    BQ1.32

    BQ1.31

    BQ1.32

    BQ1.31

    BZ1.34

    BZ1.33

    BZ1.32

    BZ1.31

    BZ1.36

    BZ1.35

    BZ1.34

    BZ1.33

    BZ1.32

    BZ1.31

    AQ1.42AQ1.41

    AQ1.3224

    AQ1.3223

    AQ1.3222

    AQ1.3221

    BY1.38

    BY1.37

    BY1.36

    BY1.35

    BY1.34

    BY1.33

    BY1.32

    BY1.31

    BY1.92BY1.91

    BQ1.5222BQ1.5221

    BZ1.524

    BZ1.523

    BZ1.522

    BZ1.521

    BZ1.722BZ1.721

    BY1.74

    BY1.73

    BY1.72

    BY1.71

    BY1.56

    BY1.55

    BY1.54

    BY1.53

    BY1.52

    BY1.51

    AZ1.326

    AZ1.325

    AZ1.324

    AZ1.323

    AZ1.322

    AZ1.321

    AZ1.722

    AZ1.721

    AY1.92

    AY1.91

    AY1.74

    AY1.73

    AY1.72

    AY1.71

    AY1.516

    AY1.515AY1.37

    AY1.514

    AY1.513

    AY1.512

    AY1.51

    AY1.514

    AY1.38

    AY1.36

    AY1.35

    AY1.34

    AY1.33

    AY1.32

    AY1.31

    BX1.11

    BX1.10BX1.9

    BX1.8

    BX1.7

    BX1.5

    BX1.6

    BX1.4

    BX1.3

    BX1.2

    AX1.11

    AX1.10

    AX1.9

    AX1.8

    AX1.7

    AX1.6

    AX1.5

    AX1.4

    AX1.3

    AX1.2 AX1.1

    A

    B

    A

    Pitch up 20

    Pitch up 20

    BA

    BABA

    AZ1.32

    AZ1.31 AZ1.31

    AZ1.52

    AZ1.51 AZ1.51

    BZ1.31

    BZ1.32

    BZ1.31

    AQ1.3221

    BY1.38

    BY1.37

    BY1.36

    BY1.35

    BY1.34

    AZ1.323

    AZ1.322 AZ1.322

    AZ1.321 AZ1.321

    AZ1.721

    AY1.72 AY1.72

    AY1.71 AY1.71

    AY1.513 AY1.513

    AY1.512 AY1.512

    AY1.51 AY1.51

    AY1.514 AY1.514

    AY1.36

    AY1.35 AY1.35

    AY1.34 AY1.34

    AY1.33 AY1.33

    AY1.32

    AX1.9 AX1.9

    AX1.8 AX1.8

    AX1.7 AX1.7

    AX1.6 AX1.6

    AX1.5 AX1.5

  • 70

    70

    70

    70

    xytoxz

    110

    40

    150

    Side

    Plan y = SinX

    y = -SinX

    y=e x y=-e x y = SinX

    Spiral: a = x-.1

    y = SinX

    (x,y)

    !

    AQ1.32

    AQ1.31

    BW1.32

    BW1.31 BQ1.32

    BQ1.31AZ1.51

    AZ1.52

    AZ1.51

    AZ1.32

    AZ1.31AQ1.52

    AQ1.51

    AZ1.34

    AZ1.33

    AZ1.32

    AZ1.31

    AZ1.54

    AZ1.53

    AZ1.52

    AZ1.51

    AQ1.32

    AQ1.31

    BW1.12BW1.11

    BQ1.34

    BQ1.33

    BQ1.32

    BQ1.31

    BQ1.32

    BQ1.31

    BZ1.34

    BZ1.33

    BZ1.32

    BZ1.31

    BZ1.36

    BZ1.35

    BZ1.34

    BZ1.33

    BZ1.32

    BZ1.31

    AQ1.42AQ1.41

    AQ1.3224

    AQ1.3223

    AQ1.3222

    AQ1.3221

    BY1.38

    BY1.37

    BY1.36

    BY1.35

    BY1.34

    BY1.33

    BY1.32

    BY1.31

    BY1.92BY1.91

    BQ1.5222BQ1.5221

    BZ1.524

    BZ1.523

    BZ1.522

    BZ1.521

    BZ1.722BZ1.721

    BY1.74

    BY1.73

    BY1.72

    BY1.71

    BY1.56

    BY1.55

    BY1.54

    BY1.53

    BY1.52

    BY1.51

    AZ1.326

    AZ1.325

    AZ1.324

    AZ1.323

    AZ1.322

    AZ1.321

    AZ1.722

    AZ1.721

    AY1.92

    AY1.91

    AY1.74

    AY1.73

    AY1.72

    AY1.71

    AY1.516

    AY1.515AY1.37

    AY1.514

    AY1.513

    AY1.512

    AY1.51

    AY1.514

    AY1.38

    AY1.36

    AY1.35

    AY1.34

    AY1.33

    AY1.32

    AY1.31

    BX1.11

    BX1.10BX1.9

    BX1.8

    BX1.7

    BX1.5

    BX1.6

    BX1.4

    BX1.3

    BX1.2

    AX1.11

    AX1.10

    AX1.9

    AX1.8

    AX1.7

    AX1.6

    AX1.5

    AX1.4

    AX1.3

    AX1.2 AX1.1

    A

    B

    A

    Pitch up 20

    Pitch up 20

    BA

    BABA

    Anabolic EnclosureThe overall massing and composition is loosely an L-Systems driven layout that swirls into a multi-directional fl owing stream. This swarm mass-ing biases operative moves of enclosure over radial spreading. This logic drives the assembly upwards.

    Anabolic EnclosureThe overall massing and composition

  • Creativ

    e Work

    s

    Curve Fitting Curve fitting is the process of constructing a curve, or mathematical function, that has the best fit to a series of data points, possibly subject to constraints. These curve-systems are drawn with variable degrees of curvature. This system encompasses with both explicit and visibly indeterminate

    vectors showing the range of each system. This composition of meridians articulates nodal relationships that and ultimately suggests spatial implications. The idea is to capture an graphic speculation on energy fields charted by the calculus based meridians.

    Cumulative CoherenceFall 2009 ARC_411 Professor Georgina Huljich

  • Acad

    emic

    Speculative Site DiagrammingA site visit to the Neurosciences Institute in La Jolla, designed by Tod Williams and Billie Tsien, was the experiential component to this case study. Analysis of the program and how the building truly functions yielded insight into the Architects original processes and goals. These diagrams were used to describe the observances and potentialities of the design.

    Case Study:Asbuilt Site AnalysisSpring 2009 ARC_413 Professor Craig Hodgetts

  • DatascapeViewing census data and speculating on population were the inspiration for this drawing exercise for an infrastruc-ture studio. The emphasis for this Datascape drawing on the left was to look age in a boundary condition located in central Los Angeless Kore-atown. The image above from a visual survey of the provisional infrastructure of a random streetscape section in LA. This drawing was primarily for indexing simultaneous systems and looking for solutions to in efficiencies.

    Case Study :Urban Analysis GraphicsSpring 2010Professor Dana Cuff

    42 TO 85

    39 TO 4237 TO 3932 TO 36

    0 TO 31 Census Data 2008

    Koreatown Median Age, 2008

    The LA Streetscape: A Story of Provisional Acumulation

    1

    7

    34

    26

    8

    5

    Telecommunications Cellular Towers

    Tertiary Domestic Service

    Regional/Statewide Grid Service Traffic Lights

    Streetlighting

    Parking Lighting

    Streetcar Power (approx 1880 to 1947)

    As Los Angeles history of power involves supply of utilities and infrastructure over time, the order of the respective systems implementation tells of a language of provision and Necessity. As each system is installed, it must contend with existing adjacencies often without much anticipation for future technologies. The consequences of this additve logic is the muddling of the composotion to a degree of rhetorical geometry and banality.

    Street AnalysisAcross Los Angeles , we see the result of systemic redundancies in the accumulation of water, electricity, cable TV, telephone, internet, plumb-ing, and sewers lines and pipes. All these metabolic se vices fill up any voids that remain in the sky and underground. The consequences of this additive logic, or illogic, is the muddling of the composition of the city-scape that lacks a principal uni-fying order that could otherwise ser-vice the built environment elegantly.

  • Acad

    emic

  • Academic Work SampleMark Cruz

  • Acad

    emic

    This open-air pavilion design pro-posal to enclose a space for show-casing Tara Donovan sculptures, accentuates continuous, fl owing structural tectonics. The facades of is a system fi n-shades to create a fl uidic moir pattern. The shape was informed by circulation and formal notions about her work.

    Pavilion for Tara DonovanFall 2009 ARC_411 Prof. Georgina Huljich

    Moire 1999by Tara DonovanAnalysis byMark Cruz & Lillian Nobel

    Stair to Lower Platform

    Stair to Upper Platform

    Stair toUpperPlatform

    Stair to Roof

    Stair to Lower Platform

  • Acad

    emic

    Structural StudioWinter 2009 ARC_412Building Design StudioProf. Hadrian Predock

    412 Winter Studio 2009Department of Architecture and Urban Design

    UCLAMark Cruz 1/2" = 1'-0"Westwood Sculpture Center 1Diagram / Detail

    2 Perspective View

    Indirect Daylighting

    Optimum ActiveSolar Orientation

    PredominantWinds (for crossventilation)

    ExistingDeciduousShading

    Green Space

    Acoustic Response

    Formal Daytime Entance

    Busy Corridor

    Night Entrance

    Site Analysis

    1/2" = 1'-0"1Drafting 1

    3 Structural AXO

    Parametric FacetingThe modulating wall trusses facili-tates the panelization of a continu-ous skin which performs multiple functions based on the per face ori-entation, direction, and angle of inte-rior and exterior parameters. These parameters can be calculated from environmental data ,such as active and passive solar angles, acoustical

    uses (amphitheater), or cross ventila-tion locations. They can also respond to programmatic requirements such as day-lighting (or darkening), best views, and overhang (by shifting the panels out). Optimization was not however the prime directive as much as the exploration in continuity and sculpting.

    412 Winter Studio 2009Department of Architecture and Urban Design

    UCLAMark Cruz 1/2" = 1'-0"Westwood Sculpture Center 1Diagram / Detail

    2 Perspective View

    Indirect Daylighting

    Optimum ActiveSolar Orientation

    PredominantWinds (for crossventilation)

    ExistingDeciduousShading

    Green Space

    Acoustic Response

    Formal Daytime Entance

    Busy Corridor

    Night Entrance

    Site Analysis

    1/2" = 1'-0"1Drafting 1

    3 Structural AXO

  • Level 10' - 0"

    Main Gallery Level20' - 0"

    Main Gallery Level20' - 0"

    T.O. Roof52' - 6"

    T.O. Roof52' - 6"

    G F E D C

    B

    Upper Small Gallery36' - 0"

    Upper Small Gallery36' - 0"

    Level 5-2' - 0"

    A

    3/16" = 1'-0"1West

    Level 10' - 0"

    Main Gallery Level20' - 0"

    Main Gallery Level20' - 0"

    T.O. Roof52' - 6"

    T.O. Roof52' - 6"

    1 432

    Upper Small Gallery36' - 0"

    Upper Small Gallery36' - 0"

    CL

    Level 5-2' - 0"

    Level 5-2' - 0"

  • Acad

    emic

    Structure as SpectacleThe faceted facade is supported on a tertiary vertical truss system carried by the primary super structure of large columns ar-ranged to maximize drama and spectacle of the gallery space. The super-structure, is intended to support the roof truss system while maneuvering to carry the slabs in an angular shifted orien-tation. This unusual maneuvering allows the columns to position specifically to the nodes an isostatic structural system, but mainly to compose structurally dramatic events.

  • Building energy loads share a sinusoidal wave of peaks and troughs throughout teh day and seasons.

    Diurnal and circadian cycles can be evalueted coincedentaslly with ese for more blanced

    approach top load manegemtn.

    Building Integrated Photovoltaics (BIPV)Efficiencies are expected to double in the coming decades elevating the building integration to a standard facade technol-ogy.

    Solar Thermal Energy (STE)High Temperature Solar Thermal Technologies are increasing in popularity and may make their way onto buildings facades to deal wit energy loads, heating loads, and domesticate hot water needs..

    Vertical Gardens and Algae Photobioreactors Building facades are a great surface for urban gardening. Sealed containers of algae photobioreactors could be inte-grated into the sides of buildings to produce befouls and sequester carbon.

    Primary arterials feed tertiary branching while maintaining a axis through the site.

    A perimeter scheme provides lines of supply while enclosing and freeing up central voids.

    A diagonals matrix can quickly divide the site up providing a scalable implicitness and can work in contrast or con-cert with the orthogonal building grid.

    A diagonals matrix can quickly divide the site up providing a scalable implicitness and can work in contrast or con-cert with the orthogonal building grid.

    Explicit flows feed into parallelisms yet networked grid.

    This radial organization along the perimeter provides an extensive ruling to allow for variably intensive nodes to fluctuate .

    This study demonstrates a parametric rule based L system mesh that can expand and contract to address flows and distribution intensity.

    Bucky Fullers Dymaxion Power Grid once ignored is gaining polarity again as recent stimulus moneys go into reinvigorating our national power grid. We see here a map of how the distribution geometry creates an a global exchange of power over a dynamically fluxuant power grid. This design uses the network as a battery: as the earth turns, the nigh time half of the planet is trading power with the sunlit side.

    Acad

    emic

    MEP GeometriesThe experimental studies above show organizational strategies that could be applied to systems of power delivery. Each geometry has a vector-based solution diagram for distribution , sharing and metabo-lism. Once programmatic possibili-ties are refi ned, their choice-act as an example of how to create dynamic metabolic ecologies rather than just provisional supply (or elimination) lines.

    Infrastructural AutonomyWinter 2009 ARC_414Major Building Design StudioProf. Deborah Richmond

  • Building energy loads share a sinusoidal wave of peaks and troughs throughout teh day and seasons.

    Diurnal and circadian cycles can be evalueted coincedentaslly with ese for more blanced

    approach top load manegemtn.

    Building Integrated Photovoltaics (BIPV)Efficiencies are expected to double in the coming decades elevating the building integration to a standard facade technol-ogy.

    Solar Thermal Energy (STE)High Temperature Solar Thermal Technologies are increasing in popularity and may make their way onto buildings facades to deal wit energy loads, heating loads, and domesticate hot water needs..

    Vertical Gardens and Algae Photobioreactors Building facades are a great surface for urban gardening. Sealed containers of algae photobioreactors could be inte-grated into the sides of buildings to produce befouls and sequester carbon.

    Primary arterials feed tertiary branching while maintaining a axis through the site.

    A perimeter scheme provides lines of supply while enclosing and freeing up central voids.

    A diagonals matrix can quickly divide the site up providing a scalable implicitness and can work in contrast or con-cert with the orthogonal building grid.

    A diagonals matrix can quickly divide the site up providing a scalable implicitness and can work in contrast or con-cert with the orthogonal building grid.

    Explicit flows feed into parallelisms yet networked grid.

    This radial organization along the perimeter provides an extensive ruling to allow for variably intensive nodes to fluctuate .

    This study demonstrates a parametric rule based L system mesh that can expand and contract to address flows and distribution intensity.

    Bucky Fullers Dymaxion Power Grid once ignored is gaining polarity again as recent stimulus moneys go into reinvigorating our national power grid. We see here a map of how the distribution geometry creates an a global exchange of power over a dynamically fluxuant power grid. This design uses the network as a battery: as the earth turns, the nigh time half of the planet is trading power with the sunlit side.Multi-Faceted Solar HarvestingEmerging high performance photo-voltaic technology is poised to revolutionise the building industry. An example of this is a new lumi-nescent solar concentrator (LSC) breakthrough that will potentially increase photovoltaic production 10 fold. This diagram shows a dual PV array faade potential that managed loads between the optimum summer and winter PV angles

  • Acad

    emic

    1- Ground Floor0' - 0"

    Level 212' - 0"

    Level 324' - 0"

    Level 436' - 0"

    Level 548' - 0"

    Level 660' - 0"

    Level 772' - 0"

    Level 884' - 0"

    Level 996' - 0"

    Level 10108' - 0"

    Level 11120' - 0"

    Level 12132' - 0"

    Level 13144' - 0"

    Level 14156' - 0"

    Level 15168' - 0"

    Level 16180' - 0"

    Level 17192' - 0"

    Level 18204' - 0"

    Level 19218' - 6"

    A-12' - 0"

    1/8" = 1'-0"

    Section

    1 1

    2 2

    6 6

    A CB

    4 4

    5 5

    3 3

    Livi

    ng R

    oom

    1

    1 1

    2 2

    6 6

    AA

    CC

    Not

    Enc

    lose

    d

    Bed

    room

    3

    22' - 0"

    BB

    11' - 0"11' - 0"

    133

    SF

    Bed

    room

    8- ---

    4 4

    5 5

    63' -

    0"

    Not

    Enc

    lose

    d

    Bat

    hroo

    m11

    Not

    Enc

    lose

    d

    Bat

    hroo

    m12

    3 3

    14' -

    0"

    7' -

    0"14

    ' - 0

    "14

    ' - 0

    "14

    ' - 0

    "

    Not

    Enc

    lose

    d

    Bed

    room

    20

    Not

    Enc

    lose

    d

    W.I.

    C.

    22

    1 1

    2 2

    6 6

    AA

    CC

    BB - ---

    4 4

    5 5

    3 3

    14' -

    0"

    7' -

    0"14

    ' - 0

    "14

    ' - 0

    "14

    ' - 0

    "

    11' - 0"11' - 0"

    22' - 0"

    14' -

    0"

    7' -

    0"14

    ' - 0

    "14

    ' - 0

    "14

    ' - 0

    "63

    ' - 0

    "

    12

    6

    A CB

    - ---

    45

    3

    Gro

    und

    Floo

    r0'

    - 0"

    Leve

    l 210

    ' - 0

    "Le

    vel 2

    10' -

    0"

    Leve

    l 320

    ' - 0

    "Le

    vel 3

    20' -

    0"

    Roo

    f33

    ' - 0

    "R

    oof

    33' -

    0"

    12

    64

    53

    14' -

    0"

    14' -

    0"

    14' -

    0"

    7' -

    0"14

    ' - 0

    "

    Gro

    und

    Floo

    r0'

    - 0"

    Leve

    l 210

    ' - 0

    "

    Leve

    l 320

    ' - 0

    "

    Roo

    f33

    ' - 0

    "

    12

    64

    53G

    roun

    d Fl

    oor

    0' -

    0"

    Leve

    l 210

    ' - 0

    "

    Leve

    l 320

    ' - 0

    "

    Roo

    f33

    ' - 0

    "

    AC

    B

    Gro

    und

    Floo

    r0'

    - 0"

    Leve

    l 210

    ' - 0

    "

    Leve

    l 320

    ' - 0

    "

    Roo

    f33

    ' - 0

    "

    AC

    B

    1" =

    40'

    -0"

    2S

    ite

    1/8

    " = 1

    '-0"

    1G

    roun

    d Fl

    oor

    1/8

    " = 1

    '-0"

    3Le

    vel 2

    1/8

    " = 1

    '-0"

    4R

    oof

    1/8

    " = 1

    '-0"

    5S

    ite P

    lan

    63D

    Vie

    w 1

    1/8

    " = 1

    '-0"

    7So

    uth

    1/8

    " = 1

    '-0"

    8N

    orth

    1/8

    " = 1

    '-0"

    9W

    est

    1/8

    " = 1

    '-0"

    10Ea

    st

    12"

    = 1

    '-0"

    113D

    Vie

    w 2

    1_1

    Rhi

    z(h)

    ome

    R

    hiz(

    h)om

    e is

    a h

    ousi

    ng s

    yste

    m th

    at u

    tiliz

    es a

    mod

    ular

    con

    stru

    ctio

    n of

    uni

    que

    geom

    etrie

    s an

    d ob

    lique

    d sk

    ylite

    sto

    exp

    loit

    avila

    ble

    site

    am

    eniti

    es. T

    he fe

    nest

    ratio

    n st

    rate

    gy is

    to d

    esig

    n ea

    ch m

    odul

    e to

    not

    onl

    y or

    ient

    to p

    rope

    rlyba

    sed

    on e

    nviro

    nmen

    tal d

    ata,

    and

    day

    light

    ing

    optim

    izat

    ion

    but t

    o al

    so in

    clud

    e su

    itabl

    e vo

    lum

    etric

    s fo

    r add

    edpr

    ogra

    mm

    atic

    acc

    omda

    tions

    , suc

    h as

    mec

    hani

    cal e

    quip

    men

    t sto

    rage

    , a s

    leep

    ing

    loft,

    or n

    atur

    al v

    entil

    atio

    nm

    easu

    res.

    Stru

    ctur

    ally

    the

    mod

    ules

    are

    des

    igne

    d to

    a 1

    4' x

    11'

    max

    . wid

    th id

    eal f

    or lo

    adin

    g on

    to tr

    ucks

    and

    cran

    ing

    into

    pla

    ce. T

    he s

    teel

    fram

    e m

    odul

    e is

    con

    figur

    ed to

    dea

    l with

    late

    ral f

    orce

    s w

    hen

    not e

    noug

    h ad

    jace

    ntco

    nnec

    tiosn

    occ

    urs.

    Thi

    s fa

    cilta

    tes

    a sp

    atia

    l mod

    ulat

    ion

    of th

    e ro

    oms

    incr

    easi

    ng o

    utdo

    or s

    pace

    s w

    ithin

    the

    norm

    al b

    uild

    ing

    enve

    lope

    .

    Level 19218' - 6"

    ?Solar Thermal Collection Systems PhotoVoltaic CollectionArteial Circulatory Geometries Thermal Concentration Futurel GeoThermal Location Dissipative Grids/Coils

    Compositional Alignments in concert with programmatic circulation and meta-bolic forces of the site address the potential need to manage loads of the pres-

    ent and future multiplicitous energy systems.

    Multiple Building Types in OneThis exercise was to fi nd a solu-tion to density and Infrastructural integration (solar) via manoeu-vred massing to accomplish a megastructrue that includes street grade plaza, courtyards, mid-rise housing, and a luxury tower.

    This exercise was to fi nd a solu-

  • Acad

    emic

    Rhiz(h)ome Rhiz(h)ome is a housing system that utilizes a modular construction of unique geometries and oblique skylites to exploit a sites available solar and day lighting amenities. The fenestration strategy is to design each module to not only be oriented, based on environmental data and day-lighting optimization, but also to include suitable volumetric for added programmatic accommodations.

    These columns can provide functions like housing mechanical equipment storage, a sleeping loft, or tall ceilings providing natural ventilation. Structurally the modules are designed to a 14 x 11 max. width ideal for loading onto trucks and craning into place. The geometry of the steel frame module is configured to address with lateral forces

    Steel HouseSpring 2010 ARC_415Comprehensive Design StudioProf. Barton Myers

    5420+

    4968

    451 6

    4064

    361 2

    31 60

    2708

    2256

    1 804

    1 352

    900

    when not enough adjacent connections occurs. This facilitates a spatial modulation of the rooms increasing outdoor spaces within the normal building envelope.

  • Acad

    emic

    5/11

    /201

    2 5:

    39:2

    7 P

    M

  • Acad

    emic

    Building as LandscapeWinter 2009 ARC 411Building Studio w/ LandscapeProf. Craig Hodgetts

    Hybrid Vector/Surface Active Stuctural System

    Monocoque Superstructure

    Green Roof with Skylites

    Grade Level Open Plan

    Exterior Screen of Auditorium

    Walkays to Accomodate Campus Pedestrian Flow

    Outdoor Room: a Natural Lounge for Students

    Multi - Lateral Entry

    Exterior Screen of Auditorium

    Robots/MArch2

    Faculty/Research/PhD

    Architecture Library

    Administration

    ResearchLibrary

    Administration

    1st Yr/Undergrad

    Architectural Community

    UCLA Community

    MArch2

    Architecture Library

    Administration

    Offices

    3rd Yr

    PhD

    Robots

    Undergrad

    Robots

    MArch2

    3rd Yr

    3rd Yr/2nd Yr

    Faculty

    Undergrad

    1st Yr Shop/Fabrication

    Faculty

    Lounge

    1st Yr

    Commons

    2nd Yr

    PhD

    Architectural Community

    Research

    Architectural Community

    Classrooms

    Research

    2nd Yr

    Image ChamberConceived as a crystalline chamber to share the productions of multiple faculty and studio factions, this scheme for a replacement to Perloff, uses dramatic structural geometry and intense site work to create an environment that unifi es UCLA AUDs many focuses.

  • Acad

    emic

  • Acad

    emic

  • Acad

    emic

    Nanjing Industrial RehabilitationSpring 2010 - UCLA Travel Studio Tianjin UniversityProfessor Ben Refuerzo , Professor Zhen Xu

    North

    This urban design studio at Tianjin University was an immersive experience in China, exchanging and sharing ideas with Chinese Architecture students. The historic Nanking district incorporates an industrial zone next to historic governmental district, and the polluted Yellow River. Density, community, history, and landscape design were all themes in the planning process, and the goal was a master planning strategy that repaired provided for future developers. The use of solar and Infrastructural grid overlays here prescribes a system of nodes and alignments, arranged to buffer the freeway, enclose a community park, and allow for multiple scales of development.

  • Normative GridAn 100 orthogonal grid overlay is driven by the adjacent urban street grid to regulate site flow and study a distributive approach to the a pedestrian street scape and its scale.

    Concentric GridFreeway noise and proximty to river are mea-sured via concetnic rings that show locations for buffering and arranging of building.

    Southern Exposure OverlayThe soler angles are crucial for aligning each parment block to some degree of southern exposure.

    RiverRiver views and access to river front are facilt-ated by lifting the buidlings up 20 at the grade.

    City Wall of NanjingThe 600 year old wall establishes a cultural boundary and attention to height of building comes into question, with rgard to preserving the horizon yet providing modern solutions for densification.

    Existing Warehouse iDistrictWhether repurposing or demoliting Nanjings existing warehouse district, this new develop-ment warrants addressing the current infras-turctual grid, but with a change in cadence and pace for future community development.

    Freeway The freeway is the hardest boundary condition to address. This geometry artiuclates the wetsren border, an ideal location for storefront.

    J F M A M J J A S O N D0 0

    20 100

    40 200

    60 300

    80 400

    100 500

    0

    10

    20

    30

    40

    50

    0

    2

    4

    6

    8

    10

    12

    8

    4

    0 DAYLT

    IRRAD

    TEMP

    CLIMATE SUMMARY

    9amWind

    3pmWind

    J F M A M J J A S O N D0k

    2k

    4k

    6k

    8k DEGREE HOURS (Heating, Cooling and Solar)

    H

    C

    S

    NAME: NanjingLOCATION: CHNDESIGN SKY: Not Av ailableALTITUDE: 7.1 m W eathe r T ool

    LATITUDE: 32.8LONGITUDE: 118.8TIMEZONE: +8.0 hrs

    DBT(C) 5 10 15 20 25 30 35 40 45 50

    AH

    5

    10

    15

    20

    25

    30

    Comfort

    Psychrometric ChartLocation: Nanjing, CHNFrequency: 1st January to 31st DecemberWeekday Times: 00:00-24:00 HrsWeekend Times: 00:00-24:00 HrsBarometric Pressure: 101.36 kPa W eathe r T ool

    NOR T H1 5

    30

    45

    60

    75

    EAST

    1 05

    1 20

    1 35

    1 50

    1 65SOU T H

    1 95

    21 0

    225

    240

    255

    W EST

    285

    300

    31 5

    330

    345

    10 km/ h

    20 km/ h

    30 km/ h

    40 km/ h

    50 km/ h hrs

    316+

    284

    252

    221

    189

    158

    126

    94

    63

  • Acad

    emic

    This multifamily housing block idea was centered around a diamond-shaped courtyard building typology, inspired from the Duo Gong, or Chinese structural-bracket system This maneuvering of stacked living units is intended to unify communities but with discreet private and communal open spaces for each unit. Central corridors, and dispersed green ways modulate with the single family apartments and propose to deal with density in a sensibly scaled porosity strategy.

    Duo Gong Housing Block TypologySpring 2010 - UCLA Travel Studio - Tianjin University Professor Ben Refuerzo , Professor Zhen Xu

  • Acad

    emic

    TENSION SPRING

    MOTOR

    The double height condominium was envisioned as a new form of real estate as whole fl oors are treated like sovereign Bel Air properties. Fellow UCLA student and brilliant designer David Johnson and I developed a two story condo with a modulated outdoor spaces, and an operable, responsive facade system. We were tasked to commit to a single material to carry through as the theme of our design efforts. We chose wood and developed a kind of parametric shingle to variably control light, wind and views.

    Parametric ShinglesFall 2010 - UCLA Advanced Topics Studio Instructor Michael RaDesign Team: Mark Cruz, Dave Johnson

    FIXED THREADED ROD OPERABLE CABLE

    BALL JOINT SECTION

    3/16 STEEL CABLE / ROD

    1/32 TRANSLUCENT WOOD VENEER

    MOLED PLASTIC CUPLER

    RESIN PANEL

    CABLE SLEEVE

  • Acad

    emic

    Literal Arts StudioWinter 2010 Professor Roger Sherman

    This Hollywood night club. dealt with the use of supergraphic imposition on a louvered facade. Thematically, the classic Greek pediment reinvented was a theoretical justifi cation for this arrangement of images. Instead of Gods and Godesses, this selection of images suggests simalar panoply of mythic humanoid beasts corresponding to primal desires of part goers of LA night life.

  • Acad

    emic

    Graduate Research StudioWinter 2010 Professor Jason Payne

    This preliminary look at the Favelas of Ecualyptos, Sao Paulo, was an experiment in representaional analyisis. In contrast to the GIS impericallity approach, these are intended as speculative diagrams. exploiting light, tones, colors, and values of hi res satelite imagery to expose and isolate qualities of the image. Mutation and overlaying techniques whimsically lead me to pursue a graphic style that in teh end was akin to engraving.

  • Acad

    emic

    Graduate Research StudioEucaliptos, Brazil - Winter 2010 Professor Jason PayneWith 8 billion people in the world, we must ever focus on creatively finding ways to help design places for them to survive, organize, and thrive. My experience while studying the Favelas in Sao Paulo, involved direct exposure not only to infrastuctural failure, pollution, and blight, but to the daily life of the people who live there. These images are not intended as a curatorial photography exhibit. Rather, they are arranged here as

    simple reminders of the very need for infrastuctural innovation in the world. This need is what I hope to work on, so I include as an example of my ambitions. It is fine for a portfolio to show a range of capabilty, experience, and credential, but this page is dedicated to the recognition of need that exists for Architects.

  • Acad

    emic

    15-0

    16-0

    Level 28-0

    Level 10-0

    14-0

    A

    21 - 6 7 - 64 - 6

    112

    168 169

    B C D E F G

    EUCALIPTOS:CONNECT THE DOTSPART 2

    Graduate Research StudioEucaliptos, Brazil Winter 2010 Professor Jason Payne

    Deep in the slum neighborhoods of Sao Paulo, we investigated the constituent parts of the buildings, streets, and sewers. This asbuilt exercise of the Favela houses, not only taught us about the ingenuity of local trades, but exposed us to new and beautiful ways of seeing design. For example, in modernist design, deliberate moves and gestures often occur perhapsat the whimsy of the Architect. Here in the Favelas, houses designed with many skewed angles,bent walls, and stacked cottages were conceived out of necessity, untrained eyes, and even haphazard. The absence of zoning and codes yields a freedom of form that has great worth to the distinguishing eye. Our observations were treated as fodder for new inspiration in design moves.

  • House #4

    FRONT bFRONT c

    LEFT

    FRONT a

    ROOF

    BOTTOM

    BACKBACK

    RIGHT

    14.7'

    8.0'

    0.0'

    -1.4'

    Scale: 1-0 = 1/4

    connect

    connect

    connect

    connect

    connectconnect

    connect

    connect

    connect

    40- 31- 6

    7- 9

    8- 8

    8

    2- 6

    7- 6

    2- 2 1- 1 4- 7

    109

    166

    166

    176

    83

    176

    86

    60

    176

    206

    87

    164

    88

    92

    3- 1 2- 3

    1- 1

    2- 5

    2- 9

    2- 9

    3- 1

    1

    1- 3

    2- 5

    3- 7

    4- 6

    2- 3 1- 0 1- 3 3- 0

    14- 016- 0

    3- 0 8

    21- 6

    4- 6

    A B C

  • Acad

    emic

    Graduate Research StudioWinter 2010 Professor Jason Payne

    Our visit to the Favelas, and to the Housing Authority Office managing (or attempting to manage) the infrstructural and social housing projects of Sao Paulo, taught us about the controversy of Favelas. Working in ghettos and slums is a highly political problem. The polarity of socials issues and land entitlements often debilitates any progress put forth by municipal planning departments.

    Our studio intended to avoid the typical polarizing points of debate of any Academic research done on impoverished people of another culture. We instead chose the High Art route, and focused on representation an curation as devices used to expose and dignify the Architecture of the Favelas. We abandon the social agenda in favor of an exercise in more innocent viewing to their raw buildings. The moves we learned form the Favela Asbuilts were deployed and then we printed (and 3-D printed) them as iconic displays of geometry, with only hints of brick and concrete

  • Acad

    emic

    Graduate Research StudioWinter 2010 Professor Jason PayneThis was an exercise in inventing an architectural folly, based on tectonics we learned form in the Favela. The use of a folly to celebrate the vernacular stylings of Favela houses, circumvents the political entanglements of shanty villages, while still dignifying the structural moves in a venue for designers and visitors alike. Here masonry patterns combine with heroic concrete buttresses to devise a sculptural ode to the accidental innovations of Favela builders.

  • Scale : NTSMark Cruz

  • Comp

    etition

    s

    This shade design strategy for the city at large is to think of the sun-shade design as a continuous fabric that morphs and responds to a vast range of urban sce-narios, but ultimately aspires to a citywide presence. As the fabric of linked sunshade elements begins around intense areas like downtown cores, malls, and park-ing lots. The linear components

    Sun Shade CompetitionPhoenix AZSpring 2009Predock Frane

    REN

    DER

    ING

    SD

    ESER

    T D

    RAPE

    on boulevards, and streets act to suture them together. Critical masses of cover could begin to create a kind of surrogate atmo-sphere for Phoenix that creates a cooler citywide micro climate - one in which heat is more effi ciently dis-sipated, and where shade prevents

  • Competition Center for Civil RightsAntione PredockFall 2009

    M O O D Y N O L A N / A N T O I N E P R E D O C K

    Center for Civil & Human Rights

    Rainwater lters through the tissue of the project along furrows, and is eventually stored within visible cisterns. The water is used to irrigate gardens, and subsidize non-potable water sources in the building such as restroom sinks.

    VISIBLE CISTERN

    Photovoltaic cells are embedded in the roof slope at an optimal solar angle. These panels contribute to the overall energy supply for the building and considerably reduce dependence on fossil fuel sources.

    During optimal months, natural ventilation is introduced into the interior environment, owing from prevailing wind directions and creating a chimney effect inside the proj-ect.

    Dou

    ble

    skin

    faca

    dere

    duce

    s he

    at g

    ain

    alon

    g gl

    ass

    faca

    des

    The primary mechanincal system is a geothermal heat sink that uses the earths mass for both heating and cool-ing.

    Under oor radiant cooling

    Solar arrays act as demonstration sites on the path of the projects roofscape while harness-ing energy from the Sun.

    Light courts bring natural sunlight into some portions of the project. These cuts in the buildng also act as demonstra-tion gardens for the sustainable systems in the project.

    Stair wells and light courts also act to exhaust hot air from the interior spaces via passive measures.

    As guest designer on this National competition, I worked with a team of designers to produce this design for a Center for Civil Rights. We were short listed for this anti-building : a subterranean museum and reflection chamber for the disturbing imagery of the era of the Civil Rights struggle. We laid out a garden on top as respite from the labyrinthine structure of spectacular imagery and structural acrobatics.

  • Comp

    etition

    s

    NAIOP Real Estate Challenge1st PlaceWinter 2010 UCLA Anderson School of BusinessEvery year USC and UCLA face off for the National Association of Industrial and Offi ce Properties (NAIOP) competition: The Real Estate Challenge. This years site was the famous Bunker Hill in downtown Los Angeles. My winning design included the tactical use of a parking garage to shore up and the mitigate the steep slope while providing a foundation for the mixed use and mixed income housing strategy mandated buy the Community Redevelopment Agency. The historic Angles Flight Funicular Tram is fl anked by tiered gardens that tie the upper plaza with a new retail lined street.

    UP

    UP

    1 Bedroom

    2 Bedroom

    Studio

    11/3

    /201

    0 8:

    06:5

    8 P

    M

    1" = 30'-0"1Sample Floor Layout

  • Acad

    emic

    Univeristy of ColoradoSolar Decathlon 2005Design Team Lead

    1st Place OverallDIY Best Built House1st Place Communications1st Place Transportation

    Few projects provide the training in a design/build education that being on a Solar Decathlon Team does. As Design Team lead in 2005 for CUs school of Architecture, I took a pro-totypical solar-powered mobile home that designed and built to the mall in DC. Our team won 1st place overall that year and we brought the house back and used it as teaching facility for sustainable design. In 2007 I re-turned to the Team as Sr. Designer, and worked with a team of engineer-ing students to build a modularized

    shipping container house. Span-ning three years of intense designing, engineering, and building, this unique experience was a crash course in cross-disciplinary cooperation and creative problem solving.

  • Acad

    emic

  • Drawing

    University of Colorado - Boulder

    2007 National Solar Decathlon - Washington, DC

    Drawn by:

    Revisions (Name/Date):

    Checked By:

    Title:

    Date:

    Civil, Environmental, and Architectural Engineering428 UCB, Room ECCE 441Boulder, CO 80309-0428

    5/23/2007 6:13:43 PM

    SC-1Axonometrics

    mscruz

    05/23/071 NE Axo

    2 SE Axo

    Table of ContentsSC-1 Information, AxonometricsSC-2 PlanSC-3 ElevationsSC-4 ElevationsSC-5 Section - South OpeningSC-6 Section - South Opening- Horiz.SC-7 Section - North Opening- Horiz.SC-8 Window SectionSC-9 Window Section - Horiz.SC-10 Section - DoorSC-11 Section - Enrty Door - Horiz.

    5/23/07 - beam/bolt

    Comp

    etition

    s

    0' -

    4 1/

    2"

    Wood Jamb

    Wall Type A

    Transport Panel Construction (Typ.)Corrugated steel panel (cut from

    container opening) onL3 1/2 x 3 x .25 frame w/HSS 2 1/2" x 1 1/2" x.25 cross bracing

    fix to container w/1/2" f.h. bolts thrucompressible gasket & access hole to1/2" nut welded to face of tube steel buck.

    sheet metal jamblinerwelded totube steel buck &sill pan

    Drawing

    University of Colorado - Boulder

    2007 National Solar Decathlon - Washington, DC

    Drawn by:

    Revisions (Name/Date):

    Checked By:

    Title:

    Date:

    Civil, Environmental, and Architectural Engineering428 UCB, Room ECCE 441Boulder, CO 80309-0428

    6/16/2010 6:05:31 PM

    SC-11Section - Door - Horiz.

    MScruz

    04/02/07

    1 1/2" = 1'-0"1Door Section - Horizontal

    5/23/07 - beam/bolt

    Wall Type A wood jamb wood jambdbl. csmnt. fiberglassframe by Alpen

    Transport Panel Construction (Typ.)Corrugated steel panel (cut from

    container opening) onL3 1/2 x 3 x .25 frame w/HSS 2 1/2" x 1 1/2" x.25 cross bracing

    fix to container w/1/2" f.h. bolts countersunk thrucompressible gasket & access hole to1/2" nut welded to face of tube steel buck.

    Drawing

    University of Colorado - Boulder

    2007 National Solar Decathlon - Washington, DC

    Drawn by:

    Revisions (Name/Date):

    Checked By:

    Title:

    Date:

    Civil, Environmental, and Architectural Engineering428 UCB, Room ECCE 441Boulder, CO 80309-0428

    6/16/2010 6:10:31 PM

    SC-9Section - Window - Horiz.

    MScruz

    04/27/07

    1 1/2" = 1'-0"2Window Section - Horiz. (Typical)

    5/23/07 - beam/bolt

    CU Solar Decathlon 2007SR Designer/ Communications Team LeadSummer 2005As Sr., designer team I returned to help the 2007 team. So much fan fare in 2005 caused quite a lot of expecta-tion of us to continue innovating.

  • COREAs SR Designer for this years University of Colorado Solar Decathlon Team, I worked with a small design team daily for a year straight

    year to develop a prototype for integrated solar architecture/systems . .The reclaimed container,, integrated photo-voltaics, and architec-turally fore-grounded mechanical systems, showcased to thousands, the virtues for renewable energies.

    2007 solar decathlon12-9-07 Cruz Portfolio.indd 35 1/3/2008 11:38:28 AM

    The Envelope

    5

    Regionally Specific and Economically Sound

    The CORE strategy encourages freedom of aesthetics, construction method, and material selection. In a production home environment, modular construction can be em-ployed without every house looking the same. The system also allows users to create connection and response to local conditions. By combining a prefabricated core and high performance energy technolo-gies with vernacular architecture and local materials and methods, housing can be created with better local economic regeneration, lower materials costs , and less overall embodied energy.

    Preserve the SHIP-ABILITY

    Ship it , Ship it AGAIN!

    15

    Wall Type A wood jambdbl. csmnt. berglassframe by Alpen

    Our containers are modified to provide windows, doors, and circulation to adjoin-ing spaces. We also reinforce the open-ings and retain the removable panels. Once customized as a building core, the removable panels can be re-attached and container shipped to a construction site. With careful design, our containers retain their ISO certification and ship-ability.

  • Comp

    etition

    s

    U s e r s M a n u a l

    S u r p l u s S o l u t i o n

    P r e s e r v e t h e S h i p - a b i l i t y

    A R E A L H o m e

    T h e E n v e l o p e

    T h e C O R E

    C e n t r a l I n t e l l i g e n c e

    C O R E C o o l i n g

    D i u r n a l S t o r a g e

    S u s t a i n a b l e I n t e r i o r s

    E n e r g y M a n a g i n g A p p l i a n c e s

    C u s t o m C O R E D e s i g n sT h e Te a m

    S p o n s o r s

    B a l a n c e d E n e r g y C a p t u r e

    D y n a m i c F o o t p r i n t

    W i n d o w s

    B u i l d i n g I n t e g r a t e d P h o t o v o l t a i c sB u i l d i n g I n t e g r a t e d P h o t o v o l t a i c s

    B u i l d i n g I n t e g r a t e d S o l a r T h e r m a l

    C O R E H e a t i n g

    2

    3

    4

    5

    6

    7

    8

    91 0

    1 1

    1 2

    1 3

    1 4

    1 51 6

    1 7

    1 8

    1 9

    2 0

    B u i l d i n g I n t e g r a t e d O v e r h a n g s

    2 1

    University of ColoradoSolar Decathlon 2007

    Dynamic Footprint

    3

    Dynamic FootprintThis design utilizes the shipping container spine to modulate the spatial experience of the home. The dwellings servant (utility) spaces flow into the served areas for living, dining, working, and sleeping. The containers central position allows the rooms to be added or subtracted per user needs over the time, as they function as transition zones between the public and private areas of the home.

    3

    While competition rules and practical logistics dictate that all homes in the Solar Decathlon are small, light-weight, and mobile, our team has taken the bold approach of designing, and ulti-mately building, a 2,100 square foot full-size home, and delivering a smaller competition com-ponent to Washington, D.C. This component conforms to the programmatic and size constraints of the competition. The full house is more relevant to typical home buyers and home builders, and includes three bedrooms, three bathrooms, a larger living room and an office/media room. All indoor environmental control equipment is sized for the complete house, yet allows modular deployment in the competition entry.

    bedroom bedroommaster suite

    w.i.c.

    kitchen bath

    playroom

    courtyard

    living

    entry

    bath

    w/d

    mechanical

    dining

    sunroom

    Building Integrated Photovoltaics

    The panels are the roof!

    Most current PV systems are installed over the roof, with additional cost for the PV support system and framing. The CORE approach to photovoltaic energy collection eliminates the need for duplicate roofing and support systems - the PV system is the roof. This imple-mentation of a sleek energy-collecting roof of-fers a low-profile geometry that is aesthetically efficient as well as technologically advanced.

    8

    Building Integrated PV Roof

    R e u s e , r e v i v e ! R e u s e , r e v i v e ! Preserve the SHIP-ABILITY

    Ship it , Ship it AGAIN!

    15

    Wall Type A wood jambdbl. csmnt. berglassframe by Alpen

    Our containers are modified to provide windows, doors, and circulation to adjoin-ing spaces. We also reinforce the open-ings and retain the removable panels. Once customized as a building core, the removable panels can be re-attached and container shipped to a construction site. With careful design, our containers retain their ISO certification and ship-ability.

    CU Solar Decathlon 2007Communications Team LeadSummer 2005100,000 people visit the Solar De-cathlon every year. They com to see the design , the homes, and to learn how sustainable tech-nologies will change their lives. I designed a manual that the tour gave out to explain the tenets of our design.

  • A self learning home...? Custom CORE design

    20

    This CORE concept uses the shipping con-tainer spine to modulate the spatial experi-ence of the home. Our full house design adds a second container, housing two additional bathrooms and a dedicated laundry area. The containers central position allows them to function as transition zones between the public and private areas of the home. Count-less other variations are possible. The cores flexible, transportable, and modular nature al-lows it to be used in diverse applications, from off-grid vacation cabins to high-density in-fill housing. Cores can be stacked in multi-story designs. They can be combined with local ma-terials and methods. Over time, the footprint size can change as the lifestyle of the owner evolves, adding rooms for a larger family or removing rooms as the nest empties.

    *Mass Customization - a business technique which allows any customer to buy a product or service that has been pre-designed (customized) to fit a customers exact needs.

    The TEAM

    21

  • Comp

    etition

    s

  • Professional Work SamplesMark Cruz

  • Profes

    siona

    l

    This schematic design for a high end, modern Bel Air residence was for a wealthy client. The project was limited to a pre-existing foundation on a very steep site. Widening the driveway, adding a lap pool and arraigning ample outdoor areas were prioritized.

    Schematic Design Bel Air RemodelClient: Private2009

  • Profes

    siona

    l

    A comprehensive design build experience, this low budget project included a full LADBS submittal phase, a series of renderings and schematic designs, as well as 3-D framing drawings. A 500 sq. ft. residence addition for Gary Steinborn in Venice CA, entailed a elaborate schematic design phase and extensive construction management services to monitor a very limited budget.

    Residential Design / Con-struction Management for Gary SteinbornLocation: Venice, CACompleted: Winter 2009Budget: 110,000$

  • Profes

    siona

    l

    Scott Rodwin ,AIA dictated to me flexible plans to be that modeled and developed . I developed the plan views into a three dimensional design in REVIT. We created generic CD set with renderings that he then sold to a stock plans company online. There are three optional sets for two major designs, including detached garage, multiple bedrooms, and roof decks. The Facade design is solely my work.

    Modern Home DesignStock Plans forRodwin ArchitectureBoulder, CO

    Spring 2007

    Sheet Mtl. Parapet Cap

    Stucco [alt. FinishGrade Plywood]

    Awninig

    Awning structure

    Railing

    Finish Grade Plywood

    Finish Grade PlywoodDN

    UP

    UP

    UP

    WH

    A2.21

    A2.1

    A2.2

    A2.1

    1

    2

    2

    1A3.1

    1A3.2

    A4

    5

    -

    A4

    1

    A46

    9A1.3

    Master Bath202

    MasterBedroom

    201

    Bedroom203

    W.I.C.

    62' - 10"

    38' - 10" 4' - 6 3/4" 13' - 5 1/2" 5' - 11 3/4"

    13' -

    6"

    10' -

    0"

    14' -

    0 3

    /8"

    37' -

    6 3

    /8"

    10' -

    6"

    3' -

    0"10

    ' - 0

    "

    15' - 2" 8' - 4" 20' - 10"

    23' - 6" 20' - 10" 24' - 0"

    68' - 4"

    35' -

    10

    3/8"

    35' -

    10

    3/8"

    0"

    9' -

    1 1/

    2"10

    ' - 1

    0 3/

    8"

    19' -

    11

    7/8"

    5' -

    11 1

    /2"5' - 10" 7' - 9" 3' - 6" 6' - 5"

    W.C.

    2A3.2

    3A3.2

    1A5

    11A1.3

    A4

    A2.3 4

    2A5

    3A5

    2

    4

    3

    2A3.1

    13' -

    3"

    3 1/

    2"

    3' -

    2"

    3 1/

    2"

    5' -

    7"

    5' - 6"

    5 1/2"

    21' - 11"

    17' - 2 5/8" 3 1/2" 5' - 7"

    W.I.C.213

    Bathroom214

    13' -

    0 3

    /8"

    3 1/

    2"6'

    - 4"

    Porch215

    25' - 1 1/4" 5 1/2" 13' - 0"

    7' -

    6"

    14' -

    8 3

    /8"

    5 1/

    2"19

    ' - 9

    "

    Exterior Wall:5/8" Stucco Finish SystemBuilding Paper Installed Per Manufacturer1/2" OSB Sheathing2x6 Studs @16" O.C. w/Min. R-19 Batt Ins.1/2" Interior Gyp. Board

    Interior Wall:1/2" Interior Gyp. Board2x4 Studs @16" (w/Opt. Sound-Proof Ins.)1/2" Interior Gyp. Board

    NOTICE: DUTY OF COOPERATIONRelease of these p lans contemplates fur ther cooper-a t i on among th e owner , h i s con t rac to r an d the a rch i -tec t . Des ign and const ruc t ion are complex . A l thoughthe arch i tec t and h is consul tants have per formed the i rserv ices wi th due care and di l igence, they cannotguarantee per fect ion. Communicat ion is imperfect ,and every cont ingency cannot be ant ic ipated. Anyambigu i ty o r d isc repancy d iscovered by the use ofthese p lans sha l l be repor ted immedia te l y t o the a rch i -tec t . Fa i l u re t o no t i f y t he a rch i t ec t compounds m is -unders tanding and increases const ruct ion costs. Afa i l u re to coopera te by a s imp le no t i ce to the a rch i t ec tshal l re l ieve the arch i tect f rom respons ib i l i ty for a l lconsequences. Changes made f rom the p lans wi thoutconsent o f the a rch i tect are unauthor ized, and sha l lre l i eve the a rch i tec t o f respons ib i l i t y fo r a l l conse-quences ar r iv ing out o f such changes.

    DRAWN:CHECKED:

    JOB NO:

    DATE:REVISED:

    MAIN ST.

    R O D W I N A R C H I T E C T U R E1425 Pearl St. Suite BBoulder, Colorado 80302(p)303.413.8556 ( f) 303.413.8557www.rodwinarch.com

    M O

    D

    H O

    U S

    E

    S E

    R I

    E S

    Project NumberAuthor

    Issue DateChecker

    A1.2

    1/4" = 1'-0"1Second Floor

  • 11

    22

    33

    44

    A

    A

    B

    B

    C

    C

    G

    G

    H

    H

    I

    I

    199 SF

    Men's RR16

    577 SF

    ComputerClassroom

    18 576 SF

    InteractiveWorkshop

    22

    Not Enclosed

    Classroom26

    Not Enclosed

    Classroom27

    352 SF

    Computer Repair28

    1A102

    25' -

    0"

    8' -

    0"25

    ' - 0

    "

    D3D3

    9' -

    6"

    155 SF

    Storage36

    568 SF

    Classroom37

    Outdoor Corridor

    Outdoor Corridor

    Outdoor Corridor

    Open To Below

    K

    K

    L

    Department Legend

    Administration

    Classroom

    Computer Classroom

    Shop/Storage Space

    InteractiveWorkshop

    41

    34' -

    6"

    8' -

    0"25

    ' - 0

    "

    Student Printers62

    Equipment /PrintRoom

    64

    Women's RR65

    Admin.88

    Men's Bath90

    Principal's Office91

    Corridor95

    4' - 11"

    Women's Bath104

    Restroom105

    4' -

    4 3/

    8"

    Lounge92 Conference

    93

    1/8" = 1'-0"1Level 2

    Profes

    siona

    l

    This community college is set to be built in a remote location in the African Bush of Nigeria. This design useshumble materials and local labor. An open air trussed roof and ventilated masonry walls helped to to creatively mitigate the hot climate with the un-air -conditioned computer labs. occur in air condition-less building.

    Schematic DesignChristian Technical CollegeNigeria

  • ----

    YURT CABINS, LLC[Address][website/email][logo]

    General Notes

    Scale

    7/19

    /201

    0 7:

    50:4

    3 A

    M

    3/4" = 1'-0"

    6.0Roof

    1 Roof Panels

    3/4" = 1'-0"2Roof Section

    This Colorado Startup hired me as a desiogner/modeler to develop their kit of parts emergency shelters. This modifed Yurt features a quick assmbly time (under 4 hours), sleep 8 ppl and can be shipped within days of order. This image suggestes the Yurt-Cabin being deployed in Haiti.

    Modular Building Design Yurt-Cabins, llc.Spring 2010

  • Profes

    siona

    l

    Tenant Improvement Bikrams Yoga StudioBoulder, CO Fall 2007

    Rasa Zubkute hired me to do design work and permit docu-ments for the yoga franchise Bikrams Yoga, in the historic Tulagis Building (specializing in heated yoga rooms). The project required oversized mechanical systems measures to accommodate the increased heat loads and in compliance of historic preservation constraints.

    register

    register

    fan

    fan

    exi

    stin

    g 24

    " dia

    AHU-1

    H-1

    F-12

    dryer vent

    add (4) 12" dia.S.A. diffusers

    existing truss

    existing truss

    existing truss

    existing 24" dia

    existing ductwork from roof AHUon roof to space below

    Note: enclose the existingductwork from unit on roofto space below withG.W.B. on3 5/8" stl. studsenclosure..

    Connect NEW 18" dia.SA to existing 24" dia. SAduct.

    new location forexisting 12"" dia. SA

    Mechanical ScheduleMark Description Manufactrurer Performance/ Capacity RequirementsAHU-1EF-1H-1F-1

    Comments

    12" dia. R.A.

    6" dia. R.A.(typ. 6 loc.)

    6" dia. R.A.(typ. 6 loc.)

    6" dia. R.A.(typ. 6 loc.)

    6" dia. R.A.(typ. 6 loc.)

    6" dia. R.A.(typ. 6 loc.)

    6" dia. R.A.(typ. 6 loc.)

    12" dia. R.A.

    16" dia. R.A.

    proposed 12" casework bench & return airconnect 6" dia. tocasework bech asRA plenum ( typ.6 )

    AHU-1

    SA

    RAF-1

    H-1

    AHU-1GGas SupplyGas Cock

    6" min. Dirt Leg

    Finish Floor

    strap

    elbow

    combustion air

    pad

    3"

    3"

    3"

    1"

    1"

    1" 1"

    Proposed full height partiton

    Proposed full height partiton

    Note: Alter to accomodate new walllayout & new ceiling installation

    existing truss

    existing truss

    NEW 18" dia. RAplaced aboveexisting 24" SAduct

    NEW 12" dia. RA

    AHU-1

    Scale

    Date

    Tenant Finishfor

    Bikram's Yoga

    1129 13th st Unit CBoulder, CO

    Revisionsdate

    8-22-07

    P.O. Box 763Boulder, CO 80306(303) 442 1144

    Hatcher Engr Assoc

    As indicated

    M1

    HVAC 1/4" = 1'-0"1Reflected Ceiling Plan - SA Ductwork

    2 Interior Axo of Ductwork

    3/4" = 1'-0"3Mechanical Schedule

    1/4" = 1'-0"4Proposed Return Air Duct System

    5 3D View of Retunr Air System

    1" = 1'-0"690+ AFUE Gas Furnace Detail

    1/8" = 1'-0"7Existing Sprinkler Plan

    1/8" = 1'-0"8Reflected Ceiling Plan - RA Ductwork

  • 4' - 10"

    2' - 0"

    4' - 10"0' - 0"

    0' - 0"

    8' - 9 7/8"

    8' - 9 1/2"

    4' - 7 7/8"

    8' - 9 7/8"

    0' - 0"

    0' - 0"

    0' - 0"

    4' - 10"

    7' - 0"

    7' - 0"

    0' - 0"

    -1' - 4"

    T.O.W.-2' - 2"

    -0' - 9" (TOP OF SLAB)

    -0' - 4"

    2' - 0"4' - 10"

    7' - 0"

    7' - 0"

    4' - 10"

    0' - 0"

    0' - 0"

    4' - 7 7/8"

    8' - 9 1/2"

    -0' - 4"

    -0' - 4"

    -0' - 4"-2' - 2"

    0' - 0"8' - 9 1/2"

    BOTTOM REINFORCING

    DOWELS - MINIMUM #4 x 30"WITH 6" HOOK @ 32" O.C.FOR REINFORCING.

    FOOTING - SEE PLANS

    1'-0

    2" M

    IN.

    CLE

    AR8"

    MAX

    TOP REINFORCING

    OPEN

    COVER OVER OPENINGS

    4'-0 MIN.

    ADD 2-#5 ALLAROUND OPNGS

    4'-0 MIN.

    2'-0

    BOTTOM REINFORCING.

    THAN 2'-0

    HOOK VERTICAL BARSWHERE "H" IS LESS

    2-#5 OR MATCH TOP AND

    MINIMUM 6" CONCRETE

    INSTALL 2x4 INTERMITTENT KEYWAY

    AND LAP WITH REINFORCING FORALL HORIZONTAL REINFORCING 2'-0FULL HEIGHT OF WALL, AND EXTEND

    2'-0 TYP.

    2nd POUR.

    1'-0

    2'-0

    WHERE COLD JOINTS ARE REQUIRED,

    MINIMUM SPLICE LENGTHS#4 BARS:#5 BARS:

    26"34"

    Bear Ftgs onUndisturbed Soil

    (2) #5 Top & Bot.Cont. , Typ.

    #4 @ 16" O.C.VERTICAL

    4" Conc. Slab

    3' -

    0"

    0' -

    8"

    FoundationDrain

    1' - 6"

    0' -

    10"

    32

    6

    0' -

    3"

    min

    .

    A

    FoundationDrain

    4" Conc. Slab

    1' - 6"

    2x6 Treated ACQ Platew/ 1/2" dia.Galvanized Anch. Bolts @ 32" O.C.

    (Typ.)

    VA

    RIE

    S.

    (Typ.)

    #4 @ 16" Vert.

    0' - 3 3/4"

    #5 @ 12" O.C.HORIZ. CENTERED

    #4 AT 16" O.C. VERTICAL

    Perimeter Drain toDaylight or Sump

    max

    .

    0' - 8"

    #5 AT 12" O.C. HORIZ.CENTERED

    (Typ.)

    slope grade

    1/2" Anchor Bolt

    #4 AT 16" O.C. VERTICAL

    Perimeter Drain toDaylight or Sump

    #5 AT 12" O.C. HORIZ.CENTERED

    A

    A C

    C

    11

    44

    B

    3A105

    2A106

    3

    3A106

    4A106

    1A106

    3S101

    2S101

    1S101

    WORKSHOP LAUNDRY

    GARAGE

    UTILITY

    UTILITY

    50' - 0"

    27' - 8"22' - 4"

    44' -

    4"

    ALL GRID LINES ARE TO EXTERIOR OF WALL.

    BEAM POCKET (above)

    BEAM POCKET (above)

    8" WALL w/ #5 O.C. AT 12" HORIZ#4 AT 16" O.C. VERTICAL

    TYP. COUNTERFOOT FOOTING3' X 3' X 10" w/ 4 #5 EACH WAY

    T.O.W. 12" +- BELOW GRADEAT COUNTERFORTS, (Typ.)

    EXTEND ALL COUNTERFOOTREINFORCEMENT TO INT. FACE OFWALL w/ 18" HOOKS (Typ.)

    FOOTING 3'-0" x 3'-0" x 10"w/ 4 #4 EA. WAY

    HD-2

    HD-1HD-1

    HD-1HD-1

    NOTE:TOP OF WALL & FOOTINGSTEP AS SHOWN AREAPPROXIMATE ANDSUBJECT TO CHANGE PERACTUAL SITE CONDITIONS.

    NOTE ON SLAB:4" SLAB ON UNDISTURBED GRADE ORCOMPACTED FILL WITH FIBERMESHREINFORCING, JOINT IN MAX 150 S.F.SECTIONS, MAX LENGTH: WIDTH RATIO3:2, JOINT AT COL CENTER LINES AND RE-ENTRANT CORNERS.

    2 2

    ALL

    GR

    ID L

    INES

    AR

    E T

    O E

    XTER

    IOR

    OF

    WAL

    L.

    15' -

    0"

    15' -

    0"

    4' - 0"

    BEAM ABOVE

    SLO

    PE 5

    " TO

    DO

    OR

    BEAM ABOVE

    #4 x 6' @ 16" O.C.IN SLAB

    DROP T.O.W. 16" @DOOR AND POURSLAB OVER

    (4) 4 #5 DOWELS TOWALL, (TYPICAL)

    4" Step in Slab

    4" Step in Slab

    BEAM ABOVE BEAM ABOVE

    6' -

    0"

    16' - 4"0' - 8"

    16' - 0"0' - 8"

    16' - 4"

    6' -

    0"

    4' - 0"

    BEAM ABOVE

    14' -

    3 7

    /8"

    14' -

    3 7

    /8"

    13' - 5"13' - 9 1/2"8' - 4 1/2"13' - 1"

    2' - 11 3/4"

    16' - 4 1/2"

    4' - 0"

    2' - 11 3/4"

    3A104

    -0' - 4"

    0' - 0"

    0' - 0"

    -0' - 4"

    0' - 0"

    Step T.O.W.

    Step Footing

    4' -

    10"

    4' -

    3 1/

    2"

    NOTE:ALL FOOTING REINF. SHALL BE SUPPORTED ON CHAIRS, CONCRETE, BRICKS OROTHERWISED SUPPORTED FIRMLY AND TIED IN PLACE, 3" CLEAR OF EARTH.

    Step T.O.W.

    Bot of Footing(-3'-9") Field Verify

    FOOTING 1'-6" x 1'-6" x 10"w/ 2 #4 EA. WAY

    ENLARGE FOOTING TO 4'-0" x 4'-0"x 10" W/ 4 #5 EA. WAY AND 2 #5CONTINUOUS THROUGH

    1' - 6"FOOTING

    (Typ.)

    2 #5 VERTS FULL HEIGHT OFWALL 1 1/2" CLEAR OF OUTSIDEFACE, TYP. @ COUNTERFORTS.

    Step T.O.W.

    Step Footing

    BEHINDPEIRS(Typ.)

    2 # 4 12

    6

    6

    NOTE ON SLAB:ICF FORMING SYSTEMS MAY BE USED WITH NO CHANGE INREINFORCING. 8" THICK WALLS PER SECTIONS

    4S101

    0' -

    8"

    1' -

    6"

    BEAM POCKET (above)

    15' -

    0"

    15' -

    0 1

    /4"

    14' -

    3 3

    /4"

    Scale

    Project number

    Date

    CELL 303-803-3788Designed by

    RESIDENCE

    Paul Merritt

    Revisionsdate

    Mark Cruz

    70 Collins WayRollinsville,

    Gilpin County,Colorado

    As indicated

    7/25

    /200

    8 7:

    29:1

    1 PM

    S101

    FOUNDATION

    60210-6-2006

    HD-1 = SIMPSON STHD14 PER CAT C - 2006, PG 42

    HD-2 = SIMPSON STHD 14 RJ CAT C-2006, PG42

    7 3d Foundation

    8 Rear 3d Foundation View

    JVA Job # 12604

    Merritt Residence70 Collins WayRollinsville, Gilpin County, Colorado

    DESIGN LIVE LOADS: 2003 IBC, U.O.N.* Snow 75 psf* Wind 120 mph, exp C, 3 second gust* Floor 40 psf* Exterior Decks 75 psf

    FOUNDATION:* Foundations are designed without an engineer's soil investigation. Foundation design criteria was assumed for purposes offoundation design and shall be confirmed by a soils engineer, at owner's expense, prior to construction. (This procedure mayrequire revisions to foundation design, at additional expense to the owner, if soils engineer determines that such design criteriaare inappropriate for this building site.)* Footings shall be placed on undisturbed natural soil or compacted fill tested and approved by soils engineer.* Maximum design soil pressure: 2000 psf

    BASEMENT WALLS:* Design lateral soil pressure (equivalent fluid pressure):Basement Walls: 45 pcf.* Backfill all retaining walls with free draining granular material except the top two feet.* Provide perimeter drain system with invert minimum of 6" below bottom of basement slab. Extend perimeter drain to daylight orto sump.* Slope perimeter grade away from building.* Place concrete continuously without horizontal cold joints.* Basement slab and main level floor joists must be in place prior to backfilling, or provide adequate shoring and bracing.

    CONCRETE AND REINFORCEMENT:* Concrete shall conform to applicable provisions of ACI-301 and 318. Minimum 28 day compressive strength (F'c) as follows:

    Footings : 3000 psiFoundation Walls: 3000 psi 6-7% air entrainmentInterior Slabs: 3000 psi max 0.45 water : cement ratioExterior Slabs: 3500 psi max 0.45 water : cement ratio, 6-7% air entrainment* Cement Type: I / II* Deformed reinforcement: ASTM A615 grade 60, except bars specified to be field-bent, stirrups, and ties which shall be grade40.* Fibremesh: 100% virgin polypropylene, fibrillated fibers as manufactured by Fibremesh Co. per ASTM C-1116 type 111 4.1.3and ASTM C-1116 performance level one, 1.5 lb. per cubic yard.* Welded Wire Fabric (WWF): ASTM A185. See also plan.* Typical minimum foundation reinforcing: 2 #5 top and bottom, (except as noted) continuous at corners and steps.* Reinforcement shall be fabricated and placed per ACI Manual of Standard Practice (ACI-315). At splices, lap bars 50 diametersunless noted otherwise.* Minimum 2 #5 around all four sides of all openings, extend min. 2'-0 beyond openings.* Concrete cover over reinforcing: 11/2" for concrete placed against forms; 3" for concrete placed against earth. See alsodrawings.* In continuous members, splice top bars at mid span and bottom bars over supports.* Keep reinforcement clean and free of dirt, oil, and scale. Oil forms prior to placing reinforcement.

    STRUCTURAL STEEL:* Structural Beams: A992* Angles, misc.: ASTM A36* Anchor Bolts: ASTM A307 or A36.* Connector bolts: ASTM A307* Adjustable pipe columns:3" diameter, 11 (eleven) gage, shall be certified by the manufacturer for a safe load capacity of 13,500 lbs. at 7'-6"3" diameter "Heavy Duty" schedule 40 (3.5" O.D.) Columns shall be certified for 28,000 lbs. at 7'-6". Maximum screw extension 2".* Expansion Anchors shall be NER approved, installed in accordance with manufacturers specifications.In concrete: Wedge Type* Non-shrink grout beneath column base and beam bearing plates shall be non-metallic with minimum compressive strength5000psi.* All structural steel shall be fabricated and erected per the current edition of AISC Steel Construction Manual.* Welding by qualified welders. E70XX electrodes.* Except as noted, framed beam connections shall be detailed to develop 0.6 x Allowable Uniform Load values tabulated in the 9thEdition AISC Manual, Pp. 2-27 and following.* All beams shall have fitted web stiffeners welded to each side of webs above and below columns. ( plate or as noted)* Attach wood nailer plates to beams with 3/8" diameter bolts at 32" with glued contact face, or 5/32" diameter powder actuateddrive pins at 24" o.c., U.O.N.

    1/2" = 1'-0"5Typical Reinforcing @ Steps & Openings

    1/2" = 1'-0"1Foundation Detail 1

    1/2" = 1'-0"2Foundation Detail 2

    1/2" = 1'-0"3Foundation Detail 3

    1/2" = 1'-0"4Foundation Detail 4

    1/4" = 1'-0"6Foundation Plan

    Structural DrawingsPaul Merritt Residence Rollinsville COFall 2007Paul Merritt hired me to do structural drawings for his mountain home. Axonometric foundation drawings assisted the contractor in building the extreme excavation and shoring needed for this steep mountain site.

  • Comp

    etition

    s

    Loft Aeronautics Inc, an air travel startup is developing shipping tech-nologies or developing countries. These 400 yard long dirigibles can lift shipping containers and deliver them, via remote control to and place in the world.

    They hired me to digitally develop their geometries of the outer Air-ship manifolds and produce basic renderings used to explain their concepts to potential investors.

    Freelance 3-D ModelingLoft AeronauticsSummer 2006

    Comp

    etition

    s

  • Creativ

    e Work

    s

  • Mark [email protected] m

    ark cruz

    desig

    n

  • Profes

    siona

    l