mark hadden portfolio
DESCRIPTION
Portfolio of architectural workTRANSCRIPT
-
Sandal Magna School
-
Sandal Magna School
-
Sandal Magna School
-
Sandal Magna School
-
Sandal Magna School
tarmac - vehicular and/or pedestrian
rubber crumb surfacing
breedon gravel
1
2 3
4
5 6
7
8 9
10
1
234
5 6 7 8
910
1112
E
S
W
N5
4
3
2
1
12 345
6
7 8
9
10
26
.4
25.990
Fall
ram
p
landin
g
ram
p
ram
p
ram
p
landin
g
landin
g
76
00
30
41
18
00
60
2.5
8100 2915 8100 4940 8100 2915 8100 4940 8100 2915 8100 4940
13c12c11c10c9c8c7c6c5c3c2c1c
J
K
L
M
N
30
41
18
00
54
00
4730 7200 7200 7200 6063 10285 5235
9b4b3b2b1b
E
F
G
H
57
32
.5
10
00
0
4c
6b
7b
8b
85.00
57
32
.5
5b
5a
4a
3a
2a
1a
0a
6400
5685
4715
7600
A
B
C
D
54
00
18
00
30
41
7200
15
47
5
9900 7095
26663
53
17
14481
13
01
5
28
90
7
63
44
13689
24867
11019
67
43
69
09
71819
31
09
22
26
48
39
6200
16
88
8
63
63
4
34663
26894
211
8
13432
10
62
3
24629
50
44
30
77
136222
11
02
6
16150
+26.400
appro
x. +
26
.5
(as
exis
ting)
+26.4
+26.5
+26.3
+26.0
+26.1
+26.2
appro
x. +
26
.5
(as
exis
ting)
+25.950
+25.950
+25.990
+25.990
+25.490
+26.390
+25.950
+26.500+26.490
+25.490
+25.990
appro
x. +26.2
(as
exis
ting)
+25.000
+24.900
+25.990 +25.990
+26.150
+26.130
+26.235
+26.+260
+25.700
+26.275
+25.990
+26.500
+26.490
+24.990
+25.990
+25.990
+24.990
+25.990
+24.990
+24.990
+24.990+24.750
+24.850
+24.850
+24.850
+26.400
++24.650
+24.990
+25.940
+25.750
+25.600
+25.300
+25.200
+25.500
+25.550+25.450
+25.990
+25.250
+26.490
+26.400
+26.300
+26.020
+25.990
+25.990
+25.1
+25.3
+25.4
+24.9
+25.950
+25.990
+25.950
+25.990
+25.990
+26.000
+25.990+25.990
+26.515
+26.000
+25.990
FFL:
+26.000
FFL:
+26.000FFL:
+26.000
+26.000
+25.950
+25.990
+26.700 +26.400
+2
4.7
5
+2
4.6
0
++24.500
FFL:
+25.990 +25.990
+25.490
+25.990
+25.950
+25.990
+25.950
+25.990+25.960
+26.000
+25.990
+25.960
+25.990
+25.490
+25.990
+25.950
+25.950
+26.390 +25.990
+25.950
+25.990
+25.950
+26.490
+25.950
appro
x. +26.4
00
2485 2595 2485
3200
3150
1625
3150
3490 510 59352485 2595 2485 6445
3175
3175
1625
3150
1575
25000
16
50
0
25100
27450
13
72
5
99
00
88
20
5000 2504 5000 6340 50004397
51
59
22271 2950
745 750 750 749 750 751 750
25
.11
52
5.2
40
25
.36
5
25
.49
0
25
.61
5
25
.74
0
+26.4
90
7 stepsat 125 high each
14630
17
25
37
30
+25.950
+25.990 +25.990
+25.605
+25.720
+25.835
+25.950
15
00
83
45
1250
10001000
+25.950
22000
14982
14982.3
1875
1570
6353
57
29
14000
20
0
1220
+26.400
+26.000 +26.000 +26.000
+25.950
+25.950
5000
+26.490
50004000
+25.990+25.490
rst 750mm of landing to be constructed from decking. Block paving to be set out from this end to achieve whole/half blocks at the jucntion between the materials
+24.850
+24.850
+25.9
90
+25.4
90
7487.5
7000
7512.5
juniper (juniperus virginiana) as visual and acoustic buffer
vehiculartarmac: Green
existing oak treeto remain
new hornbeam (carpinus betulus) hedge to boundary as visual and acoustic buffer
new american sweetgum tree(liquidambar styraciflua)
new muskwood bush(viburnum burkwoodii)
new umbrella pine (pinus pinea)
boundary wall to remain; exact position of fence to be installed TBC
existing high boundary wall (brickwork plinth with chainlink metal fence over) to remain, untouched and untreated
existing wall removed toground level and replacedwith Zaun 'Duo Perimeter'
galvanised steel fence
line of existing pavement
existing crossing to be stopped upto match existing adjacent pavement
existing pavement to beremoved, provide new
vehicle crossover into site
new vehicular gates
new pedestriangates
at visitor'sentrance
new pedestrian gatesat children's entrance
existing substation to remain
2m x 2m visibility splay
2m x 2m visibility splay
job title
dwg. no.
job no.
scale
dwg. title
date status
rev. no description Sarah Wigglesworth Architects
T +44 (0)20 7607 9200 F +44 (0)20 7607 5800E [email protected] W www.swarch.co.uk
do not scale from this drawing
524 Sandal Magna Site Plan
524-L-025 1:200@A1 Nov 09 Construction N
NOTE: all trees to be planted in 2nd and 3rd quarter of 2010 relative to species
SURFACES LEGEND
grass or similar planting
timber - railway sleepers or decking
brick pavers
grasscrete or other permeable paving
new hawthorn (crataegus laevigata)
new whitebeam (sorbus aria 'lutescens')
new dogwood (cornus nuttallii)
new white mulberry (morus alba)
new apple tree(ribston pippin)
new apple tree(yorkshire greening)
new pear tree(hessle)
new pear tree(williams bon chretien)
new almond tree(prunus dulcis)
swedish birch (betula pendula)as visual and acoustic buffer
new hornbeam (carpinus betulus) hedge to boundary as visual and acoustic buffer
new hornbeam (carpinus betulus) hedge to boundary as visual and acoustic buffer
gabion retaining wall
assorted wildflower meadow
raised planting bed: timber sleepers backfilled with soil ready for school planting use
ruin of existing courtyard to be retained (details tbc)
raised planting bed: timber sleepers backfilled with soil ready for school planting use
high fence: Zaun 'Duo Permimeter' galvanised steel fencing
low fence
high fence: Zaun 'Duo Permimeter' galvanised steel fencing
approximate location of sprinkler tank
2
D1300
1
1
D-1300
1
D-1305
new umbrella pine (pinus pinea)
vehicular tarmac:green
vehicular tarmac
vehicular tarmacpedestrian tarmac
NOTE: all trees shown at estimated mature size
high fence
low wall
carpark20 cars carpark
existing high boundary wall (brickwork plinth with chainlink metal fence over) to remain, untouched and untreated
new mixed native hedge, random spread of hawthorn, blackthorn, hazel and holly, typical along this boundary, exact extent and locations to be confirmed on site
bicycle racks
NEW BUILDINGTOP OF SLAB LEVEL RL 25.850
TOP OF SCREED LEVEL RL 26.000
vehiculartarmac: green
indicative truck turning circle shown dashed
telescopicbollards
telescopicbollards
slot drain slot drain
indicative truck turningcircle shown dashed
fall site to drain
civic drain
civic drain
civic drain
civic drain
fall site to drain
fall site to drain
fall site to drain
fall site to drain
fall
site
to
drai
n
fall
site
to d
rain
fall
site
to d
rain
fall
site
to d
rain
ramp down1:80
1:8
01:8
0
fall site to drain
1:8
0
carpark tarmac with paint linemarking as shown carpark tarmac with
painted linemarking and signage as shown
fall
site
to d
rain
fall
site
to d
rain
fall
site
to d
rain
fall
site
to d
rain
fall siteto drain
fall siteto drain
slot
dra
in
slot
dra
in
slot drain slot drain
new paving to parents waiting area
new 1000mm high steel railing
ramp down
1:20
ramp down
1:20
civic drain: to follow outermost s
ports linings
civic drain
civic drain
civic drain
pedestrian tarmac
fall site to drain
fall site to drain
fall siteto drain
fall siteto drain
fall to surroundingdrains
sports area, tarmac with painted linemarking as shown:netball yellow markedfootball red marked
ramp down
1:20
high fence and gates
high
fen
ce a
nd g
ates
high fence and gates
low fence and gates
high fence and gateshigh fence
low
fen
ce
handrail handrail
hand
rail
hand
rail
handrail
high
fen
ce a
nd g
ate
NOTE: refer 524-TSC Tree Schedule Revision 2 refer 524-LSC Landscape Surface Schedule
benchbench
benchbench
timber sleepers
Note: Do not scale from drawingsConfirm all dimensions on site prior to shop drawings and manufacture Any discrepancies to be confirmed with Architect prior to proceedingRefer to all Engineer's documentation for coordination
Note: Services intent and set out shown nominally only on Architectural documentation. For quantity, distribution and all other information refer to Services Engineer's documentation.Exact set out and coordination to be confirmed on site with Services Engineer and Architect.
Note:Structural Slab Level = +25.850 Site LevelScreed Level = +26.000 Site Level
524-L-025 Site Plan1:501
setout dimension from corner of retained boundary wall to Grid 1c
seto
ut d
imen
sion
fro
m c
orne
r of
reta
ined
bou
ndar
y w
all t
o G
rid N
seto
ut di
men
sion
fro
m G
rid H
to
Grid
J
seto
ut d
imen
sion
fro
m G
rid D
to
Grid
EB
lock
A r
otat
ed 5
deg
rees
fr
om t
his
poin
t
G110509 - A - Issued for construction for levels
RAMP
120609 - B - Revised levels and landscaping to South Boundary171109 - C - Revisions to landscaping
retaining wallfrom railway
sleepers
retaining wallfrom railway
sleepers
brick pavers
slot drain
planting
planting
juniper (juniperus virginiana) as visual and acoustic buffer
swedish birch (betula pendula Dalecarlica)as visual and acoustic buffer
slot
dra
insl
ot d
rain
slot
dra
in
swedish birch (betula pendula Dalecarlica)as visual and acoustic buffer
Existing trees protected or removed as discussed with tree officer for Wakefield
030210 - D - Revisions to landscaping
Tactile paving
Curb to match existing -ramps down to createpedestrian access way
planting
planting
planting
120210 - E - Revisions to landscaping
Breedon Gravel
pedestrian tarmac
pedestrian tarmac
pedestrian tarmac
pede
stria
n ta
rmac
pede
stria
n ta
rmac
slot drain:gulley discharge to MH
rubber crumbColour ref see
SK_160
rubber crumbColour ref see
SK_160rubber crumbColour ref see
SK_160
Block PavingDurapave
Block PavingDurapave
Tim
ber
Dec
king
drainage channel:discharge to
beneath decking
rubber crumbColour ref see
SK_160
pedestrian tarmac
boundary wall to remain; exact position of fence to be installed TBC
boundary wall to remain; exact position of fence to be installed TBC
boundary wall to remain; exact position of fence to be installed TBC
bree
don
timber edging to pathway: 50x200
timber edging to pathway: 50x200
timber edging to pathway: 50x200
timber edging to pathway: 50x200
ramp landing and 4th step to align in height: front and back of step to align with front and back of landing
220410 - F - Landscaping clarications
boundary wall to remain; exact position of fence to be installed TBC
set gabion back 200mm from boundary wall and back frill to same level with topsoil
set gabion end 500mm past end
of pump house:
top of gabion: 26.490
290410 - G - Landscaping clarications
timber sleeper walled planter with concrete strip footing 150mm below top surface. Sleepers pinned together as drawing D-1304
Timber edgings to breedon gravel/grass/planting beds as drawings 1307-1309
Timber edgings to breedon gravel/grass/planting beds as drawings 1307-1309
Sand cementy screed to areas under proposed greenhouse and garden shed
Rubber crum to extend to doorway
Gulley to MHbeneath decking
Tim
ber
Dec
king
to
step
s
Timber Decking
Tim
ber
Dec
king
to
step
s
slot drain to alignwith door centre
adjacent
215 brick wall:
GRAPHIC DESIGNFOR SOFT
SURFACING TO BECONFIRMEDALONG WITH
COLOURSSCHEME
GRAPHIC DESIGNFOR SOFT
SURFACING TO BECONFIRMEDALONG WITH
COLOURSSCHEME
-
Sandal Magna School
76
00
30
41
18
00
60
2.5
8100 2915 8100 4940 8100 2915 8100 4940 8100 2915 8100 4940
13c12c11c10c9c8c7c6c5c3c2c1c
J
K
L
M
N
30
41
18
00
54
00
4730 7200 7200 7200 6063 10285 5235
9b4b3b2b1b
E
F
G
H
57
32
.5
10
00
0
4c
6b
7b
8b
85.00
57
32
.5
5b
5a
4a
3a
2a
1a
0a
6400
5685
4715
7600
A
B
C
D
54
00
18
00
30
41
7200
R.10L1600xH200xW118100mm above FFL
5373
5441
L1000xH950xW118 100mm above FFL1.393
18
1
L800xH500xW118 100mm above FFL1.409
L1000xH950xW118 100mm above FFL1.393
L800xH500xW118100mm above FFL
1.409
18
1
F.01L1400xW76
F.02L1400xW76250 250
50
F.03L2600xW76
50
Eq EqF.05L1400xW76
F.04L1400xW76 250250
50
F.06L2600xW76
50
EqEq
50
50
F.08L1400xW76
F.07L1400xW76 250250
50
F.09L2600xW76
50
EqEq
50
F.11L1400xW76
F.10L1400xW76 250250
50
F.12L2600xW76
50
EqEq
50
F.14L1400xW76
F.13L1400xW76 250250
50
F.15L2600xW76
50
EqEq
50
F.17L1400xW76
F.16L1400xW76 250250
50
F.18L2600xW76
50
EqEq
50
R.06L600xH500xW218550mm above FFL
Eq
R.07L600xH500xW218550mm above FFL
Eq EqEq
R.05L600xH500xW218550mm above FFL
EqEq
R.04L600xH500xW218550mm above FFL
EqEq
R.03L600xH500xW218550mm above FFL
EqEq
R.02L600xH500xW218550mm above FFL
EqEq
R.24L600xH500xW218550mm above FFL
EqEq
R.01L600xH500xW218550mm above FFL
EqEq
R.08L600xH500xW218550mm above FFL
EqEq
L1000xH950xW118100mm above FFL
1.393
L800xH500xW118 100mm above FFL1.409
R.13L700xH200xW118100mm above FFL
50
Eq Eq
R.12L700xH200xW118100mm above FFL
50
Eq Eq
R.11L1200xH500xW118100mm above FFL EqualEqual
50
R.14L1600xH200xW118100mm above FFL
50
50
R.09L1600xH200xW118100mm above FFL
83.00
CHANGE TO WINDOW OPENINGS: COORDINATE WITH KLH SETTING OUT INFORMATION
CHANGE TO WINDOW OPENINGS: COORDINATE WITH KLH SETTING OUT INFORMATION
R.27L1000xH500xW218150mm above FFL
Eq
Eq
R.26L1000xH500xW218150mm above FFL
Eq
R.25L1600xH500xW168150mm above FFL
Eq Eq
R.17L1810xH280xW180
20
0
Eq
ua
l
Eq
ua
l
R.16L1410xH280xW180
R.18L1400xH650xW118100mm above FFL 150
R.15L1200xH950xW118100mm above FFL
15
0
R.28L1000xH500xW118150mm above FFL
Eq Eq
Eq
R.19L800xH500xW118150mm above FFL
Eq Eq
42
.8 k
w g
as
16
kw
3 p
hase
42
.8 k
w g
as
9.0
5kw
3 p
hase
R.22
L1000xH500xW118
100mm above FFL
77
3
24
35
R.23
L1600xH500xW118
100mm above FFL
62
6
18
24
R.20
L1400xH500xW118
100mm above FFL
L500xH2000xW110
DIM above FFL TBC
L2400xH280xW180
100mm above FFL
Align with edge
G51G52
G48
Full height Studwork
Wall 2810
Top of Bund Wall +0.15
0
(minimum) above FFL
38
13
100
job title
dwg. no.
job no.
scale
dwg. title
date status
rev. no description Sarah Wigglesworth Architects
T +44 (0)20 7607 9200 F +44 (0)20 7607 5800E [email protected] W www.swarch.co.uk
do not scale from this drawing
524 Sandal Magna GA Plan
524-L-003 1:100@A1 April 08 Information
Staff RoomG50 Meeting
G51
Head OfficeG52
Plant RoomG53
KitchenG56
WCG46
Staff UtilityG48
Cleaners RoomG54Circulation
G49
Covered Play AreaG33
Play Area 1G29
Play Area 2G30
Teaching SpaceG31
StoreG38
ResourceG37
Parents RoomG36WC
G35Cloakroom
G34
StoreG33A
CorridorG32
HallG41
PE StoreG40
Dis WC 4G39
Link CorridorG28
DiningG44
FoyerG42
ReceptionG43
WC/Cloakroom 1G02
Classroom YR 1G01
Classroom YR 2 G03
Group Room 1G04
Classroom YR 3G05
Resource corridorG13
Resource corridorG13
Resource corridorG13
Shared Resource 1G14
Small Group Room 1G15
Dis WC 1G16
StoreG17
SENG18
StoreG19
Dis. WC 2G20
Link CorridorG28
Classroom YR 4G07
Group Room 2G08
Classroom YR 5G09
WC/Cloakroom 3G10
Classroom YR 6G11
Group Room 3G12
Resource corridorG13
Resource corridorG13
Resource corridorG13
ICT ServerG21
ICT SuiteG22
Book StopG23
Dis. WC 3G24
StoreG25
Small group room 2G26
Shared resource 2G27
524-L-003 GA Plan 1
Data RackG55
WC/Cloakroom 2G06
storestorestore
WCG47
BLOCK A
Staff WCG45
StoreG57
Dis WC 5G58
OfficeG59
UtilityG35a
Female WCG02a
Male WCG02b
Female WCG06a
Male WCG06b
Female WCG10a
Male WCG10b
FOR BLOCK A FLOOR PLAN REFER TO L-004FOR BLOCK A ROOF PLAN REFER TO L-009FOR BLOCK A CEILING PLAN REFER TO L-031
BLOCK BFOR BLOCK B FLOOR PLANS REFER TO L-005 AND L-006FOR BLOCK B ROOF PLANS REFER TO L-010 AND L-011FOR BLOCK B CEILING PLANS REFER TO L-032 AND L-033
BLOCK CFOR BLOCK C FLOOR PLANS REFER TO L-007 AND L-008FOR BLOCK C ROOF PLANS REFER TO L-012 AND L-013FOR BLOCK C CEILING PLANS REFER TO L-034 AND L-035
Store
G40A
Note: Do not scale from drawingsConfirm all dimensions on site prior to shop drawings and manufacture Any discrepancies to be confirmed with Architect prior to proceedingRefer to all Engineer's documentation for coordination
Note: Services intent and set out shown nominally only on Architectural documentation. For quantity, distribution and all other information refer to Services Engineer's documentation.Exact set out and coordination to be confirmed on site with Services Engineer and Architect.
N
-
Sandal Magna School
East Elevation
job title
dwg. no.
job no.
scale
dwg. title
date status
rev. no description Sarah Wigglesworth Architects
T +44 (0)20 7607 9200 F +44 (0)20 7607 5800E [email protected] W www.swarch.co.uk
do not scale from this drawing
524 Sandal Magna Elevations
524_L_113 A 1:100@A1 Dec 08 For Planning Approval N
corrugated cementitious board rainscreen cladding: charcoal grey
1 East Elevation Main Entry and view from street
2 West ElevationView from rear play area and playing fields
Block C - Classrooms Glazed LinkEntry
Block B - Foundation / Sports Hall Glazed LinkEntry - Dining Room
Block A - Administration
clay brick cladding: variegated red
cementitious board rainscreen cladding:pale grey
timber framed glazed curtain walland entry doors
timber board rainscreen cladding: natural finish
clay brick cladding: variegated red
timber framedglazed curtain walland entry doors
timber board rainscreen cladding: natural finish
clay brick cladding: variegated red
cementitious board rainscreen cladding:pale grey
EPDM membrane roof cladding: grey
timber board rainscreen cladding: natural finish
glazed rooflights to hall
high level windows to group rooms
green (sedum) roof to corridor
green (sedum) roof to corridor
kitchen entrance
bell tower (beyond)corrugated cementitious board rainscreen cladding: charcoal greycorrugated cementitious
board rainscreen roofcladding: charcoal grey
corrugated cementitious board rainscreen roofcladding: charcoal grey
Block C - ClassroomsGlazed LinkMain Entry
Block B - Foundation / Sports Hall Glazed LinkEntry
Block A - Administration
covered play areacorrugated glass reinforced plastic cladding: white/translucent
glazed rooflights to hall
timber framedglazed curtain walland entry doors
green (planted) wall to corridor
timber framedglazed curtain walland entry doors
green (planted) wall to corridor
green (sedum) roof to corridor
green (sedum) roof to corridor
clay brick cladding: variegated red
cementitious board rainscreen cladding:pale grey
EPDM membrane roof cladding: grey
glazed rooflights to class rooms
corrugated cementitious board rainscreen roofcladding: charcoal grey
timber board rainscreen cladding: natural finish
high level windowsto group rooms
brick ventilation stack chimneysclay brick cladding: variegated red
corrugated cementitious board rainscreen roofcladding: charcoal grey
timber entry gate and doors
clay brick cladding: variegated red
cementitious board rainscreen cladding:pale grey
corrugated cementitious board rainscreen cladding: charcoal grey
bell tower (beyond)corrugated cementitious board rainscreen cladding: charcoal grey
1m 2m 3m 4m 5m 10m 15m0m
-
Sandal Magna School
job title
dwg. no.
job no.
scale
dwg. title
date status
rev. no description Sarah Wigglesworth Architects
T +44 (0)20 7607 9200 F +44 (0)20 7607 5800E [email protected] W www.swarch.co.uk
do not scale from this drawing
524 Sandal Magna Sections / Elevations
524_L_115 A 1:100@A1 Dec 08 For Planning Approval N
5 Section (elevations visible from courtyards between blocks)
6 Section(elevations visible from courtyards between blocks)
7 Section(elevations visible from courtyards between blocks)
glazed rooflights to hall
Block B - Foundation
Block B - Sports Hall
bell towercorrugated cementitious board rainscreen cladding: charcoal grey
corrugated cementitious board rainscreen cladding: charcoal grey
Glazed Link Block B - Sports Hall
Block B - Foundation Block B - Sports Hall Glazed Link - Main EntryGlazed Link - Dining Room
bell towercorrugated cementitious board rainscreen cladding: charcoal grey
corrugated cementitious board rainscreen roofcladding: charcoal grey
green (sedum) roof to corridor
green (sedum) roof to corridor
corrugated cementitious board rainscreen roofcladding: charcoal grey
corrugated cementitious board rainscreen cladding: charcoal grey
covered play areacorrugated glass-reinforced plastic cladding: white/translucent
rooflights to foundation rooms
ventilation stacks to foundation rooms
timber framed windows
building signage
Block C - Classrooms Glazed Link
green (sedum) roof to corridor
Block C - Classrooms
corrugated cementitious board rainscreen roofcladding: charcoal grey
corrugated cementitious board rainscreen cladding: charcoal grey
timber framedglazed curtain wall
opening vents to curtain wallto match cladding
ventilation stacks to foundation rooms
covered play areacorrugated glass reinforced plastic cladding: white/translucent
corrugated cementitious board rainscreen cladding: charcoal grey
corrugated cementitious board rainscreen roofcladding: charcoal grey
EPDM membrane roof cladding: grey timber board rainscreen cladding: natural finish
timber board rainscreen cladding: blackboard paint finish
timber framed windowstimber gate entry to classroom block
timber gate entry to classroom block timber gate entry to
classroom block
timber board rainscreen cladding: natural finish
timber board rainscreen cladding: blackboard paint finish
timber board rainscreen cladding: natural finish
timber board rainscreen cladding: blackboard paint finish
EPDM membrane roof cladding: grey
timber framed windows
timber split-log rainscreen cladding: clear finish
anti-climb rainwater pipe
anti-climb rainwater pipe
anti-climb rainwater pipe
timber split-log rainscreen cladding: clear finish
timber split-log rainscreen cladding: clear finish
greenhouse (by school)
garden shed (by school)
corrugated glass reinforced plastic cladding: white/translucent, with opaque cladding behind
timber sunshades to timber framed windows
SANDAL MAGNA SCHOOL
Block C - Classrooms (beyond)
1m 2m 3m 4m 5m 10m 15m0m
job title
dwg. no.
job no.
scale
dwg. title
date status
rev. no description Sarah Wigglesworth Architects
T +44 (0)20 7607 9200 F +44 (0)20 7607 5800E [email protected] W www.swarch.co.uk
do not scale from this drawing
524 Sandal Magna Sections / Elevations
524_L_115 A 1:100@A1 Dec 08 For Planning Approval N
5 Section (elevations visible from courtyards between blocks)
6 Section(elevations visible from courtyards between blocks)
7 Section(elevations visible from courtyards between blocks)
glazed rooflights to hall
Block B - Foundation
Block B - Sports Hall
bell towercorrugated cementitious board rainscreen cladding: charcoal grey
corrugated cementitious board rainscreen cladding: charcoal grey
Glazed Link Block B - Sports Hall
Block B - Foundation Block B - Sports Hall Glazed Link - Main EntryGlazed Link - Dining Room
bell towercorrugated cementitious board rainscreen cladding: charcoal grey
corrugated cementitious board rainscreen roofcladding: charcoal grey
green (sedum) roof to corridor
green (sedum) roof to corridor
corrugated cementitious board rainscreen roofcladding: charcoal grey
corrugated cementitious board rainscreen cladding: charcoal grey
covered play areacorrugated glass-reinforced plastic cladding: white/translucent
rooflights to foundation rooms
ventilation stacks to foundation rooms
timber framed windows
building signage
Block C - Classrooms Glazed Link
green (sedum) roof to corridor
Block C - Classrooms
corrugated cementitious board rainscreen roofcladding: charcoal grey
corrugated cementitious board rainscreen cladding: charcoal grey
timber framedglazed curtain wall
opening vents to curtain wallto match cladding
ventilation stacks to foundation rooms
covered play areacorrugated glass reinforced plastic cladding: white/translucent
corrugated cementitious board rainscreen cladding: charcoal grey
corrugated cementitious board rainscreen roofcladding: charcoal grey
EPDM membrane roof cladding: grey timber board rainscreen cladding: natural finish
timber board rainscreen cladding: blackboard paint finish
timber framed windowstimber gate entry to classroom block
timber gate entry to classroom block timber gate entry to
classroom block
timber board rainscreen cladding: natural finish
timber board rainscreen cladding: blackboard paint finish
timber board rainscreen cladding: natural finish
timber board rainscreen cladding: blackboard paint finish
EPDM membrane roof cladding: grey
timber framed windows
timber split-log rainscreen cladding: clear finish
anti-climb rainwater pipe
anti-climb rainwater pipe
anti-climb rainwater pipe
timber split-log rainscreen cladding: clear finish
timber split-log rainscreen cladding: clear finish
greenhouse (by school)
garden shed (by school)
corrugated glass reinforced plastic cladding: white/translucent, with opaque cladding behind
timber sunshades to timber framed windows
SANDAL MAGNA SCHOOL
Block C - Classrooms (beyond)
1m 2m 3m 4m 5m 10m 15m0m
-
Sandal Magna School
ICT cooling provided by heat pump
North-light to classrooms provide natural light
without glare
Passive ventilation strategy via open brick construction provides means of cooling
and air passage to classrooms
Allotment gardens provide external teaching space adjacent to classrooms
Central building management system controls environments and
reports energy usage for the life of the building enabling
life cycle analysis
Ground source heating and hot water provided by by borehole array (125m deep)
125m2 of photovoltaic panels provide power for the heat pumpand feed back to the grid when not required by the school
15000L rainwater collection tank
Load bearing masonry made from locally sourced bricks provides thermal mass to temper the environmental conditions inside the building
Green roofs help dissipate water flowduring heavy rain and provide microhabitats for local animal species
Gabion walls to perimeters are built from bricks reclaimed from the first phase of demolition Sustainability Diagram
-
Sandal Magna School
-
Sandal Magna Schooljob titledwg. no.
job no.
scale
dwg. title
date status
rev. no description
524 Sandal Magna Group Shed Elevations
524-A-002 1:20@A1 April 09 Construction
Sarah Wigglesworth Architects
T +44 (0)20 7607 9200 F +44 (0)20 7607 5800E [email protected] W www.swarch.co.uk
do not scale from this drawing
13C 12C4940
3811 4797
1540
872
885
Top of screed+ 0.150
Deck height+ 0.140
SSL+ 0.000
Eaves height+ 3.374
Ridge height+ 4.076
K J
3041
1290
Group Shed Elevations1A002
Group Shed Elevations
13C 12C
615 440440 468 413 440 440 440 488 413 444 610 440 440 440 413 467467 440 615
600
600
143
600
206
457
600
600
600
431
600
143
Group Shed Elevation with timber fixings
Wall construction:94mm cross-laminated timber, 60mm Ecotherm insulation (TBC), Breather membrane, 50mm vertical softwood battens, 25mm horizontal softwood battens, 18mm tongue and groove cedar rainscreen
Lower section finished with external black Falun paint as M60, shown shaded
K J
630 630 623 638 634
472
600
500
500
435
Group Shed Elevation with timber fixings
Top of screed + 26.000
SSL + 25.850
Top of roof trim+ 3.191
Top of reveal + 1.790
Top of cill + 0.436
Underside of cladding stop + 0.180
Display Window(fixed)
Top of reveal + 2.476
Top of reveal + 2.633
Top of cill + 0.962
Top of screed + 0.150
SSL + 0.000
Top of cill + 0.436
Top of reveal + 1.566
Top of roof trim+ 3.374
Top of cill + 1.108
1
D-111
2
A002
4
A002
3A002
H21_115 - Vertical 18mm tongue and groove cedar boards w/ concealed fixings
H21_116 - Horizontal 18mm tongue and groove cedar boards w/ concealed fixings
H21_115 - Vertical 18mm tongue and groove cedar boards w/ concealed fixings
L10_210 - Opening window: see window schedule for futher details
L10_210 - Fixed window
L10_210 - Fixed window
L10_210 - Fixed window
L10_210 - Opening window: see window schedule for futher details
H21_115 - Vertical 18mm tongue and groove cedar boards w/ concealed fixings
J42_110 - Single ply roofing membrane
H21_115 - Vertical 18mm tongue and groove cedar boards w/ concealed fixings
L10_210 - Fixed window
J42_110 - Single ply roofing membrane
J42_110 - Single ply roofing membrane
H21_116 - Horizontal 18mm tongue and groove cedar boards w/ concealed fixings
G20_270A - 50x 75mm softwood studs
G20_270A - 25mm x 50mm softwood battens fixed diagonally to vertical battens
G20_270 - 50 x 50mm softwood battens
H21_115 - Vertical 18mm tongue and groove cedar boards w/ concealed fixings
G20_270 - 25 x 50mm softwood battens
Lower section finished with external black Falun paint as M60, shown shaded.
G20_270 - 50 x 50mm softwood battens
G20_270 - 25 x 50mm softwood battens
H21_115 - Vertical 18mm tongue and groove cedar boards w/ concealed fixings
L10_210 - Fixed window
L10_210 - Opening window: see window schedule for futher details
H31_310A - Aluminium Flashing
L10_310- Steel framed fixed windowOpaque film to inner pane in shaded area to conceal structure behindP20_110 - Western Red cedar window board reveals
Top of cill + 0.436
Top of reveal+ 1.566
P20_110 - Western Red cedar window board reveals
Cornern windowCornern window
shown dashed
shown dashed
H31_310A - Aluminium Flashing
Note: Do not scale from drawingsConfirm all dimensions on site prior to shop drawings and manufacture Any discrepancies to be confirmed with Architect prior to proceedingRefer to all Engineer's documentation for coordination
20.04.09 - Issued for KLH setting out purposes onlyIssued for KLH setting out purposes only
-
Sandal Magna School
H41_110 - Profiled GRP Cladding Sheeting
job title
dwg. no.
job no.
scale
dwg. title
date status
rev. no description
524 Sandal Magna Library Shed Plan & Sections
524-A006 1:20@A1 April 09 Construction
C
2. 08.04.01 - Issued for Pricing
C. 20.04.09 - Issued for KLH setting out purposes only
Sarah Wigglesworth Architects
T +44 (0)20 7607 9200 F +44 (0)20 7607 5800E [email protected] W www.swarch.co.uk
do not scale from this drawing
3
A006
1
A-804
4
A006
1
D116
2
A006
J K
600
2225
320
2880
3444
73
300
470
350
600
120386
J K
3041
600
320
2880
2225
411
94
351
3444
2725
350
386
470
94
120
Library Shed Plan1A006
Library Shed Section3A006
Library Shed Section4A006
Top of screed + 0.150
SSL + 0.000
Underside Gutter +2.375
Top of roof trim + 3.550
Top of screed + 0.150
SSL + 0.000
Underside Gutter +2.375
Top of roof trim + 3.550
Top of reveal + 3.365
Top of cill
+0.436
SSL - 1.000
SSL - 1.000
4
D115
2
D116
Book StopG23
2
A006
H31_310A - Aluminium edge trim
J:23c
plywoodshelving unit
open tocorridor
J:23
J:23d, 23e, 23f, 23g
J:23d, 23e, 23f, 23g
J:23c
plywoodshelving unit
open tocorridor
J:23
Q55_110 - External timber decking
L10_210 - Opening window: see window schedule for futher details
KLH cross laminated timberWSI: domestic gradeto Structural Engineer's specification;with fire retardant to Z12
L10_210 - Fixed window
L10_610 Red Western Cedar timber slats to form shading louvres - mounted on flush recessed stainless steel angle plates- fixed with countersunk self tapping screws
H31_310A - Aluminium edge trim
P20_110 - Western Red cedar window board reveals
L10_210 - Opening window: see window schedule for futher details
H21_115B Western red cedar to library widow edge detail
H41_110 - Profiled GRP Cladding Sheeting
W:25W:26W:27W:28W:29
10C 9C
8100
8006
3349 34
46
Top of screed + 0.150
SSL + 0.000
Underside Gutter +2.375
Top of roof trim + 3.550
Library Shed Section2A006
Book StopG23
J:23c
plywoodshelving unit
open tocorridor
J:23b
J42_110 - Single ply roofing membrane lapped up and over SW roof fascia strip P10_140G - 100mm Insulation to single ply membrane roofs
J42_110 - Vapour Barrier
P10_320A - Breather membrane
P10_315 - Vapour barrier
KLH cross laminated timberWSI: domestic gradeto Structural Engineer's specification;with fire retardant to Z12
G20_270 - 25 x 50mm softwood battens
P10_140D- 60mm insulation
G20_270 - 38 x 38mm softwood battens
G20_270 - 25 x 50mm softwood battens
KLH cross laminated timberWSI: domestic gradeto Structural Engineer's specification;with fire retardant to Z12
P10_140D- 60mm insulation
G20_270 - 38 x 38mm softwood battens
H41_110 - Profiled GRP Cladding Sheeting
P10_320A - Breather membrane
P10_315 - Vapour barrier
J42_110 - Single ply roofing membrane lapped up and over SW roof fascia strip
P10_140G - 100mm Insulation to single ply membrane roofs
KLH cross laminated timberWSI: domestic gradeto Structural Engineer's specification;with fire retardant to Z12
J42_110 - Vapour Barrier
J42_110 - Single ply roofing membrane lapped up and over SW roof fascia strip P10_140G - 100mm Insulation to single ply membrane roofsJ42_110 - Vapour Barrier
10C 9C
K
J
8100
3041
94 3806 50694 94
600
176
6036
4
600
2994
1006 1000 500 1000 500 1000 500 1000 500 1000
594
60
866
544
250
300
600
1644
750
94
3506
60 380 60 60 380 60 60 380 60 60 380 6060
L10_210 - Opening window: see window schedule for futher detailsH21_115B Western red cedar to library widow edge detailH41_110 - Profiled GRP Cladding Sheeting
P10_140D- 60mm insulation
P10_320A - Breather membrane
P10_315 - Vapour barrier
KLH cross laminated timberWSI: domestic gradeto Structural Engineer's specification;with fire retardant to Z12
KLH cross laminated timber NSI: industrial grade non visualto Structural Engineer's specification; with fire retardant to Z12
KLH cross laminated timberWSI: domestic gradeto Structural Engineer's specification;with fire retardant to Z12
J:23
KLH cross laminated timber NSI: industrial grade non visualto Structural Engineer's specification; with fire retardant to Z12K13_110 - 20 x 100 SW boards on 50mm battens with 50m rockwool between
J:23
KLH cross laminated timber NSI: industrial grade non visualto Structural Engineer's specification; with fire retardant to Z12
K13_110 - 20 x 100 SW boards on 50mm battens with 50m rockwool between
Gutter formed within rigid insulation - single ply roofing membrane to run into gutter
P10_140K - 25mm rigid insulation to single ply membrane gutters
KLH cross laminated timber ISI: industrial grade visualto Structural Engineer's specification;with fire retardant to Z12
KLH cross laminated timber NSI: industrial grade non visualto Structural Engineer's specification; with fire retardant to Z12
M50_150 anti slip rubber sheet flooring adhered directly to each access panel
G20_311A - ply support
P10_140E - 40mm Ecotherm Floor-Therm rigid board insulation
Steel angle at access panel edge to Structural Engineer's specification
225mm Concrete slab on piers to Structural Engineer's specificationJ40_120 - Visqueen 500mu/2000 gauge EcoMembrane continuous damp proof membrane
J40_120A - Visqueen 250mu/1000 gauge EcoMembrane continuous damp proof membrane
Sand blinding, min 50 mm, level to receive slab
J40_190 - Visqueen continuous self adhesive tanking membrane
Prepared hardcore base to Structural Engineer's specification
P10_140E - 40mm Ecotherm Floor-Therm rigid board insulation
M10_130 - 110mm sand cement screed to contain underfloor heating pipework to mechanical engineer's specification
M50_170 - broadloom carpet floor finish
Q55_110 - External timber decking
Top of deck + 0.140
KLH cross laminated timberWSI: domestic gradeto Structural Engineer's specification;with fire retardant to Z12
K13_110 - 20 x 100 SW boards on 50mm battens with 50m rockwool between
KLH cross laminated timber NSI: industrial grade non visualto Structural Engineer's specification; with fire retardant to Z12
M50_150 anti slip rubber sheet flooring adhered directly to each access panel
G20_311A - ply support
P10_140E - 40mm Ecotherm Floor-Therm rigid board insulation
Steel angle at access panel edge to Structural Engineer's specification
W:29
Gutter formed within rigid insulation - single ply roofing membrane to run into gutter
P10_140K - 25mm rigid insulation to single ply membrane gutters
KLH cross laminated timber ISI: industrial grade visualto Structural Engineer's specification;with fire retardant to Z12
Please see drawings A102 - A104 for further details
Please see drawings A102 - A104 for further details
225mm Concrete slab on piers to Structural Engineer's specificationJ40_120 - Visqueen 500mu/2000 gauge EcoMembrane continuous damp proof membrane
J40_120A - Visqueen 250mu/1000 gauge EcoMembrane continuous damp proof membrane
Sand blinding, min 50 mm, level to receive slab
J40_190 - Visqueen continuous self adhesive tanking membrane
Prepared hardcore base to Structural Engineer's specification
P10_140E - 40mm Ecotherm Floor-Therm rigid board insulation
M10_130 - 110mm sand cement screed to contain underfloor heating pipework to mechanical engineer's specification
M50_170 - broadloom carpet floor finish
225mm Concrete slab on piers to Structural Engineer's specificationJ40_120 - Visqueen 500mu/2000 gauge EcoMembrane continuous damp proof membrane
J40_120A - Visqueen 250mu/1000 gauge EcoMembrane continuous damp proof membrane
Sand blinding, min 50 mm, level to receive slab
J40_190 - Visqueen continuous self adhesive tanking membrane
Prepared hardcore base to Structural Engineer's specification
P10_140E - 40mm Ecotherm Floor-Therm rigid board insulation
M10_130 - 110mm sand cement screed to contain underfloor heating pipework to mechanical engineer's specification
M50_170 - broadloom carpet floor finish
Service Riser
-
Sandal Magna School
-
Sandal Magna School
-
Sandal Magna School
-
Sandal Magna School
-
Sandal Magna School
G20_270C - Timber blocking/fillets to suit: sized as drawings
H30_120A - Marley Eternit profile 6 sheeting
R10_370A - aluminium rainwater pipe
R10_311A - aluminium eaves gutter
R10_370A - aluminium rainwater pipe
G20_270 - 50 x 125mm softwood battens
H30_120A - Marley Eternit profile 6 sheeting
P10_140A - Ecotherm insulation to roofs
G20_270 - 50 x 125mm softwood battens
P10_140A - Ecotherm insulation to roofs
H30_120A - Marley Eternit under glazing flashing piece
P10_140A - Ecotherm insulation to roofs
job title
dwg. no.
job no.
scale
dwg. title
date status
rev. no description Sarah Wigglesworth Architects
T +44 (0)20 7607 9200 F +44 (0)20 7607 5800E [email protected] W www.swarch.co.uk
do not scale from this drawing
524 Sandal Magna School Block C Section Details - Classroom
524.-D-103 1:5@A1 June 09 Construction
--
A - 190509 - Issued for construction for brickwork setting out
524-D-103 Block C- Footing and low level vent1:51
SSL + 0.000
Top of screed
+ 0.150
40
11
02
25
25
53
562.5
19
55
35
Sill height
+ 0.705
108
Top of deck
+ 0.140
22
Window head height
+ 2.260
Ceiling height
+ 2.557
125
20
29
7
9470
125
532
50
220
Ceiling height
+ 4.043
125
106
75
125
9
524-D-103 Block C- Wall and Roof Junction1:52
524-D-103 Block C- Ridge 1:53
524-D-103 Block C- Roof Junction: Classroom and Resource Corridor1:54
Door head
+ 2.250
540
Top of screed
+ 0.150
SSL + 0.000
22
5
94
50
12
4
100
225
540150
40
11
0
524-D-103 Block C- Wall: Classroom and Resource Corridor1:55
524-D-103 Block C-Floor and Wall Junction: Classroom and Resource Corridor1:56
F10_110 - Clay facing brickwork to external wall skins, with mortar as Z21
P10_320A - Breather membrane
P10_315 - Vapour barrier
F10_110 - Clay facing brickwork to external wall skins, with mortar as Z21
Ventilation to M+E Engineer'sspecification
M10_130 - 110mm sand cement screed to contain underfloor heating pipework to mechanical engineer's specification
225mm Concrete slab on piers to Structural Engineer's specification
Prepared hardcore base to Structural Engineer's specification
Sand blinding, min 50 mm, level to receive slab
P10_320A - Breather membrane
P10_315 - Vapour barrier
J40_120 - Visqueen 500mu/2000 gauge EcoMembrane continuous damp proof membrane
J40_120A - Visqueen 250mu/1000 gauge EcoMembrane continuous damp proof membrane
M50_110A/110B - rubber tile floor finish directly adhered to substrate
P10_320A - Breather membrane
P10_315 - Vapour barrier
F10_110A - Clay facing brickwork to internal structural walls, with mortar as Z21
F10_110A - Clay facing brickwork to internal structural walls, with mortar as Z21
F10_110A - Clay facing brickwork to internal structural walls, with mortar as Z21
F10_110A - Clay facing brickwork to internal structural walls, with mortar as Z21
F10_110A - Clay facing brickwork to internal structural walls, with mortar as Z21
P10_315 - Vapour barrier
P10_140D- 60mm insulation
K13_110 - Acoustic lining to walls and soffits with insulation behind
G20_311B - ply soffitt substrate
K13_110 - Acoustic lining to walls and soffits with insulation behind
K10_205 - two layers plasterboard to walls
H31_310 - Flashing
L10_650- Metal louvres powder coated to match cladding
G20_270A - 50x 75mm softwood studs
K10_205 - two layers plasterboard to walls
K13_110 - Acoustic lining to walls and soffits with insulation behind
G20_270 - 50 x 50mm softwood battens
P10_140E - 40mm Ecotherm Floor-Therm rigid board insulation
KLH cross laminated timber NSI: industrial grade non visualto Structural Engineer's specification; with fire retardant to Z12
KLH cross laminated timber NSI: industrial grade non visualto Structural Engineer's specification; with fire retardant to Z12
L10_480 - Velux P25 openable rooflight
K13_120- 12mm Birch Plywood
G20_270B - Timber Packer to suit
L10_480 - Velux EDW flashing
L10_480 - Velux EDW flashing
Decking to be replaced with Breedon Gravel: details to be confirmed
125 x 50mm Planed SW rafters to SE specification, with fire retardant to Z12 and clear finish as M60
P10_230A -Insulation between studs
F10_110A - Clay facing brickwork to internal structural walls, with mortar as Z21
SERVICE TRENCH
P10_140J - 10mm Insulation to thermal breaks
Steel angle at access panel edge to Structural Engineer's specification
M50_110A rubber tile flooring adhered directly to each access panel
J40_120A - Visqueen 250mu/1000 gauge EcoMembrane continuous damp proof membrane
J40_190 - Visqueen continuous self adhesive tanking membrane
P10_140E - 40mm Ecotherm Floor-Therm rigid board insulation
M10_130 - sand cement screed to 1:60 fall
Gas Membrane lapped over slab and back up behind upstand to glazed screen
K13_120- 12mm Birch Plywood Panel with fire retardant to Z12Perforated: setting out of perforations tbc.
G20_270 - 50 x 50mm softwood battens
K13_120- 18mm Birch Plywood Panel with fire retardant to Z12
G20_270B - Timber Packer to suit
Timber curtain wall by Scandinavian Timber: connections/supports by scandinavian timber
Protection board
P10_140F- 20mm insulation to edges
G20_270D - Planed Timber Packer to suit
J40_190 - Visqueen continuous self adhesive tanking membrane
G20_270B - Timber Packer to suit
Z22_10mm silicone sealant
KLH cross laminated timber NSI: industrial grade non visualto Structural Engineer's specification; with fire retardant to Z12
SERVICES VOIDPenetrations to brickwork to accommodate services route. To be co-ordinated with Structural and Services Engineers
K10_205 - two layers plasterboard to walls
P10_230 - acoustic Insulation
Note: Do not scale from drawingsConfirm all dimensions on site prior to shop drawings and manufacture Any discrepancies to be confirmed with Architect prior to proceedingRefer to all Engineer's documentation for coordination
F
P10_320A - Breather membrane
B - 150609 - Issued for external envelope cladding information
H30_120A - Marley Eternit Eaves Filler
L10_400A - Timber/aluminium curtain wall glazing with L10_210A overclad opening lights
L10_400A - Timber/aluminium curtain wall glazing with L10_210A overclad opening lights
C - 020709 - Building envelope issued for construciton, glazing addedD - 040809 - Screen to grid N revised.
K13_110 - Acoustic lining to walls and soffits with insulation behind
G20_311B - ply soffitt substrate
G20_311B - ply soffitt substrate
K13_110 - Acoustic lining to walls and soffits with insulation behind
E - 020909 - Details 4&5 updatedF - 150909 - Details 4 updated
-
Sandal Magna School
N10_110a Acoustic baffles suspended from structure over, to align with suspended ceiling grid
600mm radius to sprinkler range pipes, typical
600mm radius to sprinkler range pipes, typical
12
50
12
50
12
50
12
50
12
50
62
50
41
1.2
5
70
72
.5
41
1.2
5
CLCL
CL
CL
CL
CL
CLCL
CL CL CL CLLIGHTING LAYOUT
UNISTRUT GRID
LAYOUT
UN
ISTRU
T G
RID
LA
YO
UT
LIG
HTIN
G L
AYO
UT
585 585
ACO
USTIC
BA
FFLE
LA
YO
UT
ACOUSTIC BAFFLE
LAYOUT
SPRIN
KLER H
EA
D
LA
YO
UT
SPRINKLER HEAD
LAYOUT
37
9
379.3
164
719
164
719
164
719
164
719
164
2997.1
302 1170 95 1170 95 1170 95 1170 95 1170 95 1170 302
293 757 1000 1000 1000 1000 1000 1000 757 293
1419 2518 2738 1425
14
86
20
50
20
50
14
86
job title
dwg. no.
job no.
scale
dwg. title
date status
rev. no description Sarah Wigglesworth Architects
T +44 (0)20 7607 9200 F +44 (0)20 7607 5800E [email protected] W www.swarch.co.uk
do not scale from this drawing
524 Sandal Magna School Classroom Reflected Ceiling Grid Layout
524-A-1101 1:20@A1 Jan 10 Construction
524-A-1101 Classroom reflected ceiling grid layout, TYPICAL1:501
A - 21.08.09 - Issued for construction
N
M
1c (also 3c/5c/7c/9c/11c) 2c (also 4c/6c/8c/10c/12c)
K13_110 - 20 x 100 SW boards on 50mm battens with 50m rockwool between
Linear lighting to M&E Engineer's specification, surface mounted to suspended ceiling grid
Sprinkler heads and distribution pipework to M&E Engineer's specification, installed to top of suspended ceiling grid
900mm radius to sprinkler distribution pipe
RL:40 RL:41 RL:42
900mm radius to sprinkler distribution pipe
900mm radius to sprinkler distribution pipe
ceiling grid suspension xing point,xed to roof over
Install acoustic boards with 20mm shadow gap from adjacent wall lining. Setout full width boards neatly at nominal 120mm centres, adjusted to suit overall dimension
Ceiling beyond, raking
Underside of structure beyond, raking
N10_110B Unistrut ceiling grid, suspendedfrom structural roof panels. Coordinate with all M&E services to be supported on grid
N10_230 Curved privacy curtain rail fixed to underside of suspended ceiling grid, with associated room divider curtain
L
Classroom YR 1G01
(also G03, G05, G07, G09, G11)
Classrooms G01, G03, G05, G07, G09, G11
-
2
585 585
1000
58
5
800
720
Suspended Acoustic Panel Detail - Elevation, Section N10_110A1:102
80
164
80
dim
ensi
on v
aries
80
Stainless Steel adjustable cable system. 4mm stainless steel cable with threaded ball and swage adjuster
Surface mounted cable sockets fixed to KLH with woodscrews
Back mounted cable sockets mounted to steel plate from rear
7mm painted steel plate with preformed holes to accept cable sockets
4mm painted steel plate frame welded to top and bottom plate
Offect Soundwave acoustic panels direct fixed to steel plate frame
L10_480 - Velux openable rooflight
Note: Do not scale from drawingsConfirm all dimensions on site prior to shop drawings and manufacture Any discrepancies to be confirmed with Architect prior to proceedingRefer to all Engineer's documentation for coordinationNote: Services intent and set out shown nominally only on Architectural documentation. For quantity, distribution and all other information refer to Services Engineer's documentation.Exact set out and coordination to be confirmed on site with Services Engineer and Architect.
C
Dotted circles indicate fixing locations for ceiling grid
B - 14.01.10 - Issued for constructionC - XXXXXX - Issued for construction
-
Sandal Magna School
-
Sandal Magna School
-
Sandal Magna School
-
Sandal Magna School
H10_310C - Powder coated Aluminium edge trim/drip flashing
G20_270 - 50 x 125mm softwood battens
P10_315 - Vapour barrier
225x50 Planed SW rafters to SE specG20_311A - ply support
P10_140A - Ecotherm insulation to roofs
H30_120A - Marley Eternit profile 6 sheeting
H30_120A - Marley Eternit profile 6 sheeting
job title
dwg. no.
job no.
scale
dwg. title
date status
rev. no description Sarah Wigglesworth Architects
T +44 (0)20 7607 9200 F +44 (0)20 7607 5800E [email protected] W www.swarch.co.uk
do not scale from this drawing
524 Sandal Magna School Block B Hall Section 2
524.-A-113 1:20@A1
524-A-113 Block B Hall Cross Section 1:201
SSL + 0.000
Top of
screed
+ 0.150
Door
head
datum
+ 2.260
Ceiling
height
+ 2.780
Wall height
+ 4.320
KLH height
+ 6.155
Eaves height
+ 7.775
Wall height
+ 4.690
KLH height+ 8.195
12
95
10051452
12
90
1452
14
13
35
4
21
52
Ridge height+10.150
52
5
1350 2485
1570 1800 2925
211
0
Perforated brickwork above
1800 2926
2440
20
92
.6
22
75
18
5
12
51
2600
2600
290
82
2
3050
2600
290
D:41
D:40
W:78
D:44
W:77
RL:39
DiningG44
HallG41
KLH cross laminated timber ISI: industrial grade visualto Structural Engineer's specification;with fire retardant to Z12
P10_320A - Breather membrane
P10_315 - Vapour barrierP10_140D- 60mm insulation
KLH cross laminated timber ISI: industrial grade visualto Structural Engineer's specification;with fire retardant to Z12
M10_130 - 110mm sand cement screed to contain underfloor heating pipework to mechanical engineer's specificationJ40_120A - Visqueen 250mu/1000 gauge EcoMembrane continuous damp proof membrane
J40_120 - Visqueen 500mu/2000 gauge EcoMembrane continuous damp proof membrane
J40_190 - Visqueen continuous self adhesive tanking membrane225mm Concrete slab on piers to Structural Engineer's specification
P10_140E - 40mm Ecotherm Floor-Therm rigid board insulation
FLOOR BUILD UP:M40_110 - Sima Ceramiche red quarry tiles 200 x 100mm adhered directly to screed
M10_130 - 110mm sand cement screed to contain underfloor heating pipework to mechanical engineer's specificationJ40_120A - Visqueen 250mu/1000 gauge EcoMembrane continuous damp proof membrane
J40_190 - Visqueen continuous self adhesive tanking membrane225mm Concrete slab on piers to Structural Engineer's specification
P10_140E - 40mm Ecotherm Floor-Therm rigid board insulation
FLOOR BUILD UP:
Underfloor heating to M&E engineer's specification
K13_110 - Acoustic lining to walls and soffits with insulation behind
KLH cross laminated timber ISI: industrial grade visualto Structural Engineer's specification;with fire retardant to Z12
F10_110C - Clay facing brickwork to internal skin of hall blockwith open joints for acoustic absorption behind, with mortar as Z21
D134
2
D134
5
D134
1
K13_110 - Acoustic lining to walls and soffits with insulation behindKLH cross laminated timber ISI: industrial grade visualto Structural Engineer's specification;with fire retardant to Z12
KLH beam behind to SE design and specification.
K21_120 - Junckers Sylvasport flooring, installed to UnoBat50 sprung sports floor system with ventilated skirting
F10_110F - Clay facing brickwork to half brick internal wall skins, with mortar as Z21
L20_410 - Internal doorsetL20_410 - Internal doorsetL20_310 - Timber door frame
H10_115A - Patent Glazing
Removeable panel Removeable panel
Fixed panel Fixed panel
Fixed panel Fixed panel
Fixed panel Fixed panel
L20_410 - Internal doorsetL20_310 - Timber door frame
L40_230A Internal Glazed Screen
L10_510B- Timber subframe with single glazed infill panels as L40_230A
D1332handed
D133
3handed
D1334handed
D133
5 handed
D133
6handed
D133
7 handed
D133
8 handed
M52_110 Fabric wall covering
K13_120- 12mm Birch Plywood Panel with fire retardant to Z12
K13_120- 12mm Birch Plywood Panel with fire retardant to Z12
Flush doorsIronmongery TBC
J40_120 - Visqueen 500mu/2000 gauge EcoMembrane continuous damp proof membrane
Concrete blinding to receive slabPrepared hardcore base to Structural Engineer's specification
Sand blinding, min 50 mm, level to receive slab
J42_110 - Single ply roofing membrane
J42_110 - Vapour Barrier
G20_311B - ply soffitt substrate225x50 Planed SW rafters to SE spec
P10_140G - 100mm Insulation to single ply membrane roofs
Gutter formed within rigid insulation - single ply roofing membrane to run into gutterP10_140K - 25mm rigid insulation to single ply membrane gutters
P10_320A - Breather membrane
G20_311B - ply soffitt substrate
L10_510B- Timber subframe with single glazed infill panels as L40_230A
Please see Roof Plan for details of mansafe system for roof access and roof light cleaning
1-2A106
1-2L028
R10_311A - aluminium eaves gutter
R10_311A - aluminium eaves gutter
Typical
services distribution and access bulkhead; details tbcto be coordinated with M&E Engineer
Note: Do not scale from drawingsConfirm all dimensions on site prior to shop drawings and manufacture Any discrepancies to be confirmed with Architect prior to proceedingRefer to all Engineer's documentation for coordination
Sep 2009 Construction
D A - 08.05.09 - Issued for KLH and brickwork setting out information
Standard brick dims to internal skin
REVISED DETAIL
B - 15.05.09 - Revisions to brickwork setting out informationC - 03.07.09 - Issued for external envelope and window information
H30_120A - Marley Eternit profile 6 sheeting
G20_270 - 50 x 60mm softwood battens
H30_120A - Marley Eternit profile 6 sheetingP10_320A - Breather membrane
P10_315 - Vapour barrierP10_140D- 60mm insulation
G20_270 - 50 x 60mm softwood battens
H30_120A - Marley Eternit profile 6 sheetingP10_320A - Breather membrane
P10_315 - Vapour barrier
H30_120A - Marley Eternit profile 6 sheetingP10_320A - Breather membrane
P10_315 - Vapour barrierP10_140D- 60mm insulation
G20_270 - 50 x 60mm softwood battens
KLH cross laminated timber ISI: industrial grade visualto Structural Engineer's specification;with fire retardant to Z12
G20_270 - 50 x 125mm softwood battens
G20_311F - 12mm ply substrate
P10_140A - Ecotherm insulation to roofs
H30_120A - Marley Eternit profile 6 sheetingP10_320A - Breather membrane
P10_315 - Vapour barrierP10_140D- 60mm insulation
G20_270 - 50 x 60mm softwood battens
KLH cross laminated timber ISI: industrial grade visualto Structural Engineer's specification;with fire retardant to Z12
R10_370A - aluminium rainwater pipe
G20_270 - 50 x 125mm softwood battens
H30_120A - Marley Eternit profile 6 sheetingP10_320A - Breather membrane
P10_315 - Vapour barrier
P10_140A - Ecotherm insulation to roofs
H30_120A - Marley Eternit under glazing flashing piece
H30_120A - Marley Eternit Eaves Filler
D - 28.09.09 - Issued for brickwork setting out
Inner skin to be constructed following installation of KLH panels
Stretcher courses to be set out to avoid cut bricks along length
-
Sandal Magna School
-
Sandal Magna School
-
Weymouth Seafront Regeneration
-
Weymouth Seafront Regeneration
Sand Sculpture Exhibitition Space
Weymouth Seafront Regeneration
RNLI Base
Visitors Centre`
Sand Sculpture
-
Weymouth Seafront Regeneration
RNLI Base
-
Weymouth Seafront Regeneration
Visitors Centre
-
Southwark Park School
Infant villageInfant villageInfant village
parents/communitydiningreorganisationcirculationexibilitylandscapeentrancenew face new identity
connections to Southwarkperforming artsdining hall nursery
Inside
Outside
Big additionssmall losses
Across the Board
Southwark Park School
Solutions Outcomes
a vision plan with the child at the centre
enhanced enthusiasm of pupils and staff
welcoming and accessible to all
exibility and adaptability to future change
a comfortable learning environment
sustainability features as a learning tool.
a signal of an inspirational culture and ethos.
1. Whats new?
new identity and sense of community enhanced links to community and local partnerships new performance hall and nursery new wildlife and sensory garden ease of movement and accessibility for all bigger classrooms and exibility of space
A new world...
infant village
junior city
piazza
village green
boulevard
Southwark Park Road
SouthwarkPark
village green
running track
new performance hall with roof garden
newnursery
wildlife garden
running track
NBJOIBMMQFSGPSNBODFTQBDF
TJUFCPVOEBSZ
ZFBS
ZFBS
IVCCSFBLPVUSFTPVSDFTQBDF
TNBMMIBMMJOGPSNBMEJOJOH
XD
GPPEUFDI LJUDIFO ZFBS
ZFBS
ZFBS ZFBS
SFDFQUJPO
SFDFQUJPO
OVSTFSZ
TFO
HFOPGGTJDLCBZ
IFBEPGmDFTFO
PGG
SFDFQUJPO
DPNNVOJUZHBMMFSZLJPTL
TUBGGXD
TFO
XDHBSEFOXD
XD HBSEFO
WFHFUBCMFIFSCHBSEFO
Ground Floor Plan
ZFBS
MJCSBSZ ZFBS
ZFBS
ZFBS ZFBS XD
XD WPJE
JDU
TFO
TUBGGSPPN
IBMMHBMMFSZTFBUJOH
XD
JOGPSNBMSFBEJOHTQBDF
ZFBS
WPJE
VQQFSTUVEJP
VQQFSIBMM
WPJE
WPJE
WPJE
VQQFSDPNNVOJUZTQBDF
Upper Floor Plan
A new layout
Roof Plan
SPPGUPQHBSEFO
SPPGUPQXFBUIFSTUBUJPOHSFFOIPVTF
TUVEJP
MJGU
IVCCSFBLPVUSFTPVSDFTQBDF XD
XD
QVQJMFOUSBODF
MJGU
NBJOFOUSBODF
XD
XD
XD
mSTUBJE
UPPMT
HSFFOIPVTF
RVJFUQMBZ
VQ
VQ
Gn
GPZFS
OVSTFSZFOUSBODF
IVCCSFBLPVUSFTPVSDFTQBDF
IVCCSFBLPVUSFTPVSDFTQBDF
MJGU
Gn
Gn
Gn
Gn
'&
GnSPPGUPQXFBUIFSTUBUJPOHSFFOIPVTF
SPPGUPQHBSEFO
HSFFOIPVTF VQ
VQ
TPVUIXBSLQBSLSPBE
parlour
new entrance
soft play
new nursery reception class infant block
greenhousequiet play
S4
-
Southwark Park School
a tool block
a book store
a wendy house
a tool block
a book store
a wendy house
oor screens with links to wildlife dens
classroom
A thresholdA quiet place
plasma screen
with links to:gardenperformance hallwildlifeplay houseclassroomsglobe theatreweather stationrooftop garden
performance hall
nature is encouraged to inhabit the site
reading and games playing
2. Outside
Village blocks and city blocks
Playtime
Learning blocks
Existing halls are reused as resource and breakout space for the classrooms arranged around them. Existing logic retained.
Hubs
A new identity and connection to Southwark Park greets the community. Trafc is calmer, access is friendly and safe.
Friends are welcome...
green house art box rst aid box
recycling block toilet block gym store
tool shed reading place eating place ICT station quiet place music room
cloak room toilet block cooking place
classroom
art box reading room
Functions:
The ribbon
wind screen
balcony
grass roof
shared resource space
planted bed
covered play house
racetrackgarden shed
bench
gutter
quiet space
outside classroom
sun shade
light shelf
canopy
rain catcher
greenhouse
magic carpet
the hub
learning block
learning block
classroom
breakout to the hub
Functions:
option 1 option 2
Small
ICT
station
circulation
existing halls:
breakout/resource space
existing classroom:
extended
circulation
Classroom ClassroomAdjoining
Space
large
activity zone
Adjoining
Space
Environmental Threshold
small group room
extended classroom
activity pods /specialist stores
cooking station
wc zone
small group room science station
Adjoining
Space
ICT station
activity zone
circulation
small group room
extended classroom
activity pods /specialist stores
food tech zone
wc zone
wet zone
existing halls:
breakout/resource space
existing classroom:
extended
circulation
Classroom ClassroomAdjoining
Space
activity zone
Adjoining
Spaceactivity zone
circulation
small group room
extended classroom
activity pods /specialist stores
existing fireplace
extended classroom external
quiet space/reading
existing halls:
breakout/resource space
existing classroom:
extended
circulation
Classroom ClassroomAdjoining
Space
activity zoneAdjoining
Space
circulation
small group room
extended classroom
activity pods/specialist stores
library/bookstation
extended classroom external
quiet space/reading
existing halls:
breakout/resource space
existing classroom:
extended
circulation
Classroom Classroom
Small
ICT
station
circulation
existing halls:
breakout/resource space
existing classroom:
extended
circulation
Classroom ClassroomAdjoining
Space
large
activity zone
Adjoining
Space
quiet zone/reading
Environmental Threshold
Environmental Threshold
small group room
extended classroom
activity pods /specialist stores
cooking station
wc zone
small group room science station
Adjoining
Space
Small
Book
Station
large
activity zone
Adjoining
Space
wc zone
Classroom
Classroom
ICT station
DMBTT DMBTTBEKPJOJOHTQBDF FYJTUJOHDMBTT
FYUFOEFE
DJSDVMBUJPO
FYJTUJOHIBMMTCSFBLPVUSFTPVSDFTQBDF
BDUJWJUZQPETTQFDJBMJTUTUPSFT
FYUFOEFEDMBTTSPPN
TNBMMHSPVQSPPN
RVJFUTQBDFSFBEJOH
FYUFOEFEDMBTTSPPNFYUFSOBM
FYJTUJOHmSFQMBDF
BEKPJOJOHTQBDF
BDUJWJUZ
[POFBDUJWJUZ[POF
DJSDVMBUJPO
FYJTUJOHDMBTTFYUFOEFE
FYJTUJOHIBMMTCSFBLPVUSFTPVSDF
TQBDF
DJSDVMBUJPO
DMBTT DMBTTBEKPJOJOHTQBDF
BEKPJOJOHTQBDF
BDUJWJUZ
[POF
BDUJWJUZ[POF
DMBTT
DJSDVMBUJPO
BDUJWJUZQPETTQFDJBMJTUTUPSFT
FYUFOEFEDMBTTSPPN
TNBMMHSPVQSPPN
XFU[POF
XD[POF
GPPEUFDI[POFRVJFUTQBDFSFBEJOH
BDUJWJUZQPETTQFDJBMJTUTUPSFT
FYUFOEFEDMBTTSPPN
TNBMMHSPVQSPPN
RVJFUTQBDFSFBEJOH
FYUFOEFEDMBTTSPPNFYUFSOBM
MJCSBSZCPPLTUBUJPOXD[POF
DMBTT
DMBTT DMBTT FYJTUJOHDMBTTFYUFOEFE
DJSDVMBUJPO
FYJTUJOHIBMMTCSFBLPVUSFTPVSDFTQBDF
DMBTTTNBMMCPPLTUBUJPO
MBSHFBDUJWJUZ[POFBEKPJOJOHTQBDF
DJSDVMBUJPO
FOWJSPONFOUBMUISFTIPME
BEKPJOJOHTQBDF
IVCIVC
IVC
Hubs are exible: option 3
QBSFOUTFYIJCJUJPOTQBDF
3. InsideDPNNVOJUZBENJOCMPDL
*$5TVJUFTUBGGSPPN
BENJOTFOTFODP
IFBEEFQVUZ
SFDFQUJPO
UPNZDMBTT
QBSMPVS
4PVUIXBSL1BSL3PBE
4PVUIXBSL1BSL
DMBTTDMBTTDMBTT
DMBTTDMBTT
IVC
DMBTT
IVCIVCUISFTIPME IVC IVC
DMBTT
DMBTT
DMBTT
threshold outside world
DMBTTDMBTT DMBTT DMBTT DMBTT
an environmental threshold external to the buildings
The Ribbon is a free standing, independant structure which weaves its way around the perimeter of the existing building providing: circulation routes additional teaching space sun shading wind catcher water channel and collector storage zone breakout space
grass roof
play house
blackboard
hammock
DMBTT
IVC
DMBTT DMBTT
DMBTT
S4
ground oor upper oor
-
Southwark Park School
Welcome to our new school... ...come inside
new nursery
Building blocks... a kit of parts
new nursery
new performance hall
new entrance
new way in
a new way in
Big additions
small class removed
small store removed
heat exchange
exiting chimneys reused
brick performance hallfor thermal mass
chimneys for ventilation
punkah fans circulate air up or down
air duct
chimneys for ventilation
kitchen
dining hall
solar hot water and pv panels on existing roofs for demonstration
rainwater collection air bricks
new windows throughout
Junior city
air bricks
boulevard
running track
piazza
new entrance to school
adultentrance
Southwark Park
Comfort & Sustainability
4. Feeling good 5. The new bits...
grass roof
OFXMJCSBSZ
OFXQMBDFUPXBUDIBQMBZ
OFXXFBUIFSTUBUJPO
OFXSPPGHBSEFO
Southwark Park Road Southwark Park
new performance hall
new library
new exible dining spacenew lift
new foundation play space
The Parlour - new parents and community apace
new entrance to school
a way in to the new world
new nursery
roof garden play space
a new reading area
new science station
roof garden play space
A new community and staff block
S4
-
West Cork Arts Centre
CMBDLCPYCMBDLCPY
HSFZCPYHSFZCPY
XIJUFCPYXIJUFCPY
SPDLTUPSFSPDLTUPSF
WJFXGSPNJOTJEFHBMMFSZ8IJUFCPY
WJFXGSPNJOTJEFHBMMFSZMPPLJOHUPXBSEUIFQSPKFDUJPOSPPNWJFXGSPNJOTJEFHBMMFSZMPPLJOHUPXBSEUIFQSPKFDUJPOSPPN8IJUFCPYMPPLJOHJOUPCMBDLCPY
WJFXMPPLJOHUPXBSETUIFEBODFTUVEJPXJUIWJFXTPVUJOUPUIFMBOETDBQFMPPLJOHJOUPCMBDLCPY
8IJUF#PY(BMMFSZ
(SFZ#PY%BODF4QBDF
#MBDL#PY1FSGPSNBODF
(SFZ#PY"SUJTUT4UVEJPT
H e a v y L i g h t D a r k L i g h t "/FX$FOUSF0VSQSPQPTBMBJNTUPDSFBUFBOFXMBOENBSLBOEGPDVTGPSUIFDVMUVSBMMJGFBOEFDPOPNZPG4LJCFSFFOBQMBDFUPCF*UEPFTUIJTJOUXPXBZT
t5IFCVJMEJOHXJMMCFPVUTUBOEJOHJOJUTWJTVBMBUUSBDUJPOMJUFSBMMZWJTJCMFGSPNBMMBSPVOEUIFUPXOBOECFZPOEGSPNWBOUBHFQPJOUTJOUIFTVSSPVOEJOHDPVOUSZTJEF*UTGPSNXJMMCFGSJFOEMZJOTQJSFPQFOOFTTBOEXFMDPNJOHUPBMM
t5IF8$"$XJMMCFBUUIFIFBSUPGBOFXQVCMJDSFBMN5IFOFXTRVBSFXJMMCFBTUPQPGGPOBKPVSOFZUISPVHIUIFUPXOUIBUXJMMMFBEUPUIFOFXCVJMEJOHWJBBOFXSBNQFECSJEHFBDSPTTUIF$BPM4USFBN5IFKPVSOFZUISPVHIUIFCVJMEJOHXJMMQSPWJEFWJTUBTUPTVSSPVOEJOHDPOUFYUFYUFSOBMMZBOEUPBSUXPSLUPQFSGPSNBODFTBOEBSUJTUTUVEJPTJOUFSOBMMZBWJTVBMBOEFYQFSJFODJBMGFBTU
"/FX#VJMEJOH
"WJTJUUPUIFTJUFDPOmSNFEUIBUSFUBJOJOHBUMFBTUQBUPGUIFFYJTUJOHTUSVDUVSFGPSUIFOFXCVJMEJOHBTXFIBEXBOUFEDPVMEQSPWFQSPIJCJUJWFBOEDPTUMZEVFUPUIFAQBUDIXPSLDPOTUSVDUJPOPGUIFFYUFSOBMXBMMT
5IFJOUFOUJPOUIFSFGPSFJTUPSFVTFUIFEFNPMJTIFENBUFSJBMQSBHNBUJDBMMZJOBOVNCFSPGXBZTJOUIFOFXEFWFMPQNFOU
t"SPDLTUPSFBTBUIFSNBMTUPSFUPQSPWJEFIFBUJOHPSDPPMJOHBTOFDFTTBSZ
t(BCJPOXBMMTGPSNBQMJOUIUPUIFVQQFSnPPST
t$SVTIFESFDMBJNFESPDLDBOCFVTFEJOUIFGPSNBUJPOPGFYUFSOBMDMBEEJOHQBOFMTBOEDPVMEQSPWJEFBWJTVBMNFNPSZPGXIBUIBTHPOFCFGPSF
.BUFSJBMTESBXJOTQJSBUJPOGSPNMPDBMDPOUFYUJSJTIMJNFTUPOJOBMMPGJUTGPSNTSBXSFVTFEPSSFDPOUJUVUFEJODPODSFUFGSPN$PMPVSFEQBOFMTNJSSPSUIFWJCSBODZPGUIFTVSSPVOEJOHUPXO
"/FX0SHBOJTBUJPO
0VSQSPQPTBMJTCBTFEBSPVOEPSHBOJTJOHBTFSJFTPGTQBDFTEFTJHOFEGPSTQFDJmDVTFTFBDIPGXIJDISFRVJSFTQBSUJDVMBSFOWJSPONFOUBMDPOEJUJPOT
"DDPSEJOHMZUIFSFBSF
tACMBDLCPYTQBDFTXJUIMJUUMFPSOPEBZMJHIUTVDIBTUIFQFSGPSNBODFTQBDF
tAHSFZCPYTQBDFTEBODFTUVEJPBSUJTUTTUVEJPTBOEDFSUBJOHBMMFSJFTBSFnFYJCMFBOEDBQBCMFPGCFJOHEBZMJUPSCMBDLFEPVU
tAXIJUFCPYTQBDFTHBMMFSJFTXPSLTIPQBENJOSFDFQUJPOUIBUSFRVJSFBOEPSFOHBHFEJGGFSFOULJOETPGEBZMJHIU
5IFXIJUFCPYTQBDFTGPSNBnVJEnFYJCMF[POFIPMEJOHUIFPUIFSTQBDFTUPHFUIFS5IFZGPSNBQPSPVTJOUFSGBDFCFUXFFOUIFUPXOBOEUIFBSUTDFOUSFCZDPOmHVSJOHBDDFTTBOEWJFXTPGUIFUPXOBOEJUTTVSSPVOEJOHTJOUPBOEPVUPGUIFCVJMEJOH5IJTJTJOUFOEFEUPFODPVSBHFFOHBHFNFOUXJUIUIFFYUFSOBMXPSMEBTQFPQMFNPWFBSPVOEUIFDFOUSFBTQFPQMFNPWFBSPVOEUIFDFOUSF
.BJO4USFFU
$BPM4USFBN
$BPM4USFBN
5PUIF
*MMFO3JWFS
*MMFO3JWFS
/FX1VCMJD4RVBSF
5P5P
(SPVOE'MPPS1-BO
4FDPOE'MPPS1MBO
'JSTU'MPPS1MBO
%BODF4UVEJP
$IBOHJOH
5FSSBDFXJUISPPnJHIUUPXPSLTIPQCFMPX
"ENJO
$BOUFFOXJUIWJFXTBSPVOEUIFBSPVOEUIFDJUZ
-JGU
4UVEJP
8$T
5FSSBDF(BSEFO
(BMMFSZ
-JGU8$T
8PSLTIPQ
#MBDLPVU4QBDF1SPKFDUJPO8BMMM
(BMMFSZ
4UVEJP
4UVEJP
.BJO&OUSBODF
3FDFQUJPO
0GmDF-JGU4UPSF
1FSGPSNBODF
(BMMFSZ
7PJE"CPWF
8$T
4UVEJPT&OUSBODF
#SJEHF
$PVSU
4IPQ
$PGGFF1PJOU
$BPM4USFBNCFMPX
$BPM4USFBNC
FMPX
5PUIF)FSJUBHF
5PUIF)FSJUBHF
$FOUSFBOE
0CTFSWBUJPOQPJOU
0CTFSWBUJPOQPJOU
1BSBHPO#BS
/FXQVCMJDSFBMN
"SUJTUTUVEJPTGPSNBDPMPOZBUUIF/PSUI8FTUDPSOFSPGUIFCVJMEJOHPOUIFVQQFSnPPSTXJUIWJFXTUPMBOTDEBQFJOUIF4PVUI8FTUCFZPOE#BMUJNPSFBOE4IFSLJO*TMBOEBIBWFOGPSMPDBMBSUJTUT
7JTJUPSTUPUIF"SUT$FOUSFDBOWJFXBUSJTUBUXPSLBTQBSUPGUIFKPVSOFZUISPVHIUIFCVJMEJOH
4PVUI&MFWBUJPO &BTU&MFWBUJPO 8FTU&MFWBUJPO
(SFZ#PY%BSLSPPN1SPKFDUJPOXBMM
(SFZ#PY"SUJTUT4UVEJPT
8IJUF#PY'MVJETQBDF
-
Scotswood Regeneration
inte
rnalare
a5
2sqm
gla
zin
g6.0
5sqm
doors
5.6
1sqm
Gla
zin
g/doors
:In
tern
alare
a2
inte
rnalare
a2
5sqm
gla
zin
g1.4
sqm
doors
2.0
4sqm
Gla
zin
g/doors
:In
tern
alare
a1
TO
TA
LG
lazin
g/doors
:In
tern
a
TO
TA
LG
lazin
g/doors
:In
tern
a
S09SCOTSWOODEXPOThe Flip Flop Flex HousesThe Flip Flop Flex Houses
inte
rnalare
a3
0sqm
gla
zin
g/doors
7.3
7sqm
Gla
zin
g/doors
:In
tern
alare
a2
inte
rnalare
a3
7sqm
gla
zin
g/
doors
11.9
8sq
m
Gla
zin
g/doors
:In
tern
alare
a3
inte
rnalare
a3
0sqm
gla
zin
g/doors
11
.78sqm
Gla
zin
g/doors
:In
tern
alare
a3
The Flip Flop Flex HousesPlans
BO
AR
D 1
GROUND
The Flip Flop Flex houses are a 3 bedroom terrace house and a 1 bedroom live-work mews house sitting either side of a private garden at the centre of a single plot. The key to the houses is their adaptability by both the house builder at the start of the project and the occupant throughout the life of the homes. This means that the houses are both flexible to the demands of the housing market and flexible to the demands of changing family dynamics.
The flexibility within the scheme is achieved through a number of principles. Internally the houses are designed through the premise of slack space where each room can be used for a variety of different functions.
The building is also structured in a very simple and adaptable way so that occupants can easily make future alterations to it.
Externally the spaces around the two houses provide ample opportunity for extension allowing the buildings to grow in a number of different ways.
A services zone is provided along one long edge of the plot, below ground, to allow flexibility of services provision, now and at all times in the future.
The buildings also recognise the requirement for future adaption to meet Code for Sustainable homes level 6 with the building fabric upgraded to meet this standard and the opportunity to provide increased on - site renewable energy if required. This is described in more detail in the sustainability section of the technical document.
The Life Cycle of the Houses
FIRST
SECOND
N
Year 2012We are all enjoying see the garden come to life. It been 2 years since we moved here and the mews house is built. A lady (Dominique) has moved in with her lovely dog. She works a lot from home so is always around to talk to. The dogs love playing in the mews. I have a little brother on the way.. i am soooo excited..
Year 2010Mum (Jenny), Dad (John), Patch (dog) and Me (Amanda) have just moved into our new 3 bedroom family house in the prestigious Scotswood development. At the moment we have a huge garden and lots of amenity (or play as i like to call it) space at all levels. Soon there might be a mews house at the end of the garden. We are looking forward to having neighbours and being part of a new and growing community.
Year 2018I am 13 now, officially a teenager. We need more room in the house. We all wanted our own room so Dad built another bedroom upstairs and extended the living room. We still have a spare room in case Nan wants to come and stay. Dominique has made her mews house bigger and added another bedroom. She lives with Sam, her boyfriend, now. Hes nice too. The trees in the street are all big and blooming...
Year 2020Mum and Dad have made their bedroom bigger and made the balcony into a raised garden. Dominique has extended her house to meet ours. She and Sam have a baby on the way...
Year 2023I am off to university to study architecture. Growing up here really made a difference to me. We dont need so much space now so we have offered to sell of part of our house to Dominique and Sam who need the extra room. She and Sam have a baby now so they will use the space to extend her office. Very clever..
Year 2035Our family has grown a lot since we moved here. Our surroundings have grown and filled the plot we bought 25 years ago. Nan moved in a couple of years ago. Mum likes looking after her but dads not so sure. Dominiques mews house opposite likewise filled its site and is up for sale. We are looking to buy it. We love Scotswood...!
STREET ELEVATION FROM EXPO LINK
Terrace
Garden
Terrace
Car Port
Bedroom
Services Zone
Bike Store
Bed/Office
Rooflight over stair
Rooflight
Bike Store
Kitchen
Living/Dining
WC and shower
Bathroom
Bed 3Bed 2
Bed 1
1 BED - LIVE WORK HOUSE
3 BED - EXPO LINK HOUSE
EXPO L
INK
Garde
n
Changing the colour of the cladding and the window reveals makes each house individual
7500
mm
EXP
O L
INK
EXP
O L
INK
ME
WS
ME
WS
inte
rnalare
a5
2sqm
gla
zin
g6.0
5sqm
doors
5.6
1sqm
Gla
zin
g/doors
:In
tern
alare
a2
inte
rnalare
a2
5sqm
gla
zin
g1.4
sqm
doors
2.0
4sqm
Gla
zin
g/doors
:In
tern
alare
a1
TO
TA
LG
lazin
g/doors
:In
tern
a
TO
TA
LG
lazin
g/doors
:In
tern
a
S09SCOTSWOODEXPOThe Flip Flop Flex HousesThe Flip Flop Flex Houses
inte
rnalare
a3
0sqm
gla
zin
g/doors
7.3
7sqm
Gla
zin
g/doors
:In
tern
alare
a2
inte
rnalare
a3
7sqm
gla
zin
g/
doors
11.9
8sq
m
Gla
zin
g/doors
:In
tern
alare
a3
inte
rnalare
a3
0sqm
gla
zin
g/doors
11
.78sqm
Gla
zin
g/doors
:In
tern
alare
a3
The Flip Flop Flex HousesPlans
BO
AR
D 1GROUND
The Flip Flop Flex houses are a 3 bedroom terrace house and a 1 bedroom live-work mews house sitting either side of a private garden at the centre of a single plot. The key to the houses is their adaptability by both the house builder at the start of the project and the occupant throughout the life of the homes. This means that the houses are both flexible to the demands of the housing market and flexible to the demands of changing family dynamics.
The flexibility within the scheme is achieved through a number of principles. Internally the houses are designed through the premise of slack space where each room can be used for a variety of different functions.
The building is also structured in a very simple and adaptable way so that occupants can easily make future alterations to it.
Externally the spaces around the two houses provide ample opportunity for extension allowing the buildings to grow in a number of different ways.
A services zone is provided along one long edge of the plot, below ground, to allow flexibility of services provision, now and at all times in the future.
The buildings also recognise the requirement for future adaption to meet Code for Sustainable homes level 6 with the building fabric upgraded to meet this standard and the opportunity to provide increased on - site renewable energy if required. This is described in more detail in the sustainability section of the technical document.
The Life Cycle of the Houses
FIRST
SECOND
N
Year 2012We are all enjoying see the garden come to life. It been 2 years since we moved here and the mews house is built. A lady (Dominique) has moved in with her lovely dog. She works a lot from home so is always around to talk to. The dogs love playing in the mews. I have a little brother on the way.. i am soooo excited..
Year 2010Mum (Jenny), Dad (John), Patch (dog) and Me (Amanda) have just moved into our new 3 bedroom family house in the prestigious Scotswood development. At the moment we have a huge garden and lots of amenity (or play as i like to call it) space at all levels. Soon there might be a mews house at the end of the garden. We are looking forward to having neighbours and being part of a new and growing community.
Year 2018