    Aggregate Production Planning

    Aggregate production planning is defined as theprocess of development, analytics and maintenance ofa schedule for the business' overall operations.

    It is usually medium range in nature, lasting anywherefrom three to 18 months.

    The planned output levels, targeted sales andintended inventory levels are taken into account while

    preparing an aggregate plan. An efficient aggregate plan should do away with day-

    to-day scheduling

  • 8/13/2019 MASTER Schedule2

    3/17

    Definition:Master Production scheduling (MPS)

    Translating a business plan into a comprehensiveproduct manufacturing schedule that covers what is to

    be assembled or made, when, with what materialsacquired when, and the cash required.

    MPS is a key component of material requirementsplanning

    It represents the critical linkage between planningand execution of operations. It is the next stage in theproduction planning process in any organisation afteraggregate production planning is done.

  • 8/13/2019 MASTER Schedule2

    4/17

    HOW MPS WORKS

    Information needed for MPS logic

    Lot size

    Lead time Product demand

    Starting inventory

  • 8/13/2019 MASTER Schedule2

    5/17

    Relationship between MPS &APP Aggregate production planning is a rough cut capacity

    planning exercise on the basis of forecast quantities ofproducts.

    MPS makes use of actual customer orders for thepurposes of capacity planning and resource allocation

    to specific customer orders.

  • 8/13/2019 MASTER Schedule2

    6/17

    Master Production Scheduling

    TechniquesAvailable = inventory position at end of week

    = starting inventory + MPS forecast

    Plan to have positive inventory level

    Buffer in case production below plan

    Or demand higher than anticipated

  • 8/13/2019 MASTER Schedule2

    7/17

    Utility of MPS MPS is the process by which disaggregation of varieties

    is done

    using this information additional planning is carriedout to assign the required capacity to each variety.

    planning for the material required for productionduring each period is also done

  • 8/13/2019 MASTER Schedule2

    8/17

    Why MPS is required ? . The most important reason is that at the stage of

    aggregate production planning, normally forecast

    demand is taken for the purpose of estimating thecapacity required

    when actual orders are received this informationprovides a better input

    MPS uses actual and the most recent information

  • 8/13/2019 MASTER Schedule2

    9/17

    It ensures specific material and capacity availability ina particular time period.

    As customer orders get amended and/or cancelled,the information has a bearing on capacity availability.

    The MPS module serves the important purpose ofcomputing capacity available to promise.

  • 8/13/2019 MASTER Schedule2

    10/17

    FORECASTING

    AGGREGATEPRODUCTION

    PLANNING

    CAPACITYPLAN

    MATERIALPLAN

    ACTUALPRODUCTION

    MASTERPRODUCTIONSCHEDULING

    MARKET

    LABOUR

    VENDOR

  • 8/13/2019 MASTER Schedule2

    11/17

    Link b/w MPS & other planning

    processesAs shown the figure MPS takes inputs from the order

    in flow system and APP to perform the disaggregationexercise.

    Based on the disaggregation, capacity planning andmaterials planning are performed to ensure theiradequate availability

    .If there is some infeasibility in either capacity or

    material availability, the plans are altered to arrive atpossible production plans. Therefore, MPS determineswhat needs to be ultimately produced and what isdemanded.

  • 8/13/2019 MASTER Schedule2

    12/17

    The stages involved in MPS There are two stages involve in MPS

    1.To update the projected demand based on earlier

    forecast and current market information. 2. It involves the Disaggregation of product

    information and relating to specific material, andcapacity requirements.

  • 8/13/2019 MASTER Schedule2

    13/17

    STEPS FOR ACTUAL PRODUCTION

    Step 1. Incorporating current market information into

    the production plan

    Step 2.Disaggregation of product information

  • 8/13/2019 MASTER Schedule2

    14/17

  • 8/13/2019 MASTER Schedule2

    15/17

    . if the forecast quantities are higher than the firmorders it is a normal practice to work on the basis offorecast quantities.

    On the other hand if the firm orders are more thanthe forecast quantity then it is desirable to incorporatethis information for the purpose of planning .

  • 8/13/2019 MASTER Schedule2

    16/17

    STEP 2.Disaggregation of product

    informationAt the time of APP an aggregate unit was chosen and

    different varieties of a product or services wereconverted to equivalent product/services .

  • 8/13/2019 MASTER Schedule2

    17/17

    SUMMARY MPS breaks the Sales & Operations plan into product

    families. Maintains Desired Level of Customer Service

    Allows proactive control of inventory