    MATERIAL

    AND

    EQUIPMENT

    INSPECTION PROCEDUR E

    g

    D R O

    omcaour I E c

    CoNSoRT'I JM

    CONTRACT

    NO

    PROJECT

    COMPANY

    SITE

    INSPE IION

    PROCEDURE

    DOC

    NO SP17 18-COM-07-3-PR-0008

    SOUTH PARS GAS

    FIELD DEVELOPMENT

    (PHASES

    I7 18)

    AI 0 C

    NBlUCpq

    Rev.

    NO.

    :O

    Class :1

    NATIONAL IRANIAN OIL COMPANY

    ASSALUYEH

    SOUT PARS

    GAS FIELD

    PERSIAN

    GULF. IRAN

  • 8/10/2019 Material & Equipment Inspection Procedure)

    2/38

    TABULATION

    OF

    REVISED PACES

  • 8/10/2019 Material & Equipment Inspection Procedure)

    3/38

    r

    INSPECTION

    PROCEDURE

    N

    L 0 C

    c m m m -

    I D A 0 or~cceom D E c

    .

    C a N S O f i ? T j u M Doc

    No

    SP17 18-COM-07-3-PR-0008

    Rev.

    No. O Class

    1

    TABLE OF CONTENTS

    Page

    1

    GENERAL

    I

    I Scope 5

    1.2 Tenns and definitions

    1.3

    Referenced

    docunlents

    1 4 Inspection policies

    2. INSPECTION

    AND

    TESTING

    REQUIREMENTS

    7

    2.1 General requirements

    for

    VENDOR shop inspection a nd 7

    testing

    2.2 Definition of inspection levels

    9

    2 .3 Inspection visit frequency 11

    2 4 Allocation of inspection levels to equipment and m aterials 12

    3. WORK SCOPE

    OF TPA

    I6

    4 MATERIAL

    AND EQUIPMENT CERTIFICATION 18

    4.1 Application I8

    4.2 Terms and defmitions 18

    4.3

    Certification

    typ s

    19

    4 4

    Documentation

    20

    4.5 Material

    test

    type

    test 1

    4.6 Certification

    matrix

    5

  • 8/10/2019 Material & Equipment Inspection Procedure)

    4/38

    INSPECTION

    ms

    I

    PROCEDURE

    f f r 0 c

    M h C Q . .I U

    I D R O

    orxcma

    o

    E

    APPENDIX 1 . Form

    of Inspection

    and Test

    Plan

    3

    APPENDIX 2.

    Form

    of

    Certificate

    of

    Conformity

    33

    APPENDIX 3 .

    Form

    of

    Inspection

    Application

    33

    APPENDIX 4 Fornl

    of

    Inspection Release Certificate

    5

    PPENDIX

    5

    Form of

    FindingNon conformance Report

    36

    APPENDIX 6 Flow

    Chart

    of Coordination for Shop

    7

    Inspection and Certification

    APPENDLX 7 Flow Chart of NCR Disposilion

    and

    Closing

    38

  • 8/10/2019 Material & Equipment Inspection Procedure)

    5/38

    l f J RO

    OECGROUP

    I D E c

    1 . GENER L

    CONSoRf

    This document

    describes minimum

    quaIity requirements

    for materids

    and

    equipment

    to be

    s u p p l id

    by VENDOR

    n d

    inspection coordinatior~

    rocedure among related

    parties

    such as COMPANY, CONTRACTOR, VENDOR or

    TPA etc.

    INSPECITON

    PROCEDURE

    1 2

    Terms and Definitions

    N.f.Q C

    ma- -

    Doc.

    No.

    S~l7 18-COM-07-3-PR-O008

    1.2.2

    CONTRACTOR

    Purchaser

    CONSORTIUM or

    nyof Consortium members.

    [IDRO:OIECIIOEC)

    Rev No.

    O Class :I

    1 2 3

    VENDOR :Supplier.

    A

    company

    appointed to supply

    materials

    or equipment in accordance

    with

    the terms and

    conditions

    of

    a Purchase Order.

    2 . 4 MSPECTOR

    Inspector dispztched by

    CONTRACTOWCOMPANY

    or

    inspector

    of

    third

    party

    inspection

    agency

    designated

    by

    CONTRACTOR.

    2.5

    Inspection

    and

    Test Plan ITP) A

    document

    which identifies the main quality control activities {inspectiox,

    examination or test etc.

    to be

    performed

    during

    fabrication and manufacturing

    of equipment

    and

    materials.

    Each

    activity js designated

    with

    key codes

    as

    stated in followings;

    a Hold Point H):

    A designated

    point during ur

    ful lowing a

    specific

    activity

    at which

    inspection

    or

    examination shall not

    proceed

    unless the designated

    parties

    have witnessed

    t he

    inspection andlor test.

    b

    Witness

    Point

    W):

    A designated

    point during or following

    an

    imporiant

    activfty

    at

    which inspection

    or

    examination

    is

    required i n accordance with thz relative

    procedure.

    Work may

    procccd

    through the

    designated witness point if

    VENDOR has officially

    informed

    that

    INSPECTOR is not

    present due

    to

    pre vi~ usly stablished

    activity,

    c Spot

    Witness

    Point (SW): A designated point

    during

    or following ad

    activity

    at

    which spot

    inspection or

    spot

    examination

    is required in accordance with

    the

    relative

    procedure. Work may

    proceed

    through the

  • 8/10/2019 Material & Equipment Inspection Procedure)

    6/38

    INSPECTION

    PROCEDURE

    tmRtrac-Carp

    I O C

    C ) R O

    OIECGROLT rP

    E

    C

    CQCi ilS ORTfU

    Doc. No, :

    SP17 18-COM-07-3-PR-OD08

    Rev.

    No :O

    Class

    :

    1.2.8

    PLANT means

    and

    applies to each offshore platforms, offshore pipelines or onshore permanent f cilities

    being installed/constnrcteJ

    or

    to

    be installedfconstructed at

    site

    resulting

    from

    the works and services by

    CONTRACTOR..

    1.3 Referenced Documents

    Doc. No.

    COM-O 1 3-QA-0001

    Project Quality

    Plan

    Section 8. Shop Inspection

    and

    Testing

    1.4

    Inspection P olicies

    -4.1

    rONTRACTOR,

    in addition

    to

    his representative iu-ld/ur COMPANY

    MSPECTOH, shall

    ssign TPA

    to

    perform designated inspection activities. Compensation of TPA s services shall be borne by CONTRACTOR.

    However, in

    case

    that a scheduled shop

    or field test would

    faif

    and it

    must

    be repeated

    after the

    remedy

    of th

    failed

    material

    or equipment,

    the

    additional

    TFA s

    and COMTANY CONTRACTOR INSPECTOR servi es

    and

    charges

    shall be

    borne

    by VENDOR'S care and cost. (traveling and accommodation expenses plus

    working t ime of TPA and INSPECTOR)

    1.4.2

    VENDOR shall bear any

    additional

    costs due to

    delays

    that may occur,

    attributable to

    the VENDOR,

    e.

    g. not

    ready

    to

    perform the test

    on

    the

    proposed

    date.

    1

    Such

    inspection shall not release the

    VENDOR

    from performing its

    wn

    inspection

    and

    qua;ity control

    programs.

    VENDOR

    shall incorporate all

    inspection

    certif cates andlor compliance certificates in VENDOR'S

    final documentation.

    1.4.4

    Shop

    inspection

    andfor

    document

    review shall

    be

    carried out at both the manufacturing

    plant and

    where

    necessary,

    at

    the

    material

    supplier

    shop.

  • 8/10/2019 Material & Equipment Inspection Procedure)

    7/38

    2

    INSPECTION

    ND TESTING

    REQUIREMENTS

    2.1

    General Reauirement~ or

    VEN OR

    Shop lnspcction and Testing

    h m r f * r -

    .LO.C

    Rev.

    No. O Class

    :1

    Jb

    DRO

    DIGCGRDllP

    Com*a= RTMJM

    2.1.1 Qualiiy Assurance Plan

    INSPECTION

    PROCEDURE

    Doc.

    No,

    SP178ti8 COM 07 3 PR 0008

    VENDOR

    shall su mit

    his

    Q A plan

    describing

    h s

    quality system

    and its

    application to

    the s c o p of

    supply

    complying with the details of inspection level described herein.

    h i s plan shall be

    in

    accordancewith IS0 900119002standards and

    the

    applicable project specifications.

    This

    quality plan

    shall

    cover the following

    topics

    but

    not

    limited to:

    1

    Organization

    VENDOR shall provide a

    description

    of their QA organization,

    qualifications

    its resources and how it is

    incorporated into his management structure, together with

    the

    procedures used to review its effectiveness.

    2

    Production schedule

    VENDOR shall

    provide a production schedule indicating the key points where quality related manufacturing

    processes

    i~isptctions

    nd

    tests would occur.

    3) Hold points

    VENDOR

    shall

    provide

    a

    plan identifying proposed hold points

    in

    the

    production

    process

    for

    witness

    or

    approval

    of particular activities

    by

    COMPANWCONTRACTOR or

    his appointed

    agents, and the method of

    advising

    CONTRACTOR

    of

    the timing of relevant inspections and tests.

    4) Procedure

    VENDOR shall provide details of processes and

    st nd rds

    by

    which

    it

    is proposed

    to control:

    Quality related manufacturing processes, inspections

    and tests, including sanlpling

    techniques

    Quality control plan for

    Sub-VENDOR

    products,

    -

    Methods of qualification

    of

    wmk, inspection

    and

    test procedures,

    Qudity

    and identification

    of

    incoming maierial

    and

    equipment.

    Calibration and maintenance of

    inspection and

    test equipment,

    Packing

    and

    shipping of finished

    products

    Preparation

    and

    supply of specified documentation

    2.1.2

    Inspection

    Documents

    to

    e

    submitted by VENDOR for CONTRACTOR ApprovaV

    COMPAh Y Review

  • 8/10/2019 Material & Equipment Inspection Procedure)

    8/38

    2.1.4

    N T

    Qualification

    I R O

    omccaour I E c

    oNSoRTPU

    Unless

    otherwise

    specified

    in Project

    Specifications,

    all

    personnel

    performing

    NDT

    functions must

    be

    adequately qualif ed. Only individuals

    qualified

    for NDT

    Level

    and working

    under

    the NDT

    Level

    II or

    INSPECTION

    PROCEDURE

    Doe. NO. SP17 18-COM-07-3-PR-0008

    individuals

    qualified

    for

    NDT Level

    may

    perform

    nondcstructivt testing.

    Certification

    of

    Level

    and

    N I 0 C

    h O 4 i k

    ~ e v

    O. O

    Class

    Level I

    individuals shall be

    performed

    by

    a Level

    ll

    who h a s

    been

    certified

    y ASNT o r

    Equivalent

    Bodies.

    NDT individual's qu alifica tions shall

    form a part of

    all mani~facturing uality plans

    and

    therefore be

    approved

    by

    CONTRACTOR

    before

    manufacturing.

    The

    actual

    certificates shall

    be

    reviewed at

    the

    manufacturer shop

    y INSPECTOR.

    Note:

    The

    manufacturermust bear

    in

    mind that the above

    is

    also applicable to all submanufacturer.

    2.1.5 Pre-Inspection Meeting VIM)

    In

    case

    that

    PIM

    is

    required

    in

    Inspection Basis,

    VENDOR shall request

    CONTRACTOR

    to attend PIM

    at

    VENDOR'S shop

    21

    working days in advance After

    receiving

    PIM

    attendance

    request from VENDOK

    CONTRACTOR

    wiII

    give

    a notice

    to

    related

    partits including COMPANY, TPA,

    etc.

    VENDOR

    shall

    prepare

    the

    following

    documents for the PIM, but not

    limited

    to

    the

    followings

    Inspection and test

    plan

    referred

    to

    APPENDJX 1.

    Production/tnspection schedule

    Standard

    forms

    for

    inspection reporting suchas hydrostatic

    test, NDT

    results, performance

    test etc

    Inspection documents

    listed in

    "Vendor Documents Requirement

    in

    relevant

    Material Requisition.

    Submission procedure

    of

    certification

    Raw

    material

    source

    plan

    and

    Sub-VENDOR

    list

    Others

    Witness points by CONTRACTOR,

    COMPANY

    and/or

    TPA

    for

    materials

    and equipment

    of

    Inspection Lcvel

    or

    H

    might be finalized

    in

    PIM prior

    to commencement

    of

    fabrication.

    2.1.6

    VEN OR

    Obligation

  • 8/10/2019 Material & Equipment Inspection Procedure)

    9/38

    2.1.8

    inspection Reports

    JbA

    I D R O O~ECGROLT I

    o

    E

    c

    C*NSCBRTC

    Inspector s reports shall be

    issued within five

    5 ) working days

    following the end of inspection by

    COKTRACTOR or TPA,

    with

    copy to COMPANY.

    Such

    reports

    shall

    indicate

    in particuls

    :

    P.O.

    number,

    MateriaI inspected

    Nature

    of inspection and test

    performed

    Quantity accepted

    Quantity

    rejected with

    reasons

    All

    information

    about

    progress, qualjty, quantity, aspect

    List of rsferenced documents

    such

    as specifications,

    drawings, procedures,

    international codes;standards,

    etc.

    2.1.9

    Certification

    INSPECT1ON

    PROCEDURE

    Doc

    No.

    SP17 18-COM-07-3-PR-0008

    The

    equipment

    shall

    be provided

    with

    relevant

    certificate s),which

    certifies

    compliance

    of maleriallequipment

    with

    specified

    code

    standard

    andlor

    specification.

    Accordingly,VENDOR shalI

    provide

    certificates

    submission

    procedure for

    appro~d ,

    nd

    the procedure

    will

    be

    finalized

    during

    pre-inspyctionmeeting.

    N.8.O.C

    m a r k

    Rev,

    No

    O

    Class :1

    2.1.10 Quallty Audit

    CONTRACTOR

    QA

    n d

    COMPANY

    QA

    reserve the right to audit VEhDOR quality system. VENDOR

    sh ll

    prepare and submit all information and

    documents

    requested.

    2 2 Definition

    of

    Inspection

    Levels

    2.2.1

    LEVEL

    I

    Highest)

    1nspec:ion

    Level

    is defined s a f u l l stage inspection carried

    out

    progressively from commencement of

  • 8/10/2019 Material & Equipment Inspection Procedure)

    10/38

    Witness

    all pressure, mechanical, full string and

    performme

    tests followed

    b~

    inspection of

    disassembled

    equipment,

    if applicable.

    Review/Witness

    all

    major

    tests

    required

    by

    approved

    QNQ

    VENDOR

    documents, including on

    and

    off

    load

    tests

    of mzchinery or type t s t s of electrical equipment

    as

    required.

    Final visual

    and

    dimensional inspection of

    equipment.

    Review

    of final data

    book package

    in accordance with

    zpproved

    index.

    Verify packing

    and

    mark ing idenrifications.

    Issue

    uf Final

    Release Certificatejs .

    l

    D

    R

    omcGROW

    %%

    CQMSuRTBUM

    2 2 2

    LEVEL

    11

    Inspection Lwel

    11 is

    defined

    as specific stage

    inspectionof equipment and

    final inspection of

    equipment prior

    to shipment.

    Stages

    of

    inspection

    shall

    be agreed

    upon during a pre-inspectionmeeting t be held with the

    VENDORS after purchase award

    and

    shall include:

    Scrutinize material t e ~ tertificates

    Check at random of

    materials,

    dimensions, and finishes

    Monitor

    specific tests

    n d stage inspections

    Auditicg of the VENDnRS quality control program.

    Witnessing

    final

    pressure

    and

    workshop performanct

    trsting

    inclrrding

    o n

    nd

    o

    oad

    tests

    as

    apglicable

    and

    simulation of automatisms, followed

    by inspection of

    disassembled

    equipment

    i f required.

    Final

    visual and dimensional ir~spectjon

    Review

    data

    book package in accordance

    with approved index.

    Verification

    of

    packing

    and marking.

    INSPECTION

    PROCEDURE

    DOC.

    NO

    SPl7 i8-COM-Q7-3-PR-,008

    2.2.3

    LEVEL

    111

    a=Cc

    n o.c

    Rev.

    No. :O Class

    :i

    Inspection Ievel 111is defined as final condition or as built

    exarnination s)

    and test s).

    Inspection

    may be

    on

    one

    or

    more pieces of

    equipment

    or on a randarn batch selection and

    shall

    include:

    Review all

    qualify

    control records for conformnncc.

    Witness final pressure

    and

    workshop perfom~anceesting

    including

    running tests following by

    inspection of disassembled equipment,

    if

    required

  • 8/10/2019 Material & Equipment Inspection Procedure)

    11/38

    CONTRACTOR

    shall

    perfom

    inspection visits

    in VENDORS shops, as well

    as

    in their

    Sub-vendors

    shops, a

    specific

    stages

    of equipment fabrication assembly

    esting,

    painting

    and

    packing. Such

    specific

    inspection

    stages are

    to

    be determined for each category of equipment

    in accordance

    with the

    finalized/approved

    inspection

    and

    test plan which identifies

    all inspection, NUT witnessing, and

    witness testing

    points

    applicable

    to all phases

    of fabrication assembly and testing.

    In addition to specific inspection visits, CONTRACTOR

    shall

    also

    conduct

    regular

    inspection

    visits

    in

    accordance with

    the frequencies indicated

    hereafter which

    are

    to be understoodas

    minimum frequencies

    to be

    applied to each com ponent

    of

    each eqiripment item

    Such

    frequencies are

    intended to cover inspection visits by professional inspectors only. CONTRACTO R

    shall

    not combine inspection and

    expedidng

    functions, nor

    have

    them performed

    by

    the

    same

    individual.

    A

    D R O OI E C GR OW

    E

    C

    C6M5aRTruM

    2.3.2

    Pressure

    Vessels

    Heat Exchangers,

    Boilers

    Level :

    regular

    inspection visits shall be

    conducted a t

    least once

    every

    month

    Level L : regular inspection visits

    shall

    be

    conducted

    at

    least once every six weeks.

    2.3.3 Major Machinery

    Equipment

    Level

    I

    :

    egular

    inspection

    visits

    shall

    be

    conducted at

    least

    once every

    other

    week

    Level

    11

    :

    egular

    inspection

    visits

    shall

    be

    conducted

    at

    least

    once

    eveq

    month

    Lcvel 111:

    regular

    inspection visits

    shall

    be

    conducted

    at

    least

    once every six

    weeks.

    INSPECITON

    PROCEDURE

    DOC,

    NO.

    :

    SP17 18-COM-07-3-PR-0008

    2.3.4 Packages

    Level

    I :

    egular inspection visits

    shall

    be

    conducted

    at least once every

    month

    Level I t

    :

    regular

    inspectionvisits shall

    be ctlnducted at least once every six weeks.

    h. IkcnR.

    . I o ~

    REV

    NO,

    ;O Class

    :1

    23 5

    ElectricaYInstrumentation Equipment

    Level

    I

    :

    egular

    inspection

    visits shall

    be

    conducted

    at

    least once

    every

    month

    Level I

    : regular

    inspection visits

    sllall

    be conducted

    at

    least clnce

    every

    six w k s

    Level 111 inspectior, visits a . specific stages

    only.

  • 8/10/2019 Material & Equipment Inspection Procedure)

    12/38

    Y V

    l

    D

    orsc GROUP

    coNSQRTItUM

    he

    descriptions of

    equipment and

    materials

    to be inspected

    are general.

    lTEMSOF

    EQUIPMENT

    MATERIALS TO

    BE

    INSPECTED

    ITEM

    NO.

    - r -

    INSPECI7ON

    LEVELS

    XNSPE llON

    PRO EDURE

    DOC.

    NO. :

    SP17 18-COM-07-3-PR-0008

    .o

    a

    a

    NJ 0 C

    O s . t b -

    Rev. No. :O Class

    :I

    DESCRIPTION

    1

    I1

    PRESSURE

    VESSELS

    1.

    Proccss,

    Injection, Accumulator dmm. and

    pressurized storage vessels;

    S55

    nd

    A S h E V l ll ,

    D i v . 2

    A S M E

    VIIl,

    Di v l for design pressure

    And

    temperature

    ccnditions.

    g0 bar gor grcatcr

    Itss than 8 bar.g to 3 bar

    less

    than 30

    bar.g except

    vacuum

    and

    less han 340C to OC

    less

    than 30 b ~ . gnd

    above 34 C

    less

    th n 30 bar.g and

    below 0C

    undcrvacuum

    1 2 Reactor

    VeseIs, Driers,

    Columns

    1.3 Impact tested carbon and low alloy

    sieclh. high

    N i

    steel and austenitic

    srainless steels,

    Inconel

    lined

    1.4

    All

    services

    n

    low

    and

    cryogznir:

    X

    x

    X

    X

    X

    X

    X

    x

    x

    III

    design emperatures

    1.5 Non-ferrous Alloy Vessels

    1.6 ladded

    Vessels

    I=.7 Lined Vessels, rubber or epoxy coaling

    1 8 Slug-Catchers

    IV

    X

    X

    X

    x

    X

    X

    2.0 ATOMOSPHERIC

    PRESSURE

    STORAGE TANKS

    2 1 Field

    fabricated

    carbon steel:

    2Smm

    or

    greater

    less

    than

    25mm

    impact

    tested carbon

    and

    low al loy

    steel,

    h i ~ h i

    steel. S S

    and nnn-ferrous

    alloys

    2.2 Shop fabrica~ ed

    carbon steel

    35mm

    and

    g r e a t ~ r

    7

  • 8/10/2019 Material & Equipment Inspection Procedure)

    13/38

    EXCHANGERS 7 1

    N.LO.C

    m a

    Rev. No.

    O

    Class : 5

    t

    -

    D R O OTECGROUP 1 E

    c

    cohllsoRT UM

    INSPECnON

    PROCEDURE

    Doc. NO SP17 18-COM-07-3-PR-0008

    4.1

    Shell and Tube for service:

    40 har.g or greater

    125 mm

    bundle

    dia,

    or

    greater

    less than 40 bar.g or 1250mm bundle dia.

    - low temperature less than 0C

    X

    X

    X

    generators:

    5 2

    Electrically

    driven gas

    compressors

    5 3

    Pumps:

    X

    alloy or non-ferrous,

    or

    cladded

    SOUR

    service

    Cold BOX

    4 2

    Air

    coolers

    headers, tube-bundles, fins

    : I

    fans, motors, plenums,

    etc.

    I

    X

    4.3

    Double pipe,

    plate

    frame,

    spiral

    X

    .4

    Plate

    f i d co r e )

    exchangers

    X

    4.5 Cryogenic Exchangers

    4.6

    Cold Box

    ROTATTNG

    EQUIPMENT

    5.1 Gas

    turbine

    driven and

    power

    low and cryogenic temperatures

    x

    - Manufacturer s standard items

    5.7

    Diewl

    Engine

    Units

    PIPW G

    ND

    PIF~GMAGZRIALS

    6.1 Piping:

    X

    fire

    water

    sea

    water

    - main

    but

    not

    cr i l ica l

    5

    5.4 Emergency generators

    5.5 Air compressors

    5 6

    MiscelIaneous

    x

    x

    x

    impact tested carbon and

    Iow

    alloy steel

    austenitic

    stainless steel

    and

    Inconel

    62511ncoIoy 825

    othet piping

    X

    X

    Boiler blower /

    Fans

    X

    Blowers,

    metering pumps, mixers

    x

    I

  • 8/10/2019 Material & Equipment Inspection Procedure)

    14/38

    7 0 STRUCTURAL

    I

    7.1 S~ecial

    ategorv

    steel X

    7 2 First and Secondary Category steel

    3

    Terliarv

    stee l

    N ~ 0 . c

    k n s l l k t a p

    Rev

    No.

    O Class :1

    l D R O

    OIECGROLT o E

    c

    CQMSuRT1 M

    INSPECTION

    PROCEDURE

    Doc. No. SP17&18-COM-07-3-PR-0008

    ]

    9.1 DelugelsprinkerlCO2/fixed kids

    X

    8

    Process

    and utilities filter and

    strainers

    8.2 Effluen t reatment units

    8 3

    Chlorination package units

    8.4 Desalination

    units

    8 5Nitrogen generation

    9 4 H .drank, and

    piping

    system

    X

    x

    X

    X

    X

    X

    X

    X

    I

    X

    X

    X

    X

    X

    X

    X

    10 3

    Transformers:

    I

    22Kv and higher or 300

    kVA and

    X

    I

    X

    X

    X

    X

    X

  • 8/10/2019 Material & Equipment Inspection Procedure)

    15/38

    2 5

    Inspection Monitoring

    Sclr

    edule

    IV LO c

    a=

    REV NO. :O class I

    -

    D R O O~ECGROLJP o E

    c

    coMsoRT hBM

    Contraclor

    shall

    prepme n Inspecliol7 Mojtitoring Schedule indicuting each

    equipment

    ond noterialrelating

    ?he

    TPA assignment as ol Lol iss:

    - P eference

    INSPECTION

    PROCEDURE

    Doc No SP17 18-COM-07-3-PR-O00S

    11.0

    12.0

    X

    I

    X

    X

    10.11

    Emergency

    Generators

    X

    0.12Air

    navignlion

    aid beacons

    10.I 3 Cable traydcable ladders

    10 14Bus bar trunking

    TELECOhlMS

    Telecommunication equipment

    PA

    Systems

    Telephone PABX

    lntercommunicalion system

    Radio systems, TV

    others

    INSTRUMENTATION

    12.1

    Safety

    system

    PLCs

    ESD.

    PSS,

    FG

    12.2

    Control panels

    12.3Analyzers

    12 7

    Audio,

    visual

    arn

    X

    I

    X

    x

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    12.9 Pressure control

    regulating

    skids

    X

    X

    13.0

    11.10

    Flow meters, indicators non-electrical)

    12 11

    DCS/Supervisory

    computers

    12.12 Gas chromatograph, sample conditioning

    systems,

    prefab

    sheIters

    12.1

    3

    Cables-fikr optic

    :able

    MISCELLANEOU 5

    13.1 Equipment, malerials or components not

    listed

    above

  • 8/10/2019 Material & Equipment Inspection Procedure)

    16/38

    3 W O R K SCOPE

    OF

    TPA

    3.1

    CONTRACTOR

    will

    appoint

    the

    services

    of

    TPA (Third Party Authorities) from

    the

    list

    set

    out

    in

    clause

    3.5

    of

    this Section to perform inspection

    and

    certification functions.

    N I 0 C

    ma r k

    ~ e v o. :O Class

    :

    I D R O

    o r ~ c ~ a o u ~ c

    cQNSoRTiuM

    3.2 For the above services, CONTRACTOR

    shall provide full

    knowledge

    of the PROJECT contract

    requirements,

    specification, shop drawings and purchase order requirements

    plus

    applicable

    codes

    to

    TPA.

    INSPECTION

    PROCEDURE

    D o c

    No SPl7 18-COM-07-3-PR-0008

    3.3 AS one of CONTR ACTOR S representative,

    TPA

    will

    perform the

    followings according

    to

    CONTRACTOR

    formal request, but not

    be

    limited to:

    1) Quality Monitoring

    2)

    Visual

    Inspection

    3

    Test witnessing

    at

    shop

    of fabrication or manufacturing

    4) Reviewing vendor documents and procedures

    5)

    Verification

    of all

    Quality Control(QC)

    and

    Quality Assurance(QA) activities

    performed by the VENDOR to

    ensure

    compliance with

    purchasing

    specifications

    3.4 The

    scope

    of the Certification TPA shall

    as

    a minimum accommodate;

    3.4.1 Engineering Documents Approval

    CONTRACTOR shall

    obtain

    all

    necessary

    design approval for

    the

    prefabrimtion

    if

    any and

    construction

    engineering of any heavy lifting

    or

    site movements design and procedures.

    3.4.2

    CONTRACTOR ITEMS

    Reviews

    CONTRACTOR

    subject to

    review includes all

    material and

    equipment

    for which material

    certificates are

    required

    by

    relevant

    regulations.

    The

    review by

    the

    TPA will have to

    be performed,

    and certificate issued accordingly, before

    the

    marerials or

    equip~nent

    re relsased from

    VENDOR S

    Works.

    3.4.3 Fabrication

    work

    Approval

    CONTRACTOR

    shall obtain TPA s

    approvals for fabrication of th e

    PLANT

    including:

    Review

    of dossier for heavy

    lifting and

    site movements

    WPS,

    WPQT

    welders qualification

    Heat treatment procedures

    and

    equipment

    NDT

    equipment,

    procedures and

    specifications, NDT operators

  • 8/10/2019 Material & Equipment Inspection Procedure)

    17/38

    3.4.4 Reporting

    Throughout

    the period

    o f TPA s involven~ent n the work, the TPA will

    issue

    to CONTRACTOR nd

    COMPANY monthly

    report which

    describe

    Progress

    - Outstanding matters

    Problems arising from above

    3.4.5 Close-out Report

    The

    certification

    TPA shall

    issue

    to CONTRACTOR the close-out report with similar

    content

    to

    that of

    the

    CONTRACTOR S

    Close-out

    report, but

    covering

    only Certification TPA s Scope of Work

    3 5 Approved

    Certif ication

    TPA by CONTRACTOWCOMPANY

    IV LO C

    rw mu-Crac.

    Rev No :O Class :

    I D R O

    OIECGROITP

    o

    E

    c ~ N s ~ ~ T I U M

    1

    LLOYD

    REGlSTER

    2

    BUREAU VERITAS

    PARIS

    3)

    DET NORSKE VERITA

    S

    41

    GERMANISHER LLOYDS

    5 SOCIETE GENERATEDE SURVEILLANCE (SGS)

    INSPECTTON

    PROCEDURE

    Doe

    No.

    SP17 18-COM-07-3-PR-0008

  • 8/10/2019 Material & Equipment Inspection Procedure)

    18/38

    4.

    MATERIALAM QUIPMXNT CERTIFICATION

    4.1

    Applicatian

    N 1 U C

    0 a bCamp

    ~ e v

    o

    :O Class

    : I

    I O R O m ~ n o u r o E c

    cuh8s0RTguM

    This Section applies to the

    documentary

    certification

    requirement

    for materials

    and

    equipment

    and

    lays own

    the

    minimum acceptable standards for the format, nature and content of the certification

    supplied. In

    case of

    discrepancy and for omission andlor lack of information between this

    Section

    and

    the norm

    EN 10204 and

    Project

    Specification,

    Project Specificat

    ons will prevail.

    INSPECTION

    PROCEDURE

    D o ,

    NO

    SPl7 18-COM-07-3-PR-0008

    4.2 Terms And Abbreviations

    1

    Certified

    Copy

    A copy

    of

    the original certificate which has

    been

    verified against

    ihe original by either the

    Originator, the

    Certification

    Authority, n

    inspector appointed by CONTRACTOR,

    or an independent

    inspector acceptable

    to COMPANY acting on behalf of the VENDOR, and which

    bears

    their original red

    stamp and

    signature.

    2

    Independent

    lifting appliance examiner

    A competent person authorized to conduct examination

    and

    testing of lifting appliances

    and

    gear acceptable

    to the Certification Authority.

    3 Material

    Raw, manufactured or processed material.

    4)

    Material estCertificate

    A document whjch

    provides

    and attests to

    the

    results of

    tests

    on

    the

    material actually supplied, readily

    identifiable to, and recording

    the

    conformih of the material with the requirements of

    the code,

    standard

    or

    specifications

    given

    in the purchase order.

    5 Original Certificate

  • 8/10/2019 Material & Equipment Inspection Procedure)

    19/38

    8)

    Source

    l D R O OIECGUOUP o

    E

    c

    coRlsuRT UM

    Original

    place

    of manufacture

    of

    the material.

    9 endor

    INSPECTION

    PROCEDURE

    Doc. No. : SPl7&18-COM-07-3-PR-0008

    A company appointed to

    suppiy

    materials or equipment in

    accordance

    with the

    terms and

    conditions

    of

    a

    Purchase Order.

    N 60.c

    MWRChcesr

    ~ e v o :O Class :1

    4.3

    Certification

    Type

    Material

    certification

    shall be

    provided for

    all

    purchased items in accordance

    with

    the

    specific requirements of

    the

    purchase

    order. A matrix of

    certification

    Type against various materials and equipment is provided in

    clause

    4.6,

    and

    certification Types quoted therein are defined

    betow.

    NOT :

    Alt

    materials

    testing

    certificates shall be issued by VENDOR'S QNQ

    ersonnel

    who are

    not

    involved in the

    production process in

    manufacturing

    or processing works.

    4.3.1 TYPE A -

    EN

    10 204 3.1C

    Certificates confirming that

    the materials

    supplied conform to the delivery conditions of

    the

    Purchase Order

    and

    attested

    to

    by the Authority, COMPAN Y authorized Representative or Certification

    TPA.

    4.3.2

    TYPE B

    EN

    10

    204

    3.1

    B

    Certificates confirming that

    the

    materials supplied

    conform

    to

    the

    delivery conditions

    of

    the Purchase

    Order

    a n d o r

    in

    accordance

    with

    the oficial regulation and attested to by the

    VENDOR'S

    authorized Representative.

    4 3 3

    TYPE

    C

    EN

    10

    204 2.2 and 2.3

    Reports provided by

    the

    VENDOR

    in

    accordance

    with

    the requirement of

    the

    order

    andlor

    official regulation

    andlor corresponding technical rules.

    EY lr 204 2.3

    Specific

    Test Report

    issued on

    thc basis

    of specific inspection

    and

    testing carried out

    on the

    products

    actually

    supplied

    mentioning the

    test

    results in accordance with the order andor

    official

    regulation and

    corresponding technical rules.

  • 8/10/2019 Material & Equipment Inspection Procedure)

    20/38

    Certificates of

    type

    approval, type test and proof test.

    I D R O

    DYECGROllP E C

    CoIWSORTIUM

    4.4

    Docurnenta

    tion

    4 - 4 1 General

    INSPECnON

    PROCEDURE

    Doc. No SP17 18-COM-07-3-PR-0008

    A material certificate shall be provided for each discrete

    piece or

    item of material or equipment. Where

    number

    or

    pieces

    have identical batch number, heatJcast number, test number,

    and

    were manufactured at the

    s me process

    and

    for the

    same

    purchase order item, then they maybe recorded

    on

    a single certificate.

    Material certificates shall be th e original documents except as subsequently defined.

    For TYPE

    A

    and

    TYPE

    B applications, the material certificate supplied shall be the original document or a

    verified copy.

    For materials where mechanical properties may

    have

    changed as result

    of

    subsequent processing,

    the

    certificates issued by the VENDOR shall be in accordance

    with

    TYPE B and shall contain source chemical

    analysis and m anufacturer s check analysis.

    Any

    transcription o f the source material chemical analysis on to

    the VENDOR s certificate shall be accompanied by the original or a verified copy thereof.

    Stockists

    certificates and

    typical certificates

    are

    unacceptable.

    Certificates and letters of conformity shall

    be

    signed by an authorized representative of the Vender s

    Quality

    Department.

    N t 0 C

    --a -

    Rev. No. :O Class I

    4.4.2

    Document

    Quality

    I ) All certificates shall be typed or printed. Handwritten certificates are unacceptable.

    2) All certificates shall

    be stated

    in English language.

    I f impossible,

    a notarized translation shall be provided.

    3)

    All

    certificates

    shall

    be free from additiclns.

    deletions and corrections.

    The use

    of correction fluid is

    unacceptable

    4)

    All

    certificates

    shall

    be of a clear,

    well contrasted

    and

    legible quality suitable for photocopying,

    microfilming or electronic imaging w ith reference to

    the

    following standards:

    S : 5536 Preparation of Technical Drawings and

    Diagrams

    for Microfilming

    BS 5444 Recommendations for the Preparation of Copy

    for

    Microfilming

    BS : for 35mmMicrofilming of Technical Drawings

  • 8/10/2019 Material & Equipment Inspection Procedure)

    21/38

    Materiallequipment descrip tion

    Certificate nu~nber

    Relevant test data

    Heat

    and

    batch number

    VENDOR s serial number

    Certification

    Authority endorsement

    l R O OIECGROW 1 C

    QMSoRT uM

    4.5 Material Test Tvpe Test( Proof

    Test

    TypeApproval Certificates)

    4.5.1 General Requirements

    f

    NSPECTION

    PRO EDURE

    Doc, NO : SP17 18-C0M-O7-3-PR-0008

    I In addition to the certification listed

    in

    clause 4.5.2, all equipment and materials reIeased from VENDORS

    shall

    be

    accompanied

    by

    a

    copy

    (or

    copies

    of;

    a.

    CONTRACTOR S Inspection Release Certificate.

    b. The Certification Authority inspection Release Certificate,

    where

    appropriate.

    c.

    The

    letter or certificate

    of conformity

    from the

    VENDOR

    [Type D certificate)

    stating

    compliance with

    the applicable

    Order

    requirements.

    d. Material

    test

    certificates

    for

    all items to be welded on site.

    e. Outstanding

    Work Lists

    and QC

    punch

    listed items to be curnpIeted on site by the VENDOR arldl or

    fabrication

    CONTRACTOR.

    f. Handling procedure, if required.

    g. Packing, unpacking, storage and preservation procedure, required.

    h. Lubrication schedule

    (as

    appropriate).

    i. Approved Vendor deviation requests.

    nr I 0 C

    Pmwrter

    ~ e v .

    O :O

    Class :

    2) Full details of

    the

    certification requirements of the Order are to be given in

    each

    Requisition.

    4.5.2 Specific

    Requirement

    1)

    General

    a.

    Unless

    otherwise specified, or required by code or regulation,

    type

    test and type approval certificates

    shall be issued

    by an accredited independent test laboratory or authority acceptable to

    COMPANY

    and

    the Certification Authority. It

    shaIl

    be the VENDOR s responsibility to determine

    the

    acceptability or

    othenvise to

    the Certification

    Authority of

    the test

    laboratory

    or

    authority

    proposed.

  • 8/10/2019 Material & Equipment Inspection Procedure)

    22/38

    3 Struaural

    Steel

    J

    D R O om ~now

    o c

    CQMsBR l 'uM

    Structural

    steel

    plate,

    section, tubular

    and

    castings

    for

    main members

    of pipe

    rack

    and

    structure

    shall

    be

    provided with TYPE

    B

    material

    test

    certification.

    4) Electrical Appliances and Fittings

    INSPE TION

    PROCEDURE

    DOC.

    NO

    SP17&18-COM-07-3-PR-0008

    Certificates concerning suitability of appliances,

    enclosures,

    etc., for

    use

    in hazardous areas shall

    be

    issued

    by a nationaIIy approved certifying body or nationally accredited laboratory acceptable to

    COMPANY

    and the

    Certification Authority.

    These

    certificates shall state the service temperature class, gas group

    and

    zone classification

    for

    which

    the

    item is approved.

    Drawings

    approved

    by

    the relevant certification body shall be made available for reviewlverification at

    the

    VENDORS

    works.

    W.1.O.C

    morrw

    ~ e v .

    O, :O Class

    5) Passive

    Fire Protection

    All passive fire protection systems, fire-rated archi?ecturaI items

    and

    fire dampers which form pan of a

    fire boundary shall be of a type which

    is fire-tested and

    certified

    in

    accordance with the

    requirements of

    the

    relevant specifications.

    For l fire-rated architectural items, including doors windows, ceilings, bulkheads, partition, roller

    shutters,

    insulation,

    coating

    systems,

    pipingkablelducting

    penetration

    systems,

    etc., together with

    HVAC

    fire dampers. either

    of

    the following shall be

    provided:

    a.

    A

    Certification A uthority approval

    certificate for

    prototype fire t sts carried out on

    the

    itern s) under

    the witness of the

    Certification

    Authority.

    or

    b.

    A

    fire

    Certificate

    and supporting

    fire test report for tests on the item s) conducted

    by an

    independent,

    nationally accredited fire-test laboratory whose

    certification

    is

    acceptable to the

    Certification

    Authority.

    All such certification shall provide:

    a.

    A clear statement of the

    class of

    division

    for

    which the item is suitable.

    b. Adequate

    reference to

    t h e original test specifications

    and

    drawings upon

    which the

    prototype

    test

    was performed.

    c A st tement of

    the validity

    period of

    the certificate.

  • 8/10/2019 Material & Equipment Inspection Procedure)

    23/38

    certificate which demonstrates

    that the hose

    and method

    of

    a ~ a c h m e n t

    f

    the end connections

    have

    together been type tested to the requirements given

    in

    Figure 1 .

    OIECGROUP i E C

    co sonTruM

    Type tests shall

    be

    performed either in the presence

    of

    the

    Certification

    Authority themselves,

    or by an

    independent, accredited test laboratory

    whose

    certification is acceptable

    to

    the Certification Authority.

    The

    type

    test certification presented

    shall be

    applicable

    to

    the bore,

    pressure

    rating

    and

    materials of

    construction of the actual hose(s) supplied. Where such certification covers a range

    of

    hose size, pressure

    ratings

    and

    materials.

    the

    limits

    of

    this range shall

    be

    agreed with

    the

    Cefiification Authority

    and

    shall

    also be in accordance with the applicable code(s)

    specified.

    SNSPECTION

    PROCEDURE

    Doc No SP17 18-CQM-07-3-PR-O008

    and Certification Requirements for Flexible Hoses

    9) Fire Safe Valves

    W LO C

    h a a u

    Rev. No :O Class

    All valves which

    have parts

    which

    can degrade

    or deform in

    the

    event of fire

    (and

    especially those having

    elastomeric

    seat or seal

    materials),

    and which

    are to

    be

    installed

    in hydrocarbon or

    fire

    water

    service

    (including

    hydrant

    valves ,

    shall

    have

    relev nt

    fire

    type test certification acc eptable to COMPANY.

    Fire tests shall

    be

    carried out

    in

    presence of a recognized independent Authority. or by an independent,

    accredited fire test laboratory

    whose

    certification is acceptable to the Certification

    Authority

    It shall

    be

    the VEN DOR S responsibility to determine the acceptability or

    otherwise

    to the Certification Authority of

    t h e

    test

    laboratory or

    authority

    proposed.

    Fire test certification for valves shall be in accordance with the requirements of API 6FA API 607,

    BS:6755 or

    other relevant

    codes as

    agreed

    with

    the

    CONTRACTOR and COMPANY.

    The fire test certification presented shall

    be

    applicable to the

    bore,

    pressure rating

    and

    materials of

    construction

    o f

    the

    actual valve supplied. Where

    such

    certification covers a range

    of valve size,

    pressure

    classes and bod?. materials, the limits of this

    range

    shall be

    in

    accordance with

    the

    applicable

    codes

    specified.

    All individual valves shall be provided with test certificates as

    required

    in Project Specification

    DUTY

    PRODUCT

    nater,

    chemicals,

    c u m p r e ~ s e d

    air

    and gases

    and hydraulic

    fluids

    10 Pressure Relief Devices

    Individual hoses shall be provided with hydrostatic pressure test certificates.

    iL4TING

    CODE

    S E J5

    1

    7 B

    BURST

    PRESSURE

    x Working

    Pressure

  • 8/10/2019 Material & Equipment Inspection Procedure)

    24/38

    12 Lifting

    Appliances

    i D R O

    OIECGROIT I E c

    CoNSoWY uM

    -

    General

    :

    All lifting gear

    and

    appliances shall

    be manufactured,

    tested

    and

    certified

    in

    accordance

    with

    the

    requirements

    o f

    the

    ertifying

    Authority s

    Code

    for Lifting Appliances, or

    an

    alternative code

    or

    codes acceptable to

    COMPANY and

    the C ertification Authority.

    AII fixed

    lifting appliances

    shall be

    provided

    with

    individuaI proof load test cehfica tes and appropriate deflection reports.

    -

    Loose

    gear

    :

    All

    loose

    lifting

    gear,

    including hooks, blocks, slings, swivels, rings,

    chains,

    etc., shali

    h v e

    individual pro of

    load

    test certificates. Wire ropes

    and

    chains shall have

    individual

    proof

    test and

    material certificates in a ccordance with the relevant

    code.

    Winches

    and

    tugs

    :

    Winches

    and tugs

    shall

    be

    supplied

    with

    a type approval

    certificate for each discrete

    type

    or

    arrangement.

    -

    Man-riding

    winches and

    tugs

    :

    Man-riding

    winches and tugs

    shall be supplied with

    a type

    approval

    certificate conforming

    that

    the

    arrangement is

    of a

    type

    approved

    for

    man-riding.

    -

    Pad

    eyes and

    lifting ugs : All fixed lifting points forming part

    of

    equipment

    and package

    skids,

    together with any

    loose lifting

    gear designed

    for routine handing of equipment during normal platform

    operation ,

    shall be

    subject to a

    trial

    l ift

    prior to

    delivery.

    The satisfactory

    execution of

    the

    trial

    l ih shall

    be detailed

    in

    a

    report.

    A11 loose lifting gear shall be proof load tested and

    certi

    Bed accordin giy.

    13

    Level

    gauges

    INSPE TION

    PROCEDURE

    Doc.

    NO

    SP17 18-COM-07-3-PR-0008

    Level

    gauges and sight

    glasses to be

    used

    for

    measuring

    hazardous or combustible liquids except

    LPG

    products

    shall

    be

    either

    have

    a

    certificate

    of type

    approval issued

    by the

    Certification

    Authority,

    or

    shall

    be of a

    type

    which

    is acceptable

    to

    the Certification Authority

    in the proposed

    application

    and service.

    N ~ o c

    h r k c w

    Rev,

    No.

    :O

    Class

  • 8/10/2019 Material & Equipment Inspection Procedure)

    25/38

    4.6

    Certification M a t r i x

    A

    D R O

    O I E ~ C R O U P

    I

    E c

    coMSQRT~ ltM

    The matrixes of

    material, type test

    type approval

    and proof

    test requirements which

    follows are

    not

    exhaustive.

    It

    shall

    be

    the VENDOR S responsibility to be

    aware

    of

    the

    requirements of the codes standards. procedures

    and

    Specifications,

    which

    apply to the Purchase Order, and to implement them accordingly.

    Full details

    of the

    certification requirements

    of the

    Purchaser

    Order are to be given

    in

    each

    Requisition.

    AII materials

    and

    equipment shall be certified in accordance

    with

    the

    requirements of the codss, standards,

    specifications and

    procedures referenced in

    the Requisition

    and

    the

    Purchase

    Order.

    In

    addition to the certification

    listed in the

    matrix

    which

    follows,

    all

    equipment and materials released from

    VENDOR

    shall be accompanied by a copy or copies of;

    a. CONTRACTOR S Inspection

    Release

    Certificate IRC).

    b

    The

    Certification Authority Inspection

    Release

    Certificate,

    where

    appropriate

    C The

    letter

    of

    certificate of conformity

    from the

    VENDOR

    Type

    D

    certificate) stating compliance

    with the

    appliance

    order

    requirements.

    d. Materids test certificates for all items

    to

    be

    welded on

    work site.

    e. Outstanding U ork

    List

    and QC punch-listed

    items

    to

    be

    on work site by the VENDOR

    and

    CONTRACTOR.

    f . Handling procedure, if required.

    g Packing,

    unpacking, storage

    and

    preservation procedure,

    if required.

    h.

    Lubricatio~i

    chedule (as appropriate).

    i.

    Approved

    Vendor deviation

    requests

    j

    Spare

    parts

    I

    Documentation

    INSPECTION

    PROCEDURE

    DOC.

    NO.

    SP17 18-COM-07-3-PR-00Q8

    An =GrCIPL

    T I 0 C

    Rev,

    No. O Class :I

  • 8/10/2019 Material & Equipment Inspection Procedure)

    26/38

    INSPEClTON

    PROCEDURE

    Doc. No

    :

    SP17 18-COH-07-3-PR-0008 I ~ e v .

    o.

    :O

    Class

    I

    4 6 Certification

    Matrix Continued)

    MATERIAL

    CERTIFICATION

    RIlhlAEUCS

    AND

    ADDITIONAL

    c

    V N T S

    cial

    Category Steel

    Material

    cefiificate TYPE

    A

    Structural steel

    B, D Material certificate

    TYPE B

    b m d

    Electrical

    B, D, E

    Material

    certificates T Y P E

    I3 for

    Equipment component materials as defined

    elsewhere in this table, TYPE D for

    compliance with order,

    TYPE E

    as

    Electrical Appliances and Fiaings BASEEFA or equivalent Type lest

    Electric cable

    Cable test

    certificates for individual

    Passive Fire

    Protection Insulation

    C , D E

    and

    Coatings

    Fire rated Architectural

    items, e.g. C, D. E

    doors, windows, bulkheads,

    Lift

    saving Appliances

    l en~ths ,

    y

    e

    test

    certificate

    Fire

    test

    certificate,

    fire

    test

    report

    ---

    ire test certificate,

    penelrations

    and transits

    Fire Dampers

    Instruments-tagged

    and

    bulk

    Fire

    Fighting Equipment

    C

    D

    B

    D

    T e approval certificate I

    3 C, D?E

    +-

    aterial t certificate T ~

    as appropriate, certificate to SOLAS I

    certificates

    TYPE B

    and

    C as

    appropriate

    for

    individual

    fittings, hydrrrtest certificates

    where

    i

    I

    I Type test certificate for burstlproof

    Piping-General

    Pipe fittings-General

    tructural Steel

    Castings for

    primary

    duty

    B, D

    B, D

    appropriate

    A

    tests.

    Material TYPE

    A

    endorsed by

    the Certification

    uthority or an accredited

  • 8/10/2019 Material & Equipment Inspection Procedure)

    27/38

    I D R O

    O I E C E R O ~ ~

    o E

    c

    c M S ~ R T ~ k J ~

    C h ydro-test on body and seal

    Pressure

    Relief

    Devices; PSV s

    and

    I

    A,

    C,

    D

    I Material test

    certificate

    for

    body

    and

    Valves;

    ESD

    vaI\:es

    and

    SSIV s

    Valves, Tagged

    and

    Bulk

    Relief Valves ControI Valves

    I N S P E C l l O N

    PROCEDURE

    Doc. No. :SPl7 lB-COM-07-3-PR-O008

    Pressure

    Relief Devices; Bursting

    Discs

    N.1 O.C

    PwrWaEa

    Rev No.

    :O

    Class

    I

    A ,

    C: D

    A i B . C , D , E

    Pressure Vessels

    test

    certificate

    Materiai test certificate

    for body

    and

    bonnet

    TYPE A and

    trim

    TYPE

    C,

    hydro-test on body and seat,

    Certification

    Aulhority

    Type test or

    approval certificate

    Material

    test

    certificate

    for

    body and

    bonnet TYPE

    B generally,

    TYPE A

    I Tor

    exotic

    materials and trim TYPE

    I

    calibration

    certificate

    C

    D E

    I

    Material test

    ceriificare

    TYPE

    C,

    I

    Type test certificate, batch test

    bonnet TYPE A generally.

    TYPE

    A

    for exotic materials and

    trim

    TYPE

    C hydro-test on body and

    seat

    L

    I

    certificate

    I D E

    I Certification

    Authority

    certificates fur

    code eomplivlce

    appropriate, proof load and

    calibration

    test certificates. Type

    Lifting appliances of

    lo t

    SwL and

    above

    .

    I

    approval certificate

    Loose Gear I Material lest certificates, proof and

    Am,

    C,

    D, E

    compo nents in the load path 1'1'PE A

    or

    B,

    slew

    rings,

    TYPE

    A.

    and

    for

    I

    Type

    test

    certificates

    Man-riding Winches and Tugs

    B,

    D

    I Material test cenificates, proof test

    1

    other

    components, TYPE

    B

    or

    C

    as

    I certificates, Type

    approval1Type

    test

    I approvalflype

    test

    certificate

    1

    certif

    ciites

    Pad-eyes

    and lifting lugs on

    Equipment

    Level Gaugesand Sight Glasses

    B, D E

    test

    certificates

    Type test

    certificate,

    trial

    lifting reporl

    C D E I attrial test certificate, Q p e

  • 8/10/2019 Material & Equipment Inspection Procedure)

    28/38

    5

    INSPECTlON COOR DINATION PROCEDURE

    l D R O O I E C G R O ~

    o

    c

    C a ~ 5 n r r u M

    5.1

    General

    5.1.1

    If

    there

    is

    any conflict between the related

    specifications, code

    and standard, VENDOR shall

    immediately

    consult with CONTRACTOR in written form for clarification.

    INSPE TION

    PROCEDURE

    Doc.

    No.

    :SPl7 lS-COM-07-3-PR-0008

    5 1 2 CONTRACTOR will

    employ

    TPA approved

    by

    COMPANY and

    inspection agency is able

    to perform the

    shop

    inspection on behalf

    of CONTRACTOR.

    CONTRACTOR shall make available to equipment TPR all

    needed

    informalion and allow full access to

    the

    work.

    m a.0.c

    * R E r r .

    Rev.

    N o : O Class :

    5 1

    VENDOR

    shall be responsible for providing required quality document during procurement

    activities

    based

    on clause

    5.5

    during the

    purchasing.

    These

    documents

    shall

    be

    reviewedapproved

    by

    CONTRACTOR

    or

    COMPANY.

    5.1.4

    VENDOR shall grant C O N ~ C T O R s l C O M P A N Y s nspector free

    of

    ccess to VENDOR slSubVendor s

    shop

    or plant at reasonable time to verify progress and to witness inspection test activities of related

    equipment/materials.

    5.1.5 VENDOR shall be responsible for inspectionhest

    uf

    he

    equipment

    and materials including parts

    supplied

    by

    sub-vendors, nd

    for

    submittal

    of

    vendor

    document

    package of sub-vendor items.

    5.1.6 VENDOR shall ensure that materiallpart used by sub-vendor are purchased only from acceptable

    sources

    according to

    his

    QNQC manual and purchase specification. Quality documents

    of

    sub-vendor

    items

    shall

    be

    reviewed by

    design ted

    inspector of

    COMPANY/CONTRACTOR during visiting

    VENDOR S shop for

    inspection test witne ss.

    5 1 7

    VENDOR shall offer not only inspection test measu ring tool but also assistant manp ower and

    f cility

    to

    decrease

    inspection time.

    5.1.8

    All

    inspection

    test measuring tools

    shall

    be calibrated

    with

    vdid

    calibration certificate

    and

    recorded

    on

    control log by VENDOR.

    5.1.9

    uring visiting

    VENDOR S

    shop for illspection test activities, designated inspectors of COMPANY

    and

    CONTRACTOR can c rry out spot audits jointly

    with

    VENDORS nspector to

    assure

    that all work of

    VENDOR shall be

    performed in accordance with VENDOR QA/QC

    manual.

  • 8/10/2019 Material & Equipment Inspection Procedure)

    29/38

    5.2.1 According

    to approved shop

    inspection test

    p an ITP), VENDOR shall

    not i fy

    the

    beginning date of

    the

    related

    inspectiodtest activities-to CONTRACTOR at due time below table. For the Type 1 after getting

    COMPANY S

    ntention, CONTRACTOR will relay it to VENDOR immediately.

    NO time

    onc(2l) days in

    advance

    Fourteen ( 14 davs

    in

    --

    dvan

    I

    -

    O R O

    OIECGROLW

    o

    E

    c

    C M 5 RT iLJM

    5 2 2

    CONTRACTOR has

    a

    right

    to adjust

    the

    proposed

    inspection date ~) rom

    VENDOR

    considering various

    factors or

    situations.

    5.2.3

    VENDOR

    shall

    never

    proceed

    with

    inspection

    test

    activities

    designated

    by

    COMPANYICONTRACTOR

    without advance notice or

    a

    written

    waiver from

    CONTRACTOR.

    INSPECTION

    PROCEDURE

    Doc. No,

    :

    SPl7 18-COM-07-3-PR-0008

    5.2.4 CONTRACTOR'S

    inspector will

    visit VENDOR'S

    shop

    at

    scheduled

    inspection date time, witness

    inspection

    test

    activities and

    review

    all

    related

    inspectionltest results performed

    already

    by VENDOR according

    to

    shop inspection

    8: test plan in conjunction with inspection reyirements. f all inspectiordtest results

    are

    satisfactory, then designated i n s pc t o r will leave

    his

    narnelsignature on

    each

    inspectionltest record for witness

    evideoce.

    hr

    8 O C

    a m

    Rev, No

    O Class

    I

    5.2.5

    Witness of

    any

    inspectiodtest

    activities

    shall

    not be construed

    as

    acceptance

    of

    ny

    said

    componentlpart

    of

    the

    equipment.

    5 2 6

    VENDOR shall provide designated

    inspector with

    approved

    drawing,

    procedure

    and other related

    data

    to

    assist

    COMPANY

    slCONTRACTOR's

    inspectiors

    .

    5.2.7

    A pre-inspection meeting w ill be held between COMPANY,

    CONTRACTOR,

    TPA and VENDOR for critical

    .item. if requtsted

    by

    any

    party.

    5.2.8

    The inspection test

    report

    shall be

    prepared by VENDOR

    and co-signed by

    designated

    inspector

    after

    witness of icspection

    test

    activities.

    5 2 9 Verbal inspection

    notice is

    not acceptable

    and written inspection notice shall be sent to CONTRACTOR by

    mail or

    fax.

    using APPENDIX 3.

  • 8/10/2019 Material & Equipment Inspection Procedure)

    30/38

    5.3 .3 All

    repair work

    of non-conformance

    shall

    be

    inspected or

    reviewed by designated inspector

    according to

    resolvable

    method

    approved

    by

    CONTRACTOR

    nd

    COMPANY.

    I D R O OrECCRoUP E C

    oIVSoRTIUNi

    5.3.4

    No

    items shall be shipped

    while

    non-confommce(s) remained ouatanding except COMPANY approval

    to

    clear at site

    under

    CONTRACTOR'S and VENDOR'S

    responsibility.

    5.3.5

    Depending

    on the

    nature of non-conformance, and upon Contractor's decision andor Company proposal to

    clear the nonconformance, a quality audit may

    be

    performed at Vendor

    or

    sub-vendor to verify compliance of

    the QA program and

    ro establish

    reasons for

    the nonconfoma~ce.

    Nonconforming items that cannot closed

    immediately

    will

    be place punch-list

    to

    ensure that the item(s) are not forgotten.

    INSPECTION

    PROCEDURE

    Doc. No. SPI7 18-COM-07-3-PR-0008

    5.4 ReIease

    For Shipment

    N. I 0 .C

    h Q l r b C a m r

    Rev.

    No :O Class

    1

    5.4.1

    CONTRACTOR will

    noti@

    VENDOR

    of

    shipping release through lnspection Release

    Certificare

    (Refer

    to

    APPENDIX

    4.)

    after final/packing inspection and review of

    Vendor

    QuaTity Documents

    with

    Certificate of

    Conformity (Refer

    to

    APPENDIX

    2. prepared y VENDOR.

    5.4.2 VENDOR shall not

    ship

    any items

    of equipment

    without

    receiving

    written notice for

    shipping

    release

    5 4 3

    %%en VENDOR is

    permitted

    ro

    ship

    on condition

    to perform

    the following

    work at

    work site,

    VENDOR

    shall

    bear all cost and

    expense

    incurred by such

    work;

    a.

    Additional and /or modification

    work.

    b. Repair andlor inspection.

    5 4 4

    If COMPANY

    or

    his representative

    signs off on Inspection

    Release Certificate

    during

    shop inspection,

    VENDOR may ship

    the related

    equipment/material and

    shall subtnit

    Vendor Quality

    Documents with

    Certificate

    of

    Conformity to

    CONTRACTO R after

    shipping

    5.4.5

    No item shall be shipped

    until

    TPA has accepted

    the

    response from VENDOR or CONTRACTOR, when

    required.

    Certificate of conformity is the report which shows thatequipment/material was made in accordance with vendor

    ITP and vendor work was accepted in all stage of relevantITP by relevant assigned inspector.This report will be

    issued by vendor and signed after final/Packinginspection and review of Vendor Quality Document.

  • 8/10/2019 Material & Equipment Inspection Procedure)

    31/38

    5.5

    Documentation

    l D R 0

    OECGROLT E

    ORT iU

    Incomplete,

    inaccurate or

    illegible documents will be the cause

    of

    rejection for related items until such time as

    satisfactory

    rectification

    has

    been

    effected.

    5.5.1

    Submittal of

    qua1

    ty documents with certif icate

    o f conformity.

    VEXDOR

    shall

    prepare

    quality

    document

    with

    certificate

    of con for mi^ and submit t

    CONTRACTOR

    through

    normal channel.

    INSPECTION

    PROCEDURE

    Doc

    NO. SP17 18-COM-07-3-PR-0008

    5.5.2

    TWO 2 )

    copies

    of

    Vendor

    Quality Documents shall be

    available

    for r vi w by CONTRACTOR for issue of

    Inspection

    Release Certificate.

    N.1 0.C

    W M r n G m t a u

    ~ e v .

    o

    :O C\ass

    5 5 3

    Contents

    of Vendor Quality Documents.

    Quality documents shall include the following documents

    and

    records as a

    vendor

    document, but

    not

    be

    limited

    to.

    See also Vendor Documents Requirement in the relevant

    Material

    Requisition)

    a) Certificate

    of

    Conformity

    Kefer

    to

    APPENDIX 2.)

    b) Material certificate.

    c VisuallDimension check report

    d) Nondestructive exam ination record

    e) Pressure test certificate

    f) Mechanical runninglperformance test records (with curve)

    g)

    FAT

    report

    h

    Functional

    test report

    i)

    Heat treatment records

    j)

    Painting

    inspection report

    k Other

    test

    records/certificatcs,if applicable.

  • 8/10/2019 Material & Equipment Inspection Procedure)

    32/38

    CoNSoRTIUM DOC

    NO : SP17 18-COM-07-3-PR-0W8 Rev

    No :O Class I

    -

    D R O

    OIECGROUP

    E c

    INSPECTION

    PROCEDURE

    N.I 0.C

    Oak

  • 8/10/2019 Material & Equipment Inspection Procedure)

    33/38

    APPENDIX 2 Form of Certificate o

    Conformitv

    .

    CERTIFIC TE OF CONFORMITY

    INSPE TION

    PROCEDURE

    coMSoRThaM Doc No. :

    SP17 18-COM-07-3-PR-OOOB

    SOUTH

    PARS

    FIELD

    DEVELOPMENT

    PHASES

    17

    S

    AI-I O.C

    ball

    Rev. NO.

    :O

    Class I

    m

    CERTIFIC TE

    NO.

    MATERIAL REQUISITION NO.

    PURCHASE ORDER NO.

    DESCNPTION

    OF

    PI

    SHIPMENT NO.

    VENDOR MANUFACTURER

    :

    PURCH SER

    1

    TEM N ~ ~ S C ~ ~ ~ ~ESCRIPTION OF

    SUB-ITEMS

    IF ANY)

    We

    undersigned

    hereby

    certify

    that

    t

    with the followings:

    he goods have been manufactured, tested

    and

    inspected in accordance with the requirements

    of

    the purchase order and

    specifications

    All dimensions in approved drawing

    have

    been strictly followed

    n

    manufacturing the goods

    The goads have been manufactured

    n

    accordance

    with

    the international practices and technical standards.

    herc

    are

    no known hidden flaws or

    defects

    in the plant and equipment due to faulty

    materials and

    or workmanship.

  • 8/10/2019 Material & Equipment Inspection Procedure)

    34/38

    APPENDIX 3. Form

    of

    Inspection Application

    INSPECTION

    APPLICATION

    DOCUMENTNO. :

    N 1 Q C

    arch

    REV.

    NO

    :O Class

    :1

    INSPECTlON

    PROCEDURE

    I D R O

    OIFCGROIT I

    o

    c

    SSUE DATE

    ATTN. E-MAIL :

    C*MSoRTIuIVI

    cc

    . .. J-

    -

    AX

    NO

    I T L NO.

    :

    + i

    Doe. No. :

    SPl7 18-COM-07-3-PR-0008

    PSI: NO./NAME

    INSPECTION

    DATE

    APPLICATION

    r N F O W T I O N

    (Shall

    incIude revJew

    of pnar imp repom

    WSP. DATE

    :

    FROM .- TO FAX

    NO.

    :

    2

    LOCATION :

    LOCATION

    VENDOR DOC'T

    - +.--.

    CONTACT PERSON

    :

    P.ONO. ITEMN A M E

    I

    QT'Y

    '

    KIN OF INSPECTION

    I

    APPROVAL CODE

    APPROVAL

    DATE

    APPLIED ... ...

    ...

    - ................................................. ............... .....

    - ..

    ...

    ............... ...............

    ....

    ............ ...........................

    PECTION

    .

    -

    j

    CONTRACT

    SHIPPING DUE DATE

    -

  • 8/10/2019 Material & Equipment Inspection Procedure)

    35/38

    APPENDIX

    4. Form of Inspection Release

    Certificate

    A d

    D R O or~cnour o E c

    c ~ 5 ~ T r U M

    IRC

    NO.

    I

    INSPECTION RELEASE CERTIFICATE

    IRC)

    W E

    HEREBY CERTIFY

    THAT

    TH UNDERMENTIONED COMMODITY HAS

    SATiSFACTORlLY

    PASSED

    THE

    TEST

    & INSPECTION AS

    NOTED

    IN

    ACCORDANCE

    WITH

    THE

    CONTRACTURAL SPECIFICATION.

    HOWEVER THIS CERTIFICATE DOES NOT RELIEVE VENDOR FROM THE GUARAKTEES AND

    .

    CIBLIGATIOYS SET FORTH

    IN

    THE PURCHASE ORDER AND ATTACHMENTS.

    PROJECT NO 0 0 7 4i~ SF

    Phases 17 18

    3 N SP f C n O N

    PROCEDURE

    DOC.

    No.

    SP17 18-COM-07-3-PR-0008

    CLIENT : POGC

    SITE

    VENDOR CONTACT :

    INSP. DATE

    :

    INSP. PLACE

    mmmGr-

    U.LCI.C

    Rev. No

    O

    Class

    :I

    RELEASED

    FOR

    COMMODITY / ITEM NO

    IF

    EGEND

    I

    PARTIAL

    2 COMPLETE

    3

    BALANCE

    I

    PARTIALP 0 RELEASE

    BY THIS

    IRK

    ' ,

    ATTACHMENT

  • 8/10/2019 Material & Equipment Inspection Procedure)

    36/38

    FINDINGmON-CONFORMANCE EPORT

    W

    1

    D

    OIEC GROUP

    CoNsQRT1uM

    NCR NO. NCR-'7007-PO-XXXXX PAGE OF

    PROJE T NO./NAME

    South

    Pars

    Gas

    Fleld

    Develaprnent

    Phases

    178~18

    P.O.

    N O .

    .

    7007-PO- ORDER TO

    EQ U I P NAh.IE/Q TY Interim Final

    NSP. STAGE

    LOCATION

    COMLRMED BY

    LCJ

    FA&

    ~ J S P E C T ~ O N

    ESULT

    C O ~ I T I O

    ALLY

    ACCEP

    ILGE C NSPECTOR DATE

    INSPECTION

    PROCEDURE

    Doc No. :

    SP17 18-COM-07-3-PR-0008

    HOLD

    FOR

    TLM

    EING

    REJECT

    RE-INSPECTION. REQ D n

    NOTKEQ'D

    HOLDING

    ESTIMATED

    RE-WSPECTION

    DATE

    :

    DlSTRIBUTlON T PR0JEC.T 0 PROCUREMENT

    SITE

    CLrENT VENDOR

    N I 0 C

    P... e EsmP

    Rev, O.

    O

    Class

    VENDOR

    RPSTV.

    DATE .

  • 8/10/2019 Material & Equipment Inspection Procedure)

    37/38

  • 8/10/2019 Material & Equipment Inspection Procedure)

    38/38