May 2013LIEBE Project
T. Stora
1
LIEBE Progress Report
Coordination meeting – 3rd SC
CEA-Saclay, 24th May 2013
T. Stora – EN-STI-RBS
![Page 2: May 2013 LIEBE Project T. Stora 1 LIEBE Progress Report Coordination meeting – 3 rd SC CEA-Saclay, 24 th May 2013 T. Stora – EN-STI-RBS](https://reader036.vdocuments.net/reader036/viewer/2022082613/5697bff91a28abf838cbfe6c/html5/thumbnails/2.jpg)
May 2013LIEBE Project
T. Stora
2
Pb/Bi loop online @ ISOLDE
Static Pb/BI target already tested once at ISOLDE
Target material Pb 44.5% / Bi 55.5% Melting point / boiling point [C] 125 / 1670 Operating temperature [C] 150-600 Target material density [kg/m3] 10.5 @ 200C; 10.2 @ 400C; 9.9@600C Thermal conductivity [W/K.m] 11.3 @ 400C Irradiation cell volume [cm3] 60 Flow rate [cm3/s] 60-200 Pump pressure [Bar] 0.1-2
![Page 3: May 2013 LIEBE Project T. Stora 1 LIEBE Progress Report Coordination meeting – 3 rd SC CEA-Saclay, 24 th May 2013 T. Stora – EN-STI-RBS](https://reader036.vdocuments.net/reader036/viewer/2022082613/5697bff91a28abf838cbfe6c/html5/thumbnails/3.jpg)
May 2013LIEBE Project
T. Stora
3
Work packages
WP definition WP holder Coordinator WP1 : Coordination CERN T. StoraWP2 : Conceptual Design and simulations SCK-CEN P. SchuurmansWP3 : Construction, assembly CERN M. DeloncaWP4 : Instrumentation CERN T. MendoncaWP5 : Safety and Licensing CEA A. MarchixWP6 : Target characterization and analysis PSI D. SchumannWP7 : Radiochemistry SINP S. LahiriWP8 : Offline commissioning IPUL K. KravalisWP9 : Online operation CERN T. Mendonca
![Page 4: May 2013 LIEBE Project T. Stora 1 LIEBE Progress Report Coordination meeting – 3 rd SC CEA-Saclay, 24 th May 2013 T. Stora – EN-STI-RBS](https://reader036.vdocuments.net/reader036/viewer/2022082613/5697bff91a28abf838cbfe6c/html5/thumbnails/4.jpg)
May 2013LIEBE Project
T. Stora
4
PlanningLIEBE project planning - endorsed 2nd SC, Lisbon, Oct 2012
WP Q3-12 Q4-12 Q1-13 Q2-13 Q3-13 Q4-13 Q1-14 Q2-14 Q3-14 Q4-14 Q1-15 Q2-15 2018
2 Design
1st design CFD, FEMFinal design
3 Assembl
Techn. drawings
components
Procurement
Construction
Adaptation
4 Instr. DefinitionTests@ipul/cern
software
5 SafetyCERN authorities.
Safety constraints
Risk analysis +RP
Risk analysis +RP II
Safety fileBeam permit
Waste
PIE
7 Chemist
Activation Pb/Bi
Compar MC code
Activation Pb/Bi-II
8 Offline
Test pumps IPUL
Test IPULCERN
commissioning
commissioning
Cold check-out
1 week online –
Report
CERN-wide Long Shutdown 1
6 Target charact
Release (Po…)
Inventory
9 Online
Operational parameters
Definition of onlinetests
Final report
Modif target area I
Modif target area II
![Page 5: May 2013 LIEBE Project T. Stora 1 LIEBE Progress Report Coordination meeting – 3 rd SC CEA-Saclay, 24 th May 2013 T. Stora – EN-STI-RBS](https://reader036.vdocuments.net/reader036/viewer/2022082613/5697bff91a28abf838cbfe6c/html5/thumbnails/5.jpg)
May 2013LIEBE Project
T. Stora
5
Budget, Communication, etc
3 x 150 kCHF granted (2012-2014)Need spending estimates (WP 2-4)
Don’t forget the sharepoint project site:https://espace.cern.ch/isobeam/Pb-Bi-Loop/default.aspx
![Page 6: May 2013 LIEBE Project T. Stora 1 LIEBE Progress Report Coordination meeting – 3 rd SC CEA-Saclay, 24 th May 2013 T. Stora – EN-STI-RBS](https://reader036.vdocuments.net/reader036/viewer/2022082613/5697bff91a28abf838cbfe6c/html5/thumbnails/6.jpg)
May 2013LIEBE Project
T. Stora
6
News from WPsWP 1 : Next project coord meeting at CEN.SCK (high power targetry workshop).Coord+SC in Kolkata Jan 2014
WP 2 : 2 designs proposed and compatible with ISOLDE environment, pumps seem to be Ok, robot handling also: to be further tested, prototyped, checked against safety,
WP 4 : slightly delayed (PSI will provide expertise, CERN holds the WP)
WP 5 : some estimates by Fluka, well on tracks for recommendations taken into account in the design
WP 6 : collections of Po done. 2 Draft publications.
WP 7 : 1st data on At and other isotopes inventories.
WP 8 : Refurbishment of Radiochemical lab in progress.IPUL ?
See following presentations
![Page 7: May 2013 LIEBE Project T. Stora 1 LIEBE Progress Report Coordination meeting – 3 rd SC CEA-Saclay, 24 th May 2013 T. Stora – EN-STI-RBS](https://reader036.vdocuments.net/reader036/viewer/2022082613/5697bff91a28abf838cbfe6c/html5/thumbnails/7.jpg)
May 2013LIEBE Project
T. Stora
7
Items for SCPlanning, budget
ENSAR II