measurement for land slide slope stability using high ... - presentation landslide...1 measurement...
TRANSCRIPT
1
Measurement for land slide slope stability using High
Capacity Micropiles
Masao SAGARAMasao SAGARA(Fujita Corporation)(Fujita Corporation)
Prof. Masaru HOSHIYAProf. Masaru HOSHIYA(Musashi Institute of Technology)(Musashi Institute of Technology)
Good evening! (Good, afternoon!)My name is MASAO SAGARA.We applied HMP on the slope in exit of the tunnel.We executed the field measurement.I will present result of it.
I introduce the result of field measurement.
2
We applied HMP on the slope in the exit of the tunnel.We executed the field measurement.
HMP in the Retaining Wall
Good evening! (Good, afternoon!)My name is MASAO SAGARA.We applied HMP on the slope in exit of the tunnel.We executed the field measurement.I will present result of it.
I introduce the result of field measurement.
3
ContentsContents
1.Background & Outline of the 1.Background & Outline of the ConstructionConstruction
2.Purpose of Field measurement 2.Purpose of Field measurement 3.Field measurement result of 3.Field measurement result of
High Capacity MicropilesHigh Capacity Micropiles4.Conclusion4.Conclusion
I would like to speak four contents.1.Background & Outline of the Construction2.Purpose of Field measurement 3.Field measurement result of High Capacity Micropiles4.Conclusion
4
Background(Site location)Background(Site location)
TOKYO
This is the site location from Google Earth.It is a site of the tunnel construction. The name is called BESHO tunnel.
This is the site location from Google Earth.It is a site of the tunnel construction. The name is called BESHO tunnel.
5
BESHO Tunnel L=948m
NEW Expressway
L=100km
ISE Bay
TOUMEI
Expressway
TOKAI Belt LineCHUOH Expressway
MEISHIN
Expressway
SURUGA Bay
NAGOYA City
Background(Site location)Background(Site location)
TOKYO
In Japan, there are two expressways where Tokyo is connected with Nagoya.Tokyo is located besides the right of the screen.One is a CHUOH expressway, and another is a TOUMEI expressway. These two expressways are connecting by the new expressway. It is constructing, now.One of tunnels on this expressways is BESHO tunnel.The length is 948m. Here, HMP was constructed.
In Japan, there are two expressways where Tokyo is connected with Nagoya.Tokyo is located besides the right of the screen.One is a CHUOH expressway, and another is a TOUMEI expressway. These two expressways are connecting by the new expressway. It is constructing, now.One of tunnels on this expressways is BESHO tunnel.The length is 948m. Here, HMP was constructed.
6
Exit
The Forestry RoadPrivate House
Serpentinite Crystalline schist
Epidote -Amphibolite
Shallow overburden(18m)Subsurface layers
Outline of the ConstructionOutline of the ConstructionExit of tunnel terminal sideExit of tunnel terminal side
((longitudinallongitudinal vertical section)vertical section)
Crystalline schist
Tunnel
There is a private house and the forestry road up soon about the tunnel.If the tunnel is dug without the reinforcement construction method, the house will be leaning to one side.And, the slope will be failure, too.
This figure is a longitudinal vertical section of the tunnel. There is a private house and the forestry road up soon about the tunnel.If the tunnel is dug without the reinforcement construction method, the house will be leaning to one side.And, the slope will be failure, too.
7
All Ground Fasten Method (AGF)
For TunnellingFor Slope StabilityThe three countermeasures were
applied for the slope stability.
•Extension of entrance of tunnel(8m)
•Rock Bolt
•High Capacity Micropilewith Ground Anchor
Countermeasure Against Landslide Countermeasure Against Landslide and Tunneling and Tunneling
However, the exit of the tunnel has been extended. As a result, the amount of cut has been reduced.
In the first plan, the exit of the tunnel was here.And, it was scheduled to be cut.
All Ground Fasten Method was applied to the tunneling.
Like this, a small slope failure and a large-scale slope failure were forecast.
The lock bolt was constructed to a small slope failure.
HMP with the ground anchor were constructed to a large-scale slope failure.
This figure shows countermeasure against landslide and tunneling.All Ground Fasten Method was applied to the tunneling.And, three countermeasures were applied for the slope stability.In the first plan, the exit of the tunnel was here.And, it was scheduled to be cut.However, the exit of the tunnel has been extended. As a result, the cut amount has been reduced.Like this, a small slope failure and a large-scale slope failure were forecast.The lock bolt was constructed to a small slope failure.HMP with the ground anchor were constructed to a large-scale slope failure.
8
CConstructiononstruction position position in ground plan
Private House
林道
Construction position of High Capacity Micropiles
The Forestry Road
Tunneling
•HMP was constructed near the tunnel. •11 piles•[email protected]•Total Length 149m
This figure shows the construction position of HMP.
HMP was constructed near the tunnel. 11 piles were constructed.The length is from 13 to 17m.The total length is 149m.
14
The process for Retaining WallHigh capacity Micro-Piles
Φ178@11piecesL=13.0~17.5m@1.5m
CradleRetaining Wall strip(H150 beam)
15
The process for Retaining WallThe process for Retaining Wall(Placing of reinforcement)(Placing of reinforcement)
17
Purpose of field measurement Purpose of field measurement
We aim to confirm the effect of HMP control works on the slope.
The strain gauges ware put on HMP, and the bending moment was measured on the site.
18
Measurement PilesMeasurement PilesThe vinyl chloride pipe with The vinyl chloride pipe with the strain gauges was set the strain gauges was set up in the steel pipe.up in the steel pipe.The strain gauges of The strain gauges of installation sections ware installation sections ware six places.six places.
The vinyl chloride pipe
8
7
6
5
4
3
2
1
7
6
5
4
3
2
1
1200
0 S
teel
Cas
ing
2000
1000
BearingStratum
SoftStratum
1300
0 To
tal H
MP
leng
th
Drill bit
Steel CasingPipe
SteelCasingJoint
Deformed Bar
1000
1000
9000
Cas
ed U
pper
HM
P L
engt
h
20001000
1000⑥
1000
⑤
1000
④
1000
③
500
②
8000
Vinyl ChloridePipe
5600
①
Slip surface
Strain Gauge
H beam
500Baseine
Pressure GroutedHMP Bond Length
Non
-ste
el C
asin
g
This is an outline of the measurement piles.In this case, the vinyl chloride pipe with the strain gauges was set up in thesteel pipe.The strain gauges of installation sections are six places.
計測杭の概念図です。
高耐力マイクロパイルの場合、鋼管を削孔ケーシングとして用いますので、鋼管へひずみゲージを貼付することは不可能です。
そこで、塩ビ管にひずみゲージを貼付し、鋼管内に設置して計測しました。
ひずみゲージは、想定すべり面(5.6m)および最大曲げモーメントが発生すると予想される深度(2~3m)を考慮して6箇所に設置しました。
19
Measurement position Measurement position in sectionin section
High Capacity [email protected]
H beam
Measurement Piles
Measurement Piles
予備のスライドです。
使用しません。
非表示に設定しています。
計測杭の設置位置の断面図です。
20
Measurement position Measurement position in ground plan
House of Inhabitant 林道
Construction position of High Capacity Micropiles
The Forestry Ro
Measurement Piles
No.6No.9
Tunneling
The field measurement was done by two places.They are the No.6 and No.9.In the following, the result of No.9 is introduced.
This figure shows the position of the measurement piles.The field measurement was done by two places.They are the No.6 and No.9.In the following, the result of No.9 is introduced.
21
Bending Moment & Date (No.9)
-50
-40
-30
-20
-10
0
10
20
30
40
50
2/20 2/27 3/6 3/13 3/20 3/27 4/3 4/10 4/17 4/24 5/1 5/8 5/15 5/22 5/29 6/5 6/12
Date
Bendi
ng
Mom
ent(
kN・m
)
9-①
9-②
9-③
9-④
9-⑤
9-⑥
Date & Bending Moment Date & Bending Moment
Valley side
Mountain side
It was March 21 that the tunnel penetrated. The bending moment has increased in those days. The bending moment changed on March 27. After that, it indicates a constant value.
This figure shows the distribution of the date and the bending moment. It was March 21 that the tunnel penetrated.The bending moment has increased in those days. The bending moment changed on March 27.After that, it indicates a constant value.
22
When we had the When we had the tunneling, the tunneling, the bending moment bending moment was an increasing was an increasing tendency. tendency. After the tunnel had After the tunnel had penetrated (3/21), penetrated (3/21), the bending moment the bending moment indicated a value indicated a value about half of the about half of the design.design.
No.9 Bending Moment Diagram
0
2
4
6
8
10
12
-80 -60 -40 -20 0 20 40 60 80
Bending Moment (kN・m)
Depth
(m)
2/21
3/20
3/27
4/6
4/26
5/6
Design Value
Slip Surface
Bending Moment DiagramBending Moment Diagram
Valley side Mountain side
This figure shows depth and the bending moment. When we had the tunneling, the bending moment was an increasingtendency. After the tunnel had penetrated (3/21), the bending moment indicated a value about half of the design.
23
No.9 Axis force Diagram
0
2
4
6
8
10
12
-800 -600 -400 -200 0 200 400 600 800
Axis force(kN)
Depth
(m)
2/21
3/20
3/27
4/6
4/26
5/6
Slip Surface
Axis Force DiagramAxis Force DiagramThe change in the axial The change in the axial force is seen in the force is seen in the sliding surface.sliding surface.It might be an influence It might be an influence of the tunneling. of the tunneling. However, clear However, clear consideration is not consideration is not obtained. We will obtained. We will examine it in the future. examine it in the future.
Tension Compression
This figure shows depth and the axial force.The change in the axial force is seen in the sliding surface.It might be an influence of the tunneling. However, clear consideration is not obtained. We will examine it in the future.
24
ConclusionConclusionThe bending moment has increased The bending moment has increased while digging the tunnel. while digging the tunnel. After the tunnel had penetrated, the After the tunnel had penetrated, the bending moment indicated half the bending moment indicated half the value of the design.value of the design.
It is thought that High Capacity It is thought that High Capacity MicropilesMicropiles are working as the control are working as the control piles.piles.
The bending moment has increased while digging the tunnel. After the tunnel had penetrated, the bending moment indicated half the value of the design. It is thought that HMP functions as a control works.
トンネルを掘削中の時は、曲げモーメントが増加した。
トンネル貫通後は、曲げモーメントは設計値の半分の値を示した。
HMPは抑止杭として機能していると考えられる。