Page 1: MIP Workbench: Revisions FEMA Learning Management System TASK LEAD ROLE MODULE

MIP Workbench: RevisionsMIP Workbench: Revisions

FEMA Learning Management SystemFEMA Learning Management System

TASK LEAD ROLE MODULETASK LEAD ROLE MODULE

Page 2: MIP Workbench: Revisions FEMA Learning Management System TASK LEAD ROLE MODULE

Welcome to the Revisions Task Lead module of the “MIP Workbench: Revisions” course. The role of the Task Lead comprises the bulk of a case review which includes the preliminary and detailed technical engineering review, the generation of the LOMR determination document and attachments, and the issuance of the determination. All of these steps, and others, are tracked within the MIP revisions workflow for the Task Lead.

Task Lead Functionality: Task Leads have the ability to review data received, receive additional data, process requests, distribute invoices, distribute determinations, receive BFE publication affidavits, receive appeals or protests, resolve appeals or protests, distribute special responses, and distribute final BFE determinations.

4

Revisions Workflow Link

MIP Revisions Task Lead Role FunctionalityOverview

MIP Revisions Task Lead Role FunctionalityOverview

Page 3: MIP Workbench: Revisions FEMA Learning Management System TASK LEAD ROLE MODULE

The website to access the MIP is

http://hazards.fema.gov

Once you navigate to this webpage you must go to the login screen to login as an authenticated user by entering your username and password. Your username and the role of Task Lead is associated with your MIP user account which is established through your regional manager and MIPHelp.

NOTE: After 3 failed login attempts, you will be locked out and will need to contact MIPHelp to regain access.

4MIP Revisions Task Lead Role Functionality

Overview: Log inMIP Revisions Task Lead Role Functionality

Overview: Log in

Page 4: MIP Workbench: Revisions FEMA Learning Management System TASK LEAD ROLE MODULE

The Task Lead’s workbench is comprised of various tabs which will lead you to different portals within the MIP. The tabs available are: Work Items Project Dashboard Reports & Form Letters Search & Retrieve Data Create Project

Other useful links on this page:

• Map Modernization – helpful links to FEMA main website • Tools & Links – allows Task Lead to upload to Content Manager outside the workflow• Learning – link to Learning Management System (LMS) along with other helpful links• Map Viewer – search for flood map info• Process Admin – tool for users with the PA role

4MIP Revisions Task Lead Role Functionality

Overview: Welcome ScreenMIP Revisions Task Lead Role Functionality

Overview: Welcome Screen

Page 5: MIP Workbench: Revisions FEMA Learning Management System TASK LEAD ROLE MODULE

The Task Lead’s workbench is the primary location where all the functionality associated with the Task Lead role can be accessed. Each tab contains specific functionality:

Work Items Displays all cases tracked in MIP based on user’s role, geography, and organization

Project Dashboard Quick visual tracking tool

Reports & Form Letters Run various reports and generate LOMR determination document and cover letter

Search & Retrieve Data Find data that is stored in Content Manager

Create Project Location where user’s with the Project Admin role can create projects

MIP Revisions Task Lead Role FunctionalityOverview: Workbench

MIP Revisions Task Lead Role FunctionalityOverview: Workbench

Page 6: MIP Workbench: Revisions FEMA Learning Management System TASK LEAD ROLE MODULE

The Work Item List will display all projects associated with the Task Lead’s role, geography, and organization. If another user has the same role, geography, and organization, then both users will see the same projects on their Work Item List. To claim a project, click the green Claim button. Once a project is claimed it will no longer appear on other user’s Work Items Lists. Once a project is claimed the Item Name will activate into a hot link which the user can click to launch the activity.

4

Click the hot link to launch the activity

MIP Revisions Task Lead Role FunctionalityReview Data Received: Claim an Activity

MIP Revisions Task Lead Role FunctionalityReview Data Received: Claim an Activity

Page 7: MIP Workbench: Revisions FEMA Learning Management System TASK LEAD ROLE MODULE

MIP Revisions Task Lead Role Functionality

Review Data Received: Project Data

MIP Revisions Task Lead Role Functionality

Review Data Received: Project Data

7

Once an activity is launched, the first module of the activity will appear. A list of all modules within that activity will appear under the Work Item Details heading. Each module represents a separate screen within the activity.

Project Data Module:

Most of this information will have been entered by the Project Administrator when the project was created. In this module the Task Lead can review, modify, add, or delete information.

Initial Request Date - This value should correspond to the date of the cover letter received with the initial case submittal. Related Case No. - A related case could be a previously dropped case or a previously issued CLOMR.Follows Conditional Case No. - If this project is a follow up to a CLOMR, then that CLOMR case number must be entered in this field in order for it to be populated on the revisions determination document and cover letter. The value entered in this field is required to end in the suffix R.Corrected Copy Case - select Yes if project is to correct a portion of a previously issued LOMR. Suffix will change to X upon work item list refresh.

MIP Revisions Task Lead Role FunctionalityReview Data Received: Project Data

MIP Revisions Task Lead Role FunctionalityReview Data Received: Project Data

Page 8: MIP Workbench: Revisions FEMA Learning Management System TASK LEAD ROLE MODULE

MIP Revisions Task Lead Role FunctionalityReview Data Received: Main Requestor Mailing Address

MIP Revisions Task Lead Role FunctionalityReview Data Received: Main Requestor Mailing Address

Main Requestor Mailing Address Module:

Most of this information will have been entered by the Project Administrator when the project was created. In this module the Task Lead can review, modify, add, or delete information.

Page 9: MIP Workbench: Revisions FEMA Learning Management System TASK LEAD ROLE MODULE

MIP Revisions Task Lead Role FunctionalityReview Data Received: Other Addresses

MIP Revisions Task Lead Role FunctionalityReview Data Received: Other Addresses

Other Addresses Module:

In this module the Task Lead will enter Secondary contacts for the revision project. Usually this includes the engineer and community official whose names and contact information can be found on Page 2 of MT-2 Form 1. Up to ten contacts can be entered.

Once all information is entered in the required fields, the Add Mailing Address button must be clicked in order to save the information to the project. The information will then be consolidated as it appears below. The Task Lead always has the ability to Modify or Delete this information.

Page 10: MIP Workbench: Revisions FEMA Learning Management System TASK LEAD ROLE MODULE

MIP Revisions Task Lead Role FunctionalityReview Data Received: Flooding Source

MIP Revisions Task Lead Role FunctionalityReview Data Received: Flooding Source

Flooding Source Module:

The flooding source(s) information may have been entered by the Project Administrator when the project was created. The Task Lead should verify that the flooding source name was entered exactly as it appears on the FIRM, and modify if necessary. All flooding sources affecting the revision should be entered.

Once a flooding source is entered, the Add Flood Source button must be clicked in order to save the information to the project. The information will then be consolidated, and the Task Lead will have the ability to Modify or Delete this information.

Page 11: MIP Workbench: Revisions FEMA Learning Management System TASK LEAD ROLE MODULE

MIP Revisions Task Lead Role FunctionalityReview Data Received: Supplementary Data

MIP Revisions Task Lead Role FunctionalityReview Data Received: Supplementary Data

Supplementary Data Module:

In this module, when it is the first cycle through the workflow, the Task Lead will inventory items received with the revision submittal and enter those data items by using the Data Type drop down or by using the Other Data Type free text field. The Date Requested field may be left blank, and the Date Received field can be populated with the date the project was received.

In subsequent cycles through the workflow, the Task Lead will modify previously entered data items to update the Date Received field.

Existing data can be Modified or Deleted

Page 12: MIP Workbench: Revisions FEMA Learning Management System TASK LEAD ROLE MODULE

MIP Revisions Task Lead Role FunctionalityReview Data Received: All Data Received

MIP Revisions Task Lead Role FunctionalityReview Data Received: All Data Received

All Data Received Module:

Enter a date only if all data and fees have been received. This date should correspond to the most recent date entered in the Date Received field in the Supplementary Data Module.

If additional data and/or fees are pending (i.e. a required item does not have a value entered in the Date Received field) leave the All Data Received field blank and click Continue. However, the user will need to select the Letter Type Request Additional Data & Fees in the subsequent Letters Module.

If previous workflow cycles have been completed, a date may appear in the All Data Received field. The user will need to delete the date from this field if new data has been requested since the previous time that all data was received.

Page 13: MIP Workbench: Revisions FEMA Learning Management System TASK LEAD ROLE MODULE

MIP Revisions Task Lead Role FunctionalityReview Data Received: Fee Information

MIP Revisions Task Lead Role FunctionalityReview Data Received: Fee Information

Fee Information Module:

This information will be entered by the fee administrator. Contact [email protected] for discrepancies. If fee has been received attach a pdf copy of the payment to the e-mail.

Page 14: MIP Workbench: Revisions FEMA Learning Management System TASK LEAD ROLE MODULE

MIP Revisions Task Lead Role FunctionalityReview Data Received: Community Information

MIP Revisions Task Lead Role FunctionalityReview Data Received: Community Information

Community Information Module:

The State, County, and Community will have been entered by the Project Administrator when the project was created. In this module the Task Lead can review, modify, add, or delete information, as well as add the revised Map Panels to the project.

In the subsequent Process Request activity, this module will expand to allow the Task Lead to enter detailed determination information.

The Add Map Panel button must be clicked in order to save the information to the community. The Add Community button must be clicked once all information is entered in order to save the information to the project. The information will then be consolidated as it appears below. The Task Lead always has the ability to Modify or Delete this information.

Page 15: MIP Workbench: Revisions FEMA Learning Management System TASK LEAD ROLE MODULE

MIP Revisions Task Lead Role FunctionalityReview Data Received: Letters

MIP Revisions Task Lead Role FunctionalityReview Data Received: Letters

Letters Module:

Each cycle through the workflow requires a Letter Type to be selected which represents official FEMA correspondence between the National Service Provider and the revision requestor. The Letter Type selected determines the path of the workflow.

The Letter Date should correspond to the date that appears on the final letter.

Page 16: MIP Workbench: Revisions FEMA Learning Management System TASK LEAD ROLE MODULE

MIP Revisions Task Lead Role FunctionalityReview Data Received: Review Data

MIP Revisions Task Lead Role FunctionalityReview Data Received: Review Data

Review Data Module:

All information associated with the Review Data Received activity can be viewed from this module. To expand a single module, click the arrow located to the left of the module name. To view all modules, click the Expand All hot link to show all data fields and information entered.

Page 17: MIP Workbench: Revisions FEMA Learning Management System TASK LEAD ROLE MODULE

MIP Revisions Task Lead Role FunctionalityReview Data Received: Complete Task

MIP Revisions Task Lead Role FunctionalityReview Data Received: Complete Task

Complete Task:

A brief reminder message will be displayed reminding that once the Complete Task button is clicked, the Task Lead will no longer be able to work in this activity and the project will then progress to the next step in the workflow.

Once Complete Task is clicked a brief message will be displayed stating that the task (activity) has been completed. The project has now moved to the next step in the workflow. Click the expand window button to return to the Work Items List.

Click here to expand Task Lead’s Work

Item List

Page 18: MIP Workbench: Revisions FEMA Learning Management System TASK LEAD ROLE MODULE

The Work Item List will display all projects associated with the Task Lead’s role, geography, and organization. If another user has the same role, geography, and organization, then both users will see the same projects on their Work Item List. To claim a project, click the green Claim button. Once a project is claimed it will no longer appear on other user’s Work Items Lists. Once a project is claimed the Item Name will activate into a hot link which the user can click to launch the activity.

4

Click the hot link to launch the activity

MIP Revisions Task Lead Role FunctionalityReceive Additional Data: Claim an Activity

MIP Revisions Task Lead Role FunctionalityReceive Additional Data: Claim an Activity

Page 19: MIP Workbench: Revisions FEMA Learning Management System TASK LEAD ROLE MODULE

If additional data has been received, click the radio button Yes. The additional data received will be reflected in the Review Additional Data Activity on the Supplementary Data module.

4MIP Revisions Task Lead Role Functionality

Receive Additional Data: Additional Data ReceivedMIP Revisions Task Lead Role Functionality

Receive Additional Data: Additional Data Received

Page 20: MIP Workbench: Revisions FEMA Learning Management System TASK LEAD ROLE MODULE

MIP Revisions Task Lead Role FunctionalityReceive Additional Data: Review Data

MIP Revisions Task Lead Role FunctionalityReceive Additional Data: Review Data

Review Data Module:

All information associated with the Review Data Received activity can be viewed from this module. To expand a single module, click the arrow located to the left of the module name. To view all modules, click the Expand All hot link to show all data fields and information entered.

Page 21: MIP Workbench: Revisions FEMA Learning Management System TASK LEAD ROLE MODULE

MIP Revisions Task Lead Role FunctionalityReceive Additional Data: Complete Task

MIP Revisions Task Lead Role FunctionalityReceive Additional Data: Complete Task

Complete Task:

A brief reminder message will be displayed reminding that once the Complete Task button is clicked, the Task Lead will no longer be able to work in this activity and the project will then progress to the next step in the workflow.

Once Complete Task is clicked a brief message will be displayed stating that the task (activity) has been completed. The project has now moved to the next step in the workflow. Click the expand window button to return to the Work Items List.

Click here to expand Task Lead’s Work

Item List

Page 22: MIP Workbench: Revisions FEMA Learning Management System TASK LEAD ROLE MODULE

The Work Item List will display all projects associated with the Task Lead’s role, geography, and organization. If another user has the same role, geography, and organization, then both users will see the same projects on their Work Item List. To claim a project, click the green Claim button. Once a project is claimed it will no longer appear on other user’s Work Items Lists. Once a project is claimed the Item Name will activate into a hot link which the user can click to launch the activity.

4

Click the hot link to launch the activity

MIP Revisions Task Lead Role FunctionalityProcess Request: Claim an Activity

MIP Revisions Task Lead Role FunctionalityProcess Request: Claim an Activity

Page 23: MIP Workbench: Revisions FEMA Learning Management System TASK LEAD ROLE MODULE

MIP Revisions Task Lead Role Functionality

Process Request: Project Data

MIP Revisions Task Lead Role Functionality

Process Request: Project Data

7

Project Data Module:

This module is primarily the same as it appears in the Review Data Received activity. The only features added to this module within the Process Request activity, are the Project Description and Basis of Request fields. The values input for each of these areas will be generated on the determination document.

Project Description Values:

No Project Bridge Dam

Channelization Culvert Fill

Coastal Structure Levee Berm

Channel Relocation Excavation Other

Alluvial Structure Det. Basin Weir Struc.

Basis of Request Values:

Hydraulic Analysis Hydrologic Analysis

New Topographic Data Floodway

Base Map Changes Correction

Coastal Analysis Weir-Dam Changes

Levee Certification Alluvial Fan Analysis

Natural Changes

MIP Revisions Task Lead Role FunctionalityProcess Request: Project Data

MIP Revisions Task Lead Role FunctionalityProcess Request: Project Data

Page 24: MIP Workbench: Revisions FEMA Learning Management System TASK LEAD ROLE MODULE

MIP Revisions Task Lead Role FunctionalityProcess Request: Main Requestor & Other Addresses

MIP Revisions Task Lead Role FunctionalityProcess Request: Main Requestor & Other Addresses

Main Requestor Mailing Address Module and Other Addresses Module:

Both of these modules appear in Process Request just the same as in Review Data Received. Most of this information will have been entered by the Project Administrator when the project was created, however the Task Lead will still have the ability within this activity to review, modify, add, or delete information.

Page 25: MIP Workbench: Revisions FEMA Learning Management System TASK LEAD ROLE MODULE

MIP Revisions Task Lead Role FunctionalityProcess Request: Flooding Source

MIP Revisions Task Lead Role FunctionalityProcess Request: Flooding Source

Flooding Source Module:

This module appears in Process Request just the same as it did in Review Data Received.

The flooding source(s) information may have been entered by the Project Administrator when the project was created. The Task Lead should verify that the flooding source name was entered exactly as it appears on the FIRM, and modify if necessary. All flooding sources affecting the revision should be entered.

Once a flooding source is entered, the Add Flood Source button must be clicked in order to save the information to the project. The information will then be consolidated, and the Task Lead will have the ability to Modify or Delete this information.

Page 26: MIP Workbench: Revisions FEMA Learning Management System TASK LEAD ROLE MODULE

MIP Revisions Task Lead Role FunctionalityProcess Request: Supplementary Data

MIP Revisions Task Lead Role FunctionalityProcess Request: Supplementary Data

Supplementary Data Module:

In order for a project to push to Process Request in the workflow all data and fees must have been received. If once the project is in Process Request, the Task Lead may still request additional data by entering it in the Supplementary Data modue.

If the there is no outstanding required data that needs to be requested, then this module may be bypassed without entering any information.

Existing data can be Modified or Deleted

Page 27: MIP Workbench: Revisions FEMA Learning Management System TASK LEAD ROLE MODULE

MIP Revisions Task Lead Role FunctionalityProcess Request: Invoice Information

MIP Revisions Task Lead Role FunctionalityProcess Request: Invoice Information

Invoice Information Module:

This module only applies to Alluvial Fan, Levee, Berm or Other Structural Measure, or PMR projects and will not appear for any other type of revision. Enter the amount to be invoiced for the Alluvial Fan review. This will trigger the Distribute Invoice activity in the workflow once the project has been pushed in the workflow past the FEMA Revision Lead activity of Review Determination.

Page 28: MIP Workbench: Revisions FEMA Learning Management System TASK LEAD ROLE MODULE

MIP Revisions Task Lead Role FunctionalityProcess Request: Fee Information

MIP Revisions Task Lead Role FunctionalityProcess Request: Fee Information

Fee Information Module:

This module in Process Request will appear just as it did in Review Data Received.

This information will be entered by the fee administrator. Contact [email protected] for discrepancies. If fee has been received attach a pdf copy of the payment to the e-mail.

Page 29: MIP Workbench: Revisions FEMA Learning Management System TASK LEAD ROLE MODULE

MIP Revisions Task Lead Role Functionality Process Request: Community Information

MIP Revisions Task Lead Role Functionality Process Request: Community Information

Community Information Module:

The Community Information module within Process Request appears significantly different than in previous activities. Each existing community will need to be brought into edit mode in order to add determination information. The information entered in the portal within this activity will be used to populate fields on the determination document.

Follow the on-screen step-by-step instruction to correctly enter the information.

Community Information module can be bypassed without entering information if the project is a CLOMR.

Page 30: MIP Workbench: Revisions FEMA Learning Management System TASK LEAD ROLE MODULE

• Click Existing Communities Link

• Screen will adjust to bottom

• Bing an existing community into edit mode by clicking “Modify”

MIP Revisions Task Lead Role Functionality Process Request: Community Information

MIP Revisions Task Lead Role Functionality Community Info: Step 1 Modify Existing Community

MIP Revisions Task Lead Role Functionality Community Info: Step 1 Modify Existing Community

Page 31: MIP Workbench: Revisions FEMA Learning Management System TASK LEAD ROLE MODULE

2

6

11A

MIP Revisions Task Lead Role Functionality Community Info: Step 2 Add Map Type to Existing Map Panels

MIP Revisions Task Lead Role Functionality Community Info: Step 2 Add Map Type to Existing Map Panels

Page 32: MIP Workbench: Revisions FEMA Learning Management System TASK LEAD ROLE MODULE

• Add information for each flooding source affecting community

• When Zone Axx is selected from dropdown, fields to the right will activate

• Second page will automatically be generated if information does not fit on page 1

10

MIP Revisions Task Lead Role Functionality Community Info: Step 3 Add Summary of Revisions to each FS

MIP Revisions Task Lead Role Functionality Community Info: Step 3 Add Summary of Revisions to each FS

Page 33: MIP Workbench: Revisions FEMA Learning Management System TASK LEAD ROLE MODULE

Determination Cover Letter Determination Cover Letter

11B

MIP Revisions Task Lead Role Functionality Community Info: Step 4 Add Annotated Mapping & Study Enc.

MIP Revisions Task Lead Role Functionality Community Info: Step 4 Add Annotated Mapping & Study Enc.

Page 34: MIP Workbench: Revisions FEMA Learning Management System TASK LEAD ROLE MODULE

9

20

MIP Revisions Task Lead Role Functionality Community Info: Step 5 Add Determination Information

MIP Revisions Task Lead Role Functionality Community Info: Step 5 Add Determination Information

Page 35: MIP Workbench: Revisions FEMA Learning Management System TASK LEAD ROLE MODULE

Indicate if Ordinance Adoption period required

20

8STEP 6STEP 6

STEP 7STEP 7

MIP Revisions Task Lead Role Functionality Community Info: Step 6 Lat & Long and Step 7 Ordinance Adoption

MIP Revisions Task Lead Role Functionality Community Info: Step 6 Lat & Long and Step 7 Ordinance Adoption

Page 36: MIP Workbench: Revisions FEMA Learning Management System TASK LEAD ROLE MODULE

• This section will assist in generating standard paragraphs under This section will assist in generating standard paragraphs under • Community Obligation (Variable 17) • Community Reminders (Variable 18) • Status of NFIP Maps (Variable 19)

• Click “Add Community” to add all info entered in steps 1 – 8 to the community

MIP Revisions Task Lead Role Functionality Community Info: Select Applicable Community Information

MIP Revisions Task Lead Role Functionality Community Info: Select Applicable Community Information

Page 37: MIP Workbench: Revisions FEMA Learning Management System TASK LEAD ROLE MODULE

MIP Revisions Task Lead Role FunctionalityProcess Request: Interim Letters

MIP Revisions Task Lead Role FunctionalityProcess Request: Interim Letters

Interim Letters Module:

If the project has taken longer than the regulatory 90 days to process, then an interim letter is sent and that information is captured within this module. Select the interim letter type and enter the date shown on the final letter, as well as any applicable notes.

If an interim letter was not sent, then this module may be bypassed without entering any information.

Page 38: MIP Workbench: Revisions FEMA Learning Management System TASK LEAD ROLE MODULE

MIP Revisions Task Lead Role FunctionalityProcess Request: Violation Status

MIP Revisions Task Lead Role FunctionalityProcess Request: Violation Status

Violation Status Module:

If the project has a violation select the violation type from the drop down

If the project is not a violation, then this screen can be bypassed without entering any information.

Page 39: MIP Workbench: Revisions FEMA Learning Management System TASK LEAD ROLE MODULE

MIP Revisions Task Lead Role FunctionalityProcess Request: Letters

MIP Revisions Task Lead Role FunctionalityProcess Request: Letters

Letters Module:

If no additional data was requested in the Supplementary Data module and determination information was entered in the Community Information module, then Determination letter to FEMA should be selected as the Letter Type within this module.

The Letter Date should correspond to the date that the revision project is sent to FEMA for review and approval.

Page 40: MIP Workbench: Revisions FEMA Learning Management System TASK LEAD ROLE MODULE

MIP Revisions Task Lead Role FunctionalityProcess Request: Review Data

MIP Revisions Task Lead Role FunctionalityProcess Request: Review Data

Review Data Module:

All information associated with the Process Request activity can be viewed from this module. To expand a single module, click the arrow located to the left of the module name. To view all modules, click the Expand All hot link to show all data fields and information entered.

Page 41: MIP Workbench: Revisions FEMA Learning Management System TASK LEAD ROLE MODULE

MIP Revisions Task Lead Role FunctionalityProcess Request: Complete Task

MIP Revisions Task Lead Role FunctionalityProcess Request: Complete Task

Complete Task:

A brief reminder message will be displayed reminding that once the Complete Task button is clicked, the Task Lead will no longer be able to work in this activity and the project will then progress to the next step in the workflow.

Once Complete Task is clicked a brief message will be displayed stating that the task (activity) has been completed. The project has now moved to the next step in the workflow. Click the expand window button to return to the Work Items List.

Click here to expand Task Lead’s Work

Item List

Page 42: MIP Workbench: Revisions FEMA Learning Management System TASK LEAD ROLE MODULE

The Work Item List will display all projects associated with the Task Lead’s role, geography, and organization. If another user has the same role, geography, and organization, then both users will see the same projects on their Work Item List. To claim a project, click the green Claim button. Once a project is claimed it will no longer appear on other user’s Work Items Lists. Once a project is claimed the Item Name will activate into a hot link which the user can click to launch the activity.

4

Click the hot link to launch the activity

MIP Revisions Task Lead Role FunctionalityDistribute Invoice: Claim an Activity

MIP Revisions Task Lead Role FunctionalityDistribute Invoice: Claim an Activity

Page 43: MIP Workbench: Revisions FEMA Learning Management System TASK LEAD ROLE MODULE

MIP Revisions Task Lead Role FunctionalityDistribute Invoice

MIP Revisions Task Lead Role FunctionalityDistribute Invoice

Distribute Invoice Module:

This activity only applies to Alluvial Fan revision projects and will not appear for any other type of revision. Enter the Letter Date that appears on the final invoice that is mailed.

Page 44: MIP Workbench: Revisions FEMA Learning Management System TASK LEAD ROLE MODULE

MIP Revisions Task Lead Role FunctionalityDistribute Invoice: Review Data

MIP Revisions Task Lead Role FunctionalityDistribute Invoice: Review Data

Review Data Module:

All information associated with the project can be viewed from this module. To expand a single module, click the arrow located to the left of the module name. To view all modules, click the Expand All hot link to show all data fields and information entered.

Expanded view of Fee Invoice Information

Page 45: MIP Workbench: Revisions FEMA Learning Management System TASK LEAD ROLE MODULE

MIP Revisions Task Lead Role FunctionalityDistribute Determination: Complete Task

MIP Revisions Task Lead Role FunctionalityDistribute Determination: Complete Task

Complete Task:

A brief reminder message will be displayed reminding that once the Complete Task button is clicked, the Task Lead will no longer be able to work in this activity and the project will then progress to the next step in the workflow.

Once Complete Task is clicked a brief message will be displayed stating that the task (activity) has been completed. The project has now moved to the next step in the workflow. Click the expand window button to return to the Work Items List.

Within Distribute Determination a Content Manager upload portlet will appear. Revision user’s do not use the Citrix Web Interface and can ignore this portion of the screen.

Page 46: MIP Workbench: Revisions FEMA Learning Management System TASK LEAD ROLE MODULE

The Work Item List will display all projects associated with the Task Lead’s role, geography, and organization. If another user has the same role, geography, and organization, then both users will see the same projects on their Work Item List. To claim a project, click the green Claim button. Once a project is claimed it will no longer appear on other user’s Work Items Lists. Once a project is claimed the Item Name will activate into a hot link which the user can click to launch the activity.

4

Click the hot link to launch the activity

MIP Revisions Task Lead Role FunctionalityDistribute Determination: Claim an Activity

MIP Revisions Task Lead Role FunctionalityDistribute Determination: Claim an Activity

Page 47: MIP Workbench: Revisions FEMA Learning Management System TASK LEAD ROLE MODULE

MIP Revisions Task Lead Role FunctionalityDistribute Determination

MIP Revisions Task Lead Role FunctionalityDistribute Determination

Distribute Determination Module:

This module will show the Task Lead the FEMA Lead Determination Results including any comments they may have entered. The Task Lead is to enter the issue date of the determination and publication information, if applicable.

This module will also display the letter code that was generated based on the information entered in the Determination Section in the Community Information module within the Process Request activity. The Task Lead should verify that the correct letter code was generated. If it was not, MIP Help should be contacted to change to letter code.

Page 48: MIP Workbench: Revisions FEMA Learning Management System TASK LEAD ROLE MODULE

MIP Revisions Task Lead Role FunctionalityDistribute Determination: Review Data

MIP Revisions Task Lead Role FunctionalityDistribute Determination: Review Data

Review Data Module:

All information associated with the project can be viewed from this module. To expand a single module, click the arrow located to the left of the module name. To view all modules, click the Expand All hot link to show all data fields and information entered.

Page 49: MIP Workbench: Revisions FEMA Learning Management System TASK LEAD ROLE MODULE

MIP Revisions Task Lead Role FunctionalityDistribute Determination: Complete Task

MIP Revisions Task Lead Role FunctionalityDistribute Determination: Complete Task

Complete Task:

A brief reminder message will be displayed reminding that once the Complete Task button is clicked, the Task Lead will no longer be able to work in this activity and the project will then progress to the next step in the workflow.

Once Complete Task is clicked a brief message will be displayed stating that the task (activity) has been completed. The project has now moved to the next step in the workflow. Click the expand window button to return to the Work Items List.

Within Distribute Determination a Content Manager upload portlet will appear. Revision user’s do not use the Citrix Web Interface and can ignore this portion of the screen.

Page 50: MIP Workbench: Revisions FEMA Learning Management System TASK LEAD ROLE MODULE

The Work Item List will display all projects associated with the Task Lead’s role, geography, and organization. If another user has the same role, geography, and organization, then both users will see the same projects on their Work Item List. To claim a project, click the green Claim button. Once a project is claimed it will no longer appear on other user’s Work Items Lists. Once a project is claimed the Item Name will activate into a hot link which the user can click to launch the activity.

4

Click the hot link to launch the activity

MIP Revisions Task Lead Role FunctionalityReceive BFE Publication Affidavit: Claim an Activity

MIP Revisions Task Lead Role FunctionalityReceive BFE Publication Affidavit: Claim an Activity

Page 51: MIP Workbench: Revisions FEMA Learning Management System TASK LEAD ROLE MODULE

Receive BFE Publication Affidavit Module:

This module allows the Task Lead to enter information regarding when the Newspaper affidavit was received and the final dates that the BFEs were published in the local newspaper for a revision project. The Affidavit Date can be obtained from Project Administration. The publication dates can be assumed to be the same as were listed on the determination document unless Project Administration lets the Task Lead know otherwise. The Appeal/Protest Period End Date is specific to each revision and depends on the type of revision (i.e. 90 days after second publication date for BFE changes; 30 days after second publication date for SFHA increases).

4MIP Revisions Task Lead Role Functionality

Receive BFE Publication AffidavitMIP Revisions Task Lead Role Functionality

Receive BFE Publication Affidavit

Page 52: MIP Workbench: Revisions FEMA Learning Management System TASK LEAD ROLE MODULE

MIP Revisions Task Lead Role FunctionalityReceive BFE Publication Affidavit: Review Data

MIP Revisions Task Lead Role FunctionalityReceive BFE Publication Affidavit: Review Data

Review Data Module:

All information associated with the project can be viewed from this module. To expand a single module, click the arrow located to the left of the module name. To view all modules, click the Expand All hot link to show all data fields and information entered.

Page 53: MIP Workbench: Revisions FEMA Learning Management System TASK LEAD ROLE MODULE

MIP Revisions Task Lead Role FunctionalityReceive BFE Publication Affidavit: Complete Task

MIP Revisions Task Lead Role FunctionalityReceive BFE Publication Affidavit: Complete Task

Complete Task:

A brief reminder message will be displayed reminding that once the Complete Task button is clicked, the Task Lead will no longer be able to work in this activity and the project will then progress to the next step in the workflow.

Once Complete Task is clicked a brief message will be displayed stating that the task (activity) has been completed. The project has now moved to the next step in the workflow. Click the expand window button to return to the Work Items List.

Click here to expand Task Lead’s Work

Item List

Page 54: MIP Workbench: Revisions FEMA Learning Management System TASK LEAD ROLE MODULE

The Work Item List will display all projects associated with the Task Lead’s role, geography, and organization. If another user has the same role, geography, and organization, then both users will see the same projects on their Work Item List. To claim a project, click the green Claim button. Once a project is claimed it will no longer appear on other user’s Work Items Lists. Once a project is claimed the Item Name will activate into a hot link which the user can click to launch the activity.

4

Click the hot link to launch the activity

MIP Revisions Task Lead Role FunctionalityReceive Appeals or Protest: Claim an Activity

MIP Revisions Task Lead Role FunctionalityReceive Appeals or Protest: Claim an Activity

Page 55: MIP Workbench: Revisions FEMA Learning Management System TASK LEAD ROLE MODULE

Receive Appeals or Protest Module:

If no appeals or protests were received during the Appeals/Protest Period, then the top section of this module can be left blank. The bottom section, Appeal/Protest Period Complete needs to have the radio button Yes selected in order to complete this activity.

4MIP Revisions Task Lead Role Functionality

Receive Appeals or Protest – None ReceivedMIP Revisions Task Lead Role Functionality

Receive Appeals or Protest – None Received

Page 56: MIP Workbench: Revisions FEMA Learning Management System TASK LEAD ROLE MODULE

4

Receive Appeals or Protest Module:

If an appeal or protest was received during the Appeal/Protest Period, enter the appropriate information and click Add Appeal/Protest. The information entered will appear consolidated below and the Task Lead will have the ability to Modify or Delete this information. To complete this task the appeal/protest period must be complete and the radio button Yes selected. Until this is done, this activity will continue to show up on the Task Lead’s workbench until they complete the activity with the Yes radio button selected indicating that the Appeal/Protest Period is complete.

MIP Revisions Task Lead Role FunctionalityReceive Appeals or Protest – Appeal/Protest Received

MIP Revisions Task Lead Role FunctionalityReceive Appeals or Protest – Appeal/Protest Received

Page 57: MIP Workbench: Revisions FEMA Learning Management System TASK LEAD ROLE MODULE

MIP Revisions Task Lead Role FunctionalityReceive Appeals or Protest: Review Data

MIP Revisions Task Lead Role FunctionalityReceive Appeals or Protest: Review Data

Review Data Module:

All information associated with the project can be viewed from this module. To expand a single module, click the arrow located to the left of the module name. To view all modules, click the Expand All hot link to show all data fields and information entered.

Page 58: MIP Workbench: Revisions FEMA Learning Management System TASK LEAD ROLE MODULE

MIP Revisions Task Lead Role FunctionalityReceive Appeals or Protest: Complete Task

MIP Revisions Task Lead Role FunctionalityReceive Appeals or Protest: Complete Task

Complete Task:

A brief reminder message will be displayed reminding that once the Complete Task button is clicked, the Task Lead will no longer be able to work in this activity and the project will then progress to the next step in the workflow.

Once Complete Task is clicked a brief message will be displayed stating that the task (activity) has been completed. The project has now moved to the next step in the workflow. Click the expand window button to return to the Work Items List.

Click here to expand Task Lead’s Work

Item List

Page 59: MIP Workbench: Revisions FEMA Learning Management System TASK LEAD ROLE MODULE

The Work Item List will display all projects associated with the Task Lead’s role, geography, and organization. If another user has the same role, geography, and organization, then both users will see the same projects on their Work Item List. To claim a project, click the green Claim button. Once a project is claimed it will no longer appear on other user’s Work Items Lists. Once a project is claimed the Item Name will activate into a hot link which the user can click to launch the activity.

4

Click the hot link to launch the activity

MIP Revisions Task Lead Role FunctionalityResolve Appeals or Protest: Claim an Activity

MIP Revisions Task Lead Role FunctionalityResolve Appeals or Protest: Claim an Activity

Page 60: MIP Workbench: Revisions FEMA Learning Management System TASK LEAD ROLE MODULE

Resolve Appeals or Protest Module:

If an appeal(s) or protest is received it will trigger the workflow activity Resolve Appeal or Protest. The appeal or protest can either be Accepted or Rejected. Coordination with FEMA must be made in order to resolve the conflict. Completing this activity will push the project to the Review Appeal or Protest activity on the FEMA Revision Lead’s workbench.

4MIP Revisions Task Lead Role Functionality

Resolve Appeals or ProtestMIP Revisions Task Lead Role Functionality

Resolve Appeals or Protest

Page 61: MIP Workbench: Revisions FEMA Learning Management System TASK LEAD ROLE MODULE

MIP Revisions Task Lead Role FunctionalityResolve Appeals or Protest: Review Data

MIP Revisions Task Lead Role FunctionalityResolve Appeals or Protest: Review Data

Review Data Module:

All information associated with the project can be viewed from this module. To expand a single module, click the arrow located to the left of the module name. To view all modules, click the Expand All hot link to show all data fields and information entered.

Page 62: MIP Workbench: Revisions FEMA Learning Management System TASK LEAD ROLE MODULE

MIP Revisions Task Lead Role FunctionalityResolve Appeals or Protest: Complete Task

MIP Revisions Task Lead Role FunctionalityResolve Appeals or Protest: Complete Task

Complete Task:

A brief reminder message will be displayed reminding that once the Complete Task button is clicked, the Task Lead will no longer be able to work in this activity and the project will then progress to the next step in the workflow.

Once Complete Task is clicked a brief message will be displayed stating that the task (activity) has been completed. The project has now moved to the next step in the workflow. Click the expand window button to return to the Work Items List.

Click here to expand Task Lead’s Work

Item List

Page 63: MIP Workbench: Revisions FEMA Learning Management System TASK LEAD ROLE MODULE

The Work Item List will display all projects associated with the Task Lead’s role, geography, and organization. If another user has the same role, geography, and organization, then both users will see the same projects on their Work Item List. To claim a project, click the green Claim button. Once a project is claimed it will no longer appear on other user’s Work Items Lists. Once a project is claimed the Item Name will activate into a hot link which the user can click to launch the activity.

4

Click the hot link to launch the activity

MIP Revisions Task Lead Role FunctionalityDistribute Special Response: Claim an Activity

MIP Revisions Task Lead Role FunctionalityDistribute Special Response: Claim an Activity

Page 64: MIP Workbench: Revisions FEMA Learning Management System TASK LEAD ROLE MODULE

Distribute Special Response Module:

Once the FEMA Revision Lead completes their activity of Reviewing the Appeal or Protest and they accept the outcome, then the project will be pushed through the workflow to the Task Lead’s workbench in the activity Distribute Special Response. The date appearing on the final mailed copy of this letter should be entered as well as any comments. If a new revision project was opened as a consequence of the appeal or protest, this new project number should also be entered.

4MIP Revisions Task Lead Role Functionality

Distribute Special ResponseMIP Revisions Task Lead Role Functionality

Distribute Special Response

Page 65: MIP Workbench: Revisions FEMA Learning Management System TASK LEAD ROLE MODULE

MIP Revisions Task Lead Role FunctionalityDistribute Special Response: Review Data

MIP Revisions Task Lead Role FunctionalityDistribute Special Response: Review Data

Review Data Module:

All information associated with the project can be viewed from this module. To expand a single module, click the arrow located to the left of the module name. To view all modules, click the Expand All hot link to show all data fields and information entered.

Page 66: MIP Workbench: Revisions FEMA Learning Management System TASK LEAD ROLE MODULE

MIP Revisions Task Lead Role FunctionalityResolve Appeals or Protest: Complete Task

MIP Revisions Task Lead Role FunctionalityResolve Appeals or Protest: Complete Task

Complete Task:

A brief reminder message will be displayed reminding that once the Complete Task button is clicked, the Task Lead will no longer be able to work in this activity and the project will then progress to the next step in the workflow.

Once Complete Task is clicked a brief message will be displayed stating that the task (activity) has been completed. The project has now moved to the next step in the workflow. Click the expand window button to return to the Work Items List.

Click here to expand Task Lead’s Work

Item List

Page 67: MIP Workbench: Revisions FEMA Learning Management System TASK LEAD ROLE MODULE

The Work Item List will display all projects associated with the Task Lead’s role, geography, and organization. If another user has the same role, geography, and organization, then both users will see the same projects on their Work Item List. To claim a project, click the green Claim button. Once a project is claimed it will no longer appear on other user’s Work Items Lists. Once a project is claimed the Item Name will activate into a hot link which the user can click to launch the activity.

j

Click the hot link to launch the activity

MIP Revisions Task Lead Role FunctionalityDistribute Final BFE Determination: Claim an Activity

MIP Revisions Task Lead Role FunctionalityDistribute Final BFE Determination: Claim an Activity

Page 68: MIP Workbench: Revisions FEMA Learning Management System TASK LEAD ROLE MODULE

MIP Revisions Task Lead Role FunctionalityDistribute Final BFE Determination Letter

MIP Revisions Task Lead Role FunctionalityDistribute Final BFE Determination Letter

Distribute Final BFE Determination Letter:

The Task Lead should enter the date of the 116 letter once it has been mailed. Any comments can be added in the Comments field.

Within Distribute Final BFE Determination a Content Manager upload portlet will appear. Revision user’s do not use the Citrix Web Interface and can ignore this portion of the screen. This portlet can also be accessed outside of the workflow through the Tools & Links tab.

Page 69: MIP Workbench: Revisions FEMA Learning Management System TASK LEAD ROLE MODULE

MIP Revisions Task Lead Role FunctionalityDistribute Final BFE Determination Letter: Review Data

MIP Revisions Task Lead Role FunctionalityDistribute Final BFE Determination Letter: Review Data

Review Data Module:

All information associated with the project can be viewed from this module. To expand a single module, click the arrow located to the left of the module name. To view all modules, click the Expand All hot link to show all data fields and information entered.

Page 70: MIP Workbench: Revisions FEMA Learning Management System TASK LEAD ROLE MODULE

MIP Revisions Task Lead Role FunctionalityDistribute Final BFE Determination Letter: Complete TaskMIP Revisions Task Lead Role FunctionalityDistribute Final BFE Determination Letter: Complete Task

Complete Task:

A brief reminder message will be displayed reminding that once the Complete Task button is clicked, the Task Lead will no longer be able to work in this activity and the project will then progress to the next step in the workflow.

Once Complete Task is clicked a brief message will be displayed stating that the task (activity) has been completed. The project has now moved to the next step in the workflow. Click the expand window button to return to the Work Items List.

Click here to expand Task Lead’s Work

Item List