mncs 091113 alu

25
EFFECTIVE DEPLOYMENT OF MULTI OPERATOR IN BUILDING SYSTEMS MNCS ® MOBILE NETWORK COMBINING SYSTEM WOLFGANG RICHTER SENIOR SALES MANAGER [email protected] SPINNER GMBH • MUNICH • GERMANY WWW.SPINNER.DE

Upload: frank-woods

Post on 29-Nov-2014

1.036 views

Category:

Technology


3 download

DESCRIPTION

 

TRANSCRIPT

Page 1: Mncs 091113 Alu

EFFECTIVE DEPLOYMENT OF MULTI OPERATOR IN BUILDING SYSTEMS

MNCS®

MOBILE NETWORK COMBINING SYSTEM

WOLFGANG RICHTER

SENIOR SALES MANAGER

[email protected]

SPINNER GMBH • MUNICH • GERMANY

WWW.SPINNER.DE

Page 2: Mncs 091113 Alu

Mobile Network Combining System

Multi-Operator –Multi- Band In-Building Coverage

09.04.23 2

OPERATORNo. 1

GSM 900

OPERATORNo. 2

GSM 900

OPERATORNo. 1

DCS 1800

OPERATORNo. 2

DCS 1800

OPERATORNo. 1

W-CDMA

OPERATORNo 1

LTE 2,7

OPERATORNo.1

TETRA 450OPERATOR

No. nGSM 900

OPERATORNo. n

DCS 1800

OPERATORNo. 1

W-CDMA

OPERATORNo. 2

W-CDMA

OPERATORNo. n

W-CDMA

OPERATORDVB-H 700

OPERATORNo. 1

DMB 1400

330 MHz

2700 MHz

6 dB 6 dB 6 dB 6 dB

Splitter

4,8dB

4,8dB

4,8dB

Sp litter

3 3 dB dB

Splitter

Splitter 1:10 10 0,4 dB dB

Radiating Cable

Splitter 1:5 1 7 dB dB

Splitter 1:3 1,8 4,8 dB dB

3 3 dB dBSplitter

TETR

AD

VB-H

GSM

900

DM

B (L

-Ban

d)

GSM

1800

UM

TSW

-LAN

LTE

2.6

(WiM

AX)

WiM

AX

MNCS® - Frequency coverage

Dig

ital D

ivid

end

Page 3: Mncs 091113 Alu

SPINNER MNCS

Passiv POI’s vs. Repeater – trends and arguments

04/09/23 3

smaller cells,

improved capacity management

less demand of wide-spread capacity via fiber

cost saving policy

no monitoring; no software upgrade

no additional acclimatisation

no power consumption for active technology

infrastructure sharing for cost saving

small decentralized operation rooms are feasible

flexible and future-proofed systems required

easy upgrade and expansions

• All passive DAS;

• Hybrid-systems (passive and active components) and

• All active systems (Repeaters)

…are applicable solutions for In-Building Coverage Systems

Some arguments “pro” all passive systems

Changing subscriber behavior flat rates more data transfer low prices per minute/call/Kbid

Changing Operator requirements low Operational Expenses green technology (power consumption) technology-sharing with competitors

Changing technology BTS/NodeB price drops dramatically BTS/NodeB size shrinks new frequency allocations (LTE etc.)

Page 4: Mncs 091113 Alu

Mobile Network Combining System

Combiner for DAS – Operator‘s requirements

04/09/23 4

19“ modular compact design

wide band compatibility

low PIM (very important <-155dBc)

high signal isolation (Filter solution)

low insertion losses (Filter solution)

short downtime for installation

high reliability

factory mounted and tested (test report attached)

cost saving (CAPEX and OPEX)

no monitoring, no software-upgrade, no power-consumption

Page 5: Mncs 091113 Alu

Mobile Network Combining System

Why „modular combiners“

04/09/23 5

Combiner are “living beings” – they are growing(Tetra->G900-> G1800-> UMTS-> LTE-> digital dividend-> more sectors etc..etc… )

wall mounted “cable-spaghetti” creates problems in the long run unreliable combiners distress customers short downtime while installation and upgrade makes customers happy trust in “guaranteed future” generates high customer loyalty

Page 6: Mncs 091113 Alu

Mobile Network Combining System

MNCS Modules - examples-

04/09/23 6

BN573302 (2RU)

G900 + G1800 -> common1G900 + G1800 -> common2

BN573405 (5RU)

10 dB coupler moduleFor Fiber-optical repeater extension(Dig. Divid/ G900/G18/UMTS/ W-LAN/LTE2.6)

BN573324 (3RU)

G900+G1800+UMTS-> common1G900+G1800+UMTS-> common2

BN573455 (5RU)

3 x UMTS -> common1 3 x UMTS -> common2

Frequencies t.b.d.

BN573329 (3RU)

4 x 700…2700 -> 4 common ports(Dig. Divid/ G900/G18/UMTS/ W-LAN/LTE2.6)

BN573359 (5RU)1 x G900 +1 x G1800+3 x UMTS -> common PortFrequencies t.b.d.

BN573338 (3RU)2 x 700…2700 -> common 1(3dB)2 x 700…2700 -> common 1(3dB)(Dig. Divid/ G900/G18/UMTS/ W-LAN/LTE2.6)

BN570450 (5RU)2 x G900 +2 x G1800+2 x UMTS -> common Port+ test-port

BN573330 (3RU)Powersplitter-ModuleWideband(Dig. Divid/ G900/G18/UMTS/ W-LAN/LTE2.6)

BN573450 (5RU)2 x G900 +2 x G1800+4 x UMTS -> 2 x common Port+ test-portFrequencies t.b.d.

Page 7: Mncs 091113 Alu

04/09/23 7

23 HE

●MNCS-cabinet

4 x GSM 1800- Operator

mmO21710.1-1715.91805.1-1810.0

Vodafone1715.9-1721.71810.9-1816.7

T-Mobile1721.7-1751.71816.7-1846.7

Orange1751.7-1781.71846.7-1876,7

● Rack-ports

Vodafone880-914925-960

mmO2880-914925-960

+ 2 x GSM 900- Operator

Multiplexer 2x1/1 B0349X

1710-1880

Multiplexer 2x1/1 B0349X

1710-1880

Coupler3 dB

573166─ ─X─ ─↔

BN573462

1

4

6

3

10

97

5

2

8

573462

Module: ● Multiplexer GSM1800

H3G1920-1934.9

2110.3-2124.9

mmO21934.9-1944.92124.9-2134.9

T-Mobile1959.7-1969.72149.7-2159.7

Vodafone1944.9-1959.72134.9-2149.7

Orange1969.7-1979.72159.7-2169.7

+ 5 x UMTS- Operator

Diplexer UMTS – GSM1800

BN573430

7

1

2

6

5

4

8

Multiplexer 1900-2200

B03609

Multiplexer 1900-2200

B0357X

573430

BN573334

1

3

6

7

8

4

Diplexer

B02514

Diplexer

B02514

573334

● Module: Multiplexer UMTS

Common output

● cable-set

BN573324

1

2

5

3

6

7

8

4

Triplexer

B02513

Triplexer

B02513

573324 ● Module: Triplexer

● Load

Modular assembly system - how it works

Connecting cables

● → Antennas

→ BTS

MNCS combining rack – extension on demand

Upgrade within minutes!

Implementation of MNCS®

Page 8: Mncs 091113 Alu

Implementation of MNCS®

Markets and Applications

04/09/23 8

Office Buildings: Almost all Facilities of the new German Government in Berlin• House of German President,House of German Chancellor• Ministries of .. Education, Agriculture, Justice, Labor etc. • Thailand: Government Complex of His Majesty The King..” • UK “ Medow Hall”• Singapore “Supreme Court” • Sweden: Headquarter Telia Stockholm

Exhibition Grounds • Germany: Düsseldorf Fair; Cologne Fair; BMW Event Center Munich• Switzerland: Palexpo Geneva

Airports• Austria: Airport Vienna”• Germany: Airports Frankfurt; Hamburg, Düsseldorf, Dresden etc.• UK: Airpurt Luton• Singapore: Airport Shangi

Malls• Bavaria/Germany: Arcade Munich• Germany: Gesundbunnen Center Berlin; Europa Center Hamburg• City Palace Duisburg etc.• Singapore: Paragon Centre• Indonesian: Mall Jakarta; Medan Commercial Centre

Undergrounds• France: Metro Paris• Germany: U-Bahn (Metro) Cologne; Station “Bahnhof Zoo” Berlin • Austria: Linzer Verkehrsbetriebe”, City-Tunnel Vienna• Sweden Södertunnel Stockholm

Hotels• Germany Adlon Berlin, Four Seasons Berlin, Estrel Berlin

Playgrounds• Olympic Stadium Berlin (Final-Playground World cup 2006)• Stadium Hamburg; Stadium Hannover• Stadium Mönchengladbach etc.

Application areas for Multi-Operator – Multi Band – High Power POI’s

Page 9: Mncs 091113 Alu

Implementation of MNCS®

Driving forces for POI design

04/09/23 9

POI- design

costs

space-limitations

installation time

technical performance

low insertion loss

operational expenses

complexity of frequency situation

likeliness of alterations

power-consumption

Page 10: Mncs 091113 Alu

Implementation of MNCS®

04/09/23 10

Decision Matrix for appropriate combiner solutions

technical focused flexibility focused installation/space focused

high

medium

low

•no. of operators / networks•transmission capacity demand•complexity of frequency-plan•output-power of BTS/NodeB•signal-isolation-requirements•demand of low insertion loss•intermodulation performance (PIM)

•no. of operators / networks•complexity of operator’s strategy•likeliness of freq.-plan changes•likeliness of new freq.-allocations (LTE, digital dividend, DVB-H, Tetra etc.)

•immaturity of networks•long term customer loyality

•no. of operators / networks•no. of sectors•limitation of installation space•demand for low installation-time•degree of protection•comprehensive test report required (IL,Iso, PIM)

full-filter-intraband and interband-combiner

filter-for interband-combination

hybride-coupler combiner

full-modular-standardplug-and-play-system

factory mounted custom-tailored

installation plates extension by

additional plates

custom-tailored on-site installation

no extensions

factory-mounted combiner cabinet/rack

indoor or outdoor (ready for connection)

factory mounted combiner plate (wall mounted)

on-site-installation of components(on wall or on frame)

Page 11: Mncs 091113 Alu

Implementation of MNCS®

Example: Europa Centre Hamburg

04/09/23 11

- Huge mall in Centre of Hamburg

-110 shop`s on 5 floors

- 60.000 sqm

- All passive network 80 antennas

technical focus:„high“•low Iosses required

flexibility focus: "high”•12 networks involved

•extensions and changes likely

installation:„high“•no of sectors

•soace limitations

Page 12: Mncs 091113 Alu

Implementation of MNCS®

Example: Switzerland PALEXPO Area Geneva

04/09/23 12

- UMTS Extension for Exhibition Area

- 3 Operators involved

technical focus:„high“•low Iosses required

flexibility focus: “medium”•fixed installation

•no space for extensions

installation:„medium“•reuse of existing racks

•custom tailored modules

existing Customer- designed cabinet and rack

Page 13: Mncs 091113 Alu

Implementation of MNCS®

Example: Football-Stadium AWD Arena Hannover

04/09/23 13

▫ Build/reconstructed: 1951 / 2003-2004

▫ capacity: ca. 50.000 spectator

49.000 roofed; 1250 Business-seats;

29 VIP-Loges; 96 media-seats

11.000 sqm ETFE –roof

(Ethylen-Tetrafluorethylen)

▫ FIFA World-Cup-Stadium 2006

▫ IOC design award (bronze medal)

http://www.awd-arena.de

Page 14: Mncs 091113 Alu

Implementation of MNCS®

Example: Football-Stadium AWD Arena Hannover

04/09/23 14

Operation Room east

2 Operation Rooms

2 Racks per room

8 common antenna-

sectors

Rack 1 - 4

4 UMTS-Operator

(28 sectors)

4 GSM1800- Operators

(24 sectors)

2 GSM900-Operators

(8 sectors)

16 Common Antenna-Ports

(varying combinations)

Operation Room west

technical focus:„high“•low Iosses required

•excellent PIM-characteristic

flexibility focus: "high”•ca. 40 BTS/NodeB

•extensions and changes likely

installation:„high“•no of sectors

•soace limitations

Page 15: Mncs 091113 Alu

Implementation of MNCS®

Paris Underground (Metro)

04/09/23 15

custom-tailored combiner board

Input 1GSM1800

Input 2GSM1800

Input 1GSM900

Output

BN 573261870-2170 MHz

50w Max

Input 2GSM900

Input 3GSM1800

technical focus:„low“•only 2G-networks

•simple frequency plan

flexibility focus: “medium”•extensions unlikely•no of networks low

installation: " medium”•extreme space limitations •standard solution required

Page 16: Mncs 091113 Alu

Implementation of MNCS®

Example: Airport Hamburg

04/09/23 16

▪ Situated: about 8 Km north of Hamburg

▪ Airport area: 5.700.000 sqm

▪ Capacity: 16 Mio. passengers

▪ Number of airlines: 65

▪ Number of check-in-counters: 120

▪ Flight movements: 173.000

170 m 1 ¼“ cableDeparture Hall (counter 1)Departure Hall (counter 2)Luggage claim (left ) Luggage claim (right )

basement supply (freight zone)Arrival Hall (pick up left)Arrival Hall (pick up right)

Pier north; gate C4/5

135 m 1 ¼“ cable

85 m 1 ¼“ cable

170 m 1 ¼“ cable

325 m 1 ¼“ cable

145 m 1 ¼“ cable

127 m 1 ¼“ cable

127 m 1 ¼“ cable

8 Trunk Feeder Cables

technical focus:„high“•low Iosses required

•high complexity

flexibility focus: “high”•diverse operator strategy

•extensions and changes likely

installation:„high“•high no of sectors •space limitations

full passive system – Operators decision: “Repeaters are too expensive”

Page 17: Mncs 091113 Alu

Implementation of MNCS®

Example: Airport Hamburg

04/09/23 17

▪ 3 x Racks 19”- 2200 mm

▪ UMTS: 4 Operators 20 Sectors

▪ G1800:3 Operators 12 Sectors

▪ G 900: 2 Operators 8 Sectors

▪ Antenna lines: 8

▪ (varying combinations)

▪ Cables Top of Cabinet: 90

▪ engaged components:

▫ broad-band coupler: 24

▫ Dual-Band-Combiner: 4

▫ Triple-Band combiner: 7

▫ Powersplitter: 10

▫ Testcoupler: 8

▫ Filter-Intra-Band-Combiner: 15

Page 18: Mncs 091113 Alu

Implementation of MNCS®

Example: spaghetti-sites

04/09/23 18

Anywhere in Germany

technical focus:„low“•it works

flexibility focus: “low”•never try to touch the system

installation:„low“•waste of space

•debugging hopelessly

Anywhere in France

It always starts with two simle 3 – dB – couplers….

Page 19: Mncs 091113 Alu

Implementation of MNCS®

Example: O2 World Berlin

04/09/23 19

▫O2-World – Big Multifunction-Arena in Berlin

▫Size: 160 m x 130 m x 35 m

▫cubic content ca. 500.000 m³

▫Total Area: 60.000 m2

▫17.000 seats

▫ Stage area: 288 m2

▫ Ice- hockey field: 60 m x 30 m8

▫Opening: 10.10.2008

Implementation of MNCS®

technical focus:„high“•low Iosses required

•high complexity

flexibility focus: “high”•GSM-E and LTE-upgrade

•extensions and changes likely

installation:„high“•high no of sectors •space limitations

Page 20: Mncs 091113 Alu

Implementation of MNCS®

Example: O2 World Berlin

04/09/23 20

▫ 3 common sectors,

▫ 3 Operators

▫ GSM900, GSM1800, UMTS

▫ Test ports

▫ Filter-Multiplexer for

3 NODEB-Signals to 1 common port

▫ two upgrades „plug and play“

in the phase of first implementation

3-sector combiner-rack

NodeB‘s and BTS

Price of competing Repeater-System (ca. 1.9 Mio €)

is about 10 x higher than Passive combiner and passive DAS

Page 21: Mncs 091113 Alu

Implementation of MNCS®

Example: Cunning Road Tunnel Singapore

04/09/23 21

technical focus:„medium“•Filer-coupler combination

flexibility focus: “low”•custome-tailored plate•no extensions required

installation:„medium“•factory mounted plates

•on site installation in cabinets

It always starts with two simle 3 – dB – couplers….

Page 22: Mncs 091113 Alu

Implementation of MNCS®

Example: VF Qatar-Project

04/09/23 22

scalable rack – size

405 …2200 mm

technical focus: "high”•low losses required

•high signal isolation requ.

flexibility focus: “high”•unit – assembly system for different situations on site

installation:„high“•short installation time

Page 23: Mncs 091113 Alu

Indoor cabinet

Implementation of MNCS®

Example: Singapore

04/09/23 23

Outdoor cabinet

Indoor cabinet

Paragon 2 Shopping Center

More than 100 Projects in Singapore

managing complex frequency situation

(mixed frequency plan)

technical focus:„high“•very complex frequency plan•high signal isolation required

flexibility focus: “medium”•approved configuration•no changes expected

installation:„high“•outdoor

•unlocked operation room

Page 24: Mncs 091113 Alu

SPINNER MNCS

MNCS passive combiner Features

04/09/23 24

factory designed and factory mounted guaranteed technical performance high MTBF test report on CD-ROM

19” modular system upgradeable/expandable wide band compatible

filter-based intra-band and inter-band combiner elimination of “blocking” and “spurious emissions” very low insertion losses, low PIM, high power rating

no power-consumption no software-upgrades no maintenance, no monitoring required

high reliability

high flexibility

excellent performance

cost saving

Page 25: Mncs 091113 Alu

SPINNER SETS STANDARDS SPINNER SETS STANDARDS IN RF TECHNOLOGYIN RF TECHNOLOGY

WWW.SPINNER.DE