mod2 rnp ar apch basics

23
Welcome! RNP AR APCH Introduction to PBN Nagayaindran Module 2 – RNP AR APCH Basics

Upload: hasry3489

Post on 11-Nov-2015

66 views

Category:

Documents


1 download

DESCRIPTION

RNP AR Approach

TRANSCRIPT

  • Welcome!

    RNP AR APCH

    Introduction to PBN Nagayaindran

    Module 2 RNP AR APCH Basics

  • GE Proprietary Information

    The information contained in this document is the proprietary information of GE and Naverus, Inc. and was

    prepared in English to be used in English. Any translation into a different language remains GE Proprietary

    but as it has not be reviewed or approved by Naverus, it is therefore not endorsed by Naverus or GE.

    Naverus has prepared this information in English in good faith solely for use by Airasia with regard to RNP

    Navigation Charts, training material, engineering reports, etc. and as such, it may not be used by any other

    entity or for any other purpose without Naverus consent. NO WARRANTY, EXPRESS OR IMPLIED, IS GIVEN

    NOR IS FREEDOM FROM INTELLECTUAL PROPERTY INFRINGEMENT TO BE INFERRED. Because conditions of

    use and applicable laws may differ and may change with time, Airasia and any other authorized user is

    responsible for determining whether the translated from English information in this document is appropriate

    for their use and for ensuring that their processes and practices are in compliance with applicable laws and

    other governmental enactments. As Naverus did not prepare the translation, neither GE nor Naverus assume

    any obligation or liability for the information contained in this document or how it is used, except to the

    extent expressly covered by contract.

    GE Proprietary Information: Use or disclosure of data contained on this sheet is

    subject to the restrictions on page two.

  • Overview

    Introduction to PBN Nagayaindran

    1. Introduction to Required Navigation Performance (RNP) AR APCH

    RNP AR Video

    2.Why RNP AR?

    - Operator & ATC Benefits

    3. Global Applications of RNP AR APCH Procedures

    4. Malaysia RNP AR APCH Program

  • Module objectives

    Introduction to PBN Nagayaindran

    1. Understand what is RNP AR APCH.

    2. Understand the benefits RNP AR APCH.

    3. Understand the global applications.

    4. Understand Malaysian deployment plan.

  • RNP-AR APCH

    Introduction to PBN Nagayaindran

    Approach Procedure

    Lateral Guidance

    Vertical Guidance

    GNSS based navigation

    Non-precision

    Approach Procedure

    Lateral Guidance

    Vertical Guidance

    Ground Based

    Precision/Non-precision

    vs ILS

  • Module One

    Program Overview

    Kelowna (CYLW), Canada

    WJA CYLW RW34 154 Lateral Flight Tracks

    WJA CYLW RW34 154 Vertical Flight Tracks

    GE Proprietary Information: Use or disclosure of data contained on this sheet is subject to the restrictions on page two.

  • Module One

    Program Overview

    Kelowna (CYLW), Canada

    WJA CYLW RW34 154 Lateral Flight Tracks

    WJA CYLW RW34 154 Vertical Flight Tracks

    GE Proprietary Information: Use or disclosure of data contained on this sheet is subject to the restrictions on page two.

  • Module One

    Program Overview

    Why?

    RNP AR

    Vertical Guidance

    Reduce CFIT Risk

    Runway aligned approaches (LNAV only) are some 25 X safer than circling approaches

    Addition of Vertical guidance increases the safety margin again by some 8 times.

    Instances of unstable Approaches

    Temperature Compensated paths

    Wind aligned operations

    SAFETY

  • Module One

    Program Overview

    RNP AR

    Reduced DA/MDH

    As low as 250 Reduce MAPs, Diversions,

    Cancellations

    No dependency on ground based Navaids

    Continuity of service

    Natural disaster

    Accidents

    Power supply

    ACCESS

    Why?

  • Module One

    Program Overview

    RNP AR

    Increase Payloads off of restricted runways

    Maximize de-rate / reduced thrust opportunities

    CAPACITY

    GE Proprietary Information: Use or disclosure of data contained on this sheet is subject to the restrictions on page two.

    Why?

  • Module One

    Program Overview

    RNP AR

    Reduced lateral track miles flown

    Reduce fuel and time

    Crew costs

    Fleet Utilization

    Optimum Profile Descent

    Reduce fuel and time

    Reduce block time variance

    ECONOMICS

    GE Proprietary Information: Use or disclosure of data contained on this sheet is subject to the restrictions on page two.

    Why?

  • Module One

    Program Overview

    RNP AR

    Community Noise Concerns

    Flexible Paths

    Idle Descent

    Emissions Reduction

    Reduced track miles / Provide CDA

    Reduce fuel burn

    1:3.15

    ENVIRONMENT

    GE Proprietary Information: Use or disclosure of data contained on this sheet is subject to the restrictions on page two.

    Why?

  • Module One

    Program Overview

    Global Applications of RNP AR

    APCH Procedures Canada

    US 99 Airports/300 approaches Peru -

    Malaysia -15 Airports 40 45 Approaches

    China Australia

    Tibet UAE

    Japan Honduras

    Deployment

  • Module One

    Program Overview

    Kelowna (CYLW), Canada

    Challenges

    Mountainous Terrain

    Runway 34 Visual operations only

    Mins. = 1379 (MDH) & 3 SM

    Highest rate of Missed, diverts, and cancellations in the WestJet network.

    Highest rate of Unstable Approaches

    Worst airport for On-Time-Performance (OTP)

    Leaving weight behind on the runway

    GE Proprietary Information: Use or disclosure of data contained on this sheet is subject to the restrictions on page two.

  • Module One

    Program Overview

    Kelowna (CYLW), Canada

    Mitigation with RNP AR

    Approach Procedures RW34 MDH = 340

    (reduced by 1,072)

    Continuous Descent Operations from cruise

    Track mileage reduction:

    RW16 = 11 nm

    RW34 = 24-34 nm

    Schedule Variance reduction

    Departure Procedures MTOW in all conditions

    GE Proprietary Information: Use or disclosure of data contained on this sheet is subject to the restrictions on page two.

  • Module One

    Program Overview

    Kelowna (CYLW), Canada

    WJA CYLW RW34 154 Lateral Flight Tracks

    WJA CYLW RW34 154 Vertical Flight Tracks

    GE Proprietary Information: Use or disclosure of data contained on this sheet is subject to the restrictions on page two.

  • Module One

    Program Overview

    Kelowna (CYLW), Canada

    WJA CYLW RW34 169 Lateral Flight Tracks

    WJA CYLW RW34 169 Vertical Flight Tracks

    GE Proprietary Information: Use or disclosure of data contained on this sheet is subject to the restrictions on page two.

  • Module One

    Program Overview

    Mitigation with RNP AR Greener Skies Initiative Alaska Airlines, Boeing, and the Port of

    Seattle collaborate to deploy short gates into KSEA

    Noise Impact (65 Db) Longest Vectored Track - As Proposed

    by FAA ( Red Track) = 326,000

    Existing Vectored Track (Orange Track) = 239,000

    Shortest Track Proposed RNP/CDA (Yellow Track) =52,000

    Annual Benefit Time = 4800 Hours Fuel Burn = 2.9 M Gallons ($4.35M) CO2 Emissions = 30,500 Metric Tons

    Seattle (KSEA), USA

    GE Proprietary Information: Use or disclosure of data contained on this sheet is subject to the restrictions on page two.

  • Module One

    Program Overview

    Introduction to Required Navigation

    Performance (RNP)

    Video

    Queenstown, New Zealand

    GE Proprietary Information: Use or disclosure of data contained on this sheet is subject to the restrictions on page two.

  • Module One

    Program Overview

    10 NM 3.3 Minutes 114 Kg Fuel 385 Kg CO2 $234 *Per Approach

    AirAsia

    GE Proprietary Information: Use or disclosure of data contained on this sheet is subject to the restrictions on page two.

  • Module One

    Program Overview

    Deployment Scope

    SBJV Concept RNP Approaches RW33

    Up to 15 Airports

    Conversion to a public network

    WMKP

    WBGG

    WMKJ

    WBGR

    WMKN

    WBKL

    WBGS

    GE Proprietary Information: Use or disclosure of data contained on this sheet is subject to the restrictions on page two.

    Maintenance

    RNP Forecasts Navigation Data Validation NOTAM Monitoring

  • Malaysia Airlines

    Introduction to PBN Nagayaindran

    1. Penang

    2. Kuching

    3. Kota Kinabalu

    3. Kathmandu

    KLIA Deployment is by DCA/ENAV.

  • Introduction to PBN Nagayaindran